8/9/2019 API Purchasing Guidelines 01-01-04 http://slidepdf.com/reader/full/api-purchasing-guidelines-01-01-04 1/202 PLIrchasi ng G LI d el ries Amer isan Petroleum Institute yright American Petroleum Institute oduced by IHS under license with API Licensee=BG Group/5943895100 Not for Resale, 12/25/2004 05:05:55 MST eproduction or networking permitted without license from IHS
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
8/9/2019 API Purchasing Guidelines 01-01-04
http://slidepdf.com/reader/full/api-purchasing-guidelines-01-01-04 2/202yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100
Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
For updates to the Purchasing Guidelines Handbook, visi t the Addenda and Errata section
of
www.api.orgícat
Bsp rodu&lesia
Practical Guidelines
for
Making
Practica
Choices
A m pec 2B
Fabrication
of
Structural
Steel Pipe
API
spec
2gd
Specifi::atÍ:x?
for Cii'fsiicire Pe:lestai hkiririted
Cranes
APB spec
2H
Carbon P~4angainese teei Plate for Offshore
PlatTom
Tijtxjlar ioirits
APB
spec
2MT1
Carbori Mangaritise
Steel Plate
w i t h In>proved
1-oughness or Offshore Structures
A W spec
2MT2
Fiolle:l
Shapes
with
1rriprove:l Notch
lougiiriess
API
spec
dow
Steel
Plates h:r
OTfsIioI~:
Sti-u::tui-c:s, lrc:diiced
t y
-1hernio-9iieclianicalControl
Processing
1-PvKPj
API
spec 2Y
Steel Plates, Qiieriched-ar?d-l-eirir)ered,
for Offshore
Structures
APB spec 4F
Drillii-g and
Weli Servicing
Structures
A m pecsm
Specif ca
io
i far Casi
rig
a
n:l
Tu t ng
API
spec I D
Specifi::ai.io
n
h:r Eri Pipi:
APB spec
OBL
Line
Pipe
(naw spec 9LC
CRA
Line Pipe
API spec
ILCP
Coiled lLi1-e
Pipe
A W spec OBLD
CRA c;l¿3d
or
I..irif:d Steel
Pipc:
APB s p e c E a
Specification
for Pipeiine Valves
API
spec 7
Rotary Drill Sten i Elenieriis
APB
s p e c
$K
Specif icat iw for Drill ing ~ 3ritl
Well Servicirig Equipriierii.
(naw
spec
Dri
I
ngarid
Production
H
oisti
rig Eq i ipment
API
spec sgd
Drilling
and
Productioi?
Hoisting
Equipment
( P s i I.
arid
PSl.2)
APB s p e c 9 A
Specification
for
Wire
Rope
(naw
spec
%SB
Suclier
Rods
API
spec
& RI
Peir oleurii arid Naiurai Gas iridusl.ries -
Downhole
Equipment
-
Packers
and
Bridge
[>lüg5
API
spec
L@
Elet:ti'Íc Molar
?i Íriie
Mover
for Bearri
Pui-nping
unit
Se:-vice
APB s p e c S N
Lease Autoinatic
Custody .liai?sfer
LACQ Equipinent
APB s p e c 32F
S hop Welded
Tanks
for Storage of
Produchno
Liquids
(naw
spec 22GDaB
Glycoi-lype
Gas
Deliydiarion Ui-~its
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
8/9/2019 API Purchasing Guidelines 01-01-04
http://slidepdf.com/reader/full/api-purchasing-guidelines-01-01-04 10/202yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100
Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
should then be attacheci to the purchase orciri or request for
pro-
ie r i t
ct iould be rnanufactur
posal.
Data
Sheets
in questions a n d information that
can
1
equipirierit,
Íric1u:lii-g chokes
arid
ins general information which
pertains
to
the
entire well. 1-abies
1?4.3o A.12
are
designed
to be used for
1-he effects of exterrial ioatls
(i.e,
twidirig rrioriierits,
.erisiciris,
etc.) i::) ihe:
assernbiy
i:f c:oriipm::r:ts a re r io t c:xplic:ii. jj atlcires:jc:d
by this international Standard (see 4.2.1.3j.
.The
purcliaser
1 - i ~
urchaser should
specify
whether the perforinance vei-ifica-
tior)
pIi:c::durec in
Anriex
F are appl imble.
should specify any i:xcept
I
limling corifigriration.
E.xarriples
c
typi::al wel
i iead
anci
cti
riclmias tree cor:figi: ~3t i k :n~
ai-esi iown
in Figures
A . l
and
A . 2
Also included are
exampies
of
casing arid hit
prc:gr¿3nimii:s that are
t:ürisist<?nt wii.h the well-
Iheads as sl~nwri.
A A
Ax&%
Geaaeaasli
PSL 1ncludes
piactices cuirently
being
iiiiplen?ented
by a broad
spxti?ci ir iof
lhe
Íridus1.y far sewice cmdii.ioris
rectirnriierided in
PSL.
2 includes aii the re
P ~ ~ ~ ~ ~ t~@~~~~~~~~~ keweas QPSL]
ts of
PSI.. i plus adtlitioni il
PSL. 3 ncludes aii the
re
pr¿3ctit:es (xrrer i t ly being irnplem
dcscribetl
i r i this Anriex
A .
PSL
3G
includes
aii the requiren
pr¿3ctit:es
(xrrer i t ly being irnplem
the ii-idusti-y or a specific range
:isstxibed in this
Aririex
A . 1-he
desigriatÍw
PSI.
36
is
m i y iil.ilÍze
in
those ciauses and tables wher
tÍ:x?al gas-tes jing i?equ
reriierits
o
i.est
PSI. 4 in:;ludes i i i i
the re:
ts
of
PSI.. ii plus adtlitioni il
f PSL3 plus additionai
by i3
br?oatl;pe<:trilmi
of
ice conditions as
tissary
to befine the
addi-
pri ier i t that cari be gas-
ts
of PSI. 3G
pitis ceriairi
addi-
tional requirements a n d
is
intended for
the seivice condirions
usually
identified
a
iori~3
Sta
ndi2
r tl a n d is
rior
mi a
I
y
the scope of this
equip1nent.
Figure: A.3 s~ic:v,cs
he
rewnimii:nde:i specification level r::
pri-
inary equipnient.
Priinary
equipiiient
of a
well l iead
asseinbiy
inc ludes a a
rniriimirini:
e tubii-ig
head;
e tubing
hanger;
tubirig tieatl adapter;
e
iower inaster vaive.
All other wellheaci parts are classifieci as secondary. The specifi-
catiori
level
for
secoritlary
equipnierii.
riiay
be
i.i-ie
siirrie
as
or
les
lha i.h
e level
for prirna ry
<:y
tj
i
p
r i ieni..
i n of ?Si. houlti kie hasetl
iiri ii
y
ich
is a
foimal
a n d
systematic ap
potentiaiiy Iiaza
rdous events,
and
estimating
dents
developing
i-onithese events.
Ttie following
ci:nimienls
appiy to the
basic
ques t ions asked ¡ r i
Figure
1?4.3.
<:oïisc;<j:<:??c<::j>
pcp I<:?
::?:vi
rc:n
rn::r:t ¿3
id
I
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
cm ce pb irtay substii.ute ::lose proxiirtity f ix
gas well
in
Figrin:
Tlie
prcxirrtityassessrrieril.
sbould corisider the pc>i.eril.iai iripaci.
of
an
uncontrolled
enxssinn
of
H,S
threa
for
d
ei.er ni
i
n
irig p ten t i a i
I
sk:
iiient
near the w elll iead.
T h e
following lis
of
i,S
is
greater
thari
E
i?
i5i3
fi)
frwrt
i.i-ie
iriclude s ¿3ny
part
i:f ¿3
put:lic area except
i3
pub-
lic
road.
ROE is
defined
in
A.4.5.
?ubiic
area ineans a
dwelling. plac:e of bu
school sus stop,
gov
portÍ:x?
of
a
park.
city,
to
one
can expect
t o be
populated. Public road
mean s
any
street
or
road owned
or
inaintained
foi.
public
access or
use;
5) F U 0 p p n i ROE
of
H,S is greater than
15
ni 50t; froin
t h e
v~el lhead
rid iriclutles
ariy part of
a
put:lic are2 ir icluti ing
a
c) kvell is located Í r i
a y rivii ': r?rrierilaiiy
serisitÍve area su::li as a
park?
wildlife preseive,
ity l in i i k ,
etc.:
d j
well is
located
w i t h i n 46 ni
(:I50 ft) ofari operi fiarne or
f ireti
eq
il
i
p
merit;
i : ) ~ve l lk
Io::ai.eci
withiri 1.5 in (50 t) of i3
f j well
is located
i13 or near
iniand navigable waters;
g)
well is
located
in or
near surface
doinestic watersupplies;
put)l ic
:c:ad
;
ii) ~:rc;llk Io::&<i
withiri
l.07 ni (350
rt ¿3riy
ch~Ili?:g.
.l-h
ese eonditions a
re
recoin
i i iended in
in in u n i cons
d
eralioi-~s.
An y
ici(x3i rc:giilatc:ry requ ire riier1i .s
$;I
AAL5
AasabrngSLt
The following informalion
is
taken from
Texas Railroaci
Corriiriissiori
Rule
36.
SI
rriel.rioeyriivalent rules
are
r io t
giveri.
as
t t ie
rnet:ic:d
c ROE
dei.erniinatiori
is
ris::tl in
t t ie
IJriii.ed Si.ates
oi-~ly. thei.
methods
of
caiculaling ROE inay
apply
depending
oi?
ic:cal
regulatioris.
A.sab.gS.2.
For
de temin i r i g
i i e
ocatiori
or tt ie 3.00
pprn
ROE :
RadEses
o
Exposure
[R'OQ
o H2.S
)I
=
[(q.,58g)(rriole fractiori
t-i,S)(y)]"e's
E
For
deterininingti ie iocation of the
5OU ppin
FiDE:
X = [j0,454
6)(rnolc:
fractiori l-i,S)(q)]ü
8
where
r
H,S
is
the
mole fraclion
of
hydrogeiÎ
suif ide
in the gaseous
is
the
radius
of
exposure,
in feet;
is
the
niaxiriiuri: ?ioli:riie flowrate cic:terriiirie<l to be mail-
abie for
escape,
l l
cubic
feet
p e r
day;
mi~tui-e
vailable foi-eseme.
A.4.5m3
lhe
VoltiIrteflowral.e
used
as t be escape ra ie il?:
radius of
expusiire siiali be that
specified below?
a) For
i:ew
wc:s i r i tic:velop::tl areasp t
cieteri-ninedhj:
usingthe current-adj
set
wells, or tbe
fieidaverage current-adjusted
open
flowrate,
whichever
is
laiger.
i )
1-be
escape
ra ie used
Í r i
deterniinÍrig
the
raditis
of
expost ire
shall be
correcteci
to
standard conditions of 14.65
psia
and
60°F (:I6"C).
A S
~ ~ ~ ~ ~
f
@tain@&
MUd
To seiect the
besired
material
class in Table
3.
he
purchaser
sktoultl
determine
tbe corrosivii.y
i r i j ~ 3 . d
luid
tiy
<><>ri$jikj<
sild
production
variable
c. r
<,sb-c:ir:osiori
-
cr¿3ckii:
::rosion-~:orI~:si~i?:~
nd
sulfide
stiess cracking
SSU)re aii influericeci by the
i
erivironriierital factcirs anti tbe prodtictÍ:x?
varÍa
a n d vaiiables riot listed ~ I Î
able
A.2 niay ais0 influence fluid cor-
The
purchaser should determine
if
inateiials shall me et
NAUE
hW?
0175
for
so u r
service.
NACE h4R 03.75 is oriiy coricernetl with
t t ie inetall i(:
Ki¿3t<?1a req
ui
rern::?:t:;
10
pri:verit
s l
If ide
:;tr<?F;S
king
and
not with
resistance
to geneiai
corrosion.
iitic::ation $;iioilld i3is:i b e
give?:
te: t i i e
c;ixbw:
dioxide
partial
i%),ilÎ wells
as s h o w n
t i ie
field
perfoi-niance
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchas e API Soec 6A online a t www.do bal.ihs.com
API Spec ification 6A
:
19t h Edit ion, July 2 00 4
Specification for W ellhead and Christmas Tree E quipme nt
Annex
A
(lnformatlve)
Purchaslng Guldellnes
The m inimum partial pressure of carbon dioxide required to initi-
ate corrosion and the relative effect of increasing partial pres-
sures on th e corrosion rate are strongly influenced by other envi-
ronmental factors and production variables, such as:
a) temp eratu re;
b) H2S level;
c) PH;
d) chloride ion concentration;
e) sand production;
f)
water production and comp osition;
g) types and relative amo unts of produced hydrocarbons.
Finally, h e purchaser should consider future service of the w ell
when selecting a material class. This should no t be limited to
anticipated change s in the acid gas partial pressures for p roduc
tion or increased water production with or without increased
chloride content, but also should include consideration of opera
tions such a s acidification or other well treatments.
Table A . l - Relatlve Corroslvlty of Retalned Flulds as Indlcated by CO, Partl al Pressure
Partial Press ure of
CO,
Retained Fluids Relative Corrosivity M Pa
General Service Noncorrosive
General Service Slightly Corrosive
General Service
Sour Service Noncorrosive
Sou r Service Slightly Corrosive
Sour Service
Moderately to Highly Corrosive
Moderately to Highly Corrosive
<0.05
0.05 to 0.21
>0.21
<0.05
0.05 to 0.21
>0.21
See following pages for Wellhead Equipm ent Data She ets.
Copyright 20 04 American Petroleum Institute. All rights reserved. I 23130
6A-
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
--`,`,,`,,,```,``,,,```,,,,-`-`,,`,,`,`,,`---
8/9/2019 API Purchasing Guidelines 01-01-04
http://slidepdf.com/reader/full/api-purchasing-guidelines-01-01-04 19/202yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100
Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Surface-Controlled Subs urface Sa fety Valve Outlets
Number
Size
Electrical Feed-through Connection
Special Material Requirements
Temperature Rating (Table 2)
Mate rial Class (Table 3)
Retain ed Fluid Corrosivity (Table A. l)
Witness o esa o o
External Coating
o
es
o
o
Internal Coating o es
Type
Ma in Run (Studs) (Nuts)
Flange Bolting Requirements (Table
49)
Non-exposed Exposed Exposed (Low Streng th)
aif
yes, specify what
and
by
whom.
Copyright 20 04 American Petroleum Institute. All rights reserved. I 23130
6A-1
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Define or specify material requirements and, if cladding or other corrosion resistant ma teriais are to be iniayed, state base
material type/ciad material type, e.g., 4130/625.
if yes, specify what and by whom.
indicate required boiting for the ap plicable retained fluid and temperature classification specified in Table 49
(Cont inued to next page}
6A-12
Copyright 200 4 -American Petroleum Institute. All rights reserved. I 23130
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Service Conditions a t Max. Flow (Units) Norm al Flow (Units) Min. Flow (Units)
Pressure I inlet I I I
I
Outlet or^^
I I I
Temperature a t Inlet
I I I
Oil I Flowrate I I I
I S.G. (if available) I I I
Gas
I
Flowrate
I I I
I or
G.O.R.
I
I S.G. (if available) I I I
Liauid
I
Flowrate
I I I
S.G. (if available)
Ma nual/Actuated
Actua or Type/Ma ke/M ode
Power Source
Manu al Override
I
Position Indication Local Remote/Position Tra nsm ter
Positioner
Additional Comments
a See Figures 20 and 21.
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 6A online a t www.global.ihs.com
Appendlx
A
Purchashg Gaald@llpeeas
API
Speciiiciil.iciri
63
:
i 9 i . h E.ci i l . icx~~
uiy
206 4
Specification
or Well l?ead
anci Cli:-islmasTree
Eyu i pnxn t
Quanti ty
Pneumatlc
Dia ph ragm Single
Double
Piston Single
Double
Table A.12
-
Wellhead Equlpment Data Sheet-Actuator and Bonnet
Quantity Quantity
Hydraullc Electrlc
Conventional Rising Stem
Retained fluid Rising Stem
W ecutter Wire/Cable Size
Self-contained Stand-alone Power Source
Non-risingStem
Non-risingStem
Supply
Requlrements/Speclflcatlons
Pneumatlc
Ava i a bi ty
Clean Air
N trogen
Well Gas Non-NACE
Other NACE
MPa (psi)
Max. Min.
Hydraullc
Ava i a bi ty
Well Fluid
Non-NACE NACE
Self-contained
Other
MPa (psi)
Max. Min.
Current Available
Other
Actuator Requlrernents
Speclflcatlons Actuator
Temperature Rating Fab le 2)
Retained Fluid (Table A .l )
Mate rials Class (Table 3)
Externa l Coating ? No Yes
If yes type
Bonnet Requlrernents
Maximum Working Pressure MPa (psi)
Materl al Class:
Fleld Data
Customer
Field Location
Platform
Well No.
Closed-in Tubing Head Pressure MPa (psi)
Accessories
Fusible Hold-open Device
Manual Hold-open Device
Qu ick Exhaust Valve
Position Indication a) Local
b) Remote
Speclflcatlon PSL
SSV PR2
2
3
3G
4
Temperature Ratlng:
6A-18
Copyright 200 4 -America n Petroleum Institute. All rights reserved. I 2313
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Specification for Wellhead and Christmas Tree Equipment
Appendlx
A
Purchaslng Guldellnes
Flgure A . l - Typlcal Wellhead and Tree Conflgu ratlon
5,000 psl(34.5
MPa) Rated Worklng Pressure (WP)
Surface Safety
Va Ive
Option 5
Surface Safety
Typical
Programs
Casing Program
in. (mm)
8% 219.1)x 5% 139.7)
9% 244.5)x 7 (177.8)
10% 273.1)x 7% 193.7)
Bit Program Casing Head Top Flange Tubing Head Top Flange
in. (mm ) in.
-
psi (mm
-
MPa) in.
-
psi (mm
-
MPa)
7% 200.0)
11
- 3000 (279 - 20.7) 7116- 5000 (179 - 34.5)
8% 215.9)
or
8% 222.2)
or
9% 250.8)
11-
5000 (279
-
34.5)
Copyright 20 04 American Petroleum Institute. All rights reserved. I 23130 6A-1
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Specification for Wellhead and Christmas Tree Equipment
Appendlx
A
Purchaslng Guldellnes
Flgure A.2 - Typlcal Wellhead and Tree Conf lguratlon 10,000 psl(69.0 MPa) Rated Worklng Pressure (WP)
Surface Safety
5,000 psi (34.5 MPa)
Typlcal Programs (US Customary Un h )
Casing Program (in.)
16
x
10%
x
7%
16x 11%x 9 7
Liner
13%x 9 7
10%x 7%x 5
Typlcal Programs (Metrlc )
Casing Program (mm)
406.4 273.1 193. 7
406. 4 298. 5 244.5 177.8
Liner
339. 7 244. 5 177.8
273.1 193.7 127.0
Bit Program (in.)
14%
x 9xor x 9
14%x 10%x 8
12%x
8
6
9 x 6%
Bit Program (mm)
374.7 250. 8
r
241.3
374.7 269.9 215.9
311.2 215.9 152.4
250.8 165.1
Casing Head Housing
Top Flange
(in. - psi)
16%- 5000
16%
-
5000
13% 5000
16
-
5000
Casing Head Housing
Top Flange
(mm
-
MPa)
425
-
34.5
425
-
34.5
346
-
34.5
279- 34.5
Casing Head Spool
Top Flange
(in. - psi)
11- 10, 000
13%
-
10, 000
11
-
10, 000
11- 10, 000
11
-
10, 000
Casing Head Spool
Top Flange
(mm
-
MPa)
279
-
69. 0
346
-
69. 0
279- 69. 0
279
-
69. 0
279- 69. 0
Tubing Head
Top Flange
(in.
-
psi)
71/, 10, 000
71/, 10, 000
71/, 10, 000
71/, 10, 000
Tubing Head
Top Flange
(mm
-
MPa)
179
-
69. 0
179
-
69. 0
279
-
69. 0
179- 69. 0
6A- 20 Copyright 200 4 -American Petroleum Institute. All rights reserved. I 23130
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
--`,`,,`,,,```,``,,,```,,,,-`-`,,`,,`,`,,`---
8/9/2019 API Purchasing Guidelines 01-01-04
http://slidepdf.com/reader/full/api-purchasing-guidelines-01-01-04 32/202yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100
Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
li} ariy part Icu iar iriarking i’equ irerrieri1.s;
I) a r y
particuiar packing requirements;
ri:) rniriimri ni br’e aiirig force requ reci.
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
--`,`,,`,,,```,``,,,```,,,,-`-`,,`,,`,`,,`---
8/9/2019 API Purchasing Guidelines 01-01-04
http://slidepdf.com/reader/full/api-purchasing-guidelines-01-01-04 36/202yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100
Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
8/9/2019 API Purchasing Guidelines 01-01-04
http://slidepdf.com/reader/full/api-purchasing-guidelines-01-01-04 38/202yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100
Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Specification foi-Control Sysieins or Drill ing Well Control
E u
i
pnie it. arid Con
r d
Systerris
f o r
Dive i r u
i
11
irierit
1.
Direrter
Unit
ODt. ?
Close
2
Pas.
Operating Pressure
R k X
Miar
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Specification foi-Control Systeins or Drill ing Well Control
E
u
pnie it. arid Con
rei1
Systerris
f o r
ilive
i r
Banaaeexes
n aad a
u
i
11
irierit
S a i
.ocal.iciri Qua
ritity
NQ.
I
2.
3 .
4.
5.
6.
,
8,
9.
10.
Il..
12.
13.
3.
15.
16,
17
18.
3.9.
m.
21.
22.
23.
Ceintad Funct ion
Foil Select
Upper Annular BOP
l.ow::r Anriular BO?
Riser Conriecior
Riser Cnrinector Second ary
U p l ~ ~ ri r ~
arris
Shea,
Viains
High
P r e s s u r e Shear
Rams
Upper Pipe Rariis
Middle
Pipe
Rains
I c w c : ~
Pipe
Rams
Wei h
eatl Cori
nec:l.cir
\dZ el
h ead
Con
nector
Secarida y
POD
l.ai.ct1
Blue
Hydraulic Stab s
Yeiiow
Hydraulic
Stahs
c:lholíe anti
Kill Stabs
Annuiai'
BOP
Outer Bleed
Arinui¿3:
BOF
Iriner BIec:d
ILMRP Ci-iolíe
aritl Kiii ]-esl.Vaive
Upper
Outer
Choke
Upper Imer Choke
Lowe,
Outer
Choke
P O S
3
3
3
3
2
3
3
-
3
3
3
3
2
2
3
3
3
2
2
2
2
2
2
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
yright American Petroleum Instituteoduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Practical Guidelines for Mak ing Practical Choices
API Spec 2B
Fabrication of Structural Steel Pipe
API spec 2c
Offshore Cranes
API Spec 2H
Carbon Man ganese Steel Plate for Offshore
Platform Tubular Joints
API Spec 2M Tl
Carbon Manga nese Steel Plate with Improved
Toughness for Offshore Structures
API Spec
2MT2
Rolled Shapes with Improved Notch Toughness
API Spec 2W
Steel Plate s for O ffshore Structures, Prod uced by
Thermo-MechanicalControl Processing (TMCP)
API
Spec
2Y
Steel Plates, Quenched-and-Tempered,
for O ffshore Structures
API
Spec 4F
Dril ling an d W ell Servicing Structures
API
Spec
5CT
Specification for Casing and Tubing
API Spec 5D
Specification for Drill Pipe
API Spec 5L
Line Pipe
API
Spec 5LC
CRA Line Pipe
API Spec SLCP
Coiled Line Pipe
API Spec 5LD
CRA Clad or L ined Steel P ipe
API
Spec BA
Wellhead and Christmas Tree E quipmen t
Page No.
i
iii
2 5 1
2 G 1
2H-1
2MT1-1
2MT2-1
2 w - 1
2Y-1
4F-1
5CT-1
5D-1
5L-1
5 L G 1
5LCP-1
5 L D 1
6A-1
API Spec 6D
Specification fo r P ipeline Valves
API Spec 6H
End Closures, C onnectors, and Swivels
API Spec 7
Rotary Dril l Stem Elem ents
Page No.
