A-1 APPENDIX 1 MEMBER LIST OF THE STUDY TEAM 1. Field Survey Name Position Affiliation (1) Mr. Ryuichi KATO Team Leader Deputy Resident Representative JICA Senegal Office (2) Ms. Maki IKKATAI Coordinator First Project Management Division Grant Aid Management Dept., JICA (3) Mr. Shigeyoshi KAGAWA Chief Consultant Japan Techno Co., Ltd. (4) Ms. Mikiko AZUMA Operation and Maintenance Planner/ Socio-Economist Japan Techno Co., Ltd. (5) Mr. Christopher JAYAKARAN Hydrogeologist Japan Techno Co., Ltd. (6) Mr. Minoru KIMISHIMA Water Supply Planner/ Equipment Planner Japan Techno Co., Ltd. (7) Mr. Shinichi MOROMACHI Water Supply Planner 2 Japan Techno Co., Ltd. (8) Mr. Shoji TAKAMATSU Cost Estimation/ Procurement Planner Japan Techno Co., Ltd. 2. Explanation of Draft Final Report Name Position Affiliation (1) Mr. Shigeyoshi KAGAWA Chief Consultant Japan Techno Co., Ltd. (2) Mr. Minoru KIMISHIMA Water Supply Planner/ Equipment Planner Japan Techno Co., Ltd. (3) Mr. Shoji TAKAMATSU Cost Estimation/ Procurement Planner Japan Techno Co., Ltd.
21
Embed
APPENDIX 1 MEMBER LIST OF THE STUDY TEAM - …Chief Consultant Water Supply/ Equipment Planner Cost & Procurement Planner Mr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU 1 1/12 Mon
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
A-1
APPENDIX 1 MEMBER LIST OF THE STUDY TEAM
1. Field Survey
Name Position Affiliation
(1) Mr. Ryuichi KATO Team Leader Deputy Resident RepresentativeJICA Senegal Office
(2) Ms. Maki IKKATAI Coordinator First Project Management DivisionGrant Aid Management Dept., JICA
(3) Mr. Shigeyoshi KAGAWA Chief Consultant Japan Techno Co., Ltd.
(4) Ms. Mikiko AZUMAOperation and Maintenance
Planner/ Socio-EconomistJapan Techno Co., Ltd.
(5) Mr. Christopher JAYAKARAN Hydrogeologist Japan Techno Co., Ltd.
(6) Mr. Minoru KIMISHIMAWater Supply Planner/Equipment Planner
Japan Techno Co., Ltd.
(7) Mr. Shinichi MOROMACHI Water Supply Planner 2 Japan Techno Co., Ltd.
(8) Mr. Shoji TAKAMATSUCost Estimation/Procurement Planner
Japan Techno Co., Ltd.
2. Explanation of Draft Final Report
Name Position Affiliation
(1) Mr. Shigeyoshi KAGAWA Chief Consultant Japan Techno Co., Ltd.
(2) Mr. Minoru KIMISHIMAWater Supply Planner/
Equipment PlannerJapan Techno Co., Ltd.
(3) Mr. Shoji TAKAMATSUCost Estimation/
Procurement PlannerJapan Techno Co., Ltd.
APPENDIX 2 STUDY SCHEDULE(1) Basic Design Field Survey
Mr. Ryuichi KATO Ms. Maki IKKATAI Mr. S. KAGAWA Ms. M. AZUMA Mr. TAKAMATSU Mr. KIMISHIMA Mr. MOROMACHI Mr. JAYAKARAN
1 8/18 Mon Leave Bangalore
2 8/19 Tue
3 8/20 WedCourtesy call and Meeting
with JICA and EOJ
4 8/21 Thu
5 8/22 Fri Arrive Banjul
6 8/23 Sat Site Survey
7 8/24 SunArrive Banjul, Site Survey(EDF,UNDP/UNCDF)
Preparation forField Survey
Leave Tokyo Workshop Survey
8 8/25 Mon ParisMeeting & Data
Collection
9 8/26 Tue Arrive BanjulPreparation for
Survey
10 8/27 WedField Trip to Solar
Sites w/Team LeaderPreparation for
Site Survey
11 8/28 Thu Leave Dakar for ParisContract w/Sub-Contract Study
Site Survey andDiscussion w/
NBD
ProcurementSurvey (Banjul)
Preparation PreparationHydrogeologicalSurvey (WD)
12 8/29 Fri Leave Paris for TokyoProcurement
Survey (Banjul)Preparation Preparation
HydrogeologicalSurvey (NBD)
13 8/30 SatEDF/DWR meeting
for O & M SolarSite Survey
(WD)Procurement
Survey (Banjul)W-01,W-02 W-01,W-02
HydrogeologicalSurvey (NBD)
14 8/31 Sun Leave for Dakar N-09,N-10, N-02 N-09,N-10, N-02Move to Tendaba &
NBD: North Bank Division LRD: Lower River Division
WD: Western Division CRD: Central River Division
Team Leader (JICA) Coordinator (JICA) Hydrogeologist
Leave for Tokyovia Paris
Site and Workshop Survey with Team Leader Site and Workshop Survey
with Team Leader
Field Trip of EDF, UNDP/UNCDF and JICAProject Sites, Leave for Dakar
Preparation for Site SurveyProcurement and Local Cost Survey
Minutes of Discussion
Water SupplyPlanner 2
O&MPlanner/Socio-
Economist
Leave Tokyo for Paris
Field Trip of EDF Solar Pumping Systems and JICA Grant Project Sites
Chief ConsultantCost &
