Top Banner
AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006
20

AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

Jan 20, 2016

Download

Documents

Jessie Welch
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

AP Network Report

Aries Hung, Min TsaiASGC

WLCG T2 Asia WorkshopTIRF, Dec 2, 2006

Page 2: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

Site network validation

Page 3: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

T0-T1-T2 network connectivity

Page 4: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

Australia

• Australia-UNIMELB-LCG2:• RTT: 137 ms – 340 via US• July 2006, establish peering with AARNet at Singapore.

• Alter routing path • from ASNet-TW ASNet-US AARNet Australia-UNIMELB-LCG2 • to ASNet-TW ASNet-SG AARNet Australia-UNIMELB-LCG2

Page 5: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

China

• BEIJING-LCG2• RTT: 55 ms

• BEIJING-CNIC-LCG2-IA64• RTT: 55 ms

Page 6: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

India

Page 7: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

India

• IN-DAE-VECC-01:• 320 ms• Routing path:

• ASNet-TW ASNet-HK Flag RIL-IDC ERNet-IN INDAE-VECC-01

• INDAE-VECC-01 ERNet-IN Geant2 Internet2 TWAREN ASNet-TW

• INDIACMS-TIFR: • 280 ms• Routing path:

• ASNet-TW ASNet-HK Flag RIL-IDC ERNet-IN INDAE-VECC-01

• INDAE-VECC-01 ERNet-IN Geant2 Internet2 TWAREN ASNet-TW

• Issues• Could ERNet-IN prefer AS route from RIL-IDC and Flag?

Page 8: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

Japan

• JP-KEK-CRC-01: • RTT: 62 ms

• JP-KEK-CRC-02: • RTT: 64 ms

• TOKYO-LCG2: • RTT: 61 ms

Workday Holiday

Page 9: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

Korea

• LCG_KNU: • RTT: 84 ms• Sep. 2006, alter route path of SE endpoint network segment

(go through HK), RTT: 58 ms now.• Could 155.230.0.0/16 go through HK?

Holiday

Workday

Page 10: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

Pakistan

Page 11: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

Pakistan

• NCP-LCG2: • 240 ms• Nov. 2006, alter route path

• from ASNet-TW ASNet-US AT&T UUNet ITIKarachi NTCPKNet NCP-LCG2

• to ASNet-TW ASNet-HK ANC SingTel NTCPKNet NCP-LCG2

• PAKGRID-LCG2: • 348~387 ms• many icmp checksum error (firewall restriction?)• Could NTCPKNet advertise route info to SingTel?

Page 12: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

Singapore

• GOG-Singapore:• RTT: 49 ms• July 2006, alter routing path

• from ASNet-TW ASNet-HK ANC-HK ANC-SG GOG-SingAREN

• to ASNet-TW ASNet-SG SingAREN ANC GOG-SingAREN

Page 13: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

Taiwan

Page 14: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

Taiwan domestic

• Taiwan-IPAS-LCG2:• < 1 ms

• TW-FTT:• < 1 ms

• TW-NIU-EECS-01: • 9 ms

• Taiwan-NCUCC-LCG2: • 17 ms

• TW-NCUHEP: • 11 ms

• TW-NTCU-HPC-01: • 5 ms

• TW-THU-HPC: • 5 ms

Daytime

Page 15: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

Network monitoring

• Monitoring tools• Smokeping -- latency measurement tool• Nagios -- host, service and network monitoring program • MRTG• WeatherMap

• Evaluation• PerfSonar: http://www.perfsonar.net/• IEPM: http://www-iepm.slac.stanford.edu/

Page 16: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

Other issues

• Info collection• Contact info of site network manager• Contact info of circuit provider (optional)• Network map, include bandwidth (WAN & LAN)• Firewall rules

• Open ICMP access to ASGC (140.109.98.0/24 and 202.169.168.0/22)

• If possible, enable iPerf daemon on one server for testing

Page 17: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

ASGC future plan

• T0-T1 connectivity: • Upgrade to 10Gb (2007 Q2)

• T1-T2 connectivity:• TW-JP: Upgrade to 2.5+Gb• TW-HK: Upgrade to 2.5+Gb• TW-SG: Upgrade to 622+Mb

Page 18: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

ASNet POPs

• Taiwan• Juniper M160, Juniper M320• Located in Academia Sinica

• HongKong• Juniper M20• Located in Mega-iAdvantage

Building (in Chai-wan area)• Japan

• Juniper M20• Located in KDDI Building (sa

me as APAN building, in Otemachi-Ku area)

• Singapore• Juniper M7• Located in SingAREN GIX Buil

ding• America

• Juniper T320, located in Palo Alto PAIX Building

• Juniper M40e, located in StarLight

• Netherlands• Juniper M20• Located in SARA

Page 19: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

Thanks for Your Attention!

Page 20: AP Network Report Aries Hung, Min Tsai ASGC WLCG T2 Asia Workshop TIRF, Dec 2, 2006.

Reference

• ASGC Smokeping: • http://osadm.grid.sinica.edu.tw/smokeping/

• Smokeping: • http://oss.oetiker.ch/smokeping/index.en.html

• Nagios: • http://www.nagios.org/

• MRTG: • http://oss.oetiker.ch/mrtg/

• WeatherMap: • http://netmon.grnet.gr/weathermap/