Àngela Vilaplana Mira
n g e l aVilaplana Mira
VITAL DATA Birth: March 2, 1990Address: Sant Cugat, 118. 08201 Sabadell, BarcelonaPhone: +34 93 725 41 39Cellullar ph.: +34 606 010 334ID: 47180877 BEmail: [email protected]
ACADEMIC TRAINING
Actuality: Master in Design and Production of spaces
2008 Sept- Architecture degree at Escola Tcnica Superior2015 June: dArquitectura del Valles. (ETSAV, Sant Cugat)
2011-2012: Exchange course of Architecture degree (Erasmus) at Universitt Liechtenstein.
2006-2008: High School diploma at Escola Pia de Sabadell.
ADDITIONAL TRAINING
2015 Set-Oct: Revit Course
2014 Oct- Professional and advanced course of Feng Shui2015 June: & Ba Zi at Escola Feng Shui Natural in Barcelona
2013 Oct- Professional course of Feng Shui at Escola Feng 2014 June: hui Natural in Barcelona
2014 Feb: Photoshop for Architecture Workshop an&
2013 August: EASA Workshop in Slovenia (European Architecture Students Assembly)2012 Oct: Volunteering at OHB(Open House Barcelona)
2012 July: EASA Workshop in Finland (European Architecture Students Assembly)
FOREIGN LANGUAGES
Catalan: Mother TongueSpanish: NativeEnglish: Actuality: Attending a Proficiency course 2013 Sep-2014 Jul: Oral course of Proficiency level 2013 March: Certificate in Advanced English of Cambridge 2008: First Certificate of Cambridge Summer english studies abroad: 2009: Edinburgh 2006: Edinburgh 2008: Oxford 2005: London 2007: LimerickFrench: Beginner
WORKING EXPERIENCE related to architecture or design
COMPUTER SKILLS Microsoft Office Advanced Adobe Photoshop Advanced V-Ray AdvancedAutoCAD 2004-2013 Advanced Adobe InDesign Advanced Sketchup AdvanceMicrostation V8 User Adobe Illistrator User Revit User
Macintosh OSX, Windows XP-8
2014 Nov-2015 Jan: Design of the scientific magazine of oftalmovilaplana.
2014 Jul- Nov: Internship at Benot Cruysmans Architects in Brussels, Belgium.
2014 Jan- March: Internship at BomaInpasa in Barcelona.
2013 Sep-2014 Jan: Junior teacher at the introduction course of architecture in ETSAV.
2013 Des-March: Controlling the interior restoration of a flat in the eixample, Barcelona.
2012 Oct: volunteering at OHB (Open House Barcelona).
2012 Set- Oct: controlling the interior construction of the restaurant Kurz&Gut at la maquinista.
INTERESTS
Travelling, photography, reading, skiing, cooking, trekking, dancing, jogging, cycling and making pottery
Urban quality design, Uni Li
This portfolio includes some of the work Ive done since I began my studies on architecture at the Escola Tecnica Superior d'Arquitectura del Valles (ETSAV)-Universitat Politecnica de Catalunya, Sant Cugat, Barcelona, Catalonia (Spain) in 2008.It is a summary in which you can appreciate my knowledge in the representation and carrying out of projects as well as in the different tools used. If, by any chance, you were interested in knowing the development in full of a particular project, I would gladly make it available to you.
Easa Workshop, Slovenia 2013
MASTERS WORK:
INSTALLATION: Llum BCN 2016: Bany de Roig. INTERIOR DESIGN: Intellectual nest. INTERIOR DESIGN: Mn Llibre 2016: La ciutat de les lletres.
ACADEMIC PROJECTS:
PUBLIC FACILITY: Final Thesis: Can Monmany; Integration in reverse. PUBLIC FACILITY: Library and Kindergarten. PUBLIC FACILITY: Assisted residence for the elderly at Hospital del Mar. PUBLIC FACILITY: Community Hall: Connecting Knot. URBAN PLAN: Social Bioscapes HOUSING: Dwelling complex with level changes inside.
PROFESIONAL WORK:
HOUSING: Isolated single family dwelling HOUSING: Detached single family dwelling HOUSING: Refurbishment and expansion of an isolated single family dwelling HOUSING: Detached single family dwelling
CONTENT
Fullness installation. Master in Design & Production of Spaces.
Masters Work
Llum BCN 2016: Bany de RoigPalau del Lloctinent s courtyard, Barcelona, Catalonia.7 weeks, February 2016, Installation designed and constructed. Master in D.&P. of Spaces
The project was designed and realized by 24 students. We were working on the field of perception, so we wanted to show how the bodies react under the saturation of colour through the light. We wanted it to be an experiential project for the visitors, an experiment where the viewer became the experiment itself. How the surrounding is seen depending on the light it has.The project consisted on saturating the place with red light, so the visitor saw everything in black&white. The central part of the courtyard was closed with black courtains so the visitor couldnt see it from the ground floor and he was pushed to go upstairs to experiment the installation. There were some little green lights hanging in the middle of the courtyard, being a constallation. As we wanted it to be an interactive project, and to reach the final emphasis, the user could throw one of this little green lights to the courtyard, as a wish. So it was creating a rain of green lights that were beeing acomulated at the courtyard. Being the green the complementary colour of the red, it increased the effect of the red being more red, and the green being more green than they really were.
