Top Banner
APPENDIX A Observations of Suspended Sediment Concentration (TSS) Measured with ADCP
51

APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Feb 04, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

APPENDIX A

Observations of Suspended Sediment Concentration (TSS) Measured with ADCP

Page 2: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-2

This page intentionally left blank

Page 3: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-3

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

TSS

Con

c (m

g/L)

01020304050

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

Dep

th(m

)

Distance (m)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

Transect A

Transect B

Transect C

Transect D

Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC. Presented are vertical slices of turbidity measured with ADCP along each vessel

transect. The approximate location of the channel boundaries are shown as dashed lines.

Dep

th(m

)

-250 -200 -150 -100 -50 0 50 100 150 200 250

05

1015

TSS

Con

c (m

g/L)

01020304050

Dep

th(m

)

-250 -200 -150 -100 -50 0 50 100 150 200 250

05

1015

Dep

th(m

)

-250 -200 -150 -100 -50 0 50 100 150 200 250

05

1015

Dep

th(m

)

-250 -200 -150 -100 -50 0 50 100 150 200 250

05

1015

Dep

th(m

)

-250 -200 -150 -100 -50 0 50 100 150 200 250

05

1015

Dep

th(m

)

Distance (m)

-250 -200 -150 -100 -50 0 50 100 150 200 250

05

1015

Transect A

Transect B

Transect C

Transect D

Transect E

Transect F

Figure A-2. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Max Ebb in the Northern MSC. Presented are vertical slices of turbidity measured with ADCP along each vessel

transect. The approximate location of the channel boundaries are shown as dashed lines.

Page 4: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-4

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

TSS

Con

c (m

g/L)

01020304050

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

Dep

th(m

)

Distance (m)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

Transect A

Transect B

Transect C

Transect D

Transect E

Figure A-3. Suspended Sediment Concentration (TSS) Measured with ADCP during First Low Slack in the Northern MSC. Presented are vertical slices of turbidity measured with ADCP along each vessel

transect. The approximate location of the channel boundaries are shown as dashed lines.

Dep

th(m

)

-200 -100 0 100 200 300

05

1015

TSS

Con

c (m

g/L)

01020304050

Dep

th(m

)

-200 -100 0 100 200 300

05

1015

Dep

th(m

)

-200 -100 0 100 200 300

05

1015

Dep

th(m

)

Distance (m)

-200 -100 0 100 200 300

05

1015

Transect A

Transect B

Transect C

Transect D

Figure A-4. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Low Slack in the Northern MSC. Presented are vertical slices of turbidity measured with ADCP along each

vessel transect. The approximate location of the channel boundaries are shown as dashed lines.

Page 5: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-5

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300

05

1015

TSS

Con

c (m

g/L)

01020304050

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300

05

1015

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300

05

1015

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300

05

1015

Dep

th(m

)

Distance (m)

-200 -150 -100 -50 0 50 100 150 200 250 300

05

1015

Transect A

Transect B

Transect C

Transect D

Transect E

Figure A-5. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Flood in the Northern MSC. Presented are vertical slices of turbidity measured with ADCP along each vessel

transect. The approximate location of the channel boundaries are shown as dashed lines.

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

TSS

Con

c (m

g/L

01020304050

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

Dep

th(m

)

Distance (m)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

Transect A

Transect B

Transect C

Transect D

Transect E

Transect F

Figure A-6. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Max Flood in the Northern MSC. Presented are vertical slices of turbidity measured with ADCP along each

vessel transect. The approximate location of the channel boundaries are shown as dashed lines.

Page 6: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-6

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

TSS

Con

c (m

g/L)

01020304050

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

Dep

th(m

)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

Dep

th(m

)

Distance (m)

-200 -150 -100 -50 0 50 100 150 200 250 300 350

05

1015

Transect A

Transect B

Transect C

Transect D

Figure A-7. Suspended Sediment Concentration (TSS) Measured with ADCP during First High Slack

in the Northern MSC. Presented are vertical slices of turbidity measured with ADCP along each vessel transect. The approximate location of the channel boundaries are shown as dashed lines.

