Phone Number (866) 495-6160 Participant code: 6836 June 14, 2012 ANT Program APC Webcast June Project Status
Phone Number (866) 495-6160
Participant code: 6836
June 14, 2012
ANT Program
APC Webcast
June Project Status
2 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Meeting Objectives
–Review the upcoming APC Agenda
–Request support for new TAG formations
–Provide a quick overview of new 2012 Projects
–Look at 2012 published reports
–Review upcoming meetings
3 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Current 2012 ANT Membership Breakdown
4 © 2012 Electric Power Research Institute, Inc. All rights reserved.
2012 ANT Operational Calendar
Winter APC Meeting (@NPC)
(San Diego: Jan 31 - Feb 1, 2012)
Summer APC Meeting (@NPC)
(Atlanta: August 28-29, 2012)
• Finalize budget for current CY
• Review status of ongoing R&D
• Review status of ongoing R&D
• Review new projects for next CY
• Set priority list for next CY
Integration Committee (IC) Meetings New Task Development (UK; Feb 16, 2012) (Seattle: May 21, 2012) (Washington, D.C.; August 8, 2012)
(Charlotte; March 21, 2012)
• Brainstorm needs of industry
• Discuss best us of ANT
resources for next CY
End of Year Webcast (Dec 6, 2012)
• Review status of ongoing work
Mid-Year Webcast (June 14, 2012)
• Review status of ongoing work
• Review DRAFT Task Proposals
• Develop list for APC review
Action P
lan
Com
mitte
e (
AP
C)
Inte
gra
tion
Com
mitte
e (
IC)
• Finalize DRAFT Task Proposals
• Finalize list for APC review
5 © 2012 Electric Power Research Institute, Inc. All rights reserved.
August APC Agenda
TUESDAY, AUGUST 28, 2012
TIME TOPIC PRESENTER
1:00 p.m. Introductions / Meeting Objectives / ANT Program Status
ANT APC Chairman
Jeff Hamel
1:30 p.m. Review 2012 Active Projects EPRI ANT Staff
3:00 p.m. Break
3:15 p.m. Review 2012 Active Projects EPRI ANT Staff
4:30 p.m. Success Stories Utilities/Vendors
5:00 p.m. Adjourn
7:00 p.m. ANT Sponsored Dinner All
6 © 2012 Electric Power Research Institute, Inc. All rights reserved.
August APC Agenda
WEDNESDAY, AUGUST 29, 2012
TIME TOPIC PRESENTER
8:00 a.m. Overview of Process used to Develop Candidate
Tasks Jeff Hamel
8:15 a.m. Review of 2013 Candidate Tasks EPRI ANT Staff
10:30 am Review of 2013 Candidate Tasks EPRI ANT Staff
11:30 am Financial Review Jeff Hamel
12:00 pm Lunch
1:00 p.m. Group Discussion on 2013 Candidate Tasks &
Vote
ANT APC Chairman
Jeff Hamel
1:30 p.m. EPRI Customer Satisfaction Survey Ken Barry
2:00 p.m. Water Project Briefing Sean Bushart
2:30 p.m. Meeting Action Items / Upcoming ANT APC Chairman
Jeff Hamel
3:00 p.m. Adjourn
3:30 p.m. ANT Member Feedback Session ANT APC
7 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Varied ANT Engagement Levels and Deliverables
• TAGS, Webcasts, Integration Committee, Action Plan Committee – Various levels of engagement
• Technical Guidelines – Examples: Materials Management Matrices, Fuel Reliability Guidelines, and Water
Chemistry Evaluation
• Maintenance and Process Guidebooks – Examples: Equipment Reliability Guidelines, Modular Equipment Testing
• Technology and Software – Examples: Concrete Void Detection Probes, I&C Training Modules
Early and frequent engagement will provide the greatest value.
8 © 2012 Electric Power Research Institute, Inc. All rights reserved.
New Technical Advisory Group Formation
• Groundwater Protection Guidelines Addendum for New
Plants - expertise in the area of new plant licensing,
environmental assessments, and construction
• Supplier Quality Performance Assurance Guide -
representatives of nuclear plant owners and prime
contractors interested in improving the quality of products
and services delivered to nuclear construction projects and
managing associated project risks ([email protected])
• Seasonal Annual Cooling Tower Impact (SACTI) model
– People who performed the cooling tower Environmental
Impact Statements (EIS) for the COLAs/ESPs that have
been submitted so far ([email protected])
9 © 2012 Electric Power Research Institute, Inc. All rights reserved.
New Technical Advisory Group Formation (cont)
• Alloy 690 steam generator tubing - Committee members
will have the opportunity to provide input into the revised
specification ([email protected])
• Digital Cyber-Security Procurement Specifications –
Members interested in Cyber-Security Issues
10 © 2012 Electric Power Research Institute, Inc. All rights reserved.
2012 New Tasks
Task ID# Task Title
2012-01 Water Chemistry Guidelines for Advanced Light Water Reactors
2012-02 Concrete Placement Inspection Guidelines
2012-03 Digital Cyber-Security Procurement Specifications
2012-04 Supplier Quality Performance Manual
2012-05 HDPE Pipe Aging Degradation Mechanisms
2012-06 High Strength Reinforced Rebar
2012-07 Pilot Project - Implementation of ASME Section III Code Case
2012-08 Seismic Equipment Qualification (EQ) Assessment
2012-09 10CFR50.69 Application and Pilot Plant Submittal
2012-10 Generic Latent Debris Sampling Methods
2012-11 Alloy 690TT Steam Generator Tubing Specification Handbook
2012-12 Feasibility Evaluation of Glass Reinforced Spiral Wound HDPE for
Circ Water Piping
2012-13 EPRI Groundwater Protection Guidelines for NNPP
2012-14 Guidelines for Crediting Self Testing and Monitoring to Extend Tech
Spec Surveillances
2012-15 New Steam Generator Thermal-Hydraulics Code
11 © 2012 Electric Power Research Institute, Inc. All rights reserved.
2012 Published Reports
Product
ID Product Name Completion
Date
1024502 An Assessment of PWR Water Chemistry in Advanced Light Water Reactors: US-APWR
1/31/2012
1024503 Human Factors Engineering for Managers: Computer-Based Training for Utilities Involved in New Nuclear Power Plant Designs, Construction and Operation - 2012
2/27/2012
1024859 Human Factors Engineering (HFE) Computer Based Training Module for Utilities Involved in Implementing Digital Instrumentation and Control Systems
3/23/2012
1024860 Three Human Factors Engineering Training Courses for Utilities Involved in New Nuclear Power Plant Designs, Construction and Operation
3/23/2012
1024945 Program on Technology Innovation: Sonoluminescing Bubbles and the Synthesis of Nanocatalysts for Hydrogen Production
4/26/2012
12 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Upcoming ANT Related Meetings
International BWR/PWR Reactor Materials Conference & Exhibition
July 16th – July 19th , National Harbor, Maryland
Supplier Quality Performance Assurance TAG Meeting
July 24-25th, Charlotte, NC
DOE - Advanced Methods of Manufacturing Working Group
August 7th, Washington DC
ANT Integration Committee – 2013 Project Finalization
August 8th, Washington DC
Risk-informed Strategies for the New Build Fleet
August 9th, Washington, DC
ANT Action Plan Committee
August 28th – 29th, Atlanta, GA
13 © 2012 Electric Power Research Institute, Inc. All rights reserved.
EPRI’s ANT Program Website http://www.epri.com/ant