Top Banner
1 TWNIC Update Tim Wang, TWNIC APNIC 46
13

apnic 46 twnic update 1536580715APNIC, Taiji of JPNIC came to TWNIC on 28-29 May and 20 June, respectively, for sharing their RPKI experience with TWNIC engineers. l TWNIC has built

Jul 08, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: apnic 46 twnic update 1536580715APNIC, Taiji of JPNIC came to TWNIC on 28-29 May and 20 June, respectively, for sharing their RPKI experience with TWNIC engineers. l TWNIC has built

1

TWNIC Update

Tim Wang, TWNICAPNIC 46

Page 2: apnic 46 twnic update 1536580715APNIC, Taiji of JPNIC came to TWNIC on 28-29 May and 20 June, respectively, for sharing their RPKI experience with TWNIC engineers. l TWNIC has built

Outlinel Statistics of TWNIC’s IP membersl TWNIC’s activities and training programsl Conclusions & Future Works

2

Page 3: apnic 46 twnic update 1536580715APNIC, Taiji of JPNIC came to TWNIC on 28-29 May and 20 June, respectively, for sharing their RPKI experience with TWNIC engineers. l TWNIC has built

Statistics of TWNIC’s IP Members

3

������ ������ ������1 �}��F�2O�� 22 �k�t�p=*F�2O�� 43 u�2O��2 ,GN� �Bh�& 23 �Z�yF�2O�� 44 ���@��F�2O��3 #rF�2O�� 24 �.2z�~F�2O�� 45 "8L�F�2O��4 C���F�2O�� 25 �k)aaF�2O�� 46 �q��F�2O��5 mU��F�2O�� 26 �� _�yKF�2O�� 47 ����F�2O��6 I+P;Ee 27 /�LyKDw2O�� 48 ��(��F�2O��7 �|=*F�2O�� 28 d�L[�yKF�2O�� 49 9RVF�2O��8 �T��F�2O�� 29 �lo_�F�2O�� 50 ij2z�~F�2O��9 #���F�2O�� 30 :H=*F�2O�� 51 �.%5�2z�~F�2O��10 �MyK=*F�2O�� 31 48=*F�2O�� 52 <L��=*F�2O��11 ��=*F�2O�� 32 �}|y_�F�2O�� 53 |�=*F�2O��12 �!_�yKF�2O�� 33 ����F�2O�� 54 ��n9��F�2O��13 X'=*F�2O�� 34 �\6�[$^�;?P 55 �[2z�~F�2O��14 .�v�LF�2O�� 35 �`��F�2O�� 56 J!y�yK[�F�2O��15 .xK=*F�2O�� 36 �Z_�F�2O�� 57 ���2z�~F�2O��16 �k�yF�2O�� 37 ���=*F�2O�� 58 �k1byF�2O��

17 Q7�ARz2O���k���

38 �k���F�2O�� 59 �k�0>V��F�2O��

18 wR��F�2O�� 39 S���F�2O�� 60 ���yK=*F�2O��19 -{d�3WF�2O�� 40 fS2z�~F�2O�� 61 ��n9��F�2O��20 �k_�L��YF�2O�� 41 UcF�2O��21 �ksyyK]gF�2O�� 42 f�=*F�2O��

TWNIC

TWNIC ’s Member: 86

Service Types # of TWNIC’s MembersCo-location/IDC 64

FTTx 18ADSL 4

Cable Modem 25WLAN 2

3G/3.5G 54G(LTE) 5

Page 4: apnic 46 twnic update 1536580715APNIC, Taiji of JPNIC came to TWNIC on 28-29 May and 20 June, respectively, for sharing their RPKI experience with TWNIC engineers. l TWNIC has built

IPv4 Address Allocation

Unit: /24

l TWNIC has allocated 131,798 /24s IPv4 addresses l The IPv4 application growing slightly in this year

�������

Page 5: apnic 46 twnic update 1536580715APNIC, Taiji of JPNIC came to TWNIC on 28-29 May and 20 June, respectively, for sharing their RPKI experience with TWNIC engineers. l TWNIC has built

l TWNIC has allocated 2,363 /32s IPv6 addresses l Most of TWNIC IP members have obtained IPv6

addresses.

