Appendix 5 Minutes of Discussions on the Basic Design Study on the Project for Rehabilitation of Kandal Stung Irrigation System in the Kingdom of Cambodia (Results of Second Field Survey, February, 2003)
Appendix 5 Minutes of Discussions on the Basic Design Study on the Project for
Rehabilitation of Kandal Stung Irrigation System in the Kingdom of
Cambodia (Results of Second Field Survey, February, 2003)
Appendix 6 Letter of MOWRAM regarding Land Acquisition
Appendix 7 Minutes of Discussions on the Basic Design Study on the Project for
Rehabilitation of Kandal Stung Irrigation System in the Kingdom of
Cambodia (Explanation on Draft Report, March, 2003)
Appendix 8 Minutes of Discussions on the Basic Design Study on the Project for
Rehabilitation of Kandal Stung Irrigation System in the Kingdom of
Cambodia (Commencement of Third Field Survey, June, 2003)
Appendix 9 Minutes of Discussions on the Basic Design Study on the Project for
Rehabilitation of Kandal Stung Irrigation System in the Kingdom of
Cambodia (Results of Third Field Survey, July, 2003)
Appendix 10 Minutes of Discussions on the Basic Design Study on the Project for
Rehabilitation of Kandal Stung Irrigation System in the Kingdom of
Cambodia (Results of Forth Field Survey, September, 2004)
Appendix 11 Technical Discussion Record of Steering Committee for the Basic Design
Study on the Project for Rehabilitation of Kandal Stung Irrigation
System in the Kingdom of Cambodia (September, 2004)
Appendix 12 Minutes of Discussions on the Basic Design Study on the Project for
Rehabilitation of Kandal Stung Irrigation System in the Kingdom of
Cambodia (Alternative Plans of the New Weir Structure, October, 2004)
Appendix 13 Minutes of Discussions on the Basic Design Study on the Project for
Rehabilitation of Kandal Stung Irrigation System in the Kingdom of
Cambodia (Explanation on Draft Report, November, 2004)
5. Cost Estimation Borne by the Recipient Country
5. Cost Estimation Borne by the Recipient Country
Required Costs to be born by the Cambodian Side
Description Unit Price (USD) Quantity Amount (USD)
1. Land acquisition m2 1 20,000 20,000
(1) Main canal: 15,000 m2
(2) O&M roads (4 nos): 5,000 m2
2. Investigation and removal of UXOs LS 156,000
3. Banking cost LS 2,700
4. Customs clearance cost LS 1,000
4. Construction and improvement of lateral LS 767,000
and tertiary canals
5. Establishment of O&M office LS 10,500
Total 957,200
Operation and Maintenance Cost
Item Amount (USD)
Personnel cost of O&M office 2,475
O&M cost for O&M office 1,460
O&M cost (average of 30 years) 4,145
Total 8,080