Top Banner
Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program APC Webcast June Project Status
15

ANT Program APC Webcast June Project Statusmydocs.epri.com/docs/ant/ANT APCJune 2012 Webcast r1.pdf · Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program

Feb 20, 2019

Download

Documents

Dung Tien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ANT Program APC Webcast June Project Statusmydocs.epri.com/docs/ant/ANT APCJune 2012 Webcast r1.pdf · Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program

Phone Number (866) 495-6160

Participant code: 6836

June 14, 2012

ANT Program

APC Webcast

June Project Status

Page 2: ANT Program APC Webcast June Project Statusmydocs.epri.com/docs/ant/ANT APCJune 2012 Webcast r1.pdf · Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program

2 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Meeting Objectives

–Review the upcoming APC Agenda

–Request support for new TAG formations

–Provide a quick overview of new 2012 Projects

–Look at 2012 published reports

–Review upcoming meetings

Page 4: ANT Program APC Webcast June Project Statusmydocs.epri.com/docs/ant/ANT APCJune 2012 Webcast r1.pdf · Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program

4 © 2012 Electric Power Research Institute, Inc. All rights reserved.

2012 ANT Operational Calendar

Winter APC Meeting (@NPC)

(San Diego: Jan 31 - Feb 1, 2012)

Summer APC Meeting (@NPC)

(Atlanta: August 28-29, 2012)

• Finalize budget for current CY

• Review status of ongoing R&D

• Review status of ongoing R&D

• Review new projects for next CY

• Set priority list for next CY

Integration Committee (IC) Meetings New Task Development (UK; Feb 16, 2012) (Seattle: May 21, 2012) (Washington, D.C.; August 8, 2012)

(Charlotte; March 21, 2012)

• Brainstorm needs of industry

• Discuss best us of ANT

resources for next CY

End of Year Webcast (Dec 6, 2012)

• Review status of ongoing work

Mid-Year Webcast (June 14, 2012)

• Review status of ongoing work

• Review DRAFT Task Proposals

• Develop list for APC review

Action P

lan

Com

mitte

e (

AP

C)

Inte

gra

tion

Com

mitte

e (

IC)

• Finalize DRAFT Task Proposals

• Finalize list for APC review

Page 5: ANT Program APC Webcast June Project Statusmydocs.epri.com/docs/ant/ANT APCJune 2012 Webcast r1.pdf · Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program

5 © 2012 Electric Power Research Institute, Inc. All rights reserved.

August APC Agenda

TUESDAY, AUGUST 28, 2012

TIME TOPIC PRESENTER

1:00 p.m. Introductions / Meeting Objectives / ANT Program Status

ANT APC Chairman

Jeff Hamel

1:30 p.m. Review 2012 Active Projects EPRI ANT Staff

3:00 p.m. Break

3:15 p.m. Review 2012 Active Projects EPRI ANT Staff

4:30 p.m. Success Stories Utilities/Vendors

5:00 p.m. Adjourn

7:00 p.m. ANT Sponsored Dinner All

Page 6: ANT Program APC Webcast June Project Statusmydocs.epri.com/docs/ant/ANT APCJune 2012 Webcast r1.pdf · Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program

6 © 2012 Electric Power Research Institute, Inc. All rights reserved.

August APC Agenda

WEDNESDAY, AUGUST 29, 2012

TIME TOPIC PRESENTER

8:00 a.m. Overview of Process used to Develop Candidate

Tasks Jeff Hamel

8:15 a.m. Review of 2013 Candidate Tasks EPRI ANT Staff

10:30 am Review of 2013 Candidate Tasks EPRI ANT Staff

11:30 am Financial Review Jeff Hamel

12:00 pm Lunch

1:00 p.m. Group Discussion on 2013 Candidate Tasks &

Vote

ANT APC Chairman

Jeff Hamel

1:30 p.m. EPRI Customer Satisfaction Survey Ken Barry

2:00 p.m. Water Project Briefing Sean Bushart

2:30 p.m. Meeting Action Items / Upcoming ANT APC Chairman

Jeff Hamel

3:00 p.m. Adjourn

3:30 p.m. ANT Member Feedback Session ANT APC

Page 7: ANT Program APC Webcast June Project Statusmydocs.epri.com/docs/ant/ANT APCJune 2012 Webcast r1.pdf · Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program

7 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Varied ANT Engagement Levels and Deliverables

• TAGS, Webcasts, Integration Committee, Action Plan Committee – Various levels of engagement

• Technical Guidelines – Examples: Materials Management Matrices, Fuel Reliability Guidelines, and Water

Chemistry Evaluation

• Maintenance and Process Guidebooks – Examples: Equipment Reliability Guidelines, Modular Equipment Testing

• Technology and Software – Examples: Concrete Void Detection Probes, I&C Training Modules

Early and frequent engagement will provide the greatest value.

Page 8: ANT Program APC Webcast June Project Statusmydocs.epri.com/docs/ant/ANT APCJune 2012 Webcast r1.pdf · Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program

8 © 2012 Electric Power Research Institute, Inc. All rights reserved.

