ANNEXURE V(C) JOINT SITE INSPECTION REPORT
12

ANNEXURE V(C)forestsclearance.nic.in/writereaddata/Addinfo/0_0... · consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane/2 lane

Aug 25, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ANNEXURE V(C)forestsclearance.nic.in/writereaddata/Addinfo/0_0... · consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane/2 lane

ANNEXURE – V(C)

JOINT SITE INSPECTION REPORT

Page 2: ANNEXURE V(C)forestsclearance.nic.in/writereaddata/Addinfo/0_0... · consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane/2 lane

DDeeppaarrttmmeenntt ooff RRooaadd TTrraannssppoorrtt aanndd HHiigghhwwaayyss

MMiinniissttrryy ooff RRooaadd TTrraannssppoorrtt && HHiigghhwwaayyss

GGoovveerrnnmmeenntt ooff IInnddiiaa

CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT

REPORT FOR REHABILITATION AND UPGRADING TO 2 LANE/2 LANE

WITH PAVED SHOULDERS CONFIGURATION AND STRENGTHENING

OF PORTBLAIR – MAYABUNDER - DIGLIPUR SECTION (KM 0.00 TO

KM 61, KM 104 TO KM 142 & KM 155 TO KM 333) OF NH-223 IN THE

UNION TERRITORY OF ANDAMAN & NICOBAR ISLANDS (PACKAGE

NO. SP/B/1)

JOINT SITE INSPECTION REPORT (MIDDLE STRAIT & HUMPHREY STRAIT CREEK BRIDGES)

November 2015

C E C Projects Pvt. Ltd. In JV with Chaitanya Projects Consultancy Pvt. Ltd 2nd Floor, Plot No. 21-22, R.K.Tower, Sector-4, Vaishali, Ghaziabad – 201010 Ph:- 0120-3223419, 4120472, Fax:- 0120-4110472 Email:- [email protected]

[email protected]

Page 3: ANNEXURE V(C)forestsclearance.nic.in/writereaddata/Addinfo/0_0... · consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane/2 lane

C E C PROJECTS

PVT. LTD

CHAITANYA PROJECTS

CONSULTANCY PVT. LTD.

Project: Construction of Creek Bridges along Middle St. & Humphrey St. Creek Document: 2011-03/P-70/DDPR/Brief Report DPR for Creek Bridges

0.1 Introduction

The Andaman Trunk Road (ATR) has been designated as NH-223 vide GOI MoRT&H Notification dated 25.08.2005 except the Chainages between Km. 61 to 104 and Km. 142 to 155. Subsequently, the entire ATR situated within the UT of Andaman & Nicobar Islands was designated as NH-223 vide GOI MoRT&H Notification dated 07.07.2008.

There are two missing links on NH-223 i.e. the First one is Middle Strait Creek which is between South Andaman Island & Baratang Island (at Km.107 of NH-223) and the other is Humphrey Strait Creek which is between Baratang Island & Middle and North Andaman Island (at Km. 130 of NH-223). NH-223 is the lifeline of Andaman Island. The movement of passenger & goods over these two creeks are carried out at present through vehicle ferry services which are also for a limited period & frequency. Moreover, the inter-island cargo movement per day works out to 63.34 MT (23120.64MT/365 days). The inter-island cargo movement is often disrupted due to bad weather conditions and therefore the connectivity between the Islands is in jeopardy. Therefore the construction of the two creek bridges is most essential. It is also essential on strategic considerations.

The present site of the 2-lane Creek Bridge at Middle Strait existing chainage, Km. 106.590 (on Middle Strait Jetty Side, South Andaman Island) and meets at existing chainage, Km. 107.762 (on Nilambur Jetty side, Baratang Island) and Humphrey Strait existing chainage, Km. 129.420 (on Gandhi Ghat Jetty Side, Baratang Island) and meets at existing chainage, Km. 130.600 (on Uttara Jetty side, Middle & North Andaman Island) are section of National Highway-223 . The proposed Bridges lies in Andaman & Nicobar Islands.

