7

Appendix B: EAP CVs › OurCompany › SustainableDevelopment... · M01.JNB.000003 . Environmental and Social Impact Study (ESIA) for Envelor Lda in Mozambique, Mozambique > 2011

Jun 27, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Appendix B: EAP CVs › OurCompany › SustainableDevelopment... · M01.JNB.000003 . Environmental and Social Impact Study (ESIA) for Envelor Lda in Mozambique, Mozambique > 2011

Appendix B: EAP CVs

Page 2: Appendix B: EAP CVs › OurCompany › SustainableDevelopment... · M01.JNB.000003 . Environmental and Social Impact Study (ESIA) for Envelor Lda in Mozambique, Mozambique > 2011

Curriculum Vitae

Malcolm Roods Sector Area Manager Transport, Aviation and Planning T: +27117986000 F: +27117986005 Email: [email protected]

Malcolm who specialises in environmental impact assessments (EIAs) for electricity supply (generation, transmission and distribution), road infrastructure, residential developments as well as water management projects. This, together with Malcolm’s broad government background, makes him particularly flexible. His experience includes 6 years in public service where his tasks included policy development, environmental law reform and EIA reviews. He also has significant experience in environmental consulting – notably in the fields of impact assessments and authorisation applications - with specific focus on legislative requirements and business management. Since joining the Company, he has been involved with major EIA projects such as the Transnet New Multi Product Pipeline (NMPP), various Rand Water pipeline projects, numerous Eskom research, generation, transmission and distribution projects. Malcolm also did independent reviews of the EIA process for, amongst others, the national Department of Environmental Affairs.

Nationality South African Years of Experience 13 year(s) Years with Royal HaskoningDHV 6 year(s) Professional memberships Institute of Waste Management of South Africa Environmental Assessment Practitioners of SA Qualifications 1997 NHD HED College of Education, Potchesfroom

University, South Africa 1999 BA Public and Private Sector, North West University,

Potchefstroom, South Africa 2000 BA (Hons) Geography and Environmental Management,

North West University, Potchefstroom, South Africa

Page 3: Appendix B: EAP CVs › OurCompany › SustainableDevelopment... · M01.JNB.000003 . Environmental and Social Impact Study (ESIA) for Envelor Lda in Mozambique, Mozambique > 2011

Professional experience Environmental Impact Assessment (EIA) and Waste Management Licence for the Matimba Ash Disposal Facility, South Africa > 2012 > Eskom Holdings SOC Limited > Project Value: R3,430,630.00 Environmental Impact Assessment and waste management license for Matimba ash disposal facility. Position: Project Manager ■ Project support and Client Liaison. ■ Certification practitioner E02.JNB.001222

Environmental Assessment Services and Water Use Licence Application for the Proposed BRT Line 1, South Africa > 2012 > A-M Consulting Engineers (Pty) Ltd > Project Value: R551,250.00 Appointment for conducting all the General Environmental Assessment Services and Public Participation Process work related to the managing the process in obtaining the required environmental authorisation and Water Use Licence for the relevant authorities, for the proposed BRT Line. Position: Project Principal ■ Reviewer and overall quality controlling of the project

deliverables. E02.JNB.001167

Technical Support to GDID: Enhancement of current Technical and Administrative Capacity, South Africa > 2012 > Gauteng Department of Infrastructure Development > Project Value: R19,918,210.40 SSI (in association with Messrs Ernest & Young and Nokuthula Dube & Associates cc) are appointed to provide technical support to enhance current capacity within the GDID to deliver on infrastructure projects. M01.JNB.000003

Environmental and Social Impact Study (ESIA) for Envelor Lda in Mozambique, Mozambique > 2011 > Envalor Lda > Project Value: R2,535,604.48 Appointed to obtain environmental authorisation to develop plantations, generate electricity and produce Ethanol from sugarcane and sweet sorghum, as well as the production of food crops. Position: Project Principal ■ Environmental Management Licence Applications E02.JNB.000900

Environmental Impact Assessment (EIA) for SOLARFICA CSP, South Africa > 2010 > Lereko Metier Capital Growth Fund Manager (Pty) Ltd > Project Value: R777,355.00 Environmental Impact Assessment (EIA) for the proposed solar power plant Position: Project Principal ■ Client consultation ■ Overall management of project team E02.JNB.000674

Environmental Impact Assessment for the Underground Coal Gasification in Amersfoort Area, South Africa > 2008 > Eskom Holdings SOC Limited > Project Value: R3,700,909.01 An Environmental Impact Study and Environmental Management Plan are required as part of the mining rights application and authorisation, for the Underground Coal Gasification (UCG) for Eskom Holdings Position: Project Principal ■ Overall Project Management ■ Overseeing public participation processes E02.JNB.000308