New Technical Advisory Group Formation

• Groundwater Protection Guidelines Addendum for New

Plants - expertise in the area of new plant licensing,

environmental assessments, and construction

([email protected])

• Supplier Quality Performance Assurance Guide -

representatives of nuclear plant owners and prime

contractors interested in improving the quality of products

and services delivered to nuclear construction projects and

managing associated project risks ([email protected])

• Seasonal Annual Cooling Tower Impact (SACTI) model

– People who performed the cooling tower Environmental

Impact Statements (EIS) for the COLAs/ESPs that have

been submitted so far ([email protected])

Page 9: ANT Program APC Webcast June Project Statusmydocs.epri.com/docs/ant/ANT APCJune 2012 Webcast r1.pdf · Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program

9 © 2012 Electric Power Research Institute, Inc. All rights reserved.

New Technical Advisory Group Formation (cont)

• Alloy 690 steam generator tubing - Committee members

will have the opportunity to provide input into the revised

specification ([email protected])

• Digital Cyber-Security Procurement Specifications –

Members interested in Cyber-Security Issues

([email protected])

Page 10: ANT Program APC Webcast June Project Statusmydocs.epri.com/docs/ant/ANT APCJune 2012 Webcast r1.pdf · Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program

10 © 2012 Electric Power Research Institute, Inc. All rights reserved.

2012 New Tasks

Task ID# Task Title

2012-01 Water Chemistry Guidelines for Advanced Light Water Reactors

2012-02 Concrete Placement Inspection Guidelines

2012-03 Digital Cyber-Security Procurement Specifications

2012-04 Supplier Quality Performance Manual

2012-05 HDPE Pipe Aging Degradation Mechanisms

2012-06 High Strength Reinforced Rebar

2012-07 Pilot Project - Implementation of ASME Section III Code Case

2012-08 Seismic Equipment Qualification (EQ) Assessment

2012-09 10CFR50.69 Application and Pilot Plant Submittal

2012-10 Generic Latent Debris Sampling Methods

2012-11 Alloy 690TT Steam Generator Tubing Specification Handbook

2012-12 Feasibility Evaluation of Glass Reinforced Spiral Wound HDPE for

Circ Water Piping

2012-13 EPRI Groundwater Protection Guidelines for NNPP

2012-14 Guidelines for Crediting Self Testing and Monitoring to Extend Tech

Spec Surveillances

2012-15 New Steam Generator Thermal-Hydraulics Code

Page 11: ANT Program APC Webcast June Project Statusmydocs.epri.com/docs/ant/ANT APCJune 2012 Webcast r1.pdf · Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program

11 © 2012 Electric Power Research Institute, Inc. All rights reserved.

2012 Published Reports

Product

ID Product Name Completion

Date

1024502 An Assessment of PWR Water Chemistry in Advanced Light Water Reactors: US-APWR

1/31/2012

1024503 Human Factors Engineering for Managers: Computer-Based Training for Utilities Involved in New Nuclear Power Plant Designs, Construction and Operation - 2012

2/27/2012

1024859 Human Factors Engineering (HFE) Computer Based Training Module for Utilities Involved in Implementing Digital Instrumentation and Control Systems

3/23/2012

1024860 Three Human Factors Engineering Training Courses for Utilities Involved in New Nuclear Power Plant Designs, Construction and Operation

3/23/2012

1024945 Program on Technology Innovation: Sonoluminescing Bubbles and the Synthesis of Nanocatalysts for Hydrogen Production

4/26/2012

Page 12: ANT Program APC Webcast June Project Statusmydocs.epri.com/docs/ant/ANT APCJune 2012 Webcast r1.pdf · Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program

12 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Upcoming ANT Related Meetings

International BWR/PWR Reactor Materials Conference & Exhibition

July 16th – July 19th , National Harbor, Maryland

Supplier Quality Performance Assurance TAG Meeting

July 24-25th, Charlotte, NC

DOE - Advanced Methods of Manufacturing Working Group

August 7th, Washington DC

ANT Integration Committee – 2013 Project Finalization

August 8th, Washington DC

Risk-informed Strategies for the New Build Fleet

August 9th, Washington, DC

ANT Action Plan Committee

August 28th – 29th, Atlanta, GA

Page 13: ANT Program APC Webcast June Project Statusmydocs.epri.com/docs/ant/ANT APCJune 2012 Webcast r1.pdf · Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program

13 © 2012 Electric Power Research Institute, Inc. All rights reserved.

EPRI’s ANT Program Website http://www.epri.com/ant

Page 14: ANT Program APC Webcast June Project Statusmydocs.epri.com/docs/ant/ANT APCJune 2012 Webcast r1.pdf · Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program

14 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Thank You!

Page 15: ANT Program APC Webcast June Project Statusmydocs.epri.com/docs/ant/ANT APCJune 2012 Webcast r1.pdf · Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program

15 © 2012 Electric Power Research Institute, Inc. All rights reserved. Image from NASA Visible Earth