0.2 Joint Site Visit

A joint site visit of the demarcated forest land for approaches of proposed 2 nos. of Creek Bridges namely Middle Strait & Humphery Strait was conducted on 15 June 2015 with the following officials:

Assistant Commissioner, Middle Andaman

DFO, Ranghat & Baratang Forset Division

Tehsildar Rangat

Assistant Engineer, Rangat

Assistant Engineer, Baratang

Abhishek Gupta & Kaushik Mukherjee, CPC Pvt. Ltd ( Consultants)

DGPS reading of diverted area has been taken on 16 June 2015, in the presence of authorized revenue person.

0.3 Land Acquisition

The alignment for the bridges passes through reserve forest land on either side of

Middle Strait creek: Construction of the bridge shall required diversion of reserve forest land of 2.77 Ha. (approx). Requirement for diversion of forest land on Middle Strait Jetty Side, South Andaman Island is 1.18 Ha and on Nilambur Jetty side, Baratang Island is

1.59 Ha.

Page 4: ANNEXURE V(C)forestsclearance.nic.in/writereaddata/Addinfo/0_0... · consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane/2 lane

C E C PROJECTS

PVT. LTD

CHAITANYA PROJECTS

CONSULTANCY PVT. LTD.

Project: Construction of Creek Bridges along Middle St. & Humphrey St. Creek Document: 2011-03/P-70/DDPR/Brief Report DPR for Creek Bridges

Humphrey Strait creek: Construction of the bridge shall required diversion of reserve forest land of 1.81 Ha. (approx). Requirement for diversion of forest land on Gandhi Ghat Jetty Side, Baratang Island is 0.86 Ha and on Uttara Jetty side is 0.95 Ha

Details of Land acquisition for Middle Strait and Humphrey strait and provided in Appendix I and Appendix II respectively.

0.4 Compensatory Afforestation Land

4.60 Ha of revenue land has been identified in Baludera village of Baratang Island to be handed over to Forest department for compensatory afforestation. Joint site visit of the same has been conducted on 15.06.2015.

0.5 Trees

Total 763 numbers of trees are to be felled in both the bridges during construction. For Middle Strait 627 number of trees to be felled and for Humphery Strait 136 numbers are to be felled.

Details for the same are enclosed in Appendix-IA for Middle Strait Bridge and Appendix –IIA for Humphery Strait Bridge.

Page 5: ANNEXURE V(C)forestsclearance.nic.in/writereaddata/Addinfo/0_0... · consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane/2 lane

APPENDIX - II

Page 6: ANNEXURE V(C)forestsclearance.nic.in/writereaddata/Addinfo/0_0... · consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane/2 lane

Particulars Gandhi Jetty Side Uttara Jetty Side

1 Start/End of Alignment (m) 0 1450

2 Start of Mangroves (m) 180 1220

3 Start/End of Water Line (m) 480 920

4 Forest Area Length (m) 180 230

5 Mangrove/Swamp Area Length(m) 300 300

6 Length of Alignment in Water (m)

7 Forest Area (Ha) (18m Corridor) 0.32 0.41

8 Mangrove Area(Ha) (18m Corridor) 0.54 0.54

9 Area on Water (Ha) (18m Corridor)

10 Total Area for Diversion (Ha)

11 No of Trees 88 48

2.61

Summary of Forest Land Area affected due to construction ofHumphery Strait Creek Bridge

Humphrey Strait Creek BridgeS.No.

440

0.79

Page 7: ANNEXURE V(C)forestsclearance.nic.in/writereaddata/Addinfo/0_0... · consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane/2 lane

APPENDIX - IIA

Page 8: ANNEXURE V(C)forestsclearance.nic.in/writereaddata/Addinfo/0_0... · consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane/2 lane

300-600 600-900 900-1200 1200-1800 >1800

1 Nabha 1

2 Pema 1

3 Tejpat 1

4 Papita 1

5 Gadun 1

6 Kala Lakdi 1

7 Kala Lakdi 1

8 Badak 1

9 Puraiya 1

10 Lohra 1

11 Kusum 1

12 Pema 1

13 Kala Lakdi 1

14 Baur 1

15 Baur 1

16 Latau 1

17 Baur 1

18 Kala Lakdi 1

19 Kala Lakdi 1

20 Piglum 1

21 Kusum 1

22 Korkot 1

23 Korkot 1

24 Badak 1

25 Chiui 1

26 Chiui 1

27 Chiui 1

28 Chiui 1

29 Agya 1

30 Kala Lakdi 1

31 Kala Lakdi 1

32 Chiui 1

33 Kala Lakdi 1

34 Peepok 1

35 Korkot 1

36 Kala Lakdi 1

37 Latau 1

38 Katafal 1

39 Tejpat 1

Details of Trees to be felled for construction of Humphrey Strait Bridge

(Gandhi Ghat Side)

