Acquisition Notice Posting Headquarters Acquisition Division ANNOUNCEMENT OF CUBESAT LAUNCH INITIATIVE General Information Solicitation Number: NNH14HEOMD001L Reference Number: N/A NAIS Posted Date: Jul 31, 2014 FedBizOpps Posted Date: Jul 31, 2014 Response Date: Nov 25, 2014 Recovery and Reinvestment Act Action?: NO Classification Code: A -- Research and Development NAICS Code: 541712 - Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology) Set-Aside Code: N/A Internet Address: http://prod.nais.nasa.gov/cgi- bin/eps/bizops.cgi?gr=D&pin=04#161828 Office Address NASA/Goddard Space Flight Center, NASA Headquarters Acquisition Branch, Code 210.H, Greenbelt, MD 20771 Page 1 of 12
222
Embed
ANNOUNCEMENT OF CUBESAT LAUNCH INITIATIVE · 2014-07-31 · Acquisition Notice Posting Headquarters Acquisition Division ANNOUNCEMENT OF CUBESAT LAUNCH INITIATIVE General Information
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
1.0 INTRODUCTION AND BACKGROUND The National Aeronautics and Space Administration (NASA) Human Exploration and Operations Mission Directorate (HEOMD) anticipates making launch opportunities for a limited number of CubeSats available on launches, as well as deployments from the International Space Station, currently planned for 2015-2018. The CubeSat Launch Initiative is a project to provide viable launch opportunities for CubeSat payloads as auxiliary payloads on planned missions. More information about the CubeSat Launch Initiative, including previously-selected Respondents, is available at: http://www.nasa.gov/directorates/heo/home/CubeSats_initiative.html. A CubeSat is a type of space research nanosatellite. The base CubeSat dimension is 10x10x11 centimeters (one “Cube” or “1U”). CubeSats supported by this Launch Initiative include volumes of 1U, 2U, 3U, and 6U. CubeSats of 1U, 2U and 3U size typically have a mass of 1.33 kilograms per 1U Cube. A 6U CubeSat typically has a mass of 12 kg. The final mass is dependent upon the selected dispenser. NASA anticipates using its authority to enter into one or more collaborative Agreements with selected Respondents (“Collaborators”) to support the CubeSat Launch Initiative. During the project, NASA will provide integration and other services as necessary to complete the launch activity. The CubeSat Launch Initiative is open to NASA centers, U.S. not-for-profit organizations, and accredited U.S. educational organizations. Participation in the CubeSat Launch Initiative will be contingent upon selection by NASA and negotiation of an appropriate Agreement between NASA and the Collaborator. Proposed CubeSat investigations must address an aspect of science, technology development, education, or operations encompassed by NASA’s strategic goals and outcomes as identified in the NASA Strategic Plan. The NASA 2014 Strategic Plan is available at: http://www.nasa.gov/sites/default/files/files/2014_NASA_Strategic_Plan.pdf NASA will not transfer any funds to selected Collaborators under Agreements negotiated in response to this Announcement. Collaborators will be responsible for securing funding to support the development of their CubeSat payload and for all other costs incurred by the Collaborator to participate in the CubeSat Launch Initiative. Moreover, a Collaborator may be required to reimburse NASA for the direct costs of the integration and launch activities in the event the Collaborator terminates the Agreement.
2.0 GENERAL INFORMATION Agency Name: NASA (National Aeronautics and Space Administration) Opportunity Title: Announcement of CubeSat Launch Initiative Response Date: Electronic Proposals may be received until the close date on November 26, 2014 at 4:30 P.M. EST via email to [email protected]. Points of Contact: If you have any questions concerning this opportunity please contact: Anne Sweet Jason Crusan Telephone: 202-358-3784 202-358-0635 Email: [email protected][email protected] Instrument Type(s): NASA may use Agreements negotiated under this Announcement in the form of Space Act Agreements (SAAs) or Cooperative Research and Development Agreements (CRADAs). Evaluation Panel: Government personnel from NASA will participate in the evaluation of Proposals. All contractor personnel participating in the evaluation will be bound by conflict of interest provisions and appropriate non-disclosure requirements to protect proprietary information. Selection Notification: Selection is anticipated by February 6, 2015. Submission Instructions: All Proposals submitted in response to this Announcement must be emailed to [email protected]. Paper submissions will not be reviewed. Any material submitted in response to this Announcement will not be returned. Proposals may be submitted at any time before the response date. Proposals received by the Government after the response date and time will not be considered. If a Respondent is concerned about information security during transmission NASA has the ability to accept secure transmission. Contact the Point of Contact (Jason Crusan) for secure transmission requirements. Files must be submitted in a single bookmarked and searchable PDF of less than 10 Mb. NASA will not issue paper copies of this Announcement. This Announcement does not constitute an obligation for NASA to begin negotiations or enter into agreements with any Respondents to carry out this activity. NASA reserves the right to select for negotiations all, some, or none of the Proposals submitted in response to this Announcement. NASA provides no funding for reimbursement of Proposal development costs. It is NASA’s policy to safeguard all Proposals as confidential and privileged information, as provided by law. NASA will not, without permission of the Respondent, use the Proposal contents for other than evaluation purposes.
It is not NASA’s intent to publicly disclose proprietary information obtained during this solicitation. To the full extent that it is protected pursuant to the Freedom of Information Act and other laws and regulations, information identified by a Respondent as “Proprietary or Confidential” will be kept confidential. NASA reserves the right to amend or withdraw this Announcement at any time. 3.0 ELIGIBILITY INFORMATION
3.1 Eligible Applicants
U.S. organizations meeting the following requirements are eligible to submit Proposals in response to this Announcement.
• The Respondent must be from a NASA center, a U.S. not-for-profit organization, or
U.S. accredited educational organization.
• The Respondent is responsible for securing funding to support the development of the CubeSat payload and for all other costs incurred by the Respondent to support its participation in the project.
• The Respondent may be required to provide NASA reimbursement of direct costs of
the integration and launch activities in the event the collaborator fails to meet its obligations under the collaboration agreement, or terminates the agreement.
3.2 Eligible Payloads
Benefit to NASA. Each CubeSat investigation must demonstrate a benefit to NASA by addressing goals and objectives of the NASA Strategic Plan. More specifically, each CubeSat investigation must address an aspect of science, technology development, education, or operations encompassed by NASA’s strategic goals and outcomes as identified in the NASA Strategic Plan.
Merit Review. Prior to submission of the Proposal, each CubeSat investigation must have passed an intrinsic merit review. In the review, goals and objectives of the proposed investigation must be assessed to determine the scientific, educational or technical quality of the investigation. The review will assess the overall alignment of the proposed investigation in addressing one or more of the science, technology, education, or operations goals or objectives identified in the NASA Strategic Plan. The merit review panel should be comprised of individuals not on the project team.
Feasibility Review. Prior to submission of the Proposal, each CubeSat investigation must have passed a feasibility review in which the technical implementation, including feasibility, resiliency, risk and the probability of success, was assessed. The feasibility review panel should be comprised of individuals not on the project team.
Page 4 of 12
Launch Services Requirements. To enhance compatibility with a Primary payload, each CubeSat payload should fully comply with the Launch Services requirements as described in “Launch Services Program, Program Level Dispenser and CubeSat Requirements Document (LSP-Req-317.01).” If a Respondent is unsure of compliance or would like to pursue a waiver to a requirement, the proposal should identify the requirement needing clarification or identify the specific requirement(s) you seek to have waived, and clearly state the rationale for waiver in the proposal. Detailed Launch Services requirements are available at: http://www.nasa.gov/pdf/627972main_LSP-REQ-317_01A.pdf. 3.3 Project Focus Area Proposals must identify a primary and, if appropriate, secondary focus for their CubeSat effort, i.e., whether the Investigation addresses a scientific research question, a technology development/demonstration objective, or an education objective. Additional post-flight NASA-required Collaborator deliverables will depend on the CubeSat project focus and will be specified in the negotiated Agreement.
4.0 PROPOSAL EVALUATION AND SELECTION
4.1 Evaluation and Selection Process
All Proposals will be screened to determine their compliance with the Eligibility (Section 3.0) and Proposal Instructions (Section 5.0) of this Announcement. Proposals that do not comply may be declared noncompliant and rejected without further review. A submission compliance checklist is provided in Section 5.0. This checklist provides Respondents a list of the items that NASA will check for compliance before releasing a Proposal for evaluation.
Proposals deemed compliant with this Announcement will be assessed by the Selection Recommendation Committee against the Evaluation Criteria outlined in Section 4.2. Respondents should be aware that NASA may request clarification of a specific point or points in a Proposal during the evaluation and selection process. Such a request and the Respondent’s response shall be in writing.
The Selection Recommendation Committee members will independently assess the Proposals according to Evaluation Criteria outlined in Section 4.2. Afterwards, the Selection Recommendation Committee will develop a final prioritization based on their assessments of the Proposals.
The Evaluation Criteria below will be used to assess and prioritize the Proposals as described in Section 4.1. The Evaluation Criteria (which are defined more fully in the sections below) are as follows:
• Relevance to one or more NASA Strategic Goals or Objectives;
• Outcome of Scientific, Educational, or Technical Merit Review(s); and
• Outcome of Feasibility Review.
Standard evaluation factors for each of these criteria are described below. The Proposal prioritizations discussed in Section 4.1 will be based on these criteria. Relevance to one or more NASA Strategic Goals or Objectives is weighted 40%, Outcome of Scientific, Educational, or Technical review(s) is weighted 30%, and Outcome of Feasibility Review is weighted 30%. 4.2.2 Relevance to one or more NASA Strategic Goals or Objectives
Each CubeSat investigation must demonstrate a benefit to NASA by addressing goals and objectives of the NASA Strategic Plan.
The following factors will be assessed for the benefit to NASA. Proposals must include sufficient information and supporting details to allow assessment of these factors.
• Does the Proposal demonstrate that the CubeSat investigation provides
benefits to NASA by addressing one or more of the goals and objectives of the NASA Strategic Plan?
• Are these the benefits that were reviewed in the merit review?
• Why is an orbital flight opportunity necessary or advantageous for providing
these benefits to NASA?
4.2.3 Outcome of Scientific, Educational, or Technical Merit Review(s)
Each CubeSat-supported investigation must have passed an intrinsic merit review in which the goals and objectives of the proposed investigation were assessed to determine the scientific, educational or technical quality of the investigation and the overall alignment of the proposed investigation to addressing one or more of the science, technology, education, or operations goals or objectives identified in the NASA Strategic Plan.
Page 6 of 12
Reviewers will assess the following factors. Proposals must include sufficient information and supporting details to allow reviewers to assess these factors. The merit review panel should be comprised of individuals external to the project team.
• What was the merit review process?
• Was the merit review competitive or non-competitive?
• What were the qualifications of the merit review committee members (if
possible identify by name, title, and expertise)?
• What factors did the merit review use to assess merit?
• What was the outcome of the merit review?
• How did the Respondent respond to and/or address the findings of the merit review?
NASA is not specifying how the merit review should be conducted. NASA is, however, requiring that a determination of the merit of the CubeSat investigation be conducted prior to the Proposal being submitted.
Any supporting documentation from the merit review that is useful in supporting this assessment may be included in the Proposal as an Appendix.
4.2.4 Outcome of Feasibility Review
Each CubeSat investigation must have passed a feasibility review in which the technical implementation, including feasibility, resiliency, and the probability of success, was assessed.
Reviewers will assess the following factors. Proposals must include sufficient information and supporting details to allow reviewers to assess these factors. The feasibility review panel should be comprised of individuals external to the project team.
• What was the feasibility review process?
• What were the qualifications of the feasibility review committee members (if
possible identify by name, title, and expertise)?
• What factors did the feasibility review use to assess feasibility?
• How were the management team roles, experience, expertise, and the
Page 7 of 12
organizational structure of the team assessed?
• How was the technical development risk associated with the overall CubeSat mission assessed?
• If the CubeSat investigation requires critical technology development for
flight readiness, how were the areas assessed, and how were the plans for completing technology development assessed?
• Concerning the development of the CubeSat for flight, how was the
probability of success assessed?
• What was the outcome of the feasibility review?
• How did Respondent respond to and/or address the findings of the feasibility review?
• Is there sufficient financial support for the development of the CubeSat
payload and for all other costs incurred by Respondent to support its participation in the project?
NASA is not specifying how the feasibility review should be conducted. NASA is, however, requiring that a determination of the feasibility of the CubeSat investigation be conducted prior to the Proposal being submitted.
Any supporting documentation from the feasibility review that is useful in supporting the assessment, including project schedules, risk management plans, and/or project development plans, may be included in the Proposal as an Appendix.
4.3 Selection Factors
As described in Section 4.1, the results of the Proposal evaluations based on the criteria above and the subsequent Selection Recommendation Committee deliberations will be considered in the selection process. The Selection Recommendation Committee may take into account a variety of programmatic factors in deciding whether or not to select Proposals, including, but not limited to, available launches, Launch Service requirements waiver requests, and maintaining a programmatic and scientific balance across the sponsoring organizations. In support of the White House Maker Initiative, special consideration may be given to proposals that geographically broaden program participation to states that have not previously been selected by the CubeSat Launch Initiative. Those states include: Arkansas, Delaware, District of Columbia, Georgia, Idaho, Iowa, Kansas, Maine, Minnesota, Mississippi, Nebraska, Nevada, New Hampshire, New Jersey, North Carolina, Oklahoma, Oregon, South Carolina, South Dakota, Washington, West Virginia, Wyoming and Puerto Rico. Previous CubeSat Launch Initiative selectees are
Page 8 of 12
encouraged to partner with and/or mentor organizations from these states.
The Selection Authority shall be the Associate Administrator for Human Exploration and Operations.
4.4 Selection Notification
The Selection Recommendation Committee will produce a prioritized list of proposed CubeSat investigations. NASA will negotiate agreements with respondents recommended for selection as manifest opportunities are available. Selection recommendation does not guarantee the availability of a launch opportunity. Selected Proposals from any prior announcements that resulted in a prioritization for a launch opportunity will generally take precedence over the results of this Announcement. Manifest order will generally be in priority order unless critical needs dictate an earlier launch or available flight opportunities enable an earlier launch. NASA will notify all Respondents of the results of the evaluation and prioritization process. After the completion of the evaluation and prioritization process, NASA will begin negotiations with the selected Respondent in priority order from the Selection Recommendation Committee. The purpose of the negotiations is to define the terms and conditions of the Agreement supporting Collaborators’ participation in the project and to align the recommended Proposals with the anticipated launch manifest. The Selection Authority will make the final selection of those approved for this opportunity after the completion of negotiations, depending on the outcome of the negotiations.
5.0 PROPOSAL INSTRUCTIONS Proposals must comply with the following requirements. Page Limitations
Proposal Section Total Pages
Proposal Cover Page 1
Proposal Title Page 1
Points of Contact 1
Proposal Abstract 750 words
Proposal Detail 10
Appendix
Resumes No Page Limit
Compliance Documents No Page Limit
Page 9 of 12
Additional Documentation No Page Limit
Pages in excess of the page limitations for each section will not be evaluated. A page is defined as one (1) sheet of 8½ x 11 inches using a minimum of 12-point font size for text and 8-point font size for graphs. Files must be submitted in a single bookmarked and searchable PDF of less than 10 Mb. There is no limit on appendix documentation. The intent is to allow Proposals to include current documentation in its current format without having to alter or create any documents. The Proposal must include the following sections, in this order: Proposal Cover Page: Title of Announcement and Proposal Contact Information. An optional graphic image may be included. Proposal Title Page: Title and Notice of Restriction on Use and Disclosure of Proposal Information, if any; CubeSat Mission Parameters and CubeSat Project Details Tables (see below for Table format) Points of Contact: List contact information for all Points of Contact (POCs), including a Technical Point of Contact. For each POC, provide:
a. Name b. Title c. Address d. Phone e. Fax f. Email
Proposal Abstract: Executive summary describing the prominent and distinguishing features of the proposed CubeSat. Proposal Detail: The Proposal shall contain sufficient information to enable reviewers to determine whether the Proposal complies with the Eligibility Information (Section 3.0) and to assess the Proposal based on the Evaluation Criteria (Section 4.2). The proposal shall also include:
• CubeSat primary and, if appropriate, secondary focus area: scientific research question, technology development/demonstration, or education.
• CubeSat Development: schedule for remaining CubeSat development that supports a launch in 2015-2018.
• Summary of Requirement compliance or required potential waivers.
Page 10 of 12
• A CubeSat Mission Parameters Table using the following format:
CubeSat Mission Parameters
Mission Name
Mass Cube Size
Desired Orbit Acceptable Orbit Range
400 km @ 51.6 degree incl.
Acceptable – Yes or No
Readiness Date
Desired Mission
Life
Altitude Inclination
• A CubeSat Project Details Table using the following format:
• Funding Commitment Letter(s): letter(s) demonstrating sufficient financial support for
remaining CubeSat development. • Note for Proposals identified with an Education Focus Area: If the proposed CubeSat
includes outreach components, the proposal must include a description of the education plan.
Proposal Appendix:
• Resumes
o Resumes shall be included for key personnel. In general, resumes should be limited to no more than 1-2 pages each.
• Compliance Documents
o Include any documents necessary to supplement the Proposal text and satisfy the requirements of the compliance checklist (see below).
• Additional documentation
o Include any documentation in the appendix that validates or supports the Proposal, such as plans for the remaining CubeSat development, and technical risks and their mitigation plans.
Page 11 of 12
Compliance checklist and required documents
o Respondent is a NASA center, a U.S. not-for-profit organization, or an accredited U.S. educational organization
o Proposal includes demonstration of the benefits to NASA based upon the 2014 NASA Strategic Plan
o Proposal identifies a project focus area o Proposal includes a description of the merit review process and outcome
including review committee membership o Proposal includes a description of the feasibility review process and outcome
including review committee membership o Proposal fully complies with the Launch Services requirements and identifies any
potential waivers o Proposal includes a completed Mission Parameters Table o Proposal includes a completed Project Details Table o Proposal includes a schedule for remaining CubeSat development that supports a
launch in 2015-2018. o Proposal includes funding commitment letter(s) demonstrating sufficient financial
support for remaining CubeSat development
Points of Contact
Name: Ms. Anne E Sweet Title: Launch Services Program Executive Phone: 202-358-3784 Fax: 202-358-2818 E-mail: [email protected]
Name: Mr. Jason C Crusan Title: Director, Advanced Exploration Systems Phone: 202-358-0635 Fax: 202-358-3530 E-mail: [email protected]
Amendment 01 - Posted on Jul 24, 2014 Amendment 02 - Posted on Jul 25, 2014 Amendment 03 - Posted on Jul 31, 2014
Industry Day and Draft RFP Questions and Answers - Posted on Jul 11, 2014
Posted: Jul 31, 2014 Center: MSFCTitle: MSFC INFORMATION TECHNOLOGY SERVICES MITSSolicitation: NNM14494731R-1 Response Due: Aug 13, 2014Synopsis - Posted on May 22, 2014Solicitation - Posted on Jun 26, 2014
Amendment 01 - Posted on Jul 22, 2014Amendment 02 - Posted on Jul 23, 2014Amendment 03 - Posted on Jul 25, 2014 Amendment 04 - Posted on Jul 31, 2014
Posted: Jul 31, 2014 Center: MSFCTitle: ENGINE SECTION TEST - UPPER SPIDER ASSEMBLYSolicitation: NNM14520350Q Response Due: Aug 22, 2014Synopsis/Solicitation Combo - Posted on Jul 31, 2014 Terms and Conditions, SOW, DPD, Quote Inst, etc. - Posted on Jul 31, 2014
Posted: Jul 31, 2014 Center: KSCTitle: REVITALIZE KENNEDY SPACE CENTER WATER WASTEWATER SYSTEMS - PHASE 4A NASA CAUSEWAYSolicitation: NNK14510297R Response Due: Aug 22, 2014Synopsis - Posted on Jun 09, 2014Solicitation - Posted on Jul 23, 2014Site Visit Sign-in Sheet 7-31-2014 - Posted on Jul 31, 2014
Posted: Jul 31, 2014 Center: GSFCTitle: SIGNAL AND SPECTRUM ANALYZERSolicitation: NNG14507923Q Response Due: Jul 31, 2014Synopsis/Solicitation Combo - Posted on May 28, 2014
Amendment 01 - Posted on Jun 19, 2014Amendment 02 - Posted on Jul 24, 2014
On-Line RFQ - Posted on Jul 31, 2014 SOW - Posted on May 29, 2014Statement of Work - Posted on Jun 19, 2014Statement of Work revised - Posted on Jul 24, 2014
Posted: Jul 31, 2014 Center: GRCTitle: NASA GLENN RESEARCH CENTER TECHNOLOGY TRANSFER OFFICE SUPPORT SERVICESSolicitation: NNC14ZCH026R Response Due: Jul 31, 2014
Synopsis - Posted on Jul 15, 2014NNC14ZCH026R - Synopsis Questions and Answers - Posted on Jul 28, 2014 NNC14ZCH026R - Synopsis Question and Answers (2) - Posted on Jul 31, 2014
Posted: Jul 31, 2014 Center: LARCTitle: ELECTRONIC MECHANICAL AND COMPOSITE HARDWARE FABRICATION SUPPORT SERVICES IISolicitation: NNL14ZB1002R Response Due: N/ASynopsis - Posted on Jun 27, 2014Draft Document - Posted on Jul 14, 2014Bidder's Resource File - Posted on Jul 16, 2014Pre-Solicitation Conference Slides and Attendees - Posted on Jul 31, 2014
Posted: Jul 30, 2014 Center: ARCTitle: RFI - AMES PROFESSIONAL ADMINISTRATIVE SUPPORT SERVICESSolicitation: APASS-RFI-2014-L Response Due: Aug 27, 2014Synopsis - Posted on Jul 30, 2014
Posted: Jul 30, 2014 Center: MSFCTitle: INTER-TANK TEST-LOWER LOAD RINGSolicitation: NNM14505942Q Response Due: Aug 20, 2014Synopsis/Solicitation Combo - Posted on Jul 30, 2014 Terms and Conditions, Drawings, Past Performance - Posted on Jul 30, 2014
Posted: Jul 30, 2014 Center: JSCTitle: INTERNATIONAL SPACE STATION COMMERCIAL RESUPPLY SERVICES 2Solicitation: NNJ14507542R Response Due: Aug 06, 2014Synopsis - Posted on Jun 16, 2014
Modification 01 - Posted on Jul 30, 2014 Draft Document - Posted on Jun 16, 2014
Posted: Jul 30, 2014 Center: GSFCTitle: BIT ERROR RATE TESTERSolicitation: NNG14510062L Response Due: Aug 10, 2014Synopsis - Posted on Jul 30, 2014
Posted: Jul 30, 2014 Center: MSFCTitle: RACKMOUNT EXPANSION SYSTEMSolicitation: NNM14521678Q Response Due: Aug 06, 2014Synopsis/Solicitation Combo - Posted on Jul 30, 2014 Terms and Conditions - Posted on Jul 30, 2014
Posted: Jul 30, 2014 Center: KSCTitle: SCRAMNET INTERFACESolicitation: NNK14521095Q Response Due: Aug 14, 2014Synopsis - Posted on Jul 30, 2014
Posted: Jul 30, 2014 Center: GSFCTitle: CHIP ON BOARD FOCAL PLANE ARRAY ASSEMBLYSolicitation: NNG14521131Q Response Due: Aug 11, 2014Synopsis - Posted on Jul 30, 2014
Posted: Jul 30, 2014 Center: GRCTitle: FY14 REPAIR ELECTRICAL DISTRIBUTION SYSTEMS PHASE 2 HIGH VOLTAGE REPAIRSSolicitation: NNC14ZCH027E Response Due: Aug 11, 2014Synopsis - Posted on May 22, 2014Solicitation - Posted on Jul 11, 2014Amendment 1 - Posted on May 22, 2014Response to question for site visit - Posted on Jul 14, 2014Site Visit Attendee’s on 7-17-14 - Posted on Jul 24, 2014 Amendment 2 RFI Answers to Questions - Posted on Jul 28, 2014 Amendment 3 - Posted on Jul 29, 2014 Amendment 4 - Posted on Jul 30, 2014
Posted: Jul 30, 2014 Center: GSFCTitle: FREEFLYER MISSION LICENSE RENEWAL AND MAINTENANCESolicitation: NNG14517474L Response Due: Aug 14, 2014Synopsis - Posted on Jul 30, 2014
Posted: Jul 30, 2014 Center: GSFCTitle: CIVILITY CREATIVE LEARNING GROUP CONSULTINGSolicitation: NNG14513921-Q Response Due: Aug 04, 2014Synopsis/Solicitation Combo - Posted on Jul 30, 2014 On-Line RFQ - Posted onSolicitation - Posted on Jul 30, 2014
Posted: Jul 30, 2014 Center: MSFCTitle: 7 MONTHS EXTENSION TO THE MARSHALL ENGINEERING TECHNICIANS AND TRADES SUPPORT SERVICES CONTRACT - METTSSolicitation: NNM14METTSQ Response Due: Aug 14, 2014Synopsis - Posted on Jul 30, 2014
Posted: Jul 30, 2014 Center: LARCTitle: FLIR HIGH SPEED INFRARED CAMERA WITH RESEARCHIR SOFTWARESolicitation: NNL14520587Q Response Due: Jul 18, 2014Synopsis/Solicitation Combo - Posted on Jul 16, 2014On-Line RFQ - Posted on Jul 30, 2014
Posted: Jul 29, 2014 Center: JSCTitle: PROCUREMENT OF SABATIER SYSTEM WITH HAMILTONSolicitation: NNJ14ZBG074L Response Due: Aug 13, 2014Synopsis - Posted on Jul 29, 2014
Posted: Jul 29, 2014 Center: JSCTitle: NASA OPEN INNOVATION SERVICESSolicitation: NNJ15517388L Response Due: Aug 13, 2014Synopsis - Posted on Jul 29, 2014
Posted: Jul 29, 2014 Center: GSFCTitle: GEOPHYSICS GEODYNAMICS AND SPACE GEODESY SUPPORTSolicitation: NNG14469449R Response Due: Aug 29, 2014Synopsis - Posted on Feb 25, 2014
Posted: Jul 29, 2014 Center: LARCTitle: COAXIAL CABLESSolicitation: NNL14518808Q Response Due: Aug 05, 2014Synopsis/Solicitation Combo - Posted on Jul 29, 2014 On-Line RFQ - Posted on Jul 29, 2014
Posted: Jul 29, 2014 Center: KSCTitle: KENNEDY SPACE CENTER PROPELLANTS AND LIFE SUPPORT SERVICESSolicitation: NNK15ZOR001L Response Due: Jul 30, 2014Synopsis - Posted on Jun 04, 2014
Modification 01 - Posted on Jun 17, 2014Modification 02 - Posted on Jul 29, 2014
RFI Questions and Answers - Posted on Jun 17, 2014
Posted: Jul 29, 2014 Center: MSFCTitle: MIL-STD-1553 PCI EXPRESS I O BOARDS BU-67106K400R-JL0Solicitation: NNM14521676Q Response Due: Aug 04, 2014Synopsis - Posted on Jul 29, 2014
Posted: Jul 29, 2014 Center: KSCTitle: IGNITION OVER PRESSURE AND SOUND SUPPRESSION SYSTEMS POST LIFTOFF BYPASS LAUNCH COMPLEX 39BSolicitation: NNK14518671R Response Due: Aug 21, 2014Synopsis - Posted on Jul 02, 2014Solicitation - Posted on Jul 22, 2014Date Clarification - Posted on Jul 03, 2014NNK14518671R - Site Visit Sign In Sheet - Posted on Jul 29, 2014
Response Due: Aug 06, 2014Synopsis/Solicitation Combo - Posted on Jul 29, 2014 On-Line RFQ - Posted on Jul 29, 2014
Posted: Jul 29, 2014 Center: JSCTitle: JOHNSON SPACE CENTER "JSC" OFFICE OF PROCUREMENT INDUSTRY FORUMSolicitation: NNJ14ZBD001S Response Due: Aug 11, 2014Synopsis - Posted on Jul 11, 2014
Modification 01 - Posted on Jul 29, 2014
Posted: Jul 29, 2014 Center: GRCTitle: EARLY CAREER INITIATIVE PROGRAM PARTNERSSolicitation: NNC14ZT0011L Response Due: Jul 31, 2014Synopsis - Posted on Jun 02, 2014
Modification 01 - Posted on Jun 24, 2014Modification 02 - Posted on Jul 02, 2014Modification 03 - Posted on Jul 29, 2014
ECI Cover page - Posted on Jun 02, 2014
Posted: Jul 28, 2014 Center: LARCTitle: IMAGING SPECTROMETER SYSTEMSolicitation: NNL14517496Q Response Due: Aug 05, 2014Synopsis/Solicitation Combo - Posted on Jul 28, 2014 On-Line RFQ - Posted on Jul 28, 2014 Specifications - Posted on Jul 28, 2014
Solicitation: NNK14ZOW001L Response Due: Aug 11, 2014Synopsis - Posted on Jul 28, 2014 Vehicle Lease Table - Posted on Jul 28, 2014
Posted: Jul 28, 2014 Center: JSCTitle: TEST EVALUATION AND SUPPORT TEAM 2Solicitation: NNJ14522358L Response Due: Aug 14, 2014Synopsis - Posted on Jul 28, 2014 Statement of Work (SOW) - Posted on Jul 28, 2014 Organizational Conflict of Interest RFI - Posted on Jul 28, 2014 Organizational Conflict of Interest Guide - Posted on Jul 28, 2014
Posted: Jul 28, 2014 Center: JSCTitle: HUMAN HEALTH AND PERFORMANCE CONTRACTSolicitation: NNJ14399614L Response Due: N/ASynopsis - Posted on May 19, 2014
Modification 01 - Posted on May 30, 2014Modification 02 - Posted on Jun 19, 2014Modification 03 - Posted on Jul 03, 2014Modification 04 - Posted on Jul 17, 2014Modification 05 - Posted on Jul 28, 2014
RFI on Potential Procurement Approach - Posted on May 19, 2014Sources Sought - Posted on May 19, 2014Interested Parties List - Posted on Jun 19, 2014Revised Interested Parties List - Posted on Jul 03, 2014Industry Day Charts - Posted on Jul 17, 2014Industry Day Acronym List - Posted on Jul 17, 2014Updated Interested Parties List - Posted on Jul 28, 2014 Industry Day Questions and Answers - Posted on Jul 28, 2014
Posted: Jul 28, 2014 Center: GSFCTitle: MICRO-HYPERSPEC VNIR E-SERIES CONCENTRIC IMAGING SPECTROMETER WITH LENS AND SHUTTERSolicitation: NNG14518144L Response Due: Aug 05, 2014Synopsis - Posted on Jul 28, 2014
Posted: Jul 28, 2014 Center: LARCTitle: PRELERT ANOMALY DETECTIVE FOR SPLUNK PERPETUAL LICENSE AND ANNUAL SUPPORTSolicitation: NNL14521349Q Response Due: Aug 04, 2014Synopsis/Solicitation Combo - Posted on Jul 28, 2014 On-Line RFQ - Posted on Jul 28, 2014
Title: FACILITIES MAINTENANCE SERVICES AT NASA AMES RESEARCH CENTERSolicitation: NNA14497087-RFI Response Due: Aug 15, 2014Synopsis - Posted on Jan 13, 2014
Modification 01 - Posted on Feb 03, 2014Draft Document - Posted on Jul 18, 2014Attachment 1 - Posted on Jan 13, 2014Notice of Industry Day - Posted on Jul 28, 2014
Posted: Jul 28, 2014 Center: LARCTitle: MANIPULATOR INSTRUMENTATION MOTORS AND MOTOR CONTROL HARDWARESolicitation: NNL14521362Q Response Due: Aug 04, 2014Synopsis - Posted on Jul 28, 2014
Posted: Jul 28, 2014 Center: LARCTitle: DIGITAL DELAY PULSE GENERATORSolicitation: NNL14516897Q Response Due: Aug 04, 2014Synopsis/Solicitation Combo - Posted on Jul 28, 2014 On-Line RFQ - Posted on Jul 28, 2014
Posted: Jul 28, 2014 Center: GRCTitle: OST- BACK UP STORAGE SOLUTIONSSolicitation: NNC14VC42P Response Due: N/ASynopsis - Posted on Jul 28, 2014
Posted: Jul 28, 2014 Center: LARCTitle: INTEGRATING SPHERE UNIFORM SPECTRAL SOURCE SYSTEMSolicitation: NNL14521145Q Response Due: Aug 04, 2014Synopsis/Solicitation Combo - Posted on Jul 28, 2014 On-Line RFQ - Posted on Jul 28, 2014 Specifications - Posted on Jul 28, 2014
Posted: Jul 28, 2014 Center: LARCTitle: ACOUSTIC MEASUREMENTS OF A HIGH LIFT MODEL IN A KEVLAR WALL TUNNELSolicitation: NNL14516058Q Response Due: Aug 04, 2014Synopsis - Posted on Jul 28, 2014
Posted: Jul 28, 2014 Center: GRCTitle: S3 RESEARCH POD HARDWARESolicitation: NNC14071014Q Response Due: Aug 06, 2014Synopsis/Solicitation Combo - Posted on Jul 28, 2014 S3 Research Pod Hardware - Posted on Jul 28, 2014
Posted: Jul 28, 2014 Center: GSFCTitle: SOFTWARE ENGINEERING SERVICES II - SES IISolicitation: NNG14498942R-3 Response Due: N/ASynopsis - Posted on Jun 24, 2014Draft Document - Posted on Jun 24, 2014INTERESTED PARTIES LIST - Posted on Jun 24, 2014SES II Interested Parties List Amendment 1 - Posted on Jul 01, 2014SES II Interested Parties List Amendment 2 - Posted on Jul 28, 2014 SES II Interested Parties List Amendment 3 - Posted on Jul 28, 2014
Posted: Jul 28, 2014 Center: KSCTitle: REFURBISH AND UPGRADE WATER SYSTEM LC-39B PHASE3Solicitation: NNK14520196R Response Due: Aug 28, 2014Synopsis - Posted on Jul 14, 2014Solicitation - Posted on Jul 28, 2014
