Top Banner
Annexure 4 - Public Consultation Meeting at Cuddalore
29

Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

May 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

Annexure 4 - Public Consultation Meeting at Cuddalore

Page 2: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

Enclosure 1 Minutes of Meeting

Minutes of Public Hearing Meeting held on 30.09.2015 @ 10.30Hrs. in

“Vanniyar Thirumana Mandapam” Cuddalore regarding CDRRP.

The public hearing meeting was conducted by N-Arc, under the presidency of the District collector Thiru. S. Sureshkumar, IAS., on 30.09.2015.

The Superintending Engineer, Cuddalore Electricity Distribution Circle/Cuddalore

welcomed all the participants. Superintending Engineer gave a brief speech about the

CDRRP scheme.

A slide show was arranged to show the extent of damages occurred due to Thane

Cyclone on 30.12.2011 & how it was restructured by mobilizing the TANGEDCO staff from

all over the state.

Further, the benefits of conversion of the OH lines to UG cables were

explained

1) How the damages can be avoided during natural disaster.

2) How accidents can be avoided.

3) How the narrow street will appear after laying UG cables.

4) Traffic hindrances will be avoided due to erection of UG cable.

5) Interruption of supply will be reduced can considerably.

6) How environment is safeguarded, by chance of growing more trees, which has to be cleared if OH line exists.

Revenue District Officer

Gave a speech on how the CDRRP scheme is more important and by implementing

the scheme, electrical accidents, interruption can be avoided and requested that the

Page 3: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

public should Co-operate for the implementation of the scheme.

Cuddalore, Municipal Chairman

He requested to implement the project area by area (i.e) to complete the work

fully in one area and then to go for the other to avoid hindrance to public.

Page 4: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

N-Arc consulting: Team leader Mr.Tikko expressed that the survey process was

done for 7 months. By implementing the conversion of OH lines to UG cables, the supply

would be more reliable and people would not be affected by the disaster if any in future.

Also the town would become more beautiful, secure and safe. The project is

implemented by the financial support of World Bank, so as to reduce the risk during the

disaster.

Further, explained the RMS ring main system, by which if supply interruption

occurs in one DT it would be given by alternative routes.

By implementing the project OH line cut can be avoided, so that accident can be

avoided.

Also, theft of energy will be avoided.

Line loss in OH line transmission will be avoided and also reduced.

Also, safety & reliable power supply is possible.

The proposed UG line will be designed after considering the existing TWAD, PWD,

highways BSNL & other private communication networks.

By the implementation of the scheme indirect employment is also possible. He

requested the public to Co-operate while implementation of project.

He requested the public organization to raise their doubts.

1) Thiru. M. Nizamudeen, General Secretary Tamil Nadu Consumer Federation (GSTFET)

a) What is the impact of project on environment.

b) What safety aspect is provided when water logs occurs during rainy season.

c) How far it would create hindrance to the public while implementation.

d) The project may be handed over to some NGO’s, so that the fault in the

Page 5: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

scheme may be rectified.

2) Thiru. Balasubramaniyan, District Co-Ordinator Federation Consumer Organization,

Nellikuppam

Page 6: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

He emphasized that the red paint may be laid on the places where the UG

cable runs so as to alert the public on safety aspect.

3) Thiru. Raj Mohan, FEDCOT

He raised the doubt about the area of implementation of project. Whether

the project is implemented in whole district or in coastal area of Cuddalore or

Cuddalore Town. The scheme should have been implemented earlier. Since, Thane

has taken place nearly 4 years ago.

NGOS may be included in the scheme.

4) Thiru. Arulselvam, Tamil Nadu Consumer Education and Development Foundation (TAMCED-Foundation)

Raised a doubt whether the technical feasibility report has been given on social environment assessment.

5) Thiru. Manokaran, Manjakuppam

1) How the damages like road cuts, done during the implementation will be

restored.

2) How other networks line, breakage water lines, communication lines

damages will be avoided. 6) Thiru. Venkatramakrishnan, Fed cot- Joint Secretary

Whether the encroachment will be cleared and the cables will be laid or the

cables will be laid in the middle of the road.