�����

IPv6 Address Allocation

5

Unit: /32

Page 6: apnic 46 twnic update 1536580715APNIC, Taiji of JPNIC came to TWNIC on 28-29 May and 20 June, respectively, for sharing their RPKI experience with TWNIC engineers. l TWNIC has built

2018 TWNOG & 30th TWNIC IP OPM

l Time: June 21-22, 2018l Keynote speech:

q IPv6 Trends, Taiwan, Asia-Pacific and Worldwide: an update from 2014 Paul Wilson, Director General, APNIC

q Future Challenge of Internet Fred Baker, Co-chair IPv6 Operations Working Group, IETF

l Session topics include Cooperation SIG, Policy SIG, IPv6 Deployment Next Generation Network Technology , Network Operation Technology, Cyber Security Experience Sharing, etc.

l To see the detail agenda, visit https://opm.twnic.net.tw/30th

6

Page 7: apnic 46 twnic update 1536580715APNIC, Taiji of JPNIC came to TWNIC on 28-29 May and 20 June, respectively, for sharing their RPKI experience with TWNIC engineers. l TWNIC has built

2018 TWNIC-APNIC Joint Training -

IPv6 Workshop

l Time: May 30- June 1, 2018

l Attendee: 40

l Lecturer: Mr. Tohid Naslpak and Mr. Anurag Bhatia

l This technical workshop is made up of lectures and hands-on lab exercise to understand the concept of IPv6 protocol architecture, its addressing structure and design issues when planning for IPv6 deployment focusing on IP core network

l The course includes considerable practical work based on IPv6 and Cisco IOS router configuration commands

7

Page 8: apnic 46 twnic update 1536580715APNIC, Taiji of JPNIC came to TWNIC on 28-29 May and 20 June, respectively, for sharing their RPKI experience with TWNIC engineers. l TWNIC has built

Taiwan IPv6 User Availability

l Taiwan IPv6 user availability is 0.46% in the end of 2017 and 17.48% in September, 2018.

l The growth rate is 3700%.

8

Page 9: apnic 46 twnic update 1536580715APNIC, Taiji of JPNIC came to TWNIC on 28-29 May and 20 June, respectively, for sharing their RPKI experience with TWNIC engineers. l TWNIC has built

TWNIC RPKI Testbed

l Thanks George Michaelson and Tom Harrison of APNIC, Taiji of JPNIC came to TWNIC on 28-29 May and 20 June, respectively, for sharing their RPKI experience with TWNIC engineers.

l TWNIC has built the Certification Authority(CA) system and signed the testbed CA certification with APNIC on June.

l APNIC assigned the TWNIC’s Certified Resource to TWNIC.

l TWNIC has built a RPKI Management System for members to view their own resources and manage (add/modify/delete) ROA on Augest.

Page 10: apnic 46 twnic update 1536580715APNIC, Taiji of JPNIC came to TWNIC on 28-29 May and 20 June, respectively, for sharing their RPKI experience with TWNIC engineers. l TWNIC has built

TWNIC RPKI ArchitectureRPKI Component Elements and Interactions

rsyncrepositor

y

APNICCA

APNIC Registry DB

(1)TWNIC

CA(3)

Validator

rsyncrepositor

y

(2)TWNICMyRPKI

TWNICRegistry

DB

Web access

Rsyncaccess

Internal Boundary

Signing Engine

Public Access

IPv4, IPv6, ASN, ROA

Member ID, IPv4, IPv6, ASN

RPKI DB

Signing Engine

RPKI DB

Router query

by Port 323

Page 11: apnic 46 twnic update 1536580715APNIC, Taiji of JPNIC came to TWNIC on 28-29 May and 20 June, respectively, for sharing their RPKI experience with TWNIC engineers. l TWNIC has built

TWNIC RPKI Management System

Page 12: apnic 46 twnic update 1536580715APNIC, Taiji of JPNIC came to TWNIC on 28-29 May and 20 June, respectively, for sharing their RPKI experience with TWNIC engineers. l TWNIC has built

Conclusions & Future Worksl TWNIC have 24 more members this year.l We has built the RPKI CA testbed environment�

Validator�management system and planned to provide RPKI service to TWNIC members this year.

l We will hold the routing workshop and IPv6 activities this year.

l Welcome to attend the IPv6 readiness measurement BoF tomorrow.

12

Page 13: apnic 46 twnic update 1536580715APNIC, Taiji of JPNIC came to TWNIC on 28-29 May and 20 June, respectively, for sharing their RPKI experience with TWNIC engineers. l TWNIC has built

13

Thank You