Tree

Nos.Tree Type

Girth (m)

Page 9: ANNEXURE V(C)forestsclearance.nic.in/writereaddata/Addinfo/0_0... · consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane/2 lane

300-600 600-900 900-1200 1200-1800 >1800

Details of Trees to be felled for construction of Humphrey Strait Bridge

(Gandhi Ghat Side)

Tree

Nos.Tree Type

Girth (m)

40 Piglum 1

41 Karayia 1

42 Chiui 1

43 Korkot 1

44 Kala Lakdi 1

45 Karayia 1

46 Kala Lakdi 1

47 Kala Lakdi 1

48 Kendu 1

49 Tejpat 1

50 Badak 1

51 Kala Lakdi 1

52 Tejpat 1

53 Kala Lakdi 1

54 Kala Lakdi 1

55 Kala Lakdi 1

56 Papita 1

57 Machun 1

58 Kala Lakdi 1

59 Papita 1

60 Zohra 1

61 Zohra 1

62 Kala Lakdi 1

63 Papita 1

64 Kala Lakdi 1

65 Kala Lakdi 1

66 Katsi 1

67 Katsi 1

68 Latau 1

69 Kala Lakdi 1

70 Badak 1

71 Dhoop 1

72 Peepok 1

73 Kala Lakdi 1

74 Kala Lakdi 1

75 Kala Lakdi 1

76 Kala Lakdi 1

77 Kala Lakdi 1

78 Pema 1

Page 10: ANNEXURE V(C)forestsclearance.nic.in/writereaddata/Addinfo/0_0... · consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane/2 lane

300-600 600-900 900-1200 1200-1800 >1800

Details of Trees to be felled for construction of Humphrey Strait Bridge

(Gandhi Ghat Side)

Tree

Nos.Tree Type

Girth (m)

79 Pema 1

80 Kala Lakdi 1

81 Agya 1

82 Agya 1

83 Agya 1

84 Kala Lakdi 1

85 Kendu 1

86 Kala Lakdi 1

87 Machun 1

88 Agya 1

Total Trees 46 22 4 4 12

Page 11: ANNEXURE V(C)forestsclearance.nic.in/writereaddata/Addinfo/0_0... · consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane/2 lane

300-600 600-900 900-1200 1200-1800 >1800

1 Coconut 1

2 Coconut 1

3 Coconut 1

4 Coconut 1

5 Coconut 1

6 Coconut 1

7 Coconut 1

8 Coconut 1

9 Coconut 1

10 Coconut 1

11 Coconut 1

12 Imli 1

13 Coconut 1

14 Coconut 1

15 Coconut 1

16 Imli 1

17 Coconut 1

18 Coconut 1

19 Coconut 1

20 Imli 1

21 Coconut 1

22 Coconut 1

23 Parak 1

24 Imli 1

25 Coconut 1

26 Coconut 1

27 Coconut 1

28 Coconut 1

29 Coconut 1

30 Coconut 1

31 Coconut 1

32 Coconut 1

33 Coconut 1

34 Coconut 1

35 Zinda Balli 1

36 Zinda Balli 1

37 Coconut 1

38 Coconut 1

39 Khari Perh 1

Details of Trees to be felled for construction of Humphrey Strait Bridge

(Uttara Jetty Side)

Tree

Nos.Tree Type

Girth (m)

Page 12: ANNEXURE V(C)forestsclearance.nic.in/writereaddata/Addinfo/0_0... · consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 lane/2 lane

300-600 600-900 900-1200 1200-1800 >1800

Details of Trees to be felled for construction of Humphrey Strait Bridge

(Uttara Jetty Side)

Tree

Nos.Tree Type

Girth (m)

40 Khari Perh 1

41 Coconut 1

42 Coconut 1

43 Badam 1

44 Coconut 1

45 Jamun 1

46 Jamun 1

47 Coconut 1

48 Coconut 1

Total Trees 9 13 23 3 0