6D-1
6H-1
7-1
API Spec
7K
7
K - I
Specification for Dril l ing and Well Servicing Equipm ent
API
Spec SA
8A-1
Dril ling and Production Hoisting Equipm ent
API Spec 8C 8G1
Dril ling and Production Hoisting Equipm ent
(PSL 1 nd PSL2)
API
Spec 11B
Sucker Rods
1151
API Spec 11 Dl
1 1 D 1 - I
Petroleum and Natural Gas Industries -
Downhole Equipment - Packers and
Bridge Plugs
API Spec1116
Electric Motor Prime Mover for Beam
Pump ing unit Service
11L6 -1
API Spec 1 l N 11N-1
Lease Autom atic Custody Transfer (LACT) Equ ipme nt
API
Spec
l2B 1251
Bolted Tanks for Storage of Production Liquids
API Spec l 2 D
12D-1
Field Welded Tanks for Storage of Production Liquids
API Spec l 2 F
12F-1
Sho p Welded Tanks for Storage of Productino Liquids
API Spec UGD U
Glycol-Type Gas D ehydra tion Units
API Spec
121
Oil and G as Separators
API Spec
l 2 K
Indirect-Type
Oil
Field Heaters
(Continued to
next
page
12GDU-
12J-1
1 2 K - 1
Copyright
2004
American Petroleum
nstitute.
All rights received. I
23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Specification for Subsurface Safety Valve Equipme nt
API Spec 14L
Lock Mandrels and Landing Nipples
API Spec l5HR
High Pressure Fiberglass Line Pipe
API Spec l5LE
Polyethylene (PE) Line Pipe
API Spec l5LR
Low Pressure Fiberglass Line P ipe
API Spec l 5 L T
PVC Line d Steel Tubular Goods
API Spec 16A
Drill-Through Equipme nt
API Spec 16C
Choke and Kill Systems
API Spec 16D
Control Systems for Drilling Well Control Equipment
API Spec 17D
Subsea Wellhead and Christm as Tree Eq uipment
API Spec 17E
Subsea Production Control Umbilicals
API Spec 17J
Unbonde d Flexible Pipe
API Spec 17K
Specification for Bonded Flexible Pipe
API Std 600
Bolted Bonnet Steel Gate Valves for Petroleum
and Natural Gas Industries - Modified National
Adoption of
IS0
10434:1998
Page No.
12L-1
12P-1
14A-1
14L-1
15H
R - 1
15LE-1
15LR-1
15LT-1
16A-1
16C1
16D1
1 7 D 1
17E-1
17J-1
17K-1
600-1
Please note that the following API Publicationsdo not
contain PurchasingGuidelines:
API Spec 2F
API Spec
58
API Spec 7F
API Spec
9 A
API Spec 10A
API Spec 1 0D
API Spec 1 l A X
API Spec 11E
API Spec 1 1IW
API Spec 11V1
API Spec 13A
API Spec 16R
API Spec 17F
API RP 19B
API Spec 1581
API Spec
1583
Copyright
2004
- Amencan Petroleum nstitute.All rights EseNed. 1 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purch ase API Spec 2B online at www.global.ihs.com
API SDecification
6 th Edition, July
2001
Fabrication of Structural Steel Pipe
Suggestions
for
Ordering
API Spec 2B Pipe
API Monogram@Required
Yes No
In placing orders for steel pipe to be fabricated in accordance
with API Spec 28, the purchaser should specify the following on
the purchase order:
Specification
Quantity
Size
ASTM
(or
other industry
standard) Designation or
Steel Plate
Delivery Date and Shipping
Instructions
Supplementary Requirements
API Spec 28
As Required
Nom inal Length, Wall
Thickness, and Outside
Diameter
Specification/Grade/
Supplementary Requirements
As Required
As Required
The purchaser should state whether any of the following optional
requirem ents are to apply:
Mill Test Certificate for Steel Plate
End Finish (specify, if not stand ard 30 degree bevel)
o
o
SR1, Plate Direction of Rolling
Longitudinal -
"S-IC'
Transverse -
S-IT
o
o
o
o
SR2, Notch Toughness (specify test tem peratures
SR3, 100%Radiographic Examination (joint can
SR4, Ma tching Weld Toughness for Des ignated
and m inimum energy requirements)
quality assurance)
Plate Material
Special Note: Nothing in this specification should be nterpreted
as indicating a preference by the com mittee for any optional
requirement. In the selection o f requirements, the purchaser
mu st be guided by the purchaser's experience and by the servic
for w hich the pipe is intended.
Copyright
2004
-Amer ican Petroleum nstitu te. Ali
rights reserved.
I 23130
25
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 2H o nline at www .global.ihs.com
API Specification
8 th Edition, August 1999
Carbon Manganese Steel Plate
for
Offshore P latform Tubular Joints
Suggestions
for
Ordering
API Spec 2H Steel Plate
API
Monogram@Required
Yes
oNo
In placing orders for steel plate to be manufactured
in
accordance
with API Spec 2H, the purchaser should specify the following on
the purchase order:
Specification
Quantity/Size
Grade
Retreatment
(see subs ection 4.2)
Chemical Requirements
(see Table
4-1,
Footnotes
b
& d)
Mill Inspection by Purchaser
Delivery Date and
Shipping Instructions
Supplementary Requirements
API Spec 2H
As Required
42 or 50
State Whether Retreatment
per 4.2 is Permitted
State Whether use of
Titanium, and/or Vanadium,
Zirconium is Permitted and,
if
Permitted. State Lim its
State Advance No tice
Requirements
As Rewired
As Required
The purchaser should state
on
the purchase order the require
ments concerning he following Supplementary Requirements,
which are optional with the purchaser.
Note:
Section 1 f this specification addresses the purpose/
function
of
several o f the supplementary requirements.
SR1
SR2
SR3
SR4
SR5
SR7
SR8
SR9
SR11
SR12
SR13
SR14
Ultrasonic Examination
Notch Toughness at Lower Temperatures
SR2 .1 Notch Toughness at
-60°C
SR2.2 Notch Toughness at Other Than
SR2.3 H igher Notch Toughness Energy Values
Individual Plate Testing
Through-Thickness (Z-Direction)Testing
Low Sulfur Steel for Improved Through-
Thickness Properties
Low Nitrogen Content for Improved Notch
Toughness in Strain-Aged Condition
Strain-Aged Charpy V-Notch Impac t Tests
Simu lated Post-Weld Heat Treatment
Preproduction Qualification
Notch Toughness Using Drop Weight
Surface Quality
Thickness Tolerance
-40°C
or
-60°C
O
o
O
o
o
o
o
o
o
o
o
o
Special Note: Nothing in this specification should be interpreted
as indicating
a
preference by the com mittee for any material or
process.
ln
the selection of m aterials an d processes, the
purchaser must be guided by this experience and by the service
for which the plate is intended.
~
Copyright
2004
-American Petroleum Institute.All rights resewed. I 23130
2H-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 2 M T1 online a t www.giobal.ihs.com
API SDecification
2'MTl
Appendix A
2nd Edition, September 2001
Carbon Manganese Steel Plate with Improved
Toughness for Offshore Structures
Suggestions for Ordering
API Spec 2MT1Steel Plate
~~ ~~ ~ ~
API Monogram@Required
U
Yes
O
No
In placing orders for steel plate to be m anufactured
in
accordance
with API Spec 2MT1, the purchaser should specify the following
on an inquiry and the purchase order:
Specification API Spec 2M T1
Quan tity Size As Required
Grade 2MT1
Chemical Requirements
(see Table
1,
Footnotes b an d d)
State Whether use of
Boron and/or Zirconium is
Permitted and, if Permitted,
State Limits
Process of Manufacture Subsec tion 3.2.2
Mill Inspection by Purchaser
State Advance Notice
Requirements
As Required
elivery Date and S hipping
Instructions
Supplem entary Requirements As Required
Manufacturers Procedure State if Required
Specification (MPS)
The purchaser should state on the purchase order the requirements
concerning he following supplementary requirements which are
optional with the purchaser:
S 1 Ultrasonic Examination
U
S9
Simulated Post-Weld Heat Treatment o
S I3 Surface Quality
U
S14 Thickness Tolerance
o
S15 Manufacturing Procedure Specification
o
Note:
Nothing
in
this specification should be nterpreted as
indicating a preference for any material o r process.
In
he
selection of materials an d processes, the purchaser mu st be
guided by the purchaser's experience and by the service for
which the p late is intended.
Supplementary Requirements
These requirements shall n ot apply unless specified in the order
in which case the m anufacturer
or
processor shall perform the
specified supplementary requirement before shipment of th e
material. Supplementary requirement S 1 provides for ultrasonic
examination of the plates by the ma nufacturers and specifies
limits for acceptance.
Supplem entary Requirement S9 provides for simulated post-weld
heat treatment o f test sam ples. The pu rchaser should specify on
the purchase order the temp erature range, time at temperature,
and cooling rate.
Supplem entary Requirement S1 3 may be applied where surface
quality is considered critical.
Supplementary Requirement S14 may be applied to reduce the
standard over thickness tolerance.
Supplementary R equirementS15 may be applied if additional
details of the manufacturing procedure
or
process are required
by the purchaser.
By agreement between the purchaser and m anufacturer,
and whe n specified on the purchase order, the following
Supplem entary Requirements shall apply:
SR1
Ultrasonic Examination
SR1.1
Pulse echo ultrasonic examination shall b e performed on each
plate in accordance with ASTM Specification A 578/A 578M.
Acceptance Level IIshall b e used.
SR1.2
Examination reports shall be furnished for ea ch plate, and areas
with more than
50%
oss of back reflection shall be located on a
sketch.
SR9
Simulation of Postweld Heat Treatment
SR9.1
A
second test of test coupons shall be subjected to a sim ulated
postweld heat treatme nt provided by the purchaser tha t is
representative of the therm al treatme nt to which the material will
be subjected during fabrication. The temperature range, time at
temperature, and coo ling rate shall be as specified on the order.
Copyright
2004
-American Petroleum Institute.All rights reserved. I 23130
2MT1-1
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
API Specification 2MTl: 2nd Edition, September 2001
Carbon Maganese Steel Plate with Improved
Toughness for Offsho re Structures
Handbook Revision 01.01.04
Refer to pages 5 -
6
of API Spec 2M T1
Purchase API Spec 2M T 1 online a t www.global.ihs.com
Appendix A
Suggestions for Ordering
API Spec 2MTl Steel Plate
S R l 3
Surface Quality
For applications where surface quality is co nsidered critical,
plates are to be furnished in the blasted and inspected
conditions. The depth of rolled-in scale or c lusters of p its shall
not exceed 0.015 in. and sh all not result in an undergage
condition. However, isolated individual pits not over 0.030 in.
deep are acceptable provided plate thickness is not reduce d
below the specified minimum. Other surface imperfections such
as tears, seams, snakes, blisters, scabs, etc., are n ot acce ptable
and must be conditioned without reducing the thickness below
minimu m. The surface imperfections m ay be removed by
grinding provided each ground area is well fired and grinding
does not reduce the thickness of the plate below m inimum.
S R 1 4
Thickness Tolerance
By
agreement between purchaser and supplier, plates can be
ordered to
Y
standard over tolerance for thickness shown in
ASTM A6.
SR15
Manufacturing Procedure Specification
(MPS)
Details of steel making refining, desulfurization deoxidation
continuous cas ting (if used), control of segregation, intermixing
between heats, and slab cropping shall be addressed.
The sequence of deoxidizing, microalloying, and grain refining
elements sh all be shown. Slab quality control shall be included.
The MPS shall identify aim and range values for chemical
composition, mechanical ests, and all major manufacturing
steps, including all examination and checkpoints. Process
variables for steel plate rolling and cooling conditions sh all be
identified.
Details of welding repair and rep air qualifications shall be
shown.
2MT1-2
Cowright
2004. American Petroleum Institute.
All
rights reserved.
I
23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purch ase API Spec 2M T2 o nline at www .global.ihs.com
API SDecification
ZMT2
1st Edition, June 2002
Appendix
A
Suggestions for Ordering
Rolled Shapes with Improved Notch Toughness
API Spec
2Mfz
Shapes
API Monogram@Required Yes No
A l
Placing Orders
In placing orders for steel shapes to be m anufactured in
accordance with API Spec 2MT2, the purchaser should specify
the following on the purchase order (parenthetical remarks are
comm entary for the user, and need not appear on t he order):
Specification
Grade
Class*
Quantity/Size
Mill inspec tion by Purchaser
Items Only “By Ag reement”
(Continued to next column)
API Spec 2MT 2
(Ail are
50
ksi yield, group
II
in AWS D 1 . l and API RP
2A)
C (Ordinary che mistry a nd
toughness)
B
(Improved chemistry and
toughness)
A (Superior chemistry and
toughness)
AAZ
(Invoking extras in
8.14:
S101)
As Required
State if Required, and Any
Advance Notice Requirements
Section
1.5:
Other
International Standards
Section 4.7: T hird Party
Remediation Shop
Section 8.1: SR1
-
Prescribed
Steelmaking Methods
Section
8.3:
SR3
-
Lower
Impac t Test Temperature
Section 8.4: SR4 -
Production L ot Tension Tests
Section 8.7: S R19
-
IS0 10005; Hold points
Section
8.8:
SR20
-
Surface
Defect Percentage
Items Only “By Agreement”
Section
8.9:
SR44 -
Min.
RA
>
30%
Section
8.11:
SR76
-
Core Charpy Criteria
Section
8.13:
SR78 -
Charpy 50% Shear
Section 8.14: SR101 -
Class AA2
Section 8.15: SR102 -
No Tolerance on Chem istry
Intended Fabrication For Man ufacturer’s
Heat Treatment
Informa tion, Even
if
No 8.6:
SR9
Delivery Date, As Required
Shipping Instructions
Supp lemen tary Requ iremen ts As Required
*Note:
Classes
C,
6 nd
A
are intended to c orrespond to
API
RP
2A (steel classes described
in
Section
8.1.3
and weld
impact requirements of Section 10.2.2).Class
AAï
s intended
for
exceptionally critical applications.
A2
Commentary on Supplementary
Requirements
The purchaser should state on the purchase orderthe requiremen
concerning he following Supplementary Requirements, which ar
optional with the purchaser. However, not all options a re availabl
from all producers, and some require specific agreement.
A2.1
SR1
Vacuum Treatment
Common pre scriptive supplem ent from ASTM beam specs, but
rarely found in API node steel specs, w hich are performance
based.
A2.2
SR2
Product Analysis With ou t Tolerance
Chemistry from th e finished product, rather than from the heat’s
ladle sample, eliminating th e tolerance s allowed by ASTM A6.
Cowright
2004
-American Petroleum Institute.Ali
rights
reseived. I 23130
2MT2-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purch ase API Spec 2M T2 online a t www.global.ihs.com
API
Specification2MT2
:
1st Edition, June 20 02
Rolled Shapes with Improved Notch Toughness
Appendix A
Suggestions for Ordering API Spec
2MTz
Shapes
A2.3
SR3 - m pac t Tests at Lo wer Temperature
The following targets have been suggested as being poss ible in
some cases, and more compatible with the usage of plate
specifications in offshore structures:
Class C 20 ft-lb. at
32°F
27J at 0°C
Class B 2 0 ft-lb. at -4°F 27J at -20°C
Class A 3 0 ft-lb. at -40°F
41i
at -40°F
Required for
Class AAZ
Users are cautioned that, for heavy section beam and c olumn
sections hav ing flange thickness greater than
1.5
inches,
meeting the foregoing oughness requirements may have
progressively more lim ited availability with the us ual produc tion
methods, and m ay require time consuming and costly extra
processing. For these applications , consid eration should be g iven
to fabricating m embers by welding together 50 ksi plates of
appropriate chemistry and Charpy toughness, in which case the
provisions of AWS D 1. l apply;
or
beams of a higher performance
class may be substituted.)
A2.4
SR4 - Ad ditio nal Tension Tests
Testing production lot rather tha n h eat lot, required for C lass AAZ.
A2.5
SR8 - Ultrasonic Examination
Recommended to avoid preexisting laminations in th e through
mem ber of truss connec tions or nodes; alternatively, thi s
inspection may be performed on a spot basis at th e fabrication
site, and the member reorientated to avoid laminations at
nodes.
A2.6
SR9 - Simulation of Therm al Treatment
Checks for loss of strength
or
toughness if the steel is to be
heated during fabrication above 1 050°F (565"C), beyond the
usual h eat affected zone from welding.
A2.7
SR19
-
Additional Quality Control Requirem ents
Qua lity system, quality plan, p rocess control plan, and trace ability,
for Class AAZ.
A2.8
SR20
-
Additional Surface Requirements and Weld Repair
Surface defects marked by steelmaker and weld repaired by qual-
ified fabricator. Part o f Class AAZ.
A2.9
SR44 - Through Thlckness (2-Dlrection) Testing
Recommended to avoid laminar tearing in the through member
of truss connections or nodes. Passing he test may require
furthe r pro cess ing beyond 8.12: SR77, reduced sulfur. Appropriate
supplement for Class
A.
Required part of Class AAZ. If a re duction
of area greater than the standard 30% is required, this must be
stated, subject to agreement.
A2.10
SR75 - Maxlm um Yield and Yieldflensile Ratio
Part of Class A M .
A2.11
SR76 - Core Region Charpy Tests
Results are typically less favorable than samples from the flange,
but research is mixed on the significance of this.
A2.12
SR77
-
Reduced
Sulfur
May be used to achieve the goals of
8.9:
SR44 without the extra
cost of Zdirection testing.
A2.13
SR78
- 50%
Shear Fractu re App earance
Often a better indicator
of
the brittle fracture transition temperatu re
than a modest impact energy requirement, or modern low sulfur
steels. Also may be more difficult for steel-makers to meet. Part
of Class AAZ.
A2.14
S R 1 0 1
-
Class AAZ Shapes
Collects various S upplementary Requirements for critical
applications , including Charpy tests at -40°F (40°C).
A2.15
SR102
-
Product Analysis with out Tolerance
Available by special ag reement only.
2MT2-2
Copyright 20 04 -Am erican Petroleum InSi tut e. All rights reserved.
I
23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 2Y online at w ww.global.ihs.com
4 t h Edition, August
1999
Stee Plates, Quenched-a nd-Te
m
pe ed,
for
Offs
ho re Structures
API Monogram@Required O
Yes
o o
Suggestions for Ordering
API Spec 2Y Steel Plate
In placing orders for steel plate to be manufac tured in accorda nce
with API Spec 2Y, th e purchase r should spe cify the fOllOWing on
the purchase order:
Specifica tion API Spec 2Y
Quantity/Size As Required
Grade 42,50 ,50T, or 60
Mill Inspec tion by Purchaser
Delivery Date and As Required
Shipping Instructions
Suppleme ntary Requireme nts As Required
State Advance Notice
Requirements
The purchaser should state on t he purchase order the
requirements concerning the following Suppleme ntary
Requirements, which are optional with th e purchaser.
Note: Section 1 f this specification addresses the purpose/
function o f several of t he supplementary requirements.
S 1 Ultrasonic Examination
o
S2 Notch Toughness at Lower Temperatures
o
S2 .1 Notch Toughness at -60°C o
S2.2 Notch Toughness at Other Than O
S2.3 Higher Notch Toughness Energy
o
S3 Additional Tension Test o
S4 Through-Thickness Z-Direction)Testing o
S5 Low Sulfur Steel for Improved Through-
o
S7 Low Nitrogen Content for Improved Notch o
S8 Strain-Aged Charpy V-Notch Im pact Tests o
S9
Simulated Post-Weld Heat Treatment
-40°C or -60°C
Values
Thickness Properties
Toughness in Strain-Aged Condition
(Continued to next column)
S I 0 Hardness Testing
o
S 1 1 Preproduction Qualification
S11 .3 CTOD Testing of Weld Heat
Affected Zone
S11.4 Weldability (Hydrogen Cracking)
Tests at:
- CP (Conventional Preheat) Level
- MP (Mo dified Preheat) Level of
O
S1 2 Notch Toughness Using Drop Weight O
S13 Surface Quality O
S I 4 Thickness Tolerance o
of Performance
Performance
Special
Note:
Nothing in this specification should be nterpreted
as indicating
a
preference by the committee for any ma terial
or process. In the selection
of
materials and processes, the
purchaser must be guided by this experience
and
by the
service for which the p late is intended.
2Y-
omgh 2004 -Amencan Petroleum
Institute.
All
rights
IES~IV&. 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API SDec 4F onlin e a t www.global.ihs.com
API Specification
2nd Edition, June 1995
Drilling and Well Servicing Structures
Appendix
A
Supplementary Requirements
API Monogram@Required Yes No
SR1
Low
Temperature Testing
This supplementary requirement shall apply when specified by
purchaser. In all cases, the purchaser and m anufac turer shall
agree upon the m inimum design temperature im pact test result
requirements.
Critical components shall be fabricated from materials
possessing h e specified notch toughness at the required
minimum design temperature. Impac t testing shall b e performed
in accordance with th e requirements of ASTM A370.
When
it
is necessary for subsize impact test pieces to be used,
the acceptance criteria shall be multiplied by the appropriate
adjustm ent factor listed in Table A-1. Sub size tes t piec es of width
less than 5 mm are not permitted.
Products meeting this supplementary requirement shall have
their name plate stamped with SR1 and with the design
minimum temperature in degrees
C
and the impact value in
joules.
Table
A-& Adjustment Factors for SubSize Im pact Specimens
Specimen D imensions
mm x mm Adjustment Factor
10.0 x 7.5 0.83 3
10.0
x 5.0 0.667
SR2
Proof Load Test
The equipment shall be load tested to a load agreed upon by the
purchaser and manufacturer. After load testing, the equipment
shall be visually exam ined per 10.4.1 of this specification.
The equipment shall have its name plate stamped with
SR2
and
the ratio of load test to design load (load teSvdesign load),
example SR2-1.0.
SR3
Data Book
When reque sted by the purchaser, records shall be prepared,
gathered and properly collated in a data book by the manufacturer
The data book shall at least include for each unit:
a. Statem ent of compliance
b. Equipment designation/serial number
c. Assembly and critical area drawings
d. Nom inal capac ities and ratings
e. List of com ponents
f. Traceability codes and systems (marking on parts/records
on file)
g. Stee l grades
h. Heat treatme nt records
i. Material test reports
j. NDE
records
k. Performance es t records including functional hydro static
and load testing certificates (when applicable)
I. Supplementary requirements certificates as required
m. Welding procedure spec ifications and qualification records
n. Instructions
Copyright 2004
Ameri can Petroleum Institut e. All rights resewed. I 23130
4F-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
API Spe cification 5CT : 7th Edition, October 2001
Specification for Casing and Tubing
Handbook Revision 01.01.04
Refer to pages 9
-
11
of
API Spec 5CT
Purchase API Spec 5CT online at www.global.ihs.com
IS0
119 60 :20 01- Petroleum and Natural Gas Industries
-
Steel Pipes for Use as Cas ing or Tubing or Wells
Information to be Supplied by the Purchaser
Requirement Reference
Cold Rotary Straighten ing - 6.3
QI25
Grade
Statistical Impact Testing
Impact
of
Group 1
Non-Heat-Treated Pipe
7.3.8, A.6 (SR12)
7.5.1, A.9 (SR16)
Sulfide Stress C racking Test
-
C90
and T95 Grade
7.14
Length of Accessories
8.6
Thread and Storage Compound
8.14
Waiving NDE of G roup 1 ouplings
in Grades H40, J55 and K55
9.14.3
Coupling Thread Plating- 9.17
Q I 2 5 Grade Only
Additional H ardness Testing
-
10.6.2
Grades M6 5 and L80
Additional Hardn ess Testing -
10.6.4
C90
and T 9 5 Grade
Reduced S ection Tensile
10.4.6
Specimens
- QI25
Grade
Hydro static Pressure Test for
10.12.2
Handling-Tight Make-up,
Accessories and Alternative 10.12.3
Hyd rostatic Test Pressures
Plain-End Q I 2 5 Casing
10.12.2
Hydrostatic Testing
Non-Des tructive Examination
10.15,
A . l (SR I), A.2
(SR2), A.4 (SRIO)
and A.5 (SRI I )
Marking Requirements 11.1
Thread Protectors 12.2
Coupling Blanks - Q I2 5 Grade Only
Upset Casing
-
Q I 2 5 Grade Only
A.3 (SR9)
A.4 (SRIO)
Electric-Weld Casing- A.5 (SRI I )
P I1 0 and QI25Grade
Alternative
F
Factor in
SR12
-
Q I2 5 Grade
(Continued to next column)
A.6 (SR12.2)
Requirement Reference
Spec ial End Finish for Casing,
Couplings, P upJoints or Accessories
Quality Assurance Requirements
8.12.8, 9.13.2
Spec ial Wall Thickness for
Grades C90, T95 a nd Q I 2 5
8.2
5.2
Tubing
5.2.1
When inquiring or placing orders for pipe to be manufactured in
accordance with this International Standard, the purchaser shall
specify the following:
Reauirement
Standard
Quantity
Type of P ipe or Couplings
Tubing
Non-Upset, External-
Upset or Inte gral Joint
Threaded, Plain-End,
or O ther Connection
With or Without Couplings
Spec ial Bevel Couplings
Special Clearance
Couplings
Label 1 r S pecified Outside
Diameter
Label 2 or Specified Mas s or
Wall Thickness
Grade an d Type,
where Applicable
Range Length
Seamless or Electric-Welded
(Continued to next page)
Reference
IS0 11960or API
5CT
Table
C.3
or Table E.3
8.12
8.12
9.12, Tables C.3, C.37
and C.38 or Tables E.3,
E.37 and E.38
9.8,
Tables
C.3, C.38
or Tables E.3 a nd E.38
Table
C.3
or Table E.3
Table C.3 or Table E.3
Table C.3 or Table E.3,
Table
C.5
or Table E.5
8.6,
Table C.30 or
Table E.30
6.1,
Table C.4 or Table E.4
5CT-2 Copyright2004 -American Fetmleum nstitute.
