810.753 GUY 150 810.690 GUY 151 OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE 810.753 GUY 150 810.690 GUY 151 OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE UTILITIES ELECTRIC GAS CABLE TELEPHONE "MISS DIG" INDIANA MICHIGAN POWER 2425 MEADOWBROOK ROAD BENTON HARBOR, MI 49058 (269) 926-0683 KURT SCHNEIDER CONSUMERS ENERGY 2500 CORK STREET KALAMAZOO, MI 49001 (269) 337-2366 KYLE OAK MEDIACOM 1101 AUBURN DRIVE AUBURN, IN 46706 (269) 927-3015 CRAIG GREY FRONTIER/VERIZON 601 N US-131 THREE RIVERS, MI 49093 (269) 273-0383 JEREMY MCCORD 811 INDEX OF PLANS C101 DATE: SCALE: REVISIONS P:\Kalamazoo\184171 Antwerp Twp - Harwick Cemetery\B50 AutoCAD\Harwick Cemetary\2019.05.22 Dwgs\C101.dwg C101 7/15/2019 2:58:36 PM THE REPRODUCTION, COPYING OR OTHER USE OF THIS DRAWING WITHOUT WRITTEN CONSENT IS PROHIBITED. © 2018 WIGHTMAN & ASSOCIATES, INC. BENTON HARBOR 2303 Pipestone Road Benton Harbor, MI 49022 Phone: 269.927.0100 KALAMAZOO 433 East Ransom Street Kalamazoo, MI 49007 Phone: 269.327.3532 ALLEGAN 1670 Lincoln Road Allegan, MI 49010 Phone: 269.673.8465 www.gowightman.com JOB No. MAY, 2019 02 6/27/19 PDS ISSUED FOR BIDDING 01 6/5/2019 PDS SUBMITTED FOR SITE PLAN REVIEW ANTWERP TOWNSHIP 24821 FRONT STREET MATTAWAN, MI 49071 PROJECT NAME: HARWICK CEMETARY EXPANSION 56000 COUNTY ROAD 657 PAW PAW, MI 49079 NOTES, REMOVALS, AND SOIL EROSION AND SEDIMENTATION CONTROL PLAN ANTWERP TOWNSHIP HARWICK CEMETARY EXPANSION N PROJECT LOCATION MAP SCALE: NONE 1. THE "2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION" AND "STANDARD PLANS" BY THE MICHIGAN DEPARTMENT OF TRANSPORTATION (MDOT) ARE HEREBY INCORPORATED INTO THESE CONTRACT DOCUMENTS. COPIES OF THESE STANDARDS ARE AVAILABLE FOR INSPECTION AT THE OFFICE OF THE ENGINEER. 2. THE PLACING OF TRAFFIC CONTROL SIGNS AND PAVEMENT MARKINGS SHALL BE DONE IN ACCORDANCE WITH THE 2011 MICHIGAN MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MMUTCD), AS AMENDED. 3. ALL WORK SHALL CONFORM TO ALL LOCAL, STATE AND FEDERAL LAWS, RULES AND REGULATIONS IN FORCE AT THE TIME OF CONSTRUCTION. 4. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL CONSTRUCTION WITH OTHER CONTRACTORS INVOLVED WITH CONSTRUCTION OF THE PROPOSED DEVELOPMENT AND FOR REPORTING ANY ERRORS OR DISCREPANCIES BETWEEN THESE PLANS AND/OR PLANS PREPARED BY OTHERS. IF ANY ERRORS, DISCREPANCIES, OR OMISSIONS BECOME APPARENT, THESE SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION OF ANYTHING AFFECTED SO THAT CLARIFICATION OR REDESIGN MAY OCCUR. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR POSTING ALL BONDS AND INSURANCE CERTIFICATES AND SUBMITTING TRAFFIC CONTROL PLANS FOR REVIEW AND APPROVAL WHICH MAY BE REQUIRED BY THE ROAD COMMISSION FOR THE CONSTRUCTION OF THIS PROJECT WITHIN THE ROAD RIGHT-OF-WAY. THE CONTRACTOR SHALL APPLY FOR THESE PERMITS UNLESS OTHERWISE NOTED. 6. IN CONFORMANCE WITH PUBLIC ACT 174 OF 2013, ALL CONTRACTORS SHALL CALL MISS DIG @ 811 OR 800-482-7171 FOR PROTECTION OF UNDERGROUND UTILITIES A MINIMUM OF THREE FULL WORKING DAYS (EXCLUDING SATURDAYS, SUNDAYS AND HOLIDAYS) PRIOR TO BEGINNING EACH EXCAVATION IN ANY AREA. MEMBERS WILL THUS BE ROUTINELY NOTIFIED. THIS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF NOTIFYING UTILITY OWNERS WHO MAY NOT BE A PART OF THE "MISS DIG" ALERT SYSTEM. 7. THE CONTRACTOR SHALL LOCATE ALL ACTIVE UNDERGROUND UTILITIES PRIOR TO STARTING WORK AND SHALL CONDUCT HIS OPERATIONS IN A MANNER AS TO ENSURE THAT THOSE UTILITIES NOT REQUIRING RELOCATION WILL NOT BE DISTURBED. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ANTWERP TOWNSHIP TO NOTIFY THEM THAT WORK IS COMMENCING. 9. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL PRE-EXISTING ON-SITE IMPROVEMENTS WITHIN LIMITS OF CONSTRUCTION UNLESS OTHERWISE NOTED. THIS INCLUDES BUT IS NOT LIMITED TO CONCEALED FOUNDATIONS AND FOOTINGS, CURBS, ASPHALTS, TREES, SHRUBS, EXISTING UTILITY LINES, DEBRIS AND ALL OTHER ITEMS AND UTILITIES TO BE ABANDONED. 10. THE CONTRACTOR SHALL PRESERVE AND PROTECT ALL EXISTING GRAVE SITES AND MARKERS FROM DAMAGE BY CONSTRUCTION RELATED ACTIVITIES. ANY DAMAGE SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER AT THE EXPENSE OF THE CONTRACTOR. 11. THE OWNER SHALL PROVIDE 2 DAYS WRITTEN NOTICE TO THE CONTRACTOR OF A SCHEDULED BURIAL. THE CONTRACTOR SHALL STOP WORK DURING THE TIME PERIOD SCHEDULED BY THE OWNER. THE CONTRACT PERIOD SHALL BE EXTENDED BY ONE DAY FOR EACH SCHEDULED STOPPAGE. 12. IF AN EXISTING IMPROVEMENT IS REQUIRED TO BE REMOVED WITHIN THE SHOWN PROJECT LIMITS AND NOT INCLUDED WITHIN THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR SHALL CONSIDER SUCH REMOVALS INCIDENTAL AND THE CORRESPONDING COSTS THEREOF SHALL BE INCLUDED WITHIN THE LUMP SUM BID. 13. FILL SHALL BE PLACED AND ADEQUATELY KEYED INTO STRIPPED AND SCARIFIED SOILS PER THE MDOT 2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION. ALL FILL MATERIAL SHOULD BE AT APPROXIMATELY THE OPTIMUM MOISTURE CONTENT DURING COMPACTION. FURTHERMORE, FILL MATERIAL SHOULD NOT BE FROZEN NOR BE PLACED ON A FROZEN BASE. IT IS RECOMMENDED THAT ALL EARTHWORK AND SITE PREPARATION ACTIVITIES BE CONDUCTED UNDER ADEQUATE SUPERVISION AND PROPERLY CONTROLLED IN THE FIELD BY A GEOTECHNICAL ENGINEERING TESTING FIRM. 14. COMPACTION OF ANY FILL BY FLOODING IS NOT ACCEPTABLE. THIS METHOD WILL GENERALLY NOT ACHIEVE THE DESIRED COMPACTION, AND THE LARGE QUANTITIES OF WATER WILL TEND TO SOFTEN THE FOUNDATION SOILS. 