ProcurementPlanner
Meeting with UNDP, EDF and DWR
Water Supply/Equipment Planner
Minutes of Discussion, Negotiation of Sub-Contract Study, and Data Collection
Signing of Minutes Signing of Minutes, Negotiation of Sub-Contract Study, and Data Collection
Leave Paris and Arrive Tokyo onSeptember 17
Leave Banjul for Dakar
Report to JICA in Banjul and Leave forTokyo via Paris
Leave Paris and Arrive Tokyo onSeptember 17
Meeting within the Team, Data Analysis Meeting within Team and Data Analysis
No. Date
Leave Banjul for Dakar
Report to JICA in Banjul, Leave forTokyo via Paris
Meeting with UNDP, EDF and DWR, DataCollection
Leave Paris for Dakar
Courtesy call and Meeting with JICA and Embassy of Japan (EOJ)), Leave Dakar and Arrive Banjul
Discussion w/Division (NBD), SiteSurvey N-03,N-01
Site Survey and Discussion w/Division& Village Water Committee (WD)
Courtesy call and I/R Explanation Meeting with the Gambia Government (DSFA, DSFNRE, and DWR)
A-2
Chief ConsultantWater Supply/
Equipment PlannerCost & Procurement
PlannerMr. S. KAGAWA Mr. M. KIMISHIMA Mr. S. TAKAMATSU
1 1/12 Mon
2 1/13 Tue
3 1/14 Wed
4 1/15 Thu
5 1/16 Fri
6 1/17 Sat
7 1/18 Sun
8 1/19 Mon
9 1/20 Tue
10 1/21 Wed
11 1/22 Thu
12 1/23 Fri
(2) Explanation of Draft Final Report
No. Date Day
Leave Tokyo for Paris
Leave Paris for Dakar
Courtesy call and meeting with JICA and Japanese Embassy, Leave Dakarfor BanjulCurtesy call to Department of State for Fisheries, Natural Resources and theEnvironment and Department of State for Foreign Affairs, Explanation ofdraft final report to DWR
Meeting with DWR on the draft final report
Meeting with DWR on the draft final report
Discussion on minutes with DWR
Signing of Minutes with DSFNRE and DWR
Leave Banjul for Dakar
Report to JICA and Japanese Embassy, Leave Dakar for Paris
Leave Paris for Tokyo
Arrive in Tokyo
A-3
A-4
APPENDIX 3 LIST OF PARTIES CONCERNEDIN THE RECIPIENT COUNTRY
Department of State for Foreign AffairsHon. Mr. Babucarr BlaiseIsmaila Jagne
Secretary of State for Foreign Affairs
Mr. Ansumana E. Ceesay Permanent SecretaryMr. Momodou Jang Jallow Ag. Principal Assistant Secretary
Department of State for Fisheries, Natural Resources and the EnvironmentHon. Ms. Susan Waffa-OgooO.R.G.
Secretary of State for Fisheries, NaturalResources and the Environment
Mr. Momodou A. Cham Ag. Permanent SecretaryMr. Dodu Gaye Deputy Permanent SecretaryMr. Momodou O. Njie Principal Assistant SecretaryMr. Funahashi Nobufumi JICA Expert
Department of Water Resources (DWR)Mr. Bubu Pateh Jallow DirectorMr. Loues Bass Ceesay Assistant DirectorMr. Momodou Njie Principal HydrologistMr. Giran Corr Principal HydrogeologistMr. Paousman Jarju Senior Scientific OfficerMr. Alhagi Jabi Works SuperintendentMr. John Peacock International Public Relation OfficerMr. Sheriff Bojang Motivator/ Western DivisionMr. Sheriff Mboge Motivator/ North Bank DivisionMr. Lamin Saidyleigh Senior Motivator/ Lower River DivisionMs. Isatou Bah Motivator/ Central River Division
Department of Community DevelopmentMr. Saikou Suwareh Community Development OfficerMr. Omar Ngum Community Development Officer
Commissioner ’s Office- North Bank Division (North Bank Division )
Mr. Momodou Soma Jobe Commissioner
Commissioner ’s Office – Central River Division (Western Division )
Major Mr. Momodou Bojang Commissioner
European Development Fund (EDF)Mr. Joseph A. de Bats Technical Advisor, EC/EDF Water Supply
ProgrammeMr. Moro Ceesay Co-ordinator
United Nations Capital Development Fund (UNCDF)Ms. Isatou Nasir Cham Program AnalystDr. Mopoi Nuwanyakpa ConsultantMr. Abdoulie B. Dibba Social Development Specialist/ RWSSP
A-5
Local Solar Maintenance CompanyMr.Reynold CarrolMr.Pap Malick Sey
Deputy General Manager, VM SolarGeneral Manager, Dabaakh Malick EnergyCentre
Mr. Omar M.M.Touray Managing Director, Gam-Solar Energy &Engineering Co., Ltd.
Mr. Lamin Bogang Financial Controller, Gam-Solar Energy &Engineering Co., Ltd.
NGO/Local ConsultantsMr.Edi A.Njie Managing Director, The Gambia