19 Deember 2007 Workshop at TRIPP-IIT Delhi 1
“Transport, Health, Environment &
Equity in Indian cities”
Workshop Organized By
McGill University and TRIPP-IIT Delhi
On17 – 19 December 2007
“Is anyone listening out there?”By
Sudhir BadamiTransport & Urban Analyst and Activist
[email protected]
Page 2
19 Deember 2007 Workshop at TRIPP-IIT Delhi 2
I would like to put before you the case of
Mumbai’s
1. 146.5 km of Mumbai Metro Master Plan - which is being considered as the solution for Mumbai's inadequate Public Transport capacity.
2. Scuttling of Sky Bus Technology
3. Low priority to BRTS in Mumbai
Page 3
19 Deember 2007 Workshop at TRIPP-IIT Delhi 3
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Greater Mumbai
and
Urban Agglomerate
Page 4
19 Deember 2007 Workshop at TRIPP-IIT Delhi 4
Mumbai Metropolitan Region
MMR • Population 2001 Census
• Mira-Bhayandar 5 lac
• Bhiwandi-Nizampur 6 lac
� Thane 13 lac
� Kalyan-Dombivili 13 lac
� Ulhasnagar 5 lac
� Navi Mumbai 7 lac
� Greater Mumbai 119 lac
7 M’Corpns, 13 M’Councils and ~900
villages exist in the MMR
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 5
19 Deember 2007 Workshop at TRIPP-IIT Delhi 5
~1870 ~1900 1950 1957
Municipal Corporation of Greater Mumbai
Over the years
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 6
19 Deember 2007 Workshop at TRIPP-IIT Delhi 6
Western Suburbs
Eastern Suburbs
Island City24 Municipal
Wards of MCGM
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 7
19 Deember 2007 Workshop at TRIPP-IIT Delhi 7
408309234 (31%)205.51771273MMR Urban
426325248 (31%)218.5189 (28%)
4355MMR
230181143 (27%)131119 (20%)
468MCGM
775945 (25%)40.536 (22%)168Eastern Suburbs
1158664 (28%)5750 (28%)226Western Suburbs
383634(3%)33.533(3%)72Island City
2031
Lacs
2021
Lacs
2011
Lacs
2006
Lacs
2001
Lacs
Area
Sq km
Population Projections (10 Lacs = 1 Million)
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 8
19 Deember 2007 Workshop at TRIPP-IIT Delhi 8
3202431841611391273MMR Urban
98755750434355MMR
492387306280254468MCGM
458351268241214168Eastern Suburbs
509381283252221226Western Suburbs
52850047246545872Island City
2031
P/Ha
2021
P/Ha
2011
P/Ha
2006
P/Ha
2001
P/Ha
Area
Sq km
Population Density Projections
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 9
19 Deember 2007 Workshop at TRIPP-IIT Delhi 9
18 %7.5 Lac42 LacChennai
20 %20 Lac98 LacDelhi
32 %15 Lac46 LacKolkatta
33 %4.2 Lac13 LacThane
36 %7.5 Lac21 LacNagpur
44 %4.7 Lac11 LacMeerat
46 %5 Lac11 LacFaridabad
50 %60 Lac119 LacGreater Mumbai
Slum%
SlumPopulation
PopulationCity
Slum Population Figures
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 10
19 Deember 2007 Workshop at TRIPP-IIT Delhi 10
18 %6 Lac35 LacHyderabad
8 %3.5 Lac45 LacBangalore
33 %4.2 Lac13 LacThane
36 %7.5 Lac21 LacNagpur
44 %4.7 Lac11 LacMeerat
46 %5 Lac11 LacFaridabad
50 %60 Lac119 LacGreater Mumbai
Slum%
SlumPopulation
PopulationCity
Slum Population Figures (Cont’d)
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 11
19 Deember 2007 Workshop at TRIPP-IIT Delhi 11
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
The Suburban Railway System
Page 12
19 Deember 2007 Workshop at TRIPP-IIT Delhi 12
The B.E.S.T. Bus Transport
334 Routes
Fleet size 3404
Route No 521
Route No 93
Page 13
19 Deember 2007 Workshop at TRIPP-IIT Delhi 13
10 %7 %Private Vehicle Users
5 %5 %Intermediate Public Transport (IPT)
Users
85 %88 %Public Transport (PT) Users
20071994
Atkin’s Report
Commuter Proportions
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 14
19 Deember 2007 Workshop at TRIPP-IIT Delhi 14
Commuter Proportions
Commuter journeys are made using Buses. 75% of these bus journeys are related to
suburban rail journeys45 lac
Commuters use Suburban Railway daily60 – 65 lac
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 15
19 Deember 2007 Workshop at TRIPP-IIT Delhi 15
What are the ground realities?