7) Thiru. Ganesan, Koothapakkam Angeragan Consumer Saftey Organisation Whether the cables used for laying in underground would resist the natural calamities, disaster (or) it would create accidents.

8) Thiru. Harikrishnan

UG sewage system not yet completed in Cuddalore and public are facing

hindrances. Hence the hindrance to public should be reduced.

9) Thiru. Globe: CPI

Page 7: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

The detailed project should be given to the political parties, public

organization etc.,. It should be clear.

10Thiru. Kumaran: CONFET

Page 8: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

The cable used should be of all the international standards. So that it public

will not be affected by electricity.

11) Thiru. Sadupalli:

The trenches may be dug manually and not using machineries and the work

should be completed within 4 years.

12) Thiru. R.Elangovan: MSSRF

Standards of laying cables should be followed. Concrete structures should be used.

SPEECH GIVEN BY DISTRICT COLLECTOR

Cuddalore District is more affected by the natural disasters. Whenever the

natural calamities occurs, in our state Cuddalore is more affected. So, as a precautionary

measure in order to reduce the damages, the CDRRP project is implemented in

Cuddalore.

Electricity has become a part of people if there is no electricity, people is

affected immediately as water supply is affected. Cuddalore people have realized more

during “Thane” how electricity is more important & how employees of TANGEDCO all over

Tamilnadu came over to Cuddalore to restructure the network.

So, in order to avoid the above situation, with the help of World Bank Fund

of Rs.218 crores, over head lines are converted to underground cables. This is done in

Cuddalore Town and Cuddalore coastal areas.

The survey of network has been completed.

In this project, 7 feeders in Cuddalore town emanating from

Semmankuppam SS, Capper Hills SS and Nathapattu SS are to be converted into UG

cables.

This project will be implemented at time of less public movement and during

night hours. Also, in the places of schools, colleges & worship places, safety measures

would be considered. Environment will not be affected.

During the implementation of project the public will be informed through

Page 9: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

press news, about the project. Hence public may render their co-operation during the

implementation of the project.

Page 10: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

Explanation given by TANGEDCO Officials:

Town.

The CDRRP project is implemented in Cuddalore coastal areas and Cuddalore

This project is implemented in 7Nos 22 KV feeders with 33Kms of HT line and 1300Km LT lines.

The project is implemented in 3 phases in the following feeders.

1) Pentesia 22KV 2) Vandipalayam 22KV 3) Suthukulam 22KV

4) Cuddalore-NT 22 KV

5) Manjakuppam 22KV

6) Alpettai 22KV

7) Suthukulam 22KV

This project is implemented to avoid damages during natural disaster, to avoid

interruption, to avoid electrical accidents and to avoid human loss.

While implementation the area where project work is done will be informed to

public through newspapers.

Road cut, water line damages occurs if any the rectification works will be carried

out by TANGEDCO or its contractor.

Other Department help are required during implementation of project. OH lines will

be removed only after confirmation of successful project completion.

Explanation given by N-Arc about the project:

1) Survey work has been done completely and report to be submitted for review of TANGEDCO.

2) The proposed network has been framed after considering the existing networks

of water works, communication sewage system and highways so as to avoid

hindrances during implementation.

Page 11: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

3) The UG cable will be laid 1.2 meters below the ground in trenches.

4) RMS Ring Main System would be provided so as to provide alternate supply in interruption period.

5) Barriers would be provided in the places of work.

Page 12: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

6) Cleanliness would be maintained.

7) Safety precautions will be educated to people under work.

8) Environmental social management plan will be framed.

9) Damages like road cut, water line breakages will be rectified by contractor.

10) Insulation level will be more. UPC duct will be provided in road crossing.

List of participants:

1. Thiru. S.Sureshkumar I.A.S,District Collector, Cuddalore District, Cuddalore 2. Tmt. Umamageshwari, R.D.O., Cuddalore 3. Thiru. Kumar, Municipal Chairman, Cuddalore 4. Er. N.Sivanandam Superintending Engineer /CEDC/Cuddalore 5. Er.G.Kamaraj, Executive Engineer/O&M/Cuddalore

All AEEs/O&M of Cuddalore Division All AEs, JEs/O&M of Cuddalore Division Representatives of Consumer Organisation Stake holders and Public.