Dep

th(m

)

-250 -200 -150 -100 -50 0 50 100 150 200 250 300

05

1015

TSS

Con

c (m

g/L)

01020304050

Dep

th(m

)

-250 -200 -150 -100 -50 0 50 100 150 200 250 300

05

1015

Dep

th(m

)

-250 -200 -150 -100 -50 0 50 100 150 200 250 300

05

1015

Dep

th(m

)

-250 -200 -150 -100 -50 0 50 100 150 200 250 300

05

1015

Dep

th(m

)

Distance (m)

-250 -200 -150 -100 -50 0 50 100 150 200 250 300

05

1015

Transect A

Transect B

Transect C

Transect D

Transect E

Figure A-8. Suspended Sediment Concentration (TSS) Measured with ADCP during Second High Slack in the Northern MSC. Presented are vertical slices of turbidity measured with ADCP along each

vessel transect. The approximate location of the channel boundaries are shown as dashed lines.

Page 7: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-7

Dep

th(m

)

-200 -100 0 100 200 300 400

05

1015

TSS

Con

c (m

g/L)

01020304050

Dep

th(m

)

-200 -100 0 100 200 300 400

05

1015

Dep

th(m

)

-200 -100 0 100 200 300 400

05

1015

Dep

th(m

)

-200 -100 0 100 200 300 400

05

1015

Dep

th(m

)

Distance (m)

-200 -100 0 100 200 300 400

05

1015

Transect A

Transect B

Transect C

Transect D

Transect E

Figure A-9. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Southern MSC. Presented are vertical slices of turbidity measured with ADCP along each vessel

transect. The approximate location of the channel boundaries are shown as dashed lines.

Dep

th(m

)

-300 -200 -100 0 100 200 300 400

05

1015

TSS

Con

c (m

g/L)

01020304050

Dep

th(m

)

-300 -200 -100 0 100 200 300 400

05

1015

Dep

th(m

)

-300 -200 -100 0 100 200 300 400

05

1015

Dep

th(m

)

Distance (m)

-300 -200 -100 0 100 200 300 400

05

1015

Transect A

Transect B

Transect C

Transect D

Figure A-10. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Max Ebb in the Southern MSC. Presented are vertical slices of turbidity measured with ADCP along each

vessel transect. The approximate location of the channel boundaries are shown as dashed lines.

Page 8: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-8

Dep

th(m

)

-300 -200 -100 0 100 200 300

05

1015

TSS

Con

c (m

g/L)

01020304050

Dep

th(m

)

-300 -200 -100 0 100 200 300

05

1015

Dep

th(m

)

-300 -200 -100 0 100 200 300

05

1015

Dep

th(m

)

Distance (m)

-300 -200 -100 0 100 200 300

05

1015

Transect A

Transect B

Transect C

Transect D

Figure A-11. Suspended Sediment Concentration (TSS) Measured with ADCP during First Low Slack in the Southern MSC. Presented are vertical slices of turbidity measured with ADCP along each vessel

transect. The approximate location of the channel boundaries are shown as dashed lines.

Dep

th(m

)

-400 -300 -200 -100 0 100 200 300

05

1015

TSS

Con

c (m

g/L)

01020304050

Dep

th(m

)

-400 -300 -200 -100 0 100 200 300

05

1015

Dep

th(m

)

-400 -300 -200 -100 0 100 200 300

05

1015

Dep

th(m

)

-400 -300 -200 -100 0 100 200 300

05

1015

Dep

th(m

)

-400 -300 -200 -100 0 100 200 300

05

1015

Dep

th(m

)

Distance (m)

-400 -300 -200 -100 0 100 200 300

05

1015

Transect A

Transect B

Transect C

Transect D

Transect E

Transect F

Figure A-12. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Low Slack in the Southern MSC. Presented are vertical slices of turbidity measured with ADCP along each

vessel transect. The approximate location of the channel boundaries are shown as dashed lines.

Page 9: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-9

Dep

th(m

)

-100 0 100 200 300 400 500

05

1015

TSS

Con

c (m

g/L)

01020304050

Dep

th(m

)

-100 0 100 200 300 400 500

05

1015

Dep

th(m

)

-100 0 100 200 300 400 500

05

1015

Dep

th(m

)

Distance (m)

-100 0 100 200 300 400 500

05

1015

Transect A

Transect B

Transect C

Transect D

Figure A-13. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Flood in the Southern MSC. Presented are vertical slices of turbidity measured with ADCP along each

vessel transect. The approximate location of the channel boundaries are shown as dashed lines.