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 16
19 Deember 2007 Workshop at TRIPP-IIT Delhi 16
This is peak hour load of
3,50,000 pph
500 to 550 p/coach
(Design load is Only 200p/coach)
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 17
19 Deember 2007 Workshop at TRIPP-IIT Delhi 17
Peak hour crowd
waiting for the next
train
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 18
19 Deember 2007 Workshop at TRIPP-IIT Delhi 18
Peak hour crowd trying to board a crowded
train.
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 19
19 Deember 2007 Workshop at TRIPP-IIT Delhi 19
Mumbai Rail Commuters
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 20
19 Deember 2007 Workshop at TRIPP-IIT Delhi 20
Inadequate ladies
compartments add to their
woes
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 21
19 Deember 2007 Workshop at TRIPP-IIT Delhi 21
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Any room for the Senior Citizens, Pregnant
Women, Children and the Physically Challenged?
Page 22
19 Deember 2007 Workshop at TRIPP-IIT Delhi 22
Peak hour traffic on
arterial roads do move, but congestion is
increasing rapidly
(Off Peak Hour Peddar Road)
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 23
19 Deember 2007 Workshop at TRIPP-IIT Delhi 23
Traffic congestion affects bus through put, compelling
many commuters to opt for personal vehicles.
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
(Peak Hour Peddar Road)
Page 24
19 Deember 2007 Workshop at TRIPP-IIT Delhi 24
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Between 1951 and 2004 there has been a
127 % increase in the length of city roads.
But population grew by 301 % over that
period while number of vehicles shot up by
3019 %, touching 20 million in 2007.
Page 25
19 Deember 2007 Workshop at TRIPP-IIT Delhi 25
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 26
19 Deember 2007 Workshop at TRIPP-IIT Delhi 26
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Whither Pedestrian?
Page 27
19 Deember 2007 Workshop at TRIPP-IIT Delhi 27
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Whither Pedestrian Safety?
Page 28
19 Deember 2007 Workshop at TRIPP-IIT Delhi 28
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Too Smooth ?
Too Narrow ?
Page 29
19 Deember 2007 Workshop at TRIPP-IIT Delhi 29
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Obstacles ?
Page 30
19 Deember 2007 Workshop at TRIPP-IIT Delhi 30
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Surely there are better footpaths to walk on in Mumbai
But are these where the crowds move?
Page 31
19 Deember 2007 Workshop at TRIPP-IIT Delhi 31
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 32
19 Deember 2007 Workshop at TRIPP-IIT Delhi 32
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 33
19 Deember 2007 Workshop at TRIPP-IIT Delhi 33
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Mantra to be followed:
Make Walking safe and comfortable.
Augment Public Transport Capacity significantly.
Page 34
19 Deember 2007 Workshop at TRIPP-IIT Delhi 34
Quick Overview of Mumbai’s Proposed Transportation Projects
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 35
19 Deember 2007 Workshop at TRIPP-IIT Delhi 35
Current Proposals
• Mumbai Urban Transport Project (MUTP) • Expected Completion – 2007 (2009) Cost Rs 4600 Cr (WB Component ~ Rs 2600 Cr)
• Mumbai Urban Infrastructure Project (MUIP) • Expected Completion – 2007 (2009) Cost Rs 2600 Cr
• Bandra Worli Sea Link (BWSL)• Expected Completion – 2008 (2009) Cost 1300 Cr
• Western Freeway Sea Link (WFSL)• Expected Completion – 5 Years Cost 3000 Cr
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 36
19 Deember 2007 Workshop at TRIPP-IIT Delhi 36
Current Proposals (cont’d)
• Mumbai Trans Harbour Link (MTHL)• Expected Completion – 5 Years Cost 6500 Cr
• Mumbai Metro Master Plan (MMMP) • Expected Completion – 16 Years in phases Cost Realistic Rs 60,000 Cr plus for 146.5 km
• Water Transport Project (WTP)• Expected Completion – 3 Years Cost 600 Cr
• Exclusive Bus Lanes Project (XBLP) • Expected Completion – 2 Years Cost 80 Cr
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 37
19 Deember 2007 Workshop at TRIPP-IIT Delhi 37
Current Proposals (cont’d)
• Monorail Projects• Expected Completion – 2 Years Cost 6000 Cr for 45 km
• Pedestrian Walkways
• At 21 locations at suburban railway stations
• Fleet Taxi Scheme• Meets the need of comfortable onward journeys for the affluent category
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 38
19 Deember 2007 Workshop at TRIPP-IIT Delhi 38
Current Proposals (cont’d)
• Bus Rapid Transit System (BRTS) • Pilot route under study
• Sky Bus Metro• Shelved ? Discarded ?