Posted: Jul 28, 2014 Center: GRCTitle: VADATECH 40G MICROTCA CHASSIS PLATFORM SOLE SOURCE SYNOPSISSolicitation: NNC14518446Q Response Due: Aug 01, 2014Synopsis - Posted on Jul 28, 2014
Posted: Jul 28, 2014 Center: GRCTitle: B351 WAREHOUSE ADDITION PHASE 1 PROJECTSolicitation: NNC14ZFD028E Response Due: Aug 08, 2014Synopsis - Posted on May 22, 2014Solicitation - Posted on Jun 25, 2014
Amendment 01 - Posted on Jul 11, 2014Amendment 1 - Posted on May 22, 2014AMENDMENT 2 - Posted on Jun 25, 2014100% PLANS AND SPECS - Posted on Jun 25, 2014ATTACHMENTS A,B - Posted on Jun 27, 2014B351 Warehouse Addition Sign In Sheets - Posted on Jul 11, 2014Amend 4 questions and answers revised drawings - Posted on Jul 28, 2014
Title: THIS POSTING IS PUT OUT BY VENCORE WHO HAS THE ESC WHICH IS A PRIME CONTRACT TO NASA. THE SPEC IS POSTED TO OBTAIN INTERESTED PARTIES.Solicitation: ESC-14172-LAM Response Due: Aug 11, 2014Synopsis - Posted on Jul 28, 2014
Posted: Jul 28, 2014 Center: KSCTitle: ULTRA HIGH PRESSURE SYSTEMSolicitation: NNK14517518Q Response Due: Aug 04, 2014Synopsis/Solicitation Combo - Posted on Jul 24, 2014
Amendment 01 - Posted on Jul 28, 2014 NNK14517518Q - Posted on Jul 24, 2014
Posted: Jul 28, 2014 Center: KSCTitle: KENNEDY SPACE CENTER FACILITIES MAINTENANCE SERVICESSolicitation: NNK14521202L Response Due: Aug 07, 2014Synopsis - Posted on Jul 16, 2014
Modification 01 - Posted on Jul 28, 2014
Posted: Jul 25, 2014 Center: AFRCTitle: TEST CELL WITH ALLISON 250 TURBINE ENGINESolicitation: NND14514974Q Response Due: Aug 01, 2014Synopsis/Solicitation Combo - Posted on Jul 15, 2014On-Line RFQ - Posted onSupporting Documentation - Posted on Jul 15, 2014Response to Questions - Posted on Jul 22, 2014Additional Questions and Responses - Posted on Jul 25, 2014
Posted: Jul 25, 2014 Center: ARCTitle: LOW EARTH ORBIT HOSTED PAYLOAD AND SERVICES OPPORTUNITIES AND ACCOMMODATIONSSolicitation: NNA14ZBN002L Response Due: Aug 20, 2014Synopsis - Posted on Jul 25, 2014
Posted: Jul 25, 2014 Center: GRCTitle: SOLAR ARRAY SYSTEMS- ADDITIONAL TESTING AND ASSESSMENT OF MECHANICAL STRUCTURESSolicitation: NNC14ZCH015Q Response Due: Jun 25, 2014Synopsis - Posted on Jun 04, 2014
Justification and Approval - Posted on Jul 25, 2014
Title: NASA LARC OCCUPATIONAL HEALTH PROGRAM SUPPORT SOURCES SOUGHTSolicitation: NNL14OHPSC Response Due: Aug 07, 2014Synopsis - Posted on Jul 22, 2014
Modification 01 - Posted on Jul 25, 2014
Posted: Jul 25, 2014 Center: AFRCTitle: REPAIR OF INERTIAL NAVIGATION UNITSSolicitation: NND14519697Q Response Due: Aug 12, 2014Synopsis - Posted on Jul 25, 2014
Posted: Jul 25, 2014 Center: MSFCTitle: SOFTWARE UPGRADE TO EXISTING ADVANCING FRONT LOCAL RECOMBINATION THREE-DIMENSIONAL MESH GENERATION SOFTWARE.Solicitation: NNM14520911Q Response Due: Aug 01, 2014Synopsis - Posted on Jul 25, 2014
Posted: Jul 25, 2014 Center: KSCTitle: GASEOUS HYDROGENSolicitation: NNK14518885Q Response Due: Aug 11, 2014Synopsis/Solicitation Combo - Posted on Jul 25, 2014 Solicitation - Posted on Jul 25, 2014
Posted: Jul 25, 2014 Center: HQTitle: U.S. GLOBAL CHANGE RESEARCH SUPPORT PROGRAM NATIONAL COORDINATION OFFICE SUPPORT SERVICESSolicitation: NNH14497394R Response Due: Aug 05, 2014Synopsis - Posted on Jul 15, 2014Draft Document - Posted on Jul 25, 2014
Synopsis/Solicitation Combo - Posted on Jul 25, 2014 On-Line RFQ - Posted on Jul 25, 2014
Posted: Jul 25, 2014 Center: GSFCTitle: CONTINUED DEVELOPMENT AND MAINTENANCE OF ALGORITHMS SUPPORTING THE MEASUREMENTS OF POLLUTION IN THE TROPOSPHERE INSTRUMENTSolicitation: GCC-618-509600 Response Due: Aug 08, 2014Synopsis - Posted on Jul 25, 2014
Posted: Jul 25, 2014 Center: GSFCTitle: NASA GSFC EARLY CAREER INITIATIVESolicitation: POD-NASA-GSFC-ECI Response Due: Aug 01, 2014Synopsis - Posted on Jul 02, 2014
Modification 01 - Posted on Jul 09, 2014Modification 02 - Posted on Jul 25, 2014
Solicitation - Posted on Jul 23, 2014Amendment 01 - Posted on Jul 23, 2014
PreSolicitation Clarification - Posted on Jul 08, 2014
Posted: Jul 23, 2014 Center: GSFCTitle: FABRICATION OF COATED RETROREFLECTORSSolicitation: NNG14510192Q-C Response Due: Aug 01, 2014Synopsis/Solicitation Combo - Posted on Jul 23, 2014On-Line RFQ - Posted on Jul 23, 2014
Posted: Jul 23, 2014 Center: HQTitle: NASA REQUEST FOR INFORMATION: COMMERCIAL MARS TELECOMMUNICATIONS RELAY SERVICESSolicitation: NNH14ZDA010L Response Due: Aug 25, 2014Synopsis - Posted on Jul 23, 2014
Posted: Jul 23, 2014 Center: GSFCTitle: JAMES WEBB SPACE TELESCOPE EXHIBIT FOR THE GODDARD VISITOR CENTERSolicitation: NNG14516335L Response Due: Aug 07, 2014Synopsis - Posted on Jul 23, 2014Statement of Work - Posted on Jul 23, 2014
Posted: Jul 23, 2014 Center: GRCTitle: GLOCK PISTOLS ACCESSORIES AND SPARE PARTSSolicitation: NNC14521702Q Response Due: Aug 08, 2014Synopsis/Solicitation Combo - Posted on Jul 23, 2014
Posted: Jul 23, 2014 Center: KSCTitle: FLUIDS SYSTEMS FOR FACILITIES AND GROUND SUPPORTSolicitation: NNK14SLW03 Response Due: Aug 08, 2014Synopsis - Posted on Jul 23, 2014
Posted: Jul 23, 2014 Center: GSFCTitle: INTERNATIONAL SPACE STATION DEWARSolicitation: NNG140516081L Response Due: Aug 06, 2014Synopsis - Posted on Jul 22, 2014
Posted: Jul 23, 2014 Center: KSCTitle: MECHANICAL SYSTEMS FOR FACILITIES AND GROUND SUPPORTSolicitation: NNK14SLW02 Response Due: Aug 08, 2014Synopsis - Posted on Jul 23, 2014
Posted: Jul 23, 2014 Center: MSFCTitle: LABMASTER UNIVERSAL MODEL 175 AND LABMASTER STANDARD MODEL LMS200 PARTSSolicitation: NNM14516698Q Response Due: Jul 31, 2014Synopsis/Solicitation Combo - Posted on Jul 23, 2014Terms and Conditions and Specifications - Posted on Jul 23, 2014
Posted: Jul 23, 2014 Center: GSFCTitle: AIRCRAFT FLIGHT SERVICES IN SUPPORT OF THE WISM PROJECTSolicitation: NNG14514644Q-2 Response Due: Aug 05, 2014Synopsis/Solicitation Combo - Posted on Jul 23, 2014On-Line RFQ - Posted on Jul 23, 2014SOW Appendix - Posted on Jul 23, 2014
Posted: Jul 23, 2014 Center: LARCTitle: REPLACE MOTOR CONTROL CENTERS--ROOM 109--BUILDING 1250Solicitation: NNL14515209E Response Due: Jul 22, 2014Synopsis - Posted on May 23, 2014Solicitation - Posted on Jun 17, 2014Site Visit Attendees - Questions and Answers - Posted on Jul 10, 2014Site Visit Attendees - Questions Answers Update - Posted on Jul 16, 2014
Posted: Jul 23, 2014 Center: LARCTitle: POLYETHYLENE RADIO FREQUENCY RF ABSORBERSolicitation: NNL14515195Q Response Due: Jul 28, 2014Synopsis/Solicitation Combo - Posted on Jul 15, 2014
Amendment 01 - Posted on Jul 23, 2014On-Line RFQ - Posted on Jul 15, 2014
Posted: Jul 22, 2014 Center: ARCTitle: FIRE PREVENTION SERVICES FOR NASA-AMES RESEARCH CENTERSolicitation: NNA06CD65C-BAD4 Response Due: Jul 28, 2014Synopsis - Posted on Jul 22, 2014
Posted: Jul 22, 2014 Center: ARCTitle: PROTECTIVE SERVICES FOR NASA-AMES RESEARCH CENTERSolicitation: NNA04CI14T-BAD5 Response Due: Jul 28, 2014Synopsis - Posted on Jul 22, 2014
Posted: Jul 22, 2014 Center: JSCTitle: 320KV MICRO-FOCUS X-RAY SOURCE FOR COMPUTED TOMOGRAPHYSolicitation: NNJ14519613R Response Due: Aug 06, 2014Synopsis - Posted on Jul 22, 2014
Posted: Jul 22, 2014 Center: JSCTitle: PLANNING AND ACCELERATED CONSTRUCTION CONTRACTSolicitation: NNJ14510750R Response Due: Sep 22, 2014Synopsis - Posted on Apr 30, 2014Solicitation - Posted on Jul 22, 2014
Posted: Jul 22, 2014 Center: GSFCTitle: SOCIOECONOMIC DATA AND APPLICATIONS DISTRIBUTED ACTIVE ARCHIVE CENTER FOR NASA’S EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEMSolicitation: 4200447556 Response Due: Apr 19, 2013Synopsis - Posted on Apr 04, 2013
Justification and Approval - Posted on Jul 22, 2014
Posted: Jul 22, 2014 Center: GSFCTitle: EARTH OBSERVING SYSTEMS DATA AND INFORMATION SYSTEM EVOLUTION AND DEVELOPMENT - 2
Solicitation: NNG14476256R Response Due: Jul 29, 2014Synopsis - Posted on Jan 15, 2014
Modification 01 - Posted on Feb 13, 2014Modification 02 - Posted on Mar 19, 2014Modification 03 - Posted on Apr 03, 2014Modification 04 - Posted on Apr 10, 2014Modification 05 - Posted on Apr 24, 2014Modification 06 - Posted on May 28, 2014Modification 07 - Posted on May 30, 2014Modification 08 - Posted on Jun 09, 2014Modification 09 - Posted on Jun 11, 2014Modification 10 - Posted on Jun 30, 2014Modification 11 - Posted on Jul 02, 2014Modification 12 - Posted on Jul 22, 2014
Draft Document - Posted on May 16, 2014Interested Parties List - Posted on Feb 13, 2014Interested Parties List - Posted on Mar 19, 2014Interested Parties List - Posted on Mar 19, 2014Interested Parties List - Posted on Apr 10, 2014EED-2 Presolicitation Conference List of Attendees - Posted on Jun 10, 2014EED-2 EOSDIS Overview Presentation - Posted on Jun 11, 2014Enclosure C - RTO3 - Posted on Jun 30, 2014Questions and Responses Part I - Posted on Jul 02, 2014Questions and Responses Part II - Posted on Jul 22, 2014
Posted: Jul 22, 2014 Center: LARCTitle: SINGLE POINT LASER VIBROMETERSolicitation: NNL14520095Q Response Due: Jul 24, 2014Synopsis/Solicitation Combo - Posted on Jul 14, 2014
Amendment 01 - Posted on Jul 22, 2014On-Line RFQ - Posted on Jul 22, 2014Specifications - Posted on Jul 14, 2014Updated Specifications - Posted on Jul 22, 2014
Posted: Jul 22, 2014 Center: KSCTitle: MICRO-SMALL SATELLITE CLASS PAYLOAD LAUNCH SERVICES - NEXT XLSolicitation: NNK14NEXTXL01L Response Due: Aug 22, 2014Synopsis - Posted on Jul 22, 2014
Modification 01 - Posted on Jul 22, 2014
Posted: Jul 22, 2014 Center: AFRCTitle: MODELING OF VIRTUAL FLIGHT RULE TRAFFIC MODELSolicitation: NND14518853R Response Due: Aug 06, 2014Synopsis - Posted on Jul 22, 2014
Posted: Jul 22, 2014 Center: JSCTitle: LUNAR AND PLANETARY INSTITUTESolicitation: NNJ14ZKA001N Response Due: Sep 30, 2014Synopsis - Posted on May 14, 2014
Modification 01 - Posted on Jun 30, 2014Modification 02 - Posted on Jul 01, 2014Modification 03 - Posted on Jul 09, 2014Modification 04 - Posted on Jul 10, 2014Modification 05 - Posted on Jul 17, 2014Modification 06 - Posted on Jul 22, 2014
Posted: Jul 22, 2014 Center: GSFCTitle: SUSTAINABLE LAND IMAGING SLI REDUCED INSTRUMENT ENVELOPE STUDYSolicitation: NNG14518373Q Response Due: Jul 25, 2014Synopsis/Solicitation Combo - Posted on Jun 30, 2014
Amendment 01 - Posted on Jul 01, 2014Amendment 02 - Posted on Jul 02, 2014Amendment 03 - Posted on Jul 09, 2014Amendment 04 - Posted on Jul 22, 2014
SLI Documents - Posted on Jun 30, 2014Amendment 1, Replacement page 50 - Posted on Jul 01, 2014Amendment 2 - Posted on Jul 02, 2014
Posted: Jul 21, 2014 Center: AFRCTitle: ON-SITE SUPPORT FOR SAFETY AND ENVIRONMENTAL SERVICESSolicitation: NND14SAFETY Response Due: Aug 01, 2014Synopsis - Posted on Jul 11, 2014
Modification 01 - Posted on Jul 11, 2014Modification 02 - Posted on Jul 21, 2014
Posted: Jul 21, 2014 Center: MSFCTitle: REQUEST FOR INFORMATION - ORACLE IDENTITY MANAGEMENT SOFTWARE MAINTENANCE SUPPORTSolicitation: EDS-BRC-0003 Response Due: Jul 28, 2014Synopsis - Posted on Jul 21, 2014RFI Sun Identity Equipment List - Posted on Jul 21, 2014
Posted: Jul 21, 2014 Center: MSFCTitle: SPACE LAUNCH SYSTEM INTERTANK TEST SOLID ROCKET BOOSTER LOAD BEAMSolicitation: NNM14505953Q Response Due: Aug 14, 2014Synopsis/Solicitation Combo - Posted on Jul 21, 2014Terms and Conditions and Drawings - Posted on Jul 21, 2014
Posted: Jul 18, 2014 Center: GSFCTitle: WALLOPS FLIGHT FACILITY MULTIPLE AWARD CONSTRUCTIONSolicitation: NNG14449599R Response Due: Jul 21, 2014Synopsis - Posted on Oct 31, 2013
Modification 01 - Posted on Mar 26, 2014Modification 02 - Posted on May 15, 2014Modification 03 - Posted on May 23, 2014Modification 04 - Posted on Jul 16, 2014
Solicitation - Posted on Jun 06, 2014Amendment 01 - Posted on Jul 11, 2014Amendment 02 - Posted on Jul 16, 2014
WMAC SITE VISIT INSTRUCTIONS - Posted on Jan 31, 2014NASA's Response to Industry Questions on Draft RFP - Posted on Feb 04, 2014WMAC SITE VISIT ATTENDEE LISTING - Posted on Feb 11, 2014Additional Draft RFP Questions and Responses - Posted on Feb 18, 2014
Additional Draft RFP Questions and Responses - Posted on Feb 25, 2014Additional Draft RFP Questions and Responses - Posted on Mar 07, 2014Additional Draft RFP Questions and Responses - Posted on Mar 26, 2014Industry Question Answer - Posted on May 16, 2014WMAC Final RFP NASA Response to Industry Questions - Posted on Jun 16, 2014Response to Industry Questions 3 to 10 - Posted on Jul 02, 2014Response to Industry Questions 11 to 15 - Posted on Jul 11, 2014Response to Industry Questions 16 to 21 - Posted on Jul 15, 2014RESPONSE TO INDUSTRY QUESTIONS 22 23 - Posted on Jul 16, 2014Response to Industry Question 24 - Posted on Jul 17, 2014Response to Industry Questions 25 26 - Posted on Jul 18, 2014
Posted: Jul 18, 2014 Center: GRCTitle: ELECTRONIC PACKAGES AND PRINTED CIRCUIT BOARDSSolicitation: NNC14520026Q Response Due: Aug 01, 2014Synopsis/Solicitation Combo - Posted on Jul 18, 2014
Posted: Jul 18, 2014 Center: JSCTitle: MAIL AND DUPLICATION SUPPORT SERVICESSolicitation: NNJ14499347R Response Due: Jul 23, 2014Synopsis - Posted on Mar 13, 2014
Modification 01 - Posted on Apr 04, 2014Modification 02 - Posted on May 20, 2014Modification 03 - Posted on Jun 11, 2014Modification 04 - Posted on Jun 12, 2014Modification 05 - Posted on Jun 13, 2014
Solicitation - Posted on Jun 09, 2014Amendment 01 - Posted on Jun 13, 2014Amendment 02 - Posted on Jul 01, 2014Amendment 03 - Posted on Jul 09, 2014Amendment 04 - Posted on Jul 11, 2014Amendment 05 - Posted on Jul 18, 2014
Questions Answers Document - Posted on Apr 04, 2014Questions and Answers 5-20-2014 - Posted on May 20, 2014Pricing Web Ex Charts - Posted on Jun 11, 2014Preproposal Bulletin Charts - Posted on Jun 12, 2014
Posted: Jul 18, 2014 Center: MSFCTitle: ENGINE SECTION TEST PEDESTAL AND KICK RING ASSEMBLYSolicitation: NNM14505911Q Response Due: Aug 11, 2014Synopsis/Solicitation Combo - Posted on Jul 18, 2014Terms and Conditions and Drawings - Posted on Jul 18, 2014
Posted: Jul 18, 2014 Center: MSFCTitle: AFT LOAD RING WELDMENTSolicitation: NNM14505910Q Response Due: Aug 08, 2014Synopsis/Solicitation Combo - Posted on Jul 18, 2014Terms and Conditions and Drawings - Posted on Jul 18, 2014
Posted: Jul 18, 2014 Center: LARCTitle: REQUEST FOR INFORMATION FOR LONG ENDURANCE UNINHABITED AERIAL VEHICLES FOR NASA LARC MISSIONSSolicitation: LongEnduranceUAVs Response Due: Aug 18, 2014Synopsis - Posted on Jul 18, 2014
Posted: Jul 17, 2014 Center: MSFCTitle: ENVIRONMENTAL REMEDIATION SERVICES AT SANTA SUSANA FIELD LABORATORYSolicitation: NNM4200483208Q Response Due: Aug 15, 2014Synopsis - Posted on Jul 17, 2014
Modification 01 - Posted on Jul 17, 2014Justification and Approval - Posted on Jul 17, 2014
Posted: Jul 17, 2014 Center: GSFCTitle: REPAIR AND EQUIPMENT FOR A NV1002 ION IMPLANTERSolicitation: NNG14510472L Response Due: Aug 01, 2014Synopsis - Posted on Jul 17, 2014
Posted: Jul 17, 2014 Center: GRCTitle: TECHNICAL INFORMATION ADMINISTRATION AND LOGISTICS SERVICES TIALS-2Solicitation: NNC14ZC013R Response Due: Oct 17, 2014Synopsis - Posted on Jul 01, 2014Industry Day cover letter - Posted on Jul 01, 2014Date Change for Industry Day - Posted on Jul 17, 2014Clarification to Industry Day Cover Letter - Posted on Jul 17, 2014
Posted: Jul 17, 2014 Center: GRCTitle: PACKAGED SILICON CARBIDE SENSORS FOR PRESSURE TESTINGSolicitation: NNC14519167Q Response Due: Aug 01, 2014Synopsis/Solicitation Combo - Posted on Jul 17, 2014Specifications for NNC14519167Q - Posted on Jul 17, 2014
Posted: Jul 17, 2014 Center: GRCTitle: BUILDING 14 TECHNICAL SERVICES BUILDINGSolicitation: NNC14ZFD016E Response Due: Sep 02, 2014Synopsis - Posted on Jul 15, 2014Draft Document - Posted on Jul 17, 2014
Posted: Jul 16, 2014 Center: ARCTitle: AEROSPACE TESTING AND FACILITIES OPERATIONS AND MAINTENANCE ATOM 4Solicitation: NNA14443194R Response Due: N/ASynopsis - Posted on Oct 24, 2013
Modification 01 - Posted on Dec 18, 2013Modification 02 - Posted on Mar 31, 2014Modification 03 - Posted on Apr 10, 2014Modification 04 - Posted on Apr 24, 2014Modification 05 - Posted on May 08, 2014Modification 06 - Posted on Jun 11, 2014Modification 07 - Posted on Jul 16, 2014
Draft Document - Posted on Mar 31, 2014Interested Parties List - Posted on Oct 24, 2013Interested Parties List date October 30, 2013 - Posted on Oct 30, 2013Interested Parties List date November 13, 2013 - Posted on Nov 13, 2013Interested Parties List date December 4, 2013 - Posted on Dec 04, 2013Interested Parties List date December 11, 2013 - Posted on Dec 11, 2013
Interested Parties List date January 15, 2014 - Posted on Jan 15, 2014Interested Parties List date January 22, 2014 - Posted on Jan 22, 2014Ames Research Center Map - Posted on Apr 10, 2014Interested Parties List date April 10, 2014 - Posted on Apr 10, 2014Interested Parties List date April 24, 2014 - Posted on Apr 24, 2014Technical Reference Documents - Posted on Apr 28, 2014Industry DayPre-Proposal Conference Presentation - Posted on Apr 30, 2014QUESTIONS and ANSWERS SET 1 - Posted on May 08, 2014Industry DayPre-Proposal Conference Question Set1 - Posted on May 14, 2014QUESTIONS and ANSWERS SET 2 - Posted on May 14, 2014Technical Reference Documents - Posted on May 14, 2014Industry DayPre-Proposal Conference Question Set 2 - Posted on May 15, 2014QUESTIONS AND ANSWERS SET 3 - Posted on May 15, 2014
Posted: Jul 16, 2014 Center: GRCTitle: TEST FACILITY OPERATIONS MAINTENANCE AND ENGINEERING II - TFOME IISolicitation: NNC14ZCH015J Response Due: Jul 23, 2014Synopsis - Posted on May 30, 2014
Modification 01 - Posted on Jun 19, 2014Modification 02 - Posted on Jul 16, 2014
Draft Document - Posted on Jun 19, 2014TFOME-II Industry Days Preregistration Packet - Posted on Jun 19, 2014Interested Parties List - Posted on Jun 19, 2014Industry Days Presentation Registered Companies - Posted on Jul 16, 2014Manufacturing Tour Preregistration Packet - Posted on Jul 16, 2014
Response Due: Jul 18, 2014Synopsis/Solicitation Combo - Posted on Jun 19, 2014
Amendment 01 - Posted on Jul 10, 2014Amendment 02 - Posted on Jul 16, 2014
On-Line RFQ - Posted on Jul 16, 2014
Posted: Jul 16, 2014 Center: LARCTitle: REQUEST FOR INFORMATION FOR RADIATION SYSTEMS BIOLOGYSolicitation: NNJ14ZSA002L Response Due: Sep 02, 2014Synopsis - Posted on Jul 16, 2014
Posted: Jul 16, 2014 Center: MSFCTitle: LIQUID HYDROGEN LH2 TANK AFT LOAD SPIDERSolicitation: NNM14514431Q Response Due: Aug 04, 2014Synopsis/Solicitation Combo - Posted on Jun 13, 2014
Amendment 01 - Posted on Jun 16, 2014Amendment 02 - Posted on Jul 01, 2014Amendment 03 - Posted on Jul 16, 2014
Solicitation - Posted on Jun 13, 2014Amendment 01 - Posted on Jun 16, 2014
Revised Drawings - Posted on Jul 16, 2014
Posted: Jul 16, 2014 Center: GSFCTitle: LMS TEST LAB DESKTOP SOFTWARESolicitation: NNG14510137L Response Due: Aug 01, 2014Synopsis - Posted on Jul 16, 2014
Posted: Jul 16, 2014 Center: GSFCTitle: DATA EFFICIENCY AND CONTAINERIZATIONSolicitation: NNH14000000L Response Due: Jul 30, 2014Synopsis - Posted on Jul 16, 2014RFI Attachment - Details Regarding Approaches - Posted on Jul 16, 2014
Posted: Jul 15, 2014 Center: LARCTitle: ALLEN BRADLEY CRYOGENIC BALL VALVE ACUATOR AND POSITIONERSolicitation: NNL14520611Q Response Due: Jul 22, 2014Synopsis - Posted on Jul 15, 2014
Posted: Jul 15, 2014 Center: HQTitle: NASA EUROPA INSTRUMENT INVESTIGATION PROGRAM ELEMENT APPENDIXSolicitation: NNH012ZDA006O-EUROPA Response Due: N/ASynopsis - Posted on Jul 15, 2014
Posted: Jul 14, 2014 Center: MSFCTitle: AIRCRAFT SUPPORT DURING THE EXPERIMENTAL HIGH ALTITUDE BALLOON FLIGHT OF THE EXTREME UNIVERSE TELESCOPE OBSERVATORY PROTO-TYPE TELESCOPE.Solicitation: NNM14520061 Response Due: Jul 17, 2014Synopsis - Posted on Jul 14, 2014
Posted: Jul 14, 2014 Center: GSFCTitle: PROFESSIONAL SPACE WEATHER ANALYSIS AND FORECASTING SERVICESSolicitation: NNG14518080Q Response Due: Jul 25, 2014Synopsis - Posted on Jul 14, 2014
Posted: Jul 14, 2014 Center: LARCTitle: DATA ACQUISITION AND CONTROLLER UPGRADE FOR INSTRON 1361 TEST MACHINESolicitation: NNL14520280Q Response Due: Jul 21, 2014Synopsis/Solicitation Combo - Posted on Jul 14, 2014On-Line RFQ - Posted on Jul 14, 2014Specifications - Posted on Jul 14, 2014
Solicitation: NNL14519845Q Response Due: Jul 21, 2014Synopsis/Solicitation Combo - Posted on Jul 14, 2014On-Line RFQ - Posted on Jul 14, 2014Specifications - Posted on Jul 14, 2014
Posted: Jul 14, 2014 Center: LARCTitle: UPGRADES TO SCIAKY ELECTRON BEAM WELDING EQUIPMENTSolicitation: NNL14518831Q Response Due: Jul 21, 2014Synopsis - Posted on Jul 14, 2014
Posted: Jul 14, 2014 Center: HQTitle: DRAFT AO FOR ASTROPHYSICS EXPLORER MISSIONS OF OPPORTUNITY RELEASED FOR COMMUNITY COMMENTSolicitation: NNH14ZDA012J Response Due: Aug 04, 2014Synopsis - Posted on Jul 14, 2014
Posted: Jul 14, 2014 Center: HQTitle: DRAFT AO FOR SMALL ASTROPHYSICS EXPLORER MISSIONS RELEASED FOR COMMUNITY COMMENTSolicitation: NNH14ZDA011J Response Due: Aug 04, 2014Synopsis - Posted on Jul 14, 2014
Posted: Jul 11, 2014 Center: JSCTitle: HUMAN EXPLORATION RESEARCH OPPORTUNITIES NASA RESEARCH ANNOUNCEMENTSolicitation: NNJ14ZSA001N Response Due: N/ASynopsis - Posted on Jul 11, 2014
Response Due: Jul 14, 2014Synopsis - Posted on Jun 26, 2014
Modification 01 - Posted on Jul 10, 2014
Posted: Jul 10, 2014 Center: MSFCTitle: OPEN BAY MOBILE OFFICE BUILDINGSolicitation: NNM14515764Q-1 Response Due: Jul 17, 2014Synopsis/Solicitation Combo - Posted on Jul 10, 2014Specifications - Posted on Jul 10, 2014
Posted: Jul 10, 2014 Center: GSFCTitle: MAG W 2000 CT DIGITAL TURBOVACSolicitation: NNG14506461-2 Response Due: Jul 15, 2014Synopsis/Solicitation Combo - Posted on Jul 10, 2014On-Line RFQ - Posted on Jul 10, 2014DETAILED SPECIFICATIONS - Posted on Jul 10, 2014
Posted: Jul 10, 2014 Center: GSFCTitle: MAG W 2000 CT DIGITAL TURBOVACSolicitation: NNG14506461Q Response Due: May 29, 2014Synopsis/Solicitation Combo - Posted on May 23, 2014
Amendment 01 - Posted on May 23, 2014On-Line RFQ - Posted on Jul 10, 2014
Posted: Jul 10, 2014 Center: KSCTitle: SOLAR PROBE PLUS LAUNCH SERVICESolicitation: NNK14ZLS005R Response Due: Aug 01, 2014Synopsis - Posted on Jul 10, 2014Solicitation - Posted on Jul 10, 2014
Posted: Jul 10, 2014 Center: MSFCTitle: COUPLERS CABLES BUS TERMINATORS AND STUB RELAY SWITCHESSolicitation: NNM14519132Q Response Due: Jul 11, 2014Synopsis/Solicitation Combo - Posted on Jul 07, 2014
Amendment 01 - Posted on Jul 10, 2014NNM14519132Q - Posted on Jul 07, 2014Revised Specifications - Posted on Jul 10, 2014
Posted: Jul 10, 2014 Center: GRCTitle: FY14 CENTRAL COMPRESSED AIR SYSTEMS REPAIR - PHASE ISolicitation: NNC14ZFD023R Response Due: Jul 16, 2014
Synopsis - Posted on Apr 01, 2014Modification 01 - Posted on Apr 02, 2014
Solicitation - Posted on May 19, 2014Amendment 01 - Posted on May 19, 2014Amendment 02 - Posted on May 22, 2014Amendment 03 - Posted on Jun 17, 2014Amendment 04 - Posted on Jun 19, 2014Amendment 05 - Posted on Jul 10, 2014
STATEMENT OF WORK - Posted on May 19, 2014ATTACHMENT B C - Posted on May 19, 2014PLANSSPECSDESIGN ANALYSISREFERANCE DOCUMENTS - Posted on May 19, 2014Site Showing Attendance List - Posted on Jun 10, 2014amendment 5 - Posted on Jun 25, 2014Amendment 6 - Posted on Jun 30, 2014Amendment 7 - Posted on Jul 02, 2014
Posted: Jul 10, 2014 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – NASA COMMERCIAL INVENTION OF THE YEAR FOR 2013: THE LOW FREQUENCY PORTABLE ACOUSTIC MEASUREMENT SYSTEM DETECTS AND LOCATES ATMOSPHERIC CLEAR AIR TURBULENCE AND SEVERESolicitation: TT01063 Response Due: Jul 10, 2015Synopsis - Posted on Jul 10, 2014
Posted: Jul 10, 2014 Center: ARCTitle: ENTRY SYSTEMS TECHNOLOGY RESEARCH AND DEVELOPMENT ESTRADSolicitation: NNA14ESTRAD-ACR Response Due: N/ASynopsis - Posted on Feb 07, 2014
Modification 01 - Posted on Feb 10, 2014Modification 02 - Posted on Jun 30, 2014
Interested Parties 03-19-2014 - Posted on Mar 19, 2014Interested Parties List April 3 2014 - Posted on Apr 03, 2014Interested Parties List June 10 2014 - Posted on Jun 10, 2014DRAFT Statement of Work - Posted on Jul 10, 2014
Posted: Jul 09, 2014 Center: KSCTitle: REPLACE LIQUID OXYGEN VAPORIZER LAUNCH COMPLEX 39BSolicitation: NNK14511688R Response Due: Jun 20, 2014Synopsis - Posted on Apr 28, 2014Solicitation - Posted on May 14, 2014
Amendment 01 - Posted on May 28, 2014Amendment 02 - Posted on Jun 06, 2014Amendment 03 - Posted on Jun 10, 2014
Document download restriction - Posted on May 01, 2014Site Visit Sign-In Sheet - Posted on May 28, 2014NNK14CA16CA - Award Synopsis - Posted on Jul 09, 2014
Posted: Jul 09, 2014 Center: HQTitle: ULTRALIGHTWEIGHT NANOLATTICES FOR EFFICIENT LOAD-BEARING STRUCTURES APPENDIXSolicitation: NNH14ZOA001N-14GCD-C3 Response Due: N/ASynopsis - Posted on Jun 06, 2014
Modification 01 - Posted on Jul 09, 2014
Posted: Jul 09, 2014 Center: KSCTitle: 3D LASER SCANNERSolicitation: NNK14517459Q Response Due: Jul 22, 2014Synopsis/Solicitation Combo - Posted on Jul 09, 2014NNK14517459Q - Posted on Jul 09, 2014
Posted: Jul 08, 2014 Center: MSFCTitle: FUEL TANK WIRELESS POWER AND SIGNAL INTERFACE SYSTEM PROOF OF CONCEPTSolicitation: NNM14515682Q Response Due: Jul 14, 2014Synopsis - Posted on Jul 08, 2014
Posted: Jul 08, 2014 Center: AFRCTitle: CNV LOW LIGHT BLACK AND WHITE CAMERASolicitation: NND14517617Q Response Due: Jul 14, 2014Synopsis - Posted on Jul 08, 2014
Posted: Jul 08, 2014 Center: GRCTitle: NEW LICENSES AND SUPPORT FOR FEMAP SOFTWARESolicitation: NNC14514201Q Response Due: Jul 23, 2014Synopsis - Posted on Jul 08, 2014
Posted: Jul 08, 2014 Center: LARCTitle: SPACECRAFT OPERATING SOFTWARE SYSTEM IN SUPPORT OF CUBESAT VAULT ELECTRONICSSolicitation: NNL14518620Q Response Due: Jul 14, 2014Synopsis - Posted on Jul 08, 2014
Posted: Jul 08, 2014 Center: GSFCTitle: REFURBISH SOLAR ARRAY HOT BOXSolicitation: NNG14515606L Response Due: Jul 25, 2014Synopsis - Posted on Jul 08, 2014
Posted: Jul 02, 2014 Center: AFRCTitle: ARMSTRONG FLIGHT RESEARCH CENTER PARTNERING FOR EARLY CAREER INITIATIVE PROPOSALSSolicitation: NND14SA43-RFI Response Due: Jul 11, 2014Synopsis - Posted on Jun 25, 2014
Modification 01 - Posted on Jun 25, 2014Modification 02 - Posted on Jul 02, 2014Modification 03 - Posted on Jul 02, 2014
Cover Page - Posted on Jul 02, 2014
Posted: Jul 02, 2014 Center: GSFCTitle: HUBBLE IPAD BASED KIOSKSolicitation: NNG14518338Q Response Due: Jul 14, 2014Synopsis/Solicitation Combo - Posted on Jul 02, 2014On-Line RFQ - Posted on Jul 02, 2014
Posted: Jul 02, 2014 Center: LARCTitle: REPLACEMENT OF PARTS AND RECONDITIONING OF WORTHINGTON BDC MACHINESolicitation: NNL14516128Q Response Due: Jul 09, 2014Synopsis/Solicitation Combo - Posted on Jul 02, 2014On-Line RFQ - Posted on Jul 02, 2014
Posted: Jul 02, 2014 Center: GSFCTitle: HARDWARE AND SOFTWARE SUPPORT FOR RAMAN LIDAR LABSolicitation: NNG14512307L Response Due: Jul 16, 2014Synopsis - Posted on Jul 02, 2014
Posted: Jul 02, 2014 Center: KSCTitle: ON ORBIT DELIVERY SERVICE OF A SEPARATING SPACE VEHICLESolicitation: NNK14SSV001L Response Due: Jul 05, 2014Synopsis - Posted on Jun 05, 2014
Synopsis/Solicitation Combo - Posted on Jun 30, 2014Solicitation - Posted on Jun 30, 2014ATTACHMENTS A,B,C,D,E - Posted on Jun 30, 2014
Posted: Jun 30, 2014 Center: MSFCTitle: F30438CM THERMOLYNE® LARGEST TABLETOP MUFFLE FURNACESolicitation: NNM14516481Q Response Due: Jul 08, 2014Synopsis/Solicitation Combo - Posted on Jun 30, 2014Terms and Conditions - Posted on Jun 30, 2014
Posted: Jun 30, 2014 Center: NSSCTitle: POINTWISE GRIDEN RENEWALSolicitation: NNX14MD51D Response Due: Jul 01, 2014Synopsis - Posted on Jun 30, 2014
Posted: Jun 30, 2014 Center: GRCTitle: MILLWRIGHT TRADE SERVICES - BPASolicitation: NNC14ZCH010R Response Due: Jul 31, 2014Synopsis/Solicitation Combo - Posted on Jun 30, 2014ATTACHMENTS A,B,C,D,E - Posted on Jun 30, 2014
Posted: Jun 30, 2014 Center: ARCTitle: EXTENSION OF CONTRACT NNA09DB39C AEROSPACE TESTING AND FACILITIES OPERATION AND MAITENANCE-ATOMSolicitation: NNA09DB39C-Extension Response Due: N/ASynopsis - Posted on May 15, 2014
Modification 01 - Posted on Jun 30, 2014
Posted: Jun 30, 2014 Center: GRCTitle: ELECTRICAL TRADE SERVICES - BPASolicitation: NNC14ZCH009R Response Due: Jul 31, 2014Synopsis/Solicitation Combo - Posted on Jun 30, 2014ATTACHMENTS A,B,C,D,E - Posted on Jun 30, 2014REVISED ATTACHMENT E - Posted on Jun 30, 2014
Posted: Jun 30, 2014 Center: KSCTitle: REFURBISHMENT OF ENVIRONMENTAL CONTROL SYSTEM LAUNCH COMPLEX 39BSolicitation: NNK14507560R Response Due: Jun 05, 2014Synopsis - Posted on Apr 09, 2014Solicitation - Posted on Apr 23, 2014
Amendment 02 - Posted on May 02, 2014Amendment 03 - Posted on May 20, 2014Amendment 04 - Posted on May 20, 2014Amendment 05 - Posted on May 22, 2014Amendment 06 - Posted on May 23, 2014Amendment 07 - Posted on May 28, 2014
NNK14507560R Site Visit Sign In - Posted on May 02, 2014Memo for Amendment 3 - Posted on May 20, 2014Award Notice - Posted on Jun 30, 2014
Posted: Jun 30, 2014 Center: MSFCTitle: OMNISCAN MX2 PACK AND ACCESSORIESSolicitation: NNM14516733q Response Due: Jul 07, 2014Synopsis - Posted on Jun 30, 2014
Posted: Jun 27, 2014 Center: GRCTitle: PENTEK 52730 SOFTWARE-DEFINED RADIO BOARDSSolicitation: NNC14507800Q Response Due: Jul 09, 2014Synopsis - Posted on Jun 27, 2014
Posted: Jun 27, 2014 Center: MSFCTitle: ROBOTIC WELD HEAD REPAIRSolicitation: NNM14517937Q Response Due: Jul 08, 2014Synopsis - Posted on Jun 27, 2014
Posted: Jun 27, 2014 Center: JSCTitle: COOLING AND HYDRAULIC SUPPLY SYSTEMSolicitation: NNJ14516999Q Response Due: Jun 27, 2014Synopsis/Solicitation Combo - Posted on Jun 12, 2014
Amendment 01 - Posted on Jun 27, 2014
Posted: Jun 27, 2014 Center: GRCTitle: GLENN FOOD SERVICES PROGRAMSolicitation: NNC14ZC012L Response Due: Jul 25, 2014Synopsis - Posted on Jun 27, 2014
Posted: Jun 27, 2014 Center: GSFCTitle: PRECISION SELF-CONTAINED LASER CUTTING SYSTEMSolicitation: NNG14514252L Response Due: Jul 02, 2014Synopsis - Posted on Jun 17, 2014
Posted: Jun 27, 2014 Center: GSFCTitle: ION BEAM ETCH SYSTEMSolicitation: NNG14511252Q Response Due: Jul 07, 2014Synopsis/Solicitation Combo - Posted on Jun 16, 2014
Amendment 01 - Posted on Jun 27, 2014On-Line RFQ - Posted on Jun 27, 2014Statement of work - Posted on Jun 16, 2014Updated SOW and technical answers - Posted on Jun 27, 2014
Posted: Jun 27, 2014 Center: LARCTitle: SMALL BUSINESS EVENT NASA LARC SERVICE DISABLED VETERAN OWNED SMALL BUSINESSINDUSTRY DAYSolicitation: 2014SDVOSBA Response Due: Aug 06, 2014Synopsis - Posted on Jun 27, 2014
Posted: Jun 27, 2014 Center: LARCTitle: VIDEO TOOLMAKER MICROSCOPE AND ACCESSORIESSolicitation: NNL14513775Q Response Due: Jul 07, 2014Synopsis/Solicitation Combo - Posted on Jun 27, 2014On-Line RFQ - Posted on Jun 27, 2014
Posted: Jun 26, 2014 Center: MSFCTitle: TABLET UT AND ACCESSORIESSolicitation: NNM14516719Q Response Due: Jul 02, 2014Synopsis - Posted on Jun 26, 2014
Posted: Jun 26, 2014 Center: JSCTitle: INTERNATIONAL FLIGHT SUPPORT SERVICESSolicitation: NNJ14516345L Response Due: Jun 30, 2014Synopsis - Posted on Jun 18, 2014
Modification 01 - Posted on Jun 26, 2014
Posted: Jun 26, 2014 Center: GRCTitle: FOCUSED BEAM MICROWAVE LENS SYSTEMSolicitation: NNC14512575Q Response Due: Jul 09, 2014Synopsis - Posted on Jun 26, 2014
Posted: Jun 26, 2014 Center: LARCTitle: GENERAL DYNAMICS ENCRYPTORS
Solicitation: NNL14516121Q Response Due: Jul 07, 2014Synopsis - Posted on Jun 26, 2014
Posted: Jun 26, 2014 Center: MSFCTitle: OPEN BAY MOBILE OFFICE BUILDINGSolicitation: NNM14515764Q Response Due: Jul 07, 2014Synopsis/Solicitation Combo - Posted on Jun 26, 2014Terms and Conditions and SOW - Posted on Jun 26, 2014
Posted: Jun 26, 2014 Center: MSFCTitle: THERMAL DESORPTION SYSTEMSolicitation: NNM14516478Q Response Due: Jul 02, 2014Synopsis - Posted on Jun 26, 2014
Posted: Jun 26, 2014 Center: GSFCTitle: ADMINISTER AND MAINTAIN CREME TOOLS SUITE VIA OPEN WEBSolicitation: NNG14516933L Response Due: Jul 02, 2014Synopsis - Posted on Jun 26, 2014
Posted: Jun 26, 2014 Center: JSCTitle: JUST-IN-TIME OFFICE SUPPLY PRODUCTS FOR THE JOHNSON SPACE CENTERSolicitation: NNJ14504092Q Response Due: Jul 10, 2014Synopsis/Solicitation Combo - Posted on Jun 11, 2014
Amendment 01 - Posted on Jun 26, 2014
Posted: Jun 26, 2014 Center: MSFCTitle: CONVERSION OF EXISTING 505-120S HYDRAULIC PUMP UNITSolicitation: NNM14517503Q Response Due: Jun 30, 2014Synopsis - Posted on Jun 26, 2014
Posted: Jun 26, 2014 Center: GRCTitle: SILICONE CARBIDE WAFERS WITH EPITAXIAL LAYERSSolicitation: NNC14515507Q Response Due: Jun 27, 2014Synopsis/Solicitation Combo - Posted on Jun 11, 2014
Amendment 01 - Posted on Jun 26, 2014Specifications - Posted on Jun 11, 2014
Title: OSCOMET SOFTWARE LICENSE MAINTENANCE RENEWALSolicitation: NNK14515437Q Response Due: Jul 11, 2014Synopsis - Posted on Jun 26, 2014
Posted: Jun 25, 2014 Center: GSFCTitle: OPERATIONAL HISTORY OF THE HUBBLE SPACE TELESCOPESolicitation: NNG14500087Q Response Due: Jul 18, 2014Synopsis/Solicitation Combo - Posted on Apr 11, 2014
Amendment 01 - Posted on Jun 06, 2014Amendment 02 - Posted on Jun 19, 2014Amendment 03 - Posted on Jun 19, 2014Amendment 04 - Posted on Jun 25, 2014
Questions and Answers - Posted on Jun 06, 2014
Posted: Jun 25, 2014 Center: KSCTitle: VIDEO HARDWARESolicitation: NNK14508260Q Response Due: Jul 07, 2014Synopsis/Solicitation Combo - Posted on Jun 25, 2014NNK14508260Q - Posted on Jun 25, 2014NNK14508260Q - Posted on Jun 25, 2014
Posted: Jun 25, 2014 Center: MSFCTitle: REQUEST FOR INFORMATION :- IDMAX - EPAC INTEGRATION MIDDLEWARESolicitation: EDS-BRC-0002 Response Due: Jul 01, 2014Synopsis - Posted on Jun 17, 2014
Modification 01 - Posted on Jun 25, 2014IDMaX -EPAC Requirments Document-Attachment A - Posted on Jun 17, 2014Letter or Clarification EDS-BRC-0002 Attachment B - Posted on Jun 25, 2014
Posted: Jun 25, 2014 Center: KSCTitle: NASA KSC PROPELLANT AUTOMATED RENDEZVOUS AND TRANSFER PART PROJECTSolicitation: NNK14ZOP008O Response Due: Jul 10, 2014Synopsis - Posted on Jun 25, 2014
Posted: Jun 25, 2014 Center: GRCTitle: COMPACT AND PORTABLE DYNAMIC LIGHT SCATTERING INSTRUMENTSolicitation: NNC14517516 Response Due: Jul 08, 2014Synopsis/Solicitation Combo - Posted on Jun 25, 2014
