ANR Monthly Customer Update – September 2017 September 27, 2017
ANR Monthly Customer Update – September 2017
September 27, 2017
ANR Customer Update Meeting, September 2017
Agenda Presenters
• Storage Update Jeff Keck, Storage Planning & Development
• Operational Update Alfred F. DeGrazia Jr., Gas Control & Planning
• Noms & Scheduling Ralph Del Rio, Noms & Scheduling
2
Storage Update
Jeff Keck – Storage Planning and Development
EIA Storage Position: The Big Picture
DateANR’s Reported EIA Storage Inventory
(MMcf)
9/15/2017 203,082
9/16/2016 203,272
9/18/2015 165,862
3.408 Tcf as of Friday, September 15, 2017
Storage Position
Working gas in underground storage compared with the 5-year maximum and minimum
(Volumes in MMcf)
Storage Inventory – 2017 vs. 2016
% of Storage
Capacity 2017 Percent Full
YOY Difference
(2016 - 2017)
Sep 21st
ANR Pipeline 83% 1.1%
ANRSCo 89% -3.3%
Blue Lake 94% -0.1%
Eaton Rapids 63% -23.5%
• The current volume in storage exceeds the five-year average level by roughly 20 Bcf. This has moderated over the last three months from about 40 Bcf over the five-year level earlier in the summer and is well within reasonable parameters.
• Injections for the summer have averaged 478 MMcf/d. Over the last month, injections have averaged 561 MMcf/d. The impact of the heat wave over the last several days was not reflected in these numbers since it mostly occurred after September 21.
• There are no concerns with meeting firm customer demand for injection.
Storage Operations
Operational UpdateAlfred F. DeGrazia Jr.
Gas Control & Operations Planning
ANR August Average Daily System Flows
ANR
Great Lakes
9
1
2
3
4
5
6
7
8
9
SW Headstation: 624-MDth/641-MDth/d
Wisconsin: 480-MDth/2,244-MDth/d
Michigan Leg South flows through St. John averaged 1,059-MDth/1,261-MDth per day in the eastbound direction. July flows averaged 1,162-MDth/d
The Michigan Leg North volumes flowed northbound with average deliveries of 1,416-MDth/d between Bridgman and Woolfolk compressor stations. July flows averaged 1,343-MDth/d
ANRPL Storage injections averaged 608-MDth/d
In the Southeast Area, offshore receipts averaged 193-MDth/day and deliveries averaged 644-MDth/day between Eunice and Patterson and Eunice and Grand Chenier
Flows along the south end of the Southeast Mainline averaged 758-MDth/d southbound through the Jena Compressor Station.
On the north end of the Southeast Mainline, REX Shelbyville receipts averaged 1,241-MDth/d – a minimal decrease over July receipts. Flows into Defiance from the south averaged 1,014-MDth/d versus 948-Mdth/d in July
Deliveries to MichCon at Willow Run averaged 796-MDth/day –an 8% increase over July levels
1
2
3
4
5
6
7
8
9
ANR Monthly Deliveries to Power Plants
1
0
103.7
73.282.1
121.5135.1
230.4
127.4 129.3
232.5
284.9
173.2
0
25
50
75
100
125
150
175
200
225
250
275
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
MM
Dth
Dec
Nov
Oct
Sep
Aug
Jul
Jun
May
Apr
Mar
Feb
Jan
ANR Posted Capacity Impacts September 2017
Posted Capacity Restrictions as of September 2017
Eunice Eastbound - DRN #226641 PSO ID #8172
29-MMcf/d (leaving 588-MMcf/d available) 7/26 - 10/31
St. Martinville LRC Delivery - DRN #218192 CN ID #8305
Limiting delivery nominations to 65-MMcf/d 9/16 - 10/15
Jena Southbound - DRN #9505489 CN ID #8318
247-MMcf/d (leaving 903-MMcf/d available) 9/25 - 10/31
Slaughters TGT Delivery - DRN #6470 CN ID #8306