Installation
Render of the design Installation
Installation Installation
Intellectual nestEspai Carmen Galofr. Consell de Cent street, 331, Barcelona, Catalonia.6 weeks, April 2016, Interior Design. Master in D.&P. of Spaces. With Jos Antonio Sosa & Arelhi Subiaur
The aim of the project is to rethink and renovate the art gallery Espai Carmen Galofr to atract people with the minimum cost and respecting the past and the actual architecture. There are 3 different spaces: the entrance, the convenctional gallery and the multifunctional space at the back, after a small courtyard.The strategies to atract people are to bring the interior space to the street to be more visible; adding Information of the artist at the showcase in a way that you can see the interior; and the reception is removed from the entrance to be placed at the other side of the room. Then, to make people stay and see the whole place there are three different strategies. The first one is to show the way with the art of the artist itself. In this case, it was proposed to place small paintings of Muxart at the ceiling. The second one is to generate a selfservice area in the middle of the way, being the center of the place. And the last one is to connect visually the front space with the back one, so the window is enlarged to be able to see that the exposition continues behind the courtyard. It will be done.Another added problem of the place is where to buy and sell the art if we are pretending to have more people inside. It is solved at the actual office in the upper floor.According to the general style of the space, the project adds some vintage furniture all along the way, and at the multifunctional area there is easy movable furniture.
NIU INTEL.LECTUAL
Crash the art gallerys concept Warm and friendly atmosphere. Like a home. Place to read, study or be with friends. Confortable
Main ideas
Conservation of the actual space
Levels
Window connection
Ground floor
Section
Window connection of the two spaces from the inside and the outside
Informacin del espacio Informacin del artista Informacin del espacio / Seguridad
rea de autoservicio
Bodega/ Limpieza
Wc
Jardn
rea multifuncional
Area 1
Area 2
Area 3
Outside Artists Information Reception
Wc Wc
Storage
Multifunctional Area Storage
Courtyard
Self-service area
Mn Llibre 2016: La ciutat de les lletresCentre de Cultura Contempornia de Barcelona (CCCB), Barcelona, Catalonia.6 weeks, April 2016, Interior Design. Master in D.&P. of Spaces.
The idea of the project was designed by the group I was, a group of 6 people, and the project was constructed by 20 people. In the event Mn Llibre there are lots of different spaces. This one is just accessible for kids from 8 to 12 years old so they feel happy to have their own space. The project wants to be a small city, the city of arts and letters. It pretends that kids enjoy reading through the urban space. Reading is always implied in our way through the cities: traffic signs, posters, ads and images that we recieve and process without being concious of it. Thats why the project recreates a urban image. The place is filled with components of the daily life, the street art, and other elements that recreate the image of a city as imaginary as real.Walls are covered with newspapers and graffittis, there are shelfs built with fruit boxes, scaffolds, tires, traffic cones as lamps, games drawn on the floor and a lot of books everywhere.
Result
Initial Space Render of the design
ResultResult
Easa Workshop, Finland 2012
Academic Projects
Can Monmany; Integration in reverse.Valldoreix, Sant Cugat del Valls, Catalonia.25 weeks, June 2015, Public facility design, ETSAV. FINAL THESIS
The aim of the project is to renovate an old country house as a day centre and residence for deep disabled people, what is really needed in that city, together with a horse riding centre. Thanks of mixing these uses, these people can regularly have horse assisted therapy, what is really good for them, and it also finances the centre. It is placed at the limit between the city and the mountain so it is surrounded by nature. The building is created by the program, its relations and the gradation from public to private. It is adapted to the existent platform as a limit for the construction and it opens to the nature, to the views. It needs to be totally accessible.A new building is the connecting knot between the two old ones, and the main part of the old house is the connecting knot between the two new parts, being always the highest.The new construction of the residence and the kitchen are made with cross laminated timber walls and roof as structure. It is seen from the inside. The access and the multi-use room are made with laminated timber beams and columns together with cross laminated timber roof. They all have ventilated faades of timber and the roof is finished with zinc sheeting.The residence is composed by three living modules that each of them has 10 users, its own services and its common room.Heating is provided by geothermal energy as well as hot water.
Existent
Proposal
Strategy
Demolition New - old relations Group formation Limits treatment
RECEPTIONBAR/
CAFETERIA
CHANGING ROOMS
CHANGINGROOMS
CONTROLAREA
COMMONAREA
STORAGECLEAN CL.WC &
SHOWERS
BEDROOMS
PERSONAL WC
CONTAINMENTROOM
EXTRABED ROOM
HAIRDRESSER
STORAGE
ADAPTEDWC
STRETCHERROOM
MEETINGROOM
DINNINGROOM
KITCHEN
GYMSWIMMING
POOL
CLASSROOMS
SENSORYSTIMULATION
PROFESSIONALBUREAU
MULTI-USEROOM
ADMINISTRATION
HARNESS ROOMS FIELDS
TRAINING(60x20m)
publicprivate
THERAPY(15x25m)+ ramp
DUNG HEAP
PADDOKS
STABLES(boxs 2x3min)
EXTERIOR
SOCIALROOM
ACCESS
EXTERIOR
DAY CENTERFOR DISABLED
FACILITIES
SMALLPROGRAM
BIGPROGRAM
PERSONAL
LIVING MODULE
CHANGINGROOMSREST ROOM
LOUNDRY
STORAGE &CLEANING R.