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 39
19 Deember 2007 Workshop at TRIPP-IIT Delhi 39
Current Proposals (cont’d)
Mumbai Metro Master Plan (MMMP)
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 40
19 Deember 2007 Workshop at TRIPP-IIT Delhi 40
Current Proposals (cont’d)
MMMP
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
In Delhi
Page 41
19 Deember 2007 Workshop at TRIPP-IIT Delhi 41
Current Proposals (cont’d)
MMMP
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
In Delhi
Page 42
19 Deember 2007 Workshop at TRIPP-IIT Delhi 42
Current Proposals
(cont’d)
MMMPPhase I
1. Versova-Andheri-Ghatkopar 15 km
2. Colaba (Backbay)-Mahim-Charkop 36 km
3. Mahim-Mankhurd 12.8 km
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 43
19 Deember 2007 Workshop at TRIPP-IIT Delhi 43
Current Proposals
(cont’d)
MMMPPhase II
4. Charkop-Dahisar 7.5 km
5. Ghatkopar-Mulund 12.4 km
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 44
19 Deember 2007 Workshop at TRIPP-IIT Delhi 44
Current Proposals
(cont’d)
MMMPPhase III
6. BKC-Kanjur via Airport 19.5 km
7. Andheri (E) – Dahisar (E) 18 km
8. Hutatma Chowk-Ghatkopar 21.8 km
9. Sewri-Prabhadevi 3.5 km
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 45
19 Deember 2007 Workshop at TRIPP-IIT Delhi 45
Current Proposals (cont’d)
MMMP
Phase I 12.0 u/g 51.8 Elevated 2005-’11
Phase II 0 u/g 19.9 Elevated 2011-’16
Phase III 20.5 u/g 32.3 Elevated 2016-’21
--------------------------------------------------------
TOTAL 32.5 u/g 114 Elevated 2005-’21
--------------------------------------------------------
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 46
19 Deember 2007 Workshop at TRIPP-IIT Delhi 46
Overall MMMP Map
Overview of Mumbai’s
Proposed Transportation Projects
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 47
19 Deember 2007 Workshop at TRIPP-IIT Delhi 47
Current Proposals (cont’d)
MMMP (Revised in May 2006)
Phase I 20.0 u/g 43.8 Elevated 2005-’11
Phase II 0 u/g 19.9 Elevated 2011-’16
Phase III 20.5 u/g 32.3 Elevated 2016-’21
--------------------------------------------------------
TOTAL 40.5 u/g 106 Elevated 2005-’21
--------------------------------------------------------
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 48
19 Deember 2007 Workshop at TRIPP-IIT Delhi 48
Current Proposals (cont’d)
Monorail Projects
Overview of Mumbai’s
Proposed Transportation Projects
Page 49
19 Deember 2007 Workshop at TRIPP-IIT Delhi 49
Current Proposals (cont’d)
Monorail Projects
Proposed on
• Thane – Kalyan - Bhiwandi
• Lokhandwalla – Kanjur Marg
• Chembur - Mankhurd -Mahul
• Malabar Hill – Wadala - BKC
Overview of Mumbai’s
Proposed Transportation Projects
Page 50
19 Deember 2007 Workshop at TRIPP-IIT Delhi 50
Current Proposals (cont’d)
Monorail Projects
• Thane – Kalyan - Bhiwandi
• Lokhandwalla – Kanjur Marg
• Chembur - Mankhurd - Mahul
• Malabar Hill – Wadala - BKC
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 51
19 Deember 2007 Workshop at TRIPP-IIT Delhi 51
Current Proposals (cont’d)
Pedestrian Walkways
Overview of Mumbai’s
Proposed Transportation Projects
Page 52
19 Deember 2007 Workshop at TRIPP-IIT Delhi 52
Current Proposals (cont’d)
Pedestrian Walkways
Proposed at
• Twenty locations to facilitate easy dispersion of
suburban rail commuters.