Shut-in due to pressure incompatibility 9/16 - 10/15Lebanon Dominion - DRN #1387755 CN ID #8327Scheduling Alert to ANR customers for Dominion Shut-in
Pipeline maintenance on Dominion side 10/2 - 10/6
SWML Northbound - DRN #226630 PSO ID #8327
90-MMcf/d (leaving 609-MMcf/d) 9/25 - 9/30
50-MMcf/d (leaving 649-MMcf/d) 10/1 - 10/3
90-MMcf/d (leaving 609-MMcf/d) 10/4 - 10/5
50-MMcf/d (leaving 649-MMcf/d) 10/6 - 10/10
90-MMcf/d (leaving 609-MMcf/d) 10/11 - 10/12
50-MMcf/d (leaving 649-MMcf/d) 10/13 - 10/16
80-MMcf/d (leaving 619-MMcf/d) 10/17 - 10/31
ANR Posted Capacity Impacts September 2017
Posted Capacity Restrictions as of September 2017
Marshfield Viking Gas Interconnect DRN #288733 PSO ID #8314
Scheduling to 180-MMcf/d 9/18 - 10/5
Crystal Falls-Fortune Lake Interconnect DRN #11661 PSO ID #8329Scheduling to 235-MMcf/d 9/27 - 10/31
St. John Eastbound - DRN #226633 PSO ID #8303
75-MMcf/d (leaving 1,206-MMcf/d available) 9/13 - 10/9
720-MMcf/d (leaving 561-MMcf/d available) 10/10 - 10/14
420-MMcf/d (leaving 861-MMcf/d available) 10/15 - 10/19
Joliet NGPL - DRN #2610 PSO ID #8316
Scheduling Firm Primary Only 10/2 - 10/9
2017 ANR Mainline Compressor and Pipeline Maintenance Projects
ANR
Great Lakes
SEML Compressor OverhaulsPosted September capacity impacts to Eunice
Eastbound, Eunice Southbound, Jena South Planned Maintenance
*Will impact IT and FS Services
13
SWML Pipeline Integrity DigsMissouri/Illinois Area Digs through August and
SeptemberSWML Compressor Overhauls
*Will impact IT and FS Services
Tie-Line Compressor OverhaulNo impact to services
HCA Class Change ProjectSt. John, Indiana
10/10 – 10/19*Will impact IT, FS and portion of FP
Pipeline Integrity Projects MLS
*Commissioning activities ongoing for SEML Overhauled Units – Delhi, Sardis, Celestine
and Shelbyville
• Service Impacts are estimates. Actual nominations, markets, weather and pipeline conditions, etc., will determine any level of curtailments.
• Projects may be added, altered, delayed, or cancelled. Emergent work cannot be planned and will happen from time to time.
• Notice of such planned work, including any additions or changes, will be provided via a posting under the Planned Service Outage (PSO) category in GEMS. Emergent work will be posted under the Critical Notice category as soon as possible.
14
Outage Postings
ANRPL Nominations & Scheduling
Ralph Del Rio
Noms & Scheduling
Westrick Interconnect & Eunice Total Capacity
ANR
Great Lakes
WestrickDRN # 513105
Westrick Interconnect (513105)
• Effective Date 9/1/17• Operational Capacity
1,776,500-MDth• Average daily flow rate
625,000- MDth• Decrease volumes at Rex
Shelbyville receipt & Defiance South flow thru
Eunice Total 906,612-MDTH
• Eunice Southbound (DRN # 226640)
• Eunice Eastbound (DRN # 226641)
• Duralde Evangeline Delivery (DRN # 312115)
Eunice TotalDRN # 505592
• We encourage all Shippers with FSS storage accounts with ratchet levels to monitor and review their activity in GEMS under the Storage Ratchet Summary & Storage Overrun Summary screens as follows:
ANRPL Storage Balance Reminder
17
ANR Customer Assistance
For further customer assistance concerning scheduling priorities related to your specific firm service agreement(s),
firm service rights and features, GEMS new user training, virtual and face-to-face meetings, etc., please contact
the ANR Noms & Scheduling Team:
Toll Free: 1-800-827-5267
Group Email: [email protected]