Superintending Engineer CEDC/Cuddalore

Page 13: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

Annex 4

Enclosure 2

Public notice for public Awareness program invitation by TANGECO Cuddalore

Page 14: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

Annex: 4

E l 3

Appreciation & Suggestion letter from Cuddalore district consumer & environment welfare protection sangam.

Page 15: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

Annex: 4

E l 3

Page 16: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

CLIE

NT: T

ANGE

DCO

N_AR

C CO

NSUL

TING

An

nex

4 .

A. E

xcer

pts o

f the

cons

ulta

tion

mee

ting

Cudd

alar

e

PLAC

E - C

UDDA

LORE

DA

TE: 0

1 /10

/201

5 S.

No

Nam

e

Sugg

estio

n / Q

uest

ion

TA

NGED

CO /

NARC

Rep

ly

1

Mr.N

izam

udhi

en

Desc

ribe

abou

t the

safe

ty m

easu

res a

nd

envi

ronm

enta

l effe

ct w

hile

exe

cutin

g th

e pr

ojec

t. Pu

blic

havi

ng p

robl

em w

hile

exe

cutin

g th

e dr

aina

ge

wor

k so

take

nec

essa

ry a

ctio

n to

avo

id su

ch

impa

cts i

n th

is pr

ojec

t. Ex

plai

n ab

out t

he ca

ble

rout

e id

entif

icatio

n an

d sa

fety

mea

sure

s. O

nly

30%

of

peo

ple

calle

d fo

r thi

s fun

ctio

n, in

vite

mor

e pe

ople

for a

war

enes

s pro

gram

. Alre

ady

unde

rgro

und

syst

em a

vaila

ble

in ch

enna

i and

take

th

e su

rvey

of d

ifficu

lties

in th

is sy

stem

and

avo

id

the

such

item

s her

e.

We

had

colle

cted

info

rmat

ion

and

safe

ty m

easu

res

in th

is fir

st st

age

of sc

hem

e an

d en

surin

g th

e ex

ecut

e th

e pr

ojec

t with

out p

ublic

dist

urba

nce.

We

had

dist

ribut

e th

e ou

r Env

ironm

enta

l and

Soc

ial

high

light

ed p

oint

s for

you

r rea

dy re

fere

nce,

eve

ry

100m

tr. c

able

mar

k id

entif

icatio

n sh

all b

e av

aila

ble

and

tren

ch d

epth

is m

axim

um 1

.2m

tr. a

nd

unde

rgro

und

cabl

ing

is sa

fety

and

sam

e sy

stem

av

aila

ble

in ch

enna

i. En

viro

nmen

tal a

nd S

ocia

l ex

pert

s are

colle

cted

the

deta

ils a

nd th

is w

ill

inco

rpor

ate

in th

eir r

epor

t and

also

PM

U

cons

ulta

nt a

lso e

nsur

e th

e sa

me.

2

Mr.B

ala

Subr

aman

ian

Cudd

alor

e is

cyclo

ne a

ffect

ed a

rea

and

we

are

wel

com

ing

this

proj

ect f

or o

ur a

rea.

Exe

cute

the

proj

ect w

ithou

t pub

lic d

istur

banc

e an

d af

ter

inst

allin

g th

e ca

ble

mar

k th

e id

entif

icatio

n m

arl i

n th

at ro

ute

and

expl

ain

abou

t the

Than

ks fo

r you

r app

recia

tion

and

supp

ort.

We

shal

l pr

ovid

e ca

ble

rout

e m

arke

r in

com

plet

e ca

ble

rout

e w

ith 1

00m

tr. I

nter

val a

nd w

e ha

d co

nsid

ered

the

publ

ic sa

fety

and

min

imize

the

dist

urba

nce.

Page 17: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

CLIE

NT: T

ANGE

DCO

N_AR

C CO

NSUL

TING

An

nex

4 .