All
rights reserved. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purcha se API Spec 5CT online at www.global.ihs.com
IS0
11960:2001-
Petroleum and Natural Gas Industries -
Steel Pipes for Use as Cas ing or Tubing or W ells
Information o be Supplied by the Purchaser
Reauirement Reference
Critical Thickness for Spec ial 7.4.6
End-Finish Couplings,
Stock or Blanks
Critical Thickness for
Accessory Material
7.6.6
Wall Thickness Verification 10.13.4
of Special End-Finish Accessories
Delivery Date and
Shipping Instructions
Inspection by Purchaser Annex B
5.2.2
The purchaser should also state on th e purchase agreement the
requirements concerning the following stipulations, which are at
the purchaser's option:
Requirement
Heat Treatment
Upset Length Standard
or Extended
Rounded Nose
Coupling Make-up
(other than pow er-tight)
Tubing with Couplings Detached
Seal R ing Couplings
Heat and S upplementary Analyses
Additional Markings
Pipe Coatings
Material Certification
Reference
6.2
8.11.6
8.12.4
8.14
8.14
9.11, A.7 (SR13)
10.3
11
12.1
13.2, A.8 (SR15)
5.2.3
The following may be agreed betwee n purchaser and
manufacturer:
Reauirement
Statistical Im pact Testing
Impac t Testing of G roup 1 ipe
Sulfide S tress Cracking Test -
C 9 0
and T95 Grade
Length o f Accessories
Thread and Storage Compound
Spe cial End-Finish for Tubing,
Couplings or Accessories
Waiving NDE of Group 1 ouplings
in Grades H40, J55 and K55
Additional H ardness Testing -
Grades M 65 and L80
Additional H ardness Testing
-
C90 and T95 Grade
Hydros tatic Pressure Test for
Handling-Tight Make-up and
PupJoints
Alternative Hydrostatic Test
Pressures
Non-Destructive Examination
Marking Requirements
Thread Protectors
Electric-Weld Tubing - Grade PI 10
Special End-Finish Tubing,
Couplings, PupJoints and
Accessories
Quality Assurance Re quirements
Special Wall Thickness for
Grades C90 and
T95
Casing Used for Tubing
Reference
7.3.8, A.6 (SR12)
7.5.1, A.9 (SR16)
7.14
8.6
8.14
8.12.8, 9.13.3
9.14.3
10.6.2
10.6.4
10.12.2
10.12.3
10.15, A.1 (SRl),
A.2 (SR2), A.4 (SR10)
and A.5 (SR11)
11.1
12.2
A.5 (SR11)
8.12.8, 9.13.3
8.2
8.2, Table
C.30
or
Table E.30
copyright
2004
-American Petroleum Institute.All rights reserved. I 23130 5CT-3
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 5D on line a t www.global.ihs.com
API
Specification
5th Edition, October
2001
Specification
for
Drill Pipe
Information to be Supplied by the
Purchaser
API Monogram@Required
Yes No
When inquiring or placing orders for drill pipe to b e manufactured
in accordance with API Spec 5D, the purchaser should specify
the following on the purchase order:
Specification API Spec 5D
Quantity
Internal-Upset, External-
9.1,
Table 1
Upset or Internal-External-
Upset (for welding)
Size (outside diameter) Table 1
Weight per Foot or
Table 1
Wall Thickness
Grade Table
1
Range Length 8.5, Table 9
Seamless 4.1
Delivery Date and
Shipping Instructions
Inspection by Purchaser 10.1, 10.2
The purchaser should also state on th e purchase order the
requirements concerning the following stipulations, which are
optional with the purchaser:
Heat Treatment of Drill Pipe
Heat and Supplementary 5.2, 5.3
Analyses
Pipe Coatings
11.6
Markings in M etric U nits
4.2
11.2.3, 11.2.4, 11.2.6
9.1
rill Pipe with Special Threads
or End Finish
Pipe Ends Section 9
Marking Requirements 11.1
(Continued to next column)
Under-ThicknessTolerance
8.3
if
Less than 12.5 P ercent
(Group
3
product only)
Supplementary Requirements
SR2 Nondestruc tive Inspection Appendix B
(N5 Notch or %in. Hole)
SR15 Test Certificates for
Oil Country Tubular Goods
SR19 Charpy V-Notch Impact
Toughness Testing of Group 1
(Grade E-75) Drill P ipe
SR20 Alternate Low Tempe rature Appendix B
Charpy V-Notch Impact Toughness
Testing of G roup 1Grade E-75)
and Group 3 (Grades X-95, G-105,
and S-135) Drill Pipe
API Monogram Marking*
Appendix
B
Appendix
B
D.2 Appendix D
*Note: There is
no
longer a requirement for marking a product
with the API monogram. The American Petroleum Institute
continues to license use of the API Monogram on products cov-
ered
by
this specification but
it
is
administered
by
the staff of the
Institute separately from th e specification. The policy describing
use of he API Monogram is contained in Appendix D, herein. No
other use o f the API Monogram is permitted. Licensees may mark
products in conformance with Appendix D or Section 11and Non
Licensees may mark products in conformance with Section
11.
Special Note:
Nothing in this specification s hould be interpreted
as indicating a preference
by
the com mittee for any material or
process or as indicating equality between the various materials
or processes. In the selection of materials andprocesses, the
purchaser must be guided
by
the experience and bythe service
for which the pipe
is
intended.
5D-
awright 2004
American Petroleum nstlute . All
rights
reserved.
I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
In placing orders for line pipe to be m anufactured in accordance
with API Spec 5L, the pu rchaser should spe cify the following on
the purchase order:
Information Reference
~~ ~
Specification API Spec 5L
PSL (Product Specifica tion Level)
Quantity
Grade (and class, if applicable)
Type of Pipe Par. 5.1.3
Size or Outside Diame ter Par. 7.1
Wall Thickness Par. 7.1
Par. 1.2 and Table 1
Tables
2
and 3
Nominal Length
Par. 7.5 and Table 11
End Finish Par. 7.9
Delivery Date and
Shipping Instructions
4.2
The purchaser should also state on the purchase order the
requiremen ts concerning the following stipulations, which are
optional with th e purchaser:
Information Reference
Certificate of General Compliance
Certificate of Compliance,
with Test Results
Cold Expanded
or
Par.
5.2
Nonexpanded Pipe
High Carbon E quivalent Pipe
Par. 12.1
Par.
12.1
and SR
15
Par. 6.1.3.2
(Continued o next column)
Information
Optional Fracture Toughness:
Test Type, Temperature, and
Charpy Energy Value
Acceptance and M aximum
Percent of Jointers
Jointers for Threaded Pipe
Thread Compound
Reduced Negative Tolerance
for Wall Thickness
Power-Tight Makeup
Specific Edition of Spec 5L
for Pipe and Couplings
Alternative Bevel or End
Preparation, Plain-End Pipe
Alternative Minimum Hydrostatic
Test Pressure
Hydros tatic Test Pressure,
Maximum
Special Inspection of Electric
Welded Seams
Alternative Inspection of Laser
Welded Seams
Nondes tructive Testing of
Seamless Pipe
Type of Penetram eter for
Radiological Inspection
Bare Pipe; Temporary and
Special Coatings
Special Nondestructive
Inspection for Laminations
Demonstration of Capability of
Magnetic Particle Inspection
Method
(Continued to next page)
Reference
Par. 6.2.6; SR5;
SR6; SR19
Par. 7.7
Par. 7.7
Par. 7.9.2
Tables 9 and 10
Par. 7.9.2
Par. 7.9.2
Par. 7.9.3
Par. 9.4.3
Par.
9.4.3
Par. 9.7.2.2 and SR17
Par. 9.7.2.3 and SR17
Par. 9.7.2.6 and SR4
Par. 9.7.3.4
Par.
11.1
Par. 7.8.10
Par. 9.7.5.2
~~
Copyright
2004
-American
Petroleum
nst lute. All rights -Ned.
I
23130
5L-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
API Specification 5L : 42nd Edition, January 20 00
Line Pipe
Handbook Revision
01.01.04
Refer to pages
3 -
5 of API Spec 5L
Purchase API Spec 5 L o nline at w ww.global.ihs.com
Information t o
be
Supplied
by
the Purchaser
Information
Throu gh-theF lowline (TFL) Pipe
Length Tolerance and Jointer
Allowance for TFL Pipe
Reference
SR7
Par. SR7.2
Information Reference
Par. SR5.3
SR6.3
Charpy Spec imen Size for
Optional Fracture Toughness
Type of No tch for Drop Weight
Tear Test Spec imen s
Marking Requirements
Alternative Length Units
Internal Diam eter Tolerance
Par. 7.2
Par. 7.1
Par. 7.1
Par.
7.7
Par. 9.4.1
Par. 10.5 and 1.5
Par.
10.1.3
and
1.1.3
Intermediate Diameter
Additional M arkings for
Compatible Standards
Marking Location and
Sequence for Welded Pipe,
Size 16 and Larger
Die Stamping of P ipe or P late
Intermediate Wall Thickness
Par.
10.2~
nd
1.2.3
Skelp End Welds a t Jointer Welds
Hydrostatic Test for Threade d
and Coupled Pipe
Higher Hyd rostatic Test Pressure
Par. 10.7 and
1.7
Par. A . l
Par. 9.7.1 an d
Appendix H
Par. H.2
Par.
9.4.3
Method of Welding Jointers
Purchaser Inspection
End Load Com pensation for
Hyd otest Producing Stress
> 90%
SMYS
Par.
9.4.3
and
Appendix
K
Inspection Location
Supplementary Hydrostatic Test
Diameter Tolerance for
Nonstandard Hyd otest
Alternative N ondestructive Test
Method for Seams at Ends of
Electric Welded Pipe
Alternative Nondestructive
Test Method for Seams a t Ends
of Laser Welded Pipe
Par. 9.4.4
Table 7PI Monogram Ma rking (see Note 2)
4.3
The following stipulations are sub ject to agreement between the
purchaser and the manufacturer:
Informatlon Reference
Par.
1.1
Par. 9.7.2.2
Par. 9.7.2.3
Par.
5.1.3.3
Par.
5.1.3.4
Alternative Heat Treatment
for E lectric Weld Seams
Alternative He at Treatment
for Laser Weld Seams
Alternative Penetrameter
for Radiological Inspection
Par. 9.7.3.4
Quenching and Tempering
of Grade
B
Pipe
Par. 5.4
Alternative Reinspection Method
for Gas-Metal-Arc Welds
Par. 9.7.4.3
Par.
5.5
Par.
6.1.1
Par. 6.1.1 and 6.2.1
Alternative R eference Standard
for N ondestructive Inspection
of Seamless
Par. SR4.3.2kelp End Welds at Pipe Ends
Chemical Composition
Intermediate Grade Technique for Nondestructive
Inspection of Electric Welds and
Laser Welds
Par. SR17.2
Carbon E quivale nt Limit (PSL 2)
Grade X80 Par.
6.1.3.2
Par. 6.1.3.2
Length T olerances Applied
to Carloads
Table
11
Seamless with Wall
Thickness > 0.800 in
(20.3
mm)
High
Carbon Equivalent Pipe
Nonstandard Length and
Length T olerances
Par. 7.5
Par.
6.1.3.2
(Continued to next column)
(Continued to next page)
5L-2
Copyright
2004 -American
Petroleum nstitute.
Ail tights
received.
I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 5LC online a t www.global.ihs.com
API SDecification
5LC
rd Edition, July 1998
CRA Line Pipe
Suggestions for Ordering
API Spec 5LC CRA
Line
Pipe
API Monogram@Required
Yes No
In placing orders for line pipe to b e m anufactured in accordance
with API Spec 5LC, the purchase r should specify the following on
the purchase order.
Specification
Quantity
Grade
Type of Pipe
Size
Nominal Diameter
Standard Weight
Plain-End Pipe
Extra-StrongPlain-End Pipe
DoubleExtra-Strong
Plain-End Pipe
Outside Diameter
Regula -Weight
Plain-End Pipe
Special Plain-End Pipe
Weight Per Foot or
Wall Thickness
Nominal Length
End Finish
Delivery Date and
Shipping Instructions
API Spec 5LC
Tables 4 and 6
Par. 4.l.c
Table 8
Table 8
Table 8
Table
8
Table
8
Table 8
Par.
10.5
Sect. 10
The purchaser should also state on t he purchase order the
requirements concerning the following stipulations, which are
optional with the purchaser:
Certificate of Compliance Par. 1.5
Chem ical Analys is Test Reports Par.
6.5
(Continued to next column)
Acceptan ce and Max imum Par. 10.7
Allowable Percent of Jointers
Altern ative Bevel, Plain-End Par. 10.8
Pipe in Sizes 2% n.
O.D. and Larger
Defect Repa r Procedu es
Pars. 12.7, 12.8, 12.9
Markings in M etric Units
Par. 13.1.b
Purchaser Inspection Appendix F
API Monogram Marking*
Attention is called to the following stipulations w hich are subjec t
to agreement between the purchaser and the manufacturer:
Chem ical Composition Par. 6.1
Intermediate Grades
Appendix
G,
Par.
G . l
Par. 7.1., Table B . l
Flattening Test Orientation Par. 7.10
Intermediate Diameters Par. 10.2
Intermediate Wall Thickness Par. 10.3
Supplementary Requirements Appendix D
Supplementary Hydrostatic Test Par. 9.4
Hydros tatic Test Pressure Par. 9.3
Lengths Applied to Carloads Table 10
Nonstand ard Length and Par. 10.5
Length Tolerances
Repair of Welds of Electric-
Welded Pipe
Par. 12.7.b
Marking Requirements
*Note: Users of this specification should note that there
is
no
longer a requirement for m arking a product with the APl
Monogram. The American Petroleum Institute continues to
license use of the API Monogram
on
products covered by this
specification but it is administered by the staff of the Institute
separately from the Specification. The policy describing licensing
Par.
13.1,
13.4,
13.5
(Continued to next page)
Cowright 2004 -Amencan Petroleum nstiute. All rights reserved. I
23130
5 L G
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 5LCP online at www.global.ihs.com
API
Specification
5LCP
st Edition, November 1999
Coiled Line Pipe
Information to be Supplied
by the Purchaser
API Monogram@Required Yes
No
4
Information to be Supplied by the
Purchaser (See Note
1)
4.1
Purchaser Specification
In placing orders for line pipe to be m anufactured in accordance
with API Spec 5LCP, the purch aser should spec ify the fOllOWing
on the purcha se order:
Information
Specification
Grade
Size: Outside Diame ter
Spec ified Wall Thickness
Nominal Length
PipetePipe Welds
Pipe Ends
Reference
API Spec 5LCP
Tables 1 nd
2
7.2, Table 3
7.3
7.5
7.6
Appendices A and B
7.8
Reference
9.1.1
10.1
Method of PipetePipe Welding Appendices A, B
Appendix F
urchaser Inspection
API Monogra m Mark ing (see Note 2) Appendix G
4.3
RequirementsSubject to A greement
The following stipulations are subject to agreement between the
purchaser and the manufacturer:
Information Reference
Chemical Composition 6.1.1
Intermed iate Diameters 7.1
Information
Markings in SI (metric) Units
Bare Pipe
-
Special Coatings
Intermed iate Wall Thickness 7.1
Pipete Pipe Welds 7.6
Trim
of
Ins ide Flash 7.7.4
Shipping Reel Dimensions Appendix H
Gauge Ball
Delivery Date and Shipping
Instructions
4.2
Optional Purchaser Requirements
The purchaser should also state on th e purchase order the
requirements concerning the following stipulations, w hich are
optional with t he purchaser:
Information Reference
Fractu re Toughness Tests 6.2.5
Non des truc tive Insp ectio n 7.7.6
for Laminations
7.9
Hydro static Test Pressure
8.4.3
Additional SkelpEnd Weld 8.6.2.1
Inspection
Additional Insp ection of 8.6.2.3
PipetePipe Welds
Type of X-ray Penetrameter
8.6.3.4
Nonde structive Test
Reference Standard
8.6.4.2
Marking Requirements
9.1
and Appendix G
Radiographic Penetrameter 8.6.3.4 I Drying of Coil 10.2.3
Nondestructive Inspection of 8.6.4.4
Standard Dem onstration
Supplementary Requirements Appendix E
Shipping Reel Size Appendix
H
(Continued to next column) (Continued to next page)
Copyright
2004-American Petroleum nstitute.All rights reserved. I
23130
5LCP-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
API Specification SLCP : 1s t Edition, November 1999
Coiled Line Pipe
Information
to be
Supplied
by
the Purchaser
Notes:
1
Nothing in this specification should be interpreted as
indicating
a
preference by the com mittee for any material or
process or as indicating equa lity between th e various materials
or processes. in the selection of materials and proceses, the
purchaser must b e guided by experience and by th e service for
which the pipe is intended.
2. Users
of
this specification shou ld note that the re is
no
longer
a requirement for marking a product with the API Monogram.
The American Petroleum Institute continues to license use of the
API Monogram
on
products covered by this specification, but it is
administered by the staff of th e Institute separately from th e
specification. The policy describing use of the API Monogram is
contained in Appendix G. No other use of th e API Monogram is
permitted. Licensees may mark produ cts in conformance w ith
Appendix
G
or Section 9, and Non licencee s may mark products
in conformance with Section 9.
5LCP-2
Copyright2004 -American Petmleum I n s i h i e . All rights
r e~e i v ed .
23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purcha se API Spec 6A online a t ww w.global.ihs.com
API
Specification
Annex
A
(Informative)
17th
Edition, December 2002
Wellhead and Christmas Tree Equipment
Purchasing Guidelines
API Monogram@Required Yes
No
A l
General
This appendix provides guidelines for inquiry and p urchas e of API
Spec 6A equipment. These guidelines consist of data sheets t o
be completed by the purchaser, a series of typical wellhead and
tree configurations, and a decision tree and table for determining
specification levels.
The data sheets are designed to perform two functions:
a. Assist th e purchaser in deciding what he wants
b. Assist the purchaser in communicating the particular nee ds
and requirements, as well as information on the well
environment, to the manufacturer for the use i n designing
and producing equipment
To use this appendix, a copy of the data she ets should b e
com pleted as accurately as possible. The typical configurations
should be referred to, as needed, to select the require d
equipment. The decis ion tree Figure
A3,
and Table A 2 with its
instructions, provides the API recommended practice t o w hich
PSL each piece of equipment should be manufactured. A copy of
the data sheet should then be attached to the purchase order or
reques t for proposal.
A2
Data Sheets
The following pages contain questions and information that can
be used to select wellhead equipment. E xhibit A I ontains
general informa tion which pe rtains to the entire well. Exh ibits A2
through A 8 are designed to be used for each type of equipm ent.
A 3
Chokes
Orders for chokes shall specify the size and pressure rating of th e
inlet connection as well as size, type and pressure rating of the
outlet connection, first listing the inlet connection and then the
outlet connection, the working pressure, and type, (¡.e.,
adjustable or pos itive). Orders for adjus table chokes shou ld
specify the maximum orifice diameter. Orders for pos itive chokes
should specify the type of flow bean together with its maximum
orifice size.
A4
Typical Wellhead and Tree Configurations
Examples of typical wellhead and tree configurations are shown
on Figures A I and A2. Also included are examples o f casing and
bit programs that would be consistent with the wellheads as
shown.
A5
Product Specification Level
A5.1
Spec ification levels are defined in 1.3.Table A2 and Figure A 3
show th e recommended specification level for p rimary parts. This
table an d figure both give the same answer and either can be
used. Primary parts of a wellhead assembly include as a
minimum:
Tubing head
Tubing hanger
Tubing head adapter
Lower mas ter valve
All other w ellhead parts a re classified as secondary. The
specification level for secondary parts m ay be the s ame as or
less than th e level for primary parts.
The following definitions apply to th e basic questions asked in
Table A 2 and Figure A3.
A5.1.1
NACE?
This applies to the partial pressu re of hydrogen sulfide (H2S) in
the produced fluid as de fined by NACE Std. MR 0175.
A5.1.2
High H2S Concentrat ion?
Use “Yes” if the 100 PPM radius of exposure (ROE) of H 2S is
greater than 50 ft (15 m) from the wellhead. ROE is defined in
Section 6 of this appendix.
A5.1.3
Close Proximity?
This proximity assessment should consider the potential impact
of an uncontrolled condition on life and environment near the
wellhead. The following list of items can be use d for determ ining
potential risk. Items for additional consideration should be
included w hen necessary.
a.
100
PPM radius of exposure (ROE) of H2S is g reater than
50 ft
(15 m) from the wellhead and includes any part of a
public area except a pub lic road. ROE is defined in Section
6
of th is appendix.
Public area shall mean a dwelling, place of business, church,
school, hospital, schoo l bus stop, governm ent building, a pub lic
road, all or any portion of a park, city, town, village, or other
(Continued
to
next page)
Copyright
2004
Am erican Petro leum Institute. All right s reserved. I
23130
6A-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
API Spec ification 6A : 17th Edition, December 20 02
Wellhead Christmas Tree Equipment
Handbook Revision 01.01.04
Refer to pages A-1- A-13 of API Spec 6A
Purch ase API Spec 6 A online at www.global.ihs.com
Appendix
A
Purchasing Guidelines
similar area that one can expec t to be populated. Public road
shall m ean any federal, state, county
or
municipal street
or
road
owned
or
mainta ined for public access or use.
b. 500 PPM ROE of H2S is greater than 50 ft (15 m) from the
wellhead and includes any p art of a public area including
a
public road.
c. Well is located in any environmenta lly sensitive area such as
parks, wildlife preserve, city limits, etc.
d. Well is located within
150
t (46 m) of an open flame
or
fired
equipment.
e. Well is located within 50
ft
(15 m) of a public road (lease road
excluded).
f.
Well is located in state
or
federal waters.
g. Well is located in
or
near inlan d na vigable waters.
h. Well is located in
or
near surface domestic water supplies.
i. Well is located within 350 ft (10 7 m) of any dwelling.
These conditions are recom mended minimum considerations. It
will be necessary o m eet any local regulatory requirements.
A 6
Radius of Exposure ROE) of
Hfl
A 6 . 1
The following inform ation is taken from Texas Railroad
Commission Rule 36. SI metric equ ivalent rules may be used if
available. Other meth ods of calculating ROE may apply
depending on local regulations.
A6.1 .1
For determining the location of the 100 ppm radius of exposure:
X = [(1.589)(moie fraction H2S )(Q)] .6258
A6.1.2
For determining the location of the 500 ppm radius of exposure:
X
=
[(0.4546)(m ole fraction H 2S)(Q)] 0.625 8
where
X
= Radius of exposure in feet,
Q =
Maximum volume determined to be available
for escape in cub ic feet per day,
H2S = Mole fraction of hydrogen sulfide in the
A6.1.3
The volume used as the escape rate in determining the radius of
exposure shall be th at spec ified below, as is applicable.
(Continued to nex t column)
gaseo us mixture available for escape.
a. For the new wells in developed areas, the escape rate
shall be determined by using the current adjusted open-flow
rate of offs et wells, or the field average current adjusted
open-flow rate, w hichever is larger.
b. The escape rate used in determining the radius of exposure
shall be corrected to standard conditions of 14.65 psia and
60°F (16°C).