15. ALL FILL FOR THIS PROJECT MUST BE OBTAINED AND FURNISHED BY THE CONTRACTOR. ALL REQUIRED FILL SHALL BE SELECTED EXCAVATED MATERIAL FROM THE SITE APPROVED BY THE ENGINEER, OR MDOT CLASS II GRANULAR MATERIAL FROM BORROW. EXCESS FILL SHALL BE REMOVED FROM SITE BY THE CONTRACTOR. NOTE: NO BORROW OR SOIL REMOVAL ARRANGEMENTS HAVE BEEN PREARRANGED FOR THIS PROJECT, AND SHALL BE THE TOTAL RESPONSIBILITY OF THE CONTRACTOR. 16. THE CONTRACTOR SHALL INSTALL A PEDESTRIAN FENCE AROUND ALL EXCAVATIONS TO BE LEFT OPEN OVERNIGHT, AS REQUIRED. 17. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING EXISTING DRAINAGE PATTERNS, AND SHALL RESOLVE ANY DRAINAGE PROBLEMS ON ADJACENT PROPERTIES WHICH MAY RESULT FROM THE CONTRACTOR'S ACTIVITIES. 18. ADEQUATE DUST CONTROL MEASURES SHALL BE MAINTAINED BY THE CONTRACTOR AS DIRECTED BY THE ENGINEER IN THE FIELD, TO BE INCLUDED IN THE VARIOUS ITEMS OF WORK. 19. MATERIAL FOR AGGREGATE BASE SHALL BE MDOT 22A GRAVEL, 22A SLAG, 22A LIMESTONE, 22A RECYCLED CONCRETE, OR COLD MILLED, HMA MATERIAL WHICH APPROXIMATES THE GRADATION OF 22A MATERIAL. IF MILLED HMA MATERIAL IS USED, IT MAY BE USED FULL DEPTH OR ON TOP OF 22A AGGREGATE TO OBTAIN THE REQUIRED THICKNESS. 22A GRAVEL SHALL NOT BE PLACED ON TOP OF MILLED HMA MATERIAL. A MIX GREATER THAN 50% MILLED HMA MATERIAL SHALL NOT BE USED AS AN AGGREGATE FROM SEPTEMBER 15 TO MAY 1 WITHOUT THE WRITTEN APPROVAL OF THE ENGINEER. 20. DATUM REFERS TO NAVD 88 DATUM. 21. ALL SCALES FOR DRAWINGS AND DETAILS ARE BASED ON 24"x36" PRINTED PLANS. DIMENSIONS TAKE PRECEDENCE OVER SCALE. CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD. 22. HMA MATERIALS FOR THIS PROJECT SHALL BE PERFORMANCE GRADE 58-28. 23. ANY SANITARY SEWER, SANITARY SEWER SERVICE LEADS, WATER MAIN, WATER SERVICES, OR STORM SEWER THAT IS DAMAGED BY THE CONTRACTOR DURING THEIR OPERATIONS SHALL BE REPAIRED TO THE OWNER'S SATISFACTION AND AT THE CONTRACTOR'S EXPENSE. 24. ALL PERMANENT SIGNAGE SHALL COMPLY WITH THE MICHIGAN'S BARRIER FREE DESIGN REQUIREMENTS AND THE AMERICANS WITH DISABILITIES ACT. 25. SOILS EXPOSED IN THE BASE OF ALL SATISFACTORY FOUNDATION EXCAVATIONS SHOULD BE PROTECTED AGAINST ANY DETRIMENTAL CHANGES IN CONDITION SUCH AS FROM DISTURBANCE, RAIN, AND FREEZING. SURFACE RUN-OFF WATER SHOULD BE DRAINED AWAY FROM THE EXCAVATION AND NOT ALLOWED TO POND. IF POSSIBLE, ALL FOOTING CONCRETE SHOULD BE POURED THE SAME DAY THE EXCAVATION IS MADE. IF THIS IS NOT PRACTICAL, THE FOOTING EXCAVATIONS SHOULD BE ADEQUATELY PROTECTED. 