A. E

xcer

pts o

f the

cons

ulta

tion

mee

ting

Cudd

alar

e

PLAC

E - C

UDDA

LORE

DA

TE: 0

1 /10

/201

5 S.

No

Nam

e

Sugg

estio

n / Q

uest

ion

TA

NGED

CO /

NARC

Rep

ly

3

Mr.M

arut

hava

anan

Ther

e w

ill b

e th

e ch

ance

to in

crea

se th

e se

a le

vel

upto

2 fe

et a

nd ch

ance

to se

a w

ater

will

reac

h up

to

1/4 k

M fr

o th

e pr

esen

t lev

el. P

rovi

de co

ncre

te /

GI

pipe

whi

le ca

ble

dept

h m

ore

than

3 1

/2 fe

et.

Cons

ider

all

this

in th

is sc

hem

e.

Than

ks fo

r you

r sug

gest

ion

and

we

will

inco

rpor

ate

the

sam

e in

our

repo

rt. W

e sh

all c

onsid

er co

ncre

te

/ GI /

DI p

ipe

for r

oad

cros

sing

and

railw

ay cr

ossin

g w

ith sp

are.

Our

cabl

e tr

ench

is m

axim

um 1

.2 M

tr

and

burie

d ca

ble

tren

ch.

Page 18: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

CLIE

NT: T

ANGE

DCO

N_AR

C CO

NSUL

TING

An

nex

4 .

A. E

xcer

pts o

f the

cons

ulta

tion

mee

ting

Cudd

alar

e

PLAC

E - C

UDDA

LORE

DA

TE: 0

1 /10

/201

5 S.

No

Nam

e

Sugg

estio

n / Q

uest

ion

TA

NGED

CO /

NARC

Rep

ly

4

Mr.R

amku

mar

We

are

expe

ctin

g th

is pr

ojec

t fro

m th

e Ta

miln

adu

Hono

rabl

e Ch

ief M

inist

er a

nnou

nced

in a

ssem

bly.

As

per

you

r sta

tem

ent s

urve

y w

orks

com

plet

ed in

6

mon

ths a

nd w

ork

will

be

star

t on

afte

r 6 m

onth

s. Cy

clone

may

com

e an

y tim

e so

we

requ

est y

ou to

ex

ecut

e th

e sc

hem

e as

muc

h po

ssib

le. I

n cu

ddal

ore,

m

onso

on p

erio

d w

ill st

art t

his

mon

th a

nd y

ou

cons

ider

all

thos

e th

inks

and

exe

cute

the

wor

k.

Expl

ain

the

area

cove

red

in th

is sc

hem

e. In

last

SE

mee

ting,

TAN

GEDC

O to

ld su

rvey

wor

ks n

ot

com

plet

ed b

ut n

ow y

ou a

re te

lling

wor

k co

mpl

eted

. Pr

ovid

e th

e co

rrec

t inf

orm

atio

n. E

ndow

men

t co

mm

ittee

cost

to b

e ad

ded

in y

our r

epor

t.

Than

ks fo

r you

r sug

gest

ion.

We

intim

ated

the

field

w

orks

had

com

plet

ed a

nd d

raft

repo

rt su

bmitt

ed

to T

ANGE

DCO

for c

omm

ents

. We

shal

l spe

edup

the

wor

k as

muc

h po

ssib

le. T

his s

chem

e co

vers

cu

ddal

ore

tow

n an

d co

asta

l are

a w

ith se

ven

area

s el

ectr

ical l

ine.

It co

vers

333

kM H

T lin

e an

d 13

00 LT

lin

e. P

rese

ntly

we

desig

ned

the

cabl

e ro

ute

with

out

dist

urbi

ng th

e ot

her p

ublic

serv

ices b

y th

e co

ordi

natio

n w

ith o

ther

dep

artm

ents

and

dam

ages

w

ill b

e im

med

iate

ly re

cove

red

by

TANG

EDCO

/ Co

ntra

ctor

. We

had

cons

ider

the

Endo

wm

ent

com

mitt

ee co

st a

lso.

Page 19: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

CLIE

NT: T

ANGE

DCO

N_AR

C CO

NSUL

TING

An

nex

4 .