Overview of Mumbai’s
Proposed Transportation Projects
Page 53
19 Deember 2007 Workshop at TRIPP-IIT Delhi 53
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Current Proposals (cont’d)
Pedestrian Walkways
At about 20 Suburban Railway
Stations
Page 54
19 Deember 2007 Workshop at TRIPP-IIT Delhi 54
Current Proposals (cont’d)
Fleet Taxi Scheme
Overview of Mumbai’s
Proposed Transportation Projects
Page 55
19 Deember 2007 Workshop at TRIPP-IIT Delhi 55
Current Proposals (cont’d)
Bus Rapid Transit System (BRTS)
Overview of Mumbai’s
Proposed Transportation Projects
Page 56
19 Deember 2007 Workshop at TRIPP-IIT Delhi 56
Current Proposals (cont’d)
Bus Rapid Transit System (BRTS)
Proposed a pilot route on
• Western Express Highway
Overview of Mumbai’s
Proposed Transportation Projects
Page 57
19 Deember 2007 Workshop at TRIPP-IIT Delhi 57
Current Proposals (cont’d)
Bus Rapid Transit System
(BRTS)
Western Express Highway
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 58
19 Deember 2007 Workshop at TRIPP-IIT Delhi 58
Current Proposals (cont’d)
Sky Bus Metro
Overview of Mumbai’s
Proposed Transportation Projects
Page 59
19 Deember 2007 Workshop at TRIPP-IIT Delhi 59
Current Proposals (cont’d)
Sky Bus Metro
Currently not under consideration.
Hopefully its importance is realised before it is too
late.
Overview of Mumbai’s
Proposed Transportation Projects
Page 60
19 Deember 2007 Workshop at TRIPP-IIT Delhi 60
Current Proposals (cont’d)
Mumbai Metropolitan Region Projects
Overview of Mumbai’s
Proposed Transportation Projects
Page 61
19 Deember 2007 Workshop at TRIPP-IIT Delhi 61
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Current Proposals (cont’d)
Mumbai Metropolitan Region Rail Projects
•
Page 62
19 Deember 2007 Workshop at TRIPP-IIT Delhi 62
~ Rs 80,000 Cr with
WTP & XBLPTotal
Rs 19,525 Cr
(Rs 60,000 Cr realistic)16 years ( 2024 ?)MMMP
Rs 6500 Cr5 yearsMTHL
Rs 3000 Cr5 years (after clearance)WFSL
Rs 1300 Cr2008 (2009)BWSL
Rs 2600 Cr2007 (2009)MUIP
Rs 4600 Cr2007 (2009)MUTP
Estimated CostExpected CompletionProject
Transportation Projects
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 63
19 Deember 2007 Workshop at TRIPP-IIT Delhi 63
Rs 5000 Cr5 years (after technology acceptance)
Sky Bus Metro (80 km)
Rs 2000 Cr2 years (after 1st Pilot in
operation)BRTS (200 km)
Operation commenced 2007
Fleet Taxi Scheme
2009Pedestrian Walkways
Rs 6000 Cr2010Monorail
Estimated CostExpected CompletionProject
Transportation Projects
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 64
19 Deember 2007 Workshop at TRIPP-IIT Delhi 64
Capacity Computations – MUTP/MUIP
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 65
19 Deember 2007 Workshop at TRIPP-IIT Delhi 65
25%(MUTP Phase I
Estimate)
Expected reduction in congestion in
coaches =
Say: 3,50,00075 x (4500 to 5000)
i.e. 3,37,500 to 3,75,000 pph
Current load (before full
implementation of MUTP) =
4500 to 5000Current load of
persons per 9 coach train =
75Numbar of train
services per hour =
Capacity Computation – MUTP/MUIP
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 66
19 Deember 2007 Workshop at TRIPP-IIT Delhi 66
200(220aspiration figure of Mckinsie
Report
110 seated and 90 standees
Design capacity of each coach
3894,667/12 = 389
Number of persons per coach after
increasing coaches to 12 per rake =
519 4,667 / 9 = 519 Number of persons
per coach in a 9 coach train =
4,6673,50,000 / 75 = 4,667
Number of persons per train =
Capacity Computation – MUTP/MUIP
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 67
19 Deember 2007 Workshop at TRIPP-IIT Delhi 67
Capacity Computation – MUTP/MUIP
69% of its capacity
(337-200) / 200 =With MUTP Phase II, each coach will be overloadedby
337(100-35) x 519 / 100 = 337
Number of persons per coach after 35% reduction in coach congestion (MUTP
Phase II) =
95% of its capacity
(389-200) / 200 = With only 12 Coach per train, coach will be overloadedby
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 68
19 Deember 2007 Workshop at TRIPP-IIT Delhi 68
Capacity Computation – MUTP/MUIP
69% Overloaded337MUTP Phase II Coach Loading
95% Overloaded389MUTP Phase I Coach Loading
150% to 175% Overloaded
500 to 550(Design Load 200)
Present Coach Loading
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 69
19 Deember 2007 Workshop at TRIPP-IIT Delhi 69
Capacity Computation – MUTP/MUIP
1,80,000 pph75 x 12 x 200 i.e.