A6.1.4
When a w ell is in an area where insufficient data exists to calcu-
late a radiu s of exposure, but where hydrogen sulfide m ay be
expected, a 100 ppm radius of exposure equal to
3000
feet shall
be assumed.
A 7
Corrosivity
of
Retained Fluid
To select the desired m aterials class in Table 4.3, the purchaser
may determine the corrosivity of the retained fluid by considering
the various environmental factors and production variables listed
in
Exhibit A l . Corrosion, stresscorrosion cracking, eros ionc orre
sion, and sulfide stres s crack ing are all influenced by the
interaction of th e environmental factors and the production
variables. Other factors and variables not listed in Ex hibit
A l
may
also influence fluid corrosivity.
The purcha ser shall determine if materials mu st meet NACE
Standard MR0175 for sour service. NACE Standard MR0175 is
only concerned with t he metallic material requirements to
prevent sulfide stress cracking and not with resistance o
corrosion. A second consideration should be to determine th e
carbon diox ide partial p ressure, which generally relates to
corrosiv ity in wells as shown i n Table A l .
No
single retained fluid may be able to predict the field
performance of any single type of metallic or nonmetallic
material.
The minimum partial pressure of carbon dioxide required to
initiate corros ion and the relative effect of increa sing partial
pressures on the corrosion rate is strongly influenced by the
other environmental factors and production variables listed in
Appendix A , Exhibit A l .
Finally, the pu rchaser should consider the future service of the
well when choosing a materials class. This not only include s
anticipated changes in carbon dioxide partial pressures or
production but also should include consideration of workover
operations such as acidizing.
The purchaser may consider chem ical inhibition to reduce
corrosivity. Effective chem ical inhibition chang es the
relationship between the partial pressure of CO2 and the relative
corrosivity of the retained fluids in the above table.
The purchaser may also consider us ing metallic overlays or
plastic/orga nic co atings to reduce corrosion of low alloy
equipment. Some coatings have maximum service temperature
limitations less than th e temperature ratings selected from
Table 4.2 for the equipment.
6A-2 Copynght
2004
Amencan k tm l eum Instnute.
All
rights reseived. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Anticipated Com pletion or Future Workover or Recovery Operations which would A ffect Pressure, Temperature, or Fluid Content
New Values
Are there any Governm ent Regulations tha t will apply or must be me t by this equipme nt Yes
o o
If so, Which One@)
Water or Brine pH
Does NACE Stan dard MR 0175 Apply Yes
Will Scale, P araffin, Corrosion, or Other Types of Inhibitors be Used o es
o o
O No
Inhibitor Type
Inhibitor Carrier
Batch or Continuous Inhibition
Will Acidizing be Perform ed Yes O No
Type of Acid
Anticipated Produ ction Rates BPD Oil/Condensate
MCFD Gas
BPD S&W
Will E rosion be a Concern
OYes
Cause
External Coating
O
Yes
O
No
Internal Coating
OYes o o
Type
Type
Delivery R equirements
Special Shipping, Packing and Storage Instructions
[Continued
to
next page)
6 A 4
~~~
Copyright 2004 -American Petroleum nstitute. All r ightsreserved.
I23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 6A online at www .global.ihs.com
Appendix
A
Purchasing Guidelines
Wellhead Equipment Data Sheet
ExhibR A l
-
General continued)
Casing Program
Top Joint in String
Total String
Wt., Ib./ft Hanging Wt.
Size (OD) (Kg/m ) Grade Connection (1,000) Bit Size
Conductor
Surfa ce Csg.
Protective Csg.
Production Csg.
Tubing
Type of Completion Single Multiple
Technical Contact in Buyer's Organization
Conventional Tubingless
Phone
Copyright 2004 -American Petroleum nstitute. All
rights
reserved.
I 23130
6A-5
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 6 A online at www.global.ihs.com
Appendix A
Purchasing Guidelines
Wellhead Equipment Data Sheet
Exhibit A2
-
Casing Head Housing PSI.
PR
Bottom Connection Size
Type
Top Conn ection Size
Rated Working Pressure
Type
Size
Rated Working Pressure
Type
Number
Valve Removal Plug
quipment for Outlets
Outlets
Valves (Inboard)
Valves (Other)
Companion Flanges
Nipples
Needle Valves
Gauges
Lock Screws
Bull Plugs
PSL PR
PSL PR
E L
Q ~ Y
Q ~ Y
Lock Screw Function
Base Plate Requirements
Special Material Requirements
Casing Hanger
PSL
Size
Type
PR
API Temp erature Classifications
Material Class (Table
4.3)
Retained Fluid (Table A l )
Witness i Yes o No
External Coating 0 es o No
Internal Coating o Yes o No
Type
Type
Outlet Inboard (Studs) (Nuts)
Outlet Other (Studs) (Nuts)
Bowl Protectors
Running and RetrievingTools
Test Plugs
Flange Bolting Class (Specify Class [Ill, II, or I])
Test and Auxiliary Equipm ent
Other Requirements
6A-6
copyright
2004
-Amencan Petroleum n stltute.
All rights resewed. I23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 6 A online at www.global.ihs.com
Appendh A
Purchasing Guidelines
Wellhead Equipment Data Sheet
Exhibi t A4
-
Tubing Head Spool (continued)
PSL PR
Material Class (Table 4.3)
Retained Fluid (Table A l)
Witness
i Yes o o
External Coating
o
es
o
o
Intern al Coa ting Yes o o
Type
Type
Main Run (Studs) (Nuts)
Outlet Inboa d (Studs) (Nuts)
Outlet Other (Studs) (Nuts)
Flange Bolting Class (S pecify Class
[ill,
11 or I])
Test and Auxiliary Equipment
Bowl Protectors
Running and Retrieving Tools
Test Plugs
Other Requirements
Copyright 2004 -American Petroleum Institute.All r ights res i ved.
I 23130
6A-9
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
API Specification 6A : 17th Edition, December 2002
Wellhead Christm as Tree Equipm ent
Handbook Revision 01.01.04
Refer to pages A-1 - A- I4 o f API Spec 6 A
Purcha se API Spec
6A
online at www.global.ihs.com
Appendix
A
Purchasing Guidelines
Wellhead Equipment Data Sheet
Exhib it A5 - Crossover Flange PSL PR
Bottom Conne ction Size
Rated Working Pressure
Top Con nection Size
Rated Working Pressure
Pac koff Type
PR
Special Material Requirements
API Temperature Classifications
Material Class (Table
4.3)
Retained Fluid (Table A I)
Witness o es o No
External Coating yes o o
Internal Coating Yes o No
Type
Type
Ma in Run (Studs) (Nuts)
Flange Bolting Class (Specify Class [Ill, 11 or I])
6A-10
Copyright
2004
-American
Petroleum nstitute.
All
rights
reserved.
I
23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
API Specification 6A : 17th Ed ition, December 2002
Wellhead Christmas Tree Equipment
Handbook Revision
01.01.04
Refer to pages A -I
-
A- I4 o f API Spec
6A
Purchase API Spec 6A online a t www.global.ihs.com
Appendix
A
Purchasing Guidelines
Wellhead Equipment Data Sheet
Exhibit A6
-
Tubing Head Adaptor PSL PR
Bottom Connection Size
Rated Working P ressure
Top Connection
Size
Rated Working P ressure
Type
Ga uges/Qty
Surface Controlled SubS urface Safety Valve O utlets
Number
Type of Connection
Size
Electrical Feed Through C onnection
Special Material Requirements
API T emperature' Classifica tions
Materia l Class (Table 4.3)
Retained Fluid (Table AI )
Witness
es o o
External Coating es
o o
Internal Coating es
o
o
Type
Type
Flange Bolting Class (Spec ify Class [Ill,
II,
or I])
.
Main Run (Studs) (Nuts)
Copyright
2004
-American
Petroleum
n t i l u t e .
All rights reseived.
I
23130
6A- 11
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
API Specification 6 A : 17th Edition, December 20 02
Wellhead Christma s Tree Eq uipment
Handbook Revision
01.01.04
Refer to pages A-1
-
A-14 of API Spec 6A
Purchase API Spec 6A online at www.global.ihs.com
Appendix
A
PurchasingGuidelines
Wellhead Equipment Data Sheet
Exhibit A7 - Christmas Tree and Choke
Single Solid
Block
Dual Stacked
Multiple
Lower Master Value
Upper Master Value
Swab (Crown) Valve
Wing Valve-Inboard
Wing Valve(s)-Other
Tee/Cross (Circle one)
Choke
End Flange
Companion Flanges
Instrument Flanges
Tree Capflop Connection
Rated Working Pressure
Retained Fluid (Table A l )
API Tempe rature Classification
Material Class (Table 4.3)
Size Materiala
PSL PR Witness?
External Flangedb
Coating? If Bolting Ring
Yes, state Class- Gasket
Type Studs Nuts Type
Upper Master Prepped for Actuator Yes
o
o
Wing Valve-Inboard Prepped for Actuator Yes
o
o
Wing Valve-Other Prepped for Actuator
o
es
o
o
Specify Requireme nts Below PR
Specify Requireme nts Below PR
Specify Requirements Below PR
Choke (Adjustable or Fixed)
Orifice Size
Nominal Size
Pressure Drop
Flowline Connection
Size
a
Define or specify mate rial requirements and,
if
cladding or other corrosion resistant mate rials are to
be
inlayed, stat e base
material type/clad material ype, (e.g., 4130/625).
Indicate required class bolting, III, 11 or I per Section 10.3,as required for the applicab le retained luid class and
temperature classification.
[Continued to
nex t page)
6A-12
Copyright 2004-Am erican Petroleum nstitute.Ml rights reserved. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purch ase API Spec 6A onlin e a t www.global.ihs.com
AppendixA
Purchasing Guidelines
Wellhead Equipment Data Sheet Single Solid Block
Exhibit A7 - Christmas Tree and Choke continued)
Dual Stacked
Multiple
Special Material Requirements
Are there any Government Regulations hat w ill Apply or M ust be M et by this Equipment
~
Other Requirements
Upper Mas ter Valve Type Actuator Required
Pneumatic/Piston
Hydra u ic/Piston
Supply Pressure
Pneumatic/Diaphragm
Hydraulic/Diaphragm
Air
Gas
Wing Valve Type Actuator Required
Pneumatic/Piston
Hyd rau c/Piston
Pneumatic/Diaphragm
Hydraulic/Diaphragm
Supply Pressure
Other
Copyright
2004 - Amellcan
Petroleum nstitute.
All rights
reserved.
I 23130
~
6A-13
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 6A online at ww w.global.ihs.com
Appendix A
Purchasing Guidelines
Wellhead Equipment Data Sheet
Exhibit AS - Compact Casing Head Housing
PSL
PR
A.
Bottom Connection Size
Outlets
Type
Size
Rated Working Pressure
Type
Number
Valve Removal Plug
quipment for Outlets
Va Ives (Inboard) Q ~ Y PSL PR
Valves (O ther)
Q ~ Y
PSL PR
Companion Flanges @Y PSL
Bull Plugs
QtY
Nipples
Q ~ Y
Needle Valves Q ~ Y
Gauges
Q ~ Y
Lock Screws
o
es o o
Lock Screw Function
Base P late Requirements
Witness
o
es O No
Bottom Cas ing Spool Packoff
Size
Type
Casing Hanger
PSL
Size
PR
API Temp erature Classifications
Mater ial C lass (Table 4.3)
Retained Fluid (Table A I)
External Coating o es O No
Internal Coating
0
es
o
o
Type
Type
Flange Bo lting Class (Specify Class
[ill, II,
or
I])
Outlet Inboard
(Studs) (Nuts)
Outlet Other
(Studs) (Nuts)
Other Requirements
(Continued to n ext page)
6A-14
Cowright 2004 -American Petroleum nstitute.All
rights
EWNed. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
ypical Wellhead and Tree Configuration 5,000 psi (34.5 MPa) Rated Working Pressure (WP)
Surface Safety
TypicalOnshore Programs
Casing Program
in. (mm)
8% 219.1) x 5% 139.7)
9% 244.5)x 7 (177.8)
1VY
(273.1)x 7% 193.7)
Bit Program
in. (mrn)
8% 215.9) or 8% 222.2)
Casing Head Top Flange
in.
-
psi (rnm
-
MPa)
7% 200.0)
11- 3000 (279
-
20.7)
or
9% 250.8)
11
- 5000 (279 - 34.5)
Tubing Head Top Flange
in. - psi (mm
-
MPa)
7x6- 5000 (179 - 34.5)
copyright 2004 American Petroleum Institute.All rights reSeNed. I 23130
6A-1
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
: mical W ellhead and Tree Con figuration 10,000 psi (69.0 MPa) R ated Working Pressure (WP)
Back Pressure
Control
Valve
Ootion 6
Surface Safety
Valve
5,000 psi (34.5MPa)
. .
Typical Onshore
Programs
(Inch Sizes)
Casing Program (in.)
Bit P rogram (in.)
16 10% 7% 14% 9%
or
9%
16
11
9% 7Liner 14% 10% 8%
13%
9% 7
10%
7%
5
Typical
Metric Programs
12% 8% 6
9% 6%
Casing Program (mm) Bit Program (mm)
406.4 273.1 193.7 374.7 250.8
or
241.3
406.4 298.5 244.5 177.8 374.7 269.9 215.9
Liner
339.7 244.5 177.8 311.2 215.9 152.4
273.1 193.7 127.0 250.8 165.1
Casing Head Housing
Top Flange
(in.
-
psi)
16% 5000
16% 5000
13%-5000
16
-
5000
Casing Head Housing
Top Flange
(mm - MPa)
425 - 34.5
425 - 34.5
346
-
34.5
279
-
34.5
Casing Head Spool
Top Flange
(in.
-
psi)
11- 10,000
13% 10,000
11
- 10,000
11- 10,000
11
- 10,000
Casing Head Spool
Top Flange
(mm
-
MPa)
279
-
69.0
346
-
69.0
279 - 69.0
279 - 69.0
279
-
69.0
Tubing Head
Top Flange
(in. - psi)
7?&- 10,000
7?&
-
10,000
7%- 10,000
7%
- 10,000
Tubing Head
Top Flange
(mm - MPa)
179
-
69.0
179- 69.0
279 - 69.0
179
-
69.0
6A-18 Copyright 2 0 0 4 -American Petroleum
nstiiute. All
rights
reserved.
I23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 6D o nline a t www.global.ihs.com
API Specification
National Adoption of
IS0
14313:1999
Petroleum and Natural Gas Industries
-
Pipeline
Transportation Systems
-
Pipe line Valves
22nd Edition, January 2002
Specification for Pipeline Valves
Annexes A,
B, C
and D
API Monogram@Required Yes No
Annex A (Informative)
Purchasing Guidelines
A l
General
This annex provides guidelines to assist the purchaser with valve
type selection and specification of specific requirements when
orde ring valves.
A2
Field Testing
Pressures during the te sting of installed valves sho uld no t exceed
the pressure rating of the valve by more than 50%when testing
with the valve partially open or by more than 10% f the pressure
rating when testing ag ainst a closed valve.
Note:
The maximum test pressure
for
valves fitted with an
external pressure relief m ay be lower (see
6.8).
A 3
Pressure Relief
Certain valve designs will trap pressure in the valve body cavity
when the valve is
in
the fully open and/or closed position. High
internal pressures can result from th e thermal expansion of the
fluid trapped in these co nfined areas. Therefore, if th e valve has
no self-relieving design provision, pressure relief fittings shall be
fitted in the valve body in accordance with
6.8
of this
international Standard.
A4
Pigging
The purchaser should examine the valve design for com patibility
with p igging operations w hen ordering valves for use in pipelines
requ iring pigging.
Venturi or reduced-bore valves m ay not be suitable for pigging
operations.
A valve in which the drive member or the obturator obstructs the
bore
in
the o therwise fully op en pos ition (e.g., a dua l-plate check
valve) is not piggable.
Certain full-opening valves with pocke ts may allow bypass of fluid
around a short pig or sphere.
AS
Fire Testing
The fire resistance design of valves shall be qualified by fire
tesing in accordance with IS0 10497. Fire resistance designs
already qualified to BS 6755 Part 2, API Spec 6FA, API Spec 6FC,
API Spec 6FD or API Std 607, third edition, are also acceptable.
A 6
Additional Testing
The purchaser shall specify any additional test requirements not
covered by this International Standard.
A7
Valve Data Sheet
The valve data sheet in this annex may b e used to assist with the
specification of valves for ordering.
See following pages
for
Valve Data Sheets.
~ ~~
Copyright 2004 American Petroleum Institute.All rights reserved. I 23130
6D1
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
(Attach specifications for welding-end configuration)
Flanged End
O
Yes
O
No
Ring Joint or Plain Raised Face Ring Joint
If
Ring Joint, Flat or Raised Face Flat
Size and Pressure Class
As Per ASME B16.5
As Per MSS SP-44
As Per ASME B16.47, Series
A
Plain Raised Face
O
Raised Face
Ring Gasket or Other Gas ket Type and S ize
Note: Gaskets are n ot furnished as a
part
of th e valve.
(Continued
to
next page)
6D-2
Copynght 2004 -American Petroleum Institute.
A l l
rights reseived. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API SDec 6D o nline a t www.global.ihs.com
~
API Specification
6D
: 22nd Edition, January 2002
Specification for Pipeline Valves
National Adoption of IS0
14313:lQQQ
Petroleum and Natural
Gas Industries - Pipeline Transportation.Sys tems- Pipelin e Valves
Annexes
A, B,
C and
D
Valve
Data
Sheet continued)
Welding End
Special Flanges or Mechanical Joints
Length - Any Special Requirem ents for E nd-teEnd or Face-to-Face Dimension
Valve Operation
Is Gearbox with H andwheel Requiredo es
For a Handw heel on a H orizontal Shaft, Give Distance from C entreline of Valve Opening o H andwhee l
Or, for a H andwheel on a Vertical Shaft, Give Distance from Centreline of Valve Opening o Center of Rim of Handw heel
Note:
For plugvalves having loose wrenches, wrenches
must
be ordered separately.
Yes
o
o (Attach specifications for w elding-end configuration)
o
o
If
so,
Give Details
mm
mm
Wrench Required
o
es
o
o
Locking Device Required Yes
o
o Type
Valve Support
Support Ribs or Legs Required
o
uppor t Ribs Legs
Other Requirements
Supplementary Requirem ents (see Annexes B and
C)
Fire Test Design Yes o o
NACE MR 01 75 Yes
O
o
Pressure Relief - f Pressure Relief Devices are Required, are there Special Requirem ents or these Devices
Drain Connections -Any Requirements
Bypass Connec tions
-
Any Requirements
Supplementary Docum entation R equired (see Annex D)
Third-party Witness of Processes/Testing
Painting Required 0 es o o
Coa ting Requ ired Yes O No
Copyright
2004 -Ameri can Petroleurn Institu te. All tights -Ned. I 23130
6D3
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 6D online a t www.global.ihs.com
API Specification 6D :22nd Edition, January 2002
Spec ification for Pipeline Valves
National Adoption of IS0 14313:1999 - Petroleum and Natural
Gas Industries - Pipeline Transportation Systems
-
Pipeline Valves
Annexes A, B, C and D
Annex B (Normative)
SupplementaryNDE Requirements
B 1
General
This annex specifies supplementary NDE requirements for the
examination of valves which shall be performed by the
man ufacturer if specified by the purchaser.
62
Radiographic Testing of Castings on
100%
of Crit ical Areas in Accordance with ASME
B16.34
Examination shall be carried out in accordance with ASME
Section V, Article 22. The sen sitivity, as indicated by wire
penetrometers, shall be 1.5% or better.
Acceptance shall be i n accordance with ASME Section VIII,
Division
1,
Appendix 7. The type and severity level for a ccepta nce
of the welding ends shall be as specified by the purchaser.
B 3
Radiographic Testing of Castings on
100%
of Accessible Areas
Examination shall be carried out in accordance with ASME
Section V, Article 22 . The sensitivity, as ind icated by wire
penetrometers, shall be 1.5%or better.
Acceptance shall be in accordance with ASME Section VIII,
Division
1,
Appendix 7. The type and severity level for accep tance
of the welding ends shall be as specified by the purchaser.
B4
Ultrasonic Testing of Castings on 100%of
Crit ical Areas in Accordance with ASME
B16.34
Examination shall be carried out in acc ordance with ASME
Section V, Article
23
using the direct technique
or,
where proper
access or interpretation of results is not possible, by shear wave
examination.
Acceptance shall b e in accordance with ASTM A 609, Table 2,
Quality Level 1.
B 5
Ultrasonic Testing of Castings on 100%of
Accessible Areas
Examination shall be carried out in accordance with ASME
Section V Article 23 using the direct technique or, where proper
access or interpretation of results is not possible, by shear wave
examination.
Acceptance shall be in accordance with ASTM A 609, Table 2,
Quality Level 1.
B6
Magnetic-Particle Testing o f Castings on
100%
of Surface Area
Examination shall be carried out in accordance with ASME
Section V, Article 25.
Acceptance shall be in accordance with ASME Section VIII,
Division 1,Appendix 6.
B7
Liquid Penetrant Testing of Castings on
100%of Surface Area
Examination shall be ca rried out in accordance with ASME
Section V, Article 24.
Acceptance shall be in accordance with ASME Section VIII,
Division
1,
Appendix 8.
B8
Ultrasonic Testing of Forgings and Plate on
100%
of Surface Area
Examination shall b e carried out i n accordan ce with ASME
Section V Article
23,
or ASTM A 388 or ASTM A
435
or ASTM A
57 7 as applicable.
Acceptance shall be i n accordance with ASME Section VIII,
Division
1,
Appendix
23, or
ASTM A
388
or
ASTM A 435 or ASTM A 577 as applicable.
B9
Magnetic-Particle Testing o f Forgings on
100%
of Surface Area
Examination shall be carried o ut in accordance with ASME
Section V, Article 25.
Acceptance shall b e in accordance with ASME Sec tion VIII,
Division1,Appendix 6.
B10
Radiographic Testing of Weldments on
100%
of Weld
Examination shall be carried out in acc ordance with ASME
Section
V,
Article 22.
Acceptance sh all be in accordance with ASME Sec tion VIII,
Division1,Part UW51, for linea r indications and ASME Section
VIII,
Division
1,
Appendix
4,
for rounded indications.
B i 1
Ultrasonic Testing of Full-Penetration
Weldments on
100%
of Weld
Examination shall be carried out in acco rdance with ASME
Section
V
Article 23.
Acceptance shall be in accordance with ASME Section VIII,
Division 1,Appendix 12.
6D-4
Copyright
2ûû4 -
American Petroleum Insti uie.
All
rights reserved.
I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Gas Industries - Pipeline Transportation Systems- Pipeline Valves
Annexes
A, 6 C and D
B l 2
Magnetic-Particle Testing of Bolt ing
Examination shall be carried out in accordanc e with ASME
Section
V,
Article 25.
Acceptance shall b e in accordance with ASME Section
VIII,
Division 1,Appendix
6.
63.3
Liquid Penetrant Testing of Bolt ing
Examination shall b e carried out in acco rdance with ASME
Section V, Article
24.
Acceptance shall be in accorda nce with ASME Section
VIU,
Division
1,
Appendix 8.
B14
Magnetic-Particle Testing on 100%
of
Machined Surfaces
Examination shall b e carried out
in
accorda nce with ASME
Section V, Article 25.
Acceptance shall be in accorda nce with ASME Section VIII,
Division
1,
Appendix
6.
B15
Liquid Penetrant Testing on 100%of
Machined Surfaces
Examination shall be c arried out in accordance with ASME
Section V, Article 24.
Acceptance shall b e in accorda nce with ASME Section VIII,
Division
1,
Appendix
8.
B16
Liquid Penetrant Testing of Weld Bevelsof
Welding Ends
Examination shall b e carried out in accord ance with ASME
Section V, Article 24.
Acceptance shall be in accordance with ASME Section VIII,
Division 1,Appendix 8.
B17
Magnetic-Partide Testing of Weld Bevels
of
Welding Ends
Examination shall b e carried out in accordan ce with ASME
Section V, Article 25.
Acceptance shall be in accordance with ASME Section VIII,
Division1,Appendix 6.
