City of Colorado Springs Downtown Historic Parks Master Plan April 20, 2020 Precedent tree canopy walk at Levy Park, Houston Dog park with splash pad COS participants highly ranked garden walk images in fall and winter engagement activities Signature play element, the Osprey bird THE BIG MOVES 0’ 10’ 20’ 40’ The shaded lawn could host informal picnics or be trans- formed to host temporary events (markets, outdoor theater). Aerial view of sinuous park pathways of Storymill Park are precedent for Antler’s paths, play areas and garden rooms. Dining/Lounge Seating Existing Shade Tree Proposed Shade Tree Key 1 1 Tree Canopy Walk 4 11 Dog Park Spray Feature 2 Canopy Walk Climbing Walls 5 Dog Park Lawn Dog Special Use Area (e.g., small dogs, classes) 3 Green Screen Wall Nature-Themed Illuminated Sculpture Cele- brating Historic Trees 8 7 14 6 Improved SE Pedestrian Access to Park Tree Benches 9 City Wild Playground with Signature Nature Play Feature 10 Slide Hill 11 Proposed Improvements Legend 12 13 Garden Plaza and Promenade Temporary Stage/Pop-Up Classroom Area 14 Picnic and Small Event Lawn 15 Trail Signage Connection to Monument Valley Park Bouldering on 8-10’ climbing walls at base of canopy walk face. The four story parking garage wall along the east side of the park needs a green touch to help soften this hard edge. Options include a green screen wall combined with public art (including existing student tiles) or decorative screen components. Image Credits: Levy Park Photo-505 Design, Adobe Stock and Design Workshop. ANTLERS PARK PREFERRED PLAN Antlers Park S. SIERRA MADRE ST. PIKES PEAK AVE. 1 Zebulon Pike Monument 2 Historically Significant Trees Student Art Tile Mural 3 Supperstein Steam Locomotive Bell Tower 4 Restroom (to be renovated) Existing Elements Legend 1 2 3 4 4 5 5 2 12 13 15 4 5 6 7 16 Improved Streetscape along Pikes Peak and Sierra Nevada Terraced Seating 8 9 10 3 16 1 7 5 2 11 3 16 10’x10’ Market Tent The character imagery below shows proposed, inspirational images of how master plan improvements could look. More refinement to the plan elements will occur during the next design phases.