1,80,000 pph
Design Capacity after full
implementation of MUTP Phase I) =
3,50,000 pphCurrent load (before full
implementation of MUTP) =
75Numbar of train
services per hour =
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Page 70
19 Deember 2007 Workshop at TRIPP-IIT Delhi 70
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
The magic figure to remember which will enable this to happen is:
3,50,000 – 1,80,000 =
1,70,000 pph
additional capacity of Public Transport
Page 71
19 Deember 2007 Workshop at TRIPP-IIT Delhi 71
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
What Next ?
Page 72
19 Deember 2007 Workshop at TRIPP-IIT Delhi 72
“Transport, Heath, Environment &
Equity in Indian cities”(5 min for this slide and then 15 min for Section 1)
Workshop Organized By
McGill University and TRIPP-IIT Delhi
On17 – 19 December 2007
XXXXXXXXXBy
Sudhir BadamiTransport & Urban Analyst ad Activist
[email protected]
Page 73
19 Deember 2007 Workshop at TRIPP-IIT Delhi 73
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
On to Animations
Page 74
19 Deember 2007 Workshop at TRIPP-IIT Delhi 74
What is Skybus?
Let us understand
from
Animation Clippings
Page 75
19 Deember 2007 Workshop at TRIPP-IIT Delhi 75
Page 76
19 Deember 2007 Workshop at TRIPP-IIT Delhi 76
Page 77
19 Deember 2007 Workshop at TRIPP-IIT Delhi 77
Page 78
19 Deember 2007 Workshop at TRIPP-IIT Delhi 78
Page 79
19 Deember 2007 Workshop at TRIPP-IIT Delhi 79
Page 80
19 Deember 2007 Workshop at TRIPP-IIT Delhi 80
Page 81
19 Deember 2007 Workshop at TRIPP-IIT Delhi 81
Page 82
19 Deember 2007 Workshop at TRIPP-IIT Delhi 82
Page 83
19 Deember 2007 Workshop at TRIPP-IIT Delhi 83
Transmillenio, Bogota
Page 84
19 Deember 2007 Workshop at TRIPP-IIT Delhi 84
Page 85
19 Deember 2007 Workshop at TRIPP-IIT Delhi 85
Page 86
19 Deember 2007 Workshop at TRIPP-IIT Delhi 86
Page 87
19 Deember 2007 Workshop at TRIPP-IIT Delhi 87
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
The BRTS-Skybus Combine
Manual from here
Page 88
19 Deember 2007 Workshop at TRIPP-IIT Delhi 88
Capacity Computations
of
BRTS-Skybus Combine
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 89
19 Deember 2007 Workshop at TRIPP-IIT Delhi 89
45,000 pph180 x 250 = 45,000 pph
Hourly capacity of single route
18060 x 60 / 20 = 180Hourly services
20 secs3 every minuteFrequency of
buses
250BRTS Bus Capacity
Capacity Computations – BRTS
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 90
19 Deember 2007 Workshop at TRIPP-IIT Delhi 90
10,000 pphSurplus capacity
achieved by BRTS
1,70,000 pphRequired additional capacity
1,80,000 pph4 x 45,000 = 1,80,000 pph
Capacity of Four North South
Routes
Capacity Computations – BRTS
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 91
19 Deember 2007 Workshop at TRIPP-IIT Delhi 91
6060 / 1 = 60Hourly service at
operational headway
1 minOperational Headway
27 secs / 32 secsFor a pair / for 3 pairs of coaches
Design Headway
300Pair of coachesSkybus Coach
Capacity
Capacity Computations – Skybus
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 92
19 Deember 2007 Workshop at TRIPP-IIT Delhi 92
1,08,000 pph2 x 54,000Capacity of Two
North South Routes
54,000 pph900 x 60 = 54,000
pph
6 Coach Capacity at hourly
operational service
9003 x 300 = 9006 Coach Capacity
Capacity Computations – Skybus
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 93
19 Deember 2007 Workshop at TRIPP-IIT Delhi 93
Total capacity of BRTS-Skybus
Combine
Capacity of four North South
Routes of BRTS
Capacity of Two North South
Routes of Skybus
1,18,000 pphSurplus achieved by BRTS-Skybus
Combine
1,70,000 pphRequired additional capacity