Page 4: Appendix B: EAP CVs › OurCompany › SustainableDevelopment... · M01.JNB.000003 . Environmental and Social Impact Study (ESIA) for Envelor Lda in Mozambique, Mozambique > 2011

Environmental Impact Assessment for the Tarlton to Magalies 132 KV line, South Africa > 2008 > Eskom Holdings SOC Limited > Project Value: R716,975.50 Construction of a new 132KV distribution line from Tarlton Substation to Magalies Substation and new double 132KV line from Magalies to Springfarms Substation Position: Project Principal ■ Quality controller and final reviewer E02.JNB.000343

Environmental Impact Assessment for the Watershed to Sephaku 132 Kv line, South Africa > 2008 > Eskom Holdings SOC Limited > Project Value: R683,470.00 Construction of a new 123KV distribution line from Watershed Substation to new proposed Sephaku Substation Position: Project Manager ■ Overall Project Management and quality control E02.JNB.000342

Environmental Impact Assessment of Vryburg Substation, South Africa > 2008 > Eskom Holdings SOC Limited > Project Value: R1,081,352.00 Undertake a Environmental Impact Assessment of Vryburg Substation. Position: Project Manager and Project Principal ■ Overall Project Management and quality control ■ Quality controller and final reviewer E02.JNB.000234

Majuba Combined Cycle Gas Turbine (CCGT) Power Plant, South Africa > 2008 > Eskom Holdings SOC Limited > Project Value: R413,425.00 Environmental Impact Assessment for the proposed CCGT power plant in the Amersfoort Area, Mpumalanga Project Manager ■ Overall Project Management and quality control E02.JNB.000128

Page 5: Appendix B: EAP CVs › OurCompany › SustainableDevelopment... · M01.JNB.000003 . Environmental and Social Impact Study (ESIA) for Envelor Lda in Mozambique, Mozambique > 2011

Prashika started her career in the environmental

field after spending 5 years working for the

Department of Agriculture: Genetic Resources

Directorate. She currently holds the position of

Principal Associate in Royal HaskoningDHV

2010, she obtained her professional registration as a

Natural Scientist in the field of Environmental

Science.

Prashika has built up an impressive résumé, having

worked on diverse projects mainly in the petro

chemical industry, as well as various large

power generation projects. She has established

good working relationships with key clients and has

undertaken several flagship projects on their behalf,

such as Sasol and Eskom’s Underground Coal

Gasification project.

A hard-working and motivated individual, Prashika

produces work of a high quality based on sound

scientific thinking. She is valued by both clients and

colleagues.

Curriculum VitaePrashika ReddyEnvironmental Scientist

Transport and Planning

T: +271236758973

F: +27123675878

Email: [email protected]

Prashika started her career in the environmental

field after spending 5 years working for the

Department of Agriculture: Genetic Resources

currently holds the position of

in Royal HaskoningDHV. In

professional registration as a

Natural Scientist in the field of Environmental

Prashika has built up an impressive résumé, having

worked on diverse projects mainly in the petro-

chemical industry, as well as various large-scale

projects. She has established

good working relationships with key clients and has

undertaken several flagship projects on their behalf,

such as Sasol and Eskom’s Underground Coal

working and motivated individual, Prashika

duces work of a high quality based on sound

scientific thinking. She is valued by both clients and

Nationality

South African

Years of Experience

13 year(s)

Years with Royal HaskoningDHV

8 year(s)

Professional memberships

SA Council for Natural Scientific Professions, Professional

Natural Scientist, 400133/10

Qualifications

2006 BSc (Hons) Geography (cum laude), University of

Pretoria, South Africa

1999 BSc (Hons) Botany, University of KwaZulu

Africa

1998 BSc Biological Science, University of KwaZulu

South Africa

Curriculum Vitae Reddy

Environmental Scientist

Transport and Planning

[email protected]

Years with Royal HaskoningDHV

Natural Scientific Professions, Professional

BSc (Hons) Geography (cum laude), University of

BSc (Hons) Botany, University of KwaZulu-Natal, South

cience, University of KwaZulu-Natal,

Page 6: Appendix B: EAP CVs › OurCompany › SustainableDevelopment... · M01.JNB.000003 . Environmental and Social Impact Study (ESIA) for Envelor Lda in Mozambique, Mozambique > 2011

Professional experience

T01.PTA.000509

PMU Support to Magalies Water,

> Start Date: 2012

> Client: Magalies Water

> Project Value: R1,000,000,000.00

To provide programme and project management support

to Magalies Water to enhance the implementation of Bulk

Water supply capital projects.