20. SOIL, AGGREGATE, AND HMA DENSITY TESTING - THE ENGINEER SHALL VERIFY THE DENSITY OF ALL PLACED MATERIALS AS SPECIFIED. COMPACTION TESTING SHALL TAKE PLACE PRIOR TO INSTALLATION OF THE AGGREGATE BASE AND PRIOR TO THE INSTALLATION OF THE HMA PAVEMENT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER A MINIMUM OF 3 DAYS PRIOR TO ALL AGGREGATE AND HMA PLACEMENT ACTIVITIES. 21. PROPERTY OWNER'S NAMES, WHERE SHOWN, ARE FOR INFORMATION ONLY, AND THEIR ACCURACY IS NOT GUARANTEED. 22. THE CONTRACTOR SHALL NOTE THE OWNER INTENDS TO SOLICIT BIDS DIRECTLY THROUGH ITS OWN PROCUREMENT PROCESSES. THE PLANS PREPARED BY THE ENGINEER DEPICT THE ENTIRETY OF THE WORK TO BE COMPLETED IN WHOLE BY THE CONTRACTOR, WHICH WORK GENERALLY CONSISTS OF STRIPPING TOPSOIL AND COMPLETING ANY NECESSARY REMOVALS, EARTHWORK ACTIVITIES TO SHAPE, FORM, MOVE AND COMPACT SAND TO THE DESIRED CROSS SECTION, PLACEMENT AND COMPACTION OF AGGREGATE BASE, PLACEMENT AND COMPACTION OF HOT MIX ASPHALT PAVEMENT, AND ALL ASSOCIATED RESTORATION AND SOIL EROSION AND SEDIMENTATION CONTROL MEASURES. IN PREPARING THE BID TO BE SUBMITTED TO THE TOWNSHIP, THE CONTRACTOR SHALL INCLUDE ALL COSTS, LABOR, MATERIAL, EQUIPMENT AND ANY ACTIVITIES NECESSARY TO COMPLETE THE INDICATED WORK IN WHOLE, WHETHER DIRECTLY CALLED OUT FOR OR IMPLIED WHEN APPLYING TYPICAL INDUSTRY STANDARDS AND INCORPORATION OF THE 2012 MDOT STANDARD SPECIFICATIONS INTO ALL REQUIRED WORK ITEMS. 23. THE CONTRACTOR SHALL CONSULT DIRECTLY WITH THE TOWNSHIP TO DETERMINE INSURANCE AND BONDING REQUIREMENTS FOR THIS PROJECT. PROJECT NOTES 80-02-010-016-30 WEGELER ANTHONY J 55755 CR 657 PAW PAW, MI 49079 80-02-010-016-35 WEGELER ALAN W & MARCY L 55415 CR 657 PAW PAW, MI 49079 80-02-015-007-01 BRITTON STEPHEN P SR & SUSAN LYNN 55415 CR 657 PAW PAW, MI 49079 ## SOIL EROSION & SEDIMENTATION CONTROL NOTES 1 ALL CONSTRUCTION METHODS SHALL BE DONE IN COMPLIANCE WITH THE MICHIGAN SOIL EROSION AND SEDIMENTATION CONTROL ACT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A "SOIL EROSION PERMIT" FROM THE COUNTY AND SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL REQUIREMENTS OF THE COUNTY "SOIL EROSION PERMIT." EROSION CONTROL MEASURES SHOWN ON THE PLANS ARE THE MINIMUM REQUIREMENTS AND SHALL NOT RELIEVE THE CONTRACTOR'S RESPONSIBILITY FOR PROVIDING ALL REQUIRED EROSION CONTROL MEASURES. 2. AVOID UNNECESSARY DISTURBING OR REMOVING OF EXISTING VEGETATED TOPSOIL OR EARTH COVER, THESE COVER AREAS ACT AS SEDIMENT FILTERS. 