RESIDENCEFACILITIES
HORSE RIDING CENTER FACILITIES
Functional program
Ground floor & South faade
1st Floor & 2nd Floor
-1 Floor
View to the horse riding center
Sout
h co
urty
ard
Interior courtyard of the residence
Living module
Residence construction
D2D1
D3 D4
D1
D2
D4
D3
Multiuse room construction
D2D1 D3
D3
D2
D1
Existent-new construction
D1 D2 D3
D1
D3
D2
Model
Und
er c
onst
ruct
ion
Library & kindergarten.Poble Nou, Barcelona, Catalonia.16 weeks, June 2014, Public facility design, ETSAV.
This project consists on creating a library and a kindergarten in a plot of Barcelona. The construction is formed by the connections of the pieces of each program. It seems to be a unique building from the outside but there are two. There is a common central area for the two programs where the accesses are. The whole construction is at ground floor to not create shadows in any courtyard, except from the founds of information area of the library, what is in the north part of the plot. There is always a view to a courtyard when you go into any of the buildings and all the children rooms are facing the south. It is built by beams and columns of white reinforced concrete and unidirectional floor. The walkway of the founds of information area is hold by suspenders from the beams. Faades are finished mortared onto a specific system of thermal isolation. And roofs are non-trafficable finished with gravel.
Plot access
Kind
erga
rten
Libr
ary
Conections from the access
Access to the buidings
Orientation: Kids to the south
Interior-exterior relation in the access
Necessity of vehicular access
campus
Justification.
campus
Uses connections diagram.
EXTERIORRest roomManagementInner work room
Newspapers and magazinesMusicFunds of information, study
Vehicular access
+ storage
Access
Childrens area Multi-use area
Documentary archive
+ pblic
+ privat
Inner work area
Support area
Formation areaGeneral
area
EXTERIOR
Keep-strollersWc
Kitchen + pantryLaundryChanging rooms
Service
Classrooms(SE)
Courtyard
Multi-use room
Vehicular access
+ storage
Childrens area:
Management Educators room
Administration
Access
View of the central courtyard looking to the kindergarten.
Prin
cipa
l ent
ranc
e
Courtyard infront of the library
Ground Floor & 1st Floor
Kind
erga
rten
acc
ess
Library access
Kindergarten construction.
Library construction.
Assisted residence for the elderly at Hospital del Mar.Barcelona, Catalonia.16 weeks, June 2013, Public facility design, ETSAV.
The aim of the project is to build an assisted residence for the elderly inside the hospital del mar plot. It is placed in the abandoned structure which was meant to be the beggining of a new hospital but the construction was stopped 7 years ago. It takes profit of the level changes inside to separate the public area from the private one. They are related with public catwalks placed in the private level. At the upper levels, the public exterior is related to two floors which are protected from the sun with big horizontal slats to not disturb to the views from the interior, and awnings at the roof. From the public spaces you cannot see the interior of the rooms. The project changes the conventional bedroom for a new one because all the users are meant to live in the same conditions. The air instalation goes through the ceiling and the heating through the floor.
Existent Level changes Relating areas with catwalks Two floors related to the big public exterior
Wrapping the exterior
Strategy
Public space of the 1st floor.
Common Access
Groud floor
1st Floor
3rd
Floo
r cat
wal
k
Public exterior area at 2nd Floor
2nd Floor
3rd Floor
4th Floor
ModuleCo
nven
ctio
nal r
oom
for r
esid
ence
s
Room
s of
the
proj
ect
Community Hall: Connecting Knot.Lustenau & Widnau, Austria & Switzerland.8 weeks, January 2012, Public facility design, Uni Liechtenstein.
The aim of the project is to design a MultiUse Community Hall which extends the social connections to the external recreational areas. It has to improve the connections between two cities: Widnau and Lustenau, one belongs to Austria and the other to Switzerland. It is created by the concept of union, the concept of the walking routes and avoiding the trees. The roof is playing the role of being an outdoor space being also a catwalk that becomes a new pedestrian bridge. This catwalk connects the park area, the football fields and the picnic area from Lustenau and Widnau. The structure is made of small columns simulating the forest. The program is divided in three wings which are connected with the central point, the lobby.
Conc
ept
Union between 2 cities Pedestrian circulation flows Avoiding trees
+ +
Strategy
Circulation flow through catwalks (roof ) Geometry 2-1-2 Tree shaping form Courtyards program
Floor plan
Entr
ance
/lobb
y
From
the lobby to the restaurant terrace
Construction
Social Bioscapes.Lindau, Austria10 weeks, July 2012, Urban plan, Uni Liechtenstein.