Position: Environmentalist

■ Environmental Support. Environmental management

support to Magalies Water, Management of external

EAPs.

W01.JNB.000613E02.PTA.000401

Centurion Metropolitan Core Master

> Start Date: 2012

> Client: City of Tshwane Metropolitan Municipalit

> Project Value: R4,300,000.00

The City of Tshwane requires a multi

team to assist the Client with the Preparation of a Master

Plan of the Centurion Metropolitan Core Study Area.

Position: Environmentalist

■ Environmental Scientist. Envi

Investigation.

M01.PTA.000195

Environmental Impact Assessment

Management Licence for the Matimba Ash Disposal

Facility, South Africa

> Start Date: 2012

> Client: Eskom Holdings SOC Limited

> Project Value: R3,430,630.00

Environmental Impact Assessment and waste

management license for Matimba ash disposal facility.

Position: Environmentalist

■ EIA Support and licensing application

E02.JNB.001222

Environmental Screening for the

CSP, South Africa

> Start Date: 2012

> Client: Sasol Technology (Pty) Ltd

> Project Value: R185,000.00

Professional experience

Water, South Africa

Project Value: R1,000,000,000.00

To provide programme and project management support

to Magalies Water to enhance the implementation of Bulk

Environmental Support. Environmental management

support to Magalies Water, Management of external

Master Plan, South Africa

Client: City of Tshwane Metropolitan Municipality

The City of Tshwane requires a multi-disciplinary project

team to assist the Client with the Preparation of a Master

Plan of the Centurion Metropolitan Core Study Area.

Environmental Scientist. Environmental Screening

Assessment (EIA) and Waste

Management Licence for the Matimba Ash Disposal

Client: Eskom Holdings SOC Limited

nmental Impact Assessment and waste

management license for Matimba ash disposal facility.

EIA Support and licensing application

Environmental Screening for the Commercial 125MW

Client: Sasol Technology (Pty) Ltd

Environmental Screening Investigation for the proposed

125 MW commercial concentrated Solar Power Plant

located in Upington.

Position: Project Principal

■ Project Management, financial management,

Environmental Scoping Report.

E02.PTA.000377

Cornubia Retail Park - EIA,

> Start Date: 2012

> Client: Tongaat Hulett Developments (Pty) Ltd

> Project Value: R370,120.00

Undertaking the Environmental Impact Assessment (EIA),

full Public Participation Process (PPP), attending client

progress meetings and providing environmental input into

the planning of the proposed Phase 2 Retail Development.

Aim is obtaining environmental authorisation from KZN

DAEA.

Position: Environmentalist

■ Environmental Scientist. Strategic project advice, quality

review and approval of reports.

E02.DUR.000484JNB.001139

Environmental Impact Assessment for the Sasol

Secunda Growth programme 1B Proposed Retrofitting

of Gas Turbines, South Africa

> Start Date: 2011

> Client: Sasol Technology (Pty) Ltd

> Project Value: R302,175.00

Environmental Impact Assessment for the Sasol Secunda

Growth Programme 1B.

Position: Project Manager

■ Project Management and document control; regular

liaison with the client; on-

aspects of the project; input into the Scoping and

Environmental Impact Report (EIR), as well as the

Environmental Management Plan (EMP), assistance

with the Public Participation Process.

E02.PTA.000407

Environmental Screening Investigation for the proposed

125 MW commercial concentrated Solar Power Plant

Project Management, financial management, review of

Environmental Scoping Report.

EIA, South Africa

Client: Tongaat Hulett Developments (Pty) Ltd

Project Value: R370,120.00

Undertaking the Environmental Impact Assessment (EIA),

rticipation Process (PPP), attending client

progress meetings and providing environmental input into

the planning of the proposed Phase 2 Retail Development.

Aim is obtaining environmental authorisation from KZN

tal Scientist. Strategic project advice, quality

review and approval of reports.

Assessment for the Sasol

Secunda Growth programme 1B Proposed Retrofitting

of Gas Turbines, South Africa

Sasol Technology (Pty) Ltd

Project Value: R302,175.00

Environmental Impact Assessment for the Sasol Secunda

Project Management and document control; regular

-going review of progress of all

aspects of the project; input into the Scoping and

Environmental Impact Report (EIR), as well as the

Environmental Management Plan (EMP), assistance

with the Public Participation Process.