Posted: Jun 25, 2014 Center: MSFCTitle: REVITALIZE MECHANICAL SYSTEMS AT BUILDING 4755
Solicitation: NNM14ZPS005E Response Due: Jun 24, 2014Synopsis - Posted on Mar 11, 2014Solicitation - Posted on May 05, 2014
Amendment 01 - Posted on May 23, 2014Amendment 02 - Posted on Jun 06, 2014
Source List for IFB NNM14ZPS005E, June 2, 2014 - Posted on Jun 02, 2014Abstract of Bids, IFB NNM14ZPS005E, Posted on NAIS - Posted on Jun 25, 2014
Posted: Jun 25, 2014 Center: LARCTitle: RENTAL OF AIRBORNE WATER VAPOR LIQUID WATER RADIOMETERSolicitation: NNL14516362Q Response Due: Jul 02, 2014Synopsis/Solicitation Combo - Posted on Jun 25, 2014On-Line RFQ - Posted on Jun 25, 2014SPECIFICATIONS - Posted on Jun 25, 2014
Posted: Jun 25, 2014 Center: LARCTitle: CRYOGENIC BALL VALVE ASSEMBLIESSolicitation: NNL14517217Q Response Due: Jul 02, 2014Synopsis - Posted on Jun 25, 2014
Posted: Jun 25, 2014 Center: LARCTitle: LANGLEY RESEARCH CENTER PARTNERING FOR EARLY CAREER INITIATIVE PROPOSALSSolicitation: PartneringEarlyInitiative Response Due: Jul 03, 2014Synopsis - Posted on Jun 17, 2014
Modification 01 - Posted on Jun 18, 2014Modification 02 - Posted on Jun 25, 2014
Posted: Jun 24, 2014 Center: GRCTitle: FINANCIAL ACCOUNTING AND BUSINESS SERVICES SUPPORT II 2014Solicitation: FABSSII2014 Response Due: Jun 30, 2014Synopsis - Posted on Jun 17, 2014
Modification 01 - Posted on Jun 18, 2014Modification 02 - Posted on Jun 24, 2014
FABSSII2014 Draft SOW - Posted on Jun 19, 2014
Posted: Jun 24, 2014 Center: GSFCTitle: DARLEY GRAPHICAL CONTROL WITH INSTALLATION TRAINING AND LASER SAFETY GUARDINGSolicitation: NNG14517735L Response Due: Jul 09, 2014Synopsis - Posted on Jun 24, 2014
Posted: Jun 24, 2014 Center: GSFCTitle: ANNUAL SOFTWARE AND MAINTENANCE AGREEMENT FOR ANSYS HFSS AND DESIGNER SOFTWARE SUITES AND ADD ONSSolicitation: NNG14517276L Response Due: Jul 09, 2014Synopsis - Posted on Jun 24, 2014
Posted: Jun 24, 2014 Center: KSCTitle: ACELLENT TECHNOLOGIES CUSTOM HEALTH MONITORING SYSTEMSolicitation: NNK14517488Q Response Due: Jul 09, 2014Synopsis - Posted on Jun 24, 2014
Posted: Jun 24, 2014 Center: GSFCTitle: WALLOPS ENGINEERING SERVICES CONTRACTSolicitation: NNG13374674R Response Due: N/ASynopsis - Posted on Oct 01, 2012
Modification 01 - Posted on Nov 16, 2012Modification 02 - Posted on Jan 04, 2013Modification 03 - Posted on Feb 01, 2013Modification 04 - Posted on Feb 12, 2013Modification 05 - Posted on Mar 04, 2013Modification 06 - Posted on Mar 28, 2013Modification 07 - Posted on Apr 23, 2013Modification 08 - Posted on May 07, 2013Modification 09 - Posted on Jan 07, 2014Modification 10 - Posted on Jun 24, 2014
Solicitation - Posted on Mar 18, 2013Amendment 01 - Posted on Mar 18, 2013Amendment 02 - Posted on Apr 04, 2013Amendment 03 - Posted on Apr 30, 2013Amendment 04 - Posted on May 08, 2013
Updated Industy Day Registration Announcement - Posted on Jan 02, 2013Industry Day Itinerary & Instructions - Posted on Jan 04, 2013Industry Day Attendees List - Posted on Jan 10, 2013Industry Day/Site Visit Presentation - Posted on Jan 10, 2013Question & Response Document Revised 02122013 - Posted on Feb 12, 2013WESC Question and Response Document Set 2 - Posted on Mar 22, 2013WESC Final RFP Q&A Document Set 3 - Posted on Apr 18, 2013WESC Q&A Set 4 - Posted on Apr 29, 2013WESC Q&A Set 4(a) - Posted on May 02, 2013WESC Q&A Document Set 4(b) - Posted on May 09, 2013
Posted: Jun 24, 2014 Center: GRCTitle: FATIGUE CRACK GROWTH KB BAR SPECIMENSSolicitation: NNC14516973Q Response Due: Jun 30, 2014Synopsis/Solicitation Combo - Posted on Jun 17, 2014Drawings for NNC14516973Q - Posted on Jun 23, 2014
Questions Answers NNC14516973Q - Posted on Jun 24, 2014
Posted: Jun 24, 2014 Center: LARCTitle: 32 CHANNEL LINEAR ARRAY PHOTOMULTIPLIER TUBESolicitation: NNL14514958Q Response Due: Jul 02, 2014Synopsis/Solicitation Combo - Posted on Jun 24, 2014On-Line RFQ - Posted on Jun 24, 2014SPECIFICATIONS - Posted on Jun 24, 2014
Posted: Jun 24, 2014 Center: GRCTitle: INDOOR WALK-IN FREEZERSolicitation: NNC14515528 Response Due: Jun 27, 2014Synopsis/Solicitation Combo - Posted on Jun 10, 2014
Amendment 01 - Posted on Jun 24, 2014Questions and Answers - Posted on Jun 17, 2014
Posted: Jun 24, 2014 Center: GSFCTitle: RANGE OPERATIONS CONTRACT IISolicitation: NNG14470444R Response Due: N/ASynopsis - Posted on May 20, 2014
Modification 01 - Posted on Jun 20, 2014Modification 02 - Posted on Jun 24, 2014
Draft Document - Posted on Jun 20, 2014
Posted: Jun 23, 2014 Center: MSFCTitle: ENGINE SECTION BASE ASSEMBLYSolicitation: NNM14501831Q Response Due: Jun 30, 2014Synopsis/Solicitation Combo - Posted on Mar 03, 2014
Amendment 01 - Posted on Mar 18, 2014Amendment 02 - Posted on Mar 27, 2014Amendment 03 - Posted on Apr 01, 2014Amendment 04 - Posted on Jun 03, 2014Amendment 05 - Posted on Jun 10, 2014Amendment 06 - Posted on Jun 23, 2014
Solicitation - Posted on Mar 03, 2014Drawings - Posted on Mar 18, 2014NNM14501831Q - Posted on Jun 03, 2014Questions Answers for NNM14501831Q - Posted on Jun 10, 2014Revisions and Additions for NNM14501831Q - Posted on Jun 23, 2014
Posted: Jun 23, 2014 Center: SSCTitle: SYNERGY-ACHIEVING CONSOLIDATED OPERATIONS AND MAINTENANCE -SACOM- CONTRACTSolicitation: NNS14478585R Response Due: Jul 22, 2014Synopsis - Posted on Mar 04, 2014Solicitation - Posted on May 16, 2014
Amendment 01 - Posted on May 30, 2014Amendment 02 - Posted on Jun 16, 2014Amendment 03 - Posted on Jun 23, 2014
Preproposal Conference Questions and Answers - Posted on Mar 13, 2014Pre-Proposal Conference Information - Posted on Mar 21, 2014NOTICE TO OFFERORS (SYNOPSIS) - Posted on May 08, 2014Government Response to Industry Questions - Posted on May 16, 2014SACOM Blackout Notice - Posted on May 16, 2014
Posted: Jun 23, 2014 Center: GSFCTitle: SPECTROMETERSolicitation: NNGWL334516Q Response Due: Jul 08, 2014Synopsis/Solicitation Combo - Posted on Jun 23, 2014
Posted: Jun 23, 2014 Center: MSFCTitle: VIBRO ACOUSTIC ONE MODULESSolicitation: NNM14515570Q Response Due: Jun 30, 2014Synopsis - Posted on Jun 23, 2014
Posted: Jun 23, 2014 Center: NSSCTitle: SIEMENS PLM SOFTWARESolicitation: NNX14MD45P Response Due: N/ASynopsis - Posted on Jun 23, 2014
Posted: Jun 23, 2014 Center: NSSCTitle: DYNAMICS SIMULATOR SUPPORTSolicitation: NNX14MD48P Response Due: Jun 27, 2014Synopsis - Posted on Jun 23, 2014
Posted: Jun 23, 2014 Center: LARCTitle: COMPRO + RAVEN SOFTWARE LICENSE + TRAININGSolicitation: NNL14514772Q Response Due: Jun 30, 2014Synopsis - Posted on Jun 23, 2014
Posted: Jun 23, 2014 Center: GSFCTitle: TICRA SOFTWARE LICENSE RENEWAL AND MAINTENANCESolicitation: NNG14517272L Response Due: Jul 10, 2014Synopsis - Posted on Jun 23, 2014
Posted: Jun 23, 2014 Center: LARCTitle: HIGH RESOLUTION TRANSMISSION ELECTRON MICROSCOPY NANOPARTIESSolicitation: NNL14514573Q Response Due: Jul 02, 2014Synopsis/Solicitation Combo - Posted on Jun 23, 2014On-Line RFQ - Posted on Jun 23, 2014Statement of Work - Posted on Jun 23, 2014
Posted: Jun 20, 2014 Center: NSSCTitle: 3D EVOLUTIONSolicitation: NNX14MD42P Response Due: Jun 25, 2014Synopsis - Posted on Jun 20, 2014
Posted: Jun 20, 2014 Center: HQTitle: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CENTENNIAL CHALLENGES PROGRAM CHALLENGE CONCEPTSSolicitation: NNH14STMD006L Response Due: Aug 08, 2014Synopsis - Posted on Jun 20, 2014
Posted: Jun 20, 2014 Center: GRCTitle: C-21 -LEARTET- RECURRENT PILOT TRAININGSolicitation: NNC14514120 Response Due: Jun 26, 2014Synopsis - Posted on Jun 20, 2014
Posted: Jun 20, 2014 Center: GSFCTitle: PROGRAM ANALYSIS AND CONTROL - PAAC III BRIDGE CONTRACTSolicitation: NNG14517955R Response Due: Jul 07, 2014Synopsis - Posted on Jun 20, 2014
Posted: Jun 20, 2014 Center: GRCTitle: NOTICE OF PARTNERING OPPORTUNITY WITH GRCSolicitation: NNC14ZMA0001 Response Due: Jul 01, 2014Synopsis - Posted on Jun 20, 2014Notice of Partnering Opportunity with GRC Details - Posted on Jun 20, 2014
Posted: Jun 20, 2014 Center: GRCTitle: VIDEO OVERLAY FOR HS SDI VIDEO SIGNALSSolicitation: NNC14517024Q Response Due: Jul 14, 2014Synopsis/Solicitation Combo - Posted on Jun 20, 2014
Posted: Jun 19, 2014 Center: ARCTitle: EXERCISE OPTION PERIOD 3 FOR AERONAUTICS AND EXPLORATION MISSION MODELING SIMULATIONSolicitation: NNA10DF26C Response Due: Jul 03, 2014Synopsis - Posted on Jun 19, 2014
Posted: Jun 19, 2014 Center: MSFCTitle: DEMOLITION OF BUILDING 4202 AT MARSHALL SPACE FLIGHT CENTERSolicitation: NNM14ZPS006E Response Due: Jun 10, 2014Synopsis - Posted on Apr 01, 2014
Modification 01 - Posted on Apr 07, 2014Solicitation - Posted on Apr 23, 2014
Amendment 01 - Posted on May 02, 2014Amendment 02 - Posted on May 14, 2014Amendment 03 - Posted on May 29, 2014Amendment 04 - Posted on Jun 05, 2014Amendment 05 - Posted on Jun 05, 2014
Source List - Posted on May 08, 2014Attendance Sheets for Site Visits - Posted on May 09, 2014Attendance Sheet for Site Visit, NNM14ZPS006E, May - Posted on May 23, 2014Abstract of Bids, IFB NNM14ZPS006E, Posted on NAIS - Posted on Jun 19, 2014
Posted: Jun 19, 2014 Center: GRCTitle: ANNUAL MAINTENANCE AND SUPPORT FOR SOFTWARE LICENSESSolicitation: NNC14517511Q Response Due: Jun 26, 2014Synopsis - Posted on Jun 19, 2014
Posted: Jun 19, 2014 Center: HQTitle: TEAMMATE RENEWALSolicitation: NNH14515058L Response Due: Jun 27, 2014Synopsis - Posted on Jun 19, 2014
Posted: Jun 19, 2014 Center: GRCTitle: FLUSH MOUNT MICROPHONE SET AND CABLESolicitation: NNC14516563Q Response Due: Jul 11, 2014Synopsis/Solicitation Combo - Posted on Jun 19, 2014
Posted: Jun 19, 2014 Center: ARCTitle: EARLY CAREER INITIATIVE - SOURCES SOUGHTSolicitation: NNA1467890L Response Due: Jun 30, 2014Synopsis - Posted on Jun 10, 2014
Modification 01 - Posted on Jun 19, 2014
Posted: Jun 19, 2014 Center: LARCTitle: RADIATION BUDGET INSTRUMENT -RBI- FORMERLY REFERRED TO AS CLOUDS AND THE EARTHS RADIANT ENERGY SYSTEM-CONTINUITY - CERES-CSolicitation: NNL13ZB1001R Response Due: N/ASynopsis - Posted on Mar 21, 2013
Modification 01 - Posted on Apr 10, 2013Modification 02 - Posted on May 06, 2013Modification 03 - Posted on May 10, 2013Modification 04 - Posted on May 15, 2013Modification 05 - Posted on May 31, 2013Modification 06 - Posted on Jun 05, 2013Modification 07 - Posted on Jun 07, 2013Modification 08 - Posted on Jun 10, 2013Modification 09 - Posted on Jun 13, 2013Modification 10 - Posted on Jun 14, 2013Modification 11 - Posted on Jul 15, 2013Modification 12 - Posted on Jul 25, 2013Modification 13 - Posted on Jul 29, 2013Modification 14 - Posted on Aug 21, 2013
Solicitation - Posted on Jun 14, 2013Amendment 01 - Posted on Jul 29, 2013Amendment 02 - Posted on Aug 14, 2013Amendment 03 - Posted on Aug 16, 2013
Amendment 1 to RBI Synopsis - Posted on Apr 05, 2013RBI Draft Request for Proposal - Posted on Apr 10, 2013RBI Pre-Solicitation Conference Slides - Posted on May 06, 2013DRAFT RBI Performance Incentive Plan - Posted on May 10, 2013Responses to Industry Questions and Comments - Posted on May 15, 2013Changes From RBI Draft to Final IPRD - Posted on May 31, 2013Changes from Draft RBI IPRD to Final RBI IPRD - Posted on May 31, 2013Responses to Industry Questions and Comments # 2 - Posted on Jun 07, 2013Requirements Changes to RBI Draft IPRD - Posted on Jun 10, 2013Responses to Industry Questions and Comments #3 - Posted on Jun 13, 2013FOR REFERENCE ONLY DOCUMENTS - DRFP to RFP - Posted on Jun 14, 2013RBI Final RFP Questions, Comments and Responses - Posted on Jul 15, 2013RBI Final RFP Questions, Comments and Responses #2 - Posted on Jul 25, 2013Points of Contact for the week of August 12th - Posted on Aug 12, 2013RBI Final RFP Questions and Responses - Posted on Aug 21, 2013Source Selection Statement - Posted on Jun 19, 2014
Title: POLYMERIC MATERIALSSolicitation: NNG14511825L Response Due: Jun 26, 2014Synopsis - Posted on Jun 19, 2014
Posted: Jun 18, 2014 Center: MSFCTitle: SECONDARY PAYLOADS AVIONICS BOX DEVELOPMENTSolicitation: NNM14512468L Response Due: Jul 18, 2014Synopsis - Posted on Jun 18, 2014Draft Document - Posted on Jun 18, 2014
Posted: Jun 18, 2014 Center: GSFCTitle: WALLOPS FLIGHT FACILITY WATER SYSTEM UPGRADESolicitation: NNG14498523R Response Due: Jun 19, 2014Synopsis - Posted on May 05, 2014Solicitation - Posted on May 20, 2014
Amendment 01 - Posted on Jun 13, 2014Amendment 02 - Posted on Jun 17, 2014
MANDATORY SITE VISIT INDUSTRY QUESTION - Posted on Jun 02, 2014MANDATORY SITE VISIT ATTENDEE LISTING - Posted on Jun 05, 2014Responses to Industry Questions - Posted on Jun 13, 2014Additional Response to Industry Questions - Posted on Jun 18, 2014
Posted: Jun 18, 2014 Center: NSSCTitle: SPLUNKSolicitation: NNX14MD29P Response Due: Jun 23, 2014Synopsis - Posted on Jun 18, 2014
Posted: Jun 18, 2014 Center: MSFCTitle: SOLARWINDS SOFTWARE LICENSES AND MAINTENANCE SUPPORTSolicitation: 124DYN75434 Response Due: Jun 23, 2014Synopsis/Solicitation Combo - Posted on Jun 18, 2014Solicitation - Posted on Jun 18, 2014
Amendment 01 - Posted on Jun 18, 2014
Posted: Jun 18, 2014 Center: GSFCTitle: INTERNATIONAL SPACE STATION DEWAR RFISolicitation: NNG14FA95RFI Response Due: Jul 03, 2014Synopsis - Posted on Jun 18, 2014Draft Statement of Work and Delivery Schedule - Posted on Jun 18, 2014
Title: CUSTOM FRAME SYNC BOARDS AND ASSOCIATED CABLESSolicitation: NNM14516653Q Response Due: Jun 25, 2014Synopsis - Posted on Jun 18, 2014
Posted: Jun 18, 2014 Center: LARCTitle: LARGE AREA HIGH RESOLUTION COMPUTED TOMOGRAPHY SYSTEMSolicitation: NNL14509280Q Response Due: Jun 27, 2014Synopsis/Solicitation Combo - Posted on Jun 18, 2014On-Line RFQ - Posted on Jun 18, 2014Specifications - Posted on Jun 18, 2014
Posted: Jun 18, 2014 Center: GSFCTitle: FABRICATION OF COMMERCIAL SERVICES AND SUPPLIES FOR GODDARD SPACE FLIGHT CENTER IISolicitation: NNG14475681Q Response Due: Jul 18, 2014Synopsis/Solicitation Combo - Posted on Jun 18, 2014On-Line RFQ - Posted on Jun 18, 2014Solicitation - Posted on Jun 18, 2014
Posted: Jun 18, 2014 Center: MSFCTitle: REVITALIZE ELECTRICAL SYSTEMS AT BUILDING 4619Solicitation: NNM14ZPS004E Response Due: Jun 17, 2014Synopsis - Posted on Mar 11, 2014Solicitation - Posted on May 05, 2014
Amendment 01 - Posted on May 23, 2014Amendment 02 - Posted on Jun 04, 2014
Abstract of Bids, IFB NNM14ZPS004E, Posted on NAIS - Posted on Jun 18, 2014
Posted: Jun 18, 2014 Center: KSCTitle: ACCUREV AND ACCUBRIDGE MAINTENANCESolicitation: NNK14516125Q Response Due: Jul 01, 2014Synopsis - Posted on Jun 16, 2014
Modification 01 - Posted on Jun 18, 2014
Posted: Jun 18, 2014 Center: KSCTitle: KA-BAND UP CONVERTER BUCSolicitation: NNK14516095Q Response Due: Jul 02, 2014Synopsis/Solicitation Combo - Posted on Jun 18, 2014NNK14516095Q - Posted on Jun 18, 2014
Title: OPTION 1 - CONTRACT NNA13AC55CSolicitation: NNA13AC55C-Opt1 Response Due: Jul 03, 2014Synopsis - Posted on Jun 18, 2014
Posted: Jun 18, 2014 Center: JSCTitle: INDUSTRY PRODUCT ROADMAP FOR THE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS "IEEE" 802.11S WIRELESS MESH NETWORKINGSolicitation: NNJ14ZBH030L Response Due: Aug 15, 2014Synopsis - Posted on Jun 18, 2014
Posted: Jun 18, 2014 Center: GSFCTitle: SAMPLE ANALYSIS AT MARS WIDE RANGE PUMPSSolicitation: NNG14511026L Response Due: Jul 02, 2014Synopsis - Posted on Jun 18, 2014
Posted: Jun 17, 2014 Center: GSFCTitle: CHEMICAL TREATMENT PROGRAM MONITORINGSolicitation: NNG14502412Q Response Due: Jun 25, 2014Synopsis/Solicitation Combo - Posted on Feb 25, 2014
Amendment 01 - Posted on Jun 17, 2014Statement Of Work - Posted on Feb 25, 2014Statement of Work (SOW) - Posted on Jun 17, 2014
Posted: Jun 17, 2014 Center: GSFCTitle: BMC SOFTWARE LICENSE AND SUPPORTSolicitation: NNG14512342Q Response Due: Jun 23, 2014Synopsis/Solicitation Combo - Posted on Jun 17, 2014On-Line RFQ - Posted on Jun 17, 2014
Posted: Jun 17, 2014 Center: KSCTitle: ORION WINDOW WAVEFRONT MEASUREMENTSolicitation: NNK14516220Q Response Due: Jun 20, 2014Synopsis - Posted on Jun 17, 2014
Posted: Jun 17, 2014 Center: GRCTitle: SINGLE PHOTON 1550 NM DETECTORSolicitation: NNC14517072Q Response Due: Jun 27, 2014Synopsis/Solicitation Combo - Posted on Jun 17, 2014
Posted: Jun 17, 2014 Center: MSFCTitle: AIR COOLED 2500W RECIRCULATING CHILLERSolicitation: NNM14508825Q Response Due: Jun 25, 2014Synopsis/Solicitation Combo - Posted on Jun 17, 2014Supporting Documents - Posted on Jun 17, 2014
Posted: Jun 17, 2014 Center: LARCTitle: TRANSFORMATIONAL HIGH SPEED ON-DEMAND MOBILITY RESEARCHSolicitation: MobilityResearch Response Due: Jul 11, 2014Synopsis - Posted on Jun 17, 2014
Posted: Jun 17, 2014 Center: GRCTitle: ANNUAL SOFTWARE LICENSE SUPPORT AND MAINTENANCESolicitation: NNC14516659Q Response Due: Jun 20, 2014Synopsis - Posted on Jun 17, 2014
Posted: Jun 17, 2014 Center: GRCTitle: THEORETICAL DEVELOPMENTS FOR ADVANCED ENERGETIC MATERIALSSolicitation: NNC14514036S Response Due: Jun 24, 2014Synopsis - Posted on May 21, 2014
Modification 01 - Posted on Jun 17, 2014
Posted: Jun 16, 2014 Center: KSCTitle: 4 WEEK CONNEXT SUPPORT PACKAGESolicitation: NNK14515795Q Response Due: Jul 01, 2014Synopsis - Posted on Jun 16, 2014
Posted: Jun 16, 2014 Center: AFRCTitle: CALMAR RESEARCH SOFTWARE MAINTENANCESolicitation: NND14515945Q Response Due: Jun 20, 2014Synopsis - Posted on Jun 16, 2014
Posted: Jun 16, 2014 Center: KSCTitle: AGENCY-WIDE ACQUISITION OF LIQUID HYDROGENSolicitation: NNK14495025R Response Due: Jun 27, 2014Synopsis - Posted on Apr 17, 2014Draft Document - Posted on Jun 16, 2014
Posted: Jun 16, 2014 Center: GRCTitle: 4H-SIC WAFERS WITH EPITAXIAL LAYERSSolicitation: NNC14516987Q Response Due: Jun 25, 2014Synopsis - Posted on Jun 16, 2014
Posted: Jun 16, 2014 Center: GSFCTitle: DATA ACQUISITION SYSTEMSolicitation: NNG14514717Q Response Due: Jun 17, 2014Synopsis/Solicitation Combo - Posted on May 28, 2014On-Line RFQ - Posted onQuestions and Answers - Posted on Jun 16, 2014
Posted: Jun 16, 2014 Center: GRCTitle: HEALTHCARE MANUFACTURING TECHNOLOGY TRANSFER SUPPORTSolicitation: NNC14ZC0017Q Response Due: Jun 30, 2014Synopsis - Posted on Jun 16, 2014
Posted: Jun 13, 2014 Center: SSCTitle: LABORATORY SERVICESSolicitation: NNS14ZDA004L Response Due: Jul 01, 2014Synopsis - Posted on Jun 13, 2014SSC Current Performance Work Statement - Posted on Jun 13, 2014
Posted: Jun 13, 2014 Center: MSFCTitle: VORTEX SIMULATOR SYSTEMSolicitation: NNM14511563Q Response Due: Jun 20, 2014Synopsis/Solicitation Combo - Posted on Jun 13, 2014NNM14511563Q Terms Conditions - Posted on Jun 13, 2014
Posted: Jun 13, 2014 Center: MSFCTitle: LIQUID HYDROGEN LH2 TANK SIMULATOR TO SPIDER AFT INTERFACE RING ASSEMBLYSolicitation: NNM14514449Q Response Due: Jul 02, 2014Synopsis/Solicitation Combo - Posted on Jun 13, 2014NNM14514449Q - Posted on Jun 13, 2014
Posted: Jun 13, 2014 Center: GSFCTitle: SATELLITE LASER RANGING OPERATIONS IN AREQUIPA PERUSolicitation: NNG14516567R Response Due: Jun 28, 2014Synopsis - Posted on Jun 13, 2014
Posted: Jun 13, 2014 Center: AFRCTitle: REQUEST FOR INFORMATION - COMMERCIAL REDUCED GRAVITY AIRCRAFT SERVICESSolicitation: NND14REDUCEDGRAVITY Response Due: Jul 07, 2014Synopsis - Posted on Jun 13, 2014
Posted: Jun 13, 2014 Center: LARCTitle: SHORT-WAVE INFRARED CAMERASolicitation: NNL14515702Q Response Due: Jun 20, 2014Synopsis/Solicitation Combo - Posted on Jun 13, 2014On-Line RFQ - Posted on Jun 13, 2014
Posted: Jun 12, 2014 Center: ARCTitle: SPACE STUDIES PROGRAM 2014Solicitation: NNA14PC54Q-UTU Response Due: Jun 16, 2014Synopsis - Posted on Jun 12, 2014
Posted: Jun 12, 2014 Center: GRCTitle: GE DRUCK UNIK PRESSURE TRANSDUCERSSolicitation: NNC14516152Q Response Due: Jun 27, 2014Synopsis/Solicitation Combo - Posted on Jun 12, 2014
Posted: Jun 12, 2014 Center: GRCTitle: GLENN MULTIPLE AWARD CONSTRUCTION CONTRACTSolicitation: NNC14ZFD020J Response Due: Jun 13, 2014Synopsis - Posted on Mar 06, 2014
Modification 01 - Posted on Mar 26, 2014Solicitation - Posted on May 13, 2014
Amendment 01 - Posted on Jun 05, 2014Amendment 02 - Posted on Jun 06, 2014Amendment 03 - Posted on Jun 12, 2014
Posted: Jun 11, 2014 Center: GSFCTitle: RANGE DATA ACQUISITION COMPUTERSolicitation: NNG14512871L Response Due: Jun 26, 2014Synopsis - Posted on Jun 11, 2014Statement of Work - Posted on Jun 11, 2014
Posted: Jun 11, 2014 Center: MSFCTitle: MODIFICATION OF EXISTING MAST CLIMBING WORK PLATFORM
Solicitation: NNM14509660Q1 Response Due: Jun 17, 2014Synopsis/Solicitation Combo - Posted on Jun 11, 2014Terms Cond. for NNM14509660Q1 - Posted on Jun 11, 2014
Posted: Jun 11, 2014 Center: HQTitle: DIVERSITY AND INCLUSION SATERN TRAININGSolicitation: NNH14492723L Response Due: Jun 16, 2014Synopsis/Solicitation Combo - Posted on Jun 11, 2014
Posted: Jun 11, 2014 Center: GRCTitle: SOFTWARE TEMA MOTIONSolicitation: NNC14512833Q Response Due: Jun 17, 2014Synopsis/Solicitation Combo - Posted on Jun 11, 2014
Posted: Jun 10, 2014 Center: AFRCTitle: CDI MULTITEST MOTORIZED SYSTEMSolicitation: NND14508203Q Response Due: Jun 23, 2014Synopsis/Solicitation Combo - Posted on Jun 10, 2014On-Line RFQ - Posted on Jun 10, 2014
Posted: Jun 10, 2014 Center: JSCTitle: COMMERCIAL RESUPPLY SERVICES 2Solicitation: NNJ14ZBG007LA Response Due: Jun 13, 2014Synopsis - Posted on Mar 26, 2014
Modification 01 - Posted on Apr 09, 2014Modification 02 - Posted on Apr 14, 2014Modification 03 - Posted on Apr 28, 2014Modification 04 - Posted on Jun 10, 2014
Industry Day Charts - Posted on Apr 09, 2014Interested Parties List - Posted on Apr 14, 2014Industry Day Questions and Answers - Posted on Apr 28, 2014Industry Day Questions and Answers Round 2 - Posted on Jun 10, 2014
Posted: Jun 10, 2014 Center: LARCTitle: PACIFIC SCIENTIFIC CABLE CUTTERSolicitation: NNL14515897Q Response Due: Jun 16, 2014Synopsis - Posted on Jun 10, 2014
Posted: Jun 10, 2014 Center: LARCTitle: DIGITAL WAVE SENSORS AND COMPONENTSSolicitation: NNL14515471Q
Response Due: Jun 16, 2014Synopsis - Posted on Jun 10, 2014
Posted: Jun 10, 2014 Center: MSFCTitle: ADVANCED LARGE APERTURE MIRROR TECHNOLOGY DEVELOPMENT PROGRAMSolicitation: NNM14511057R Response Due: Jun 25, 2014Synopsis - Posted on Jun 10, 2014
Posted: Jun 10, 2014 Center: MSFCTitle: ROTARY SLIDING VANE COMPRESSORSSolicitation: NNM14514452Q Response Due: Jun 13, 2014Synopsis/Solicitation Combo - Posted on Jun 02, 2014
Amendment 01 - Posted on Jun 10, 2014Terms and Condtions - Posted on Jun 02, 2014
Posted: Jun 10, 2014 Center: HQTitle: NASA OPPORTUNITY NOTICE TO PARTICIPATE IN ITS CENTENNIAL CHALLENGES PROGRAM AS AN ALLIED ORGANIZATION FOR SMALL SPACECRAFT CHALLENGESSolicitation: NNH14STMD005L Response Due: Jul 11, 2014Synopsis - Posted on Jun 10, 2014Appendix 1 2 3 - Posted on Jun 10, 2014
Posted: Jun 10, 2014 Center: HQTitle: EVOLVING ISS INTO A LEO COMMERCIAL MARKETSolicitation: NNHXXZCJ001L Response Due: Jun 30, 2014Synopsis - Posted on Apr 28, 2014
Modification 01 - Posted on May 14, 2014Modification 02 - Posted on Jun 03, 2014
Charts - Posted on Jun 10, 2014ISS Contracting Mechanisms for RFI - Posted on Jun 10, 2014
Posted: Jun 10, 2014 Center: HQTitle: EXPLORING THE COSMOS WITH THE NATIONAL RADIO ASTRONOMY OBSERVATORY FORUMSolicitation: NNH14515296L Response Due: Jun 16, 2014Synopsis - Posted on Jun 10, 2014
Posted: Jun 10, 2014 Center: LARCTitle: PORTABLE AIRBORNE PARTICLE COUNTERSolicitation: NNL14514127Q Response Due: Jun 17, 0114Synopsis/Solicitation Combo - Posted on Jun 10, 2014On-Line RFQ - Posted on Jun 10, 2014
Posted: Jun 10, 2014 Center: GSFCTitle: THERMAL SYNTHESIZER SYSTEMSolicitation: NNG14516005L Response Due: Jun 26, 2014Synopsis - Posted on Jun 10, 2014
Posted: Jun 09, 2014 Center: HQTitle: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION {NASA} - CENTENNIAL CHALLENGES PROGRAM - SMALL SPACECRAFT CHALLENGES - REQUEST FOR INFORMATION {RFI}Solicitation: NNH14STMD004L Response Due: Jul 11, 2014Synopsis - Posted on Jun 09, 2014Lunar CubeSat Centennial Challenge Rules Appendix1 - Posted on Jun 09, 2014
Posted: Jun 09, 2014 Center: JSCTitle: EXTENSION OF JSC ADMINISTRATIVE SUPPORT SERVICES CONTRACTSolicitation: NNJ14473923R Response Due: Jun 19, 2014Synopsis - Posted on Jun 05, 2014
Modification 01 - Posted on Jun 09, 2014
Posted: Jun 09, 2014 Center: GSFCTitle: SMALL 1NMS REACTION WHEELSolicitation: NNG14513546Q Response Due: Jun 02, 2014Synopsis/Solicitation Combo - Posted on May 19, 2014On-Line RFQ - Posted on Jun 09, 2014Questions and Answers - Posted on May 28, 2014
Posted: Jun 09, 2014 Center: LARCTitle: DIODE LASERSolicitation: NNL14512870Q Response Due: Jun 17, 2014Synopsis/Solicitation Combo - Posted on Jun 09, 2014On-Line RFQ - Posted on Jun 09, 2014
Posted: Jun 06, 2014 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – WIRELESS PASSIVE FLUID MEASUREMENT SENSORSolicitation: TT01061 Response Due: Jun 06, 2015Synopsis - Posted on Jun 06, 2014
Title: TECHNOLOGY TRANSFER OPPORTUNITY - FLEXIBLE HIGH-TEMPERATURE SILVER ELECTROPLATED FILM THERMOCOUPLESolicitation: TT01060 Response Due: Jun 06, 2015Synopsis - Posted on Jun 06, 2014
Posted: Jun 06, 2014 Center: LARCTitle: MAINTENANCE OF FEI-PHILIPS CM200 TRANSMISSION ELECTRON MICROSCOPESolicitation: NNL14515524Q Response Due: Jun 10, 2014Synopsis - Posted on Jun 06, 2014
Posted: Jun 06, 2014 Center: ARCTitle: AIRCRAFT AND AIRFIELD RELATED SERVICESSolicitation: NNA10DE11C-Extension Response Due: Jun 23, 2014Synopsis - Posted on Jun 06, 2014
Posted: Jun 05, 2014 Center: GSFCTitle: ANNUAL SERVICE CONTRACT - JB TECHNICAL SERVICESSolicitation: NNG14510212L Response Due: Jun 20, 2014Synopsis - Posted on Jun 05, 2014
Posted: Jun 05, 2014 Center: GSFCTitle: 3 MIRROR AND 2 MIRROR SOLID ETALONSolicitation: NNG14507095Q-A Response Due: Jun 06, 2014Synopsis/Solicitation Combo - Posted on May 28, 2014
Amendment 01 - Posted on Jun 05, 2014On-Line RFQ - Posted on May 29, 2014SPECSDRAWINGS - Posted on Jun 03, 2014
Posted: Jun 05, 2014 Center: LARCTitle: JOHNSON CONTROLS REPLACEMENT MULTIPLE BUILDINGS CONTROLLER UPGRADESolicitation: NNL14512333Q Response Due: Jun 12, 2014Synopsis - Posted on Jun 05, 2014JOFOC - Posted on Jun 05, 2014
Posted: Jun 05, 2014 Center: GSFCTitle: CUSTOM REPLACEMENT COMPONENTS FOR ETALONSolicitation: NNG14515190L Response Due: Jun 20, 2014Synopsis - Posted on Jun 05, 2014
Posted: Jun 05, 2014 Center: MSFCTitle: IMAGEN RACKMOUNT SYSTEMSSolicitation: NNM14514473Q Response Due: Jun 09, 2014Synopsis - Posted on Jun 05, 2014
Posted: Jun 05, 2014 Center: GSFCTitle: FLIGHT SERVICES FOR GODDARD LIDAR HYPERSPECTRAL THERMAL AIRBORNE IMAGING SYSTEMSolicitation: NNG14510279Q Response Due: Jun 13, 2014Synopsis/Solicitation Combo - Posted on Jun 05, 2014On-Line RFQ - Posted on
Posted: Jun 05, 2014 Center: GSFCTitle: RD94 GPS DROPSONDESSolicitation: NNG14514894L Response Due: Jun 19, 2014Synopsis - Posted on Jun 05, 2014
Posted: Jun 04, 2014 Center: KSCTitle: NASA LAUNCH SERVICES II 2014 ON-RAMPSolicitation: RFP10-99-0021-Rev-H Response Due: Aug 15, 2014Synopsis - Posted on Apr 29, 2014Solicitation - Posted on Jun 04, 2014
Posted: Jun 04, 2014 Center: GSFCTitle: POD FOR NASA-GSFC PLANETARY SPACE FLIGHT INSTRUMENT ELECTRONICS DEVELOPMENTSolicitation: POD-NASA-GSFC-PLANETARY-SPACEFLIGHT-INSTRUMENT-ELECTRONICS Response Due: Jun 20, 2014Synopsis - Posted on Jun 04, 2014POD Information - Posted on Jun 04, 2014
Posted: Jun 04, 2014 Center: GSFCTitle: POD FOR NASA-GSFC LINEAR VARIABLE FILTERSSolicitation: POD-NASA-GSFC-LINEAR-VARIABLE-FILTERS Response Due: Jun 20, 2014Synopsis - Posted on Jun 04, 2014POD Information - Posted on Jun 04, 2014
Posted: Jun 04, 2014 Center: GSFCTitle: POD FOR NASA-GSFC TURBO-MOLECULAR VACUUM PUMP DEVELOPMENTSolicitation: Sources-Sought-NASA-GSFC-Turbo-molecular-VPD Response Due: Jun 20, 2014Synopsis - Posted on Jun 04, 2014
Posted: Jun 04, 2014 Center: NSSCTitle: WONDERWARE SOFTWARESolicitation: NNX14MD11D Response Due: Jun 11, 2014Synopsis - Posted on Jun 04, 2014
Posted: Jun 04, 2014 Center: MSFCTitle: VERICUT PROGRAMMING AND SIMULATION SOFTWARESolicitation: NNM14509562Q Response Due: Jun 11, 2014Synopsis/Solicitation Combo - Posted on Jun 03, 2014
Amendment 01 - Posted on Jun 04, 2014Solicitation - Posted on Jun 03, 2014
Posted: Jun 04, 2014 Center: MSFCTitle: IMAGEN RACKMOUNT SERVERS AND ASSOCIATED HARDWARESolicitation: NNM14514480Q Response Due: Jun 09, 2014Synopsis - Posted on Jun 04, 2014
Posted: Jun 03, 2014 Center: MSFCTitle: MICROGATE SYSTEMS SYNCLINK GT4E ADAPTORS FOR LINUXSolicitation: NNM14515262Q Response Due: Jun 09, 2014Synopsis/Solicitation Combo - Posted on Jun 03, 2014Terms and Conditions - Posted on Jun 03, 2014
Posted: Jun 03, 2014 Center: ARCTitle: ANIMAL ACCESS UNIT FABRICATION AND ASSEMBLYSolicitation: NNA14508739Q-AMH-Q Response Due: Jun 12, 2014Synopsis - Posted on May 01, 2014
Modification 01 - Posted on May 08, 2014Modification 02 - Posted on May 08, 2014Modification 03 - Posted on Jun 03, 2014
Solicitation - Posted on May 15, 2014Amendment 01 - Posted on Jun 03, 2014
Questions and Answers 1 - Posted on May 08, 2014Responses to Questions- 13 May 2014 - Posted on May 13, 2014
Posted: Jun 03, 2014 Center: SSCTitle: SOURCES SOUGHT FOR INFORMATION AND TECHNICAL SERVICES AT JOHN C STENNIS SPACE CENTERSolicitation: NNS14ITS Response Due: Jun 06, 2014
Synopsis - Posted on May 23, 2014Current PWS - Posted on May 23, 2014Responses to Questions 060314 - Posted on Jun 03, 2014
Posted: Jun 03, 2014 Center: MSFCTitle: ISS WATER PROCESSOR ASSEMBLY AMBIENT CATALYTIC REACTOR CATALYST DEVELOPMENTSolicitation: NNM14508379r Response Due: Jun 05, 2014Synopsis - Posted on Apr 04, 2014Solicitation - Posted on Apr 14, 2014
Amendment 01 - Posted on Apr 14, 2014Amendment 02 - Posted on Apr 18, 2014Amendment 03 - Posted on Apr 24, 2014
Questions and Responses - Posted on Apr 28, 2014Question and Answer 3 - Posted on May 05, 2014Questions and Answers 4 - Posted on Jun 03, 2014
Posted: Jun 02, 2014 Center: HQTitle: STRATEGIC PLANNING WORKSHOPSolicitation: NNH14514827L Response Due: Jun 05, 2014Synopsis - Posted on Jun 02, 2014
Posted: Jun 02, 2014 Center: MSFCTitle: SOLID ROCKET MOTOR FOR NANO LAUNCH ROCKETSolicitation: NNM14511044Q1 Response Due: Jun 10, 2014Synopsis/Solicitation Combo - Posted on May 27, 2014
Amendment 01 - Posted on Jun 02, 2014Terms and Conditions and Specifications - Posted on Jun 02, 2014
Posted: Jun 02, 2014 Center: MSFCTitle: PC SIGNAL LICENSE RENEWALSolicitation: NNM14511227Q Response Due: Jun 10, 2014Synopsis - Posted on Jun 02, 2014
Posted: Jun 02, 2014 Center: MSFCTitle: FLIR CAMERAS AND LENSESSolicitation: NNM14509465Q Response Due: Jun 12, 2014Synopsis/Solicitation Combo - Posted on Jun 02, 2014TERMS AND CONDITIONS - Posted on Jun 02, 2014
Posted: May 30, 2014 Center: ARCTitle: FLUID LENSING AIRBORNE AND SPACEBORNE IMAGERSSolicitation: NNA14512420Q-AKK
Response Due: Jun 16, 2014Synopsis/Solicitation Combo - Posted on May 30, 2014NNA14512420Q-AKK Specifications - Posted on May 30, 2014
Posted: May 29, 2014 Center: MSFCTitle: B K MAINFRAME LOAD CELL MODULES AND EXTENSIONSSolicitation: NNM14511294Q Response Due: Jun 05, 2014Synopsis/Solicitation Combo - Posted on May 29, 2014Terms and Conditions and Specifications - Posted on May 29, 2014
Posted: May 29, 2014 Center: MSFCTitle: MEASUREMENT OF PROTEIN CRYSTAL GROWTH RATES AND APPARATUS MAINTENANCESolicitation: NNM14513708Q Response Due: Jun 03, 2014Synopsis - Posted on May 29, 2014
Posted: May 29, 2014 Center: GRCTitle: MAINTENANCE SUPPORT AND UPGRADES TO LICENSESSolicitation: NNC14515016Q Response Due: May 30, 2014Synopsis - Posted on May 29, 2014
Posted: May 29, 2014 Center: LARCTitle: YTTRIUM LITHIUM FLUORIDE -YLF- LASER CRYSTALSSolicitation: NNL14512868Q Response Due: Jun 09, 2014Synopsis/Solicitation Combo - Posted on May 29, 2014On-Line RFQ - Posted on May 29, 2014
Posted: May 29, 2014 Center: LARCTitle: LAMINAR FLOW CLEAN BENCHSolicitation: NNL14515282Q Response Due: Jun 02, 2014Synopsis/Solicitation Combo - Posted on May 29, 2014On-Line RFQ - Posted on May 29, 2014Specifications - Posted on May 29, 2014
Posted: May 28, 2014 Center: LARCTitle: LS-DYNA SOFTWARE LICENSE RENEWALSolicitation: NNL14513693Q Response Due: Jun 02, 2014Synopsis - Posted on May 28, 2014
Title: PARTNERSHIP REQUEST FOR INFORMATION: ASTROMATERIALS RESEARCH AND EXPLORATION SCIENCE JOHNSON SPACE CENTERSolicitation: NNJ14ZBH067L Response Due: Dec 31, 2014Synopsis - Posted on May 28, 2014
Posted: May 28, 2014 Center: GSFCTitle: CUSTOM DEWARSolicitation: NNG14-514520L Response Due: Jun 12, 2014Synopsis - Posted on May 28, 2014
Posted: May 28, 2014 Center: KSCTitle: REFURBISH AND UPGRADE WATER SYSTEM LAUNCH COMPLEX LC 39B PHASE 3Solicitation: NNK14GLANOWSKI_WATER_SYSTEM Response Due: Jun 07, 2014Synopsis - Posted on May 28, 2014
Posted: May 28, 2014 Center: KSCTitle: IGNITION OVER PRESSURE IOP AND SOUND SUPPRESSION SS SYSTEMS POST LIFTOFF BYPASS - LAUNCH COMPLEX LC 39BSolicitation: NNK14GUMKE_PLB_LC39B Response Due: Jun 07, 2014Synopsis - Posted on May 28, 2014
Posted: May 28, 2014 Center: KSCTitle: REQUEST FOR INFORMATION - LEASE AND DEVELOPMENT OF KENNEDY SPACE CENTER LAND ASSETSSolicitation: RFI-KSC-Land-Assets-2014 Response Due: Jul 11, 2014Synopsis - Posted on May 27, 2014RFI Attachment 1 - Posted on May 28, 2014
Posted: May 28, 2014 Center: LARCTitle: MODELCENTER AND DESIGN EXPLORER SOFTWARE LICENSE MAINTENANCE PACKAGESolicitation: NNL14514605Q Response Due: Jun 02, 2014Synopsis - Posted on May 28, 2014
Posted: May 28, 2014 Center: KSCTitle: INSTALL GROUND SUPPORT EQUIPMENT ON THE SPACE LAUNCH SYSTEM MOBILE LAUNCHER AT KENNEDY SPACE CENTER FLORIDASolicitation: NNK14RFITJF02 Response Due: Jun 30, 2014Synopsis - Posted on May 28, 2014
Posted: May 28, 2014 Center: KSCTitle: CONSTRUCTION AND OUTFITTING OF THE CENTRAL CAMPUSSolicitation: NNK14498217R Response Due: Jun 05, 2014Synopsis - Posted on Jan 16, 2014
Modification 01 - Posted on Jan 22, 2014Solicitation - Posted on Mar 10, 2014
Amendment 01 - Posted on Mar 13, 2014Amendment 02 - Posted on Mar 28, 2014Amendment 03 - Posted on Apr 09, 2014Amendment 04 - Posted on Apr 22, 2014Amendment 05 - Posted on May 01, 2014Amendment 06 - Posted on May 05, 2014Amendment 07 - Posted on May 08, 2014Amendment 08 - Posted on May 19, 2014Amendment 09 - Posted on May 22, 2014Amendment 10 - Posted on May 28, 2014