3. ALL TEMPORARY SOIL EROSION PROTECTION SHALL REMAIN IN PLACE UNTIL REMOVAL IS REQUIRED FOR FINAL CLEAN UP AND APPROVAL. 4. MAINTENANCE, CLEANING, AND REMOVAL OF THE VARIOUS SEDIMENT CONTROL MEASURES SHALL BE INCLUDED IN THE VARIOUS EROSION CONTROL ITEMS. NUMBER IN CIRCLE REFERS TO NUMBERED DETAILS ON MDOT STANDARD PLAN R-96 SERIES, SOIL EROSION & SEDIMENTATION CONTROL MEASURES. "P" DENOTES PERMANENT MEASURE AND "T" DENOTES TEMPORARY MEASURE. SOIL EROSION CONTROL PLANS DENOTE MINIMUM EROSION MEASURES REQUIRED AS DESCRIBED BELOW. DENOTES PERMANENT SEEDING. ALL DISTURBED AREAS NOT PAVED OR GRAVELED SHALL BE RESTORED. RESTORATION SHALL BE IN ACCORDANCE WITH THE PROJECT SPECIFICATION FOR TURF ESTABLISHMENT, MODIFIED AND GENERALLY DESCRIBED AS FOLLOWS: PLACE TOPSOIL SURFACE, SALV, 4 INCH, JONATHAN GREEN TURF PRO BLACK BEAUTY HEAT AND DROUGHT GRASS SEED BLEND OR APPROVED EQUAL CONTAINING: 40% MONTANA FESCUE, 30% TALUS TALL FESCUE, 30% TONTO TALL FESCUE, APPLIED AT A RATE RECOMMEND BY THE MANUFACTURER; CHEMICAL NUTRIENT FERTILIZER 21-22-4 WITH 0.08% MESOTRIONE HERBICIDE BY THE ANDERSONS AT A RATE OF 190 LBS PER ACRE; MULCH AT A RATE OF 2 TON/ACRE AND MULCH ANCHORING. (APPLIES TO ENTIRE PROJECT) 3P DENOTES AGGREGATE COVER/PERMANENT PAVEMENT RESTORATION 8P DENOTES GRAVEL ACCESS APPROACH. APPROACH SHALL BE INSTALLED TO PROVIDE STABLE ACCESS TO ROADWAYS AND MINIMIZE DUST AND TRACKING OF MATERIALS ONTO PUBLIC STREETS AND HIGHWAYS. THE APPROACH SHALL BE A MINIMUM OF 10' WIDE, 6" DEEP, AND CONSIST OF 2"-4" AGGREGATE 14T DENOTES TEMPORARY SILT FENCE. SILT FENCE SHALL BE INSTALLED AT CREEK CROSSINGS, ADJACENT TO ALL WETLANDS AND SURFACE WATERS, AND OTHER LOCATIONS AS DIRECTED BY THE ENGINEER. EACH SILT FENCE SHALL BE INSTALLED GENERALLY ALONG THE SAME CONTOUR ELEVATION. 26T DENOTES MULCH BLANKETS. MULCH BLANKET SHALL BE PROVIDED AT LOCATIONS SHOWN ON THE PLANS, AT SLOPES GREATER THAN 1:3, AREAS WITH CONCENTRATED FLOWS, AND AS DIRECTED BY THE ENGINEER IN THE FIELD, TO PREVENT RUNOFF AND EROSION. 33 MB PROJECT LOCATION 58TH AVE I-94 CR 657 N 1 inch = ft. 0 40 40 60 80 W SB = SANITARY MANHOLE = SECTION CORNER = PAVEMENT/SOIL BORING = TELEPHONE MANHOLE = WELL = CATCH BASIN = CURB INLET = STORM MANHOLE = GAS VALVE = WATER VALVE E C OHE G T FO ELECTRIC LINE (OVERHEAD) SANITARY SEWER WATER MAIN = TELEPHONE RISER BOX = FIRE HYDRANT = GUY ANCHOR = SATELLITE DISH CONIFEROUS TREE = POST BUSH = SIGN STUMP DECIDUOUS TREE = LIGHT POLE EXISTING DITCH LINE CABLE STORM SEWER EXISTING TREE LINE FORCEMAIN FIBER