Annex C (Normative)
Supplementary Test Requirements
C i
General
This annex defines requirements for sup plemen tary valve testing
which shall be performed by the manufacturer if specified by the
purchaser. The frequency of testin g shall also be specified by the
purchaser, if not defined in this annex.
c2
Hydrostatic Testing
By agreement, hydrostatic testing may be performed at pressu res
higher than specified in 10.3 and
10.4
and/or for periods longer
than specified in Tables 9, 10
or
11.
c3
Low-Pressure Gas Seat Testing
C3.1
Acceptance
The accepta ble leakage rate for low-pressure gas seat testin g
shall be:
IS0
5208 Rate A (no visible leakage) or softseated valves
IS0
5208 Rate D for metal-seated valves
C3.2
Type I
The seat test s pecified in 10.4 shall be repeated at a test
pressure between 0.5 bar and 1.0 bar gauge (7.3 ps ig and 14.7
psig) using air or nitrogen as the test medium.
c3.3
Type
The seat test specified in 10.4 shall be repeated at a test
pressure of 5.5 f 0.7 bar gauge (80.8 psig i 10.3 psig) u sing air
or nitrogen as the test m edium.
c4
High-pressure Gas Testing
The seat tests specified in 10.2 and 10.4 shall be replaced with
a high-pressureseat test using an inert gas as the test m edium.
The test pressure and duration shall be as sp ecified in 10.2
and 10.4.
c5
Antietatic Testing
The electrical resistance between the obturator and the valve
body and between the stem/shaft and the valve body shall be
measured using a D.C. power source not exceeding 12 V. The
resistance shall be mea sured on dry valves before pressure
testing and sha ll not exceed 10R. A t least 5% of the valves in
the ord er shall be tested.
~
Copyright 2004 -American Petroleum nstitute. All
rights
reserved.
I
23130
6D5
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
National Adoption of IS0 14313:1999- Petroleum and Natural
Gas Industries- Pipeline Transportation Systems- Pipeline Valves
AnnexesA,
B,C
and D
C6
Torq ue/Th ust Test
i
ng
The ma ximum torque or thrus t req uired to ope rate ball, gate or
plug valves shall be m easured at the pressure specified by the
purchaser for th e following valve operations:
a. Open to closed with the bore pressurized and the cav ity at
atmospheric pressure
b. Closed to open with both sides of the obturator pressurized
and the cavity at atmospheric pressure
c. Closed to open with one side of the obturator pressurized and
the cavity at atmos pheric pressure
d. As in c. but with the other side of the obturator pressurized
Torque or thrust values shall be m easured with s eats free of
sealant except where the sealant is the primary means of
sealing. If necessary for assembly, a lubrican t with a viscosity not
exceeding hat of SAE 1OW motor oil or equ ivalent may be used.
Thrust and torque testing shall be pe rformed following hydrostatic
shell testing and, if specified, low-pressure gas seat testing.
The measured torque or thrust results shall be compa red with
the manufacturer's predicted values.
c7
Cavity Relief Testing
C7.1
Frequency
Each valve shall b e tested.
Cavity relief testing is not required if protection of th e cavity
against over-pressure is ensured, for b oth the open an d the
closed position, by a hole in the obturator or around the seat seal.
C7.2
Trunnion-Mounted Bali Valves and Through-Conduit Gate
Valves with Internai-RelievingSeats
The procedure for cavity relief testing of trun nion-mo unted ball
valves and throughconduit gate valves with internal relieving
seats shall be:
a. Fill the valve in the half-open position with water
b. Close the valve and allow water to overflow from the test
connection at each end of the valve
c. Apply pressure o th e valve cavity until one seat relieves the
cavity pressure into the valve end and record this relief
pressure
d. for valve types with second-seat relief, continue to increase
the pressure to the cavity until the second seat relieves and
record the relief pressure of the second seat
Failure to relieve shall be cau se for rejection.
c7.3
Floatlng -Bali Valves
The procedure or ca vity relief testing of floating-ball valves shall be:
a. With the valve half-open, pressurize the valve to 1.33 t imes
the valve pressure rating specified in
6.1
or the material at
38°C (100°F)
b. Close the valve and vent each end to atmospheric pressure
c. Open the valve to th e half-open position and monitor for the
release of test medium trapped in the cavity. Evidence of
trapped press urizing medium in the cavity shall be cause for
rejection
c8
Hydrogen-Induced Cracking Test
Process-wettedand pressurecontaining parts which are
manufactured, fabricated or formed from plate shall be resistant
to hydrogen-inducedcracking (HIC). This shall b e demon strated
by successful HIC testing in accordance with NACE TM 0284,
except that the test solution s hall comply with NACE TM 0177.
HIC acceptan ce criteria, such as th e crack sens itivity ratio (CSR),
crack length ratio (CLR) and crack thickn ess ratio (CTR), shall be
specified by the purchaser.
Annex D (Normative)
Supplementary Documentation
Requirements
The manu facturer shall provide the following supplementary
documentation if specified by the purchaser:
D 1 Non-Destructive Examination (NDE) Records
D2 NACE Hardne ss Certification
D3
Hardness Test Report on P ressure-ContainingParts
D4
Certificate of Conformance to th is International
Standard
D5
Heat Treatment Certification Records (e.g., charts)
D6
Design Calculations for P ressure-ContainingParts
and/or th e Drive Train
Pressure Test Report, inc luding Pressure, Test
Duration and Test Medium
D7
D8 NDE Perso nnel Qualification Records
D9 Coating/Plating Certification
D10 NDE Procedures
D 1 1
Calibration Records (purchaser o identify
requirements for equipment when ordering)
(Continued to next page)
6D-6
Copyright
2004
-Am enca n Petroleum Institute. All
fights resewed.
I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 6 D online at www.globaI.ihs.com
National Adoption of
IS0
14313:1999
- Petroleum and Natural
Gas Industries
-
Pipeline Transportation Systems- Pipeline Valves
Annexes
A,
B,C and D
D12 Fire Test Certificate
D13 Material Certification to
IS0
1047 4 (purchaser to
specify type of certification, and for which pa rts,
when ordering)
Design Verification by Certification Body/Agency
Type Approval by Certification Body/Agency
D I 4
D15
Copyright
2004
- American Petroleum
nstitute.All
tights
resewed.
I
23130 6 D
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
all reasonable facilities to satisfy him tha t the material is being
manufactured in acco rdance with this specification. All inspections
should be made a t the place of manufacture prior to shipment,
unless otherwise specified on the purchase order, and shall be
so conducted as not to interfere unnecessa rily with o peration of
the works.
N3
Rejection
Unless otherwise provided, material that shows defects on
inspection or subsequent to acceptance at the manufacturer's
works, or tha t proves defective when properly applied in service,
may be rejected, and the manufacturer so notified.
If
tests that
require the destruction of m aterial are made, any product that is
proven not to have met the requirements of the specification
shall b e rejected. Disposition of rejected product shall be a
matter of agreement between he m anufacturer and the purchaser.
N4
Compliance
The manufacturer is responsible for complying with all o f
the provisions of this spe cification. The purchaser may make
any investigation necessary o satisfy himself of compliance
by the manufacturer and may reject any material that doe s not
comply with this specification.
N5
Rotary Shouldered Connection
Acceptance of rotary shouldered connections shall be in
accordance with this specification, which provides the opportunity
to conduct detailed inspection
of
the connections in their as-
machined condition. The surface conditions nece ssary for precise
measurements will only be assured prior to subsequent further
processing, doping, shipping , handling, storing, etc., which can
alter the surfaces necessary for precision gauging.
Note:
Connections should be visibly inspected for damage that
may have occurred through this chain of events prior to pu tting
the conn ections into service. Such damage is generally very
minor
and
most often repairable well within the needs
for
good
connection performance.
7-2
~ ~~
Copyright 2004 -American Petroleum nstitute. All rights resewed.
I
23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchas e API Spec 7K o nline a t www.global.ihs.com
API SDecification
3rd Edition, September 2002
Specification for Drilling and Well
Servicing Euuipment
Appendix B
Supplementary Requirements
~
~~~
API Monogram@Required Yes No
BO
Introduction
By agreem ent between the purchaser and manufa cturer, and
when spe cified in the purchase order, one or more of the
following supplemen tary requireme nts shall apply.
B1
SR1
-
Proof Load Testing
The equipment shall be load tested and subse quently examined
in accordance with the requirements of 8.6 of this specification.
The equipment shall be marked “SR1” by mean s of low-stress
hard die stamping near the Load Rating dentification.
B2
SR2
- Low
Temperature Testing
Under this supplementary requirement, the maximum impact test
temperature for m aterials used in primary load carrying
components of covered equipment with a required minimum
operating temperature below that specified in 4.1 shall be
specified by the purchaser.
Impact testing shall be performed in accordance with the
requirements of 6.3 of this S pecification and ASTM A370. Except
for manual tong hinge pins of wrought material, the minimum
average Charpy impac t energy of three full size test pieces shall
be 20 ft-lb. (27
J)
with no individual value less than
15
i-lb. (20
J).
For m anual tong hinge pins of wrought material, the minimum
average impa ct energy of three full size Charpy impact test
pieces shall be
11
i-lb. (15
J)
with no individual value less than
.
8.5 fi-lb. (12 J).
Each primary load bearing component shall be marked
“SR2”
to
indicate tha t low tempe rature testing has been performed. Each
primary load bearing component shall also be marked with the
temperature in degrees Celsius to indicate th e actual design and
test temperature.
B3
SR2A -Additional
Low
Temperature Testing
Under this supplementary requirement, impact testing shall also
be applicable to m aterials used in the primary load carrying
components of equipment norm ally exempted from impact
testing. The com ponents to which impact testing shall apply shall
be determined by mutual agreement of the purchaser and the
manufacturer.
Impact testing shall be performed in accordance with the
requirements of 6.3 of this S pecification and ASTM A370. The
maximum im pact test temperature and the minimum average
and individual values shall be as agreed upon by the purchaser
and the manufacturer.
Each covered primary load carrying comp onent shall be marked
“SR 2A to indicate that additional low temperature testing has
been performed. The component shall also be m arked with the
temperature in degrees Celsius to indicate the actual design and
test temperature.
B4
SR3
-
Data Book
When reques ted by the purchaser, records shall be prepared,
gathered, and properly collated in a data book by the manufacturer.
The data book shall at leas t include for each unit:
Statement of Compliance
Equipment Designation/Serial Number
Assembly and C ritical Area Drawings
Nominal Capacities and R atings
List of Com ponents
Traceability Codes and Systems (marking on parts/rec ords
on file)
Steel G rades
Heat Treatment Records
Material Test R eports
NDE Records
Performance Test Records including Func tional Hydrostatic
and Load Testing Certificates (when applicable)
Supplem entary Requirements Certificates as Required
Welding Procedure Specifications an d Q ualification Records
B5
SR4
-
Additional Volumetric Examination of
Castings
The requirements or SR4 shall be identical to the requirements
for 8.4.7, except tha t all critical areas of each primary load
bearing casting shall be examined.
B6
SR5 - Volumetric Examination of Wrought
Material
The entire volume of primary load bearing wrought components
shall be examined by the ultrasonic method. When examination
of the “entire v olume” is impossible due to geom etric factors,
such as radii at section changes, the max imum practical volume
shall suffice.
Copyright2004 -Americ an Petroleum nstitute. All rights
esewed.
1
23130
7 K-1
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Specification for Drilling and Well Servicing Equipm ent
Appendix B
Supplementary Requirements
Wrought components examined by the ultrasonic method shall
meet the following acceptance criteria:
For both straight and angle bea m examination, any discontinuity
resulting in an indication tha t exceeds the calibration reference
line shall be classed as a defect. Any indication interprete d as a
crack or therma l rup tures shall also be considered a defect.
There shall be no multiple indications exceeding
50%
of the
reference distance amplitude curve. Multiple indications are
defined as two or m ore indications (each exceed ing
50%
of the
reference distance am plitude curve) within Y n. (12.7 m) of
each other in any direction.
7 -2
Copyright2004 American Petroleum nstitute.
All
rights
reserved.
I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purcha se API Spec 8 A online at www.global.ihs.com
API SDecification
13th Edition, December 1997
Drilling and Production Hoisting Equipment
Supplementary Requirements
API
Monogram@Required Yes O
No
l 2
Supplementary Requirements
One or more of the following supplementary requirements shall
apply only when spe cified by the purchaser in the inquiry, contract,
and order. Details of these supplementary requirements shall be
as agreed upon by the m anufacturer and the purchaser.
12.1
S R 1
-
Magnetic Part ic le Examination
All
accessible surfaces of th e main load carrying components of
the equipment shall be examined by a magnetic particle
examination method or technique conforming o the requirements
of ASTM E709: Recomm ended Practice for Magnetic Particle
Exam ination. Acceptance lim its shall be as agreed upon by the
manufacturer and the purchaser.
12.2
SR2
- Liquid Penetrant Examination
All accessible surfaces of the main load carrying components of
the equipment shall be examined by a liquid penetrant
examination or technique conforming to the requirements of
ASTM E165: Recomm ended Practice for the Liquid Penetrant
Examination Method. Acceptance limits shall be as agreed upon
by the manufacturer and the purchaser.
12.3
SR3
-
Ultrasonic Examination
Main load carrying components of the equipment shall be
ultrasonica lly exam ined in ac cordanc e with applicable ASTM
standards. The extent of ex amination, method of examination,
and basis for acceptance shall be agreed upon by the
manufacturer and purchaser.
12.4
SR4 -
Radiographlc Examination
Main load carrying components of the equipment shall be
examined by means of gamma rays
or
x-rays. The procedure
used shall be in accordance with an ASTM
or
other nationally
recognized standard which covers ultrasonic exam ination of the
prod uct inspe cted (e.g., cas ting, forging, bar, plate, etc.). The
extent of examination, method of examination, and the basis for
acceptance shall be agreed upon by the manufacturer and
pu chaser.
12.5
SR5
- Traceability
The manu facturer shall have reports of chemical analysis, heat
treatment and mechanical property tests for the main load
carrying components of the equipment.
12.6
SR6
-Weld ing
All
welding undertaken on components shall be performed using
welding procedures which are qualified in a ccordance with one o
the following and/or other national standards:
a. ASME IX
b. AWS D 1 . l
c. ASTMA488
This welding shall only be carried out by welders or welding
operators who are qualified in accordance with the
aforementioned standards.
Welding procedures for base m etals which are not listed in the
above standards shall be qualified individually or as a group
based on w eldability, tensile properties,
or
composition.
32.7
SR7
- Extreme Low Temperature
The acceptability of equipment intended for operation at
temperatures below
0°F
shall be agreed upon by the
manufacturer and the purchaser.
12.8
S R 8
-
Other Supplementary Requirements
Any additional supplementary requirements must be agreed
upon by the purchaser and manufacturer.
Copyright 2004 -Amer ican Petro leum
nstitute.All
rights reseived. I
23130
8A-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
If specified in the purchase order, one or more of the following
supplem entary requirements shall apply.
A2
SRI - Proof Load Test
The equipment shall be given a proof load test and subsequently
examined in accordance w ith 8.6.2.
The equipment shall be m arked “SR1” using low-stress, hard
die-stamps near the load rating identification.
A 3
SR2
-
Low Temperature Test
The maximum impact test temperature for materials used in
primary-load-carryingcomponents with a required minimum
operating tempe rature below -20°C (-4°F) shall be specified by
the purchaser.
Impact testing shall be performed in accordance with 6.3 and
ASTM
A
370. The minimu m average Charpy impact energy of
three full-size test pieces, tested a t the spec ified (or lower)
temperature, shall be 2 0 ft-lb. (27 J) with no individual value less
than 15 ft-lb. (20 ).
Each primary-loadcarrying component shall be marked “SR 2” to
indicate that low temperature testing has been performed. Each
primary-loadcarrying component shall also be marked to show
the the a ctual design and test temp erature in degrees Celsius.
A4
SR3 - Data Book
If specified by the purchaser, records shall be prepared, gathered
and properly collated by the m anufacture r into a data book . The
data book for each unit s hall include at least the following:
Statement of compliance
Equipment designation/serial number6
Wear limits and nomina l capac ities and ratings 6
List of components
Traceabilrty codes and systems (mark ing on parts/records on file)
Steel grades
Heat treatment records6
Material test reports6
Equipment as listed in clause 1with exception of
r.
[Continued to next column)
NDErecords
Performance est records including functional hydrostatic
and load testing certificates (when applicable)
Supplementary requirements certificates as required
Welding procedure specifications and qualification records
A5
SR4 - Additional Volumetric Examination of
Castings
The requirements or SR4 shall be identical to the requirements
of 8.4.8, except tha t all critical areas of each p rimary-load-
carrying casting shall be examined.
A6
SR5 -Volumetric Examination of Wrought
Material
The entire volume
of
primary-loadcarrying wrought com ponents
shall be examined by the ultrasonic m ethod. If examination of the
entire volume is impossible due to geometric factors, such as rad
at section changes, the maximum practical volume shall suffice.
Ultrasonic examination shall b e in a ccorda nce with ASTM A 388
(the imm ersion method may be u sed) and ASTM E 428. Straight-
beam calibration shall be performed using a distancea mplitude
curve based on a flat-bottomed hole with a diameter of 3.2 mm
(% n.) or smaller.
Wrought components examined by the ultrasonic method shall
meet th e following acceptance criteria:
a. For both straight and angle beam examination, any discontinuit
resulting in an indication which exceeds the calibration
reference line is not allowed. Any indication interpreted as a
crack or therma l ru pture is also no t allowed;
b. Multiple indica tions (¡.e., two or more indications ), each
exceeding
50%
of the reference distance amplitude curve
and located within
13
mm
K
n.) of one another, are not
allowed.
A7
SR6
-
Boreback Stress-Relief Feature
When requested by the pu rchaser, the boreback box stress-relief
feature shall be a supplementary requirement for paragraph
9.9.5 -
Rotary Swivel Subconnec tion, 9.10 - Power Swivel
Subconnection, and
9.11.3
- Power-Sub Connections . The
connection shall conform to the applicable requirements as
specified in API Spec 7 for the drill co llar boreback box stress-
relief feature.
Copyright
2004 -American Pemleurn Institute.
All
rights
reseived
I 23130
8G
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 1 1B online a t www.global.ihs.com
API Sr>ecification
1 1 B
6th Edition, Januarv
1998
Appendix
B
Suggestions for Ordering API Spec
1 l B
Sucker Rods
Sucker Rods
~
API Monogram@Required
Yes NO
B 1
SuckerRodsandPonyRods
In placing orders for sucker rods and pony rods manufactured in
accordance with API Spec I I B , purchasers should specify the
following on their purchase orders:
Specification API Spec
116
Quantity
Type Steel or FRP
Grade
Size (Diameter)
Length
5.1.1,
Table 1 r 5.2.1,
Table 1 r
3
6.1.1, Table 5 or 6.1.2,
Table 6
6.1.1, Table 5 or 6.1.2,
Table 6
Packaged 11.4
B 2
Couplings and Subcouplings
In placing orders for couplings and subco uplings manufac tured in
accordance with API Spec I I B , purchasers should specify the
following on their pu rchase orders:
Specifications API Spec 11 B
Quantity
Class 7.1
Type 7.2, Figure
4
Size 7.3, Table
8
B 3
Polished Rods
In placing orders for polished rods manufactured in accordance
with API Spec I l B , purchasers should specify the following on
their purchaser orders:
Specification API Spec 11 B
Quantity
Size (outside diameter)
12.1.1,
Table 16
(Continued to next column)
Length 12.1.1 Table 16
12.1.2, Table
16
nd Connections
Grade 12.2
Spray Metal
12.3
B 4
Stuffing
Boxes
and Pumping Tees
In placingordersfor stuffing boxes and pump ingtees man ufactured
in accordance with API Spec
116,
purchasers should specify the
following on their p urchase orders:
Specification API Spec 11 B
Quantity
Size and Type of Connections
Working Pressure
13.1.1,
13.2.1
B5
Polished Rod Clamps
In placing orders for po lished rod clamps manufac tured in
accordance with API Spec I l B , purchasers should specify the
following on their purchase orders:
Specification API Spec 11 B
Quantity
Polished Rod Size
Load Rating
B 6
Sinker
Bars
In placing orders for sinker bars manufactured in accordance
with API Spec 11B , purchasers should specify the following on
their purchase orders:
Specification API Spec 11 B
Quantity
Size 15.1.1, Table 19
Grade 15.2
12. 1. 1,Table
16
118
opyright
2004
-
Amencan
Petroleum Inst iute.
All
rights reserved. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
The user/purchaser s hall identify, as applicable, the following:
(Continued
to
next page)
Copyright
2W4 American Petroleum nsti tute.All
rights resewed. I
23130
1101
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API SDec 11 L6 on line a t www.global.ihs.com
~~
API Specification l l L 6 : s t Edition, June
1993
Electric Motor P rime Mover for Beam Pumping Unit Service
Append ix
A
Motor
Data
Sheet
Optional Accessories
User Preferenc e
O
eaters
120
VAC
O
ccessible Grease Plug Extension
Paint
-
Color Manufacturer's Standard
aint
-
White
O Winding Tem perature Detectors per P hase
nd-Turn Encapsulation
API Monogram Required on the Namep late
O
Yes
O NO
O eaters
230
VAC
O eaters 4 6 0 VAC
O
anufacturer Provides Grounding Lug
O
aint
-
(other color)*
O
tainless Steel Rodent Ba rrier
-
API Bulletin
11-5
Required with Q uotation
O
Yes
O NO
Certified Temperature and Performance Test Required with Quo tation
Yes O o
Comments
=
API Standard Unless Specified Otherwise on th e User Data Sheet
=
API Acceptable Specifications
* =
API Acceptable Range
11L6-2
Copyright2004
-American Petroleum Institute.All rights reserved. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
API Gravity having SSU Viscosity at O F and SSU at O
F.
araffin
O
ax
O
sphalt problem is
O
one ight
O
evere.
Housing Requirements
eter
ampier
+
Container otal Skid one eather Proof nsulated for O Min. Air Temp.
Internal Heater
O
es O
o
Light O es O o
Pumps
Charging
O
es
O
o
Circulating O es
o
Wet Oil Discharge Line O
es O o
with Check Valve
O
es No
with Back P ressure Valve O es
o
GPM at Psig
GPM at Ps€
Line Size in.
[Continued
to
next page)
copyright 2004 -American Petroleum
Institute.
All rights resewed. I 23130
11N-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Lease Autom atic Custody Transfer (LACT) Equipm ent
Handbook Revision 01.01.04
Refer to pages
9
- 10of API Spec 11 N
Purchase API Spec 11 N on line at www.global.ihs.com
Appendix
A
Data Sheets
API
LACT
Unit Specfncation Data Sheet
-
continued)
(U.S. Customary Units)
~ ~ ~
Diverter Valve
ydrometer Actuator Piston Actuator iaphragm Actuator Model
Pneumatic Power at Slte
Psig
Compressor Required
Meter Stack to Include
O
Pulse Switch
ransmitter
Electr ical
Power Enclosure
Control Enclosure
Monitor
Lightnin g Arrestor
Allowable Counter
Alarm Beacon
as
es
ir
o
O
Available
arge Numeral Counter
icket Printer emp. Comp ensator
O
Non-Reset Totalizer
ight Angle Drive ther
20
VAC
40 VAC 480
VAC -Pha se Ph as e
'J
eparate n Skid
ff
Skid
O Separate n Skid
Off
Skid
O
Yes No
O
Yes
O
No
Color
O
On Probe n Skid ff Skid Range %W
Indicator Lamps (Specify Fun ction)
Area Classif icat ionof Location
Remarks
Prepared by
Date
11N-2
Copyright
2004
-Amer ican Petmleum nstitute. ll
r ight.
reserved.
I
23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 12D online at www.global.ihs.com
API Specification
12D
10th Edition, November 1994
Field Welded Tanks for Storage of
Production Liauids
Appendix E
Suggestions for Ordering
API Monogram@Required Yes
No
In placing orders for tanks t o be manufactured in accordance
with the stipulations of API Spec 12D, purchasers should specify
the following on their pu rchase order:
Specification API Spec 12 D
Numb er of Tanks
Nominal Capacity
Size Par.
3.5
Table
3.1,
Col. 1
Outside Diameter
Height of Shell
Table 3.1, Col.