Specs Drawings - Posted on Mar 10, 2014Site Visit Attendee List - Posted on Mar 20, 2014Sketches for AM 4 - Posted on Apr 22, 2014Amendment 4 Referenced Sketch and Security Plan - Posted on Apr 24, 2014Upcoming Revisions to Specs and Drawings - Posted on May 05, 2014
Posted: May 27, 2014 Center: AFRCTitle: STRATOSPHERIC OBSERVATORY FOR INFRARED ASTRONOMY SOFIA AIRCRAFT MODIFICATION AND MISSION SYSTEMS TECHNICAL SUPPORTSolicitation: NND14515137R Response Due: Jun 16, 2014Synopsis - Posted on May 27, 2014
Posted: May 27, 2014 Center: MSFCTitle: 6" BORE HYDRAULIC CYLINDERSSolicitation: NNM14514411Q Response Due: Jun 04, 2014Synopsis/Solicitation Combo - Posted on May 27, 2014Terms and Conditions and Specification - Posted on May 27, 2014
Posted: May 27, 2014 Center: MSFCTitle: SOLID ROCKET BOOSTER FOR THE NL2A VEHICLESolicitation: NNM14511044Q Response Due: N/ASynopsis/Solicitation Combo - Posted on May 13, 2014
Amendment 01 - Posted on May 16, 2014Terms and Conditions - Posted on May 13, 2014Terms and Conditions SpecificationsSOW - Posted on May 27, 2014
Response Due: Jun 16, 2014Synopsis - Posted on Apr 28, 2014
Modification 01 - Posted on May 06, 2014Modification 02 - Posted on May 16, 2014
Solicitation - Posted on May 19, 2014Amendment 01 - Posted on May 23, 2014
Posted: May 22, 2014 Center: GSFCTitle: REQUEST FOR INFORMATION-FEDERAL STRATEGIC SOURCING INITIATIVE FOR DESKTOPS AND LAPTOPSSolicitation: FSSI-RFI-2014 Response Due: Jun 06, 2014Synopsis - Posted on May 20, 2014
Modification 01 - Posted on May 22, 2014RFI FSSI DESKTOPSLAPTOPS ATTACHMENT A - Posted on May 20, 2014
Posted: May 22, 2014 Center: LARCTitle: DYNAMOMETER TESTING SYSTEMSolicitation: NNL14513688Q Response Due: May 28, 2014Synopsis/Solicitation Combo - Posted on May 21, 2014
Amendment 01 - Posted on May 22, 2014On-Line RFQ - Posted on May 21, 2014Specifications - Posted on May 21, 2014Specifications Revised 052214 - Posted on May 22, 2014
Posted: May 22, 2014 Center: MSFCTitle: FABRICATION AND ASSEMBLY OF SOLAR SAIL MATERIALSolicitation: NNM14513413Q Response Due: May 27, 2014Synopsis - Posted on May 22, 2014
Posted: May 22, 2014 Center: MSFCTitle: MODAL DATA ACQUISITION AND DATA ANALYSIS HARDWARE - SOFTWARE PACKAGESolicitation: NNM14RFIMODALDATA Response Due: Jun 03, 2014Synopsis - Posted on May 22, 2014System Requirements and Response Instructions - Posted on May 22, 2014
Posted: May 22, 2014 Center: GRCTitle: HIGH-SPEED FLEX DIAPHRAGM COUPLINGSolicitation: NNC14514587Q Response Due: Jun 03, 2014Synopsis - Posted on May 22, 2014
Posted: May 21, 2014 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – LIGHTWEIGHT SENSING AND CONTROL SYSTEM -
FOR UNMANNED AERIAL VEHICLE-UAV MONITORINGSolicitation: TT01057 Response Due: May 16, 2015Synopsis - Posted on May 21, 2014
Posted: May 21, 2014 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – FAIL-SAFE HIGH TEMPERATURE COMPOSITE STRUCTURESolicitation: TT01058 Response Due: May 16, 2015Synopsis - Posted on May 21, 2014
Posted: May 21, 2014 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – WIRELESS AND PASSIVE DAMAGE AND TAMPER DETECTION SENSOR SYSTEMSolicitation: TT01059 Response Due: May 16, 2015Synopsis - Posted on May 21, 2014
Posted: May 21, 2014 Center: KSCTitle: STAR-CCM+ SOFTWARE LICENSE RENEWALSolicitation: NNK14508068Q Response Due: Jun 04, 2014Synopsis - Posted on May 21, 2014
Posted: May 21, 2014 Center: GSFCTitle: BETTII TELESCOPE MIRRORS AND MOUNTSSolicitation: NNG14505011L Response Due: May 29, 2014Synopsis - Posted on May 21, 2014
Posted: May 21, 2014 Center: LARCTitle: EXCHANGE OPERATION AUDIT OF FY2014 FINANCIAL STATEMENTSSolicitation: NNL14513666Q Response Due: Jun 03, 2014Synopsis/Solicitation Combo - Posted on May 21, 2014On-Line RFQ - Posted on May 21, 2014Statement of Work - Posted on May 21, 2014
Posted: May 21, 2014 Center: MSFCTitle: MODIFICATION OF EXISTING MAST CLIMBING WORK PLATFORMSolicitation: NNM14509660Q Response Due: May 30, 2014Synopsis/Solicitation Combo - Posted on May 21, 2014Terms and Conditions - Posted on May 21, 2014
Posted: May 20, 2014 Center: ARCTitle: REAL TIME VISION BASED RELATIVE NAVIGATION GUIDANCE AND TARGETING METHODS AND AUTONOMOUS GUIDANCE NAVIGATION AND CONTROL FLIGHT SOFTWARESolicitation: NNA14ZDR001R Response Due: Jun 04, 2014Synopsis - Posted on May 20, 2014
Posted: May 20, 2014 Center: LARCTitle: SOFTWALL CLEAN ROOM ENCLOSURESolicitation: NNL14512672Q Response Due: May 28, 2014Synopsis/Solicitation Combo - Posted on May 20, 2014On-Line RFQ - Posted on May 20, 2014Specifications - Posted on May 20, 2014
Posted: May 20, 2014 Center: GSFCTitle: TIME-LAPSE CAMERASolicitation: NNG14510670Q Response Due: May 26, 2014Synopsis/Solicitation Combo - Posted on May 16, 2014On-Line RFQ - Posted on May 16, 2014AMENDEMENT TO REQUIRMENTS ON SYNOPSIS - Posted on May 16, 2014Change to Item - Posted on May 20, 2014
Posted: May 20, 2014 Center: GRCTitle: PARKER STAINLESS STEEL CHECK VALVESSolicitation: NNC14513529Q Response Due: May 26, 2014Synopsis/Solicitation Combo - Posted on May 20, 2014
Posted: May 20, 2014 Center: GRCTitle: ORBITAL MANEUVERING SYSTEM THRUST VECTOR CONTROL SUPPORTSolicitation: NNC144802052Q Response Due: May 30, 2014Synopsis - Posted on May 20, 2014
Posted: May 20, 2014 Center: KSCTitle: KENNEDY DATA CENTER SERVICESSolicitation: NNK14ZES001L Response Due: Jun 20, 2014Synopsis - Posted on May 20, 2014
Modification 01 - Posted on May 20, 2014
Posted: May 20, 2014 Center: LARCTitle: WATER TUNNELSolicitation: NNL14512545Q
Response Due: May 26, 2014Synopsis/Solicitation Combo - Posted on May 20, 2014On-Line RFQ - Posted on May 20, 2014Specifications - Posted on May 20, 2014
Posted: May 20, 2014 Center: KSCTitle: ABSOLUTE AND BIDIRECTIONAL DIFFERENTIAL PRESSURE TRANSDUCERSSolicitation: NNK14512057Q Response Due: Jun 04, 2014Synopsis - Posted on May 20, 2014
Posted: May 20, 2014 Center: KSCTitle: INTRINSICALLY SAFE HUMIDITY AND TEMPERATURE TRANSMITTERSSolicitation: NNK14511680Q Response Due: Jun 04, 2014Synopsis - Posted on May 20, 2014
Posted: May 20, 2014 Center: HQTitle: ADVANCED OXYGEN RECOVERY FOR SPACECRAFT LIFE SUPPORT SYSTEMSSolicitation: NNH14ZOA001N-14GCD-C2-Amendment-1 Response Due: N/ASynopsis - Posted on May 20, 2014
Posted: May 20, 2014 Center: GRCTitle: AIR COOLED COMPRESSORSolicitation: NNC14514011Q Response Due: May 30, 2014Synopsis - Posted on May 20, 2014
Posted: May 19, 2014 Center: GSFCTitle: CASSIE TELEMETRY SYSTEM ANALYSIS SOFTWARE AND UPDATESSolicitation: NNG14512374L Response Due: May 28, 2014Synopsis - Posted on May 19, 2014
Posted: May 19, 2014 Center: MSFCTitle: CATERPILLAR HEAVY HAUL TRACTORSolicitation: NNM14508768Q Response Due: Jun 06, 2014Synopsis/Solicitation Combo - Posted on May 14, 2014
Amendment 01 - Posted on May 19, 2014Terms and Conditions and Specifications - Posted on May 14, 2014Terms and Conditions and Specifications - Posted on May 19, 2014
Title: TECHNOLOGY ADVANCING PARTNERSHIPS CHALLENGE AT KENNEDY SPACE CENTERSolicitation: NNK14AA01A Response Due: May 22, 2014Synopsis - Posted on Apr 25, 2014
Modification 01 - Posted on Apr 28, 2014Modification 02 - Posted on Apr 30, 2014Modification 03 - Posted on May 19, 2014
Posted: May 19, 2014 Center: NSSCTitle: MCIDAS SOFTWARESolicitation: NNX14MD04D Response Due: May 23, 2014Synopsis - Posted on May 19, 2014
Posted: May 19, 2014 Center: LARCTitle: LANGLEY INFORMATION TECHNOLOGY ENHANCED SERVICES IISolicitation: LITES-II Response Due: Jun 09, 2014Synopsis - Posted on May 19, 2014
Posted: May 16, 2014 Center: MSFCTitle: LOGISTICAL AND ECONOMIC STUDY AND INTERNATIONAL CEMENT INDUSTRY LIAISONSolicitation: NNM14510140Q Response Due: May 23, 2014Synopsis - Posted on May 16, 2014
Posted: May 16, 2014 Center: MSFCTitle: STEPANFOAM S-180 MATERIALS KITSolicitation: NNM14510820Q Response Due: May 23, 2014Synopsis - Posted on May 16, 2014
Posted: May 16, 2014 Center: SSCTitle: SUPPLY AND DELIVERY OF HIGH PRESSURE INDUSTRIAL WATER VALVES 4-EACH 30-INCH CHECK AND 4-EACH 30-INCH GATE VALVES WITH OPTIONAL ADDITIVE ITEMS FOR ADDITIONAL VALVESSolicitation: NNS13474010R Response Due: Jul 03, 2013Synopsis - Posted on May 23, 2013
Modification 01 - Posted on Jun 18, 2013Solicitation - Posted on Jun 18, 2013
Amendment 01 - Posted on May 16, 2014
Posted: May 16, 2014 Center: KSCTitle: PAYLOAD AVIONICS SYSTEMS AND AVIONICS ELEMENTS FOR LUNAR SURFACE RESOURCE PROSPECTING MISSIONSolicitation: NNK14ZMS0003L
Response Due: Jun 20, 2014Synopsis - Posted on May 16, 2014RESOLVE AVIONICS - Posted on May 16, 2014
Posted: May 16, 2014 Center: GSFCTitle: MID-ATLANTIC REGIONAL SPACE PORT II -- MARS IISolicitation: NNG14510575 Response Due: May 02, 2014Synopsis - Posted on Apr 17, 2014
Justification and Approval - Posted on May 16, 2014
Posted: May 16, 2014 Center: KSCTitle: COMTECH EF DATA SATELLITE MODEMSolicitation: NNK14510375Q Response Due: May 31, 2014Synopsis/Solicitation Combo - Posted on May 16, 2014On-Line RFQ - Posted on May 16, 2014
Posted: May 16, 2014 Center: JSCTitle: HUMAN EXPLORATION RESEARCH OPPORTUNITIES NASA RESEARCH ANNOUNCEMENTSolicitation: NNJ13ZSA002N Response Due: Sep 04, 2014Synopsis - Posted on Jul 15, 2013
Modification 01 - Posted on Feb 21, 2014Modification 02 - Posted on May 16, 2014
Posted: May 16, 2014 Center: NSSCTitle: POLARIS AND ARGO SUITESolicitation: NNX14MC88B Response Due: May 23, 2014Synopsis - Posted on May 16, 2014
Posted: May 16, 2014 Center: GSFCTitle: AIRCRAFT MAINTENANCE AND OPERATIONS CONTRACT - AMOCSolicitation: NNG1344640R Response Due: May 28, 2014Synopsis - Posted on Jun 21, 2013
Modification 01 - Posted on Aug 05, 2013Modification 02 - Posted on Sep 03, 2013Modification 03 - Posted on Sep 20, 2013Modification 04 - Posted on Oct 21, 2013
Solicitation - Posted on Apr 16, 2014Amendment 01 - Posted on May 16, 2014
AMOC Industry DaySite Visit Instructions - Posted on Nov 12, 2013AMOC Industry Day Presentation and Attendee List - Posted on Nov 22, 2013Draft RFP Questions and Responses - Posted on Jan 30, 2014 AMOC DRFP Additional Questions and Responses - Posted on Apr 09, 2014Final RFP NNG14446460R Questions and Responses - Posted on May 15, 2014
Posted: May 16, 2014 Center: KSCTitle: LH2 VACUUM JACKETED HOSESolicitation: NNK14504412Q Response Due: May 23, 2014Synopsis - Posted on Mar 07, 2014Solicitation - Posted on Apr 18, 2014
Amendment 01 - Posted on May 01, 2014Amendment 02 - Posted on May 09, 2014Amendment 03 - Posted on May 16, 2014
Specification - Posted on Mar 07, 2014Drawing - Posted on Mar 11, 2014
Posted: May 15, 2014 Center: AFRCTitle: HAZARDOUS WASTE PICK-UP TRANSPORT AND DISPOSAL SERVICESSolicitation: NND14500049Q Response Due: Jun 30, 2014Synopsis/Solicitation Combo - Posted on Apr 21, 2014
Amendment 01 - Posted on May 12, 2014Amendment 02 - Posted on May 15, 2014
Statement of Work - Posted on Apr 21, 2014
Posted: May 15, 2014 Center: MSFCTitle: 50K LOAD CELLSolicitation: NNM14509927Q Response Due: May 30, 2014Synopsis/Solicitation Combo - Posted on May 15, 2014Terms and Conditions and Specification - Posted on May 15, 2014
Posted: May 15, 2014 Center: MSFCTitle: SPARE PART GEAR BOXESSolicitation: NNM14511706Q Response Due: May 19, 2014Synopsis - Posted on May 15, 2014
Posted: May 15, 2014 Center: MSFCTitle: EXPOSURE TIME TO HIGH ENERGY HIGH FLUX PROTON BEAMSSolicitation: NNM14511040Q Response Due: May 23, 2014Synopsis - Posted on May 15, 2014
Posted: May 15, 2014 Center: KSCTitle: TELEMETRY DATA PROCESSORSSolicitation: NNK14511532Q Response Due: May 30, 2014Synopsis - Posted on May 15, 2014
Posted: May 15, 2014 Center: KSCTitle: TELEMETRY RECORDERSolicitation: NNK14511565Q Response Due: May 30, 2014Synopsis - Posted on May 15, 2014
Posted: May 15, 2014 Center: GSFCTitle: ADVANCED 532 LASERSolicitation: NNG14510057R Response Due: May 30, 2014Synopsis - Posted on May 15, 2014
Posted: May 15, 2014 Center: GSFCTitle: SOLAR SIMULATORSolicitation: NNG14507907Q Response Due: May 19, 2014Synopsis/Solicitation Combo - Posted on May 06, 2014
Amendment 01 - Posted on May 08, 2014Amendment 02 - Posted on May 15, 2014
On-Line RFQ - Posted on
Posted: May 15, 2014 Center: GSFCTitle: LASER SPECTRUM ANALYSERSolicitation: NNG14-512461L Response Due: May 29, 2014Synopsis - Posted on May 14, 2014
Modification 01 - Posted on May 15, 2014
Posted: May 15, 2014 Center: GSFCTitle: QUANTUM CASCADE LASER QCLSolicitation: NNG511580Q Response Due: May 23, 2014Synopsis/Solicitation Combo - Posted on May 15, 2014On-Line RFQ - Posted on May 15, 2014
Posted: May 15, 2014 Center: GSFCTitle: LEO SERVICING STUDIESSolicitation: NNG14042814L Response Due: May 16, 2014Synopsis - Posted on Apr 28, 2014
Modification 01 - Posted on May 06, 2014Modification 02 - Posted on May 15, 2014
Solicitation - Posted on May 06, 2014Industry Question and Response - Posted on May 12, 2014
Title: COMMUNICATIONS OUTREACH MULTIMEDIA AND INFORMATION TECHNOLOGY "COMIT" CONTRACTSolicitation: NNJ14498840L Response Due: N/ASynopsis - Posted on Feb 13, 2014
Modification 01 - Posted on Mar 03, 2014Modification 02 - Posted on Mar 10, 2014Modification 03 - Posted on Mar 11, 2014Modification 04 - Posted on Mar 13, 2014Modification 05 - Posted on Mar 20, 2014Modification 06 - Posted on Mar 21, 2014Modification 07 - Posted on Mar 27, 2014Modification 08 - Posted on May 08, 2014Modification 09 - Posted on May 08, 2014Modification 10 - Posted on May 15, 2014
Draft Document - Posted on Feb 13, 2014COMIT Industry Day Information - Posted on Mar 03, 2014Answers to RFI Questions - Posted on Mar 03, 2014One-on-One Communications with Industry Guidance - Posted on Mar 11, 2014Answers to RFI Questions - Posted on Mar 13, 2014Industry Day Schedule Information - Posted on Mar 13, 2014Industry Day One-on-One Schedule - Posted on Mar 13, 2014COMIT Interested Parties List - Posted on Mar 13, 2014Industry Day Webex and Teleconference Instructions - Posted on Mar 20, 2014Updated COMIT Interested Parties List - Posted on Mar 20, 2014Final Industry Day One-on-One Schedule - Posted on Mar 20, 2014COMIT Industry Day Charts - Posted on Mar 27, 2014Updated COMIT Interested Parties List - Posted on Mar 27, 2014Answers To Industry Questions - Posted on May 08, 2014COMIT OCI RFI - Posted on May 15, 2014
Posted: May 15, 2014 Center: GSFCTitle: VISIBLE AND INFRARED CAMERA SYSTEMS SUITABLE FOR LOW EARTH ORBIT GEOSYNCHRONOUS EARTH ORBIT AND INTERPLANETARY SPACEFLIGHTSolicitation: NNG14FA94RFI Response Due: May 23, 2014Synopsis - Posted on May 02, 2014Response to Industry Question - Posted on May 09, 2014Industry Question and Response Set 2 - Posted on May 15, 2014
Posted: May 14, 2014 Center: ARCTitle: JOINT ATTACHMENT TECHNIQUES FOR HEEETSolicitation: NNA14508776Q-AMD Response Due: May 20, 2014Synopsis - Posted on Apr 03, 2014Solicitation - Posted on Apr 18, 2014
Amendment 01 - Posted on May 08, 2014Amendment 02 - Posted on May 14, 2014Amendment 03 - Posted on May 14, 2014
Posted: May 14, 2014 Center: JSCTitle: REQUEST FOR INFORMATION FOR JSC INFORMATION TECHNOLOGY SECURITY SUPPORT SERVICESSolicitation: NNJ14512630L Response Due: May 28, 2014Synopsis - Posted on May 14, 2014Limitation of Future Contracting Clause - Posted on May 14, 2014
Posted: May 14, 2014 Center: NSSCTitle: ENTERPRISE APPLICATIONS SERVICE TECNOLOGIES EAST2Solicitation: NNX14ZXD001L Response Due: May 30, 2014Synopsis - Posted on May 14, 2014
Posted: May 14, 2014 Center: LARCTitle: ACTIVE SENSING OF CO2 OVER NIGHTS DAYS AND SEASONSSolicitation: ASCENDS Response Due: Dec 11, 2013Synopsis - Posted on Nov 26, 2013
Justification and Approval - Posted on May 14, 2014
Posted: May 14, 2014 Center: LARCTitle: FLOW INTERNATIONAL MACH 4C 4030 ABRASIVE WATERJECT CUTTING SYSTEMSolicitation: NNL14513813Q Response Due: May 20, 2014Synopsis/Solicitation Combo - Posted on May 14, 2014On-Line RFQ - Posted on May 14, 2014Specifications - Posted on May 14, 2014
Posted: May 13, 2014 Center: NSSCTitle: VERICUT SOFTWARE MACHINE CONFIGURATION AND TRAININGSolicitation: NNX14511443Q Response Due: May 16, 2014Synopsis/Solicitation Combo - Posted on May 13, 2014
Posted: May 13, 2014 Center: HQTitle: ADVANCED ENERGY STORAGE SYSTEMSSolicitation: NNH14ZOA001N-14GCD-C1-Amendment-2 Response Due: N/ASynopsis - Posted on May 13, 2014
Posted: May 13, 2014 Center: LARCTitle: ANNUAL MAINTENANCE RENEWAL FOR STRATASYS SOFTWARE AND HARDWARE EQUIPMENTSolicitation: NNL14512804Q Response Due: May 19, 2014Synopsis - Posted on May 13, 2014
Posted: May 13, 2014 Center: GSFCTitle: POD INSTRUMENT FRONT END SYSTEMSolicitation: 101460210S Response Due: May 16, 2014Synopsis - Posted on Apr 24, 2014
Modification 01 - Posted on May 13, 2014POD RF Instrument Front End System - Posted on Apr 24, 2014Ammendment and Revision 1 to POD - Posted on May 13, 2014
Posted: May 12, 2014 Center: MSFCTitle: ORGANIZATIONAL CASE STUDIESSolicitation: NNM14507665Q Response Due: May 16, 2014Synopsis - Posted on May 12, 2014
Posted: May 12, 2014 Center: MSFCTitle: UPPER LOAD SPIDER ASSEMBLYSolicitation: NNM14505808Q Response Due: May 20, 2014Synopsis - Posted on Apr 21, 2014
Modification 01 - Posted on May 12, 2014Terms and Conditions SOW DPD Rep Certs etc. - Posted on Apr 21, 2014Revised Statement Of Work and Drawings - Posted on May 12, 2014
Posted: May 12, 2014 Center: GRCTitle: FORTUS 250 MC SYSTEMSolicitation: NNC14510514Q Response Due: May 20, 2014Synopsis/Solicitation Combo - Posted on May 12, 2014
Posted: May 12, 2014 Center: GRCTitle: AVIONICS UPGRADE OF NASA GLENN RESEARCH CENTER DHC6 RESEARCH AIRCRAFTSolicitation: NNC14509647Q Response Due: May 30, 2014Synopsis/Solicitation Combo - Posted on May 02, 2014
Amendment 01 - Posted on May 12, 2014Statement of Work - Posted on May 02, 2014
Posted: May 09, 2014 Center: ARCTitle: EXTENSION OF CONTRACT NNA11AC17CSolicitation: NNA11AC17C-Ext1 Response Due: May 23, 2014Synopsis - Posted on May 09, 2014
Title: COREFIRE SOFTWARE AND TRAININGSolicitation: NNC14508840Q Response Due: May 16, 2014Synopsis/Solicitation Combo - Posted on May 07, 2014
Amendment 01 - Posted on May 09, 2014
Posted: May 09, 2014 Center: SSCTitle: 6 INCHES AND 8 INCHES NOMINAL PIPE SIZE SEAMLESS PIPESSolicitation: NNS14ZDA003L Response Due: May 19, 2014Synopsis - Posted on May 09, 2014
Posted: May 09, 2014 Center: GRCTitle: FASTCAM HI SPEED MONOCHROME CAMERASolicitation: NNC14508152Q Response Due: May 14, 2014Synopsis - Posted on May 09, 2014
Posted: May 09, 2014 Center: MSFCTitle: MODELCENTER FLEXLM FLOATING NETWORK LICENSES AND RENEWAL OF MAINTENANCESolicitation: NNM14510478Q Response Due: May 15, 2014Synopsis/Solicitation Combo - Posted on May 09, 2014Terms Conditions for NNM14510478Q - Posted on May 09, 2014
Posted: May 09, 2014 Center: SSCTitle: ADMINISTRATIVE CLERICAL SUPPORT SERVICES AT SSCSolicitation: NNS13481083R Response Due: Aug 30, 2013Synopsis - Posted on Jul 09, 2013Solicitation - Posted on Jul 31, 2013
Amendment 01 - Posted on Aug 01, 2013Amendment 02 - Posted on Aug 06, 2013Amendment 03 - Posted on Aug 20, 2013Amendment 04 - Posted on Aug 27, 2013Amendment 05 - Posted on May 09, 2014
Posted: May 09, 2014 Center: GSFCTitle: PROGRAM ANALYSIS AND CONTROL PAAC IVSolicitation: NNG13439013R-1 Response Due: Apr 15, 2014Synopsis - Posted on Mar 08, 2013
Modification 01 - Posted on May 24, 2013Modification 02 - Posted on Jun 21, 2013Modification 03 - Posted on Jul 11, 2013Modification 04 - Posted on Jul 30, 2013Modification 05 - Posted on Aug 21, 2013Modification 06 - Posted on Sep 27, 2013
Modification 07 - Posted on Oct 30, 2013Modification 08 - Posted on Nov 21, 2013
Solicitation - Posted on Feb 27, 2014Amendment 01 - Posted on Mar 27, 2014Amendment 02 - Posted on Mar 28, 2014Amendment 03 - Posted on Apr 04, 2014Amendment 04 - Posted on Apr 08, 2014
Revised Draft Request For Proposal Cover Letter - Posted on Apr 24, 2013Program Analysis And Control PAAC IV Q&A Set#1 - Posted on May 30, 2013Program Analysis and Contorl PAAC IV Q&A Set# 2 - Posted on Jul 16, 2013Program Analysis and Control PAAC IV QA Set 3 - Posted on Nov 01, 2013PAAC IV Revised Questions and Answers Set 3 - Posted on Feb 27, 2014PAAC IV QA Set 5 - Posted on Apr 04, 2014PAAC IV QA Set 6 - Posted on Apr 08, 2014PAAC IV QA Set 7 - Posted on Apr 14, 2014PAAC IV Oral Presentation QA - Posted on May 09, 2014
Posted: May 09, 2014 Center: LARCTitle: MULTI-ELEMENT WATER CONTENT SENSOR SYSTEMSolicitation: NNL14513444Q Response Due: May 15, 2014Synopsis/Solicitation Combo - Posted on May 09, 2014On-Line RFQ - Posted on May 09, 2014Specifications - Posted on May 09, 2014
Posted: May 09, 2014 Center: KSCTitle: LH2 VACUUM JACKETED PIPESolicitation: NNK14504413Q Response Due: May 19, 2014Synopsis - Posted on Mar 07, 2014Solicitation - Posted on Apr 18, 2014
Amendment 01 - Posted on May 01, 2014Amendment 02 - Posted on May 09, 2014
Specification - Posted on Mar 07, 2014Drawing - Posted on Mar 11, 2014
Posted: May 08, 2014 Center: ARCTitle: SYNOPSIS FOR CENTER ECONOMIC RESEARCH FOR SPACE DEVELOPMENT NASA RESEARCH ANNOUNCEMENTSolicitation: NNA14ZVP001P Response Due: N/ASynopsis - Posted on May 06, 2014
Modification 01 - Posted on May 08, 2014
Posted: May 08, 2014 Center: MSFCTitle: CENTRIFY SOFTWARE LICENSES AND MAINTENANCESolicitation: 124DYN75319 Response Due: May 12, 2014Synopsis/Solicitation Combo - Posted on May 08, 2014
Posted: May 08, 2014 Center: GSFCTitle: BOILER BURNER REPLACEMENTSolicitation: NNG14500002P Response Due: May 13, 2014Synopsis/Solicitation Combo - Posted on Apr 28, 2014SF 1449 for NNG14500002P - Posted on Apr 28, 2014Responses to Questions to NNG14500002P - Posted on May 05, 2014Responses to Questions to NNG14500002P - Posted on May 08, 2014
Posted: May 07, 2014 Center: KSCTitle: PTFE HOSE ASSEMBLIESSolicitation: NNK14508723Q Response Due: May 22, 2014Synopsis/Solicitation Combo - Posted on May 07, 2014NASA, KSC Specification Documents - Posted on May 07, 2014
Posted: May 07, 2014 Center: GSFCTitle: STERILIZATION GRADE SINTERED METAL FILTERSSolicitation: NNG14509871L Response Due: May 21, 2014Synopsis/Solicitation Combo - Posted on May 07, 2014
Posted: May 07, 2014 Center: HQTitle: MOSESS FOLLOW-ON REQUEST FOR INFORMATIONSolicitation: NNHMOSESS2 Response Due: May 30, 2014Synopsis - Posted on May 07, 2014Draft Document - Posted on May 07, 2014
Posted: May 07, 2014 Center: GSFCTitle: VZ-400 3D LASERSolicitation: NNG14512003L Response Due: May 21, 2014Synopsis - Posted on May 07, 2014
Posted: May 07, 2014 Center: LARCTitle: AUSIM GOLDMINER HARDWARE UPGRADESolicitation: NNL14511444Q Response Due: May 13, 2014Synopsis - Posted on May 07, 2014
Solicitation: SS-SMAAART2 Response Due: May 09, 2014Synopsis - Posted on Apr 16, 2014
Modification 01 - Posted on Apr 25, 2014Modification 02 - Posted on May 07, 2014
Draft Document - Posted on Apr 16, 2014Amended Sources Sought Synopsis and QA Responses - Posted on Apr 25, 2014Government Response to Industry Questions - Posted on May 07, 2014
Posted: May 06, 2014 Center: AFRCTitle: SRLV FLIGHT AND PAYLOAD INTEGRATION SERVICESSolicitation: NND14480735R Response Due: May 16, 2014Synopsis - Posted on Nov 13, 2013
Modification 01 - Posted on Dec 19, 2013Modification 02 - Posted on Jan 10, 2014
Solicitation - Posted on Mar 25, 2014Amendment 01 - Posted on Apr 21, 2014Amendment 02 - Posted on May 05, 2014
Instructions for Registration IDIQ 2 Industry Day - Posted on Jan 10, 2014Responses to Industry Day and Draft RFP Questions - Posted on Feb 24, 2014Responses to Final RFP Questions - Posted on May 06, 2014
Posted: May 06, 2014 Center: MSFCTitle: ANNUAL RENEWAL CONCEPTS-NREC AGILE PRODUCTS SUPPORTSolicitation: NNM14510481Q Response Due: May 13, 2014Synopsis - Posted on May 06, 2014
Posted: May 06, 2014 Center: MSFCTitle: CELL STACK ENDURANCE TESTINGSolicitation: NNM14512252Q Response Due: May 12, 2014Synopsis - Posted on May 06, 2014
Posted: May 06, 2014 Center: LARCTitle: REFRIGERANT VIRGIN UNUSED 1.1.1.2 TETRAFLUORETHANE R134ASolicitation: NNL14511970Q Response Due: May 16, 2014Synopsis/Solicitation Combo - Posted on May 06, 2014On-Line RFQ - Posted on May 06, 2014
Posted: May 06, 2014 Center: KSCTitle: REQUEST FOR INFORMATION FOR THE DESIGN DEVELOPMENT AND MANUFACTURE OF MECHANIZED DEVICE TO CONTAIN AND TRANSFER SUPERCRITICAL FLUIDSolicitation: NNK14ZOPHW1L Response Due: May 16, 2014Synopsis - Posted on Apr 04, 2014
Posted: May 05, 2014 Center: JSCTitle: EMERGENCY ESCAPE BREATHING DEVICES WITH AVOX SYSTEMSSolicitation: NNJ14ZBG005L Response Due: May 20, 2014Synopsis - Posted on May 05, 2014
Posted: May 05, 2014 Center: GSFCTitle: X-RAY DIFFRACTOMETER SYSTEMSolicitation: NNG14504126Q Response Due: May 15, 2014Synopsis/Solicitation Combo - Posted on Apr 24, 2014
Amendment 01 - Posted on May 01, 2014On-Line RFQ - Posted on Apr 24, 2014Statement of Work - Posted on Apr 24, 2014SOW QUESTIONS ANSWERS - Posted on May 05, 2014
Posted: May 05, 2014 Center: GSFCTitle: SEWP VSolicitation: SEWP-V Response Due: Dec 16, 2013Synopsis - Posted on Jan 23, 2013
Modification 01 - Posted on May 01, 2013Modification 02 - Posted on Nov 25, 2013
Solicitation - Posted on Aug 16, 2013Amendment 01 - Posted on Aug 23, 2013Amendment 02 - Posted on Aug 27, 2013Amendment 03 - Posted on Sep 04, 2013Amendment 04 - Posted on Sep 24, 2013Amendment 05 - Posted on Oct 17, 2013Amendment 06 - Posted on Oct 23, 2013Amendment 07 - Posted on Nov 07, 2013Amendment 08 - Posted on Nov 15, 2013Amendment 09 - Posted on Nov 18, 2013Amendment 10 - Posted on Nov 22, 2013Amendment 11 - Posted on Nov 25, 2013Amendment 12 - Posted on Dec 06, 2013
Revised DRFP Cover Letter and Industry Day Info - Posted on Mar 08, 2013Responses To Questions-1 - Posted on Mar 14, 2013Industry Day Slides - Posted on Mar 18, 2013Responses to Questions - 2 - Posted on Mar 20, 2013Industry Day Attendee List - Posted on Mar 20, 2013Industry Day Questions and Answers - Posted on Mar 26, 2013Responses To Questions -3 - Posted on Apr 04, 2013Responses To Questions 4 - Posted on Apr 10, 2013Responses To Questions #5 - Posted on Apr 19, 2013Responses to Questions #6 - Posted on May 01, 2013Responses To Questions - Posted on May 14, 2013Responses to Questions #9 - Posted on May 28, 2013
Responses to Questions #10 - Posted on Jun 10, 2013NOTICE- RFP RELEASE DATE - Posted on Jun 24, 2013SEWP V Release Date - Posted on Jul 01, 2013SPECIAL NOTICE - Posted on Jul 29, 2013RFP Exhibits - Posted on Aug 16, 2013Technical Exhibits - Posted on Aug 16, 2013REVISED RFP EXHIBITS Technical and Pricing - Posted on Aug 20, 2013NOTICE UPDATED EXHIBITS - Posted on Aug 22, 2013Responses to Questions - Set 1 - Posted on Sep 04, 2013RFP Questions and Answers Set 2 - Posted on Sep 24, 2013Special Notice - Posted on Sep 26, 2013Special SEWP V Notice to Industry - Posted on Oct 10, 2013Special Notice for SEWP V - Posted on Oct 17, 2013SEWP V RFP Questions and Answers Set4 - Posted on Oct 30, 2013Special Notice related to Group B - Posted on Dec 05, 2013SEWP V Status (Notification) - Posted on May 05, 2014
Posted: May 05, 2014 Center: HQTitle: NASA DISCOVERY PROGRAM DRAFT ANNOUNCEMENT OF OPPORTUNITYSolicitation: NNH14ZDA004J Response Due: N/ASynopsis - Posted on Feb 19, 2014Clarifications of NASA Discovery Program - Posted on May 05, 2014
Posted: May 02, 2014 Center: LARCTitle: ZYLON AS POLY BENZOBISOXAZOLE -PBO-YARNSolicitation: NNL14510775Q Response Due: May 09, 2014Synopsis/Solicitation Combo - Posted on May 02, 2014On-Line RFQ - Posted on May 02, 2014
Posted: May 02, 2014 Center: LARCTitle: ADD-ON STRESS MODULE FOR VA ONE SOFTWARESolicitation: NNL14511900Q Response Due: May 09, 2014Synopsis - Posted on May 02, 2014
Posted: May 02, 2014 Center: MSFCTitle: DISTILLATION ASSEMBLY SENSORSolicitation: NNM14509395Q Response Due: May 12, 2014Synopsis/Solicitation Combo - Posted on May 02, 2014Terms and Conditions and Requirements - Posted on May 02, 2014
Posted: May 02, 2014 Center: LARCTitle: CUMULUS DIGITAL ASSET MANAGEMENT SOFTWARE PACKAGESolicitation: NNL14510892Q Response Due: May 09, 2014
Posted: May 02, 2014 Center: LARCTitle: WIND LIDAR SYSTEMSolicitation: NNL14512111Q Response Due: May 08, 2014Synopsis/Solicitation Combo - Posted on May 02, 2014On-Line RFQ - Posted on May 02, 2014Specifications - Posted on May 02, 2014
Posted: May 01, 2014 Center: ARCTitle: RESEARCH AND TECHOLOGY DEVELOPMENT SERVICESSolicitation: NNA09DC79C-Extension Response Due: May 15, 2014Synopsis - Posted on May 01, 2014
Posted: May 01, 2014 Center: ARCTitle: ANIMAL ACCESS UNIT FABRICATION AND ASSEMBLYSolicitation: NNA14508739Q-AMH Response Due: May 09, 2014Synopsis/Solicitation Combo - Posted on Apr 25, 2014
Amendment 01 - Posted on May 01, 2014STATEMENT OF WORK - Posted on Apr 25, 2014Drawing Specifications - Posted on Apr 25, 2014FAR 52.212-5 Addenda - Posted on Apr 25, 2014
Posted: May 01, 2014 Center: MSFCTitle: LIQUID HYDROGEN TANK TEST FOWARD STRUCTURAL TEST ARTICLE RING ASSEMBLYSolicitation: NNM14501860Q Response Due: May 06, 2014Synopsis/Solicitation Combo - Posted on Apr 09, 2014
Amendment 01 - Posted on Apr 24, 2014Amendment 02 - Posted on May 01, 2014
TC SOW DPD RepCerts Quote Inst Quote Inst - Posted on Apr 09, 201490M14154 Additional Drawings - Posted on Apr 25, 2014Paint Issue Addressed NNM501860Q - Posted on May 01, 2014
Posted: May 01, 2014 Center: MSFCTitle: NOTICE OF AVAILABILITY FOR SITE DEVELOPMENT PARTNERSHIPS AT NASA MICHOUD ASSEMBLY FACILITY - MAFSolicitation: MAF-PPV-2014 Response Due: May 31, 2014Synopsis - Posted on May 01, 2014
Posted: May 01, 2014 Center: NSSCTitle: MENTOR GRAPHICS CORPORATIONSolicitation: NNX14MC66Z
Response Due: May 08, 2014Synopsis - Posted on May 01, 2014
Posted: May 01, 2014 Center: MSFCTitle: MAINTENANCE LIFT SYSTEMSolicitation: NNM14511748 Response Due: May 07, 2014Synopsis - Posted on May 01, 2014
Posted: May 01, 2014 Center: MSFCTitle: WELDING CONSULTATION SERVICES MEMBERSHIPSolicitation: NNM14510656Q Response Due: May 08, 2014Synopsis - Posted on May 01, 2014
Posted: May 01, 2014 Center: HQTitle: ADVANCED ENERGY STORAGE SYSTEMSSolicitation: NNH14ZOA001N-14GCD-C1-Amendment-1 Response Due: N/ASynopsis - Posted on May 01, 2014
Posted: May 01, 2014 Center: LARCTitle: INDEPENDENT ORION TUBE WELD DIGITAL RADIOGRAPHY ASSESSMENTSolicitation: NNL14510560Q Response Due: May 07, 2014Synopsis - Posted on May 01, 2014
Posted: Apr 30, 2014 Center: KSCTitle: NASA WIDE ACQUISITION OF NITROGEN AND OXYGEN 2 - NANO 2Solicitation: NNK14495022R Response Due: May 08, 2014Synopsis - Posted on Feb 11, 2014
Modification 01 - Posted on Feb 21, 2014Modification 02 - Posted on Apr 08, 2014Modification 03 - Posted on Apr 25, 2014Modification 04 - Posted on Apr 28, 2014Modification 05 - Posted on Apr 30, 2014
Solicitation - Posted on Apr 08, 2014Amendment 01 - Posted on Apr 25, 2014Amendment 02 - Posted on Apr 28, 2014Amendment 03 - Posted on Apr 30, 2014
Posted: Apr 29, 2014 Center: GRCTitle: BROOKS POLYCOLD SYSTEMS MODEL MAX COOL 4000HSolicitation: NNC14510861Q Response Due: May 02, 2014Synopsis - Posted on Apr 29, 2014
Posted: Apr 29, 2014 Center: LARCTitle: NASA LARC DEMOLITION OF VARIOUS FACILITIES DEMOLITION OF BUILDINGS 1192C D E AND 1213Solicitation: NNL13504840E Response Due: Apr 29, 2014Synopsis - Posted on Mar 13, 2014Solicitation - Posted on Mar 25, 2014
Amendment 01 - Posted on Apr 22, 2014Amendment 02 - Posted on Apr 25, 2014Amendment 03 - Posted on Apr 28, 2014
Site Visit Instructions - Posted on Apr 02, 2014Site Visit Attendees - Posted on Apr 11, 2014Second Site Visit Instructions - Posted on Apr 11, 2014Responses to Questions - Posted on Apr 18, 2014Updated Answers to Questions - Posted on Apr 28, 2014Bid Opening Results - Posted on Apr 29, 2014
Posted: Apr 29, 2014 Center: ARCTitle: NASA ACADEMIC MISSION SERVICES - NAMSSolicitation: NNA14488849R Response Due: N/ASynopsis - Posted on Mar 11, 2014
Modification 01 - Posted on Apr 29, 2014Draft Document - Posted on Mar 11, 2014Interested Parties List - Posted on Mar 11, 2014Industry Day Information - Posted on Mar 12, 2014NAMS Industry Day Additional Information - Posted on Mar 12, 2014Interested Parties List 03.18.2014 - Posted on Mar 18, 2014NAMS Industry Day - Posted on Mar 20, 2014
Posted: Apr 29, 2014 Center: LARCTitle: STRATOSPHERIC AEROSOL AND GAS EXPERIMENT -SAGE III- REFURBISHMENT AND TECHNICAL SUPPORTSolicitation: NNL14AQ01B Response Due: May 14, 2014Synopsis - Posted on Apr 29, 2014
Synopsis/Solicitation Combo - Posted on Apr 29, 2014
Posted: Apr 28, 2014 Center: LARCTitle: LYNDAENTERPRISE LICENSE RENEWALSolicitation: NNL14511893Q Response Due: May 01, 2014Synopsis/Solicitation Combo - Posted on Apr 28, 2014On-Line RFQ - Posted on Apr 28, 2014
Posted: Apr 28, 2014 Center: HQTitle: REQUEST FOR INFORMATION - EUROPA MISSION CONCEPTS COSTING LESS THAN $1 BILLIONSolicitation: NNH14ZDA008L Response Due: May 30, 2014Synopsis - Posted on Apr 28, 2014
Posted: Apr 28, 2014 Center: LARCTitle: BENCH TOP AUTOCLAVESolicitation: NNL14510717Q Response Due: May 05, 2014Synopsis/Solicitation Combo - Posted on Apr 28, 2014
Amendment 01 - Posted on Apr 28, 2014On-Line RFQ - Posted on Apr 28, 2014Specifications - Posted on Apr 28, 2014
Posted: Apr 28, 2014 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – DECONVOLUTION APPROACH FOR THE MAPPING OF ACOUSTIC SOURCES --DAMAS--Solicitation: TT01056 Response Due: Aug 15, 2014Synopsis - Posted on Apr 28, 2014
Posted: Apr 25, 2014 Center: MSFCTitle: 100K LOAD CELL AND 200K LOAD CELLSolicitation: NNM14509930Q Response Due: May 09, 2014Synopsis/Solicitation Combo - Posted on Apr 25, 2014Solicitation - Posted on Apr 25, 2014
Posted: Apr 25, 2014 Center: MSFCTitle: MAGMA EXPANSION CHASSISSolicitation: NNM14508268Q Response Due: N/ASynopsis/Solicitation Combo - Posted on Apr 08, 2014
Amendment 01 - Posted on Apr 25, 2014Terms and Conditions and SOW - Posted on Apr 08, 2014
Posted: Apr 25, 2014 Center: LARCTitle: LOW NOISE GENERATORSSolicitation: NNL14511385Q Response Due: May 02, 2014Synopsis/Solicitation Combo - Posted on Apr 25, 2014On-Line RFQ - Posted on Apr 25, 2014Specifications - Posted on Apr 25, 2014
Posted: Apr 24, 2014 Center: GSFCTitle: VIBRATION TABLE SYSTEM MAINTENANCESolicitation: NNG14506414Q Response Due: May 01, 2014Synopsis/Solicitation Combo - Posted on Apr 24, 2014On-Line RFQ - Posted on Apr 24, 2014Statement of Work - Posted on Apr 24, 2014