The project consists on creating different landscapes of biodiversity to bring life to the city. There is the park coming from the main land going along the train tracks that creates the university campus and where are water elements to collect the rain water. There are the wetlands meant to bring people to the nature and nature to the people. These two open areas are connected with green streets of the mixed used area which brings both night and day life to the island. The main structure is the crossing between this park and maximilian strasse (the most important street of the city) which is enlarged to the new development creating a new centre for the island. The most important buildings are placed there: the existing post office, a new market reusing the old train station building, a performance art center, the entrance of the university and the tram station.
Conc
ept
Floor plan main buildings
Dwelling complex with level changes inside.Barcelona, Catalonia10 weeks, June 2011, Housing, ETSAV.
The project involves the creation of an appartment building that mantains the outside frontage given by the buildings next to it. This outside faade consists of a ground floor and five storeys; the inner one, which is the new, consists of a ground floor and seven storeys. The dwellings have 90, 100 and 120 m2. There are some duplex.The outside frontage faces north and it has good views over the ciutadella park. The inner one faces south and it moves away in order to create small private terraces. The inner level changes of the dwellings level up with the porch.
Ground floor
Duplex
Build
ing
entr
ance
Living room
Floor plan duplex.
BCAs exhibition
Professional work
Isolated single family dwelling.Brussels, Belgium. BCArchitects.Collaborate on Interior design and executive process. July-November 2014. Housing.
It is a new construction project that is already accepted to be built. It is a house that plays with inner levels: each main area is in a different level. It is structured around the stairs which are in the middle of the house with a skylight on them. They are mainly made of glass to let the light go through. Just the connection to the -1 floor is made of stone. I collaborated in the interior design process by modelling and drawing by hand and by 3D modelling programs, I was also involved in the executive project so I drew from scale 1.200 to 1.10, I talked with the clients and I calculated some budgets.
Planimetry
-1 Floor Ground Floor
1 Floor Long. Section
Trans. Section
Mezanine
Sketching the interior
Kitchen
Studio
Living room
Detailing the interior
Studio
Stairs
Kitchen
Detached single family dwelling.Brussels, Belgium. BCArchitects.Collaborate on design process. July-November 2014. Housing.
It is a project that was at the beginning of the design: there were just some sketches of Benoit, chief of BCA. It is a project that plays with inner levels creating two different faades. Each room is in a different level and the kitchen is the one with access to the back courtyard. I did all the drawings and I constructed a model to rethink the project and present it to the clients.
SURFACE BRUTE: (AVEC CUISINE ET AVEC ACCS JARDIN) 86.73m
RUE
DES
HIBO
UX
N +000CUISINE
N +100LIVING
N +240SAM
hsp 350
hsp 270
hsp 280
N +000ACCS JARDIN
5,3
2,85 6,8 5,8AA AA
FOLDABLETABLE
0,9
4,4
(14.87m)
(28.84m)
(10.80m)
(28.04m)
JARDIN hsp 370 hsp 350 hsp 300
5,3
32,7
pole
BB BB
SURFACE BRUTES:
NIVEAU 00_ 86.7mNIVEAU +01_ 70.2mNIVEAU +02_ 38.4mNIVEAU -1_ 55m
-------TOTAL: 250.3m
MAITRE DE L'OUVRAGEMICHAEL NIEGO
ARCHITECTE
BCARCHITECTS SPRLREPRESENTEE PAR BENOIT CRUYSMANS
AVENUE PAUL DESCHANEL 19/10B- 1030 BRUXELLES
T + 32 474 84 68 80E [email protected]
AP 10
CONSTRUCTION D'UNE MAISON D'HABITATIONRUE DES HIBOUX 491150 WOLUWE SAINT-PIERREREGION DE BRUXELLES-CAPITALE
ECHELLE: 1 CM / M
PLAN NIVEAU 00
AVANT-PROJET 2
0 1 5m
N
2
N +000 = niveau + 000 metreshsp = hauteur sous plafond
23.09.2014
SURFACE BRUTE: 70.2m
RUE
DES
HIBO
UX
N +490
CH. DESPARENTS
hsp 260
N +560CH. 1
hsp 250
N +560CH. 2
hsp 250
3,5 1 2 1
3,4
AA AA
125,
7
0,9
2,6
2,6
3,3
(16.47m)
(10.19m)
(10.19m)
N +490SDB
hsp 260(6.60m)
N +490WC
hsp 260( 1.54m)
N +490COULOIR
hsp 260(14.48m)
N +560COULOIR
hsp 250N +330(16.55m)
TOITURE 5,3
JARDIN
4,3
BB BB