4
Table 3.1, Col. 5
Type of Botto m Par. 3.6
She ll Plate Thickness Par. 3.10
Deck Plate Thickness Par. 3.14
Delivery Date and
Shipping Instructions
Inspection by Purcha ser Par. 7.2
The purchaser should also state on th e purchase order the
requirements concerning the following stipulations, which are
optional with the purchaser:
Bolting Par. 2.9
Viscous Oil Option
Cleanout Cover-Plate Design Par. 3.19
Anti-Channel Drain Baffle Par.
3.23
Downcomer Pipe and Design Par. 3.24
Walkways, Stairways and Ladders Appendix D
Table 3.1, Footnote
Attention is called to the following stipulations, w hich are subject
to agreement between the purchaser and the manufacturer:
Additional Connections
Finish Coats of P aint
Alternative Bolting Requirements
and/or Finish
Materials
Internal Coating
Par. 3.20
Par. 5.4
Par. 2.9
Par. 2.1
Par. 5.5
Copyright
2004
-Amencan Petroleum Instiute.
All
rights
resewed. I 23130
~
1 2 D
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 12 F online a t www.global.ihs.com
12F
11th Edition, November 1994
Shop Welded Tanks for Storage of
Produ ction Liauids
Appendix E
Suggestions for Ordering
API Monogram@Required Yes No
In placing orders for tanks to be manufactured in accordance
with th e stipulations of API Spec 12F, purchasers should specify
the following on their purchase order:
Attention is also called to the following stipulations, which are
subject to agreement between the purchaser and the
manufacturer:
Specification API Spec 1 2 F Materials Par. 2.1
Number of Tanks
Nominal Capacity
Size
Outside Diameter
Height of Shell
Table 1,Col.
1
Par. 3.5
Table
1,
Col. 4
Table 1,Col. 5
Type of Bottom Par. 3.6
Shell Plate Thickness Par. 3.10
Deck Plate Thickness Par.
3.13
Delivery Date an d
Shipping Instructions
Inspe ction by Purchaser Par. 7.2
I
The purchaser should also state on th e purchase order the
requirements concerning the following stipulations, which are
optional with the purchaser:
Bo lting Par. 2.9
Viscous Oil Option
Cleanout Cover-Plate Design Par. 3.16
Anti-Channel Dra in Baffle Par. 3.18
Downcomer Pipe and Design Par.
3.19
Walkways, Stairways and Ladders Appendix D
Table 1,Footnote
Alternative Bolting Materials Par. 2.9
and/or Finish
Additional Connections
Finish Coats of Paint
Par. 3.17
Par.
5.4
Intern al Coa ting Par. 5.5
Copyright 2004 -American Petroleum nstitute. All rights r e s e d . I 23130
12F-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API SDec 12GDU online at www.global.ihs.com
API
Specification
12GDU
1st
Edition, December
1990
Glycol-Type Gas Dehydra tion Units
Appendix C
Glycol-Type Gas Dehydration
User Desígn Information Sheet
~ ~~ ~~~ ~~
API Monogram@Required Yes Q
No
Glycol-Type
Gas
Dehydration
User Design Information Sheet
_ _ ~ __
Field name and Location
Design Conditions
Gas Rate MM scfd (Max.)
MMs cfd (Min.)
Design Pressure Psig
Design Temperature, Max. "F
Design Temperature, Min.
"F
Operating Pressure psig Min. psig Max.
Operating Temperature O F Min.
"F
Max.
Gas Spe cific Gravity
(Air = 1.0)
Inlet Gas Water Con tent Ib./MMSCF
Inlet Gas Dew Point "F
Outlet Gas Water Content
or Dew Point Required Ib./MMSCF or "F
H2S Content PPM
CO2 Content
%
Available U tilities (Electricity, Instrume nt Air, Fuel Gas, Etc.)
Site Elevation
Feet Above Sea Level
copyright
2004 -Ameri can Petroleum Institu te. All rights reserved. I
23130
12GDU-1
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purch ase API SDec 1 2GD U online a t www.global.ihs.com
~ ~~ ~ __
API Specification l2GDU
:
1s t Edition, December
1990
Glycol-Type Gas Dehy dration Units
Appendix
C
GlycoCïype
Gas
Dehydration
User Design Information Sheet
GiycoCType Gas Dehydrator
-
Design Data Sheet
Vendor Design Data Sheet (cont inued)
(To
be completed by User and Vendor)
Reboiler
Design P ressure
Diameter
X
Length
Design Heat Duty
Firetube Area
Firetube Wall Thickness
Average Firetube Heat Flux
Insu ation Typeflh ickness
Pressure Relieving Device or Method
Accessories Provided
Thermometer with Thermowell
Tempe rature Controller with C ontrol Valve
High Tempe rature Shutdown (Glycol)
High Temperature Shutdown (Stack)
Flame Failure Shutdown
Sight Glassflype
Stack Gas Test Connection
Still
Column
Design Pressure
Diameter
X
Length
Pack ing Type and Material
Reflux Oil
Insulation Thickn ess and Type (if used)
Surge
Design Pressure
Diameter X Length
Integral with Reboiler
Insulation Thickness and Type
Low Glycol Liquid Level Alarm/Shutdown
Glycol/Glycol Heat Exchanger
Design Heat Duty
Design P ressure
Hea t Exchanger
-
Size, Type a nd Hea t Transfer Area
Insulation Typeflhickness
(Continued
to
next
page)
O
yes
O
yes
O
yes
O
yes
O
yes
O
yes
U
es
O yes
Cl
yes
O
yes
o
o
o
o
o
o
Type
o
o
a o
o
Type
12GDU-3
opyright
2004
-
Ametican Petroleum
nstitute.
All
tights
esewed. I
23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
American Petroleum Insti t ute ' Handbook Revision 01.01.04
Purchasing Guidelines Handbook
API@Monogram" Equipment
API Spec ification IZGDU : 1st Edition, December 1990
Glycol-Type Gas Dehydrat ion Unit s
Refer to pages 21 25 of API Spec 12GDU
Purch ase API Spec 12GD U online a t www.global.ihs.com
Appendix
C
Glycol-Type Gas Dehydration
User Design Inform ation Sheet
Glycol-Type Gas Dehydrator - Design Data Sheet
Vendor Design Data
Sheet
continued)
(To be comp leted by User and Vendor)
Particle Filter
Manufacturer/Model
No.
Design Pressure
Maximum Flow Capacity
Filter Element Micro n Removal
Insulation Thickness
Differential Pressure Indicator
Bypass Valves and P iping
Pump
Manufacturer/Model No.
Type (Electric- Glycol/Gas Powered) and S peed
Spare Pump
Flow Rate
Motor Type, HP, Voltage, Phase, Speed
Pulsation Dampeners
Flow Indicator
Miscellaneous Information
Level Gage Glass Type
Rebo iler Tem peratu re (OF)
Glycol Purity (weight %)
Circulation R ate (gal/hr)
Gallons Glycol Circulated/lb. Water Removed
Est ima ted Fuel Gas Usage (SCF/hr)
Estimated Stripping Gas Usage
Reconcen trator Assembly Skid - Size and Weight
Instrument Tubing Material
O v e s
O NO
O v e s
O
No Type
O v e s O
NO
O v e s
O
NO
O v e s O NO
12GDU-4
Cowright 2004. merican Petroleum Intiiuie. All rights resewed. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 12GDU online at www.global.ihs.com
API Specifica tion 12GDU
:
I s t Edition, December
1990
Glycol-Type Gas De hydration Units
Appendix C
GlycoCType Gas Dehydration
User Design Information Sheet
Additional Optional Requirements continued)
~
Heat Efficiency Options
A. Seco ndary Air Adjustme nt
B.
Turbulator
C.
Surge Insulated
O v e s
O
O
O v e s
O
NO
O v e s O
O
Comments
12GDU-6
~~
Copyright2004
American
Petroleum nstitute. All rights reserved. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 12J online at www.global.ihs.com
API Specification
1 2 J
th Edition, October 1989
Oil
and Gas Separators
Appendix E
Separator Design
Information
API Monogram@Required
Yes
No
Operating
Conditions
Liquid Volumes
Oil/Condensate Barrels/Day Gravity "API
Water Barrels/D ay Sp. Gr. (Wa ter
=
1.0)
Oil/Condensate Characteristics
viscosity cp
Foaming O il O oderate
O severe
Paraf fin Problem O v e s O O If Yes, give Cloud Point O F
Slug Flow O v e s O O
If yes, give details such as Maximum Liquid Rate, Slug Volume, etc. or Suggest Surge Factor
Gas MMSCFD Sp. Gr. (Air
=
1.0)
OperatingTemperature (OF) Max. Min.
Operating Pressure psig) Max. Min.
H S Content Mole %
CO2 Content Mole%
Geographical Location
Design Requirements
Type
Vertical
O
orizontal
O
pherical
Manufacturer's Recommendation
-phase 3phase
Design Pressure psig at Tem perature
"F
Type Mist Extractor (Specify)
Liquid Retention Time
Corrosion Allowance in.
Corrosion Allowance for Non-Pressure internai Parts
NACE MR-01-75 Required
Special Stress Relieving
O
es
O
NO (Specify if Yes)
APi RP 14C Safety Systems Required
in.
O v e s O NO
O es O No
Coatings
External
O fgr Std. O ther (Specify
if
Other)
internai (Specify)
Cathodic Protection (Specify)
(Continued to next page)
Copyright2004-American Petroleum nstitute. All rights resewed. I 23130
12J-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Where insp ection is required by the purchaser, the exten t of such
inspection should be stated on the purchase order. Where the
inspector representing he purchaser desires to insp ect heaters
purchased or witness any specification tests or evaluate the
results of any n ondestructive examinations, the manufacturer
shall give reasonable notice of the time at which such inspections
should be made.
7.2
Inspection
While work o n the contract of the purchaser is being performed,
the insp ector representing he pu rchaser shall have free entry at
all times to all parts of the m anufacturer’s works which concern
the manufacture of the material ordered. The man ufacturer shall
afford, without charge, all reasonable facilities to satisfy the
inspector tha t the m aterial is being manufactured in accorda nce
with this spe cification. All inspections shall be m ade a t the place
of m anufacture prior to shipm ent unless otherwise specified on
the purchase order, and shall b e so conducted as not to interfere
unnecessarily with the manufacturer’s operations.
7.3
Rejection
Material which shows injurious defects on initial inspection
or
subseque nt to a cceptance at ma nufacturer’s works, or which
proves defective when properly applied in service, may be
rejected, and the m anufacturer
so
notified. If tests tha t requ ire
the de struction of material are made, the purchaser shall pay for
material and tests com plying with a ll of the provisions of this
specification, but shall not pay for material or tests which fail
to
meet the specifications.
7.4
Compliance
The manufacturer is responsible for com plying with al l of the
provisions of this specification. The purchaser may make any
investigation necessary o be assured of comp liance by the
manufacturer and may reject any material that does n ot comply
with this spec ification.
See following pages for Indirect Heater
Design
Information data
sheets.
~ ~
Copytight
2004
-American Petmleum Instnute. All rights reseived.
I
23130
12K-1
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 1 2 K online a t www.global.ihs.com
Section 7 and Appendix
A
Inspection and Rejection and
Indirect Heater Design Information
Field Geographical Location
Service
Design Conditions
Gas Rate SCFH Sp. Gravity
Conden sate/Oil Rate BPH API Gravity
Water Ra te BPH
Sp.
Gravity
at 60°F
at 60°F
Well Shu t-in Pressure Psig Inlet Pressu.re Psig
Outlet Pressu e Psig Site Eleva tion Psig
If Sour Gas - H2S Mo l% CO2 Mol %
Inlet Flowing Tem peratu e
"F
Min.
Out let Flowing Temperature "F P a
Fuel Gas Avai lable O v e s
O
O
Pressure Psig
Fuel Gas Sourc e High Heatin g Value (HHV) BTU/SCF
Other Fuel (Specify)
Note:
Flow rates
should be
maximum instantaneous rates based on expected flow surges.
Design Requirements
Coil Bundle Single Split
Coil Working Pressure Preheat Psig Expansion Psig
Coil Corrosion Allowance O es o in.
Choke Required Mfg. Stand ard Other
Type Choke Adjustable Diaphragm
Pa
i
t Required Mfg. Standard Special (Specify)
Regulatory Requ ireme nts/Lim itations (suc h as, Stack H eight, Emissions, API RP 14C) (Specify)
Optional Requirements
Coil Connections langed
O
hreaded ther
Com panion F lange B olted On (CFBO) O es 0
o
Bore in.
Skid Mounted* Lift ing Lugs
*If so,
state how unit will be loaded, unloaded, and supported in normal operation
Insulation (Specify)
She ll L i ft ing Lugs O v e s
O
O
Intake Flam e Arrestor
Stack S park Arrestor
Stack R ain Shield
Fuel Gas Scrubber
Pilot Flame Failure Shutdown
Stack Flame Arrestor
Stack Dow n Draft Diverter
Stack Gas Sample Connection
Electric Spark Ignitor
(Continued to n ext page)
Copyright 2004 -American Petroleum Institute. All rights ressived. I 23130
2K-2
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Soec 1 2L online at www.globa1.ihs.com
API
Specification
12L
Appendix C
4th Edition, November 1994
Vertical and Horizontal Emulsion Treaters
Treater Design Information
API Monogram@Required
O
Yes No
Field Name and Location
Design Conditions
Oil
Rate bbls/hr Oil Gravrty "API
Oil viscosity
ssu
at "F
at "F
at "F
Pour Point "F
Water Rate bbls/hr Water Spe cific Gravity
Gas Rate scf/hr Gas Spec ific Gravity
Sand, Salt or Solids Present (Describe)
Gas/Oil Ratio (GOR) Average scf/b bl
Surging or Instantaneous
Flow
(Describe)
Foaming
or
Paraffin
(If
Present, Describe)
Recirculating Rate
(If
Any)
Percent H2S
%
Percent CO2
%
Production Temperature to Treater
"F
Estimated Treating Temperature (If K nown)
Operating Pressure Required Psig
Design Pressure (Normal is 50 psig)
Psig
Des ign Tem peratu re (OF) Max. Min.
Required BS&W of Outlet Oil
Fuel Supply Pressure Ps€
"F
%
Fuel Source High Heatin g Value (HHV) BTU/scf, BTU/lb.
Disposition of Effluent Water (Describe)
Firetube Minimum Thickness (If Greater than Standard)
Optional Requirements
Vertical
or
Horizontal (Preference)
Type Coale scing lectric ay Section lates
Skid Moun ted (Horizontal) O es o
Lifting Lugs Stack Flame Arrestor
Stack Down-Draft Diverter
Corrosion Allowance Pressure Parts Non-Pressure Parts
Firetube
(Continued
to
next page)
~~~ ~~ ~~ ~~ ~~~ ~ ~
Copynght
2004 Amencan Petroleum nstitu te. All rights
r e~e i v ed .
23130
12L-1
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 12 L online at www.globaI.ihs.com
Appendix C
Treater
üedgn
Information
Seal Welding Internal External
Flame Arrestor
Stack Gasflemperature Connection
Sample Cocks in Lieu of Gage Glass
Special Paint or C oating
Internal Firetube
External Stack
Fuel Gas Scrub ber
O
es
O
o
Internal Float Shutoff O v e s Cl NO
Valves and Controls Mfg. Standard
Others
Pilot Ign iter O v e s
O
O
Flame Detector/Shutdown O es
0
No
Interface Drains Sand Jets (Manu al/Auto) Sand Pan
Space/Height Limitations or Size Preference
Anode Connections O es O o
Q ~ Y
Size Type
Heat E fficiency Options
a. Burne r Stack Draft Controller
b. Flue Gas Economizer
c. Hea t Exchanger Type
d. Insulation (Specify)
e.
Turbolator
f. Others
Comments
12L-2
Copyright 2004 -American Petroleum nstitute.All rights
reserved.
I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 12 P online at www.global.ihs.com
12P
2nd Edition, January 1995
Fiberglass Reinforced Plastic Tanks
Data Sheet
1
API Monogram@Required
Yes
No
General information
Com pany
Field
Estimate No.
Requisition No.
Contact
Cost Estima te Only I 1
Inquiry Date
SDecifications
API 12 P with API Monogram Yes O No
Number
of
Units Required
Diameter
Style of Top O C o n e Dome Flat
Style of Bottom O Cone lat
Type of Fluid
Specific Gravity
Maximum Operating Pressure
Maximum Operating Temperature
-
Testing Requireme nts Standard
Wind Load O
Yes
O
No
Snow Load
O
es No
Resin Temperature R ating O 150°F
Liner O Mil . W ei l
O Mil. Nexus
UV Protection O UV Inhibito r igme nting
O Painting
Tank Color O Natural
Fire Retardants O Yes No
Grounding Ground Rod O es
Carbon We i l O Yes
Downcomer Pipe O es o
No ule Location O Per Fig. 3.2 of API 12P
Nozzles Threaded Grooved
Manway 8 in. O 20 in.
(Continued to next page)
Lease
Approximate Location
Inquiry No.
Phone
For Purchase I
Required Date
O
Standard API
Capacity
Height
O Other
O ther
O Mod ified API
Design Vacuum
u ther
M PH
PSF
O 170°F 190°F Plus
O Gelcoating
O Other
u ther
O
No Type
O No
Other
Type
O Modified"
O langed O Gusseted Flanges
O 22 in.
O 24
in. Quantity
Copyflght2004 -Amer ican Petmleum Institu te. All rights
reserved. 23130
12P-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 12 P online at www.global.ihs.com
Data Sheet 1
Walkway Brackets ainted Steel O Galvanized Steel
Lifting Lugs O Painted Steel
O
Galvanized Steel
Thief Hatch Mod el
Pressure
Piastic Trim O Yes
O
No
Pipe Support Brackets es O
No
Insulation O Yes
O
No
Heat Tracing es O No
Ladder
O
Yes O
No
Caged Ladder (OSHA) es
O No
Tie Down Lugs
O
Yes
No
Interior Top Seam Laminated es * O
No
Striker Plate O Yes No
Stairway Required a es O No
O Fiberglass
O
Painted Steel
iberglass O Painted Steel
ainted Steel
O
Galvanized Steel
alvanized ainted
Length ft in.
Width
ft in.
Walkway Req uired es
o
O
Galvanized Painted
Length
ft
in.
Width ft
in.
Nozzle Orientation Drawing O yes o
Walkway/Stairway/Ladder Drawing es
o
Enclosed
*Note:
Suggested
if
tank
is
to have a gas blan ket.
O
Fiberglass tainless Steel
Vacuum
Type
Quantity
Type
alvanized Steel
O Galvanized Steel
O Fiberglass tainless Steel
-270
Nozzles
a.
b.
C.
d.
e.
f .
O
180
I
90"
I
h Capacity
.
i. Dimensions: Diameter Height
12P-2 Copyright2004 -American PetroleumInstitute.All rights resewed. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchas e API Saec 14A online at www.8lobal.ihs.com
API SDecification
10th Edition, November
2000
Specification for Sub surface
Safety Valve Eau iDment
IS0 10432:1999
- Petroleum and Natural Gas
Industries - Downhole Equipment - Subsurface
Safety Valve Equipment
Annex F (Informative)- Checklist o f
Suggested Ordering Information for
SSSV
Eaubment
API Monoearn@Reauired O Yes O No
Fi
General
When placing nquiries or orders for CSSV equipment
in
accordance
with this International Standard, the user/purchaser should
provide the following information to the supplier/manufacturer.
F2
Requirements (Applicable to al l
SSSV
TYP-)
a. Applicable specification(s), standards(s) and their edition(s)
b. Type of system (surfacecontrolled, subsurface controlled)
c. Type of SSSV (tubing-retrievable, WL-retrievable, coil-tubing-
retrievab le, TFL-retrievable, etc.)
d. Rated working pressure (maximum requ irement or application)
e. Rated working tempe rature (maximum requirement for
application)
f. Model name (if known)
g. Class of service (see 4.2.5 of this International Standard)
h. Size (see Annex A of this International Standard)
i.
Quantity of each piece of equipment
j.
Required delivery date(s)
k. Material requirements, such as
1. Specific corrosion/chemicaI-resistance characteristics
2. Specific
NDE
methods/techniques required by purchaser
I. Applicable quality system (if desired)
m. Setting depth (minimum required for application) and contro l
system para meters (supply pressure, supply iine(s) and
connec tion rating(s), etc.)
n. Minimu m internal diamete r
o. If applicable, maximum allowable pressure drop at maximum
flow rate through SCSSV
p. The requirement(s), f any, for holding the SCSSV open w ithout
the use of the primary operating source (temporary or
perman ent lock-open system)
(Continued to nex t column)
q. The requirement(s), if any, for providing control fluid
communication from th e
SCSSV
to any other subsurface
device (e.g., a throug h-tubing retrieva ble backup valve)
r. If applicable, specific performance/accep tance criteria for
features spec ified but not previously verified
s.
Type and characteristics of control fluid to be used, if
applicable
F2.1
TR
-
SCSSVS
a. Type of tubular top and bo ttom connec tion(s) and the ma terial
and dimensions of the tubular products which are connected
to t he valve (these connections are not included in the
evaluation of combined loading)
b. The loading conditions, including combined loading (pressure,
tension/compression, torque) and the corresponding
temperature extremes anticipated to be applied to the valve
c. The receptac le profile(s) and sealing-bore dimension(s) and
location(s), if applicab le
d. Dime nsions of casing and tubing, including any requiremen t
for passage of lines (electrical/hydra uiic) between valve OD
and casing ID
F2.2
WR -
SCSSVS
a. The dimens ions of the connec tion between the valve and the
mechanism securing the valve in the tubing, or th e type and
make of mechanism securing the valve in the tubing
b. The required dimensions of and tolerances on the tubular
products in which the SCSSV is positioned when installed in
the well
c. The material of the mounting device interface to which the
valve is connected and th e tubular produc t(s) in which the
SCSSV is positioned when installed in the well
F2.3
sscsvs
a. Orifice size, if app licab le
b. Setting spring, if applicable
c. Number of spacers to be used, if applicable
d. Pressure charge, if app licab le
(Continued to n ext page)
Copydght 2004-Ame ncan Petroleum InstiUte. A l l rights resewed. 23130
~
14A-1
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purch ase API Spec 1 4L online at ww w.global.ihs.com
API
S D e c i f i c a t i o n
1 4 L
st Edition, October
2002
Lock
Mandrels
and
Landing
Nipples
IS0 16070:2001 E)
API Monogram@Required
O
Yes No
5
Functional Specification
5.1
General
The user/purchaser shall prepare a functional specification for
ordering products which conform with this International Standard
and specify the following requirements and operating conditions,
as applicable, and/or identify the suppIier's/manufacturer's
specific product. These requirem ents and operating conditions
may be conveyed by me ans of a dimensio nal drawing, data sheet
or other suitable docum entation.
5.2
Functional Characteristic sof
lock
Mandrels and
Landlng Nipples
The following functional c haracteris tics shall be spec ified, as
applicable, for lock m andrels and landing nipples:
a. Conveyance me thod
b. Locking mechanism
c. Nego
d. Selectivity
e. Sealing device
f. Dimensions
g.
Passage of lines (electrical and/or hydraulic) in the ann ulus
(for landing nipples only)
5.3
Well Parameters
The following well parameters shall be specified, as ap plicable,
for the lock mandrel and landing nipple:
a. Size, m a d , material and grade of the casing and tubing
b. Well depth and angle from the vertical to the installed
position
c. Casing and tubing architecture, deviations, and restriction s
through which the lock m andrel and/or landing nipple pass
d. Anticipated loading conditions which m ight be applied to the
lock mandrel and landing nipple
The term "weight" is commonly incorrectly
used
to mean mass, but this practice
is deDrecated.
5.4
Operational Parameters
The following operational parameters shall be specified, as
applicable, for the lock mandrel and landing nipple:
a. Acidizing, includ ing he acid composition , pressure, temp erature
velocity, exposure tim e and any other che mica ls used during
the s timulation
b. Fracturing, including proppant description, fracture fluid
velocity, proppant-tckfluid ratio
c. Sand conso lidation operation s
d. Type of well intervention including service equipm ent such as
electric line, slick line, braided line, coiled tubing, or snu bbing
equipment
5.5
Environmental Com patibl l l ty
The following shall be identified,
as
applicable, for the lock
mandrel and landing nipple to ensure environmental
compatibility:
a. Produc tion/injection fluid compos ition, mass, chem ical
and/or physical composition and the condition of the fluid
and/or its comp onents, being solid (e.g., sand prod uction,
scale, etc.), liquid and/or gaseous to which the lock ma ndrel
and landing nipple is exposed during its full life cycle
b. Both the m inimum and the maximum anticipated values of
the production/injection pressures, pressure differentials,
temperatures and flow rates
c. In cases where the user/purchaser has access to corrosion
property historical data and/or research which is applicable to
the functional specification, the user/purchaser should state
to th e manufacturer which material(s) has the ability to
perform
as
required within th e c orrosion environment
5.6
Compatib i li ty wi th the Related Wel l Equipment
5.6.1
lock
Mandrels
The following information shall be specified, as applicable, to
ensure the com patibility of the lock mandrel with the related wel
equipment:
a. Size and/or type of the lock mandre l required to position the
flow control equipment in the landing nipple
(Continued to ne xt page)
Copyright
2004
-American Petroleum Institute.All
rights
reserved.