Posted: Apr 24, 2014 Center: MSFCTitle: EMC DATA DOMAIN BACKUP STORAGE DISK CAPACITY UPGRADESolicitation: 124DYN75300 Response Due: Apr 28, 2014Synopsis/Solicitation Combo - Posted on Apr 24, 2014Solicitation - Posted on Apr 24, 2014
Posted: Apr 24, 2014 Center: GSFCTitle: SOFTWARE LICENSE RENEWAL MAINTENANCE AND SUPPORTSolicitation: NNG14506552L Response Due: May 05, 2014Synopsis - Posted on Apr 24, 2014
Posted: Apr 24, 2014 Center: LARCTitle: LANGLEY RESEARCH CENTER MULTIPLE AWARD CONSTRUCTION CONTRACTSolicitation: NNL14469811R Response Due: May 30, 2014Synopsis - Posted on Nov 18, 2013
Modification 01 - Posted on Dec 19, 2013Modification 02 - Posted on Jan 17, 2014
Solicitation - Posted on Jan 23, 2014Amendment 01 - Posted on Feb 04, 2014Amendment 02 - Posted on Feb 18, 2014Amendment 03 - Posted on Apr 24, 2014
MACC Acquisition Update and QAs - Posted on Jan 17, 2014MACC Acquisition Update 1 - Posted on Mar 25, 2014
Posted: Apr 23, 2014 Center: KSCTitle: SOLE SORCE ANNUAL FLOW 3D LICENSES AND MAINTENANCESolicitation: NNK14510263Q Response Due: May 16, 2014Synopsis/Solicitation Combo - Posted on Apr 23, 2014Redacted Sole Source and PDF Version RFQ - Posted on Apr 23, 2014
Posted: Apr 22, 2014 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – MULTI-FUNCTIONAL COMPOSITE AND HONEYCOMB PANELSSolicitation: TT01055 Response Due: Apr 21, 2015Synopsis - Posted on Apr 22, 2014
Posted: Apr 22, 2014 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – CARBON NANOTUBE GROWTH PROCESSSolicitation: TT01044 Response Due: Aug 15, 2014Synopsis - Posted on Apr 22, 2014
Posted: Apr 22, 2014 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – DISPERSION OF CARBON NANOTUBES IN POLYMERSSolicitation: TT01043 Response Due: Jul 30, 2014Synopsis - Posted on Apr 22, 2014
Posted: Apr 22, 2014 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – ZONE --ZEROING OUT NEGATIVE EFFECTS-- BIOFEEDBACK TRAINING FOR OPTIMAL ATHLETIC PERFORMANCESolicitation: TT01042 Response Due: Jun 30, 2015Synopsis - Posted on Apr 22, 2014
Posted: Apr 22, 2014 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – FIRE-RESISTANT LIGHTWEIGHT ELECTRICAL INSULATION MATERIAL LAR-17321-1Solicitation: TT01041 Response Due: Jun 01, 2014Synopsis - Posted on Apr 22, 2014
Posted: Apr 18, 2014 Center: GRCTitle: MANUFACTURING AND ASSEMBLE OF 12.7 MM BORE HYBRID BALL BEARINGSSolicitation: NNC14507793Q Response Due: Apr 28, 2014Synopsis - Posted on Apr 18, 2014
Posted: Apr 18, 2014 Center: GRCTitle: 10X10 HIGH TEMPERATURE DYNAMIC PRESSURE TRANSDUCERSolicitation: NNC14VC85Q Response Due: May 05, 2014Synopsis - Posted on Apr 18, 2014
Posted: Apr 17, 2014 Center: MSFCTitle: 3.0 PIN SWIVEL EYE BRACKETSolicitation: NNM14509935Q Response Due: Apr 30, 2014Synopsis/Solicitation Combo - Posted on Apr 17, 2014Specification and Terms and Conditions - Posted on Apr 17, 2014
Posted: Apr 17, 2014 Center: MSFCTitle: ONE YEAR SERVICE MAINTENANCE AGREEMENT FOR COMPUTED TOMOGRAPHY SYSTEM AND M3 LINEAR ACCELERATORSolicitation: NNM14509413Q Response Due: Apr 25, 2014Synopsis - Posted on Apr 17, 2014
Posted: Apr 17, 2014 Center: MSFCTitle: NICKEL ALLOY 718 POWDERSolicitation: NNM14507750Q-1 Response Due: Apr 22, 2014Synopsis/Solicitation Combo - Posted on Apr 17, 2014Specification and Terms and Conditions - Posted on Apr 17, 2014
Posted: Apr 17, 2014 Center: GSFCTitle: GEOPHYSICS GEODYNAMICS AND SPACE GEODESY SUPPORTSolicitation: NNG14502776L Response Due: May 02, 2014Synopsis - Posted on Apr 17, 2014
Posted: Apr 17, 2014 Center: GSFCTitle: MECHANICAL INTEGRATED SERVICES AND TECHNOLOGIES - MISTSolicitation: NNG13360855R Response Due: Mar 28, 2014Synopsis - Posted on Dec 07, 2012
Modification 01 - Posted on Jan 23, 2013Modification 02 - Posted on Feb 01, 2013Modification 03 - Posted on Mar 13, 2013Modification 04 - Posted on Apr 18, 2013Modification 05 - Posted on Apr 25, 2013Modification 06 - Posted on Apr 26, 2013Modification 07 - Posted on May 16, 2013Modification 08 - Posted on Jun 14, 2013Modification 09 - Posted on Jul 24, 2013Modification 10 - Posted on Sep 30, 2013Modification 11 - Posted on Nov 26, 2013Modification 12 - Posted on Feb 27, 2014Modification 13 - Posted on Mar 28, 2014
Solicitation - Posted on May 13, 2013Amendment 01 - Posted on May 16, 2013Amendment 02 - Posted on Mar 19, 2014Amendment 03 - Posted on Apr 17, 2014
Draft RFP Questions and Answers - Posted on Apr 18, 2013Draft RFP Questions and Answers - Posted on Apr 25, 2013
Posted: Apr 17, 2014 Center: JSCTitle: LIQUID OXYGEN- METHANE PROPULSION TECHNOLOGY FOR SPACECRAFTSolicitation: NNJ14ZBH029L Response Due: May 30, 2014Synopsis - Posted on Apr 17, 2014Statement of Interest Form - Posted on Apr 17, 2014
Posted: Apr 16, 2014 Center: GSFCTitle: VERY LONG BASELINE INTERFEROMETRY SYSTEMSolicitation: NNG14509158L Response Due: Apr 30, 2014Synopsis - Posted on Apr 16, 2014Solicitation - Posted on Apr 16, 2014
Posted: Apr 16, 2014 Center: GRCTitle: EXPERIMENT OPPORTUNITY FOR USE OF THE SCAN SPACE COMMUNICATIONS AND NAVIGATION TESTBEDSolicitation: SCaNTestbed2014 Response Due: N/ASynopsis - Posted on Apr 16, 2014SCaNTestbed2014 - Posted on Apr 16, 2014
Posted: Apr 11, 2014 Center: KSCTitle: SOURCES SOUGHT SYNOPSIS FOR SOLAR PROBE PLUS LAUNCH SERVICESSolicitation: NNK14ZLS005L Response Due: Apr 30, 2014Synopsis - Posted on Apr 11, 2014
Posted: Apr 10, 2014 Center: MSFCTitle: INTERDISCIPLINARY MARS STUDY ENTITLED "MARS NOW"Solicitation: NNM14502281Q1 Response Due: Apr 16, 2014Synopsis - Posted on Apr 10, 2014
Posted: Apr 10, 2014 Center: HQTitle: NASA OFFICE OF THE CHIEF TECHNOLOGIST NASA INNOVATIVE ADVANCED CONCEPTS: PHASE II STUDIES NASA RESEARCH ANNOUNCEMENT – 2014Solicitation: NNH14ZOA001L-14NIAC-A2 Response Due: Jun 03, 2014Synopsis - Posted on Apr 10, 2014
Posted: Apr 10, 2014 Center: MSFCTitle: 2219-T87 14 EACH ALUMINUM 144 INCH X 48 INCH X .750 INCH THICKSolicitation: NNM14507754Q Response Due: Apr 18, 2014Synopsis/Solicitation Combo - Posted on Apr 10, 2014Terms and Conditions - Posted on Apr 10, 2014
Posted: Apr 10, 2014 Center: JSCTitle: COLLABORATIONS FOR COMMERCIAL SPACE CAPABILITIESSolicitation: NASA-CCSC-01 Response Due: Apr 21, 2014Synopsis - Posted on Jul 17, 2013
Modification 01 - Posted on Sep 16, 2013Modification 02 - Posted on Sep 26, 2013Modification 03 - Posted on Mar 25, 2014Modification 04 - Posted on Mar 26, 2014Modification 05 - Posted on Apr 02, 2014Modification 06 - Posted on Apr 10, 2014
Interested Parties List - Posted on Sep 16, 2013Updated Interested Parties List (9-26-2013) - Posted on Sep 26, 2013NASA-CCSC-01 Announcement - Posted on Mar 31, 2014Pre-Proposal Teleconference Briefing Charts - Posted on Apr 02, 2014Amendment 1 to NASA-CCSC-01 Announcement - Posted on Apr 08, 2014Question and Answer Log Revision 0 document - Posted on Apr 10, 2014
Posted: Apr 10, 2014 Center: LARCTitle: FIBER-REINFORCED LAMINATED FLEXIBLE COMPOSITE FILMSSolicitation: NNL14510025Q Response Due: Apr 15, 2014Synopsis/Solicitation Combo - Posted on Apr 10, 2014On-Line RFQ - Posted on Apr 10, 2014Statement of Work - Posted on Apr 10, 2014
Posted: Apr 10, 2014 Center: GSFCTitle: LEADERSHIP DEVELOPMENT AND EXCELLENCE IN MANAGEMENTSolicitation: NNG14471034R Response Due: Apr 11, 2014Synopsis - Posted on Jan 31, 2014
Modification 01 - Posted on Feb 21, 2014Modification 02 - Posted on Mar 02, 2014Modification 03 - Posted on Mar 04, 2014
Solicitation - Posted on Feb 19, 2014Amendment 01 - Posted on Feb 21, 2014
Amendment 02 - Posted on Feb 28, 2014Amendment 03 - Posted on Mar 18, 2014Amendment 04 - Posted on Mar 21, 2014Amendment 05 - Posted on Apr 01, 2014
Pre-Proposal Conference Information - Posted on Feb 21, 2014SF 33 - Posted on Feb 21, 2014Solicitation Questions - Posted on Feb 28, 2014LDEM Supporting Documents - Posted on Mar 18, 2014Pre-Proposal Conference - Posted on Mar 18, 2014LDEM Updates 3-21-2014 - Posted on Mar 21, 2014LDEM RFP Questions 3 - Posted on Apr 03, 2014Question number 239 - Posted on Apr 10, 2014
Posted: Apr 10, 2014 Center: GRCTitle: REQUEST FOR INFORMATION: POTENTIAL PARTNERS FOR THE COMMERCIALIZATION OF THE SAFETY AND MISSION ASSURANCE TECHNICAL EXCELLENCE PROGRAMSolicitation: NNC14ZNA001L Response Due: Jun 10, 2014Synopsis - Posted on Apr 10, 2014
Posted: Apr 09, 2014 Center: MSFCTitle: HIGH PRESSURE GAS COMPRESSORSolicitation: NNM14504418Q Response Due: Apr 11, 2014Synopsis/Solicitation Combo - Posted on Apr 03, 2014
Amendment 01 - Posted on Apr 09, 2014Specification and Terms and Conditions - Posted on Apr 03, 2014
Posted: Apr 09, 2014 Center: GSFCTitle: MOPITT SCIENCE INVESTIGATOR LED PROCESSING SYSTEM FOLLOW ONSolicitation: NNG14500513R Response Due: Apr 24, 2014Synopsis - Posted on Apr 09, 2014
Posted: Apr 09, 2014 Center: KSCTitle: MEDICAL AND ENVIRONMENTAL SERVICE CONTRACT FOLLOW ONSolicitation: NNK14ZOS001L Response Due: May 04, 2014Synopsis - Posted on Mar 20, 2014
Modification 01 - Posted on Mar 24, 2014Modification 02 - Posted on Apr 07, 2014
Posted: Apr 09, 2014 Center: LARCTitle: AUTORETARDER UPGRADE FOR EXISTING J.A. WOOLLAM V-VASE SYSTEMSolicitation: NNL14509135Q Response Due: Apr 14, 2014Synopsis - Posted on Apr 09, 2014
Posted: Apr 09, 2014 Center: LARCTitle: ANNUAL SERVICE ON GOVERNMENT OWNED HITACHI HIGH RESOLUTION SCANNING ELECRON MICROSCOPESolicitation: NNL14509139Q Response Due: Apr 14, 2014Synopsis - Posted on Apr 09, 2014
Posted: Apr 09, 2014 Center: HQTitle: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION {NASA} - CENTENNIAL CHALLENGES PROGRAM - MARS ASCENT VEHICLE CHALLENGE - REQUEST FOR INFORMATION {RFI}Solicitation: NNH14STMD003L Response Due: May 30, 2014Synopsis - Posted on Apr 09, 2014
Posted: Apr 08, 2014 Center: AFRCTitle: SMART EYE PRO PRO 6.0 6-CAMERA EYE TRACKING SYSTEMSolicitation: NND14505656Q Response Due: Apr 18, 2014Synopsis/Solicitation Combo - Posted on Apr 08, 2014On-Line RFQ - Posted on Apr 08, 2014Brand Name Justification - Posted on Apr 08, 2014
Posted: Apr 07, 2014 Center: KSCTitle: VARIOUS ELECTRONIC PARTSSolicitation: NNK14507755Q Response Due: Apr 15, 2014Synopsis - Posted on Mar 31, 2014Solicitation - Posted on Apr 07, 2014List of Items - Posted on Mar 31, 2014
Posted: Apr 04, 2014 Center: JSCTitle: ROBOTICS VEHICLE AND GRAPHICS SIMULATION SERVICESSolicitation: NNJ13470997R Response Due: Nov 22, 2013Synopsis - Posted on Aug 20, 2013
Modification 01 - Posted on Sep 20, 2013Modification 02 - Posted on Sep 26, 2013Modification 03 - Posted on Oct 29, 2013Modification 04 - Posted on Nov 05, 2013Modification 05 - Posted on Nov 12, 2013
Solicitation - Posted on Sep 26, 2013Amendment 01 - Posted on Sep 30, 2013Amendment 02 - Posted on Oct 29, 2013Amendment 03 - Posted on Nov 12, 2013
Questions and Answers Posting 2 - Posted on Oct 29, 2013
Pre-Proposal Conference Charts - Posted on Oct 29, 2013Questions and Answers Posting 1 - Posted on Nov 05, 2013Questions and Answers Posting 3 - Posted on Nov 12, 2013Source Selection Statement - Posted on Apr 04, 2014
Posted: Apr 04, 2014 Center: KSCTitle: SEAMLESS STAINLESS TUBING - C-CHANNEL - SS RODSSolicitation: NNK14507633Q Response Due: Apr 18, 2014Synopsis/Solicitation Combo - Posted on Mar 25, 2014Solicitation - Posted on Mar 25, 2014
Amendment 01 - Posted on Mar 26, 2014Amendment 02 - Posted on Apr 03, 2014Amendment 03 - Posted on Apr 04, 2014
Posted: Apr 04, 2014 Center: KSCTitle: ACQUISITION FOR THE CONSTRUCTION OF TENTS AT THE KENNEDY SPACE CENTER VISITORS COMPLEX AS SPECIFIED IN THE STATEMENT OF WORKSolicitation: NNK14504846Q Response Due: Apr 10, 2014Synopsis/Solicitation Combo - Posted on Mar 24, 2014
Amendment 01 - Posted on Mar 26, 2014Amendment 02 - Posted on Apr 04, 2014Amendment 03 - Posted on Apr 04, 2014
Solicitation - Posted on Mar 24, 2014Amendment 01 - Posted on Mar 26, 2014Amendment 02 - Posted on Apr 04, 2014Amendment 03 - Posted on Apr 04, 2014
Posted: Apr 04, 2014 Center: MSFCTitle: VENDOR COLLABORATION - JANNAF INTERAGENCY PROPULSION WORKING GROUPSolicitation: JANNAF04032014 Response Due: May 01, 2014Synopsis - Posted on Apr 04, 2014
Posted: Apr 03, 2014 Center: ARCTitle: AIRCRAFT RELATED SERVICESSolicitation: NNA1446770-RFI Response Due: Apr 14, 2014Synopsis - Posted on Mar 06, 2014
Modification 01 - Posted on Apr 03, 2014Draft Document - Posted on Mar 06, 2014
Posted: Apr 02, 2014 Center: MSFCTitle: DEVELOPMENT OF CLIMATE ANALYSIS FOR THE MALARIA INITIATIVE IMPACT EVALUATION REPORTSSolicitation: NNM14502691R Response Due: N/ASynopsis - Posted on Feb 10, 2014
Justification and Approval - Posted on Apr 02, 2014
Posted: Apr 02, 2014 Center: JSCTitle: PLANNING AND ACCELERATED CONSTRUCTIONSolicitation: NNJ14ZBJ004L Response Due: Apr 08, 2014Synopsis - Posted on Mar 31, 2014
Posted: Mar 31, 2014 Center: JSCTitle: COMMERCIAL RESUPPLY SERVICESSolicitation: NNJ14507481R Response Due: Apr 11, 2014Synopsis - Posted on Mar 31, 2014
Posted: Mar 28, 2014 Center: NSSCTitle: EMPOWER SOFTWARE LICENSES AND ASSOCIATED SUPPORTSolicitation: NNX14MC52Q Response Due: Mar 31, 2014Synopsis/Solicitation Combo - Posted on Mar 28, 2014
Posted: Mar 27, 2014 Center: MSFCTitle: FORWARD SKIRT AND LIQUID OXYGEN TANK PEDESTAL ASSEMBLYSolicitation: NNM14505813Q Response Due: Apr 18, 2014Synopsis/Solicitation Combo - Posted on Mar 27, 2014Solicitation Package for NNM14505813Q - Posted on Mar 27, 2014
Posted: Mar 27, 2014 Center: HQTitle: ASTEROID REDIRECT MISSION BROAD AGENCY ANNOUNCEMENTSolicitation: NNH14ZCQ002K Response Due: May 05, 2014Synopsis - Posted on Mar 06, 2014
Modification 01 - Posted on Mar 19, 2014Modification 02 - Posted on Mar 27, 2014
Asteroid Redirect Mission BAA - Posted on Mar 21, 2014Asteroid BAA - Posted on Mar 27, 2014
Posted: Mar 27, 2014 Center: GSFCTitle: VA ONE ANALYSIS SOFTWARE AND LICENSE RENEWALSSolicitation: NNG14506496L Response Due: Apr 01, 2014Synopsis - Posted on Mar 27, 2014
Posted: Mar 27, 2014 Center: GRCTitle: NASA GLENN RESEARCH CENTER TECHNOLOGY TRANSFER OFFICE SUPPORT SERVICESSolicitation: NNC148432RFI Response Due: Apr 11, 2014Synopsis - Posted on Mar 27, 2014GRC TTO SUPPORT SERVICES – NNC148432RFI - Posted on Mar 27, 2014
Posted: Mar 27, 2014 Center: GRCTitle: PROFESSIONAL ADMINISTRATIVE COMPUTATIONAL AND ENGINEERING SERVICES PACE IIISolicitation: NNC08BA09B
Response Due: Mar 28, 2014Synopsis - Posted on Mar 13, 2014
Modification 01 - Posted on Mar 14, 2014Justification and Approval - Posted on Mar 27, 2014
Posted: Mar 26, 2014 Center: NMOTitle: JPL MECHANICAL AND THERMAL ENGINEERING SUPPORT SERVICES REQUEST FOR INFORMATIONSolicitation: GL-14-03 Response Due: Apr 02, 0114Synopsis - Posted on Mar 12, 2014
Modification 01 - Posted on Mar 26, 2014Exhibit 1 to JPL Solicitation GL-14-03 - Posted on Mar 12, 2014
Posted: Mar 26, 2014 Center: MSFCTitle: UV ARC LAMP AND ACCESSORIESSolicitation: NNM14504060Q1 Response Due: Apr 04, 2014Synopsis/Solicitation Combo - Posted on Mar 26, 2014Terms and Conditions and Spec - Posted on Mar 26, 2014
Posted: Mar 26, 2014 Center: GSFCTitle: MULTI-CORE EMBEDDED PROCESSOR FOR HIWRAPSolicitation: NNG14506329L Response Due: Apr 09, 2014Synopsis - Posted on Mar 26, 2014
Posted: Mar 26, 2014 Center: GRCTitle: MAINTENANCE SUPPORT FOR NEAR-FIELD AND CYLINDRICAL ANTENNA RANGESolicitation: NNC14506806Q Response Due: Apr 03, 2014Synopsis - Posted on Mar 26, 2014
Posted: Mar 26, 2014 Center: GSFCTitle: PALLCHECK LUMINOMETER SYSTEMSolicitation: NNG14505755Q Response Due: Apr 11, 2014Synopsis - Posted on Mar 26, 2014
Posted: Mar 25, 2014 Center: NMOTitle: JPL LIBRARY SUBSCRIPTION SERVICES AND OR EBOOKS REQUEST FOR INFORMATIONSolicitation: NN-14-04 Response Due: Apr 18, 0114Synopsis - Posted on Mar 25, 2014
Posted: Mar 25, 2014 Center: MSFCTitle: REPURPOSING RS-34 HARDWARESolicitation: NNM14032114L Response Due: Apr 25, 2014Synopsis - Posted on Mar 25, 2014
Posted: Mar 25, 2014 Center: ARCTitle: MACC II-SOURCE SELECTION DECISIONSolicitation: NNA12450885R Response Due: N/ASynopsis - Posted on Mar 25, 2014Source Selection Determination - Posted on Mar 25, 2014
Posted: Mar 25, 2014 Center: GRCTitle: HIGH SPEED CAMERASSolicitation: NNC14507010Q Response Due: Apr 08, 2014Synopsis/Solicitation Combo - Posted on Mar 25, 2014
Posted: Mar 25, 2014 Center: MSFCTitle: GRIDGEN SOFTWARE MAINTENANCE AND SUPPORTSolicitation: NNM14506241Q Response Due: Mar 28, 2014Synopsis - Posted on Mar 25, 2014
Posted: Mar 25, 2014 Center: MSFCTitle: INTELLIGENT LIGHT SOFTWARE MAINTENANCESolicitation: NNM14506257Q Response Due: Mar 28, 2014Synopsis - Posted on Mar 25, 2014
Posted: Mar 25, 2014 Center: HQTitle: NATIONAL SPACE GRANT COLLEGE AND FELLOWSHIP PROGRAM - COMPETITIVE OPPORTUNITY FOR PARTNERSHIPS WITH COMMUNITY COLLEGES AND TECHNICAL SCHOOLSSolicitation: NNH14ZHA003C Response Due: May 28, 2014Synopsis - Posted on Mar 25, 2014
Posted: Mar 24, 2014 Center: JSCTitle: UNDERSEA LABORATORY FACILITY AND SUPPORT SERVICES FOR NASA EXTREME ENVIRONMENTS MISSIONS OPERATIONSSolicitation: NNJ14ZBH029R Response Due: Apr 08, 2014Synopsis - Posted on Mar 24, 2014
Posted: Mar 24, 2014 Center: AFRCTitle: HAZARDOUS WASTE PICK-UP TRANSPORT AND DISPOSAL SERVICESSolicitation: NND14280521L Response Due: Mar 28, 2014Synopsis - Posted on Mar 20, 2014
Modification 01 - Posted on Mar 24, 2014
Posted: Mar 24, 2014 Center: GSFCTitle: EXCELITAS SPCM DETECTORSSolicitation: NNG14504906L Response Due: Apr 07, 2014Synopsis - Posted on Mar 24, 2014
Posted: Mar 24, 2014 Center: MSFCTitle: LOGIC ANALYZER CABLE AND COMPRESSION ADAPTERSolicitation: NNM14503197Q Response Due: Mar 27, 2014Synopsis - Posted on Mar 24, 2014
Posted: Mar 24, 2014 Center: LARCTitle: FEKO GOLD SOFTWARE LICENSESSolicitation: NNL14506972Q Response Due: Mar 28, 2014Synopsis - Posted on Mar 24, 2014
Posted: Mar 21, 2014 Center: NSSCTitle: SOFTWARE USAGE MONITORINGSolicitation: NNX14ZXD004L Response Due: Apr 16, 2014Synopsis - Posted on Mar 21, 2014
Modification 01 - Posted on Mar 21, 2014
Posted: Mar 21, 2014 Center: HQTitle: 2014 NASA RESEARCH ANNOUNCEMENT {NRA} - EDUCATOR PROFESSIONAL DEVELOPMENT {EPD}Solicitation: NNH14ZHA001N-EPD Response Due: Jun 18, 2014Synopsis - Posted on Mar 21, 2014
Posted: Mar 20, 2014 Center: AFRCTitle: SOFTWARE MAINTENANCE RENEWALSolicitation: AAI070900-14-0006 Response Due: Apr 06, 2014Synopsis - Posted on Mar 20, 2014
Posted: Mar 20, 2014 Center: GSFCTitle: SPACE FORENSICS INTERACTIVE GAMESolicitation: NNG14490267Q Response Due: Mar 26, 2014Synopsis - Posted on Mar 13, 2014On-Line RFQ - Posted onQ and A Space Forensics Interactive Game - Posted on Mar 20, 2014
Posted: Mar 20, 2014 Center: SSCTitle: LIQUID OXYGEN BARGE DRYDOCK AND REPAIRSolicitation: NNS14499544R Response Due: Mar 26, 2014Synopsis - Posted on Feb 14, 2014Solicitation - Posted on Mar 05, 2014
Amendment 01 - Posted on Mar 11, 2014Amendment 02 - Posted on Mar 18, 2014Amendment 03 - Posted on Mar 20, 2014
Posted: Mar 20, 2014 Center: MSFCTitle: RACKMOUNT SERVERSSolicitation: NNM14502269Q Response Due: Mar 27, 2014Synopsis - Posted on Mar 20, 2014
Posted: Mar 20, 2014 Center: LARCTitle: GRAYLOC FITTINGSSolicitation: NNL14507564Q Response Due: Mar 26, 2014Synopsis/Solicitation Combo - Posted on Mar 19, 2014On-Line RFQ - Posted on Mar 20, 2014Specifications - Posted on Mar 19, 2014
Posted: Mar 19, 2014 Center: MSFCTitle: FOWARD SKIRT AND OXYGEN TANK INTERFACE RING ASSEMBLIESSolicitation: NNM14501858Q Response Due: Mar 28, 2014Synopsis/Solicitation Combo - Posted on Mar 07, 2014
Amendment 01 - Posted on Mar 19, 2014T C SOW DPD Rep Certs Quote Inst. etc. - Posted on Mar 07, 2014Revised Statement Of Work - Posted on Mar 19, 2014
Posted: Mar 19, 2014 Center: MSFCTitle: LH2 TANK TEST FORWARD FACILITY-TO-STE INTERFACE RING ASSEMBLYSolicitation: NNM14501859Q Response Due: Mar 27, 2014Synopsis/Solicitation Combo - Posted on Mar 07, 2014
Amendment 01 - Posted on Mar 19, 2014Solicitation - Posted on Mar 19, 2014
TC SOW DPD Reps Certs Quote Inst etc. - Posted on Mar 07, 2014
Posted: Mar 19, 2014 Center: LARCTitle: PIPE FITTINGS FLANGES AND PIPESolicitation: NNL14507538Q Response Due: Mar 26, 2014Synopsis/Solicitation Combo - Posted on Mar 19, 2014On-Line RFQ - Posted on Mar 19, 2014Specifications - Posted on Mar 19, 2014
Posted: Mar 19, 2014 Center: MSFCTitle: FORWARD SKIRT AND LIQUID OXYGEN TANK LOWER SPIDER ASSEMBLYSolicitation: NNM14501837Q Response Due: Mar 28, 2014Synopsis/Solicitation Combo - Posted on Feb 20, 2014
Amendment 01 - Posted on Mar 11, 2014Amendment 02 - Posted on Mar 19, 2014
Solicitation - Posted on Feb 20, 2014High Resolution Drawings - Posted on Feb 21, 2014Revised Statement of Work - Posted on Mar 19, 2014
Posted: Mar 19, 2014 Center: GSFCTitle: GSMO SPACE GEODESY SLRSolicitation: RFI2014GSMOSLR Response Due: Apr 02, 2014Synopsis - Posted on Mar 19, 2014
Posted: Mar 18, 2014 Center: MSFCTitle: LICENSE RENEWAL FOR HYPERWORKS UNITSSolicitation: NNM14505543Q Response Due: Mar 24, 2014Synopsis - Posted on Mar 18, 2014
Posted: Mar 18, 2014 Center: KSCTitle: DIBROM 14 FOR MOSQUITO CONTROL AT KSCSolicitation: NNK14505660Q Response Due: Apr 02, 2014Synopsis/Solicitation Combo - Posted on Mar 18, 2014On-Line RFQ - Posted on Mar 18, 2014
Posted: Mar 18, 2014 Center: HQTitle: FY 2014 NASA COOPERATIVE AGREEMENT NOTICE {CAN} EXPERIMENTAL PROGRAM TO STIMULATE COMPETITIVE RESEARCH {EPSCOR}Solicitation: NNH14ZHA001C Response Due: Mar 24, 2014Synopsis - Posted on Mar 18, 2014
Posted: Mar 18, 2014 Center: KSCTitle: DESIGN AND OTHER PROFESSIONAL SERVICES TO FOR CIVIL INFRASTRUCTURE AND FACILITIES AT THE KENNEDY SPACE CENTER FL AND AT OTHER LOCATIONSSolicitation: NNKSLW01 Response Due: Apr 03, 2014Synopsis - Posted on Mar 18, 2014
Posted: Mar 17, 2014 Center: JSCTitle: WHITE SANDS TEST FACILITY "WSTF" NASA EXCHANGE FOOD SERVICES -LAS CRUCES NMSolicitation: NNJ14ZBR003L Response Due: Mar 24, 2014Synopsis - Posted on Mar 11, 2014
Modification 01 - Posted on Mar 17, 2014
Posted: Mar 17, 2014 Center: JSCTitle: JSC NASA EXCHANGE SOURCES SOUGHT -FOOD SERVICESSolicitation: NNJ14ZBR002L Response Due: Mar 24, 2014Synopsis - Posted on Mar 11, 2014
Modification 01 - Posted on Mar 17, 2014
Posted: Mar 17, 2014 Center: MSFCTitle: MISCELLANEOUS PIPE FITTINGSSolicitation: NNM14504665Q Response Due: Mar 21, 2014Synopsis/Solicitation Combo - Posted on Mar 17, 2014Terms and Conditions and Parts List - Posted on Mar 17, 2014
Posted: Mar 17, 2014 Center: MSFCTitle: MCIDAS SOFTWARE LICENSE AGREEMENT RENEWALSolicitation: NNM14501995Q Response Due: Mar 21, 2014Synopsis - Posted on Mar 17, 2014
Posted: Mar 17, 2014 Center: JSCTitle: REQUEST FOR INFORMATION - MAIL AND DUPLICATION SUPPORT SERVICES FOLLOW-ONSolicitation: NNJ14ZBJ001L Response Due: Mar 17, 2014Synopsis - Posted on Nov 19, 2013
Modification 01 - Posted on Mar 17, 2014
Posted: Mar 14, 2014 Center: GSFCTitle: SEWP IV EXTENSIONSolicitation: SEWP-4-2014 Response Due: Mar 28, 2014Synopsis - Posted on Mar 14, 2014
Posted: Mar 14, 2014 Center: GRCTitle: NEXT ION PROPULSION POWER PROCESSING UNITSolicitation: NNC14ZMX022L Response Due: Mar 28, 2014Synopsis - Posted on Feb 25, 2014
Modification 01 - Posted on Mar 06, 2014Modification 02 - Posted on Mar 14, 2014
Combined RFI and Sources Sought Notice - Posted on Feb 25, 2014RFISS Addendum - Posted on Mar 06, 2014Request for Export Controlled Technical Data Form - Posted on Mar 14, 2014
Posted: Mar 13, 2014 Center: GSFCTitle: HERMETRIC FEED-THROUGH CONNECTOR PLATESolicitation: NNG135039996Q Response Due: Mar 25, 2014Synopsis/Solicitation Combo - Posted on Mar 13, 2014On-Line RFQ - Posted on Mar 13, 2014Solicitation - Posted on Mar 13, 2014
Posted: Mar 13, 2014 Center: HQTitle: SUSTAINABLE LAND IMAGING ARCHITECTURE STUDY INTERIM STATUS BRIEFINGSolicitation: NNH14ZDA006L Response Due: Apr 01, 2014Synopsis - Posted on Mar 13, 2014
Posted: Mar 12, 2014 Center: LARCTitle: ELECTRONIC MECHNANICAL COMPOSITE HARDWARE FABRICATION SUPPORT SERVICESSolicitation: NNL14ZB1002Lv2 Response Due: Mar 24, 2014Synopsis - Posted on Mar 12, 2014
Posted: Mar 12, 2014 Center: GRCTitle: HIGH TEMPERATURE COMPOSITESSolicitation: NNC14505631Q Response Due: Mar 19, 2014Synopsis/Solicitation Combo - Posted on Mar 12, 2014
Posted: Mar 11, 2014 Center: GSFCTitle: 60 KV ELECTRON BEAM WELDERSolicitation: NNG14485999Q Response Due: Mar 26, 2014Synopsis/Solicitation Combo - Posted on Mar 11, 2014On-Line RFQ - Posted on Mar 11, 2014Specifications to NNG14485999Q - Posted on Mar 11, 2014
Posted: Mar 11, 2014 Center: ARCTitle: NASA ACADEMIC MISSION SERVICESSolicitation: NNA1488849R Response Due: N/ASynopsis - Posted on Nov 07, 2013
Modification 01 - Posted on Mar 11, 2014
Posted: Mar 07, 2014 Center: GRCTitle: TURBINE AND INTERNAL OPTICS REPLACEMENT AND INSTALLATION ON LASERSolicitation: NNC14504855Q Response Due: Mar 18, 2014Synopsis - Posted on Mar 07, 2014
Posted: Mar 07, 2014 Center: KSCTitle: KENNEDY SPACE CENTER FLORIDA RAIL SYSTEM OPERATIONS RFISolicitation: NNK14ZOR001L Response Due: Apr 10, 2014Synopsis - Posted on Mar 07, 2014
Modification 01 - Posted on Mar 07, 2014RFI Attachments - Draft SOW and Response Checklist - Posted on Mar 07, 2014Draft SOW - Updated - Posted on Mar 07, 2014
Posted: Mar 06, 2014 Center: GRCTitle: UPGRADE AND CONTINUED MAINTENANCE FOR EDAS SYSTEMSolicitation: NNC14505042Q Response Due: Mar 11, 2014Synopsis - Posted on Mar 06, 2014
Posted: Mar 06, 2014 Center: GRCTitle: EDUCATIONAL-INFORMATIONAL MATERIAL AND OUTREACH SUPPORT FOR NASA’S ORION SPACECRAFT PROGRAM AND FIRST TEST FLIGHT- EXPLORATION FLIGHT TEST IN 2014Solicitation: NNC14ZCH017R Response Due: Mar 13, 2014Synopsis/Solicitation Combo - Posted on Feb 27, 2014SOLICITATION ATTACHMENT A - Posted on Feb 27, 2014AMENDMENT 1 - Posted on Mar 05, 2014ORION LOGOS - Posted on Mar 05, 2014Amendment 2 - Posted on Mar 06, 2014
Posted: Mar 06, 2014 Center: GRCTitle: MACHINING OF ELECTRON BEAM MELTED TI-6AL-4V TEST SAMPLESSolicitation: NNC14504230Q Response Due: Mar 07, 2014Synopsis/Solicitation Combo - Posted on Mar 04, 2014Statement of Work - Posted on Mar 04, 2014Questions and Answers - Posted on Mar 06, 2014
Posted: Mar 05, 2014 Center: HQTitle: NASA POST DOCTORAL PROGRAMSolicitation: NNHPOSTDOCTORAL Response Due: Mar 19, 2014Synopsis - Posted on Mar 05, 2014
Posted: Mar 04, 2014 Center: GRCTitle: UPGRADE TO NEW LICENSE INCLUDING MAINTENANCE AND SUPPORTSolicitation: NNC14504149Q Response Due: Mar 11, 2014Synopsis - Posted on Mar 04, 2014
Posted: Mar 04, 2014 Center: SSCTitle: SYNERGY ACHIEVING CONSOLIDATED OPERATIONS AND MAINTENANCE -SACOM- CONTRACTSolicitation: NNSSC14478585R Response Due: Dec 02, 2013Synopsis - Posted on Jun 06, 2013
Modification 01 - Posted on Nov 14, 2013Sources Sought Attachments - Posted on Jun 07, 2013SACOM Reference Material - Posted on Jul 24, 2013Interested Parties List - Posted on Jul 24, 2013Sources Sought Modification 01 Attachment - Posted on Nov 14, 2013Modification 01, Attachment 01 (Excel Version) - Posted on Nov 14, 2013MODIFICATION 002 - Posted on Mar 04, 2014
Posted: Mar 04, 2014 Center: MSFCTitle: FASTCOMM DRIVERSSolicitation: NNM14502166Q Response Due: Mar 12, 2014Synopsis - Posted on Mar 04, 2014
Posted: Mar 04, 2014 Center: GRCTitle: ANNUAL MAINTENANCE AND SUPPORT FOR VA ONE LICENSESSolicitation: NNC14504057Q Response Due: Mar 11, 2014Synopsis - Posted on Mar 04, 2014
Posted: Mar 04, 2014 Center: GSFCTitle: ALCATEL ADIXEN DRYTEL VACUUM PUMPING SYSTEMSolicitation: NNG14500656Q Response Due: Mar 07, 2014Synopsis/Solicitation Combo - Posted on Feb 24, 2014On-Line RFQ - Posted on Mar 04, 2014
Posted: Feb 28, 2014 Center: AFRCTitle: DEMOLITION OF THE MATE DE MATE DEVICE MDD STRUCTURE
Solicitation: NND482503E Response Due: Mar 12, 2014Synopsis - Posted on Jan 07, 2014
Modification 01 - Posted on Jan 22, 2014Solicitation - Posted on Jan 31, 2014
Amendment 01 - Posted on Feb 05, 2014Amendment 02 - Posted on Feb 13, 2014Amendment 03 - Posted on Feb 28, 2014
Site Visit Attendee Listing - Posted on Feb 13, 2014
Posted: Feb 28, 2014 Center: HQTitle: NASA RESEARCH AND EDUCATION SUPPORT SERVICESSolicitation: NRESS_Presolicitation Response Due: Mar 07, 2014Synopsis - Posted on May 14, 2013
Modification 01 - Posted on Nov 06, 2013Modification 02 - Posted on Jan 02, 2014Modification 03 - Posted on Jan 17, 2014
Solicitation - Posted on Jan 09, 2014Amendment 01 - Posted on Feb 04, 2014Amendment 02 - Posted on Feb 21, 2014Amendment 03 - Posted on Feb 28, 2014
Responses to Questions Phase 1 - Posted on Oct 31, 2013Responses to Questions Phase 2 - Posted on Nov 20, 2013Responses to Questions Phase 3 - Posted on Jan 09, 2014Response to Questions_Final RFP - Posted on Feb 04, 2014SF 30 for Amendment 1 - Posted on Feb 19, 2014Final RFP_Questions and Answers Phase 2 - Posted on Feb 21, 2014Questions_Answers Phase 3 - Posted on Feb 28, 2014
Posted: Feb 27, 2014 Center: LARCTitle: BENCHTOP SONIC MIXING SYSTEMSolicitation: NNL14503714Q Response Due: Mar 06, 2014Synopsis/Solicitation Combo - Posted on Feb 27, 2014On-Line RFQ - Posted on Feb 27, 2014
Posted: Feb 27, 2014 Center: MSFCTitle: ADVANCED FIBER PLACEMENT ROBOT SYSTEMSolicitation: NNM14501804Q Response Due: Mar 12, 2014Synopsis/Solicitation Combo - Posted on Feb 27, 2014SOW DPD Performance Eva and Terms Conditions - Posted on Feb 27, 2014
Posted: Feb 26, 2014 Center: MSFCTitle: BINDER BURNOUT FURNACESolicitation: NNM14503411Q Response Due: Mar 11, 2014Synopsis/Solicitation Combo - Posted on Feb 26, 2014
Specification and Terms and Conditions - Posted on Feb 26, 2014
Posted: Feb 26, 2014 Center: MSFCTitle: INTERDISCIPLINARY MARS STUDYSolicitation: NNM14502281Q Response Due: Mar 05, 2014Synopsis - Posted on Feb 26, 2014
Posted: Feb 26, 2014 Center: LARCTitle: HIGH SPEED RUGGEDIZED SENSOR MEASUREMENT SYSTEM EQUIPMENTSolicitation: NNL14502904Q Response Due: Mar 05, 2014Synopsis - Posted on Feb 26, 2014
Posted: Feb 25, 2014 Center: ARCTitle: FIRE PREVENTION SERVICES FOR NASA AMES RESEARCH CENTERSolicitation: NNA06CD65C-BAD Response Due: Jan 30, 2014Synopsis - Posted on Jan 16, 2014
Justification and Approval - Posted on Feb 25, 2014
Posted: Feb 25, 2014 Center: ARCTitle: PROTECTIVE SERVICES FOR NASA AMES RESEARCH CENTERSolicitation: NNA04CI14T-BAD Response Due: Jan 30, 2014Synopsis - Posted on Jan 16, 2014
Justification and Approval - Posted on Feb 25, 2014
Posted: Feb 25, 2014 Center: GSFCTitle: FLIGHT DYNAMICS SUPPORT SERVICES IISolicitation: NNG13449004R Response Due: Mar 07, 2014Synopsis - Posted on Jun 07, 2013
Modification 01 - Posted on Aug 23, 2013Modification 02 - Posted on Sep 20, 2013Modification 03 - Posted on Oct 04, 2013Modification 04 - Posted on Oct 24, 2013Modification 05 - Posted on Dec 06, 2013Modification 06 - Posted on Jan 31, 2014
Solicitation - Posted on Feb 05, 2014Amendment 01 - Posted on Feb 14, 2014Amendment 02 - Posted on Feb 25, 2014
Interested Parties List - Posted on Jun 07, 2013List of Interested Parties - Posted on Jun 10, 2013List of Interested Parties - Posted on Sep 23, 2013FDSS II Questions - Posted on Nov 20, 2013Attachment N Offsite Government Furnished Property - Posted on Dec 06, 2013Questions and Responses - Posted on Dec 12, 2013
FDSS II Questions and Responses 78 -86 - Posted on Jan 07, 2014Question 88 and Response - Posted on Feb 05, 2014FDSS II Questions and Responses to Final RFP - Posted on Feb 14, 2014Question and Responses 7-10 to Final RFP - Posted on Feb 25, 2014
Posted: Feb 21, 2014 Center: JSCTitle: COMMERCIAL RESUPPLY SERVICES 2Solicitation: NNJ14ZBG007L Response Due: Mar 21, 2014Synopsis - Posted on Feb 21, 2014
Modification 01 - Posted on Feb 21, 2014
Posted: Feb 19, 2014 Center: GSFCTitle: AUDIO VISUAL SUPPORT SERVICESSolicitation: NNG14502559Q Response Due: Feb 25, 2014Synopsis - Posted on Feb 19, 2014
Posted: Feb 19, 2014 Center: HQTitle: RESEARCH OPPORTUNITIES IN SPACE AND EARTH SCIENCES {ROSES} 2014Solicitation: NNH14ZDA001N Response Due: N/ASynopsis - Posted on Feb 19, 2014
Posted: Feb 18, 2014 Center: LARCTitle: ELECTRONIC MECHANICAL COMPOSITE HARDWARE FABRICATION SUPPORT SERVICESSolicitation: NNL14ZB1002L Response Due: Mar 06, 2014Synopsis - Posted on Feb 18, 2014
Posted: Feb 14, 2014 Center: MSFCTitle: COPPER ALLOY POWDERSolicitation: NNM14498953Q-1 Response Due: Feb 17, 2014Synopsis/Solicitation Combo - Posted on Feb 14, 2014Solicitation - Posted on Feb 14, 2014
Posted: Feb 13, 2014 Center: GSFCTitle: NASA BALLOON OPERATIONS CONTRACTSolicitation: NNG13436908R Response Due: Mar 10, 2014Synopsis - Posted on Apr 18, 2013
Modification 01 - Posted on Jun 24, 2013Modification 02 - Posted on Oct 22, 2013
Solicitation - Posted on Jan 08, 2014Amendment 01 - Posted on Jan 08, 2014Amendment 02 - Posted on Jan 14, 2014
Amendment 03 - Posted on Jan 16, 2014Amendment 04 - Posted on Jan 28, 2014Amendment 05 - Posted on Jan 30, 2014Amendment 06 - Posted on Feb 03, 2014Amendment 07 - Posted on Feb 13, 2014
Draft Balloon Statement of Work - Posted on May 14, 2013NBOC Library Website - Posted on Jun 05, 2013Revised SOW 6-22-2013 - Posted on Jun 24, 2013Revised Release of DRFP - Posted on Jul 17, 2013NBOC Industry Day Instructions -August 20 22 - Posted on Aug 08, 2013Updated Industry Day Information - Posted on Aug 15, 2013Industry Day Presentation and Sign In Sheets - Posted on Aug 28, 2013NASA Balloon Operations Contract Update - Posted on Nov 07, 2013NASA's reponses to Industry's Questions on NBOC - Posted on Nov 13, 2013NBOC Revised SOW November 13, 2013 - Posted on Nov 14, 2013NBOC Additional Historical Information - Posted on Nov 18, 2013Position Descriptions - Posted on Nov 19, 2013NBOC FY 14 Prospective Balloon Flight Schedule - Posted on Dec 02, 2013NBOC Additional Responses to Industry Questions - Posted on Dec 12, 2013NBOC Resposes to Industry Questions on Final RFP - Posted on Jan 23, 2014
Posted: Feb 12, 2014 Center: ARCTitle: SOURCES SOUGHT SPECIAL NOTICE 2014Solicitation: NNA1412345L Response Due: N/ASynopsis - Posted on Feb 12, 2014
Posted: Feb 12, 2014 Center: ARCTitle: FINANCIAL SUPPORT SERVICES CONTRACT EXTENSIONSolicitation: GS-23F-0337P-NNA08BB30T-Extension-NASA-ARC Response Due: Feb 27, 2014Synopsis - Posted on Feb 12, 2014
Posted: Feb 12, 2014 Center: GSFCTitle: REAL TIME SPACE WEATHER ANALYSISSolicitation: NNG14501337 Response Due: Feb 21, 2014Synopsis - Posted on Feb 12, 2014
