Top Banner
ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011
35

ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

Mar 31, 2015

Download

Documents

Gordon Pigg
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

ANGUS BIOFUELS

PRESENTATION

FORESTRY ENGINEERING GROUP

8TH SEPTEMBER 2011

Page 2: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

ANGUS BIOFUELS

UNIT 1 – ECO PARK CARSEVIEW ROAD FORFAR DD8 3BS

FUEL SUPPLIERS

BILL WATSON TEL: 01307 466699 FAX: 01307 462278 E-MAIL:- [email protected]

Page 3: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

ANGUS BIOFUELS

MAIN BUSINESS ACTIVITIES FORESTRY OWNER

WOODCHIP PRODUCER

BOILER INSTALLATION

HEAT SUPPLY CONTRACTS

Page 4: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

BIOMASS PLANT

SITUATED AT DRAGONHALL FARM, PADANARAM, BY FORFAR

OPENED BY JOHN SWINNEY

PROJECT COSTS: £1.2 MILLION

Page 5: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 6: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

ISSUES IN SETTING UP PLANT

LOCATION TO TIMBER SUPPLY LOCATION TO BOILERS CAPITAL COST GRANT ASSISTED BY SSBS QUALITY OF CHIP MOISTURE CONTENT OF CHIP SIZE OF CHIP HANDLING OF WOOD FROM FOREST TO

BOILER

Page 7: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

BIOMASS PRODUCTS

WOOD CHIPS – WET - ABOVE 30% M.C.

WOOD CHIPS – DRY – BELOW 25% M.C.

WOODCHIPS DRIED BY –NATURAL DRYINGARTIFICIAL DRYING

Page 8: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

CHIPPERS

HEIZOHACK 400 SCREEN CHIPPER

JUNKKARI 500 DRUM CHIPPER

JENZ 561 CHIPPER

Page 9: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 10: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 11: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

STORAGE OF TIMBER/CHIP

AIR DRYING = 5000 TONNES

AT ROADSIDE = 3000 TONNES

DRY CHIP = 2000 TONNES

Page 12: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 13: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 14: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 15: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 16: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 17: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 18: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

WOODCHIP OUTPUT

MAXIMUM OUTPUT =100 TONNES OF DRY CHIP PER DAY

I.E. 400,000 kWhrs OF HEAT

TYPICAL HOUSE WILL USE APPROX 100 kWhrs

TYPICAL PRIMARY SCHOOL WILL USE APPROX 5000 kWhrs

Page 19: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

DELIVERY OF WOODCHIP

ARTICULATED LORRY HI-LIFT TRAILER BULK TRAILER BLOWER TRAILER BULK BAGS

Page 20: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 21: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 22: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 23: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

BOILER INSTALLATIONS

CHOICE BETWEEN –WOODCHIP OR WOOD PELLET

DRY WOODCHIP – LESS THAN 25% MC GENERALLY LARGER INSTALLATIONS LARGER FUEL STORAGE FACILITIES LOWER FUEL COSTS THAN PELLETS AT

PRESENT. AROUND 3.5p/kWhr LONG SHELF LIFE

Page 24: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

WET WOODCHIP- ABOVE 30% M.C. VERY LARGE BOILERS & POWER

STATIONS MORE DELIVERIES PER ANNUM MORE CONTAMINATION SHORT SHELF LIFE DUE TO

COMPOSTING & MOULDING PRICE SIMILAR TO DRY WOODCHIP

Page 25: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

WOOD PELLETS IDEAL FOR SMALLER BOILER

INSTALLATIONS LESS BULKY MORE EXPENSIVE – AROUND 4.5p/kWhr CAN BREAK DOWN IF GET DAMP OR WET LIMITED SHELF LIFE

Page 26: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

BOILERS INSTALLED – 10KW TO 600KW

BINDER FROELING VETO CALIMAX JANFIRE SONNYS GILLIES – Under consideration

Page 27: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

CHOOSING A BOILER

WHAT SIZE DO I NEED AND WHEN DO I NEED HEAT?

HOW SOPHISTICATED DO I NEED? FUEL STORAGE AND DELIVERY? BACK-UP SERVICE? GO AND LOOK AT INSTALLED EXAMPLES ASK QUESTIONS DOES IT COMPLY WITH THE LOCAL

ENVIRONMENTAL CRITERIA?

Page 28: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 29: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 30: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 31: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

HEAT SUPPLY CONTRACTS

FACTORS TO CONSIDER COST OF BOILER AND INFRASTRUCTURE PRICE FOR FUEL COST OF DELIVERY COST OF MAINTENANCE COST OF CLEANING/DE-ASHING SINKING FUND PROFIT

Page 32: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 33: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 34: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.
Page 35: ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

THANK YOU.

DO YOU HAVE ANY QUESTIONS?