2,88,000 pph1,80,000 pph1,08,000 pph
Capacity Computations – BRTS-Skybus Combine
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 94
19 Deember 2007 Workshop at TRIPP-IIT Delhi 94
33.71 %Surplus as % of load
3,50,000 pphOverall load
1,18,000 pphSurplus achieved by BRTS-Skybus
Combine
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Capacity Computations – BRTS-Skybus Combine
Page 95
19 Deember 2007 Workshop at TRIPP-IIT Delhi 95
This would mean that whether it is Suburban Railways or BRTS or Skybus, the peak load will be about 34% less than the design capacity – a very comfortable state for commuters.
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 96
19 Deember 2007 Workshop at TRIPP-IIT Delhi 96
Cost Computations of BRTS-Skybus-
Combine
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 97
19 Deember 2007 Workshop at TRIPP-IIT Delhi 97
Rs 4,800 Cr@ Rs 60 Cr/km
80 km2 North-South
Routes of Skybus
Rs 2,000 Cr@ Rs10 Cr/km
200 km4 North-South and 3 East-West Routes
of BRTS
TOTAL COST ~ Rs 7,000 Cr
For a surplus capacity of 1,18,000 pph
Cost Computations of BRTS-Skybus Combine
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 98
19 Deember 2007 Workshop at TRIPP-IIT Delhi 98
The Metro Magic
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 99
19 Deember 2007 Workshop at TRIPP-IIT Delhi 99
© Sudhir Badami s u d h I r b a d a m i @ g m a i l . c o m
Although Mumbai Metro Master Plan is an attempt to augment the capacity of Public Transport, it
1. Will take 16 to 20 years
2. Cost about TEN times of what the BRTS-Skybus will cost
And
3. Provide 28% less capacity than what is needed.
Page 100
19 Deember 2007 Workshop at TRIPP-IIT Delhi 100
Cost Computations of MMMP
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 101
19 Deember 2007 Workshop at TRIPP-IIT Delhi 101
10,5742105,4844,480Cost
Rs Cr
15520120400Rate
Rs Cr/km
68.410.545.712.2Length
km
TotalOn gradeElevatedUnderground
Table A - Delhi Metro Phase I
(at actual – alt I rates)
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 102
19 Deember 2007 Workshop at TRIPP-IIT Delhi 102
10,5752104,5705,795Cost
Rs Cr
15520100475Rate
Rs Cr/km
68.410.545.712.2Length
km
TotalOn gradeElevatedUnderground
Table B - Delhi Metro Phase I
(at actual – alt II rates)
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 103
19 Deember 2007 Workshop at TRIPP-IIT Delhi 103
19,525011,4008,125Cost
Rs Cr
133.30100250Rate
Rs Cr/km
146.5011432.5Length
km
TotalOn gradeElevatedUnderground
Table C - Mumbai Metro
(with rates placed at Public Consultation by MMRDA/DMRC in Feb 2004)
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 104
19 Deember 2007 Workshop at TRIPP-IIT Delhi 104
26,828011,40015,438Cost
Rs Cr
18220100475Rate
Rs Cr/km
146.5011432.5Length
km
TotalOn gradeElevatedUnderground
Table D - Mumbai Metro
(with same rates as for Delhi Metro – from Table B)
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 105
19 Deember 2007 Workshop at TRIPP-IIT Delhi 105
61,177021,73039,447Cost
Rs Cr
417.520205974
extrapolatedRate
Rs Cr/km
146.5010640.5Length
km
TotalOn gradeElevatedUnderground
Table E - Mumbai Metro
(with bid rates for Versova-Ghatkopar Stretch as accepted by MMRDA-Govt of Maharashtra in May 2006)
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 106
19 Deember 2007 Workshop at TRIPP-IIT Delhi 106
How Metro is projected as a “Save all” Project
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 107
19 Deember 2007 Workshop at TRIPP-IIT Delhi 107
A simple oft repeated statement that Metro has the capacity that other modes do not have seems to be the selling point.