Dep

th(m

)

-200 -100 0 100 200 300

05

1015

TSS

Con

c (m

g/L)

01020304050

Dep

th(m

)

-200 -100 0 100 200 300

05

1015

Dep

th(m

)

-200 -100 0 100 200 300

05

1015

Dep

th(m

)

-200 -100 0 100 200 300

05

1015

Dep

th(m

)

Distance (m)

-200 -100 0 100 200 300

05

1015

Transect A

Transect B

Transect C

Transect D

Transect E

Figure A-14. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Max Flood in the Southern MSC. Presented are vertical slices of turbidity measured with ADCP along each

vessel transect. The approximate location of the channel boundaries are shown as dashed lines.

Page 10: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-10

Dep

th(m

)

-200 -100 0 100 200 300 400

05

1015

TSS

Con

c (m

g/L)

01020304050

Dep

th(m

)

-200 -100 0 100 200 300 400

05

1015

Dep

th(m

)

-200 -100 0 100 200 300 400

05

1015

Dep

th(m

)

-200 -100 0 100 200 300 400

05

1015

Dep

th(m

)

-200 -100 0 100 200 300 400

05

1015

Dep

th(m

)

Distance (m)

-200 -100 0 100 200 300 400

05

1015

Transect A

Transect B

Transect C

Transect D

Transect E

Transect F

Figure A-15. Suspended Sediment Concentration (TSS) Measured with ADCP during First High Slack in the Southern MSC. Presented are vertical slices of turbidity measured with ADCP along each

vessel transect. The approximate location of the channel boundaries are shown as dashed lines.

Dep

th(m

)

-300 -200 -100 0 100 200 300 400

05

1015

TSS

Con

c (m

g/L)

01020304050

Dep

th(m

)

-300 -200 -100 0 100 200 300 400

05

1015

Dep

th(m

)

-300 -200 -100 0 100 200 300 400

05

1015

Dep

th(m

)

Distance (m)

-300 -200 -100 0 100 200 300 400

05

1015

Transect A

Transect B

Transect C

Transect D

Figure A-16. Suspended Sediment Concentration (TSS) Measured with ADCP during Second High Slack in the Southern MSC. Presented are vertical slices of turbidity measured with ADCP along each

vessel transect. The approximate location of the channel boundaries are shown as dashed lines.

Page 11: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-11

Figure A-17-a. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP

near-surface.

Depth = 6.05m

N

MEN1

-71.05 -71.048 -71.046 -71.044 -71.042

42.375

42.376

42.377

42.378

42.379

42.38

42.381

42.382TS

S (m

g/L)

10

20

30

40

50

Figure A-17-b. Suspended Sediment Concentration (TSS) Measured with ADCP during First

Max Ebb in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP mid-depth.

Page 12: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-12

Depth = Near Bottom

N

MEN1

-71.05 -71.048 -71.046 -71.044 -71.042

42.375

42.376

42.377

42.378

42.379

42.38

42.381

42.382

TSS

(mg/

L)

10

20

30

40

50

Figure A-17-c. Suspended Sediment Concentration (TSS) Measured with ADCP during First

Max Ebb in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP near-bottom.

Figure A-18-a. Suspended Sediment Concentration (TSS) Measured with ADCP during

Second Max Ebb in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP near-surface.

Page 13: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-13

Figure A-18-b. Suspended Sediment Concentration (TSS) Measured with ADCP during

Second Max Ebb in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP mid-depth.

Depth = Near Bottom

N

MEN2

-71.05 -71.048 -71.046 -71.044 -71.042

42.375

42.376

42.377

42.378

42.379

42.38

42.381

42.382

TSS

(mg/

L)

10

20

30

40

50

Figure A-18-c. Suspended Sediment Concentration (TSS) Measured with ADCP during

Second Max Ebb in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP near-bottom.