Posted: Feb 12, 2014 Center: LARCTitle: ENERGY DISPERSIVE SPECTROMETER SYSTEMSolicitation: NNL14502421Q Response Due: Feb 21, 2014Synopsis/Solicitation Combo - Posted on Feb 12, 2014On-Line RFQ - Posted on Feb 12, 2014Specifications - Posted on Feb 12, 2014
Title: PACE IV PROFESSIONAL ADMINISTRATIVE COMPUTATIONAL AND ENGINEERING SERVICESSolicitation: NNC13ZCH020J Response Due: Jun 28, 2013Synopsis - Posted on Apr 02, 2013Solicitation - Posted on May 17, 2013
Amendment 01 - Posted on May 21, 2013Amendment 02 - Posted on May 21, 2013Amendment 03 - Posted on May 30, 2013Amendment 04 - Posted on Jun 12, 2013
PACE IV Industry Day - Posted on Apr 09, 2013Industry Day Update - Posted on Apr 16, 2013Industry Day Update 2 - Posted on Apr 17, 2013Industry Day Presentation and Attendees - Posted on Apr 19, 2013Attachments J-16 and J-17 - Posted on May 21, 2013Source Selection Statement - Posted on Feb 11, 2014
Posted: Feb 11, 2014 Center: GSFCTitle: ALCATEL ADIXEN DRYTEL VACUUM PUMPING SYSTEMSolicitation: NNG14500656 Response Due: Feb 24, 2014Synopsis - Posted on Feb 11, 2014
Posted: Feb 10, 2014 Center: JSCTitle: SIMULATION AND SOFTWARE TECHNOLOGY II- SST IISolicitation: NNJ13471515R Response Due: Feb 24, 2014Synopsis - Posted on Aug 21, 2013
Modification 01 - Posted on Sep 27, 2013Modification 02 - Posted on Sep 30, 2013Modification 03 - Posted on Oct 30, 2013Modification 04 - Posted on Nov 15, 2013Modification 05 - Posted on Nov 20, 2013Modification 06 - Posted on Dec 13, 2013Modification 07 - Posted on Dec 17, 2013Modification 08 - Posted on Jan 07, 2014Modification 09 - Posted on Jan 09, 2014Modification 10 - Posted on Jan 21, 2014Modification 11 - Posted on Feb 10, 2014
Solicitation - Posted on Nov 15, 2013Amendment 01 - Posted on Dec 17, 2013Amendment 02 - Posted on Jan 21, 2014Amendment 03 - Posted on Feb 10, 2014
PreProposal Conference Announcement - Posted on Nov 20, 2013Conference Web Ex Instructions - Posted on Nov 20, 2013Pricing Web Ex Instructions - Posted on Nov 20, 2013Revised Pre-Proposal Conference Charts - Posted on Dec 04, 2013Pricing Web Ex - Posted on Dec 04, 2013Revised Preproposal Conference Questions Answers - Posted on Jan 07, 2014
Title: 6.5" PIN STANDARD FEMALE CLEVISSolicitation: NNM14487501Q Response Due: Feb 10, 2014Synopsis/Solicitation Combo - Posted on Jan 22, 2014
Amendment 01 - Posted on Jan 24, 2014Amendment 02 - Posted on Jan 31, 2014Amendment 03 - Posted on Jan 31, 2014Amendment 04 - Posted on Feb 07, 2014
Specification Drawing and TC - Posted on Jan 22, 2014Revisions to 1212014 posting of NNM14487501Q - Posted on Jan 23, 2014
Posted: Feb 07, 2014 Center: GRCTitle: NOZZLE SCREEN ASSEMBLYSolicitation: NNC14499212Q Response Due: Feb 14, 2014Synopsis/Solicitation Combo - Posted on Feb 07, 2014Nozzle Screen Assembly DrawingsSpecs - Posted on Feb 07, 2014
Posted: Feb 06, 2014 Center: GRCTitle: NATURAL GAS SUPPLY FOR GLENN RESEARCH CENTERS LEWIS FIELD AND PLUM BROOK STATION LOCATIONSSolicitation: NNC14ZCH016R Response Due: Feb 19, 2014Synopsis/Solicitation Combo - Posted on Jan 31, 2014Amendment 1 - Posted on Feb 04, 2014AMENDMENT 2 - Posted on Feb 06, 2014
Posted: Feb 05, 2014 Center: MSFCTitle: HIGH-RESOLUTION DISPLACEMENT SENSORSSolicitation: NNM14501216Q Response Due: Feb 11, 2014Synopsis - Posted on Feb 05, 2014
Posted: Feb 05, 2014 Center: HQTitle: LUNAR CARGO TRANSPORTATION AND LANDING BY SOFT TOUCHDOWN {LUNAR CATALYST} - -ANNOUNCEMENTSolicitation: Lunar-CATALYST-01 Response Due: Mar 17, 2014Synopsis - Posted on Jan 16, 2014
Modification 01 - Posted on Feb 05, 2014Lunar CATALYST Announcement - Posted on Jan 16, 2014Lunar CATALYST Q+A Posting-1 - Posted on Feb 05, 2014Lunar CATALYST Announcement_Amendment-1 - Posted on Feb 05, 2014
Posted: Jan 31, 2014 Center: MSFCTitle: ANALYSIS OF LOW ENRICHED URANIUMSolicitation: NNM14498715Q Response Due: Feb 07, 2014
Posted: Jan 30, 2014 Center: GSFCTitle: PROGRAMMATIC AND INSTITUTIONAL LEARNING SERVICESSolicitation: NNG14487642L Response Due: Feb 03, 2014Synopsis - Posted on Jan 02, 2014
Modification 01 - Posted on Jan 14, 2014Modification 02 - Posted on Jan 30, 2014
SOW - Posted on Jan 02, 2014
Posted: Jan 27, 2014 Center: GRCTitle: EDUCATIONAL AND OUTREACH SUPPORT FOR NASA’S ORION PROGRAMSolicitation: NNC14ZCH014Q Response Due: Jan 30, 2014Synopsis - Posted on Jan 27, 2014
Posted: Jan 27, 2014 Center: LARCTitle: SOURCES SOUGHT SYNOPSIS FOR REPLACEMENT OF COMPRESSORS 1 2 AND 3 IN BUILDING 1247E AT NASA LANGLEY RESEARCH CENTER IN HAMPTON VIRGINIASolicitation: NNL14ZD4002L Response Due: Feb 21, 2014Synopsis - Posted on Jan 27, 2014
Posted: Jan 27, 2014 Center: HQTitle: RESEARCH OPPORTUNITIES IN AERONAUTICS - 2014Solicitation: NNH14ZEA001N Response Due: N/ASynopsis - Posted on Jan 27, 2014
Posted: Jan 24, 2014 Center: GRCTitle: NATURAL GAS MANAGEMENTSolicitation: NNC14ZCH013R Response Due: Jan 29, 2014Synopsis/Solicitation Combo - Posted on Jan 24, 2014SAMPLE CONTRACT - Posted on Jan 24, 2014
Posted: Jan 23, 2014 Center: ARCTitle: ASRS NNA11AA19C COST GROWTH MODIFICATIONSolicitation: NNA11AA19C-INCREASE Response Due: Feb 06, 2014Synopsis - Posted on Jan 23, 2014
Posted: Jan 22, 2014 Center: HQTitle: EARLY CAREER FACULTY {ECF}
Solicitation: NNH14ZOA001N-14ECF-B1 Response Due: Mar 14, 2014Synopsis - Posted on Jan 22, 2014
Posted: Jan 21, 2014 Center: GRCTitle: ARCHITECT AND ENGINEERING SERVICES FY14Solicitation: NNC14ZFD005Q Response Due: Jan 24, 2014Synopsis - Posted on Nov 27, 2013Solicitation - Posted on Dec 21, 2013
Amendment 01 - Posted on Jan 21, 2014Statement Regarding AE Posting - Posted on Jan 21, 2014
Posted: Jan 17, 2014 Center: GSFCTitle: MID-ATLANTIC REGIONAL SPACE PORT FOLLOW-ON MARSSolicitation: NNG14494883R Response Due: Feb 03, 2014Synopsis - Posted on Jan 17, 2014
Posted: Jan 16, 2014 Center: LARCTitle: NEAR INFRARED SPECTROMETERSolicitation: NNL14499984Q Response Due: Jan 22, 2014Synopsis/Solicitation Combo - Posted on Jan 16, 2014On-Line RFQ - Posted on Jan 16, 2014Specifications - Posted on Jan 16, 2014
Posted: Jan 16, 2014 Center: GSFCTitle: MULTI DISCIPLINARY ENGINEERING AND TECHNOLOGY SERVICES METS IIISolicitation: NNG13468849L Response Due: Mar 26, 2013Synopsis - Posted on Mar 11, 2013Statement of Work METS II - Posted on Mar 12, 2013Interested Parties List for METS III - Posted on Oct 18, 2013UPDATE METS III - Posted on Dec 16, 201312.16.13 Final Interested Parties List METS III - Posted on Dec 16, 2013New Sources Sought Posting - Posted on Jan 16, 2014
Posted: Jan 15, 2014 Center: LARCTitle: 3D SYSTEMS ANNUAL MAINTENANCE AGREEMENTSSolicitation: NNL14500098Q Response Due: Jan 21, 2014Synopsis - Posted on Jan 15, 2014
Response Due: Jan 24, 2014Synopsis - Posted on Jul 05, 2013
Modification 01 - Posted on Oct 28, 2013Modification 02 - Posted on Dec 04, 2013
Solicitation - Posted on Dec 04, 2013Amendment 01 - Posted on Dec 18, 2013Amendment 02 - Posted on Jan 10, 2014Amendment 03 - Posted on Jan 14, 2014
Draft RFP NNA13464313R - Posted on Oct 28, 2013Interested Parties Listing 11-20-2013 - Posted on Nov 26, 2013Question and Answers Set 1 - Posted on Nov 26, 2013Interested Parties Listing 12-3-13 - Posted on Dec 03, 2013
Posted: Jan 14, 2014 Center: LARCTitle: FACILITY ASSURANCE INSPECTIONS MONITORING AND OCCUPATIONAL SAFETYSolicitation: NNL14493618R Response Due: Jan 28, 2014Synopsis - Posted on Nov 08, 2013Solicitation - Posted on Dec 19, 2013
Amendment 01 - Posted on Jan 14, 2014
Posted: Jan 14, 2014 Center: LARCTitle: ELECTRONIC ELECTRICAL ELECTROMECHANICAL PARTSSolicitation: NNL14EEEPARTSRFQ Response Due: Jan 20, 2014Synopsis/Solicitation Combo - Posted on Dec 19, 2013
Amendment 01 - Posted on Jan 14, 2014On-Line RFQ - Posted on Dec 19, 2013Draft BPA - Posted on Dec 19, 2013Amendment 1 with Questions and Answers - Posted on Jan 14, 2014
Posted: Jan 13, 2014 Center: HQTitle: SECTION 504 REHABILITATION ACT COMPLIANCE REVIEWSolicitation: NNH14496619L Response Due: Jan 27, 2014Synopsis - Posted on Jan 13, 2014
Posted: Dec 26, 2013 Center: GSFCTitle: 910KW MOBILE DIESEL ENGINE GENERATOR SETSolicitation: NNG141447988Q Response Due: Jan 07, 2014Synopsis/Solicitation Combo - Posted on Dec 17, 2013
Amendment 01 - Posted on Dec 17, 2013Amendment 02 - Posted on Dec 26, 2013
On-Line RFQ - Posted on Dec 17, 2013Specifications - Posted on Dec 17, 2013Generator Permit Parts A-D - Posted on Dec 26, 2013
Posted: Dec 23, 2013 Center: HQTitle: NASA OPPORTUNITY NOTICE TO PARTICIPATE IN ITS CENTENNIAL CHALLENGES PROGRAM AS AN ALLIED ORGANIZATIONSolicitation: NNH14STMD001L Response Due: Dec 01, 2014Synopsis - Posted on Dec 19, 2013
Modification 01 - Posted on Dec 23, 2013
Posted: Dec 20, 2013 Center: GSFCTitle: TECHNOLOGY AND INTEGRATED DISCIPLINE ENGINEERING SERVICESSolicitation: NNG14433033L Response Due: Jan 17, 2014Synopsis - Posted on Dec 20, 2013Draft Document - Posted on Dec 20, 2013
Posted: Dec 20, 2013 Center: GSFCTitle: SYSTEMS ENGINEERING AND ADVANCED SERVICESSolicitation: NNG14499015L Response Due: Jan 17, 2014Synopsis - Posted on Dec 20, 2013Draft Document - Posted on Dec 20, 2013
Posted: Dec 19, 2013 Center: AFRCTitle: FY 14 CONSTRUCTION OF FACILITIES REPAIR HANGAR FIRE SUPPRESSION SYSTEMSolicitation: NND14499005E Response Due: Jan 22, 2014Synopsis - Posted on Dec 19, 2013
Posted: Dec 19, 2013 Center: KSCTitle: LEASE OF LAUNCH COMPLEX 39A AT NASA KENNEDY SPACE CENTERSolicitation: AFP-KSC-LC39A--Selection Response Due: N/ASynopsis - Posted on Dec 19, 2013Selection Statement -- Lease of Launch Complex 39A - Posted on Dec 19, 2013
Posted: Dec 17, 2013 Center: JSCTitle: JSC ADMINISTRATIVE SUPPORT SERVICES II - JASS IISolicitation: NNJ13473923R Response Due: Jan 02, 2014Synopsis - Posted on Sep 18, 2013
Modification 01 - Posted on Sep 20, 2013Modification 02 - Posted on Nov 13, 2013Modification 03 - Posted on Nov 14, 2013
Solicitation - Posted on Nov 01, 2013Amendment 01 - Posted on Nov 05, 2013Amendment 02 - Posted on Nov 13, 2013Amendment 03 - Posted on Nov 14, 2013
Amendment 04 - Posted on Nov 26, 2013Amendment 05 - Posted on Dec 03, 2013Amendment 06 - Posted on Dec 05, 2013Amendment 07 - Posted on Dec 10, 2013Amendment 08 - Posted on Dec 17, 2013
Corrected Version of Pre-Proposal Bulletin Charts - Posted on Nov 14, 2013Updated Interested Parties List (12-12-2013) - Posted on Dec 12, 2013
Posted: Dec 17, 2013 Center: ARCTitle: PROGRAMS AND PROJECTS SERVICES FOR THE ASTROBIOLOGY SPACE AND RESEARCH SERVICESSolicitation: NAS2-02090-EXTENDED Response Due: Jan 03, 2014Synopsis - Posted on Dec 17, 2013
Posted: Dec 17, 2013 Center: GRCTitle: JANITORIAL SERVICESSolicitation: NNC14ZCH001R Response Due: Dec 20, 2013Synopsis - Posted on Oct 23, 2013Solicitation - Posted on Nov 20, 2013
Amendment 01 - Posted on Dec 10, 2013Amendment 02 - Posted on Dec 16, 2013
Industry Day Schedule - Posted on Nov 08, 2013INDUSTRY DAY SLIDES - Posted on Nov 21, 2013Questions and Answers Rd3 - Posted on Dec 17, 2013
Posted: Dec 17, 2013 Center: GSFCTitle: STS VISIBLE RANGE RADIOMETERSolicitation: NNG14496917L Response Due: Jan 02, 2014Synopsis - Posted on Dec 17, 2013
Posted: Dec 16, 2013 Center: LARCTitle: ROCKET MOTOR TEST OPPORTUNITYSolicitation: RFI-MOTOR-2013 Response Due: Jan 13, 2014Synopsis - Posted on Dec 16, 2013Draft Space Act Agreement - Posted on Dec 16, 2013
Posted: Dec 13, 2013 Center: MSFCTitle: NARLOY-Z-DIAMOND COMPOSITE COMBUSTION CHAMBER LINER FABRICATION USING FIELD ASSISTED SINTERING TECHNOLOGYSolicitation: NNM14495108Q Response Due: Dec 19, 2013Synopsis - Posted on Dec 13, 2013
Posted: Dec 13, 2013 Center: MSFCTitle: LIQUID METHANE GASSolicitation: NNM14496461Q Response Due: Dec 18, 2013Synopsis/Solicitation Combo - Posted on Dec 05, 2013
Amendment 01 - Posted on Dec 10, 2013Amendment 02 - Posted on Dec 13, 2013
Attachments - Posted on Dec 05, 2013
Posted: Dec 13, 2013 Center: MSFCTitle: AXIS ILS MACHINE PARTSSolicitation: NNM1494533Q Response Due: Dec 19, 2013Synopsis/Solicitation Combo - Posted on Dec 10, 2013
Amendment 01 - Posted on Dec 10, 2013Amendment 02 - Posted on Dec 12, 2013Amendment 03 - Posted on Dec 13, 2013Amendment 04 - Posted on Dec 13, 2013
Attachments NNM1494533Q - Posted on Dec 10, 2013Correct SOW for NNM1494533Q - Posted on Dec 10, 2013Correct Terms Conditions associated with Mod 4 - Posted on Dec 13, 2013
Posted: Dec 12, 2013 Center: GSFCTitle: 60KV ELECTRON BEAM WELDERSolicitation: NNG13485999Q Response Due: Dec 16, 2013Synopsis/Solicitation Combo - Posted on Nov 27, 2013
Amendment 01 - Posted on Dec 12, 2013On-Line RFQ - Posted onSpecifications to NNG13485999Q - Posted on Nov 27, 2013
Posted: Dec 11, 2013 Center: AFRCTitle: RESEARCH FACILITIES AND ENGINEERING SUPPORT SERVICESSolicitation: NND14493256R Response Due: Jan 04, 2014Synopsis - Posted on Dec 11, 2013
Posted: Dec 10, 2013 Center: ARCTitle: FINANCIAL SERVICESSolicitation: NNA14408214R Response Due: Dec 18, 2013Synopsis - Posted on May 06, 2013
Modification 01 - Posted on Jul 03, 2013Modification 02 - Posted on Jul 11, 2013Modification 03 - Posted on Sep 09, 2013Modification 04 - Posted on Nov 18, 2013Modification 05 - Posted on Nov 26, 2013Modification 06 - Posted on Dec 10, 2013
Amendment 01 - Posted on Nov 26, 2013Amendment 02 - Posted on Dec 10, 2013
Industry Day/Pre-Proposal Conference Information - Posted on Jul 11, 2013Industry Day/Pre-Proposal Conference Documents - Posted on Jul 19, 2013Questions and Answers Set 1 - Posted on Sep 09, 2013Questions and Answers Set 2 - Posted on Sep 19, 2013J1a Att 12 Wage Salary and Fringe Benefit Data - Posted on Nov 19, 2013
Posted: Dec 10, 2013 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – SUBSURFACE IMAGING OF NANOCOMPOSITES VIA RESONANT DIFFERENCE-FREQUENCY ATOMIC FORCE ULTRASONIC MICROSCOPY-- RDF-AFUMSolicitation: TT01040 Response Due: Dec 10, 2014Synopsis - Posted on Dec 10, 2013
Posted: Dec 10, 2013 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – HIGHLY ALIGNED ELECTROSPUN FIBERS AND MATSSolicitation: TT01039 Response Due: Dec 10, 2014Synopsis - Posted on Dec 10, 2013
Posted: Dec 10, 2013 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – ACTIVE FLOW EFFECTORS FOR NOISE AND SEPARATION CONTROLSolicitation: TT01038 Response Due: Dec 10, 2014Synopsis - Posted on Dec 10, 2013
Posted: Dec 10, 2013 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – QUICK CHANGE CERAMIC FLAME HOLDERSolicitation: TT0137 Response Due: Dec 10, 2014Synopsis - Posted on Dec 10, 2013
Posted: Dec 10, 2013 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY FIRE RESISTANT- LIGHTWEIGHT ELECTRICAL INSULATION MATERIALSolicitation: TT01036 Response Due: Dec 10, 2014Synopsis - Posted on Dec 10, 2013
Posted: Dec 09, 2013 Center: GSFCTitle: SPECTROMETER UPGRADESolicitation: NNG14492929R Response Due: Dec 23, 2013Synopsis - Posted on Dec 09, 2013
Posted: Dec 05, 2013 Center: GRCTitle: TEST FACILITIES OPERATIONS MAINTENANCE AND ENGINEERINGSolicitation: TFOME Response Due: Dec 16, 2013Synopsis - Posted on Nov 26, 2013Industry Telecon Opportunity + NAICS Code Revision - Posted on Dec 05, 2013
Posted: Dec 05, 2013 Center: MSFCTitle: MICHOUD ASSEMBLY FACILITY - MANUFACTURING SUPPORT AND FACILITY OPERATIONS CONTRACT EXTENSIONSolicitation: NNM09AA20C-R Response Due: Dec 19, 2013Synopsis - Posted on Dec 05, 2013
Posted: Dec 04, 2013 Center: HQTitle: SUPPORT FOR THE UNITED STATES GLOBAL CHANGE RESEARCH PROGRAM NATIONAL COORDINATION OFFICESolicitation: NNH14497394L Response Due: Dec 18, 2013Synopsis - Posted on Dec 04, 2013
Posted: Dec 03, 2013 Center: LARCTitle: REPLACEMENT OF COMPRESSORS 1 2 AND 3 BLDG 1247E AT NASA LANGLEY RESEARCH CENTER HAMPTON VIRGINIASolicitation: NNL14ZD4001L Response Due: Jan 15, 2014Synopsis - Posted on Dec 03, 2013
Posted: Nov 29, 2013 Center: ARCTitle: RESEARCH AND TECHNOLOGY DEVELOPMENT SERVICESSolicitation: SN-ResearchandTechnology Response Due: N/ASynopsis - Posted on Nov 29, 2013
Posted: Nov 27, 2013 Center: ARCTitle: RAV-B AIRSHIP USTRANSCOM AIRSHIP STUDYSolicitation: NNA08BC43C36 Response Due: Dec 12, 2013Synopsis - Posted on Nov 27, 2013
Posted: Nov 27, 2013 Center: SSCTitle: 2014 COOPERATIVE AGREEMENT NOTICE - DUAL USE TECHNOLOGYSolicitation: NNS14496742R Response Due: Sep 30, 2014Synopsis - Posted on Nov 27, 2013
Posted: Nov 26, 2013 Center: LARCTitle: QUALITY ASSURANCE - SAFETY SUPPORT - INSPECTION SERVICES FOR NASA LANGLEY RESEARCH CENTERSolicitation: NASA-LARC-SS-QUASI Response Due: Dec 13, 2013Synopsis - Posted on May 22, 2013
Modification 01 - Posted on Nov 08, 2013Modification 02 - Posted on Nov 26, 2013
Posted: Nov 26, 2013 Center: GSFCTitle: RADIATION SHIELD ASSEMBLYSolicitation: NNG14490853Q Response Due: Dec 09, 2013Synopsis/Solicitation Combo - Posted on Nov 26, 2013On-Line RFQ - Posted on Nov 26, 2013Drawings - Posted on Nov 26, 2013
Posted: Nov 25, 2013 Center: MSFCTitle: MARSHALL ENGINEERING TECHNICIANS AND TRADES SUPPORTSolicitation: NNM13443380R Response Due: Jan 07, 2014Synopsis - Posted on Jul 16, 2013
Modification 01 - Posted on Jul 22, 2013Modification 02 - Posted on Aug 09, 2013Modification 03 - Posted on Aug 20, 2013Modification 04 - Posted on Aug 22, 2013Modification 05 - Posted on Sep 27, 2013Modification 06 - Posted on Oct 11, 2013Modification 07 - Posted on Oct 17, 2013Modification 08 - Posted on Nov 04, 2013Modification 09 - Posted on Nov 25, 2013
Solicitation - Posted on Sep 27, 2013Amendment 01 - Posted on Oct 18, 2013Amendment 02 - Posted on Nov 20, 2013Amendment 03 - Posted on Nov 25, 2013
Industry Briefing Registration Form - Posted on Jul 16, 2013Industry Briefing List of Attendees and Charts - Posted on Aug 20, 2013
Posted: Nov 22, 2013 Center: MSFCTitle: SWIVEL EYE BRACKETSSolicitation: NNM13487494Q Response Due: Dec 06, 2013Synopsis/Solicitation Combo - Posted on Nov 22, 2013Solicitation - Posted on Nov 22, 2013
Posted: Nov 20, 2013 Center: GRCTitle: ENGINEERING SUPPORT FOR DEVELOPMENT OF THE ADVANCED STIRLING CONVERTOR CONTROL UNIT
Solicitation: NNC14ZDP002R Response Due: Dec 03, 2013Synopsis - Posted on Nov 20, 2013
Posted: Nov 18, 2013 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – CAVITY NOISE REDUCTION TECHNOLOGYSolicitation: TT01035 Response Due: Nov 15, 2014Synopsis - Posted on Nov 18, 2013
Posted: Nov 18, 2013 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY – TIP VORTEX NOISE REDUCTIONSolicitation: TT01034 Response Due: Nov 15, 2014Synopsis - Posted on Nov 18, 2013
Posted: Nov 15, 2013 Center: KSCTitle: ENDRESS+HAUSER CORIOLIS MASS FLOW METERSSolicitation: NNK490011Q Response Due: Dec 02, 2013Synopsis/Solicitation Combo - Posted on Nov 15, 2013
Amendment 01 - Posted on Nov 15, 2013
Posted: Nov 13, 2013 Center: GSFCTitle: THERMAL CHAMBERSolicitation: NNG14485294L Response Due: Nov 20, 2013Synopsis - Posted on Nov 07, 2013Solicitation - Posted on Nov 13, 2013
Posted: Nov 12, 2013 Center: JSCTitle: INTEGRATED MISSION OPERATIONSSolicitation: NNJ13ZBR004R Response Due: Nov 19, 2013Synopsis - Posted on Jul 22, 2013
Modification 01 - Posted on Jul 26, 2013Modification 02 - Posted on Jul 30, 2013Modification 03 - Posted on Aug 09, 2013Modification 04 - Posted on Aug 15, 2013Modification 05 - Posted on Aug 20, 2013Modification 06 - Posted on Aug 27, 2013Modification 07 - Posted on Aug 28, 2013Modification 08 - Posted on Sep 16, 2013Modification 09 - Posted on Sep 25, 2013
Solicitation - Posted on Sep 25, 2013Amendment 01 - Posted on Oct 22, 2013Amendment 02 - Posted on Oct 23, 2013Amendment 03 - Posted on Nov 12, 2013
PreProposal Conference Notice and Site Tour - Posted on Jul 22, 2013PreProposal Conference Notice & Site Tour Updated - Posted on Jul 30, 2013PreProposal Conference Presentation - Posted on Aug 09, 2013PreProposal Conference MOD Presentation - Posted on Aug 09, 2013Cost and Pricing Web Ex Presentation - Posted on Aug 09, 2013Questions and Answers 1 - 49 - Posted on Aug 27, 2013Questions and Answers 50-116 - Posted on Sep 16, 2013Updated Interested Parties List (9-25-2013) - Posted on Sep 25, 2013
Posted: Nov 12, 2013 Center: NSSCTitle: 2014 SBIR SELECT PHASE I RESEARCH DEVELOPMENTSolicitation: NNX14SBIRSELECT Response Due: Jan 29, 2014Synopsis - Posted on Nov 12, 2013
Posted: Nov 12, 2013 Center: NSSCTitle: 2014 SBIR-STTR PHASE I RESEARCH DEVELOPMENTSolicitation: NNX14SBIRSTTR-General Response Due: Jan 29, 2014Synopsis - Posted on Nov 08, 2013
Modification 01 - Posted on Nov 12, 2013
Posted: Nov 08, 2013 Center: GSFCTitle: CUBESATSolicitation: NNG14488348Q Response Due: Nov 16, 2013Synopsis - Posted on Nov 08, 2013Solicitation - Posted on Nov 08, 2013
Posted: Nov 04, 2013 Center: KSCTitle: NASA GRADE AMMONIASolicitation: NNK14OA01L Response Due: Nov 12, 2013Synopsis - Posted on Oct 22, 2013
Modification 01 - Posted on Oct 23, 2013Modification 02 - Posted on Nov 04, 2013
Statement of Work - Posted on Oct 23, 2013
Posted: Oct 28, 2013 Center: KSCTitle: LEADERSHIP TRAININGSolicitation: RFI-LION Response Due: Nov 21, 2013Synopsis - Posted on Oct 28, 2013Draft Document - Posted on Oct 28, 2013
Posted: Oct 25, 2013 Center: SSCTitle: A1 THRUST MEASUREMENT SYSTEM COMPONENT PROCUREMENT FOR RS25 ENGINE PROGRAM
Solicitation: NNS13483749R Response Due: Aug 26, 2013Synopsis - Posted on Aug 08, 2013
Justification and Approval - Posted on Oct 25, 2013
Posted: Oct 22, 2013 Center: HQTitle: ANNOUNCEMENT OF PROPOSAL OPPORTUNITY FOR THE EARTH SYSTEM SCIENCE PATHFINDER PROGRAM: EARTH VENTURE INSTRUMENT - 2Solicitation: NNH13ZDA011O-EV12 Response Due: Nov 25, 2013Synopsis - Posted on Jul 24, 2013
Modification 01 - Posted on Oct 22, 2013
Posted: Oct 21, 2013 Center: SSCTitle: REQUEST FOR INFORMATION AND SOURCES SOUGHT FOR AN OCCUPATIONAL HEALTH PROGRAMSolicitation: NNS13ZDA011L Response Due: Nov 12, 2013Synopsis - Posted on Sep 19, 2013
Modification 01 - Posted on Oct 21, 2013RFI AMENDMENT 001 OPEN INVITATION DATE CHANGE - Posted on Sep 27, 2013
Posted: Oct 18, 2013 Center: HQTitle: LESSONS LEARNED FROM RECENT PLANETARY SCIENCE DIVISIONSolicitation: NNH13ZDA014L Response Due: Nov 01, 2013Synopsis - Posted on Aug 15, 2013
Modification 01 - Posted on Oct 18, 2013
Posted: Oct 18, 2013 Center: HQTitle: REQUEST FOR INFORMATION FOR NASA’S SUSTAINABLE LAND IMAGING ARCHITECTURE STUDYSolicitation: NNH13ZDA016L Response Due: Nov 01, 2013Synopsis - Posted on Sep 18, 2013
Modification 01 - Posted on Oct 18, 2013
Posted: Oct 04, 2013 Center: GSFCTitle: ENVIRONMENTAL TEST AND INTEGRATION IISolicitation: NNG13451194R Response Due: Oct 09, 2013Synopsis - Posted on Apr 09, 2013
Modification 01 - Posted on Jul 05, 2013Modification 02 - Posted on Jul 24, 2013Modification 03 - Posted on Sep 24, 2013Modification 04 - Posted on Oct 04, 2013
Solicitation - Posted on Aug 29, 2013Amendment 01 - Posted on Sep 27, 2013
Amendment 02 - Posted on Oct 01, 2013Industry Questions Part 2 - Posted on Jul 19, 2013Industry Questions Part 3 - Posted on Aug 29, 2013ETIS II Industry Questions- 4 - Posted on Sep 27, 2013Industry Questions- 5 - Posted on Oct 01, 2013
Posted: Sep 30, 2013 Center: LARCTitle: REQUEST FOR INFORMATION FOR GNSS RECEIVER SYSTEMSSolicitation: RFI-GNSS-2013 Response Due: Nov 18, 2013Synopsis - Posted on Sep 17, 2013
Modification 01 - Posted on Sep 30, 2013RFI GNSS QUESTIONNAIRE - Posted on Sep 17, 2013
Posted: Sep 26, 2013 Center: GSFCTitle: SOLAR WINDOW ASSEMBLYSolicitation: NNG13459946R Response Due: Feb 01, 2013Synopsis - Posted on Jan 17, 2013
Justification and Approval - Posted on Sep 26, 2013
Posted: Sep 26, 2013 Center: HQTitle: RESEARCH OPPORTUNITIES IN AERONAUTICS - 2013Solicitation: NNH13ZEA001N Response Due: N/ASynopsis - Posted on Dec 18, 2012
Modification 01 - Posted on Jan 18, 2013Modification 02 - Posted on Jun 05, 2013Modification 03 - Posted on Jul 11, 2013Modification 04 - Posted on Sep 26, 2013
Posted: Sep 23, 2013 Center: GSFCTitle: FAST METHANE ANALYZERSolicitation: NNG13487320Q Response Due: Sep 26, 2013Synopsis/Solicitation Combo - Posted on Sep 23, 2013On-Line RFQ - Posted on Sep 23, 2013
Posted: Sep 20, 2013 Center: JSCTitle: JSC ADMINISTRATIVE SUPPORT SERVICES II - JASS IISolicitation: NNJ13473923L Response Due: N/ASynopsis - Posted on Apr 29, 2013
Modification 01 - Posted on May 21, 2013Modification 02 - Posted on Jun 04, 2013Modification 03 - Posted on Jul 15, 2013Modification 04 - Posted on Sep 20, 2013
JASS II RFI Questions and Answers - Posted on Jun 04, 2013Interested Parties List - (7/12/2013) - Posted on Jul 15, 2013Interested Parties List (9-17-2013) - Posted on Sep 20, 2013
Posted: Sep 18, 2013 Center: KSCTitle: CLOSE DEMOLISH FACILITIES AND STRUCTURES VARIOUS LOCATIONS AT THE JOHN F. KENNEDY SPACE CENTER AND CAPE CANAVERAL AIR FORCE STATION FLSolicitation: NNK13482809R Response Due: Sep 23, 2013Synopsis - Posted on Aug 13, 2013Solicitation - Posted on Aug 23, 2013
Amendment 01 - Posted on Aug 27, 2013Amendment 02 - Posted on Aug 28, 2013Amendment 03 - Posted on Aug 29, 2013Amendment 04 - Posted on Sep 03, 2013Amendment 05 - Posted on Sep 18, 2013Amendment 06 - Posted on Sep 18, 2013
Pre-Bid Sign-In Sheet - Posted on Sep 09, 2013
Posted: Sep 18, 2013 Center: HQTitle: NASA SPACE TECHNOLOGY RESEARCH FELLOWSHIPS - FALL 2014Solicitation: NSTRF14 Response Due: Nov 13, 2013Synopsis - Posted on Sep 18, 2013
Posted: Sep 18, 2013 Center: LARCTitle: GRAVITY RECOVERY AND CLIMATE EXPERIMENT -GRACESolicitation: GRACE Response Due: Jun 20, 2013Synopsis - Posted on Jun 04, 2013
Justification and Approval - Posted on Sep 18, 2013
Posted: Sep 16, 2013 Center: JSCTitle: JSC ADMINISTRATIVE SUPPORT SERVICES-JASS II INDUSTRY DAYSolicitation: NNJ13473923LA Response Due: N/ASynopsis - Posted on May 21, 2013
Modification 01 - Posted on Sep 16, 2013One-on-One Communications with Industry Guidance - Posted on May 21, 2013Industry Day Questions and Answers - Posted on Sep 16, 2013
Posted: Sep 16, 2013 Center: GRCTitle: PURCHASE OF ONE SFS EMULATOR - TWO UNITSSolicitation: NNC13490257Q Response Due: Sep 17, 2013Synopsis - Posted on Sep 09, 2013
Responses to Questions - Posted on Jul 02, 2013RFP QA - Posted on Aug 21, 2013RFP Questions Answers - Posted on Aug 30, 2013Response to Question - Posted on Sep 12, 2013
Posted: Sep 12, 2013 Center: GRCTitle: RF COMMUNICATIONS SYSTEMS AND DESIGN: TRAINING FOR ANALOG TO DIGITAL CONVERTERSSolicitation: NNC13ZMSO16L Response Due: Sep 27, 2013Synopsis - Posted on Sep 12, 2013Attachment A - Statement of Work - Posted on Sep 12, 2013
Posted: Sep 10, 2013 Center: MSFCTitle: TECHNOLOGY TRANSFER OPPORTUNITY - FLUID STRUCTURE COUPLING TECHNOLOGYSolicitation: NNMTTO123113 Response Due: Dec 31, 2013Synopsis - Posted on Sep 10, 2013
Posted: Sep 05, 2013 Center: JSCTitle: NASA JOHNSON SPACE CENTER ANNOUNCEMENT SEEKING POTENTIAL INTEREST IN USE OF UNIQUE CAPABILITIESSolicitation: NNJ13ZBH014L Response Due: Nov 08, 2013Synopsis - Posted on Jul 08, 2013
Modification 01 - Posted on Sep 05, 2013
Posted: Sep 04, 2013 Center: MSFCTitle: FACILITIES AND OPERATIONS MAINTENANCE SUPPORT SERVICESSolicitation: NNM13440940J Response Due: Sep 16, 2013Synopsis - Posted on May 22, 2013Solicitation - Posted on Jun 14, 2013
Amendment 01 - Posted on Jul 11, 2013Amendment 02 - Posted on Jul 17, 2013Amendment 03 - Posted on Jul 25, 2013Amendment 04 - Posted on Aug 27, 2013Amendment 05 - Posted on Sep 04, 2013
Industry Day - Posted on May 30, 2013
Posted: Sep 04, 2013 Center: KSCTitle: KSC IDIQ MULTIPLE AWARD CONSTRUCTION CONTRACTSolicitation: NNK13MACC Response Due: Sep 25, 2013Synopsis - Posted on Sep 04, 2013
Posted: Sep 03, 2013 Center: GSFCTitle: NOBLE GAS ISOTOPE MASS SPECTROMETER GAS HANDLING AND PROCESSING SYSTEMSolicitation: NNG13481950L Response Due: Sep 09, 2013Synopsis - Posted on Aug 05, 2013
Modification 01 - Posted on Sep 03, 2013
Posted: Aug 30, 2013 Center: MSFCTitle: VALVESolicitation: NNM13484873Q Response Due: Sep 04, 2013Synopsis/Solicitation Combo - Posted on Aug 28, 2013
Amendment 01 - Posted on Aug 30, 2013Solicitation - Posted on Aug 28, 2013
Posted: Aug 29, 2013 Center: SSCTitle: REQUEST FOR INFORMATION AND SOURCES SOUGHT FOR THE HIGH PRESSURE INDUSTRIAL WATER PIPE CLEAN AND LINER INSTALLSolicitation: NNS13ZDA009L Response Due: Sep 13, 2013Synopsis - Posted on Aug 29, 2013
Posted: Aug 23, 2013 Center: ARCTitle: COORDINATE MEASURING MACHINESolicitation: NNA1383248-CMM Response Due: Aug 30, 2013Synopsis - Posted on Aug 23, 2013
Posted: Aug 22, 2013 Center: AFRCTitle: NASA DFRC LOGISTICS MANAGEMENT SERVICESSolicitation: NND13488521R Response Due: Sep 09, 2013Synopsis - Posted on Aug 22, 2013
Posted: Aug 22, 2013 Center: JSCTitle: SIMULATION AND SOFTWARE TECHNOLOGY II VIRTUAL INDUSTRY DAY SYNOPSISSolicitation: NNJ13ZBH005LA Response Due: N/ASynopsis - Posted on Jun 11, 2013
Modification 01 - Posted on Aug 22, 2013One on One Communication with Industry Guidance - Posted on Jun 12, 2013Questions and Answers to the Industry Day Synopsis - Posted on Aug 22, 2013
Posted: Aug 21, 2013 Center: KSCTitle: CATIA AND DELMIA SOFTWARE RENTALSolicitation: RFIMODSIMU Response Due: Sep 25, 2013Synopsis - Posted on Aug 21, 2013
Posted: Aug 20, 2013 Center: GRCTitle: DESIGN AND FABRICATION ON HIGH VOLTAGE HALL ACCELERATOR THRUSTERSolicitation: NNC13ZRP013L Response Due: Sep 04, 2013Synopsis - Posted on Aug 20, 2013
Posted: Aug 20, 2013 Center: MSFCTitle: REALTIME VIBRATION MONITORING SYSTEM AND MULTICHANNEL INTEGRATED DYNAMIC DATA ACQUISITION SYSTEM AND ADVANCED SIGNAL PROCESSING SYSTEMSSolicitation: NNNM484411Q Response Due: Sep 05, 2013Synopsis - Posted on Aug 20, 2013
Posted: Aug 20, 2013 Center: GRCTitle: TEKTRONIX DIGITAL OSCILLOSCOPESolicitation: NNC13ZRP010Q Response Due: Sep 05, 2013Synopsis/Solicitation Combo - Posted on Aug 20, 2013Specifications - Posted on Aug 20, 2013
Posted: Aug 19, 2013 Center: SSCTitle: REQUEST FOR INFORMATION AND SOURCES SOUGHT FOR THE REPAIR AND REBUILD OF A 75 INCH LUDLOW-RENSSELAER GATE VALVESolicitation: NNS13ZDA007L Response Due: Sep 13, 2013Synopsis - Posted on Aug 13, 2013NNS13ZDA007L Photos - Posted on Aug 13, 2013Correction and Clarification - Posted on Aug 19, 2013
Posted: Aug 19, 2013 Center: MSFCTitle: SPACE TRANSPORTATION SYSTEMS ARCHITECTURE ASSESSMENTS AND STRATEGIC ANALYSISSolicitation: NNM13ED4601 Response Due: Sep 03, 2013Synopsis - Posted on Aug 19, 2013
Posted: Aug 19, 2013 Center: KSCTitle: COSMED K4B2 PULMONARY GAS DETECTION EQUIPMENTSolicitation: NNK13487174Q Response Due: Aug 26, 2013
Synopsis/Solicitation Combo - Posted on Aug 19, 2013On-Line RFQ - Posted on Aug 19, 2013
Posted: Aug 15, 2013 Center: GSFCTitle: 2-CHANNEL DIGITIZER AND PXI SYSTEMSolicitation: NNG13486531L Response Due: Sep 03, 2013Synopsis - Posted on Aug 15, 2013
Posted: Aug 15, 2013 Center: GSFCTitle: ROUND GLASS WINDOWSSolicitation: NNG13486379L Response Due: Sep 03, 2013Synopsis - Posted on Aug 15, 2013
Posted: Aug 13, 2013 Center: LARCTitle: REQUEST FOR INFORMATION FOR SPACECRAFT TWO-REACTION WHEEL HYBRID CONTROL APPROACHESSolicitation: RFI-KEPLER-2013 Response Due: Aug 30, 2013Synopsis - Posted on Aug 13, 2013
Posted: Aug 13, 2013 Center: JSCTitle: ADVANCED TECHNOLOGY AND INTEGRATION CONTRACTSolicitation: NNJ13476977R Response Due: Aug 14, 2013Synopsis - Posted on Jun 12, 2013
Modification 01 - Posted on Jul 01, 2013Modification 02 - Posted on Jul 22, 2013
Solicitation - Posted on Jul 11, 2013Amendment 01 - Posted on Jul 24, 2013Amendment 02 - Posted on Jul 30, 2013Amendment 03 - Posted on Aug 05, 2013Amendment 04 - Posted on Aug 06, 2013Amendment 05 - Posted on Aug 13, 2013
Preproposal Bulletin Charts - Posted on Jul 22, 2013Preproposal Pricing WebEx Charts - Posted on Jul 22, 2013
Posted: Aug 13, 2013 Center: GSFCTitle: SUPERCONTINUUM LASERSolicitation: NNG13481987L Response Due: Aug 20, 2013Synopsis - Posted on Aug 05, 2013Uploading answers to questions - Posted on Aug 13, 2013
Posted: Aug 13, 2013 Center: KSCTitle: SCIENTIFIC INSTRUMENTS TEMPERATURE TRANSDUCERS
Solicitation: NNK13478924 Response Due: Aug 19, 2013Synopsis/Solicitation Combo - Posted on Aug 13, 2013
Posted: Aug 12, 2013 Center: KSCTitle: TABER INDUSTRIES PRESSURE TRANSDUCERSSolicitation: NNK13478961 Response Due: Aug 19, 2013Synopsis/Solicitation Combo - Posted on Aug 12, 2013
Posted: Aug 06, 2013 Center: GRCTitle: HIGH SPEED DIGITAL MONOCHROME CAMERASolicitation: NNC13483913Q Response Due: Aug 21, 2013Synopsis/Solicitation Combo - Posted on Aug 06, 2013Combined Synopsis and Solicitation - Posted on Aug 06, 2013
Posted: Aug 05, 2013 Center: MSFCTitle: REQUEST FOR INFORMATION TO IDENTIFY TECHNOLOGY SCIENCE AND EXPLORATION SYSTEM DEMONSTRATION PAYLOADSSolicitation: 08052013 Response Due: Aug 31, 2013Synopsis - Posted on Aug 05, 2013
Modification 01 - Posted on Aug 05, 2013Solicitation - Posted on Aug 05, 2013
Posted: Aug 05, 2013 Center: GRCTitle: PURCHASE OF SCR POWER CONTROLLERS AND DISPLAY KITSolicitation: NNC134200479011Q Response Due: Aug 20, 2013Synopsis/Solicitation Combo - Posted on Aug 05, 2013Specifications - Posted on Aug 05, 2013
Posted: Aug 05, 2013 Center: KSCTitle: AOPTICS INTELLIMAX FREE SPACE OPTIC EQUIPMENTSolicitation: NNK13481489Q Response Due: Aug 19, 2013Synopsis - Posted on Aug 05, 2013
Posted: Aug 05, 2013 Center: GSFCTitle: SPECTRO 320 166 DOUBLE MONOCHROMATOR WITH DETECTORSSolicitation: NNG13481671L Response Due: Aug 19, 2013Synopsis - Posted on Aug 05, 2013
Title: PROGRAMMABLE LOGIC CONTROLLERSSolicitation: NNK13478358Q Response Due: Aug 12, 2013Synopsis - Posted on Aug 01, 2013
Posted: Aug 01, 2013 Center: GRCTitle: X-RAY WORX TUBE UPGRADESolicitation: NNC13ZRH009L Response Due: Aug 15, 2013Synopsis - Posted on Aug 01, 2013
Posted: Jul 31, 2013 Center: GSFCTitle: HARDWARE AND SOFTWARE ENGINEERING SUPPORT FOR RAMAN LIDAR LABORATORYSolicitation: NNG13483107L Response Due: Aug 12, 2013Synopsis - Posted on Jul 31, 2013
Posted: Jul 30, 2013 Center: KSCTitle: NONDESTRUCTIVE EVALUATIONSolicitation: NNK13482917Q Response Due: Aug 15, 2013Synopsis/Solicitation Combo - Posted on Jul 30, 2013NNK13482917Q - Posted on Jul 30, 2013
Posted: Jul 29, 2013 Center: JSCTitle: MISSION OPERATIONS DIRECTORATE REQUEST FOR INFORMATIONSolicitation: NNJ13ZBR004L Response Due: Jul 29, 2013Synopsis - Posted on Jan 22, 2013
Modification 01 - Posted on Jan 24, 2013Modification 02 - Posted on Mar 12, 2013Modification 03 - Posted on Jul 10, 2013Modification 04 - Posted on Jul 29, 2013