MAITRE DE L'OUVRAGEMICHAEL NIEGO
ARCHITECTE
BCARCHITECTS SPRLREPRESENTEE PAR BENOIT CRUYSMANS
AVENUE PAUL DESCHANEL 19/10B- 1030 BRUXELLES
T + 32 474 84 68 80E [email protected]
AP 11
CONSTRUCTION D'UNE MAISON D'HABITATIONRUE DES HIBOUX 491150 WOLUWE SAINT-PIERREREGION DE BRUXELLES-CAPITALE
ECHELLE: 1 CM / M
PLAN NIVEAU +1
AVANT-PROJET 2
N
0 1 5m2
N +000 = niveau + 000 metreshsp = hauteur sous plafond
23.09.2014
N +790OFFICE + TV
hsp 261
5,7
AA AA
max: hsp 381
(27.70m)
SURFACE BRUTE: 38.42m
N +870TOITURE
(21.08m)
5,5
4,4
1
RUE
DES
HIBO
UX
JARDIN
VIDE
espacetecnique
3,4
3,8
BB BB
MAITRE DE L'OUVRAGEMICHAEL NIEGO
ARCHITECTE
BCARCHITECTS SPRLREPRESENTEE PAR BENOIT CRUYSMANS
AVENUE PAUL DESCHANEL 19/10B- 1030 BRUXELLES
T + 32 474 84 68 80E [email protected]
AP 12
CONSTRUCTION D'UNE MAISON D'HABITATIONRUE DES HIBOUX 491150 WOLUWE SAINT-PIERREREGION DE BRUXELLES-CAPITALE
ECHELLE: 1 CM / M
PLAN NIVEAU +2
AVANT-PROJET 2
N
0 1 5m2
N +000 = niveau + 000 metreshsp = hauteur sous plafond
23.09.2014
JARDIN
SURFACE BRUTE: (HORS CUISINE ET HORS ACCS JARDIN) 55m
RUE
DES
HIBO
UX
3,2
N -160CAVE
N +000ACCS JARDIN
N -030EXTRIEUR
N +000
N +000CUISINE
PALIER
hsp 220
0,9
3,2
AA AA
5,3
2,85 6,4 4,8
0,8
0,9
14,9
WC
GARAGE
(10.80m)
(22.20m) (11.96m)
(1.32m)
(1.80m)
hsp 270(14.87m)
hsp 200-230
7,2
1,1
BB BB
MAITRE DE L'OUVRAGEMICHAEL NIEGO
ARCHITECTE
BCARCHITECTS SPRLREPRESENTEE PAR BENOIT CRUYSMANS
AVENUE PAUL DESCHANEL 19/10B- 1030 BRUXELLES
T + 32 474 84 68 80E [email protected]
AP 13
CONSTRUCTION D'UNE MAISON D'HABITATIONRUE DES HIBOUX 491150 WOLUWE SAINT-PIERREREGION DE BRUXELLES-CAPITALE
ECHELLE: 1 CM / M
PLAN NIVEAU -1
AVANT-PROJET 2
N
0 1 5m2
N +000 = niveau + 000 metreshsp = hauteur sous plafond
23.09.2014
Planimetry
-1st Floor
Ground Floor
1st Floor
2nd Floor
N +000
N -160
N -30
N +000
N +100
N +240
N -15
N +490
N +790
N +560
2,6
2,5
2,8
3,5
2,7
2,61
Profil terrain d'origine
2,2
2,3
CAVE
CUISINE
LIVING
SAM
GARAGE
CH ENFANTS
CH PARENTS
OFFICE
SDB
3,81
2
N +870JARDIN
N +330JARDIN
SO
3,7
3
SOLEIL SOIR
SOLEIL MATIN
RUE DES HIBOUX
JARDIN
0,5
2,3
0,6
5,2
1,45
1,15
2,3
N +290
MAITRE DE L'OUVRAGEMICHAEL NIEGO
ARCHITECTE
BCARCHITECTS SPRLREPRESENTEE PAR BENOIT CRUYSMANS
AVENUE PAUL DESCHANEL 19/10B- 1030 BRUXELLES
T + 32 474 84 68 80E [email protected]
AP 16
CONSTRUCTION D'UNE MAISON D'HABITATIONRUE DES HIBOUX 491150 WOLUWE SAINT-PIERREREGION DE BRUXELLES-CAPITALE
ECHELLE: 1 CM / M
COUPE BB
AVANT-PROJET 2
0 1 5m2
N +000 = niveau + 000 metreshsp = hauteur sous plafond
23.09.2014
n51 n47
B
D
G
H
J
H I
L
M
N -30
1,45
1,15
2,3
5,2
6,7
2,3
2,2
1,57
2,02
12,5
9
MAITRE DE L'OUVRAGEMICHAEL NIEGO
ARCHITECTE
BCARCHITECTS SPRLREPRESENTEE PAR BENOIT CRUYSMANS
AVENUE PAUL DESCHANEL 19/10B- 1030 BRUXELLES
T + 32 474 84 68 80E [email protected]
AP 20
CONSTRUCTION D'UNE MAISON D'HABITATIONRUE DES HIBOUX 491150 WOLUWE SAINT-PIERREREGION DE BRUXELLES-CAPITALE
ECHELLE: 2 CM / M
ELEVATION AVANT
AVANT-PROJET 2
0 1 2m
N +000 = niveau + 000 metreshsp = hauteur sous plafond
23.09.2014
A chemines, inoxB toiture, zincC lucarnes, zincD corniche & gouttires, zinc mat, grisE faades, enduit blancF faades, enduit grisG faades, briques, rougeH faades, boisI faades, pierre bleue, grisJ chssis, merbeauK seuils, pierre bleue, grisL sousface, boisM sousface et laterals, bois
AB
C
D
E
FF
J
K
n51n47
N -015N 000
5,39
3,3
1,383
,61
12,5
9
0,47
4,2
1,6
1,2
1,4
2,7
0,88
0,94
MAITRE DE L'OUVRAGEMICHAEL NIEGO
ARCHITECTE
BCARCHITECTS SPRLREPRESENTEE PAR BENOIT CRUYSMANS
AVENUE PAUL DESCHANEL 19/10B- 1030 BRUXELLES
T + 32 474 84 68 80E [email protected]
AP 21
CONSTRUCTION D'UNE MAISON D'HABITATIONRUE DES HIBOUX 491150 WOLUWE SAINT-PIERREREGION DE BRUXELLES-CAPITALE
ECHELLE: 2 CM / M
ELEVATION ARRIRE
AVANT-PROJET 2
0 1 2m
N +000 = niveau + 000 metreshsp = hauteur sous plafond
23.09.2014
A chemines, inoxB toiture, zincC lucarnes, zincD corniche & gouttires, zinc mat, grisE faades, enduit blancF faades, enduit grisG faades, briques, rougeH faades, boisI faades, pierre bleue, grisJ chssis, merbeauK seuils, pierre bleue, grisL sousface, boisM sousface et laterals, bois
Section
Front faade Back faade
Refurbishment and expansion of an isolated single family dwelling.Brussels, Belgium. BCArchitects.Collaborate on executive project and visits on the site. July-November 2014. Housing.