Page 14: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-14

Depth = 2.05m

N

LSN1

-71.05 -71.048 -71.046 -71.044 -71.042

42.375

42.376

42.377

42.378

42.379

42.38

42.381

42.382

TSS

(mg/

L)

10

20

30

40

50

Figure A-19-a. Suspended Sediment Concentration (TSS) Measured with ADCP during First Low Slack in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP

near-surface.

Figure A-19-b. Suspended Sediment Concentration (TSS) Measured with ADCP during First Low Slack in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP

mid-depth.

Page 15: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-15

Depth = Near Bottom

N

LSN1

-71.05 -71.048 -71.046 -71.044 -71.042

42.375

42.376

42.377

42.378

42.379

42.38

42.381

42.382

TSS

(mg/

L)

10

20

30

40

50

Figure A-19-c. Suspended Sediment Concentration (TSS) Measured with ADCP during First Low Slack in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP

near-bottom.

Figure A-20-a. Suspended Sediment Concentration (TSS) Measured with ADCP during

Second Low Slack in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP near-surface.

Page 16: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-16

Depth = 6.05m

N

LSN2

-71.05 -71.048 -71.046 -71.044 -71.042

42.375

42.376

42.377

42.378

42.379

42.38

42.381

42.382

TSS

(mg/

L)

10

20

30

40

50

Figure A-20-b. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Low Slack in the Northern MSC. Shown are plan-view contours of TSS measured with

ADCP mid-depth.

Depth = Near Bottom

N

LSN2

-71.05 -71.048 -71.046 -71.044 -71.042

42.375

42.376

42.377

42.378

42.379

42.38

42.381

42.382TS

S (m

g/L)

10

20

30

40

50

Figure A-20-c. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Low Slack in the Northern MSC. Shown are plan-view contours of TSS measured with

ADCP near-bottom.

Page 17: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-17

Figure A-21-a. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Flood in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP

near-surface.

Depth = 6.05m

N

MFN1

-71.05 -71.048 -71.046 -71.044 -71.042

42.375

42.376

42.377

42.378

42.379

42.38

42.381

42.382TS

S (m

g/L)

10

20

30

40

50

Figure A-21-b. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Flood in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP

mid-depth.

Page 18: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-18

Depth = Near Bottom

N

MFN1

-71.05 -71.048 -71.046 -71.044 -71.042

42.375

42.376

42.377

42.378

42.379

42.38

42.381

42.382

TSS

(mg/

L)

10

20

30

40

50

Figure A-21-c. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Flood in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP

near-bottom.

Figure A-22-a. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Max Flood in the Northern MSC. Shown are plan-view contours of TSS measured with

ADCP near-surface.

Page 19: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-19

Figure A-22-b. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Max Flood in the Northern MSC. Shown are plan-view contours of TSS measured with

ADCP mid-depth.

Depth = Near Bottom

N

MFN2

-71.05 -71.048 -71.046 -71.044 -71.042

42.375

42.376

42.377

42.378

42.379

42.38

42.381

42.382TS

S (m

g/L)

10

20

30

40

50

Figure A-22-c. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Max Flood in the Northern MSC. Shown are plan-view contours of TSS measured with

ADCP near-bottom.

Page 20: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-20

Figure A-23-a. Suspended Sediment Concentration (TSS) Measured with ADCP during First High Slack in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP

near-surface.

Depth = 6.05m

N

HSN1

-71.05 -71.048 -71.046 -71.044 -71.042

42.375

42.376

42.377

42.378

42.379

42.38

42.381

42.382TS

S (m

g/L)

10

20

30

40

50

Figure A-23-b. Suspended Sediment Concentration (TSS) Measured with ADCP during First High Slack in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP

mid-depth.

Page 21: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-21

Figure A-23-c. Suspended Sediment Concentration (TSS) Measured with ADCP during First High Slack in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP

near-bottom.

Depth = 2.05m

N

HSN2

-71.05 -71.048 -71.046 -71.044 -71.042

42.375

42.376

42.377

42.378

42.379

42.38

42.381

42.382TS

S (m

g/L)

10

20

30

40

50

Figure A-24-a. Suspended Sediment Concentration (TSS) Measured with ADCP during Second High Slack in the Northern MSC. Shown are plan-view contours of TSS measured with

ADCP near-surface.