Draft Statement of Work - Posted on Jul 10, 2013Interested Parties List (7-10-2013) - Posted on Jul 10, 2013Questions and Answers - Posted on Jul 29, 2013
Posted: Jul 29, 2013 Center: GRCTitle: PURCHASE OF SCR POWER CONTROLLERS AND DISPLAY KITSolicitation: NNC13479011Q Response Due: Aug 01, 2013Synopsis - Posted on Jul 09, 2013
Modification 01 - Posted on Jul 29, 2013
Posted: Jul 23, 2013 Center: NSSCTitle: NASA SHARED SERVICES CENTER SUPPORT SERVICES CONTRACTSolicitation: NNX13ZXD001L
Response Due: Aug 16, 2013Synopsis - Posted on Jul 23, 2013PWS for NSSC Contract NNX11AA02C - Posted on Jul 23, 2013
Posted: Jul 23, 2013 Center: GRCTitle: HIGH VOLTAGE HIGH POWER PROGRAMMABLE DC POWER SUPPLYSolicitation: 4200482869 Response Due: Jul 29, 2013Synopsis - Posted on Jul 23, 2013
Posted: Jul 19, 2013 Center: GRCTitle: CENTRALIZED OFFICE BUILDING AUDITORIUM PRODUCTION SYSTEMSolicitation: NNC13ZCH012R Response Due: Jul 23, 2013Synopsis/Solicitation Combo - Posted on Jun 24, 2013Attachments - Posted on Jun 24, 2013Questions and Answers - Posted on Jul 09, 2013Revised SF1449 - Posted on Jul 11, 2013PDF Version SF1449 - Posted on Jul 11, 2013Completion Date - Posted on Jul 19, 2013
Posted: Jul 12, 2013 Center: LARCTitle: PRSEUS PANELS AND ASSOCIATED HARDWARESolicitation: NNL1346615R Response Due: Mar 15, 2013Synopsis - Posted on Feb 27, 2013
Justification and Approval - Posted on Jul 12, 2013
Posted: Jul 09, 2013 Center: KSCTitle: CONSTRUCTION AND OUTFITTING OF THE CENTRAL CAMPUS COMPLEX ADMINISTRATIVE OFFICE BUILDING AT THE KENNEDY SPACE CENTER FLORIDASolicitation: C201301 Response Due: Jul 24, 2013Synopsis - Posted on Jul 09, 2013
Posted: Jul 09, 2013 Center: MSFCTitle: 64 GB MEMORY UPGRADE TO PHOTRON SA1.1 DIGITAL HIGH SPEED CAMERASSolicitation: NNM13479401Q Response Due: Jul 11, 2013Synopsis - Posted on Jul 03, 2013
Posted: Jul 03, 2013 Center: GSFCTitle: EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM EVOLUTION AND DEVELOPMENT 2Solicitation: NNG14476256L Response Due: Aug 01, 2013Synopsis - Posted on Jul 03, 2013Draft Document - Posted on Jul 03, 2013
Posted: Jul 02, 2013 Center: GSFCTitle: CONSULTANT TO PROVIDE TECHNICAL ADVICESolicitation: NNG13477564L Response Due: Jul 18, 2013Synopsis - Posted on Jul 02, 2013
Posted: Jun 28, 2013 Center: AFRCTitle: RESEARCH FACILITIES AND ENGINEERING SUPPORT SERVICESSolicitation: NND12374119R Response Due: Jul 09, 2013Synopsis - Posted on Feb 09, 2012
Modification 01 - Posted on Mar 08, 2012Modification 02 - Posted on Mar 13, 2012Modification 03 - Posted on Mar 30, 2012Modification 04 - Posted on May 31, 2012Modification 05 - Posted on Jul 23, 2012Modification 06 - Posted on Aug 01, 2012Modification 07 - Posted on Oct 25, 2012Modification 08 - Posted on Nov 15, 2012Modification 09 - Posted on Apr 11, 2013
Solicitation - Posted on May 15, 2012Amendment 01 - Posted on May 31, 2012Amendment 02 - Posted on Jul 10, 2012Amendment 03 - Posted on Jul 23, 2012Amendment 04 - Posted on Dec 11, 2012Amendment 05 - Posted on Apr 11, 2013Amendment 06 - Posted on May 03, 2013Amendment 07 - Posted on Jun 07, 2013Amendment 08 - Posted on Jun 17, 2013Amendment 09 - Posted on Jun 28, 2013
Pre-Proposal Conference Information - Posted on Mar 13, 2012Pre-proposal Documents - Posted on Mar 30, 2012RF&ESS Electronic Bidder's Library Instructions - Posted on May 16, 2012Performance Work Statement - Posted on Aug 01, 201216 May 2013 Pre-proposal Conference Presentation - Posted on May 23, 201316 May 2013 Pre Proposal Attendance List - Posted on May 23, 2013
Posted: Jun 28, 2013 Center: GRCTitle: ORBITAL MANEUVERING SYSTEM THRUST VECTOR CONTROL ANALYSISSolicitation: NNC13480205Q
Response Due: Jul 12, 2013Synopsis - Posted on Jun 28, 2013
Posted: Jun 26, 2013 Center: GSFCTitle: PYROLYZER AUTO-SHOT SAMPLER GAS SELECTOR AND MOUNTING BRACKET FOR FRONTIER PYROLYSIS SYSTEMSolicitation: NNG13477221L Response Due: Jun 28, 2013Synopsis - Posted on Jun 26, 2013
Posted: Jun 25, 2013 Center: MSFCTitle: DOME LOADED REGULATORSSolicitation: NNM13476297Q Response Due: Jul 03, 2013Synopsis/Solicitation Combo - Posted on Jun 25, 2013Terms & Conditions with Specifications - Posted on Jun 25, 2013
Posted: Jun 25, 2013 Center: HQTitle: NASA ANNOUNCEMENT: SEEKING PARTNERS TO COLLABORATE WITH NASA TO REACH NEW AUDIENCES IN INNOVATIVE WAYS ABOUT THE FUTURE OF U.S. SPACE ACTIVITIES AND AERONAUTICSSolicitation: NNH13OCOM001O Response Due: Jun 30, 2014Synopsis - Posted on Jun 13, 2013
Modification 01 - Posted on Jun 25, 2013
Posted: Jun 25, 2013 Center: MSFCTitle: URANIUM DIOXIDE UO2 SPHERESSolicitation: NNM13467121Q Response Due: Jul 02, 2013Synopsis - Posted on Jun 25, 2013
Posted: Jun 25, 2013 Center: MSFCTitle: 32 500K LOAD CELLSSolicitation: NNM13467491Q Response Due: Jul 10, 2013Synopsis/Solicitation Combo - Posted on Jun 19, 2013
Amendment 01 - Posted on Jun 25, 2013Specification and Terms and Conditions - Posted on Jun 19, 2013Revised Specifications - Posted on Jun 25, 2013
Posted: Jun 25, 2013 Center: MSFCTitle: BOARDS AND CABLE ASSEMBLIESSolicitation: NNM13479571Q Response Due: Jul 08, 2013Synopsis - Posted on Jun 25, 2013
Posted: Jun 24, 2013 Center: MSFCTitle: EMCOR RACK HARDWARESolicitation: NNM13467489Q1 Response Due: Jul 11, 2013Synopsis/Solicitation Combo - Posted on Jun 24, 2013Terms and Conditions with Specs - Posted on Jun 24, 2013
Posted: Jun 21, 2013 Center: KSCTitle: REQUEST FOR INFORMATION KENNEDY SPACE CENTER FLAME TRENCH WALL REFURBISHMENTSolicitation: RFI-KSC-FTWR Response Due: Jul 12, 2013Synopsis - Posted on Jun 12, 2013Rocket Engine Plume Analysis - Posted on Jun 12, 2013Flame Trench Drawings - Posted on Jun 21, 2013
Posted: Jun 20, 2013 Center: SSCTitle: AZTECENERGY ADVANCED MICROANALYSIS SYSTEM WITH X-MAXN 50 LARGE AREA ANALYTICAL SILICON DRIFT DETECTOR FROM OXFORD INSTRUMENTSSolicitation: 5117 Response Due: Apr 24, 2013Synopsis - Posted on Apr 18, 2013
Justification and Approval - Posted on Jun 20, 2013
Posted: Jun 20, 2013 Center: LARCTitle: MATLAB SOFTWARE MAINTENANCE RENEWALSolicitation: NNL13473632Q Response Due: Jun 24, 2013Synopsis - Posted on Jun 20, 2013
Posted: Jun 18, 2013 Center: GRCTitle: FACILITIES OPERATIONS REPAIR AND MAINTENANCE - FORM - FY13Solicitation: NNC12ZFD010R Response Due: Jun 21, 2013Synopsis - Posted on Feb 13, 2012
Modification 01 - Posted on Apr 01, 2013Modification 02 - Posted on Apr 04, 2013Modification 03 - Posted on May 07, 2013Modification 04 - Posted on May 08, 2013Modification 05 - Posted on May 28, 2013Modification 06 - Posted on Jun 06, 2013Modification 07 - Posted on Jun 11, 2013Modification 08 - Posted on Jun 18, 2013
Solicitation - Posted on May 08, 2013Amendment 01 - Posted on May 28, 2013Amendment 02 - Posted on Jun 06, 2013Amendment 03 - Posted on Jun 11, 2013
FORM-II Industry Day slides - Posted on Apr 12, 2013Additional Documents for Final RFP - Posted on May 08, 2013
Posted: Jun 18, 2013 Center: GRCTitle: SERVICE AGREEMENT FOR AN AURIGA CROSSBEAM ZEISS WORKSTATIONSolicitation: NNC13475886Q Response Due: Jun 21, 2013Synopsis - Posted on Jun 18, 2013
Posted: Jun 17, 2013 Center: GSFCTitle: CLEANING REPAIR AND INSPECTION SERVICESSolicitation: NNG13476430L Response Due: Jun 29, 2013Synopsis - Posted on Jun 17, 2013
Posted: Jun 14, 2013 Center: MSFCTitle: ELECTROSTATIC SPINNING SYSTEMSolicitation: NNM13473891Q Response Due: Jun 18, 2013Synopsis/Solicitation Combo - Posted on Jun 07, 2013
Amendment 01 - Posted on Jun 14, 2013Solicitation - Posted on Jun 07, 2013
Posted: Jun 10, 2013 Center: JSCTitle: SIMULATION AND SOFTWARE TECHNOLOGY IISolicitation: NNJ13ZBH005L Response Due: May 30, 2013Synopsis - Posted on May 03, 2013
Modification 01 - Posted on Jun 10, 2013
Posted: Jun 06, 2013 Center: GSFCTitle: SPACE GEODESY SLRSolicitation: RFI-2013SpaceGeodesySLR Response Due: Jun 28, 2013Synopsis - Posted on May 02, 2013
Modification 01 - Posted on Jun 06, 2013
Posted: Jun 06, 2013 Center: MSFCTitle: AVIONICS COOLING SYSTEMSolicitation: NNM13476164Q Response Due: Jun 20, 2013Synopsis/Solicitation Combo - Posted on Jun 06, 2013Terms and Conditions and SOW - Posted on Jun 06, 2013
Title: DESIGN FABRICATION AND TESTING SERVICESSolicitation: NNG13476918L Response Due: Jun 14, 2013Synopsis - Posted on Jun 06, 2013
Posted: Jun 04, 2013 Center: KSCTitle: PORTACOUNT RESPIRATOR FIT TESTING DEVICESolicitation: NNK13475166 Response Due: Jun 17, 2013Synopsis - Posted on Jun 04, 2013
Posted: Jun 04, 2013 Center: HQTitle: DRAFT PROGRAM ELEMENT APPENDIX M: EARTH VENTURE INSTRUMENT-2Solicitation: NNH13ZDA009J Response Due: Jun 28, 2013Synopsis - Posted on Jun 04, 2013
Posted: Jun 03, 2013 Center: GSFCTitle: SPEC 2D-S STEREO OPTICAL ARRAY PROBESolicitation: NNG13475979L Response Due: Jun 24, 2013Synopsis - Posted on Jun 03, 2013
Posted: Jun 03, 2013 Center: GSFCTitle: ORBVIEW-2 SEAWIFS DATA ARCHIVESolicitation: NNG13474811L Response Due: Jun 24, 2013Synopsis - Posted on Jun 03, 2013
Posted: May 30, 2013 Center: HQTitle: 2013 NASA RESEARCH ANNOUNCEMENT —TRIBAL COLLEGE AND UNIVERSITY - EXPERIENTIAL LEARNING OPPORTUNITYSolicitation: NNH13ZHA002N-TCUELO Response Due: N/ASynopsis - Posted on May 30, 2013
Posted: May 29, 2013 Center: MSFCTitle: TRANSDUCER CABLE AND THERMOCOUPLE EXTENSION WIRESolicitation: NNM13475599Q Response Due: Jun 05, 2013Synopsis/Solicitation Combo - Posted on May 29, 2013Terms and conditions - Posted on May 29, 2013
Posted: May 28, 2013 Center: GSFCTitle: MATHLAB SOFTWARE AND MAINTENANCE SUPPORT
Solicitation: NNG13474375L Response Due: Jun 10, 2013Synopsis - Posted on May 28, 2013
Posted: May 24, 2013 Center: MSFCTitle: PCI EXPRESS BOARDS AND SCSI CABLE ASSEMBLIESSolicitation: NNM13474994 Response Due: May 31, 2013Synopsis - Posted on May 24, 2013
Posted: May 24, 2013 Center: MSFCTitle: SOFTWARE RENEWALSolicitation: NNM13473514Q Response Due: May 31, 2013Synopsis - Posted on May 24, 2013
Posted: May 24, 2013 Center: MSFCTitle: ONE-YEAR EXTENSION TO THE MARSHALL ENGINEERING TECHNICIANS AND TRADES SUPPORT SERVICES CONTRACT - METTSSolicitation: NNM13ZES127 Response Due: Jun 10, 2013Synopsis - Posted on May 24, 2013
Posted: May 21, 2013 Center: GRCTitle: HOT RAIL FURNACE 3.5" 2-ZONE AND CONTROLLER UNITSolicitation: NNC13473985Q Response Due: May 24, 2013Synopsis - Posted on May 21, 2013
Posted: May 16, 2013 Center: GRCTitle: SOFTWARE ENGINEERING PROCESSE IMPROVEMENT SUPPORTSolicitation: NNC13Z58019R Response Due: May 28, 2013Synopsis/Solicitation Combo - Posted on May 03, 2013
Amendment 01 - Posted on May 16, 2013NNC13Z58019R_SEPI_Solicitation Documents - Posted on May 09, 2013NNC13Z58019R - Government Response to Questions - Posted on May 16, 2013Amendment #1 - Posted on May 16, 2013
Posted: May 09, 2013 Center: MSFCTitle: HIGH-ENERGY CUSTOM CAPACITORSSolicitation: NNM13474007Q Response Due: May 16, 2013Synopsis - Posted on May 09, 2013
Modification 01 - Posted on Apr 15, 2013Solicitation - Posted on Apr 26, 2013
Amendment 01 - Posted on May 08, 2013
Posted: May 08, 2013 Center: MSFCTitle: ENGINEERING SOLUTIONS AND PROTOTYPINGSolicitation: NNM12429122R Response Due: Oct 04, 2012Synopsis - Posted on Jun 29, 2012
Modification 01 - Posted on Aug 20, 2012Modification 02 - Posted on Sep 10, 2012Modification 03 - Posted on Sep 17, 2012
Solicitation - Posted on Aug 20, 2012Amendment 01 - Posted on Sep 10, 2012Amendment 02 - Posted on Sep 17, 2012
Award - Posted on May 08, 2013
Posted: May 06, 2013 Center: MSFCTitle: ANNUAL RENEWAL OF ANSA SOFTWARESolicitation: NNM13473532Q Response Due: May 13, 2013Synopsis - Posted on May 06, 2013
Posted: Apr 25, 2013 Center: JSCTitle: MISSION OPERATIONS DIRECTORATE INDUSTRY DAYSolicitation: NNJ13ZBR004LA Response Due: N/ASynopsis - Posted on Jan 25, 2013
Modification 01 - Posted on Feb 15, 2013Modification 02 - Posted on Mar 04, 2013Modification 03 - Posted on Mar 12, 2013Modification 04 - Posted on Apr 25, 2013
One-on-One Communications with Industry Guidance - Posted on Jan 25, 2013MOD Vision - Posted on Mar 04, 2013IMOC II Interested Parties List - Posted on Mar 04, 2013IMOC II Industry Day Charts - Posted on Mar 04, 2013
Posted: Apr 25, 2013 Center: MSFCTitle: FORCE BALANCE FOR WATER FLOW TESTINGSolicitation: NNM13471360Q Response Due: May 10, 2013Synopsis - Posted on Apr 25, 2013Terms and Conditions - Posted on Apr 25, 2013
Posted: Apr 23, 2013 Center: GRCTitle: REPAIR DOMESTIC WATER MAINS - PHASE ISolicitation: NNC13ZFD013E Response Due: May 03, 2013Synopsis - Posted on Feb 22, 2013Solicitation - Posted on Mar 15, 2013Site showing list - Posted on Apr 01, 2013Answers to Contractor Questions - Posted on Apr 23, 2013
Posted: Apr 19, 2013 Center: MSFCTitle: PURCHASE OF 300 SERVO CONTROL MANIFOLDSSolicitation: NNM12449183Q Response Due: Apr 19, 2013Synopsis/Solicitation Combo - Posted on Nov 21, 2012
Amendment 01 - Posted on Nov 28, 2012Amendment 02 - Posted on Apr 18, 2013Amendment 03 - Posted on Apr 19, 2013
Solicitation - Posted on Nov 21, 2012
Posted: Apr 18, 2013 Center: KSCTitle: CLOSE DEMOLISH FACILITIES AND STRUCTURES VARIOUS LOCATIONS AT THE JOHN F KENNEDY SPACE CENTER AND CAPE CANAVERAL AIR FORCE STATION FLSolicitation: 05012013 Response Due: May 01, 2013Synopsis - Posted on Apr 18, 2013
Posted: Apr 16, 2013 Center: GRCTitle: REMOVAL OF GOVERNMENT PROPERTY FROM AIRCRAFTSolicitation: NNC13463032Q Response Due: Apr 18, 2013Synopsis - Posted on Apr 16, 2013
Title: STRUCTURAL AEROSPACE TESTING LOAD CONTROL SYSTEMSolicitation: NNM13449167Q Response Due: Apr 30, 2013Synopsis/Solicitation Combo - Posted on Apr 12, 2013Solicitation - Posted on Apr 12, 2013
Posted: Apr 11, 2013 Center: JSCTitle: NASA JOHNSON SPACE CENTER ANNOUNCEMENT OF UNIQUE CAPABILITY IN ENVIRONMENTAL-LIFE SUPPORT AND AIR-WATER MONITORING-RECYCLING AND ACTIVE THERMAL CONTROL AND EXTREME ENVIRONMENT PROTECTIVE SUIT SYSTEMSSolicitation: NNJ13ZBH012LA Response Due: Jul 11, 2013Synopsis - Posted on Apr 11, 2013
Posted: Apr 03, 2013 Center: JSCTitle: SOFTWARE ROBOTICS AND SPACE SYSTEMS SERVICESSolicitation: NNJ13541712LA Response Due: Apr 15, 2013Synopsis - Posted on Apr 03, 2013One-on-One Communications with Industry Guidance - Posted on Apr 03, 2013
Posted: Apr 02, 2013 Center: JSCTitle: INTEGRATED MISSION OPERATIONS CONTRACT II ORGANIZATIONAL CONFLICT OF INTEREST REQUEST FOR INFORMATIONSolicitation: NNJ13ZBR004LB Response Due: Apr 23, 2013Synopsis - Posted on Apr 02, 2013
Posted: Apr 02, 2013 Center: LARCTitle: RESEARCH SERVICES FOR ACTIVE SEPARATION CONTROL ON AERODYNAMIC SURFACESSolicitation: NNL13ERA Response Due: Apr 15, 2013Synopsis - Posted on Mar 29, 2013
Modification 01 - Posted on Apr 02, 2013Statement of work for Research Services for Active - Posted on Apr 02, 2013
Posted: Mar 22, 2013 Center: KSCTitle: REFUSE COLLECTION AND DISPOSAL SERVICESSolicitation: NNK13OM0001L Response Due: Apr 05, 2013Synopsis - Posted on Mar 22, 2013
Posted: Mar 20, 2013 Center: MSFCTitle: TESTING AND ANALYSIS OF PROPULSION SYSTEM MATERIALSSolicitation: NNM13ZEM001 Response Due: Apr 04, 2013Synopsis - Posted on Mar 20, 2013
Posted: Mar 20, 2013 Center: HQTitle: REQUEST FOR INFORMATION PLANETARY SCIENCE DIVISION TECHNOLOGY INFUSION STUDYSolicitation: NNH13ZDA008L Response Due: Apr 19, 2013Synopsis - Posted on Mar 20, 2013Technology Infusion Appendices - Posted on Mar 20, 2013
Posted: Mar 19, 2013 Center: GSFCTitle: WALLOPS INSTITUTIONAL CONSOLIDATED CONTRACT EXTENSIONSolicitation: NAS501080-2 Response Due: N/ASynopsis - Posted on Feb 08, 2013
Justification and Approval - Posted on Mar 19, 2013WICC Synopsis Modification - Posted on Feb 25, 2013
Posted: Mar 19, 2013 Center: KSCTitle: HARRIS BROADCAST HD DIGITAL VIDEO ROUTING SWITCHERSolicitation: NNK13466884Q Response Due: Apr 01, 2013Synopsis/Solicitation Combo - Posted on Mar 19, 2013RFQ - Posted on Mar 19, 2013
Posted: Mar 15, 2013 Center: GSFCTitle: GEOPHYSICS GEODYNAMICS AND SPACE GEODESY SUPPORTSolicitation: RFI-GGSG-2013 Response Due: Apr 05, 2013Synopsis - Posted on Mar 15, 2013Draft Document - Posted on Mar 15, 2013
Posted: Mar 15, 2013 Center: KSCTitle: CRYOGENIC REFRIGERATION PARTS AND INSTALLSolicitation: NNK13460668Q Response Due: Mar 19, 2013Synopsis - Posted on Mar 15, 2013
Posted: Mar 15, 2013 Center: KSCTitle: KENNEDY INSTITUTIONAL SUPPORT SERVICES EXTENSIONSolicitation: NNK13ZOW002R Response Due: Mar 20, 2013Synopsis - Posted on Mar 15, 2013
Posted: Mar 13, 2013 Center: GSFCTitle: BEAM TIME TESTINGSolicitation: NNG13467293R Response Due: Mar 28, 2013Synopsis - Posted on Mar 13, 2013
Posted: Mar 08, 2013 Center: KSCTitle: TECHDOC SOFTWARE CONTRACT EXTENSIONSolicitation: NNK13ZOL001R Response Due: Mar 18, 2013
Posted: Mar 08, 2013 Center: GSFCTitle: LEVERAGED DEMONSTRATION OF POLARIMETRIC LUNAR AND END MEMBER ALGORITHM VALIDATION OBSERVATIONS FOR BASELINE ACE RESEARCHSolicitation: NNG13467364L Response Due: Mar 25, 2013Synopsis - Posted on Mar 08, 2013
Posted: Mar 04, 2013 Center: MSFCTitle: 16 SLOT PCIE EXPANSION SYSTEMSolicitation: NNM13465201Q- Response Due: Mar 08, 2013Synopsis/Solicitation Combo - Posted on Mar 04, 2013Solicitation - Posted on Mar 04, 2013
Posted: Mar 04, 2013 Center: MSFCTitle: IMAGEN RACKMOUNT SYSTEMSSolicitation: NNM13465442Q Response Due: Mar 11, 2013Synopsis - Posted on Mar 04, 2013
Posted: Mar 01, 2013 Center: GSFCTitle: SEWP V INDUSTRY DAYSolicitation: SEWPVindustryday Response Due: N/ASynopsis - Posted on Mar 01, 2013
Posted: Mar 01, 2013 Center: KSCTitle: TENT RENTALSolicitation: NNK13466219Q Response Due: Mar 17, 2013Synopsis/Solicitation Combo - Posted on Mar 01, 2013Solicitation - Posted on Mar 01, 2013
Posted: Feb 28, 2013 Center: LARCTitle: TRANSFORMATIONAL HIGH SPEED INDUSTRY DAY ANNOUNCEMENTSolicitation: NNL13ZB1004L Response Due: Mar 15, 2013Synopsis - Posted on Feb 28, 2013
Posted: Feb 26, 2013 Center: HQTitle: NASA’S AERONAUTICS SCHOLARSHIP PROGRAMSolicitation: NNH08CC19C Response Due: Jan 31, 2013
Synopsis - Posted on Jan 16, 2013Justification and Approval - Posted on Feb 26, 2013
Posted: Feb 25, 2013 Center: MSFCTitle: HARDWARE MAINTENANCE RENEWALSolicitation: NNM13466191Q Response Due: Mar 01, 2013Synopsis - Posted on Feb 25, 2013
Posted: Feb 21, 2013 Center: GRCTitle: COMPOUNDER EXTRUDERSolicitation: NNC13462702Q Response Due: Feb 28, 2013Synopsis/Solicitation Combo - Posted on Feb 21, 2013
Posted: Feb 20, 2013 Center: MSFCTitle: PCIE EXPANSION SYSTEMSolicitation: NNM13465201Q Response Due: Feb 28, 2013Synopsis - Posted on Feb 20, 2013
Posted: Feb 19, 2013 Center: MSFCTitle: TEAMS-DESIGNER AND TEAMS-RDS SOFTWARE RENEWALSolicitation: NNM13465038Q Response Due: Feb 25, 2013Synopsis - Posted on Feb 19, 2013
Posted: Feb 19, 2013 Center: MSFCTitle: PLATFORM BASED MECHANICAL TESTERSolicitation: NNM13464623Q Response Due: Feb 26, 2013Synopsis - Posted on Feb 19, 2013
Posted: Feb 15, 2013 Center: MSFCTitle: FABRICATION AND ASSEMBLY OF HORIZONTAL DEPOSITION CHAMBERSolicitation: NNM13462510Q Response Due: Feb 27, 2013Synopsis/Solicitation Combo - Posted on Jan 24, 2013
Amendment 01 - Posted on Jan 29, 2013Amendment 02 - Posted on Feb 15, 2013
SOW and DRAWINGS - Posted on Jan 25, 2013Additional Drawings - Posted on Jan 29, 2013
Posted: Feb 15, 2013 Center: MSFCTitle: IMAGEN RACKMOUNT SERVERS AND MAINTENANCE CONTRACT
Solicitation: NNM13461923Q Response Due: Feb 20, 2013Synopsis - Posted on Feb 15, 2013
Posted: Feb 14, 2013 Center: HQTitle: NASA ANNOUNCEMENT FOR HIGH-IMPACT NATIONAL STRATEGIC STEM EDUCATION PARTNERSHIPSSolicitation: EDUCATION01SP13 Response Due: Dec 31, 2014Synopsis - Posted on Feb 14, 2013Partner Announcement - Posted on Feb 14, 2013
Posted: Feb 12, 2013 Center: HQTitle: SPHERES INSPIRE IISolicitation: NNH13461656R Response Due: Feb 27, 2013Synopsis - Posted on Feb 12, 2013
Posted: Feb 07, 2013 Center: GRCTitle: AMC CARDS AND FMC MEZZANINE CARDSSolicitation: NNC13462077Q Response Due: Feb 15, 2013Synopsis - Posted on Feb 07, 2013
Posted: Feb 07, 2013 Center: MSFCTitle: SCIENTIFIC SUPPORT FOR CARBON CONTROL FOR LIFE SUPPORT SYSTEMSSolicitation: NNM13464119Q Response Due: Feb 12, 2013Synopsis - Posted on Feb 07, 2013
Posted: Feb 05, 2013 Center: AFRCTitle: RESEARCH FACILITIES AND ENGINEERING SUPPORT SERVICESSolicitation: NND13458146R Response Due: Jan 04, 2013Synopsis - Posted on Dec 19, 2012
Justification and Approval - Posted on Feb 05, 2013
Posted: Feb 05, 2013 Center: GSFCTitle: INERTIALLY STABLE PLATFORMSolicitation: NNG13459948R Response Due: Feb 20, 2013Synopsis - Posted on Feb 05, 2013
Posted: Jan 30, 2013 Center: MSFCTitle: RELIEF VALVES
Solicitation: NNM13461321Q Response Due: Feb 06, 2013Synopsis/Solicitation Combo - Posted on Jan 30, 2013Specification - Posted on Jan 30, 2013
Posted: Jan 28, 2013 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY - ACTIVE AND CONTROLLABLE NOISE REDUCTION SYSTEM - FOR JET ENGINESSolicitation: TTO1027 Response Due: Jun 01, 2013Synopsis - Posted on Jan 28, 2013
Posted: Jan 28, 2013 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY A DURABLE REDUNDANT JOINT TO BUILD STRUCTURES FROM SECTIONS OF COMPOSITE SANDWICH PANEL OR SHELLSolicitation: TTO1026 Response Due: Jun 01, 2013Synopsis - Posted on Jan 28, 2013
Posted: Jan 28, 2013 Center: KSCTitle: TECHDOC SOFTWARE SYSTEM DEVELOPMENT AND SUPPORTSolicitation: KSCOPOS-01LP Response Due: Feb 13, 2013Synopsis - Posted on Jan 28, 2013
Posted: Jan 25, 2013 Center: MSFCTitle: MECHANICAL STAGES AND MOTOR-CONTROLLER DRIVERSSolicitation: NNM13462483Q Response Due: Jan 31, 2013Synopsis/Solicitation Combo - Posted on Jan 25, 2013Motor Controller RFQ - Posted on Jan 25, 2013
Posted: Jan 25, 2013 Center: KSCTitle: WOMENS LEADERSHIP LABS TRAININGSolicitation: NNK13462757Q Response Due: Feb 04, 2013Synopsis - Posted on Jan 25, 2013
Posted: Jan 23, 2013 Center: MSFCTitle: COMPOSITE STIFFNERSolicitation: NNM13461593 Response Due: Jan 28, 2013Synopsis - Posted on Jan 23, 2013
Title: FASTCOM: SUPERFSCC-4 PCIE CARDSSolicitation: NNM13461891Q Response Due: Jan 29, 2013Synopsis - Posted on Jan 22, 2013
Posted: Jan 18, 2013 Center: HQTitle: SPONSORED RESEARCH AND EDUCATION SUPPORT SERVICESSolicitation: 2013-NRESS-RFI Response Due: Feb 08, 2013Synopsis - Posted on Jan 18, 2013
Posted: Jan 17, 2013 Center: JSCTitle: COOPERATIVE AGREEMENT NOTICE FOR NASA INTERNSHIPSSolicitation: NNJ13ZBR001C Response Due: N/ASynopsis - Posted on Jan 17, 2013
Posted: Jan 10, 2013 Center: HQTitle: NASA RESEARCH ANNOUNCEMENT - 2013 COMPETITIVE PROGRAM FOR SCIENCE MUSEUMS PLANETARIUMS AND NASA VISITOR CENTERS PLUS OTHER OPPORTUNITIES CP4SMP+Solicitation: NNH13ZHA001N Response Due: N/ASynopsis - Posted on Jan 10, 2013
Posted: Jan 10, 2013 Center: MSFCTitle: FAST LIGHT OPTICAL GYROSCOPES FOR PRECISION INERTIAL NAVIGATIONSolicitation: NNM13459893Q Response Due: Jan 25, 2013Synopsis - Posted on Jan 10, 2013
Posted: Jan 09, 2013 Center: MSFCTitle: SCIENTIFIC SUPPORT FOR IONIC LIQUID RESEARCH IN CRYOGENIC COMPOSITE TANKSSolicitation: NNM13460258Q Response Due: Jan 15, 2013Synopsis - Posted on Jan 09, 2013
Posted: Jan 09, 2013 Center: MSFCTitle: ALLOY POWDERSolicitation: NNM13461013Q Response Due: Jan 16, 2013Synopsis/Solicitation Combo - Posted on Jan 09, 2013Solicitation - Posted on Jan 09, 2013
Posted: Jan 02, 2013 Center: KSCTitle: METAL STORAGE CONTAINERS
Solicitation: NNK13458880Q Response Due: Jan 06, 2013Synopsis/Solicitation Combo - Posted on Dec 14, 2012
Amendment 01 - Posted on Jan 02, 2013NNK13458880Q - Posted on Dec 14, 2012
Posted: Dec 21, 2012 Center: MSFCTitle: HYDRAULIC COMPONENTSSolicitation: NNM13460766Q Response Due: Jan 11, 2013Synopsis/Solicitation Combo - Posted on Dec 21, 2012Statement of Work - Posted on Dec 21, 2012
Posted: Dec 20, 2012 Center: GRCTitle: IMPLEMENTATION MAINTENANCE OPERATIONS AND CPSSolicitation: NNCIMOC23B Response Due: Dec 31, 2012Synopsis - Posted on Dec 20, 2012
Posted: Dec 19, 2012 Center: ARCTitle: AMES RESEARCH CENTER PROTECTIVE SERVICES OFFICE SUPPORT SERVICES CONTRACTSolicitation: NNA12366339R Response Due: Dec 21, 2012Synopsis - Posted on Nov 21, 2011
Modification 01 - Posted on Nov 22, 2011Modification 02 - Posted on Dec 15, 2011Modification 03 - Posted on Feb 10, 2012Modification 04 - Posted on Feb 23, 2012Modification 05 - Posted on Feb 24, 2012Modification 06 - Posted on Feb 24, 2012Modification 07 - Posted on Mar 23, 2012Modification 08 - Posted on May 03, 2012Modification 09 - Posted on May 10, 2012Modification 10 - Posted on Jul 19, 2012Modification 11 - Posted on Nov 08, 2012
Solicitation - Posted on Nov 08, 2012Amendment 01 - Posted on Nov 21, 2012Amendment 02 - Posted on Dec 04, 2012Amendment 03 - Posted on Dec 05, 2012Amendment 04 - Posted on Dec 07, 2012Amendment 05 - Posted on Dec 10, 2012Amendment 06 - Posted on Dec 11, 2012Amendment 07 - Posted on Dec 19, 2012
ARC Protective Services Office Support Services - Posted on Mar 23, 2012Question and Answers - Posted on May 03, 2012Collective Bargaining Agreements - Posted on May 10, 2012Draft Sample Core Requirement & Task Orders - Posted on Jul 19, 2012
Title: DATA ACQUISITION UNITS FOR THE SPACE LAUNCH SYSTEMSolicitation: 4200460804 Response Due: Dec 28, 2012Synopsis - Posted on Dec 18, 2012
Posted: Dec 12, 2012 Center: MSFCTitle: GAMMA SPECTROMETERSolicitation: NNM13458787Q Response Due: Dec 18, 2012Synopsis/Solicitation Combo - Posted on Dec 12, 2012Solicitation - Posted on Dec 12, 2012
Posted: Dec 12, 2012 Center: MSFCTitle: CHEMISTRY SUPPORT FOR DESIGNING AND SYNTHESIZING IONIC LIQUIDSSolicitation: NNM13460255Q Response Due: Dec 19, 2012Synopsis - Posted on Dec 12, 2012
Posted: Dec 11, 2012 Center: MSFCTitle: CARBON NANOTUBE TAPESolicitation: NNM13459927 Response Due: Dec 19, 2012Synopsis - Posted on Dec 11, 2012
Posted: Dec 07, 2012 Center: MSFCTitle: PCI EXPRESS I-O CARDS AND CABLESSolicitation: NNM13459943Q Response Due: Dec 12, 2012Synopsis - Posted on Dec 07, 2012
Posted: Dec 06, 2012 Center: MSFCTitle: STEP STYLUS PROFILOMETERSolicitation: NNM13457274Q-1 Response Due: Dec 14, 2012Synopsis/Solicitation Combo - Posted on Dec 06, 2012Specification - Posted on Dec 06, 2012
Posted: Dec 03, 2012 Center: MSFCTitle: CONCRETE MATERIAL PREPARATION AND ANALYSISSolicitation: NNM13457784Q Response Due: Dec 03, 2012Synopsis - Posted on Nov 27, 2012
Title: ANALYTICAL AFTERBURNER FISSION FRAGMENT ROCKET ENGINESolicitation: NNM13458897Q Response Due: Dec 07, 2012Synopsis - Posted on Nov 29, 2012
Posted: Nov 27, 2012 Center: GSFCTitle: NASA BALLOON OPERATIONS CONTRACTSolicitation: 4200398723-R Response Due: Dec 12, 2012Synopsis - Posted on Nov 27, 2012
Posted: Nov 21, 2012 Center: MSFCTitle: SELF-PROPELLED MODULAR TRANSPORTERSSolicitation: NNM12442261Q Response Due: Dec 03, 2012Synopsis/Solicitation Combo - Posted on Sep 14, 2012
Amendment 01 - Posted on Sep 19, 2012Amendment 02 - Posted on Nov 21, 2012
Transporters - Posted on Sep 14, 2012Revised Specifications for SPMT - Posted on Nov 21, 2012
Posted: Nov 20, 2012 Center: GRCTitle: CURIOSITY ROVERSolicitation: NNC13455201Q Response Due: Nov 30, 2012Synopsis - Posted on Nov 20, 2012
Posted: Nov 15, 2012 Center: JSCTitle: EXPLORATION TECHNOLOGY DEMONSTRATION AND NATIONAL LAB UTILIZATION ENHANCEMENTSSolicitation: NNJ13ZBG001N Response Due: N/ASynopsis - Posted on Nov 15, 2012
Posted: Nov 13, 2012 Center: GRCTitle: SILICON CARBIDE UMBILICAL SWITCH REMOTE POWER CONTROLLER BREADBOARDSSolicitation: 4200457665 Response Due: Nov 28, 2012Synopsis - Posted on Nov 13, 2012
Posted: Oct 18, 2012 Center: SSCTitle: SPECIAL LAW ENFORCEMENT AND PATROL SERVICES WITHIN THE BUFFER ZONE AND FEE AREA OF JOHN C. STENNIS SPACE CENTER IN MSSolicitation: NNS13454866R Response Due: Nov 01, 2012Synopsis - Posted on Oct 18, 2012
Posted: Oct 16, 2012 Center: GRCTitle: SERVICE OF SERVO-HYDRAULIC EQUIPMENTSolicitation: NNC13CHA001Q Response Due: Oct 19, 2012Synopsis/Solicitation Combo - Posted on Sep 28, 2012Solicitation - Posted on Oct 16, 2012Questions and Answers - Posted on Oct 09, 2012
Posted: Sep 26, 2012 Center: GRCTitle: HIGH POWER HIGH EFFICIENCY Q-BAND SPACE TRAVELING WAVE TUBESolicitation: NNC12CA00C Response Due: Oct 11, 2012Synopsis - Posted on Sep 26, 2012
Posted: Sep 19, 2012 Center: ARCTitle: FINANCIAL SERVICESSolicitation: RFI-FinancialServices Response Due: N/ASynopsis - Posted on Jun 22, 2011
Modification 01 - Posted on Jul 19, 2011Modification 02 - Posted on Sep 22, 2011Modification 03 - Posted on Oct 19, 2011Modification 04 - Posted on Jan 19, 2012
Draft Statement of Work - Posted on Jun 22, 2011Answers to Questions - Posted on Jul 19, 2011Questions and Answers 2 - Posted on Sep 22, 2011Revision to the Original RFI - Posted on Sep 19, 2012Revision to the Statement of Work (SOW) - Posted on Sep 19, 2012Revision to the Original RFI with Contact Informat - Posted on Sep 19, 2012
Posted: Sep 17, 2012 Center: KSCTitle: KSC INSTITUTIONAL SUPPORT SERVICES IIISolicitation: NNK12423244R Response Due: Oct 01, 2012Synopsis - Posted on Mar 02, 2012
Modification 01 - Posted on Apr 20, 2012Modification 02 - Posted on May 18, 2012Modification 03 - Posted on Jun 08, 2012Modification 04 - Posted on Sep 17, 2012
Solicitation - Posted on May 18, 2012Amendment 01 - Posted on Jun 08, 2012
Posted: Sep 14, 2012 Center: GRCTitle: EXPERIMENT OPPORTUNITY FOR USE OF THE SCAN SPACE COMMUNICATIONS AND NAVIGATION TESTBEDSolicitation: SCaNTestbed2012 Response Due: N/ASynopsis - Posted on Aug 21, 2012Experiment Opportunity Announcement Document - Posted on Sep 14, 2012
Posted: Aug 31, 2012 Center: NSSCTitle: NNX12SBIR-SELECTSolicitation: NNX12SBIR-Select Response Due: Nov 29, 2012Synopsis - Posted on Aug 31, 2012
Posted: Aug 31, 2012 Center: NSSCTitle: SBIR-STTR GENERALSolicitation: NNX12SBIR-STTR-GENERAL Response Due: Nov 29, 2012Synopsis - Posted on Aug 31, 2012
Posted: Aug 23, 2012 Center: GRCTitle: CVI AND SMI CERAMIC MATRIX COMPOSITE PANELS AND VANESSolicitation: NNC12438501Q Response Due: Aug 01, 2012Synopsis - Posted on Jul 17, 2012
Justification and Approval - Posted on Aug 23, 2012
Posted: Aug 21, 2012 Center: MSFCTitle: SUPPORT FOR THE DEVELOPMENT DESIGN TESTING AND SYSTEM MAINTENANCE FOR LIFE SUPPORT SYSTEMSSolicitation: NNM12442335R Response Due: Aug 27, 2012Synopsis - Posted on Aug 10, 2012Synopsis Amendment - Posted on Aug 21, 2012
Title: QUAD BAND SATELLITE SIMULATORSolicitation: NNK12442115Q Response Due: Aug 21, 2012Synopsis/Solicitation Combo - Posted on Jul 31, 2012
Amendment 01 - Posted on Aug 16, 2012NNK12442115Q - Posted on Jul 31, 2012
Posted: Aug 14, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY DECORATED CARBON NANOTUBES FOR NOVEL MATERIALS WITH TAILORABLE ELECTRICAL PROPERTIESSolicitation: TTO1025 Response Due: Dec 31, 2012Synopsis - Posted on Aug 14, 2012
Posted: Aug 14, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY SYNTHETIC VISION SYSTEM FOR AERONAUTICAL APPLICATIONSolicitation: TTO1024 Response Due: Dec 31, 2012Synopsis - Posted on Aug 14, 2012
Posted: Aug 14, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY MULTIFUNCTIONAL WIRELESS SENSORS FOR LIGHTNING PROTECTIONSolicitation: TTO1023 Response Due: Dec 31, 2012Synopsis - Posted on Aug 14, 2012
Posted: Aug 13, 2012 Center: KSCTitle: CAMERA EQUIPMENTSolicitation: NNK12441503Q Response Due: Aug 16, 2012Synopsis/Solicitation Combo - Posted on Jul 24, 2012
Amendment 01 - Posted on Jul 27, 2012Amendment 02 - Posted on Aug 13, 2012
NNK12441503Q - Posted on Jul 24, 2012Modification 1 - Posted on Jul 27, 2012
Posted: Aug 09, 2012 Center: GRCTitle: SCAN TESTBED EXPERIMENT COOPERATIVE AGREEMENT NOTICESolicitation: NNC12ZRH002C Response Due: N/ASynopsis - Posted on Aug 09, 2012
Posted: Aug 09, 2012 Center: KSCTitle: VCOM INTERCOM SYSTEMSolicitation: NNK12445429Q
Response Due: Aug 17, 2012Synopsis/Solicitation Combo - Posted on Aug 09, 2012Solicitation - Posted on Aug 09, 2012
Posted: Aug 07, 2012 Center: MSFCTitle: ROBOTIC ARM HAND CONTROLLER. MODEL SIMULATION. AND WIRELESS COMMUNICATION NETWORKSolicitation: NNM1242778Q Response Due: Aug 10, 2012Synopsis/Solicitation Combo - Posted on Jul 30, 2012
Amendment 01 - Posted on Aug 07, 2012attachments - Posted on Jul 30, 2012Q&As - Posted on Aug 07, 2012
Posted: Aug 01, 2012 Center: KSCTitle: LCD MONITORSolicitation: NNK12441324Q Response Due: Aug 01, 2012Synopsis/Solicitation Combo - Posted on Aug 01, 2012NNK12441324Q - Posted on Aug 01, 2012
Posted: Jul 31, 2012 Center: MSFCTitle: PNEUMATIC VALVESSolicitation: NNM12441518Q- Response Due: Aug 06, 2012Synopsis/Solicitation Combo - Posted on Jul 31, 2012Solicitation - Posted on Jul 31, 2012
Posted: Jul 30, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY MULTI COMPONENT MULTI POINT INTERFEROMETRIC RAYLEIGH MIE DOPPLER VELOCIMETERSolicitation: TTO1022 Response Due: Dec 31, 2012Synopsis - Posted on Jul 30, 2012
Posted: Jul 30, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY OPTICAL REMOTE SENSING TECHNOLOGIES IMPROVING METHODS TO MONITOR POLLUTION AND TOXIC GASESSolicitation: TTO1021 Response Due: Dec 31, 2012Synopsis - Posted on Jul 30, 2012
Posted: Jul 30, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY REDUCED-ORDER MODELS FOR EFFICIENT COMPUTATIONAL ANALYSIS OF COMPLEX SYSTEMSSolicitation: TTO1020 Response Due: Dec 31, 2012
Posted: Jul 25, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY ALTERNATIVE LAUNCH ABORT SYSTEM DESIGNSolicitation: TTO1019 Response Due: Dec 31, 2012Synopsis - Posted on Jul 25, 2012
Posted: Jul 25, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY - COMPUTATIONAL VISUAL SERVO AUTOMATIC MEASUREMENT AND CONTROL FOR SMART IMAGE ENHANCEMENTSolicitation: TTO1018 Response Due: Dec 31, 2012Synopsis - Posted on Jul 25, 2012
Posted: Jul 25, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY AQUEOUS DISPERSION OF CARBON NANOTUBES AND THEIR APPLICATION IN BIONANOTECHNOLOGY AND FUEL CELL ELECTRODESSolicitation: TTO1017 Response Due: Dec 31, 2012Synopsis - Posted on Jul 25, 2012
Posted: Jul 24, 2012 Center: GRCTitle: SAFETY HEALTH ENVIRONMENTAL AND MISSION ASSURANCE SUPPORT SERVICESSolicitation: NNC12ZQ012R Response Due: Aug 02, 2012Synopsis - Posted on May 07, 2012
Modification 01 - Posted on May 15, 2012Modification 02 - Posted on May 18, 2012Modification 03 - Posted on Jun 21, 2012
Solicitation - Posted on Jun 21, 2012Amendment 01 - Posted on Jul 24, 2012