Numbers tell us a different story.
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 108
19 Deember 2007 Workshop at TRIPP-IIT Delhi 108
Metro As a savior !
2060 / 3 = 20Hourly service at
operationalheadway
3 minsOperational Headway
300Metro Coach
Capacity
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 109
19 Deember 2007 Workshop at TRIPP-IIT Delhi 109
Metro As a savior !
1,44,000 pph2 x 72,000Capacity of Two
North South Routes
72,000 pph3600 x 20 =
72,000
12 Coach Capacity at hourly
operational service
360012 x 300 = 360012 Coach Capacity
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 110
19 Deember 2007 Workshop at TRIPP-IIT Delhi 110
Metro As a savior !
1,70,000 pphThe magic figureRequired additional capacity
26,000 pph1,70,000 –1,44,000 = 26,000
The deficit comes to:
1,44,000 pph2 x 72,000
For 12 coach train
Capacity of Two North South
Routes
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 111
19 Deember 2007 Workshop at TRIPP-IIT Delhi 111
Capacity Computations – of Proposed Mumbai
Metro
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 112
19 Deember 2007 Workshop at TRIPP-IIT Delhi 112
2060 / 3 = 20Hourly service at
operational
3 minsOperational Headway
300Metro Coach
Capacity
Capacity Computations – Mumbai Metro
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 113
19 Deember 2007 Workshop at TRIPP-IIT Delhi 113
72,000 pph2 x 36,000Capacity of Two
North South Routes
36,000 pph1800 x 20 = 36,000 pph
6 Coach Capacity at hourly
operational service
18006 x 300 = 18006 Coach Capacity
Capacity Computations – Mumbai Metro
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 114
19 Deember 2007 Workshop at TRIPP-IIT Delhi 114
Capacity Computations – Mumbai Metro
1,70,000 pphThe magic figureRequired additional capacity
98,000 pph1,70,000 – 72,000 = 98,000
The deficit comes to:
72,000 pph2 x 36,000
For 6 coach train
Capacity of Two North South
Routes
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 115
19 Deember 2007 Workshop at TRIPP-IIT Delhi 115
Other projects mentioned have little impact on transportation scenario with Mumbai. However, the MTHL, will throw the Mumbai Metropolitan Region open for rapid development.
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 116
19 Deember 2007 Workshop at TRIPP-IIT Delhi 116
At Rs 60 Cr/km, Sky Bus may become unviable to most cities in India, but may not be so for the metro cities.
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 117
19 Deember 2007 Workshop at TRIPP-IIT Delhi 117
As usual, Metro Rail is being touted as “the” solution to Urban Transport and we know the reality.
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 118
19 Deember 2007 Workshop at TRIPP-IIT Delhi 118
BRTS is being considered only to get funding from JNNURM, but I see hope with some seriousness being shown lately by Government.
© Sudhir Badami s u d h i r b a d a m i @ g m a i l . c o m
Page 119
19 Deember 2007 Workshop at TRIPP-IIT Delhi 119
“Material being shown here are from sources listed below.
Sincere thanks to them for making them available for these
presentations:
• Mumbai Metropolitan Development Authority• Municipal Corporation of Greater Mumbai• Census• Western and Central Railways• B.E.S.T.• Konkan Railway• Rishi Aggarwal• Delhi Metro Rail Corporation• News papers: Indian Express, Times of India, Hindustan Times, DNA• Mumbai Traffic Police• Maharashtra State Road Development Corporation• Economic & Political Weekly
Page 120
19 Deember 2007 Workshop at TRIPP-IIT Delhi 120
Thank You