Page 22: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-22

Depth = 6.05m

N

HSN2

-71.05 -71.048 -71.046 -71.044 -71.042

42.375

42.376

42.377

42.378

42.379

42.38

42.381

42.382

TSS

(mg/

L)

10

20

30

40

50

Figure A-24-b. Suspended Sediment Concentration (TSS) Measured with ADCP during Second High Slack in the Northern MSC. Shown are plan-view contours of TSS measured with

ADCP mid-depth.

Depth = Near Bottom

N

HSN2

-71.05 -71.048 -71.046 -71.044 -71.042

42.375

42.376

42.377

42.378

42.379

42.38

42.381

42.382

TSS

(mg/

L)

10

20

30

40

50

Figure A-24-c. Suspended Sediment Concentration (TSS) Measured with ADCP during

Second High Slack in the Northern MSC. Shown are plan-view contours of TSS measured with ADCP near-bottom.

Page 23: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-23

Figure A-25-a. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Southern MSC. Shown are plan-view contours of TSS measured with ADCP

near-surface.

Figure A-25-b. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Southern MSC. Shown are plan-view contours of TSS measured with ADCP

mid-depth.

Page 24: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-24

Depth = Near Bottom

N

MES1

-71.006 -71.004 -71.002 -71 -70.998 -70.996 -70.994 -70.992 -70.9942.33

42.331

42.332

42.333

42.334

42.335

42.336

42.337

42.338

TSS

(mg/

L)

10

20

30

40

50

Figure A-25-c. Suspended Sediment Concentration (TSS) Measured with ADCP during First

Max Ebb in the Southern MSC. Shown are plan-view contours of TSS measured with ADCP near-bottom.

Figure A-26-a. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Max Ebb in the Southern MSC. Shown are plan-view contours of TSS measured with

ADCP near-surface.

Page 25: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-25

Figure A-26-b. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Max Ebb in the Southern MSC. Shown are plan-view contours of TSS measured with

ADCP mid-depth.

Figure A-26-c. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Max Ebb in the Southern MSC. Shown are plan-view contours of TSS measured with

ADCP near-bottom.

Page 26: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-26

Figure A-27-a. Suspended Sediment Concentration (TSS) Measured with ADCP during First Low Slack in the Southern MSC. Shown are plan-view contours of TSS measured with ADCP

near-surface.

Figure A-27-b. Suspended Sediment Concentration (TSS) Measured with ADCP during First Low Slack in the Southern MSC. Shown are plan-view contours of TSS measured with ADCP

mid-depth.

Page 27: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-27

Figure A-27-c. Suspended Sediment Concentration (TSS) Measured with ADCP during First Low Slack in the Southern MSC. Shown are plan-view contours of TSS measured with ADCP

near-bottom.

Figure A-28-a. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Low Slack in the Southern MSC. Shown are plan-view contours of TSS measured with

ADCP near-surface.

Page 28: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-28

Figure A-28-b. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Low Slack in the Southern MSC. Shown are plan-view contours of TSS measured with

ADCP mid-depth.

Figure A-28-c. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Low Slack in the Southern MSC. Shown are plan-view contours of TSS measured with

ADCP near-bottom.

Page 29: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-29

Depth = 2.05m

N

MFS1

-71.006 -71.004 -71.002 -71 -70.998 -70.996 -70.994 -70.992 -70.9942.33

42.331

42.332

42.333

42.334

42.335

42.336

42.337

42.338

TSS

(mg/

L)

10

20

30

40

50

Figure A-29-a. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Flood in the Southern MSC. Shown are plan-view contours of TSS measured with ADCP

near-surface.

Figure A-29-b. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Flood in the Southern MSC. Shown are plan-view contours of TSS measured with ADCP

mid-depth.

Page 30: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-30

Figure A-29-c. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Flood in the Southern MSC. Shown are plan-view contours of TSS measured with ADCP

near-bottom.

Figure A-30-a. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Max Flood in the Southern MSC. Shown are plan-view contours of TSS measured with

ADCP near-surface.

Page 31: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-31

Figure A-30-b. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Max Flood in the Southern MSC. Shown are plan-view contours of TSS measured with

ADCP mid-depth.