The office was in a hurry to produce a lot of material to be able to start the construction of this project. It is a big old house that wanted to expand to create new rooms for the children and with more facilities, like a swimming pool. It has two floors and the basement. I draw from scale 1.200 to 1.10, mainly constructive details. I did an axonometry of the new structure placed on the old one for the workers and I went to the site and reunions lots of times.
Contre latteSous Toiture
(Celit 4d 22mm)
Latte
Isolant thermique 230mm entre chevrons.
Parement de finition(plafond Gyproc type Plagyp S
avec structure type PC 6027)
Pare vapeur
Ardoise 60X32X0.4
3.0
2.2
2.5 3.8
23.0
1.0
2.5
Contre latteLatteIsolant thermique 230
mm entre chevrons.
Parement de finition(plafond Gyproc type Plagyp S
avec structure type PC 6027)
Pare vapeur
Ardoise 60X32X0.4Sous Toiture
(Celit 4d 22mm)
3.0
2.22
.5 3.8
23.0
1.0
2.5
[email protected]+ 32 42 84 28 05/+ 32 2 241 12 19
PLAN
RENOVATION ET EXTENSION D'UNE MAISON UNIFAMILIALELUXOR PARC - 1160 AUDERGHEM Echelle: 10 cm/m
Toutes les mesures sont thoriques et communiques titre indicatif, elles doiventtre vrifies sur chantier par l'entreprise.Les bordereaux de chssis devront faire l'objet d'un accord du Matre de l'ouvrage et de l'Architecte pralablement la mise en fabrication.
01. COMPOSITION TOITURE NEUVE
COUPE
28.10.2014
Contre latteSous Toiture
(Celit 4d 22mm)
Latte
Isolant thermique 230mm entre chevrons.
Parement de finition(plafond Gyproc type Plagyp S
avec structure type PC 6027)
Pare vapeur
Ardoise 60X32X0.4
3.0
2.2
2.5 3.8
23.0
1.0
2.5
Contre latteLatteIsolant thermique 230
mm entre chevrons.
Parement de finition(plafond Gyproc type Plagyp S
avec structure type PC 6027)
Pare vapeur
Ardoise 60X32X0.4Sous Toiture
(Celit 4d 22mm)
3.0
2.22
.5 3.8
23.0
1.0
2.5
[email protected]+ 32 42 84 28 05/+ 32 2 241 12 19
PLAN
RENOVATION ET EXTENSION D'UNE MAISON UNIFAMILIALELUXOR PARC - 1160 AUDERGHEM Echelle: 10 cm/m
Toutes les mesures sont thoriques et communiques titre indicatif, elles doiventtre vrifies sur chantier par l'entreprise.Les bordereaux de chssis devront faire l'objet d'un accord du Matre de l'ouvrage et de l'Architecte pralablement la mise en fabrication.
01. COMPOSITION TOITURE NEUVE
COUPE
28.10.2014
230
EXTERIEURINTERIEUR
isola
nt
beto
n de
pen
te
beto
n
tan
chi
t b
icou
che
anti
raci
ne
derb
isedu
m p
ack
(bac
s pre
culti
ves)
cant
strip
latt
e
zinc
cont
re la
tte
tan
chi
t
zinccontre latte
latteen
duit
isola
nt
boischasis coulissan
structureplafonage
41.0
15.0
10.0
10.0
6.0
32.015
.0
[email protected]+ 32 42 84 28 05/+ 32 2 241 12 19
COUPE TOIT PLAT ET VERTE
RENOVATION ET EXTENSION D'UNE MAISON UNIFAMILIALELUXOR PARC - 1160 AUDERGHEM
28.10.2014Echelle: 10 cm/m
Toutes les mesures sont thoriques et communiques titre indicatif, elles doiventtre vrifies sur chantier par l'entreprise.Les bordereaux de chssis devront faire l'objet d'un accord du Matre de l'ouvrage et de l'Architecte pralablement la mise en fabrication.