Industry Day Information and Registration - Posted on May 07, 2012Industry Call Presentation & Registered Companies - Posted on May 22, 2012Draft RFP Questions & Answers - Posted on Jun 08, 2012
SHEMA Final RFP Attachments - Posted on Jun 21, 2012SHEMA -Black Out Notice - Posted on Jun 21, 2012SHEMA Final RFP- Electronic Bidder's Library 2 - Posted on Jun 21, 2012Final RFP Questions & Answers - Part 1 - Posted on Jul 11, 2012Final RFP Questions & Answers - Part 2 of 2 - Posted on Jul 17, 2012SHEMA Updated Final RFP & Attachments - Posted on Jul 17, 2012
Posted: Jul 23, 2012 Center: GSFCTitle: FACILITIES OPERATIONS AND MAINTENANCE SERVICES - INCREASE CONTRACT VALUE AND ORDERING PERIODSolicitation: NNG10AZ19C-2012-2 Response Due: Aug 06, 2012Synopsis - Posted on Jul 23, 2012
Posted: Jul 23, 2012 Center: KSCTitle: GDP SPACE SYSTEMS TELEMETRY DATA PROCESSORS SOLE SOURCESolicitation: NNK12438442Q Response Due: Jul 30, 2012Synopsis/Solicitation Combo - Posted on Jul 23, 2012Redacted Sole Source - Posted on Jul 23, 2012
Posted: Jul 20, 2012 Center: KSCTitle: CONSULTING SERVICES - ALTERNATIVE FUELS TRANSPORTATIONSolicitation: KSCVC-CNG Response Due: Aug 31, 2012Synopsis - Posted on Jul 12, 2012Solicitation - Posted on Jul 20, 2012
Posted: Jul 19, 2012 Center: MSFCTitle: CARBON EPOXY PREPREG MATERIAL AND FABRICSolicitation: NNM12443036Q Response Due: Jul 27, 2012Synopsis - Posted on Jul 19, 2012
Posted: Jul 17, 2012 Center: JSCTitle: RESEARCH AND TECHNOLOGY DEVELOPMENT TO SUPPORT CREW HEALTH AND PERFORMANCE IN SPACE EXPLORATION MISSIONSSolicitation: NNJ12ZSA002N Response Due: N/ASynopsis - Posted on Jul 17, 2012
Posted: Jul 03, 2012 Center: MSFCTitle: IHAWK SYSTEMS AND QLOGIC ADAPTERS USED FOR MAESTRO CLUSTER SERVER SYSTEMSolicitation: NNM12441134Q Response Due: Jul 12, 2012Synopsis - Posted on Jul 03, 2012
Posted: Jun 28, 2012 Center: MSFCTitle: LICENSE AND SUPPORT RENEWAL OF PC SIGNAL SOFTWARESolicitation: NNM12439744Q Response Due: Jul 05, 2012Synopsis - Posted on Jun 28, 2012
Posted: Jun 28, 2012 Center: MSFCTitle: HARMONIC DISTORTION REDUCTION SYSTEMSolicitation: NNM12430911Q Response Due: Jul 05, 2012Synopsis - Posted on Jun 28, 2012
Posted: Jun 28, 2012 Center: MSFCTitle: PRESSURE TRANSDUCERSSolicitation: NNM12441015Q Response Due: Jul 05, 2012Synopsis - Posted on Jun 28, 2012
Posted: Jun 28, 2012 Center: GRCTitle: STATOR VANE ASSEMBLYSolicitation: 4200438167 Response Due: Jul 11, 2012Synopsis - Posted on Jun 28, 2012
Posted: Jun 25, 2012 Center: MSFCTitle: CIRCUIT BOARDSSolicitation: NNM12440193Q Response Due: Jun 29, 2012Synopsis - Posted on Jun 25, 2012
Posted: Jun 20, 2012 Center: MSFCTitle: TELEMETRIX CPCI SGLS RECEIVER - MODULATOR OR EQUIVALENTSolicitation: NNM12438423Q Response Due: Jun 29, 2012Synopsis/Solicitation Combo - Posted on Jun 20, 2012specifications - Posted on Jun 20, 2012
Posted: Jun 20, 2012 Center: MSFCTitle: METAL CUTTING BAND SAWSolicitation: NNM12439052Q Response Due: Jun 27, 2012Synopsis/Solicitation Combo - Posted on Jun 20, 2012specifications - Posted on Jun 20, 2012
Posted: Jun 20, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY ADAPTIVE REFINEMENT TOOLS SOFTWARE FOR REALTIME OF UNSTRUCTURED GRIDS IN NUMERICAL ANALYSISSolicitation: TTO1013 Response Due: Dec 31, 2012Synopsis - Posted on Jun 20, 2012
Posted: Jun 20, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY AIR COUPLED ACOUSTIC THERMOGRAPHY NONDESTRUCTIVE EVALUATION AND INSPECTION OF STRUCTURESSolicitation: TTO1012 Response Due: Dec 31, 2012Synopsis - Posted on Jun 20, 2012
Posted: Jun 20, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY BYZANTINE FAULT TOLERANT CLOCK A SELF STABILIZING SYNCHRONIZATION PROTOCOLSolicitation: TTO1011 Response Due: Dec 31, 2012Synopsis - Posted on Jun 20, 2012
Posted: Jun 20, 2012 Center: MSFCTitle: BEARING VIBRATION ANALYZER SYSTEMSolicitation: NNM12438759Q Response Due: Jun 27, 2012
Synopsis/Solicitation Combo - Posted on Jun 20, 2012attachments - Posted on Jun 20, 2012
Posted: Jun 13, 2012 Center: MSFCTitle: SPECIAL NOTICE OF NASA EXCHANGE–MSFC TO LEASE NASA CONTROLLED LAND TO A PRIVATE DEVELOPER FOR MARSHALL EXCHANGE RETAIL DEVELOPMENT PROJECTSolicitation: SN-04272012 Response Due: Aug 31, 2012Synopsis - Posted on May 01, 2012
Modification 01 - Posted on May 23, 2012Modification 02 - Posted on Jun 13, 2012
Solicitation - Posted on May 01, 2012Zipped CAD Dwg for Marshall Exchange Retail Dev - Posted on May 01, 2012Modification No. 2 Attachments - Posted on Jun 13, 2012
Posted: Jun 11, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY A FLUID FLOW SIMULATION MODEL INCORPORATING IN LINE PRESSURE REGULATORSSolicitation: TTO1010 Response Due: Dec 31, 2012Synopsis - Posted on Jun 11, 2012
Posted: Jun 11, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY FORWARD VOLTAGE SHORT PULSE TECHNIQUE FOR MEASURING TEMPERATURE OF LASER DIODE JUNCTIONSSolicitation: TTO1009 Response Due: Dec 31, 2012Synopsis - Posted on Jun 11, 2012
Posted: Jun 11, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY TACTILE FEEDBACK FOR IMPROVED AIRCRAFT FLIGHT CONTROL SYSTEMS.Solicitation: TTO1008 Response Due: Dec 31, 2012Synopsis - Posted on Jun 11, 2012
Posted: Jun 07, 2012 Center: MSFCTitle: THERMAL DESORPTION SYSTEMSolicitation: NNM1243511Q1 Response Due: Jun 11, 2012Synopsis/Solicitation Combo - Posted on May 30, 2012
Amendment 01 - Posted on Jun 06, 2012Amendment 02 - Posted on Jun 07, 2012
Solicitation - Posted on May 30, 2012
Posted: Jun 07, 2012 Center: MSFCTitle: COBRA AHS FULL EDITION SOFTWARE
Solicitation: NNM12437663Q Response Due: Jun 13, 2012Synopsis - Posted on Jun 07, 2012
Posted: Jun 06, 2012 Center: MSFCTitle: SMART HYDROGEN SENSORSSolicitation: NNM12438113Q Response Due: Jun 12, 2012Synopsis - Posted on Jun 06, 2012
Posted: Jun 04, 2012 Center: MSFCTitle: PCO 1600 DIGITAL CAMERASolicitation: NNM12437528Q Response Due: Jun 08, 2012Synopsis - Posted on Jun 04, 2012
Posted: Jun 01, 2012 Center: MSFCTitle: RUGATE NOTCH FILTERSolicitation: NNM12435456Q Response Due: Jun 07, 2012Synopsis/Solicitation Combo - Posted on May 30, 2012
Amendment 01 - Posted on Jun 01, 2012T&Cs - Posted on May 30, 2012
Posted: Jun 01, 2012 Center: GRCTitle: FIELD MICROPHONE AND MICROPHONE PREAMPLIFIERSolicitation: 4200436001 Response Due: Jun 08, 2012Synopsis - Posted on Jun 01, 2012
Posted: Jun 01, 2012 Center: MSFCTitle: IMAGEN SYSTEMSSolicitation: NNM12437505Q Response Due: Jun 08, 2012Synopsis - Posted on Jun 01, 2012
Posted: May 31, 2012 Center: MSFCTitle: ASTRONOMICAL CCD CAMERASolicitation: NNM12436704Q Response Due: Jun 08, 2012Synopsis/Solicitation Combo - Posted on May 31, 2012attachments - Posted on May 31, 2012
Posted: May 29, 2012 Center: MSFCTitle: ANNUAL LICENSE RENEWAL FOR CFD-ACESolicitation: NNM12435181Q
Response Due: Jun 06, 2012Synopsis - Posted on May 29, 2012
Posted: May 29, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY LIGHTWEIGHT LOW PROFILE TRANSDUCERSolicitation: TTO1007 Response Due: Dec 31, 2012Synopsis - Posted on May 29, 2012
Posted: May 29, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY HIGHLY ACCURATE POSITION DETECTION AND SHAPE SENSING WITH FIBER OPTICSSolicitation: TTO1006 Response Due: Dec 31, 2012Synopsis - Posted on May 29, 2012
Posted: May 29, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY ADVANCED OVER THE WING NACELLE TRANSPORT CONFIGURATIONSolicitation: TTO1005 Response Due: Dec 31, 2012Synopsis - Posted on May 29, 2012
Posted: May 25, 2012 Center: MSFCTitle: 104 CHANNEL PRECISION 28000 BRIDGE CONDITIONING SYSTEMSolicitation: NNM12436792Q Response Due: Jun 01, 2012Synopsis - Posted on May 25, 2012
Posted: May 23, 2012 Center: MSFCTitle: SINGLE HEAD ROTARY ABRASER SET WITH ACCESSORIESSolicitation: NNM12434524Q Response Due: May 25, 2012Synopsis/Solicitation Combo - Posted on May 15, 2012
Amendment 01 - Posted on May 23, 2012Solicitation - Posted on May 15, 2012
Posted: May 23, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY EDDY CURRENT PROBE FOR DETECTION OF CRACKS IN DIFFICULT TO REACH PLACESSolicitation: TTO1004 Response Due: Dec 31, 2012Synopsis - Posted on May 23, 2012
Title: TECHNOLOGY TRANSFER OPPORTUNITY NOISE REDUCING COMPOSITE PANEL DESIGNSolicitation: TTO1003 Response Due: Dec 31, 2012Synopsis - Posted on May 23, 2012
Posted: May 23, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY VERY HIGH ENERGY DENSITY LASER FOCUSINGSolicitation: TTO1002 Response Due: Dec 31, 2012Synopsis - Posted on May 23, 2012
Posted: May 22, 2012 Center: MSFCTitle: TEST SIGNAL EQUIPMENTSolicitation: NNM12436796Q Response Due: May 29, 2012Synopsis - Posted on May 22, 2012
Posted: May 22, 2012 Center: MSFCTitle: MIRROR MOUNTING INTERFACES .SPIDERS.Solicitation: NNM12435272Q Response Due: May 22, 2012Synopsis/Solicitation Combo - Posted on May 17, 2012
Amendment 01 - Posted on May 22, 2012attachments - Posted on May 17, 2012
Posted: May 17, 2012 Center: MSFCTitle: SYDOR INTEGRATED 18 MM INTENSIFIER SYSTEMSSolicitation: NNM12436456Q Response Due: May 23, 2012Synopsis - Posted on May 17, 2012
Posted: May 15, 2012 Center: GRCTitle: MTS 810 HIGH CYCLE FATIGUE TEST MACHINE UPGRADESolicitation: 4200433794 Response Due: May 22, 2012Synopsis - Posted on May 15, 2012
Posted: May 15, 2012 Center: MSFCTitle: RENEWAL OF MATHWORKS SOFTWARE LICENSESolicitation: NNM12431915Q Response Due: May 30, 2012Synopsis/Solicitation Combo - Posted on May 15, 2012Solicitation - Posted on May 15, 2012
Title: DEVELOPMENT OF ON-ORBIT UV CURED KEVLAR INFLATABLESSolicitation: NNM12435823Q Response Due: May 21, 2012Synopsis - Posted on May 15, 2012
Posted: May 15, 2012 Center: MSFCTitle: MTS SOFTWARE AND RENEWAL LICENSESolicitation: NNM12430933Q Response Due: May 22, 2012Synopsis - Posted on May 15, 2012
Posted: May 14, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY MICRORING THINFILM SPECTROMETER ARRAYSolicitation: TTO1001 Response Due: Dec 31, 2012Synopsis - Posted on May 14, 2012
Posted: May 14, 2012 Center: LARCTitle: TECHNOLOGY TRANSFER OPPORTUNITY ADAPTIVE REFINEMENT TOOLS SOFTWARE FOR REALTIME OF UNSTRUCTURED GRIDS IN NUMERICAL ANALYSISSolicitation: TTO1000 Response Due: Dec 31, 2012Synopsis - Posted on May 14, 2012
Posted: May 10, 2012 Center: MSFCTitle: FIELDVIEW SOFTWARESolicitation: NNM12435046Q Response Due: May 17, 2012Synopsis - Posted on May 10, 2012
Posted: May 08, 2012 Center: MSFCTitle: THERMAL DESORPTION SYSTEMSolicitation: NNM1243511Q Response Due: May 15, 2012Synopsis - Posted on May 08, 2012
Posted: May 07, 2012 Center: MSFCTitle: SOFTWARE RENEWAL FOR ANSASolicitation: NNM12435049Q Response Due: May 11, 2012Synopsis - Posted on May 07, 2012
Posted: May 04, 2012 Center: MSFCTitle: GOM PONTOS 3D 12 MEGAPIXEL DYNAMIC PHOTOGRAMMETRYSolicitation: NNM12434517Q
Response Due: May 11, 2012Synopsis - Posted on May 04, 2012
Posted: May 03, 2012 Center: MSFCTitle: SERVICES IN SUPPORT OF THE POGO TESTING INITIATIVESolicitation: NNM12432848Q Response Due: May 11, 2012Synopsis - Posted on May 03, 2012
Posted: May 01, 2012 Center: GRCTitle: SCIENTIFIC HIGH ENERGY ND:YAG-PUMPED DYE LASER SYSTEM WITH WAVELENGTH EXTENSIONSolicitation: NNC12431061R Response Due: May 04, 2012Synopsis/Solicitation Combo - Posted on Apr 24, 2012Specifications - Posted on Apr 24, 2012Responses to Questions - Posted on May 01, 2012
Posted: Apr 30, 2012 Center: GRCTitle: FPGA PROCESSOR BOARD FOR EVA POWER AVIONICS SOFTWARESolicitation: 4200433929Q Response Due: May 01, 2012Synopsis - Posted on Apr 30, 2012
Posted: Apr 27, 2012 Center: MSFCTitle: LICENSE RENEWAL FOR COMSOL INCSolicitation: NNM12432616Q Response Due: May 04, 2012Synopsis - Posted on Apr 27, 2012
Posted: Apr 26, 2012 Center: MSFCTitle: AGILE PRODUCTS SUPPORT AND LICENSE RENEWALSolicitation: NNM12432678Q Response Due: May 03, 2012Synopsis - Posted on Apr 26, 2012
Posted: Apr 26, 2012 Center: MSFCTitle: DATA ACQUISITION AND ANALYSIS SOFTWARE MAINTENANCESolicitation: NNM12429068Q Response Due: May 03, 2012Synopsis - Posted on Apr 26, 2012
Posted: Apr 04, 2012 Center: GRCTitle: CONTINUED TECHNOLOGY DEVELOPMENT OF THE NASA’S EVOLUTIONARY XENON THRUSTER ION PROPULSION POWER PROCESSING UNITSolicitation: NNC11ZMA11R Response Due: May 05, 2011Synopsis - Posted on Apr 20, 2011
Justification and Approval - Posted on Apr 04, 2012
Posted: Mar 30, 2012 Center: GRCTitle: GESS 3 SOURCES SOUGHT NOTICESolicitation: GESS3-SSN Response Due: Jul 08, 2011Synopsis - Posted on Oct 12, 2010Solicitation - Posted on May 18, 2011
Justification and Approval - Posted on Feb 10, 2012Amendment 01 - Posted on May 26, 2011Amendment 02 - Posted on Jun 10, 2011Amendment 03 - Posted on Jun 23, 2011
Questions and Answers as of 4-8-11 - Posted on Apr 08, 2011Industry Day Notice - Posted on Apr 11, 2011Industry Day Presentation and Attendance List - Posted on Apr 14, 2011GESS-3 GRC Policies and Procedures - Posted on Apr 14, 2011Questions and Answers as of 4-19-2011 - Posted on Apr 19, 2011Questions and Answers as of 4-20-2011 - Posted on Apr 20, 2011Postponement of Blackout Period - Posted on Apr 27, 2011Final Answers to DRAFT RFP - Posted on May 18, 2011GESS-3 Tentative Schedule as of 5-18-2011 - Posted on May 18, 2011GESS-3 Blackout Notice - Posted on May 18, 2011Final RFP Questions and Answers as of 5-26-2011 - Posted on May 26, 2011Questions and Answers as of 6-1-2011 FINAL RFP - Posted on Jun 10, 2011Clarification (#46) to Final RFP Q&A as of 6-1-11 - Posted on Jun 13, 2011GESS2 CMS Manuals and Flow Chart - Posted on Jun 15, 2011Notification of Protest - Posted on Nov 30, 2011Source Selection Statement - Posted on Mar 30, 2012
Posted: Mar 29, 2012 Center: KSCTitle: REQUEST FOR PROPOSAL FOOD SERVICES AT KENNEDY SPACE CENTERSolicitation: EXC11-01a Response Due: Apr 16, 2012Synopsis - Posted on Mar 16, 2012Solicitation - Posted on Mar 16, 2012Responses to Questions - Posted on Mar 29, 2012
Posted: Feb 23, 2012 Center: LARCTitle: REQUEST FOR INFORMATION SEEKING POTENTIAL INTEREST AND USE OF NASA LANGLEY
RESEARCH CENTER UNIQUE CAPABILITIES IN STRUCTURES AND MATERIALSSolicitation: RFI-LARC-RLC-01 Response Due: Mar 23, 2012Synopsis - Posted on Feb 23, 2012
Posted: Feb 21, 2012 Center: MSFCTitle: MSFC ENGINEERING SOLUTIONS AND PROTOTYPING REQUEST FOR INFORMATIONSolicitation: MSFC_ESP_RFI_2-21-12 Response Due: Mar 07, 2012Synopsis - Posted on Feb 21, 2012MSFC_ESP_RFI_2-21-12 - Posted on Feb 21, 2012
Posted: Feb 21, 2012 Center: KSCTitle: BROADBAND TRANSMISSION EQUIPMENTSolicitation: NNK12426855Q Response Due: Mar 07, 2012Synopsis/Solicitation Combo - Posted on Feb 21, 2012Solicitation - Posted on Feb 21, 2012
Posted: Feb 15, 2012 Center: GRCTitle: COGNITIVE NETWORKING TECHNOLOGIESSolicitation: NNC12ZRH011L Response Due: Apr 13, 2012Synopsis - Posted on Feb 15, 2012Requirement Description - Posted on Feb 15, 2012
Posted: Feb 07, 2012 Center: KSCTitle: RENEWAL OF DELMIA LICENSE SUPPORT MODELING AND SIMULATION LABSolicitation: NNK12422842Q Response Due: Feb 21, 2012Synopsis - Posted on Feb 07, 2012
Posted: Jan 17, 2012 Center: GSFCTitle: FACILITIES OPERATIONS AND MAINTENANCE SERVICES--INCREASE CONTRACT VALUE AND ORDERING PERIODSolicitation: NNG10AZ19C-2012-1 Response Due: Jan 31, 2012Synopsis - Posted on Jan 17, 2012
Posted: Jan 04, 2012 Center: GSFCTitle: SUPPORT SERVICES FOR IMPLEMENTATION OF A PUBLIC OUTREACH CONTESTSolicitation: NNG12413887L Response Due: Jan 14, 2012Synopsis - Posted on Jan 04, 2012
Posted: Dec 12, 2011 Center: KSCTitle: KSC INSTITUTIONAL SUPPORT SERVICESSolicitation: NNK12ZOW001L Response Due: Jan 08, 2012Synopsis - Posted on Dec 12, 2011
Posted: Dec 06, 2011 Center: GRCTitle: SAFETY HEALTH ENVIRONMENTAL AND MISSION ASSURANCE SUPPORT SERVICES-SHEMASSSolicitation: SHEMASS-2011 Response Due: Jan 04, 2012Synopsis - Posted on Dec 06, 2011
Posted: Sep 21, 2011 Center: KSCTitle: VEILUX CLASS 1 DIVISION 2 EXPLOSION PROOF HD CAMERA AND ACCESSORIESSolicitation: NNK11394564Q Response Due: Sep 23, 2011Synopsis/Solicitation Combo - Posted on Sep 15, 2011
Amendment 01 - Posted on Sep 21, 2011SF1449 for RFQ NNK11394564Q - Posted on Sep 15, 2011Amended SF1449 to Include Small Business Set-Aside - Posted on Sep 21, 2011
Posted: Sep 20, 2011 Center: GRCTitle: SOLAR ELECTRIC PROPULSION DEMONSTRATION MISSION CONCEPT STUDIESSolicitation: NNC11ZMA017K Response Due: N/ASynopsis - Posted on May 20, 2011
Modification 01 - Posted on Jun 21, 2011Modification 02 - Posted on Sep 20, 2011
Source Selection Statement - Posted on Sep 20, 2011
Posted: Sep 12, 2011 Center: LARCTitle: NASA LANGLEY TO SHOWCASE NOVEL MANUFACTURING TECHNOLOGY AT INDUSTRY FORUMSolicitation: Industry-Forum Response Due: N/ASynopsis - Posted on Sep 12, 2011
Synopsis/Solicitation Combo - Posted on Sep 06, 2011
Posted: Sep 01, 2011 Center: KSCTitle: HENAAC GREAT MINDS IN SCIENCE TECHNOLOGY ENGINEERING AND MATHSolicitation: NNK11407773Q Response Due: Sep 15, 2011Synopsis - Posted on Sep 01, 2011
Posted: Aug 23, 2011 Center: MSFCTitle: INDUCTION POWER SUPPLYSolicitation: NNM379072Q Response Due: Sep 12, 2011Synopsis/Solicitation Combo - Posted on Aug 19, 2011
Amendment 01 - Posted on Aug 23, 2011Attachments - Posted on Aug 19, 2011
Posted: Aug 22, 2011 Center: KSCTitle: PAYLOAD HAZARDOUS SERVICING FACILITY MECHANICAL UPGRADESSolicitation: NNK11384684R Response Due: Sep 15, 2011Synopsis - Posted on May 04, 2011
Modification 01 - Posted on Aug 22, 2011Solicitation - Posted on May 12, 2011
Amendment 01 - Posted on May 24, 2011Amendment 02 - Posted on Jun 06, 2011Amendment 03 - Posted on Aug 22, 2011
Posted: Aug 12, 2011 Center: KSCTitle: BROADBAND TRANSMISSION EQUIPMENTSolicitation: NNK11393813Q Response Due: Aug 29, 2011Synopsis/Solicitation Combo - Posted on Aug 12, 2011Solicitation - Posted on Aug 12, 2011
Posted: Aug 12, 2011 Center: KSCTitle: TIMING AND COUNTDOWN SYSTEMSolicitation: NNK11400737Q Response Due: Aug 29, 2011Synopsis/Solicitation Combo - Posted on Aug 12, 2011Solicitation - Posted on Aug 12, 2011
Posted: Aug 11, 2011 Center: GSFCTitle: GREEN EXTENDED MULTI-CHANNEL PHOTOMULTIPLIER TUBE FOR 532 NM WAVELENGTH LIGHTSolicitation: NNG11396726 Response Due: Aug 26, 2011Synopsis - Posted on Aug 11, 2011
Posted: Jul 01, 2011 Center: NSSCTitle: NASA 2011 SMALL BUSINESS TECHNOLOGY TRANSFER PROGRAMSolicitation: NNX12-1 Response Due: Sep 08, 2011Synopsis - Posted on Jul 01, 2011
Posted: Jul 01, 2011 Center: NSSCTitle: NASA 2011 SMALL BUSINESS INNOVATION RESEARCH PROGRAM SOLICITATIONSolicitation: NNX12 Response Due: Sep 08, 2011Synopsis - Posted on Jul 01, 2011
Title: DIBROM 14Solicitation: NNK11395298Q Response Due: Jul 11, 2011Synopsis - Posted on Jun 23, 2011
Posted: Apr 22, 2011 Center: MSFCTitle: NASA INTEGRATED TECHNICAL STANDARDS SYSTEMSolicitation: NNM11378229Q Response Due: May 06, 2011Synopsis - Posted on Apr 22, 2011ITSS Draft SOW - Posted on Apr 22, 2011
Posted: Apr 20, 2011 Center: KSCTitle: GPS GENERATOR-TRANSLATOR NETWORK SERVERSolicitation: NNK11375859Q Response Due: Apr 22, 2011Synopsis - Posted on Feb 23, 2011Solicitation - Posted on Apr 20, 2011
Posted: Apr 07, 2011 Center: KSCTitle: RENEWAL OF DELMIA LICENSE SUPPORT MODELING AND SIMULATION LABSolicitation: NNK11374359Q Response Due: Apr 08, 2011Synopsis - Posted on Feb 24, 2011Solicitation - Posted on Apr 07, 2011
Posted: Mar 25, 2011 Center: KSCTitle: COOPERATIVE AGREEMENT NOTICE FOR KSC EDUCATOR RESOURCE CENTERSolicitation: NNK11AA01A Response Due: May 25, 2011Synopsis - Posted on Mar 25, 2011
Posted: Mar 10, 2011 Center: GRCTitle: GLENN ENGINEERING AND SCIENTIFIC SUPPORT CONTRACT 3 - GESS 3Solicitation: GRC-GESS-3 Response Due: Mar 30, 2011Synopsis - Posted on Mar 10, 2011Joint Venture Agreement Checklist - Posted on Mar 10, 2011Sample 8(a) Joint Venture Agreement - Posted on Mar 10, 2011Interested Parties List - Posted on Mar 10, 2011
Posted: Mar 09, 2011 Center: GRCTitle: UNMANNED AIRCRAFT COMMAND AND CONTROL COMMUNICATION SYSTEM DEVELOPMENTSolicitation: NNC11UACCCS Response Due: Mar 30, 2011Synopsis - Posted on Mar 09, 2011
Posted: Mar 07, 2011 Center: KSCTitle: LUNABOTICS MINING COMPETITION AWARDS CEREMONY AND RECEPTION AT KSC VISTIOR COMPLEXSolicitation: NNK11377158Q Response Due: Mar 01, 2011Synopsis - Posted on Feb 24, 2011Solicitation - Posted on Mar 07, 2011
Posted: Feb 25, 2011 Center: GRCTitle: NASA SAFETY CENTER TECHNICAL SERVICES SUPPORTSolicitation: NNC11ZCH002R Response Due: N/ASynopsis - Posted on Dec 06, 2010DRAFT SOW - Posted on Dec 14, 2010DRAFT Letter, RFP, Attachments - Posted on Dec 22, 2010Responses to Questions/Comments - Posted on Jan 14, 2011Final RFP and Related Documents - Posted on Feb 03, 2011Attachment E - Final Version - Posted on Feb 10, 2011Attachment E w/Corrected Due Date - Posted on Feb 10, 2011Amendment #1 - Posted on Feb 18, 2011Responses to Final RFP Questions - Posted on Feb 23, 2011Government Response to Additional Questions - Posted on Feb 25, 2011
Posted: Jan 26, 2011 Center: GRCTitle: NATURAL GAS SUPPLY FOR GLENN RESEARCH CENTERS LEWIS FIELD AND PLUM BROOK STATIONSolicitation: NNC11ZFD003Q Response Due: N/ASynopsis/Solicitation Combo - Posted on Jan 26, 2011
Posted: Jan 21, 2011 Center: GRCTitle: 2011 SUMMER OF INNOVATION PROJECTSolicitation: NNC11ZCE009C Response Due: Feb 25, 2011Synopsis - Posted on Jan 06, 2011
Modification 01 - Posted on Jan 21, 2011
Posted: Jan 13, 2011 Center: KSCTitle: KSC EDUCATOR RESOURCE CENTER SUPPORTSolicitation: NNK10AA01A Response Due: Feb 10, 2011Synopsis - Posted on Aug 05, 2010Solicitation - Posted on Jan 13, 2011
Posted: Nov 23, 2010 Center: GRCTitle: FABRICATION OF 2.5D-3D OXIDE-OXIDE CERAMIC MATRIX COMPOSITE TEST COUPONSSolicitation: NNC11363322Q
Response Due: Dec 08, 2010Synopsis - Posted on Nov 23, 2010
Posted: Oct 06, 2010 Center: HQTitle: NASA REQUEST FOR INFORMATION: NO-COST INTELLECTUAL PROPERTY MARKETING AND BROKERAGE SERVICES WITH REVENUE-SHARING COMPONENT UPON LICENSE EXECUTIONSolicitation: NNH10PL001 Response Due: Oct 21, 2010Synopsis - Posted on Sep 07, 2010
Modification 01 - Posted on Oct 06, 2010
Posted: Sep 14, 2010 Center: GRCTitle: SAFETY RELIABILITY AND QUALITY ASSURANCE AND ENVIRONMENTAL MANAGEMENT SUPPORT SERVICESSolicitation: SRQA-EMSS-2010 Response Due: Sep 24, 2010Synopsis - Posted on Sep 09, 2010
Modification 01 - Posted on Sep 14, 2010
Posted: Aug 30, 2010 Center: KSCTitle: VOLUSIA COUNTY SPACE WEEKSolicitation: NNK10355049Q Response Due: Sep 07, 2010Synopsis - Posted on Aug 30, 2010
Posted: Aug 19, 2010 Center: HQTitle: ANNOUNCEMENT OF OPPORTUNITY TO PARTICIPATE IN NASA SUMMER OF INNOVATION PROJECTSolicitation: NNH10ZNE010O Response Due: Sep 10, 2010Synopsis - Posted on Aug 02, 2010
Modification 01 - Posted on Aug 19, 2010Revised Announcement of Opportunity - Posted on Aug 19, 2010
Posted: Aug 10, 2010 Center: GRCTitle: INTERCONNECTING THERMOCOUPLE WIRINGSolicitation: NNC10344654Q Response Due: Aug 12, 2010Synopsis/Solicitation Combo - Posted on Jul 14, 2010
Amendment 01 - Posted on Jul 30, 2010Amendment 02 - Posted on Aug 04, 2010Amendment 03 - Posted on Aug 10, 2010
Statement of Work, Specifications and Drawing - Posted on Jul 14, 2010Responses to Questions, Revised Drawing - Posted on Jul 30, 2010Responses to Questions and Drawing Revision #2 - Posted on Aug 04, 2010Clarification and Responses to Questions - Posted on Aug 10, 2010
Posted: Jul 30, 2010 Center: GRCTitle: SUMMER OF INNOVATION OUTREACH AND STEM COLLABORATION SERVICESSolicitation: NNC10351607Q Response Due: Aug 03, 2010Synopsis - Posted on Jul 30, 2010
Posted: Jul 22, 2010 Center: KSCTitle: DES SOFTWARESolicitation: NNK10346655Q Response Due: Aug 05, 2010Synopsis/Solicitation Combo - Posted on Jul 22, 2010Solicitation - Posted on Jul 22, 2010
Posted: Jul 22, 2010 Center: KSCTitle: COMMERCIAL PAYLOAD PROCESSING FOR EAST COAST SPACECRAFT LAUNCHING ON EXPENDABLE LAUNCH VEHICLES LAUNCHING BETWEEN FISCAL YEARS 2010 AND 2013Solicitation: NNK10ZOP001R Response Due: Jan 22, 2010Synopsis - Posted on Jan 07, 2010
Justification and Approval - Posted on Jul 22, 2010
Posted: Jun 14, 2010 Center: KSCTitle: ONE YEAR MAINTENANCE FOR IMAGER XE SCANNERSolicitation: NNK10341907L Response Due: Jun 29, 2010Synopsis - Posted on Jun 14, 2010
Posted: May 25, 2010 Center: GRCTitle: FLUID INTERFACE TOOL DEVELOPMENTSolicitation: 4200340132Q Response Due: Jun 01, 2010Synopsis - Posted on May 25, 2010
Posted: May 18, 2010 Center: KSCTitle: SOFTWARE UPGRADE FOR OPERATIONAL TELEVISION CAMERA CONTROL SYSTEMSolicitation: NNK10340347L Response Due: May 25, 2010Synopsis - Posted on May 18, 2010
Posted: May 18, 2010 Center: GRCTitle: SUMMER OF INNOVATION 2010 PILOT PROJECTSolicitation: NNC10SoIQ Response Due: Jun 02, 2010Synopsis - Posted on May 18, 2010
Posted: May 17, 2010 Center: GRCTitle: RECOVERY ACT FOR TESTING FACILITIES OPERATING MAINTENANCE AND ENGINEERING SERVICES
Solicitation: NNC10QA19D-TFOME-ARRA Response Due: May 18, 2010Synopsis - Posted on May 17, 2010
Posted: May 07, 2010 Center: GRCTitle: OUTDOOR KA-BAND 100-WATT POWER AMPLIFIERSolicitation: 4200338359Q Response Due: May 24, 2010Synopsis/Solicitation Combo - Posted on May 07, 2010
Posted: May 06, 2010 Center: GRCTitle: MOTIVATING UNDERGRADUATES IN SCIENCE TECHNOLOGY PROFESSIONAL ACADEMIC SUPPORT SYSTEMSolicitation: NNC10340907Q Response Due: May 11, 2010
Modification 01 - Posted on Mar 30, 2010Solicitation - Posted on Apr 14, 2010Specifications - Posted on Mar 29, 2010Cold Shroud Pictures - Posted on Mar 30, 2010Additional Specifications and 3 Pictures - Posted on Apr 27, 2010Pictures reuploaded - Posted on Apr 27, 2010
Posted: Mar 30, 2010 Center: GRCTitle: GLENN PRESSURE SYSTEMS CERTIFICATION -GPSC SERVICESSolicitation: NNC09ZF002R Response Due: Jun 01, 2009Synopsis - Posted on Feb 06, 2009
Modification 01 - Posted on Apr 17, 2009Solicitation - Posted on Apr 17, 2009Electronic Bidder's Library - Posted on Feb 06, 2009Attachment I- Pricing Templates - Posted on Feb 06, 2009Site Visit Registration Information - Posted on Feb 06, 2009Attachments - Posted on Feb 06, 2009DRAFT RFP - Posted on Feb 06, 2009Site Visit Information - Posted on Mar 19, 2009DRFP Questions and Answers - Posted on Mar 19, 2009Additional Information - Posted on Apr 17, 2009Amendment No. 1- Questions and Answers - Posted on May 01, 2009NNC09BA22B Source Selection Statement - Posted on Mar 30, 2010
Posted: Mar 15, 2010 Center: GRCTitle: RECOVERY ACT - ADVANCED CONTROL SYSTEM SUPPORT FOR AEROSPACE PROPULSION
Solicitation: NNC10E416T Response Due: Mar 19, 2010Synopsis - Posted on Mar 15, 2010
Posted: Mar 15, 2010 Center: GRCTitle: RECOVERY ACT - ARTIFICIAL ICE SHAPE DESIGN FOR LOSS OF CONTROL PREVENTION AND
Solicitation: NNC10E401T Response Due: Mar 20, 2010Synopsis - Posted on Mar 15, 2010
Posted: Mar 09, 2010 Center: KSCTitle: ASTRONAUT CREW GUEST SUPPORTSolicitation: NNK10332303L Response Due: Mar 16, 2010Synopsis - Posted on Mar 09, 2010
Posted: Mar 08, 2010 Center: GRCTitle: NASA CONTRACT ASSURANCE SERVICES IISolicitation: NNC10ZNCO17L Response Due: Apr 02, 2010Synopsis - Posted on Mar 08, 2010Draft Document - Posted on Mar 08, 2010
Posted: Mar 08, 2010 Center: GRCTitle: PHYSICO-CHEMICAL AND THERMAL EVALUATIONS OF FIVE INJECTABLE MEDICATIONSSolicitation: 4200317624 Response Due: Mar 17, 2010Synopsis - Posted on Mar 02, 2010
Modification 01 - Posted on Mar 08, 2010
Posted: Mar 05, 2010 Center: NMOTitle: RECOVERY IMAGING SPECTROMETER DESIGN VERIFCATION UNIT
Solicitation: 87-15011 Response Due: N/ASynopsis - Posted on Mar 05, 2010
Posted: Feb 25, 2010 Center: GRCTitle: RECOVERY ACT – ULTRA HIGH BYPASS TURBINE-POWERED SIMULATOR FAN MODEL
Solicitation: NNC10E415T Response Due: Mar 03, 2010Synopsis - Posted on Feb 25, 2010
Posted: Feb 17, 2010 Center: GRCTitle: RECOVERY ACT - ADVANCED SUBSONIC COMBUSTION RIG PLENUM REDESIGN AND FABRICATION
Solicitation: NNC10E379T Response Due: Feb 23, 2010Synopsis - Posted on Feb 17, 2010
Posted: Feb 16, 2010 Center: GRCTitle: MULTI LAYER INSULATION MLI FABRICATION INSTALLATION AND INTERGRATION FOR LARGE SCALE CRYOGENIC PROPELLANT TANKSSolicitation: NNC10ZCH012L Response Due: Mar 17, 2010Synopsis - Posted on Feb 16, 2010RFI - Posted on Feb 16, 2010
Posted: Feb 04, 2010 Center: KSCTitle: PRESS SITE VIDEO CAPTURE AND EDITING SYSTEM UPGRADESolicitation: NNK10ZOS011Q Response Due: Feb 17, 2010Synopsis/Solicitation Combo - Posted on Jan 15, 2010
Amendment 01 - Posted on Feb 02, 2010Amendment 02 - Posted on Feb 04, 2010
Solicitation - Posted on Jan 15, 2010Site Visit Instructions - Posted on Feb 02, 2010Statement of Work - Posted on Feb 04, 2010
Posted: Jan 26, 2010 Center: GRCTitle: NASA GLENN RESEARCH CENTER - NORTH CAMPUS DEVELOPMENT OPTIONSSolicitation: B500-501 Response Due: Jan 29, 2010Synopsis - Posted on Jan 05, 2010Drawings - Posted on Jan 05, 2010INDUSTRY BRIEFING/SITE VISIT - Posted on Jan 13, 2010Site Visit Registration Extended - Posted on Jan 14, 2010INDUSTRY BRIEFING Presentation/SITE VISIT Register - Posted on Jan 20, 2010REMINDER and CLARIFICATION - Posted on Jan 26, 2010
Posted: Jan 22, 2010 Center: GRCTitle: RECOVERY - UNMANNED AIR SYSTEMS REQUIREMENTS
Solicitation: ARRA-PACEIII-NNC10TA20T Response Due: Jan 28, 2010Synopsis - Posted on Jan 22, 2010
Solicitation: NNH09ZEA001NN-SSFW1 Response Due: N/ASynopsis - Posted on Jan 22, 2010
Posted: Jan 12, 2010 Center: GRCTitle: RECOVERY ACT - OPERATIONAL REQUIREMENTS AND ANALYSIS SUPPORT FOR UNMANNED AIRCRAFT SYSTEMS ACCESS IN THE NEXT GENERATION AIR TRANSPORTATION SYSTEM
Solicitation: NNC10E387T Response Due: Jan 19, 2010Synopsis - Posted on Jan 12, 2010
Posted: Jan 08, 2010 Center: GRCTitle: NATURAL GAS SUPPLYSolicitation: NNC10ZFD006Q Response Due: Feb 11, 2010Synopsis/Solicitation Combo - Posted on Jan 08, 2010
Posted: Dec 29, 2009 Center: MSFCTitle: PARSIVEL LASER DISDROMETERSolicitation: NNM10323480Q Response Due: Jan 12, 2010Synopsis - Posted on Dec 29, 2009
Posted: Dec 28, 2009 Center: GRCTitle: RECOVERY ACT - ICING RESEARCH TUNNEL REFRIGERATION SYSTEMS UPGRADE - DESIGN BUILD
Solicitation: NNC09ZF031Q Response Due: Oct 09, 2009Synopsis/Solicitation Combo - Posted on Sep 23, 2009Attachments - Posted on Sep 23, 2009Attachments - Posted on Sep 23, 2009Attachments - Posted on Sep 25, 2009Questions & Answers - Solicitation No. NNC09ZF031Q - Posted on Oct 05, 2009Re-Posting of Questions and Answers - Posted on Oct 06, 2009Draft Statement of Work - Posted on Oct 29, 2009Posting of Phase II Request for Proposal - Posted on Nov 19, 2009Amendment 3 Q and A - Posted on Dec 02, 2009Amendment 4 Questions and Answers - Posted on Dec 14, 2009Amendment 5 Q and A - Posted on Dec 28, 2009
Solicitation: NNC10QA03D-TFOME-ARRA Response Due: Dec 28, 2009Synopsis - Posted on Dec 21, 2009
Posted: Dec 21, 2009 Center: GRCTitle: RECOVERY - VEHICLE SHAPING FOR LOW-BOOM SUPERSONIC AIRCRAFT
Solicitation: NNC10QA02D-TFOME-ARRA Response Due: Dec 28, 2009Synopsis - Posted on Dec 21, 2009
Posted: Dec 21, 2009 Center: GRCTitle: RECOVERY - ULTRA HIGH BYPASS DRIVE RIG REFURBISHMENT
Solicitation: NNC10QA05D-TFOME-ARRA Response Due: Dec 28, 2009Synopsis - Posted on Dec 21, 2009
Posted: Dec 01, 2009 Center: KSCTitle: LAUNCH AND LANDING EFFECTS OPERATIONS MODELINGSolicitation: NNK10319828 Response Due: Dec 09, 2009Synopsis - Posted on Dec 01, 2009
Posted: Nov 23, 2009 Center: NMOTitle: RECOVERY DEFORMATION ECOSYSTEM STRUCTURE AND DYNAMICS OF ICE RADAR ELEMENT PRE-PHASE A INSTRUMENT DESIGN
Solicitation: NMR711055 Response Due: Nov 24, 2009Synopsis - Posted on Nov 23, 2009
Posted: Nov 06, 2009 Center: GRCTitle: LEASE OF WAREHOUSESolicitation: NNC10ZFD001Rev1
Posted: Jun 18, 2009 Center: GRCTitle: AUTOMATIC PRESSURE CALIBRATION SYSTENSolicitation: NNC09ZCH019Q Response Due: Jun 25, 2009Synopsis/Solicitation Combo - Posted on May 28, 2009
Amendment 01 - Posted on Jun 17, 2009Amendment 02 - Posted on Jun 18, 2009
Statement of Work - Posted on May 28, 2009Answers to Questions - Posted on Jun 17, 2009
Posted: Jun 05, 2009 Center: GRCTitle: AUTOMATED BATTERY CYCLING TEST STANDS USING MITS SOFTWARESolicitation: 4200286547 Response Due: Jun 12, 2009Synopsis - Posted on Jun 05, 2009
Posted: Nov 13, 2008 Center: GRCTitle: GREAT LAKES SCIENCE CENTER PARTNERSHIPSolicitation: NNC09260289Q Response Due: Nov 20, 2008Synopsis - Posted on Nov 13, 2008
Title: STRATEGIC THINKING AND STRATEGY DEVELOPMENT-FOLLOW ON PROCUREMENTSolicitation: STSD2008-NDB Response Due: Apr 24, 2008Synopsis - Posted on Apr 17, 2008
Posted: Dec 03, 2007 Center: KSCTitle: NASA LAUNCH SERVICES - NOTIFICATION OF PLANNED REVISION TO NPD 8610.7Solicitation: NLS-RFP-10-99-021REVB Response Due: N/ASynopsis - Posted on Dec 03, 2007NASA LV Certification Requirements Matrix - Posted on Dec 03, 2007
Posted: Apr 24, 2007 Center: MSFCTitle: REQUEST FOR INFORMATION FOR THE CREW LAUNCH VEHICLE UPPER STAGESolicitation: RFI-CLV-US-2006 Response Due: Aug 11, 2006Synopsis - Posted on Mar 20, 2006
Modification 01 - Posted on Jul 21, 2006Solicitation - Posted on Nov 03, 2006Request For Information - Posted on Mar 20, 2006MAF Open House/Industry Day Charts - Posted on Apr 21, 2006CLV Upper Stage Planning Update - Posted on Jun 16, 2006Avionics Planning Update - Posted on Jun 26, 2006RFI for Pyrotechnics and Separation Systems - Posted on Jul 21, 2006Notice Of Intent - Posted on Aug 18, 2006RFI Update - Posted on Aug 18, 2006TPS Request for Information - Posted on Aug 18, 2006Request for Information Update - Posted on Oct 06, 2006Instrument Unit Request for Information - Posted on Oct 20, 2006RFI Update 11/14/06 - Posted on Nov 14, 2006November 21 Update - Posted on Nov 21, 2006Avionics Update RFI - Posted on Dec 19, 2006RFI Update - Posted on Dec 21, 2006RFI Update January 4, 2007 - Posted on Jan 04, 2007Instrument Unit Notice of Intent Update - Posted on Jan 26, 2007IU Acquisition Update - Posted on Mar 20, 2007Revised IU Acquisition Update - Posted on Mar 20, 2007IU Avionics DDT&E Support & Production Planning - Posted on Mar 23, 2007IU Avionics Clarification - Posted on Apr 24, 2007
Posted: Apr 04, 2007 Center: MSFCTitle: ARES I UPPER STAGE PRODUCTIONSolicitation: NNM07181505R Response Due: Mar 16, 2007Synopsis - Posted on Jan 04, 2007Solicitation - Posted on Feb 23, 2007
Amendment 01 - Posted on Mar 20, 2007Amendment 02 - Posted on Apr 04, 2007
Presolicitation Conference Charts - Posted on Jan 17, 2007DRFP Update - Posted on Feb 16, 2007