Figure A-30-c. Suspended Sediment Concentration (TSS) Measured with ADCP during Second Max Flood in the Southern MSC. Shown are plan-view contours of TSS measured with

ADCP near-bottom.

Page 32: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-32

Figure A-31-a. Suspended Sediment Concentration (TSS) Measured with ADCP during First High Slack in the Southern MSC. Shown are plan-view contours of TSS measured with ADCP

near-surface.

Figure A-31-b. Suspended Sediment Concentration (TSS) Measured with ADCP during First High Slack in the Southern MSC. Shown are plan-view contours of TSS measured with ADCP

mid-depth.

Page 33: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-33

Figure A-31-c. Suspended Sediment Concentration (TSS) Measured with ADCP during First High Slack in the Southern MSC. Shown are plan-view contours of TSS measured with ADCP

near-bottom.

Figure A-32-a. Suspended Sediment Concentration (TSS) Measured with ADCP during Second High Slack in the Southern MSC. Shown are plan-view contours of TSS measured with

ADCP near-surface.

Page 34: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-34

Figure A-32-b. Suspended Sediment Concentration (TSS) Measured with ADCP during Second High Slack in the Southern MSC. Shown are plan-view contours of TSS measured with

ADCP mid-depth.

Figure A-32-c. Suspended Sediment Concentration (TSS) Measured with ADCP during Second High Slack in the Southern MSC. Shown are plan-view contours of TSS measured with

ADCP near-bottom.

Page 35: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-35

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

TSS

Con

c (m

g/L)

0255075100125

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

A00:01

B00:03

C00:06

D00:19

E00:32

F00:43

Distance(m)

Figure A-33. Suspended Sediment Concentration (TSS) Measured with ADCP during July 1, 2008 High Slack Disposal into the Mystic River CAD Cell. Presented are vertical slices of TSS (above

background) measured with ADCP along each vessel transect. The approximate location of the channel boundaries are shown as dashed lines.

Page 36: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-36

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

TSS

Con

c (m

g/L)

0255075100125

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

A00:01

B00:05

C00:09

D00:12

E00:15

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

F00:26

G00:37

H00:40

I01:05

J01:11

Distance(m) Figure A-34. Suspended Sediment Concentration (TSS) Measured with ADCP during October 3, 2008

Low Slack Disposal into the Mystic River CAD Cell. Presented are vertical slices of TSS (above background) measured with ADCP along each vessel transect. The approximate location of the channel

boundaries are shown as dashed lines.

Page 37: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-37

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

TSS

Con

c (m

g/L)

0255075100125

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

A00:02

B00:09

C00:13

D00:16

E00:32

F00:36

Distance(m)

Figure A-35. Suspended Sediment Concentration (TSS) Measured with ADCP during October 3, 2008 High Slack Disposal into the Mystic River CAD Cell. Presented are vertical slices of TSS (above

background) measured with ADCP along each vessel transect. The approximate location of the channel boundaries are shown as dashed lines.

Page 38: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-38

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

TSS

Con

c (m

g/L)

0255075100125

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

A00:09

B00:12

C00:14

D00:17

E00:44

F00:50

Distance(m)

Figure A-36. Suspended Sediment Concentration (TSS) Measured with ADCP during October 27, 2008 Low Slack Disposal into the Mystic River CAD Cell. Presented are vertical slices of TSS (above background) measured with ADCP along each vessel transect. The approximate location of the channel

boundaries are shown as dashed lines.

Page 39: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-39

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

TSS

Con

c (m

g/L)

0255075100125

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

A00:02

B00:05

C00:09

D00:12

E00:14

Di t ( )

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

Dep

th(m

)

-150 -100 -50 0 50 100 150

0

10

20

F00:42

G00:45

H00:47

I00:49

J00:52

K00:55

Distance(m)

Figure A-37. Suspended Sediment Concentration (TSS) Measured with ADCP during October 28,

2008 High Slack Disposal into the Mystic River CAD Cell. Presented are vertical slices of TSS (above background) measured with ADCP along each vessel transect. The approximate location of the channel

boundaries are shown as dashed lines.