10.COMPOSITION TOITURE STUDIO
Roof section
Roof plan
Green roof section
Details
+ 355
gitelattage bois
Corniche zincchevron
latte
ardoises
etancheite
zinc
creation d'un profil structurel enbois. comme existant
mur existant
isolant
OSB
isolant
OSBvidegyproc
accrochemetallique
structureexistante
gitage
panneau OSB
parquet
poutre beton P0-4
9.414.01.8
2.0
6.0
3.0
5.0
6.5
2.9
2.5
6.5
19.0
2.9
22.5
1.8
3.8
tablette MDFpeint blanc
cadre multiplex
67.2
27.2
[email protected]+ 32 42 84 28 05/+ 32 2 241 12 19
COUPE
RENOVATION ET EXTENSION D'UNE MAISON UNIFAMILIALELUXOR PARC - 1160 AUDERGHEM Echelle: 10 cm/m
Toutes les mesures sont thoriques et communiques titre indicatif, elles doiventtre vrifies sur chantier par l'entreprise.Les bordereaux de chssis devront faire l'objet d'un accord du Matre de l'ouvrage et de l'Architecte pralablement la mise en fabrication.
4.COMPOSITION PAROI PARTIE NEUVElucarne partie basse
28.10.2014
BB
I 005portes coulissantes 2
90
275
I 003
port
e vi
tre
I 004
I 002
port
e vi
tre
291
275
I 115
220
152
EXTERIEURINTERIEUR
86
162
EXTERIEURINTERIEUR
243
EXTERIEURINTERIEUR
terr
asse
boi
s
plot
boi
s
tan
chi
t b
icou
che
isola
nt
chap
e de
pen
te
stru
ctur
e ex
istan
te
esca
lier b
ois
zinc
bloc
isol
ant r
igid
e
isola
ntpa
rque
t
stru
ctur
e bo
is
cant
strip
tan
chi
t b
icou
che
patt
e d'
atta
che
met
alliq
ue
prof
il de
rive
com
posit
ega
rdec
orps
met
alliq
ue
5.0
85.0
isola
nt
20.0
6.0
14.0
3.0
max
4.0
13.0
23.3
27.0
[email protected]+ 32 42 84 28 05/+ 32 2 241 12 19
COUPE
RENOVATION ET EXTENSION D'UNE MAISON UNIFAMILIALELUXOR PARC - 1160 AUDERGHEM Echelle: 10 cm/m
Toutes les mesures sont thoriques et communiques titre indicatif, elles doiventtre vrifies sur chantier par l'entreprise.Les bordereaux de chssis devront faire l'objet d'un accord du Matre de l'ouvrage et de l'Architecte pralablement la mise en fabrication.
6.COMPOSITION TOITURE TERRASSE NORD 28.10.2014
I 005portes coulissantes 2
90
275
I 003
port
e vi
tre
I 004
I 002
port
e vi
tre
291
275
I 115
220
152
EXTERIEURINTERIEUR
86
162
EXTERIEURINTERIEUR
243
EXTERIEURINTERIEUR
chevron
latte
ardoises
contre latte
vide
chevron arrondi(existant)
zinc
boisgite bois
tanchit
parement bois
isolant
isolant
OSB
OSB
vide
gyproc
gites
poutre acier
beton
cantstrip
structure existant
isolant tanchitbicouche
poutreterrasse bois
34.6
10.014.0
1.81.82.0 5.0
6.5
3.0
2.5
3.8
19.0
5.0
42.8
chape de pente
14.0
3.0
[email protected]+ 32 42 84 28 05/+ 32 2 241 12 19
COUPE CORNICHE
RENOVATION ET EXTENSION D'UNE MAISON UNIFAMILIALELUXOR PARC - 1160 AUDERGHEM Echelle: 10 cm/m
Toutes les mesures sont thoriques et communiques titre indicatif, elles doiventtre vrifies sur chantier par l'entreprise.Les bordereaux de chssis devront faire l'objet d'un accord du Matre de l'ouvrage et de l'Architecte pralablement la mise en fabrication.
28.10.20147.COMPOSITION CORNICHE TERRASSE OUEST
New terrace section
Wall - window sectionWall section at the terrace
Detached single family dwelling.Brussels, Belgium. BCArchitects.Collaborate on design process. July-November 2014. Housing.
This project had to be started from the beginning. I could design it all by sketching, drawing, modelling and using computer to scale 1.100. It is a house with four floors. The two lower levels are the public ones and are connected with a double height area in the living room. The playing area has a special timber floor so it lets the sunlight arrive to the dinning room. The two upper floors are the private ones with two rooms each one. Stairs are lighted with a skylight.