Page 7: Appendix B: EAP CVs › OurCompany › SustainableDevelopment... · M01.JNB.000003 . Environmental and Social Impact Study (ESIA) for Envelor Lda in Mozambique, Mozambique > 2011

Environmental and Social Impact

Envelor Lda in Mozambique, Mozambique

> Start Date: 2011

> Client: Envalor Lda

> Project Value: R2,535,604.48

Appointed to obtain environmental authorisation to

develop plantations, generate electricity and produce

Ethanol from sugarcane and sweet sorghum, as well as

the production of food crops.

Position: Project Manager, Project Manager

■ Project Management, Review and compilation of EPDA,

ESIA and EMP

E02.JNB.000900

Waste Management License for the BMW Waste

Facility, South Africa

> Start Date: 2010

> Client: BMW SA (Pty) Ltd

> Project Value: R168,797.00

The Waste License Application for the BMW facility.

Position: Project Manager

■ Project management, client management, authority

consultation, report compilations and internal review of

work.

E02.PTA.000307

Environmental Impact Assessment

SOLARFICA 75MW CSP, South Africa

> Start Date: 2010

> Client: Lereko Metier Capital Growth Fund Manager

(Pty) Ltd

> Project Value: R1,570,030.00

Environmental Impact Assessment (EIA) for the proposed

solar power plant

Position: Environmentalist

■ Compilation of Scoping Report, assistance with quality

review of reports and amendment of Environmental

Authorisations

E02.JNB.000674PTA.00028

Rustenburg Integrated Rapid Public Transport

Network (IRPTN), South Africa

> Start Date: 2009

> Client: Rustenburg Local Municipality

> Project Value: R3,000,000,000.00

Impact Study (ESIA) for

Envelor Lda in Mozambique, Mozambique

Appointed to obtain environmental authorisation to

develop plantations, generate electricity and produce

eet sorghum, as well as

Position: Project Manager, Project Manager

Project Management, Review and compilation of EPDA,

for the BMW Waste

The Waste License Application for the BMW facility.

Project management, client management, authority

consultation, report compilations and internal review of

Assessment (EIA) for the

SOLARFICA 75MW CSP, South Africa

Client: Lereko Metier Capital Growth Fund Manager

Environmental Impact Assessment (EIA) for the proposed

Compilation of Scoping Report, assistance with quality

review of reports and amendment of Environmental

Rapid Public Transport

Client: Rustenburg Local Municipality

Project Value: R3,000,000,000.00

Planning and implementation of the Rustenburg Integrated

Public Transport Network (IRPTN).

Position: Environmentalist

■ Environmental Assessment

T01.PTA.000275E02.JNB.000466

Environmental Impact Assessment for the

Underground Coal Gasification

Amersfoort Area, South Africa

> Start Date: 2008

> Client: Eskom Holdings SOC Limited

> Project Value: R3,700,909.01

Undertaking the Environmental Impact Assessment

process for (EIA, Waste Management License, Water Use

License), for the Underground Coal Gasification (UCG)

project for Eskom Holdings

Position: Project Manager

■ Project Management and quality controlling

E02.JNB.000308E02.PTA.000210

EIA or the Amendment of Mining

Pilot Plant, South Africa

> Start Date: 2008

> Client: Sasol Technology (Pty) Ltd

> Project Value: R404,000.00

Environmental Impact Assessment and Mining

Authorisation for the Underground Coal Gasification Pilot

Project, located in Secunda Mpu

Position: Project Manager

■ Overall Project Management and quality control

E02.PTA.000207E02.JNB.000305

E02.JNB.000147

E02.JNB.000216

I02.PTA.000213

Planning and implementation of the Rustenburg Integrated

Public Transport Network (IRPTN).

Environmental Assessment

0466

Impact Assessment for the

asification Project in the

Amersfoort Area, South Africa

Client: Eskom Holdings SOC Limited

Project Value: R3,700,909.01

Undertaking the Environmental Impact Assessment

for (EIA, Waste Management License, Water Use

License), for the Underground Coal Gasification (UCG)

Project Management and quality controlling

E02.JNB.000308E02.PTA.000210

EIA or the Amendment of Mining Right for the UCG

Client: Sasol Technology (Pty) Ltd

Project Value: R404,000.00

Environmental Impact Assessment and Mining

Authorisation for the Underground Coal Gasification Pilot

Project, located in Secunda Mpumalanga Province.

Overall Project Management and quality control

E02.PTA.000207E02.JNB.000305