City Rail Link Aotea Community Liaison Group (CLG) 10 th of November 2016
22

Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

Apr 17, 2018

Download

Documents

Lam Huong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

1

City Rail Link Aotea Community Liaison Group (CLG)

10th of November 2016

Page 2: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

Welcome

Speaking tonight are:

• Carol Greensmith, CRL Communications Manager

• Richard Jenkins, Principal Planner

• Sonya Leahy, Advocacy & Stakeholder Manager

• Also here is Makere Carroll, Communications

Coordinator

Page 3: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

Overview

• Revisit the City Rail Link project – progress so far

• A recap of the purpose of the Community Liaison

Group

• Aotea Station

• Aotea alteration designation hearing

• Potholing in Aotea area

Page 4: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

The Route

Page 5: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

General update

• C1/C2 contracts

• DSC

• Funding agreement

• Procurement

• Industry briefing

Page 6: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

CLG Recap

Page 7: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

The role of the CLG • AT is required by the CRL designation conditions to

establish CLGs in the areas of surface works

• The Aotea CLG was established in November 2015

• AT wants input into various documents that guide the

delivery of construction work

• A Community Liaison Group, representing those

affected by the work is a key tool for this

• In addition, we will continue to keep in touch via the

project website, e-updates, etc.

Page 8: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

CLG requirements Condition 7.5 of the CRL designation requires AT to consult with those

directly and in proximity parties affected by the CRL construction

works. This happens through the CLG by:

• regular updates provided by AT on construction progress

• providing feedback on the development of the Delivery Work Plans

(DWPs) and Construction Environmental Management Plans (CEMPs),

and the Communication and Consultation Plan

• input into a regular forum monitoring the effects on the community

• reporting concerns and issues to AT that it will respond to

• possibly proposing potential initiatives to the Property Management

Strategy on the interim use of properties acquired by the CRL

Page 9: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

Aotea Station

Page 10: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016
Page 11: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016
Page 12: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016
Page 13: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016
Page 14: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

Virtual Tour

Page 15: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

BIM model

Page 16: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

Aotea designation

alteration

Page 17: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

• Vents in footpaths in Albert and Kingston Streets

• Shifting bluestone wall

• Slip lane parking

• Temporary requirement to use private land for

pedestrians

• Canopy Removals

Overview

Page 18: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

Utilities investigation in

Aotea area

Page 19: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

Overview • Investigation into condition of network utilities to assist with

station design

• Potholing, Ground Penetrating Radar (GPR) and drainage

surveys including CCTV

• Results will be used to plan utility diversions

• 11 trenches proposed for Aotea Station area

• Works may start as early as December 2016

• Duration of works will be 6 – 8 weeks

• Works to take place during daytime hours

Page 20: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

Aotea Station Utilities Investigations • A series of investigation trenches typically between 5m to 14m long, up to 1m wide

and 1.5m deep.

Page 22: Aotea Community Liaison Group (CLG) - Auckland … Rail Link 1 Aotea Community Liaison Group (CLG) 10th of November 2016

Questions or comments?