I
23130
14L-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 1 4L online a t www.global.ihs.com
IS0 16070:2001
b. Landing nipple size, mod el and type into which the lock
mandrel is to b e installed
c. Size, type, material, configuration and interface dimensions of
the connec tion between the flow control equipment and the
lock mandrel
d. Size, type and configu ration of other prod ucts to b e used with
the lock mandrel
5.6.2
Landing Nipples
The following information shall be specified, as applicable, to
ensure the compa tibility of the landing nipples with
the related well equipment:
a. Top and bottom tubular connection(s), the material and
dimensions of the landing nipple which is connected to the
tubing
b. Internal receptacle profile(s), sealing bore dimen sion(s),
outside diameter, inside diameter and their respective
locations
c. Size, type and configura tion
of
lock mandrels
or
other
products to be used with th e landing nipple
5.7
Quality Control
The quality con trol gra de (¡.e., Q1, 42 or 43 s given in 7.4) shall
be specified by the user/purchaser.
5.8
Design Validation
The design va lidation grade (¡.e.,
V1,
V2
or
V3
as given in
6.5)
shall be specified by the user/purchaser. W hen requested by the
user/purchaser, an operating envelope for the lock mandrel and
sealing device validation grade V 1 shall be sup plied. An exam ple
of an operating envelope is shown in Annex
A.
14L-2 C omght 2004
-American
Petroleum
nstime. All tights
reserved.
I
23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API SDec 15HR online at www.global.ihs.com
API Specification
Section 4, Appendices E and H
3rd Edition, August 2001
High Pressure Fiberglass Line P ipe
Purchasing Guidelines, Purchaser
Inspection and Data Sheet
API Monogram@Required
Yes
No
4
Purchasing Guidelines
4.1
General
This section provides recommend ed guidelines for inquiry and
purchase of API Spec 15HR pipe or component. These guidelines
consist of data sheets to be completed by the purchaser.
4.1.1
Data Sheet
The data sheet is designed to p erform two func tions:
a. Assist the purc haser in the p rocurem ent of the proper pipe or
component
b. Assist the purch aser in communica ting the particular needs
and requirements, as well as information on the environment,
to the manufacturer for the use in designing and producing
pipe or component
4.1.2
Use
A copy of the data sheet should be completed as accurately as
possible.A copy of the data sheet should then be attached to the
purchase order
or
request for proposal.
Appendix H provides a format t o docum ent service conditions and
requirements for ordering high pressure fiberglass components.
4.2
Pressure Ratings
It is recommended that the pipe be purchased by pressure
rating. The API Stan dard Pressure Ratings are from 500 Ibf./in.2
gauge through 5,000 Ibf./in.2 gauge in 250 Ibf./in.2 gauge
increments. The user should purchase pipe suitable for the
specific service conditions.
4.3
Components
Components, other than pipe, should be ordered on the ba sis of
thread size and pressure rating.
Appendix E
Purchaser Inspection
E l
Inspection Notice
Where the inspector representing he purch aser desires to
inspect this pipe or witness these tests, reasonable notice shall
be given of the time at which the run is to be made.
E2
Plant Access
The inspector representing the purchaser shall have unrestricted
access at all times while work on th e contract of the purchaser is
being performed, to all parts of the m anufacture r’sworks which w ill
concern the manufacture of the pipe ordered. The manufacturer
shall afford the inspector all reasonable facilities to satisfy him
that the pipe is being manufactured in accordance with this
specification. All insp ections should be made at the place of
manufacture prior to s hipment, unless otherwise specified on the
purchase order, and shall be so conducted as not to interfere
unnecessarily with th e operation of the works.
E3
Compliance
The manufacturer is responsible or complying with ail of the
provisions of this specification. The purchaser may make any
investigation necessary to satisfy himself of c ompliance by the
manu facturer and may reject any material tha t does not comply
with th is s pecification.
E4
Rejection
Unless otherwise provided, material which shows defects on
inspection or subsequent to acceptance at the manufacturer’s
works, or which proves defective when properly applied in
service, may be rejected, and the manufacturer so notified. If
tests th at requ ire the destruction of material are made, any
product which is proven to have not met the requirements of the
specification sha ll be rejected. Disposition of rejected product
shall be a matter of agreement between the manufacturer and
the purchaser.
~~
Copyright
2ûû4 American Petroleum nst iu te. All
r ights
reserved. I 23130
15H
R -
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 15 HR online a t www.global.ihs.com
Section 4, Appendices E and
H
Purchasing Guídelines, Purchaser Inspection and
Data Sheet
Project(s) and Location(s)
Maximum Operating Pressure
Test Pressure
Tempe rature Ranges Anticipated
Minimum Ambient Temperature
Maximum Fluid Temperature
Anticipated Composition of Fluids
CO2 PPm
H2S PPm
Hydrocarbon Analysis (Gas, Oil)
Salt W ater %
Other
Anticipated Future Operations which w ould A ffect Pressure, Temperature, or Fluid Content (e.g., Hot-Oiling)
Future Operating Parameters
Will Inhibitors be Used O v e s O O If Yes, what Type
Anticipated Flow Rates
BPD Oii/Condensate
MCF/D Gas
BPD Sa lt Water
Will Erosion be a Concern Yes
No
Cause
Operator or Third-party Witness es
Delivery Requirements
Special Shipping, Pac king and S torage Instructions
No
Technical Contact in Buyer's Organization
Phone
15HR-2
Copyright 2004 -American Petroleum Institute.All rights EseNed. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 1 5LE online a t www.global.ihs.com
15LE
rd Edition, April
1995
Polyethylene (PE) Line P ipe
Section 4
Purchasing Guidelines
API Monogram@Required Yes
No
4
Purchasing Guidelines
4.1
General
This section provides recommende d guidelines for inquiry
and purchase of API Spec 15LE pipe or fittings as follows:
Specification
API Spec 15LE
Type
Polyethylene
6.2
Quantity Feet
or
Pieces
Nominal Size
Table
3
SDR
Table
3
Leng th Par. 5.2.2
Delivery Date and
As
Requested
Shipping Instructions
Fittings Tables
4
and
5
Copyight
2004.
American Petroleum
Institute.
All
rights reserved.
I
23130
15LE-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 15LR on line a t www.global.ihs.com
API SDecification
15LR
th Edition, August 2001
Low Pressure Fiberglass Line Pipe
Section 1.3 and Appendix H
Suggestions for Ordering API Low Pressure
Fiberglass Line Pipe and Fittings and
Purchaser inspection
API Monogram@Required
Yes No
1.3
Suggestions for Orderin g API
l o w
Pressure Fiberglass
Line Pipe and Fitt ings
1.3.1
In placing orders for line pipe to b e manufactured i n accordance
with API Spec 15LR, the purcha ser may specify the following o n
the purchase order:
Specification API Spec 15LR
Quantity
Pressure Ratin g Par.
1.1
Process of Man ufacture Par.
3.1
Resin System Par.
3.2
Nominal Size or Outside Diameter
Len gth Par. 7.1.2
Pipe Ends Par.
8.1
Delivery Date and
Shipping Instructions
1.3.2
Attention is called to th e following paragraphs which may requ ire
agreement between the purchaser and the manufacturer:
Service Factors Par
5.4
Disposition of Rejected Product
1.3.3
The purchaser should also state on the purchase order the
requirements concerning the following stipulations which are
optional with the purchaser:
Degree of Cure Par.
4.4
Physical Prope rties Par.
5.1
Static Pressure Ratin g Par. 5.5.2
Pipe Drawing s Par.
8.2
Purchase r Inspec tion Par.
8.6
Tables
1
nd
2
App endix H, Par. H.4
Appendix H
Purchaser Inspection
H1
Inspection Notice
Where the inspector representing h e purchase r desires to
inspect this product or witness these tests, reasonable notice
shall be given of the tim e a t which the run is to be made.
H2
Plant Access
The inspector representing the purchaser shall have unrestricted
access at all times while work on co ntract of the p urchaser is
being performed, to all pa rts of the man ufacturer's plant which
will concern the manufacture of the product ordered. The
manufacturer shall afford the inspector all reasonable facilities to
satisfy him that the product is being manufactured in accordance
with this specification. All inspections should be made at the
place of man ufacture prior to shipmen t, unless otherwise
specified on the purchase order, and sha ll be so conducted as
not to interfere unnecessarily with th e operation of th e works.
H3
Compliance
The man ufacturer is responsible for complying with all of the
provisions of this specification. The pu rchaser may make any
investigation necessary to satisfy himself of comp liance by the
manufacturer and may reject any material that does no t comply
with this sp ecification.
H4
Rejection
Unless otherwise provided, material which shows de fects on
inspection or subsequen t to acceptance a t the manufacturer's
works, or which proves defective when properly applied in
service, may be rejected, and the manufacturer
so
notified. If
tests tha t require the d estruction of m aterial are made, any
product which is proven to have not m et the requirements of the
specification shall b e rejected. Disposition of rejected product
shall be a matter of agreement between the m anufacture and
the purchaser.
Copyright
2004
-American Petroleum nstitute.
All
rights
reserved.
I
23130
15LR-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purch ase API Spec 15LT online at www.global.ihs.com
API SDecification
15LT
st
Edition, January 1993
PVC Lined Steel Tubular Goods
Suggestions for Ordering API PVC Lined
Steel Line Pipe
API Monogram@Required
Yes No
In placing orders for PVC Lined Steel Line Pipe o be m anufac tured
in accord ance with API Spec 15LT, the purchaser should specify
the following on th e purchase order:
Spec ifications API Spec 15LT
Quantity
Steel Pipe Grade or Class
Tables 3.1and 4.1
New Steel Pipe Furnished
by Purchaser
Used Steel Pipe Furnished
by Purchaser
New Steel Pipe Furnished
by Manufacturer
Process of Pipe Manufa cture
Size Nominal
Weight per Foot or Wall Thickness
Length
Inspec tion of P ipe by Purchaser
Table 2.1
Section
8
Fittings Par. 7.2
PVC Line r Class Par.
4.1
Size Nom inal Table 5.2
SDR
or
Wall Thickness
End Protection Section
6
Par 5.1.g
Tables 5.1and 5.2
Rejec tion of PVC Liner
Delivery Date and
Shipping Instructions
(Continued to next column)
Attention is called to the following stipulations which are subject
to agreement between the purchaser and the manufacturer:
Hydros tatic Tests and Frequency Par. 3.2.a
End Protection Section
6
Inspection Section 8
Marking Requirements
Rejection of Steel Tubular
Acceptance Appendix
E
Testing Section 5
Special
Note: Nothing
in this
specification should be nterpreted
as indicating
a
preference by the Comm ittee for any ma terial or
process or as indicating equality between the various m aterials
or processes. In the selection o f materials an d processes, the
purchaser must b e guided by the experience an d by the service
for which the PVC lined steel pipe
is
intended.
Section 9 and Appendix B
Par. 3.2.h
Copyright
2004 -American
Petroleum
Institute. All rights resewed. I 23130
15LT
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purch ase API Spec 1 6 A online a t www.global.ihs.com
Appendix F
2nd Edition, December 1997
Drill-Through Equipm ent
Purchasing Guidelines
API Monogram@Required
Yes
No
This appendix provides recommended guidelines for inquiry and
purch ase of API Spec 16A equipment.
F1
Blowout Preventers and Drill ing Spools
F1.l
Size Designation
The size designation consists of the vertical hrough bore dimension.
A list of standa rd sizes is inc luded in Table 1 f this specification.
F1.2
Service Conditions
F1.2.1
Rated Working Pressure
The rated working pressure is determined by the lowest pressure
rating of all integral end
or
outlet connections. Rated working
pressures for API Spec 16A equipment are given in
4.2.1.
F1.2.2
Temperature Ratlng
Minimum temperature is the lowest ambient temperature to
which the equipment m ay be subjected. Maximum temperature
is the highest temperature of th e fluid w hich may flow through
the equipment.
F1.2.2.1
Metall lc Materials
Metallic parts will be designed to operate in
1
f
3
temperature
ratings, which sho uld be des ignated by the purchaser. These
ratings can be found in Table 2.
F1.2.2.2
Wellbore Elastom eric Materials
The purchaser should provide the temperature range for which
wellbore elastomeric materials m ust operate. These ratings can
be found in 8.3.4.2.
F1.2.2.3
All Other Elastom eric Seals
The purchaser should provide the tem perature range for which all
other elastom eric materials mu st Operate.
F1.3
Outlet Connections
The purchaser should determine th e num ber, location, size,
pressure, and temperature ratings for all outlet connections.
It
should be noted that the pressure rating for the BOP or drilling
spool is determined by the lowest pressure rating of a ll end
or
outlet connections.
F1.4
Equipment Details/Data Book
Supply of a data book shall require a request by the purchaser
and shall c ontain the following information:
a. Purchase order number/sales ord er number
b. Product identification, type, part number, serial numbe r
c. Date of completion and inspection
d. Assembly drawings, actual overall package dimensions,
pressure rating, end conn ection/outlet description, weight,
center of gravity, material where used list
e. M anufactu rer's statem ent of compliance to current edition
of API Spec 16A
f. Material certificates
g
Welding procedure qualification
h. NDEreports
i. Pressure test repo rts
Copyright 2004 -American Petroleum nstitute.All rights res?Ned. I 23130
16A-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
This appendix provides recomm ended guidelines for inquiry and
purchase of API Choke and Kill Systems Equipment. The purchas er
should provide rated working pressure, temperature ratings and
size designation, when placing an order or ma king an inquiry.
10.2.1
Slze Deslgnation
The size designation consists of the nominal through bore
dimension. A list of standard sizes is found in Section
3
of this
specification.
10.2.2
Rated Working Pressure
The rated working pressure is determine d by the lowest rated
working pressure of the com ponent or assembly, including
integral end or outlet connections. Standard rated working
pressures are listed in Section 3.
10.2.3
Temperature Rating
The minimum temperature rating is based on the lowest ambient
temperature to which the equipment may be subjected during
operation. The m aximum temperature rating is the highest
temperature of the fluid w hich may flow through the equipment.
10.2.3.1
Metal l ic Mater ia ls
Metallic equipment should be designed to operate in one of the
temperature ratings listed in Section
3.
10.2.3.2
Non-Metallic Materlals
Non-metallic equipment an d components, including seals, s hould
be designed to operate in one of th e temperature ranges listed in
Section
3.
Section 3
Design Requirements
3.1
Design Method
Design method shall be in accordance with one or m ore of the
following criteria.
3.1.1
ASME Method
The design methodology as described in the ASME Boiler and
Pressure Vessel Code, Section
VIII,
Division
2,
Appendix 4, shall
(Continued to nex t column)
be used for design calculations . Design allowable stresses shall
be limited by the follow ing criteria:
Sm
=
2/3 Cy and St =
0.9
Sy
where
Sm = design stress intensity at rated working pressure
Sy =
material minimum specified yield strength
S,
=
maximum allowable primary m embrane stress intensity
at hydrostatic test pressure.
3.1.2
Distortion Energy Theory Metho d
The Distortion Energy metho d shall be used for design
calculations for unions. The m inimum pressure design thickness
shall be calculated by combining triaxial stresses based on the
distortion energy method, using either one o f the limits below.
Secondary stresses and stress concentrations are beyond the
scope of this method.
1.
The rated working pressure
Se
= 2/3
Sy
Se
=
von M ises equivalent stress
2. The hydrostatic test pre ssure imited by the following
criterion:
S e = %
3.1.3
Experiment al Stress Analysis
Expe rimental Stress Analysis as described in ASME Boiler and
Pressure Vessel Code, S ection
VIII,
Division
2,
Appendix 6, shall
be used.
3.1.4
Proof Test Analysis
Proof testing as d escribe d in ASME Bo iler and Pressure Vessel
Code, Section VIII, Division 1,Part UG-101, shall be used.
3.2
Performance Requirements
Performance requirements are specific and unique to the produc
in the as-shipped condition. Products shall be designed to perform
according o the requirements of this section and in the pressure
tempe rature ranges, test fluids, and in accorda nce with Section
4
Copyright
2004
American Petmleurn
Institute.All tights resewed. I 23130
16G
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
is a change identified by the m anufacturer which affects th e
performance of the product in the intended service condition.
This includes changes in fit, form, function
or
material.
3.4
Bore sizes and Rat ed Workin g Pressure
The bore size and rated working pressure designation of a choke
and k ill system and the components shall consist of the values
delineated
in
Table 3.4.1, quipment Bore Sizes and Rated
Wo rking Pressure, Table 3.4.2 nd Table 3.4.3.
Table 3.4.1
-
Equipm ent Bore Sizes and Rated Working Pressure
Size Rated Working Pressure
(minimum through bore) psi (MPa)
in. (mm)
2000 (13.8)
5000 (34.5)
10,000 69.0)
15,000 103.5)
1
%
(46) 20,000 138)
2 6 (52)
2 6 (65)
3
6
(78)
4 6
(103)
Note: Specific size an d pressure rating combinations are no t
necessarily available for each type o f end or outlet connec tion
(e.g., flange, hub an d threaded).
16G2
Copyright
2004
American Petroleum
nstitute.
All rights
resewed. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 16C online at www.global.ihs.com
Sections 10.2 and 3
Purchasing Guidelines and Design Requirements
Table 3.4.2
-
Union, Swivel Joint an d Articulated Line Sizes and
Rated Working Pressures
Nominal Size Rated Work ing Pressure
in. (mm) psi (MPa)
2 (50.8) 3,000 (20.7)
3 (76.2)
4 (101.6)
l(25.4)
1 38.1)
2 (50.8)
3 (76.2)
4 (101.6)
5,000 (34.5)
l(25.4) 10,000 (69.0)
2 (50.8)
3 (76.2)
4 (101.6)
2
(50.8)
2
Y
63.5)
3 (76.2)
15,000 (103.5)
2 (50.8)
2
Y
63.5)
3 (76.2)
20,000 (138)
Table 3.4.3 - Flexible Line Sizes and Rated Working Pressures
ID
Rated Working Pressure
in. (mm) psi (MPa)
2 (50.8)
3 (76.2)
3 Y 88.9)
4 (101.6)
5,000 (34.5)
2 (50.8) 10,000 (69.0)
2 Y 63.5)
3 (76.2)
4 (101.6)
2 (50.8) 15,000 (103.5)
2
Y
63.5)
3 (76.2)
2 (50.8) 20,000 (138)
2 Y(63.5)
3 (76.2)
Copyright 2004 -American Petroleum Institute. All rights ressived I23130
16G3
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
-American Petroleum nstitute. All righîs reserved. I23130
16G
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purcha se API Spec 16 D online at www.global.ihs.com
API
SDecification
16D
1s t Edition, March 1993
Control Systems for Drilling Well
Co n t ol
Eu
u
D
men
Appendices
1
nd
2
Control
API Monogram@Required Yes N O
Appendix i
Control System Operating and InteHace Requirements
for
Surface BOPStack
RegulatoryAgency Compliance Required
Regulatory Agency@) MS
O EN
BOP Stack Size
BOP Stack Rams
Valves
Annular BOP Quan tity
Manufacturer
RAM BOP'S. Quantity
RAM Locks O es O o
Closing Ratio
Shear RAM Opera ting Pressure Size
Pipe to Shear
Manufacturer
Choke Vaive(s) Required
Operating Pressure (Against Working Pressure)
Manufacturer
Kill Valve($ Quan tity
Manufacturer
Hydraulic Pump Systems
Electric Powered Quan tity
AIR
Powered Quantity
Remote Pane@) Quan tity
O v e s O O
PD Other
Work ing Pressure
Annulars Valves
Failsafe Open Failsafe Close
Size Working Pressure
Model
Size Working Pressure
Type
Type Grade
Size Working Pressure
O
Open
O
Ciose
Model
Size Working Pressure
Model
Size Working Pressure
Size Working Pressure
Area Classification
Location of Choke Connection(s)
(To
Show on Panel Graphic)
Location of Kill Connec tion(s) (To Show on Panel Graphic)
copyright 2004 -Am erican Petroleum nstitute. All
rights reseived.
I 23130
16D
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Control Systems for Drilling Well Control Equipme nt
Handbook Revision
01.01.04
Refer to pages 3 8
-
43 of API Spec 16 D
Purchase
API
Spec 16 D online a t www.global.ihs.com
Appendices 1 nd 2
Control
Appendix
2
Control System Operating and Interface Requirements
Subsea BOPStack
RegulatoryAgency Compl iance Required O v e s
O O
RegulatoryAgency(s)
O
MS EN PD Othe r
Control S ystem Type O ydrau lic H UX
Maximum Water Depth
Hydra u1 c Operat ing Pressure
BOP Stack Size Wo rking Pressure
RAM BOP'S Annula r BOPs Failsafe Valves
vaives are
O SO
FSC
O
A0 AC
Subsea Um bilicals
Manu facturer Mod el Length
Subsea H ydraulic Supply Lines
Umbilical Hose Quan tity Size Working pressure
Supply Hose Quan tity Size Working pressure
Rigid Conduit Quan tity Size Working pressure
Annular BOP(s) Quan tity Size Working pressure
Manufacturer Model
RAM
BOPs
Quan tity Size Working pressure
RAM Locks O es .
o
Type
Closing Ratio
Manufacturer Model
Riser Connector Size Work ing Pressure
Manufacturer
Model
Wellhead Connector Size Work ing Pressure
Manufacturer
Model
Choke Vaive(s) Qua ntity Size Working pressure
Manufacturer Model
Choke Outlet Location(s)
(Continued to nextpage)
copyright
2004 -American
Peîroleum
nstitute.
A l l rights
reseNed.
I
23130
1 6 D
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 1 6D online at www .global.ihs.com
API Specification
16D :
s t Edition, March
1993
Control Systems for Drilling Well C ontrol Equipment
Appendices
1
nd
2
Control
Kill Vaive(s) Qu antity Size Work ing pressu re
Manufacturer Model
Kill Outlet Location(s)
LMRP Accumulators Quantity Size Working pressure Banks
BOP Accumulators Quantity Size Working pressure Banks
Hydraulic Pump Systems
Electric Powered Quantity Size Working pressure
Air Powered Quantity Size Working pressure
Remote Panels
Hazardous Location Quantity Area Classification
Safe Location Quantity
Subsea Stack Hydraulic Control System Control Function List
(Select as Applicable)
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
Control Function
POD Sele ct
Upp er Ann ular BOP
Lower Annu lar BOP
Riser Connector
Riser Connector Secondary
Upper Pipe Dreams
Shear RAMS
High P ressure Shear RAMS
Upper Middle Pipe RAMS
Lower Middle Pipe RAMS
Bottom Pipe RAMS
Wellhead Connector
Wellhead C onnector Seconda ry
POD Latch
Blue H ydraulic Stabs
Yellow Hydraulic Stabs
Choke and Kill Stabs
Annular BOP Outer Choke
Annular BOP Inner Choke
LMRP Choke an d K ill Test Valve
Upper Outer Choke
Blue
Open
Open
Unlock
Unlock
Open
Open
Close
Open
Open
Open
Unlock
Unlock
Latch
Extend
Extend
Extend
Open
Open
Close
Open
(Continued to next page)
Yellow
Close
Close
Lock
Vent
Close
Close
Close
Close
Close
Lock
Vent
Unlatch
Retract
Retract
Retract
Close
Close
Open
Close
Pos
3
3
3
3
2
3
3
1
3
3
3
3
2
2
3
3 .
3
2
2
2
2
16D4
Copyright 2004 -American Petroleum nstitute.All rights reS?Ned. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 1 6D on line a t www.global.ihs.com
Appendices1 nd 2
ContrOl
ontrol Systems for Drilling Well Co ntrol Equipment
~~
Subsea Stack Hydraulic Control SystemControl Function List (continued)
(Select as Applicable)
No.
22.
23.
24.
25.
26.