Page 40: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-40

Depth = 2.05m

N

-71.058 -71.056 -71.054 -71.052 -71.05 -71.048 -71.046 -71.04442.383

42.384

42.385

42.386

42.387

42.388

42.389

TSS

(mg/

L)

20

40

60

80

100

Figure A-38-a. Suspended Sediment Concentration (TSS) Measured with ADCP during July 1, 2008 High Slack Disposal into the Mystic River CAD Cell. Presented is the plan-view contour of

TSS (above background) measured with ADCP near-surface.

Depth = 6.05m

N

-71.058 -71.056 -71.054 -71.052 -71.05 -71.048 -71.046 -71.04442.383

42.384

42.385

42.386

42.387

42.388

42.389

TSS

(mg/

L)

20

40

60

80

100

Figure A-38-b. Suspended Sediment Concentration (TSS) Measured with ADCP during July 1, 2008 High Slack Disposal into the Mystic River CAD Cell. Presented is the plan-view contour of

TSS (above background) measured with ADCP mid-depth.

Page 41: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-41

Figure A-38-c. Suspended Sediment Concentration (TSS) Measured with ADCP during July 1, 2008 High Slack Disposal into the Mystic River CAD Cell. Presented is the plan-view contour of

TSS (above background) measured with ADCP near-bottom.

Page 42: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-42

Depth = 2.05m

N

-71.058 -71.056 -71.054 -71.052 -71.05 -71.048 -71.046 -71.04442.383

42.384

42.385

42.386

42.387

42.388

42.389

TSS

(mg/

L)

20

40

60

80

100

Depth = 2.05m

N

-71.058 -71.056 -71.054 -71.052 -71.05 -71.048 -71.046 -71.04442.383

42.384

42.385

42.386

42.387

42.388

42.389

TSS

(mg/

L)

20

40

60

80

100

Figure A-39-a. Suspended Sediment Concentration (TSS) Measured with ADCP during

October 3, 2008 Low Slack Disposal into the Mystic River CAD Cell. Presented are the plan-view contours of TSS (above background) measured with ADCP near-surface from 1 to 15 minutes (upper)

and from 26 to 71 minutes (lower).

Page 43: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-43

Depth = 6.05m

N

-71.058 -71.056 -71.054 -71.052 -71.05 -71.048 -71.046 -71.04442.383

42.384

42.385

42.386

42.387

42.388

42.389

TSS

(mg/

L)

20

40

60

80

100

Figure A-39-b. Suspended Sediment Concentration (TSS) Measured with ADCP during October 3, 2008 Low Slack Disposal into the Mystic River CAD Cell. Presented is the plan-view

contour of TSS (above background) measured with ADCP mid-depth from 1 to 15 minutes (upper) and from 26 to 71 minutes (lower).

Page 44: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-44

Depth = Near Bottom

N

-71.058 -71.056 -71.054 -71.052 -71.05 -71.048 -71.046 -71.04442.383

42.384

42.385

42.386

42.387

42.388

42.389

TSS

(mg/

L)

20

40

60

80

100

Figure A-39-c. Suspended Sediment Concentration (TSS) Measured with ADCP during October 3, 2008 Low Slack Disposal into the Mystic River CAD Cell. Presented is the plan-view

contour of TSS (above background) measured with ADCP near-bottom from 1 to 15 minutes (upper) and from 26 to 71 minutes (lower).

Page 45: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-45

Figure A-40-a. Suspended Sediment Concentration (TSS) Measured with ADCP during October 3, 2008 High Slack Disposal into the Mystic River CAD Cell. Presented is the plan-view

contour of TSS (above background) measured with ADCP near-surface.

Figure A-40-b. Suspended Sediment Concentration (TSS) Measured with ADCP during October 3, 2008 High Slack Disposal into the Mystic River CAD Cell. Presented is the plan-view

contour of TSS (above background) measured with ADCP mid-depth.

Page 46: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-46

Figure A-40-c. Suspended Sediment Concentration (TSS) Measured with ADCP during October 3, 2008 High Slack Disposal into the Mystic River CAD Cell. Presented is the plan-view

contour of TSS (above background) measured with ADCP near-bottom.