A. E

xcer

pts o

f the

cons

ulta

tion

mee

ting

Cudd

alar

e

PLAC

E - C

UDDA

LORE

DA

TE: 0

1 /10

/201

5 S.

No

Nam

e

Sugg

estio

n / Q

uest

ion

TA

NGED

CO /

NARC

Rep

ly

5

Mr.K

anna

n

Prep

are

envi

ronm

enta

l and

socia

l pla

n fo

r ana

lyzin

g th

e pu

blic

affe

cts.

In th

e tim

e of

exe

cutio

n, d

ispla

y th

e En

gine

er /

Inch

arge

cont

act n

umbe

r and

det

ails

then

pub

lic sh

all b

e co

ntac

t the

m if

ther

e is

inco

nven

ienc

e.

Than

ks fo

r you

r sug

gest

ion.

We

had

prep

ared

the

Envi

ronm

enta

l & S

ocia

l rep

ort b

y ou

r exp

erts

and

w

e sh

all s

ubm

it th

e sa

me.

We

shal

l inc

orpo

rate

yo

ur su

gges

tion

in o

ur re

port

and

in

the

time

of

exec

utio

n, co

ntra

ctor

shal

l disp

lay

the

com

pany

an

d w

ork

inch

arge

det

ails

in w

orki

ng p

lace

.

6

Mr.M

anim

aran

We

are

wel

com

ing

this

proj

ect.

We

have

to

cons

ider

the

redu

ce th

e he

socia

l cos

t and

it is

less

th

an p

roje

ct co

st. P

rovi

de th

e es

cape

pla

n fro

m th

e tim

e of

cyclo

ne a

nd d

escr

ibe

actio

n to

be

take

n by

th

e of

ficer

s and

pub

lic.

Than

ks fo

r you

r sug

gest

ion

and

supp

ort.

Now

onl

y su

rvey

wor

ks a

re co

mpl

eted

and

nec

essa

ry

arra

ngem

ent t

o be

take

n in

the

next

stag

es. W

e sh

all i

ncor

pora

te y

our s

ugge

stio

n in

our

repo

rt.

Page 20: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

CLIE

NT: T

ANGE

DCO

N_AR

C CO

NSUL

TING

An

nex

4 .

A. E

xcer

pts o

f the

cons

ulta

tion

mee

ting

Cudd

alar

e

PLAC

E - C

UDDA

LORE

DA

TE: 0

1 /10

/201

5 S.

No

Nam

e

Sugg

estio

n / Q

uest

ion

TA

NGED

CO /

NARC

Rep

ly

7

Mr.T

hiru

mal

avan

an

We

have

bad

exp

erie

nce

in th

e ot

her p

ublic

serv

ice

tren

ches

. Due

to im

prop

er b

ackf

illin

g, p

ublic

hav

e di

stur

banc

e w

hile

trav

ellin

g an

d ex

plai

n ab

out t

he

proj

e ct e

xecu

tion

by a

rea

wise

or c

ompl

ete

cudd

alor

e in

the

sam

e tim

e.

Than

ks fo

r you

r sug

gest

ion.

Con

trac

tor s

hall

exec

ute

the

proj

ect p

acka

ge w

ise a

lso a

rea

wise

an

d ba

ckfil

ling

shal

l be

done

pro

perly

afte

r cab

le

layi

ng w

ith co

nsid

erin

g av

oid

publ

ic da

y to

day

ac

tiviti

es.

Alre

ady

tele

phon

e, w

ater

and

dra

inag

e lin

es a

re g

oing

und

ergr

ound

and

this

is ch

alle

nge

to

do o

ur e

xecu

tion

with

out d

istur

bing

the

othe

r pu

blic

serv

ice a

nd w

e re

ques

t you

r sup

port

whi

le

exec

ute

the

proj

ect.

Page 21: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

CLIE

NT: T

ANGE

DCO

N_AR

C CO

NSUL

TING

An

nex

4 .