OPTIC LINE = UTILITY POLE LEGEND FENCE = WATER MANHOLE TREE DESIGNATORS E G T ELECTRIC LINE GAS LINE TELEPHONE LINE RIGHT-OF-WAY LINE EASEMENT LINE/GRADING PERMIT PROPERTY LINE = MONITORING WELL = ANTENNA O O O O O O O O [] [] [] [] [] [] [] [] [] GUARDRAIL = CLEAN OUT = ELECTRIC MANHOLE = PROPOSED GATE VALVE & VAULT = PROPOSED REDUCER = WATER ELEVATION CO C MW = FOUND IRON PIPE = TURNING POINT/TRAVERSE = CABLE RISER BOX = WATER SPIGOT VLT = VAULT WM = WATER METER E SA ST T CB = PROPOSED STORM MANHOLE = PROPOSED SANITARY MANHOLE R R CENTER LINE GRADING LIMITS/LIMITS OF DISTURBANCE SECTION LINE W = PROPOSED GATE VALVE & BOX = PROPOSED HYDRANT TO BE ABANDONED I I I I I I I I I I I I I I I I I I I I = MAILBOX PROPOSED EXISTING CONIFEROUS TREE TO BE REMOVED DECIDUOUS TREE TO BE REMOVED C OHE FO 26T 26T 8P 8P 8P 8P 8P 8P 33 MB 33 MB R R R R R R R R R R R R R RELOCATE EXISTING POWER POLE PRIOR TO CONSTRUCTION - BY OTHERS COUNTY ROAD 657 CAUTION: OVERHEAD UTILITY OVERLAY EXISTING HMA DRIVE PROTECT EXISTING HEADSTONE/ GRAVE SITE TYP 3P 3P 3P 3P 3P 3P 3P 3P 3P REMOVE EXISTING AGGREGATE DRIVE OVERLAY EXISTING HMA DRIVE 26T 26T 26T 26T 48 SYD - REMOVE EXISTING HMA DRIVE PROJECT BASE BID SHALL INCLUDE ALL TREE REMOVAL, EROSION CONTROL, TOPSOIL STRIPPING, EARTHMOVING, CONCRETE HEADSTONE FOUNDATION CONSTRUCTION, PROPOSED ROAD SUBBASE PREPARATION, INSTALLATION AND COMPACTION OF AGGREGATE BASE COURSE, TOPSOIL PLACEMENT, SEEDING, AND ALL OTHER WORK NECESSARY TO COMPLETE THE IMPROVEMENTS AS SHOWN EXCEPT FOR THE FOLLOWING SCOPE TO BE BID AS ADD-ALTERNATES: THE CONTRACTOR'S LUMP SUM PRICE FOR PAVEMENT ALTERNATIVE SHALL INCLUDE EXISTING SURFACE PREPARATION, BOND COAT, HMA OVERLAY AND NEW HMA CONSTRUCTION THE CONTRACTOR'S LUMP SUM PRICE FOR FENCE ALTERNATIVE 1 SHALL INCLUDE ALL NECESSARY MATERIALS, LABOR, AND EQUIPMENT TO INSTALL 725 FEET OF THREE RAIL WHITE VINYL FENCE ALONG NORTH, EAST, & SOUTH BOUNDARY LINES OF THE PROPOSED CEMETERY EXPANSION AREA THE CONTRACTOR'S LUMP SUM PRICE FOR FENCE ALTERNATIVE 2 SHALL INCLUDE ALL NECESSARY MATERIALS, LABOR, AND EQUIPMENT TO INSTALL 187 FEET OF 6' TALL WHITE VINYL SCREENING FENCE ALONG THE NORTH BOUNDARY LINE OF THE EXISTING CEMETERY THE CONTRACTOR SHALL RELOCATE SELECTED VALUABLE, QUALITY TREES FROM THE MIDDLE OF THE SITE TO THE PERIMETER OF THE SITE PRIOR AT THE DIRECTION OF THE OWNER PRIOR TO TREE CUTTING AND REMOVAL. THIS WORK SHALL BE PAID AT THE CONTRACTOR'S UNIT PRICE SUBMITTED FOR TREE RELOCATION ALTERNATIVE. C101 NOTES, REMOVALS, AND SOIL EROSION AND SEDIMENTATION CONTROL PLAN C102 PROPOSED LAYOUT AND GRADING