Page 47: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-47

Depth = 2.05m

N

-71.058 -71.056 -71.054 -71.052 -71.05 -71.048 -71.046 -71.04442.383

42.384

42.385

42.386

42.387

42.388

42.389

TSS

(mg/

L)

20

40

60

80

100

Figure A-41-a. Suspended Sediment Concentration (TSS) Measured with ADCP during

October 27, 2008 Low Slack Disposal into the Mystic River CAD Cell. Presented is the plan-view contour of TSS (above background) measured with ADCP near-surface.

Depth = 6.05m

N

-71.058 -71.056 -71.054 -71.052 -71.05 -71.048 -71.046 -71.04442.383

42.384

42.385

42.386

42.387

42.388

42.389

TSS

(mg/

L)20

40

60

80

100

Figure A-41-b. Suspended Sediment Concentration (TSS) Measured with ADCP during

October 27, 2008 Low Slack Disposal into the Mystic River CAD Cell. Presented is the plan-view contour of TSS (above background) measured with ADCP mid-depth.

Page 48: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-48

Depth = Near Bottom

N

-71.058 -71.056 -71.054 -71.052 -71.05 -71.048 -71.046 -71.04442.383

42.384

42.385

42.386

42.387

42.388

42.389

TSS

(mg/

L)

20

40

60

80

100

Figure A-41-c. Suspended Sediment Concentration (TSS) Measured with ADCP during

October 27, 2008 Low Slack Disposal into the Mystic River CAD Cell. Presented is the plan-view contour of TSS (above background) measured with ADCP near-bottom.

Page 49: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-49

Depth = 2.05m

N

-71.058 -71.056 -71.054 -71.052 -71.05 -71.048 -71.046 -71.04442.383

42.384

42.385

42.386

42.387

42.388

42.389

TSS

(mg/

L)

20

40

60

80

100

Depth = 2.05m

N

-71.058 -71.056 -71.054 -71.052 -71.05 -71.048 -71.046 -71.04442.383

42.384

42.385

42.386

42.387

42.388

42.389

TSS

(mg/

L)

20

40

60

80

100

Figure A-42-a. Suspended Sediment Concentration (TSS) Measured with ADCP during

October 28, 2008 High Slack Disposal into the Mystic River CAD Cell. Presented are the plan-view contours of TSS (above background) measured with ADCP near-surface from 2 to 14 minutes (upper)

and from 42 to 55 minutes (lower).

Page 50: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-50

Depth = 6.05m

N

-71.058 -71.056 -71.054 -71.052 -71.05 -71.048 -71.046 -71.04442.383

42.384

42.385

42.386

42.387

42.388

42.389

TSS

(mg/

L)

20

40

60

80

100

Depth = 6.05m

N

-71.058 -71.056 -71.054 -71.052 -71.05 -71.048 -71.046 -71.04442.383

42.384

42.385

42.386

42.387

42.388

42.389

TSS

(mg/

L)

20

40

60

80

100

Figure A-42-b. Suspended Sediment Concentration (TSS) Measured with ADCP during

October 28, 2008 High Slack Disposal into the Mystic River CAD Cell. Presented is the plan-view contour of TSS (above background) measured with ADCP mid-depth from 2 to 14 minutes (upper)

and from 42 to 55 minutes (lower).

Page 51: APPENDIX A Observations of Suspended Sediment ......Jul 02, 2009  · Figure A-1. Suspended Sediment Concentration (TSS) Measured with ADCP during First Max Ebb in the Northern MSC.

Boston Harbor Inner Harbor Maintenance Dredging Project June 2009 Plume Monitoring Final Summary Report Page A-51

Depth = Near Bottom

N

-71.058 -71.056 -71.054 -71.052 -71.05 -71.048 -71.046 -71.04442.383

42.384

42.385

42.386

42.387

42.388

42.389

TSS

(mg/

L)

20

40

60

80

100

Figure A-42-c. Suspended Sediment Concentration (TSS) Measured with ADCP during

October 28, 2008 High Slack Disposal into the Mystic River CAD Cell. Presented is the plan-view contour of TSS (above background) measured with ADCP near-bottom from 2 to 14 minutes (upper)

and from 42 to 55 minutes (lower).