27
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
Control Funct ion
Upper Inner Choke Open
Lower Outer Choke Open
Lower Inner Choke Open
Upper Outer Kill Open
Upper Inner Kill Open
Lower Outer Kill Open
Lower Inner Kill Open
Shear RAMS Wedgelocks Lock
Upper RAMS Wedgelocks Lock
Upper Midd le RAMS Wedgelocks Lock
Lower Midd le RAMS Wedgelocks Lock
Bottom RAMS Wedgelocks
Blue Supply Pilot Check
Yellow Supply Pilot Check
LMRP Accum Isolator
Lower Stack Accum Isolator
LMRP Failsafe Supply
Lower Stack F ailsafe Supply
Acoustic Accum Isolator
Subsea Mainfold Regulator
Failsafe Assist Regulator
Upper Annular BOP R egulator
Lower Annular BOP Regulator
Lock
Vent
Vent
Open
Open
Open
Open
Open
Increase
Increase
Increase
Increase
Close
Close
Close
Close
Close
Close
Close
Unlock
Unlock
Unlock
Unlock
Unlock
Check
Check
Close
Close
Close
Close
Close
Decrease
Decrease
Decrease
Decrease
Pos
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Hose
Reel “Uve” Funct ions
Acoust ic Funct ions
1.
2.
Copyright 2004 -American Petmleum Institute. All rights reserved. I 23130
16D
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Control Systems for D rilling Well Control Equipment
Handbook Revision
01.01.04
Refer to pages 38
- 43 of
API Spec 16D
Purchase API Spec 16 D online at www.global.ihs.com
Appendices
1
nd
2
Control
Subsea Stack Hydrauli c
Control
System Readback Function
List
(Select as Applicable)
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Redback Function
Surface Accum ulator Supply Pressure
Surface P ilot Supply Pressure
Rig Air Supply Pressure
Subsea Manifold Regulator Pilot PressUre
Subsea Ma nifold Regulated Pressure
Failsafe Assist Regulator Pilot Pressure
Failsafe Assist Regulated Pressure
Upper Annular BOP Regulator Pilot Pressure
Upper Annular BOP Regulated Pressure
Lower Annular BOP Regulator Pilot Pressure
Lower Annular BOP Regulated Pressure
Required
Surface Diverter Hydraulic Control System Control Function
List
(Select as Applicable)
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
I O .
11.
12.
13.
14.
15.
Control Function
Diverter Unit
Flow Selector
Diverter Lockdown
Vent Valve
Port Overboard Valve
Starboard Overboard Valve
Flow line Valve
Insert Packer Lockdown Dogs
Flowline Seal
Filling Line Valve
Ball Joint Pressure
Overshop Packer
Trip Tank
Support Ring
Open
Port
Latch
Open
Open
Open
Open
Latch
Energize
Open
Energize
Open
Open
Close
Starboard
Unlatch
Close
Close
Close
Close
Un atch
Vent
Close
Range
Vent
Close
Close
Other (Specify)
Note which functions (if any) are to be interconnected for sequencing.
16D6
copyright
2004
-American
Petroleum
Institute.
Ail
rights resewed. I23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
b. For installation by th e manu facturer, the pu rchase r should
specify any requireme nts for season, environ men t, vessel
limitations, installation tolerances, restrictions due to co nflicting
activities, and installation scope (including trenching, burial,
testing, inspection, surveying and documentation)
The purchaser should specify any requireme nts for recoverability
and reu sability of the umbilical within i ts service life.
17E-2
Copyright 2004
-American
Petroleum Inctitute.Ai l rights resewed.
I
23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 17J online at w ww.global.ihs.com
Appendix A
Table A-& Flexible Pipe Purcha sing Guidelines (continued)
Internal Fluid Parameters
General
Fluid Description (Oil, Gas, Water)
Flow Regime D escription (Single, Phase, Slug)
Flow Direction
Pressures
Design P ressure (MPa)
Operating Pressure (MPa)
Vacuum Conditions (MPa)
Differential Intern al Pressure (MPa)
Temperatures
Des ign Min. Te mpe rature (OC)
Des ign Max . Tempera ture (OC)
Operating Inle t Temperatu re (OC)
Upse t Tempera ture and Cycles (OC)
Service Definition
Description (Sweet/Sour)
NACE MR 01 -75 t o apply O Yes No
H2S Partial Pressure (Bar)
CO2 Partial P ressure (Bar)
pH of Aqueous Phase
TAN (mg KOH/g)
Flow
Rate and Thermal Calculations
Flow Ra te (m3/day)
Fluid Den sity (kg/m3)
Viscosity (Paos)
Min. In let Pressure (MPa)
Required Outlet Pressure (MPa)
Fluid Heat Capacity (kJ/kgí°C)
Fluid Composltlonal Data
NaCI Content (Weight Percent of Water)
Chlorides Content (ppm)
Ga soi l Ratio (m3/m3)
Water Cut (Volume Percent)
Alcohols O Yes O NO
Aromatic Components O Yes O
NO
Corrosive Agents O Yes
O
No
Inhibitors (Scale, Paraffin) O Yes No
Injected Chemicals O Yes O NO
Solids, Precipitates, etc.
O
Yes O NO
If
available, attach details of full fluid compositional data and
expected variation over the service life. Also, attach details of
any aromatic com ponents, corros ive agents, inhibitors, alcohols,
solids, or injected chemicals in the fluid composition.
OC
O F
g
K
kg
w
kN
KOH
kPa
degree Centigrade
degree Fahrenheit
gram
Kelvin
kilogram
kilojoule
kilonewton
potassium hydroxide
kilopascal
I
m
MBR
mg
MPa
PPm
vTAN
TFL
W
liter
meter
minimum bend radius
milligram
megapascal
parts pe r million
titrated acid num ber
through flowline
Watt
17J-2
Copyright 2004 . American Petroleum nstitute. All rightsreserved. 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 17J online at ww w.global.ihs.com
API Specification
17J
: 2nd Edition, November 1999
Unbonded Flexible Pipe
Appendw A
Purchasing Guidelines
Table A-& Flexible Pipe Purchas ing Guidelines (continued)
External Environment- Static Loads
Water Depths
Design Water D epth (m)
Min. Tidal Variation (m)
Max. Tidal Variation (m)
Attach D etails of Water D epth Variation over Flexible Pipe Route
Air
Temperatures
Min. Temperature (OC)
Max. Tem pera ture (OC)
Min. Storage /Transp ort/lnstallation T emperature (OC)
Max. S torage/Tra nsport/lns taIlation Temperature (OC)
Seawater Data
Density
pH Value
Min . Sur face Temperature (OC)
Max. Su rface Temperature (OC)
Min. Seabed Temperature
OC)
Max. S eabed T emp eratu re (OC)
Soil Data
Soil D escription (Clay, Sand)
Soil Shear Streng th (kPa)
Angle of Internal Friction (degrees)
Lateral Friction Coefficient
Longitudinal Friction Coefficient
Seabed Scour/Sand Waves Occur O Yes No
If
available, Attach Seabed Profile
Other
Marine G rowth to b e Considered O Yes O No
If yes, Attach Details
Ice Effects to be Considered O Yes O No
If
yes, Attach D etails
Sunlight Exposure O Yes O No
Current Data Attached O Yes N
Attached current data should be given as a function of water
depth, direction, and return period.
External Environment
-
Dynamic Loads
Wave D ata Attached O Yes No Wind Data Attached O Yes No
Attached wave data sho uld be given in terms of s ignificant wave,
maxim um wave, equivalent periods, spreading functions, scatter
diagrams, as a function of d irection, and return period. For
irregular seas, the wave spectrum data sh ould be specified.
Attached wind data should be given in terms of m aximum
Bsecond, I- minu te, 10-minute, and I-h our wind speeds, as a
function of direction, height above water level, and return period.
OC = degree Centigrade
l
=
liter
O F = degree Fahrenheit
m = meter
g = gram
MBR = minimum bend radius
K = Kelvin mg = milligram
kg
=
kilogram
MPa
=
megapascal
W = kilojoule
ppm = parts per m illion
kN = kilonewton
vTAN
=
titrated acid number
KOH
=
potassium hydroxide
TFL = through flowline
kpa = kilopascal
W =
Watt
~
opyright
2004
Amencan Petroleum nstitute. All
rights reserved.
I
23130 17J-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
current source, and current density should be specified.
Thermal insulatlon
Thermal Insulation Required O Yes O No
Required Ou tlet Temp erature (OC)
Required Insulation U-Valve (W/m2K)
Insulation U-Valve should be base d on pipe ID and be for th e pipe
alone. Specify any allowances that can be made for external
effects such as soil.
Connector
Lower Connector Type (Flange, Pipe)
Upper Connector Type (Flange, Pipe)
Attach weld ing specification seal type and sizes, and
responsibility for s upply and mounting of components.
Gas Venting
Gas-Venting Required
O
Yes O
NO
System Com ponents (Valves, Burst Disks)
Allowable Gas Perme ation Rate (I/m/day)
Venting-Location Restrictions O Yes O NO
Gas-Monitoring System
O
Yes O NO
Fire Resistance Required O Yes O NO
Spec ify (Lloyds/DNV/API Spec 16C)
Pigging, TFL, Workover, etc. Required O Yes O NO
Piggyback R equired
O
Yes
O
No
If yes, Attach D etails
Pressure and Tensile Armor O Yes O NO
Weld Location Restrictions
Interface
Definitions/Specifications
see 4.6.1.10)
Exothermal Chemical Reaction O Yes O NO
Cleaning Required
Inspection Condition Monitoring Required yes
O
No
If
yes, Give Details of R equirem ents
Other
o c =
O F
=
g =
K =
u =
k J =
kN =
KOH =
kPa
=
degree Centigrade
degree Fahrenheit
gram
Kelvin
kilogram
kilojoule
kilonewton
potassium hydroxide
kilopascal
I
m
MBR
mg
MPa
PPm
vTAN
TFL
W
liter
meter
minimum b end radius
milligram
megapascal
parts pe r million
titrated ac id number
through flowline
Watt
17J-4
Copyright 2004 -American Pe troleum nstitute. All rights reseived. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
forth, and specify allowable interferences/clashing.
Vessel Motion Data
Vessel Motion Data Attached O Yes O No
Attached vessel motion data should be specified in terms of the
following for the relevant loading conditions. Attached data
should include a general layout drawing, showing vessel heading
North point, riser(s) in plan, and m ooring lines.
Vessel Static and D ynamic Offsets for all Conditions
Vessel Data, Dimensions , Drafts, etc.
Vessel First- and Second-O rder Motions, in Terms
of Heave, Surge, Sway, Yaw, Roll and P itch
Vessel Motion Phase Data and Specification
Reference Point for Motions
Mooring System Design, including Line Properties
Position Tolerances
and Anchor Locations
C
=
g =
K =
kg =
w =
kN =
KOH =
kPa =
O F =
degree Centigrade
degree Fahrenheit
gram
Kelvin
kilogram
kilojoule
kilonewton
potassium hydroxide
kilopascal
I
m
MBR
mg
MPa
PPm
vTAN
TFL
W
liter
meter
minimum bend radius
milligram
megapascal
parts pe r m illion
titmted aci d number
through flowline
Watt
Copyright
2004
-Amer ican
Petroleum
nsti tute. All
rights resewed. I 23130
17J-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Additional National Authority/Government Regulations O Yes
O NO
If yes, Specify D etails
Purchaser Inspection Required O Yes a o
If yes, Specify Details
General Requirements n Addition to API Spec 17J
If yes, Specify Details
Cl
Yes O No
"C
F
g
K
kg
w
kN
KOH
kPa
degree Centigrade
degree Fahrenheit
gram
Kelvin
kilogram
kilojoule
kilonewton
potassium hydroxide
kilopascal
I
m
MBR
m g
MPa
PPm
vTAN
TFL
W
liter
meter
minimum b end radius
milligram
megapascal
parts p er m illion
titrated ac id number
through ffowline
Watt
17J-6
Copyright
2004
-American Petroleum nstitute. All rights reserved. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Delivery, i nst allati on and Maintenance Requirements
Delivery Requirements
Shipping, Packing, and Storage Requireme nts
Documentation Requirements
Purchaser should specify if a separate installation manual
is required.
Installation Requirements
Method
Vessel
General
Where relevant, the purchaser should specify any req uireme nts
for season, environment, vessel limitations, restrictions due to
conflicting activities, and installation scope (including trenching,
burial, testing, inspection, surveying, and docu menta tion).
Installation Design Cilteiia
Equipment Bend Radius (m)
Tensioner Crush Loads (kN)
Installation/Lifting Device Requirements
Transport Reel Used for Ins tallation O Yes O No
Pipe Inte rnal Fluid a t Delivery (Empty, Water-Filled)
Seawater Flooding Requirements
O
yes
O
No
(Exposure Time)
Where relevant, the purchaser should specify details such as
length of tensioners, shape of tensioner shoes, number of belts,
diamete r of wheels, reels, ramp angles, and surface shape.
Insta ation Test Requirements
Installation Vessel Motions and O Yes
No
Offsets Attached
Attached details should, in general, re flect data requirements in
vessel motion data requirements listed under riser parameters
(above).
Maintenance
Ma ntenance Required
If yes, S pecify Details
LI
Yes O NO
"C
"F
g
K
kg
kJ
kN
KOH
kPa
I
m
MBR
m g
MPa
PPm
vTAN
TFL
W
degree Centigrade
degree Fahrenheit
gram
Kelvin
kilogram
kilojoule
kilonewton
potassium hydroxide
kilopascal
liter
meter
minimum be nd radius
milligram
megapascal
parts per million
titmted acid number
through flowline
Watt
Copyright 2004 -American Petroleum nstitute.All rights resewed. I 23130
17J-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Specification of normal and abnormal load cases, including
accidental loads, and definition of load combinations to be used
in the design
~
"C
"F
g
K
kg
w
kN
KOH
kPa
degree Centigrade
degree Fahrenheit
gram
Kelvin
kilogram
kilojoule
kilonewton
potassium hydroxide
kilopascal
I
m
MBR
m g
MPa
vTAN
TFL
W
ppm
liter
meter
minimum bend radius
milligram
megapascal
parts pe r million
titrated acid number
through ffowline
Watt
Copyright2004
-Amer ican Petroleum Institute. All rights reserved. 23130 17K -
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purch ase API Spec 1 7K o nline a t www.global.ihs.com
Purchasing Guidelines
API Spec ification 17K : 1st Edition, September 2 00 1
Appendix
A
Table A-&
Flexible Pipe Purch asing Guidelines (continued)
Internal Fluid Parameters
General
Fluid Description (Oil, Gas, Water)
Flow Regime Description (Single, Phase, Slug)
Flow Direction
Pressures
Design P ressure (MPa)
Operating Pressure (MPa)
Vacuum C onditions (MPa)
Differential Internal P ressure (MPa)
Temperatures
Design Min. T emperatu re (OC)
Des ign Max. Temperatu re (OC)
Operat ing Inle t Temperature (OC)
Upset Temperature and Cycles (OC)
Service Def init ion
Description (SweeYSour)
NACE MR 01-75 t o Apply O Yes
O
No
H2S Pa rtial Pressure (Bar)
CO2 Pa rtial Pressure (Bar)
pH
of
Aqueous Phase
TAN ( mg KOH/g)
Flow Rate and Thermal Calculations
Flow Rate (m3/day)
Fluid Density (kg/m3)
Visco sity (Pa
s)
Min. Inlet Pressure (MPa)
Required Outlet Pressu re (MPa)
Fluid H eat Capa city (kJ/kg/"C)
Fluid Compo sl t ional Data
NaCI Content (W eight Percent of W ater)
Chlorides Content (ppm)
Gas-Oil Ratio (m3/m 3)
Water Cut (Volume Pe rcent)
Alcohols
O
Yes
O
NO
Aromatic Components O Yes O
NO
Corrosive Agents
O
Yes
O NO
Inhibitors (Scale, Pa raffin)
O
Yes
O NO
Injected Chemicals
O
Yes
O
No
Solids, Prec ipitates, etc. O Yes O NO
If available, attach de tails of full fluid comp ositional data and
expected variation over the service life. Also, attach d etails of
any aromatic com ponents, corrosive agents, inhibitors, alcohols,
solids, or injected chemicals in the fluid composition.
o c =
O F =
g =
K =
k g =
w =
kN
=
KOH =
kPa =
degree Centigrade
degree Fahrenheit
gram
Kelvin
kilogram
kilojoule
kilonewton
potassium hydroxide
kilopascal
I
m
MBR
m g
MPa
PPm
vTAN
TFL
W
liter
meter
minimum bend radius
milligram
megapascal
parts per million
titrated ac id number
through flowline
Watt
17K-2
Copyright
2004
American Petroleum
nstitute. All rights recenid. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Attach Details of Water Depth Variation over Flexible Pipe Route
Alr Temperatures
Min. Tem perature ("C)
Max. Tem perature ("C)
Min.
Storage/Transport/lnstallation
Temperature ("C)
Max. Storage/Transport/lnstaIlation Temperature ("C)
Seawater Data
Density
pH Value
Min. Sur face Temp erature (OC)
Max. Surface Temperature ("C)
Min. Seabed Temperature ("C)
Max. Seabed Te mperature ("C)
Soil Data
Soil Desc ription (Clay, Sand)
Soil Shear Stren gth (kPa)
Angle of Internal Friction (Degrees)
Lateral Friction Coefficient
Longitudina l Friction Coefficient
Seabed Scour/Sand Waves Occur
O
yes O
N
If available, Attach Seabed Profile
Other
Marine Growth to be Considered O yes No
If yes, Attach D etails
Ice Effects to be Considered O yes O No
If yes, Attach De tails
Sun ight Exposure O yes O No
Current Data Attached
O
yes
O
No
Attached current data should be given as a function of water
depth, direction, and return period.
External Environment
-
Dynamic Loads
Wave Data Attached O yes
NO
Wind Data Attached O yes O No
Attached wave data sh ould b e given in terms of sign ificant wave,
max imum wave, equivalen t periods, spread ing functions , scatter
diagrams, as a function of direction, and re turn period. For
irregular seas, the wave spectrum data should be specified.
Attached wind data should be given in terms of maximum
Ssecond, 1-minute, lGm inute , and 1-hour wind speeds, as a
function of direction, height above water level, and return period.
oc
=
g =
K =
k g =
k J =
kN =
KOH =
kPa =
O F =
degree Centigrade
degree Fahrenheit
gram
Kelvin
kilogram
kilojoule
kilonewton
potassium hydroxide
kilopascal
I
m
MER
m g
MPa
PPm
vTA
N
TFL
W
liter
meter
minimum bend radius
milligram
megapascal
parts per million
titrated acid number
through flowline
Watt
Copydght2004
-American Pe troleum nstitute.
All
rights reserved. I 23130 17K-
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
System Description (Flowline, Riser, Jumper, S ubsea, Topsides)
~
Application Definition (Static, Dynamic)
Pipe Bore D escription (Rough, Smooth)
Corrosion Protection Requirements
Corrosion Protection Required O Yes No
Cathodic Protection System Required O yes No
Electrica Continuity Required
O
Yes
O
NO
End-fitting Coatings Required
O
Yes No
External Coating Description
Internal Coating Description
If available, allowable electrical resistance, protection voltage,
curren t source, and current den sity should be specified.
Thermal insulation
Thermal linsulation Required O Yes O
NO
Required Outlet Temperature O C )
Required Insulation U-Valve (W/m2K)
Insulation U-Valve should b e based on pipe ID and be for th e pipe
alone. Specify any allowances hat can be m ade for external
effects such as soil.
Connector
Lower Connecto r Type (Flange, Pipe)
Upper Connector Type (Flange, Pipe)
Attach we lding specification seal type an d sizes, and
responsibility for supply and mounting of components.
Gas Venting
Gas-Venting Required
O
Yes No
System Co mpone nts (Valves, Burst Disks)
Allowable Gas Perme ation Rate (I/m/day)
Venting-Loca tion Restrictions
Gas-monitoring system
Other
Fire R esistance Required O Yes No
Specify (Lloyds/DNV/API Spec 16C)
Pigging, TFL, Workover, etc. Required O Yes O No
Piggyback Required
O
Yes
No
If yes, Attach Details
Pressure and Tensile Armor O Yes O No
Weld Location Restrictions
Interface Definitions/Specifications (see 4.6.1.10)
Exothermal Chemical Reaction O Yes O No
Cleaning Required
Inspection Condition Monitoring Required O Yes O
No
If
yes, Give Details of Requirements
" C
F
g
K
kg
kJ
kN
KOH
kPa
degree Centigrade
degree Fahrenheit
gram
Kelvin
kilogram
kilojoule
kilonewton
potassium hydroxide
kilopascal
I
m
MBR
mg
MPa
PPm
vTAN
TFL
W
liter
meter
minimum ben d radius
milligram
megapascal
parts per mill ion
titrated acid number
through flowline
Watt
17K-4
Copyright
2004 -Amencan Petroleum nstitute.
Al rights reserved. I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Purchase API Spec 17K online a t www.global.ihs.com
Purchasing Guidelines
API Specification 17K : Ist Edition, September 2001
Appendix
A
Table A-& Flexible Pipe Purchas ing Guidelines (continued)
Additional Requirements
Materials R equired in Addition to API Spec 17 K
If
yes, Specify Details
Manufac turing Required in Addition to API Spec 17K
If yes, Specify Details
O
Yes
O
NO
O Yes
O NO
Selec tion of PSL Level for Paragraph 7.9.6 (default is PSL 2-3)
If
yes, Sp ecify Details
O
Yes
O NO
FAT Required in Addition to API Spec 17K
If
yes, Specify Details
O Yes O NO
Markings R equired in Addition to API Spec 17K
O Yes O NO
If yes, Specify Details
Prototype Tests Required O Yes O No
If yes, Specify Details
Additional National Authority/Government Regulations O Yes O No
If yes, Specify Details
Purchaser Inspection Required
O Yes O
NO
If yes, Specify Details
General Requirements n Addition to API Spec 17K
If
yes, Specify Details
O
Yes O
NO
"C =
g =
K =
@ =
w =
kN =
KOH =
kPa =
O F =
degree Centigrade
degree Fahrenheit
gram
Kelvin
kilogram
kilojoule
kilonewton
potassium hydroxide
kilopascal
I
m
MBR
mg
MPa
PPm
vTAN
TFL
W
liter
meter
minimum bend radius
milligram
megapascal
parts per mill ion
titrated acid number
through flowline
Watt
17K-6 Copyright 2004 -American Petroleum nstitute.All rights
resewed.
I 23130
yright American Petroleum Institute
oduced by IHS under license with API Licensee=BG Group/5943895100Not for Resale, 12/25/2004 05:05:55 MSTeproduction or networking permitted without license from IHS
Delivery, install atio n and Maintenance Requirements
Delivery Requirements
Shipping, Packing, and Storage Requireme nts
Documentation Requirements
~~
Purchaser should specify if a separate installation manual
is required.
Installation Requirements
Method
General
Where relevant, the purchaser should specify any requirem ents
for season, environmen t, vessel limitations, restrictions due to
conflicting activities, and installation scope (including trenching,
burial, testing, inspe ction, surveying, and d ocum entation).
Installation Design Criteria
Equipment Be nd Radius (m)
Tensioner Crush Loads
(kN)
Installation/Lifting Device Requirements
Transport Reel Used for Installation
O
Yes O
NO
Pipe Internal Fluid at Delivery (Empty, Water-Filled)
Seawater Flooding Requirements O Yes O No
(Exposure Time)
Where relevant, the purchaser should specify details such as
length
of
tensioners, shape of tensioner shoes, number of belts,
diamete r of wheels, reels, ramp angles, and surface shape.
Installation Test Requirements
Installation Vessel Motions an d O Yes O NO
Offsets Attached
Attached details should, in general, reflect data requirements in
vessel m otion data requirements listed under riser parameters
(above).
Maintenance
Maintenance Required
If yes, Specify D etails
O Yes
O
No
"C
F
g
K
kg
w
kN
KOH
kPa
I
m
MBR
m g
MPa
vTAN
TFL
W
ppm
degree Centigrade
degree Fahrenheit
gram
Kelvin
kilogram
kilojoule
kilonewton
potassium hydroxide
kilopascal
liter
meter
minimum bend radius
milligram
megapascal
parts per million
titrated acid number
through flowline
Watt
Copyright 2004 American Petroleum Institute . All
right.
reserved. I 23130
17K-7
yright American Petroleum Institute