A. E

xcer

pts o

f the

cons

ulta

tion

mee

ting

Cudd

alar

e

PLAC

E - C

UDDA

LORE

DA

TE: 0

1 /10

/201

5 S.

No

Nam

e

Sugg

estio

n / Q

uest

ion

TA

NGED

CO /

NARC

Rep

ly

8

Mr.G

anes

an

We

are

wel

com

ing

this

proj

ect.

we

have

dou

bt o

n th

e sa

fety

of t

he u

nder

grou

nd ca

blin

g sy

stem

whi

le

road

cros

sing,

brid

ge cr

ossin

g an

d fe

asib

ility

of t

he

cabl

e in

cyclo

ne.

Than

ks fo

r you

r sug

gest

ion

and

supp

ort.

Unde

rgro

und

cabl

ing

is m

ore

safe

r com

pare

d to

Ov

erhe

ad, w

e ha

d pr

opos

ed p

ipes

for r

oad

cros

sing

,railw

ay cr

ossin

g an

d br

idge

cros

sing.

We

had

prop

osed

our

cabl

e tr

ench

dep

th is

1.2

Mtr

and

co

nsid

er th

e sa

fety

mea

sure

s in

this

syst

em.

9

Mr.B

aska

r

Exec

ute

the

wor

k as

muc

h po

ssib

le, c

onsid

er th

e ra

inin

g se

ason

and

bac

kfill

ing

s to

be d

one

with

out

dela

y.

Than

ks fo

r you

r sug

gest

ion

and

we

shal

l con

sider

th

e sa

me.

10

Mr.R

ajan

We

are

wel

com

ing

this

proj

ect a

nd c

ircul

ate

the

plan

det

ails

to w

elfa

re o

rgan

izatio

n fo

r exe

cute

pr

ojec

t in

prop

er m

anne

r and

in ti

me.

Than

ks fo

r you

r sug

gest

ion.

In th

is fir

st st

age

we

had

com

plet

ed su

rvey

wor

ks a

nd w

e sh

all e

xecu

te

the

proj

ect w

ith co

nsid

erin

g te

chni

cal e

xper

ts a

nd

wel

fare

org

aniza

tion

idea

s and

com

plet

ing

the

proj

ect a

s muc

h ea

rlier

.

Page 22: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

CLIE

NT: T

ANGE

DCO

N_AR

C CO

NSUL

TING

An

nex

4 .

A. E

xcer

pts o

f the

cons

ulta

tion

mee

ting

Cudd

alar

e

PLAC

E - C

UDDA

LORE

DA

TE: 0

1 /10

/201

5 S.

No

Nam

e

Sugg

estio

n / Q

uest

ion

TA

NGED

CO /

NARC

Rep

ly

11

Mr.P

eriy

asam

y W

e ar

e w

elco

min

g th

is pr

ojec

t and

exe

cute

the

proj

ect w

ith fu

lly tr

ansp

aren

t and

inte

rnat

iona

l st

anda

rds.

Than

ks fo

r you

r sug

gest

ion.

We

had

cons

ider

the

inte

rnat

iona

l sta

ndar

ds a

nd cl

ient

spec

ifica

tion.

12

Mr.R

aman

ujam

M

axim

um co

nsid

er th

e m

anua

l exc

avat

ion

and

back

fillin

g to

be

com

plet

ed a

s muc

h po

ssib

le.

Than

ks fo

r you

r sug

gest

ion.

We

had

cons

ider

the

sam

e.

13

Mr.M

arut

ham

uthu

In

chen

nai a

nd p

ondi

cher

y, n

o el

ectr

ical l

ine

in th

e ra

inin

g se

ason

and

tow

n ha

s nea

t loo

k. In

the

sam

e re

ason

we

are

wel

com

ing

the

proj

ect h

ere.

Than

ks fo

r you

r sug

gest

ion

and

supp

ort.

Page 23: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

Enclosure 5

Lists of participants attended

Page 24: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion
Page 25: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion
Page 26: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion
Page 27: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion
Page 28: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion

Annex 4

Enclosure 6

Constructing Underground cable with safety. Requested in awareness meeting

In Cuddalore underground electrical cable: Public consultation programme

Page 29: Annexure 4 - Public Consultation Meeting at Cuddalore Hearing...Annex 4 . A. Excerpts of the consultation meeting Cuddalare PLA CE - CUDDALORE DATE: 01 /10/2015 S. No Name Suggestion