AE94.2 UPGRADING PROJECT
Stefano Traverso Federico BonzaniProduct DevelopmentProduct Development
09/10 : Concurrent Engineering with casting suppliers startg pp
01/10 : Product specification
03/09 : Project Start
Pag. 14Ansaldo Enegia 2010. All rights reserved
HW5 : Fully 3D Compressor Blades & Vanes
Five front stages fully 3D designg y g
Completely retrofitable on AE94.2 range gas turbine with same rotor di kdisks too
+4% inlet mass flow @same efficiencyefficiency
Low mass flow variations against ambient temperatureambient temperature
High turndown capabilities
W t i bilitiWet compression capabilities
A il 12 P d t i li ti
Pag. 15Ansaldo Enegia 2010. All rights reserved
April 12 : Product commercialization
AE94.2 Evo2 : Summary
Upgrade Scope (HW4, HW3 and HW5 upgrade packages)
New Ansaldo Energia 3D turbine blades and vanes,
New aerodynamic optimized 1-5 compressor stages,
Advanced coatings (BC & TBC) on mixing chamber and inner casing
Benefit
Evo2 Turbine inlet temperature fixed to 1090°CEvo2 Turbine inlet temperature fixed to 1090 C
+10.0% increased power output in Simple Cycle(*)
+8.0% increased power output in Combined cycle(**)8.0% increased power output in Combined cycle( )
more than +1.4pt% increased efficiency in Simple Cycle (Up to 4.0% higher exhaust mass flow provide more power output in case of existing combined cycle or combined cycle extension compared to HW4 package only)cycle or combined cycle extension compared to HW4 package only)
Maintenance Interval Extension @ 1075°C (41MAC for base load units)
Pag. 16Ansaldo Enegia 2010. All rights reserved
(**) w/o design limit in Combined plant parts(*) ISO conditions, methane firing
Contents
New development for Ansaldo Energia AE94.2New development for Ansaldo Energia AE94.2
F D l t d P d t O iFrame Development and Product Overview
AE94.2-Evo1 details
AE94.2-Evo2 overview
Summary and ConclusionSummary and Conclusionyy
Pag. 17Ansaldo Enegia 2010. All rights reserved
Summary & Conclusion
Ansaldo Energia Upgrade present and future packages for AE94 2Ansaldo Energia Upgrade present and future packages for AE94.2 have been presented.
All upgrade packages are modular, can be combined and are completely retrofitable.
Extended maintenance interval MAC41 up to 1075°C ISO (by HW2 HW4 d HW3 k )or HW4 and HW3 packages).
Decreasing combustion emissions by new VeLoNoxTM low NOx Burner (15ppm for methane firing units)Burner (15ppm for methane firing units).