MAITRE DE L'OUVRAGE
ARCHITECTE
BCARCHITECTS SPRLREPRESENTEE PAR BENOIT CRUYSMANS
AVENUE PAUL DESCHANEL 19/10B- 1030 BRUXELLES
T + 32 474 84 68 80E [email protected]
AP 16
CONSTRUCTION D'UNE MAISON D'HABITATION
ELEVATION ARRIERE
N +000 = niveau + 000 metreshsp = hauteur sous plafond
LEYSEN
RUE GELEYTSBEEK 751180 UCCLEREGION DE BRUXELLES-CAPITALE
AVANT-PROJET
17.10.2014
ECHELLE: 2 CM / M0 21
Front faade Back faade
N +0,00
N +7,09
N +4,38
n 77 n 75
MAITRE DE L'OUVRAGE
ARCHITECTE
BCARCHITECTS SPRLREPRESENTEE PAR BENOIT CRUYSMANS
AVENUE PAUL DESCHANEL 19/10B- 1030 BRUXELLES
T + 32 474 84 68 80E [email protected]
AP 16
CONSTRUCTION D'UNE MAISON D'HABITATION
ELEVATION AVANT
N +000 = niveau + 000 metreshsp = hauteur sous plafond
LEYSEN
RUE GELEYTSBEEK 751180 UCCLEREGION DE BRUXELLES-CAPITALE
AVANT-PROJET
17.10.2014
ECHELLE: 2 CM / M0 21
AAAAsalle du jeuN +0.33hsp 2.20(17.9 M)
entreN +0.00hsp 2.53(18.85 M)
garageN +0.00 - +0.2hsp 2.53 - 2.33(16.7 M)
wc 1(1.4 M)
toitureN +0.30
68.11 M
vide
211
3,2 3,2
2,14
5,212,8
3,4
4,74
0,8
3,23
toitureN +0.30
terrasseN +0.30
1,76
2,1
2,08
MAITRE DE L'OUVRAGELEYSEN
ARCHITECTE
BCARCHITECTS SPRLREPRESENTEE PAR BENOIT CRUYSMANS
AVENUE PAUL DESCHANEL 19/10B- 1030 BRUXELLES
T + 32 474 84 68 80E [email protected]
AP 10
CONSTRUCTION D'UNE MAISON D'HABITATIONRUE GELEYTSBEEK 751180 UCCLEREGION DE BRUXELLES-CAPITALE
ECHELLE: 2 CM / M
PLAN NIVEAU 00
AVANT-PROJET
0 2
N
1
N +000 = niveau + 000 metreshsp = hauteur sous plafond
17.10.2014
AA
heater
toitureN +3.03
58.03 M
211
wc 2(1.89 M)
ch. 1N +2.83hsp 2.50(18.53 M)
SDB 1N +2.83hsp 2.50(6.03 M)
ch. 2N +2.83hsp 2.50(15.39 M)
palierN +2.83hsp 2.50(14.34 M)
5,54
3,34
7,03
2,4 4,532,5
1 3,4
0,89
1,24 2
,04
MAITRE DE L'OUVRAGE
ARCHITECTE
BCARCHITECTS SPRLREPRESENTEE PAR BENOIT CRUYSMANS
AVENUE PAUL DESCHANEL 19/10B- 1030 BRUXELLES
T + 32 474 84 68 80E [email protected]
AP 11
CONSTRUCTION D'UNE MAISON D'HABITATION
PLAN NIVEAU +1
N +000 = niveau + 000 metreshsp = hauteur sous plafond
LEYSEN
RUE GELEYTSBEEK 751180 UCCLEREGION DE BRUXELLES-CAPITALE
AVANT-PROJETN17.10.2014
ECHELLE: 2 CM / M0 21 AAAA
wc
58.03 M2
2
wash.m.
ch. 3N +5.63hsp 2.50(18.85 M)
wc 2(1.89 M)
SDB 1N +5.63hsp 2.50(6.03 M)
ch. 4N +5.63hsp 2.50(15.39 M)
palierN +5.63hsp 2.50(14.34 M)
5,54
3,34
7,03
2,4 4,532,5
1 3,4
0,89
1,24 2
,04
1MAITRE DE L'OUVRAGE
ARCHITECTE
BCARCHITECTS SPRLREPRESENTEE PAR BENOIT CRUYSMANS
AVENUE PAUL DESCHANEL 19/10B- 1030 BRUXELLES
T + 32 474 84 68 80E [email protected]
AP 12
CONSTRUCTION D'UNE MAISON D'HABITATION
PLAN NIVEAU +2
N +000 = niveau + 000 metreshsp = hauteur sous plafond
LEYSEN
RUE GELEYTSBEEK 751180 UCCLEREGION DE BRUXELLES-CAPITALE
AVANT-PROJETN17.10.2014
ECHELLE: 2 CM / M0 21
Ground floor
1st floor
2nd floor
Planimetry
feu AAlivingN -2.37hsp 4.90(20.5 M)
SAMN -2.37hsp 2.50(18 M)
cuisineN -2.37hsp 2.20(8.5 M)
46.5 M
2
1 2
2,1
2,07
4,74
9,05
hsp 2.17
MAITRE DE L'OUVRAGE
ARCHITECTE
BCARCHITECTS SPRLREPRESENTEE PAR BENOIT CRUYSMANS
AVENUE PAUL DESCHANEL 19/10B- 1030 BRUXELLES
T + 32 474 84 68 80E [email protected]
AP 13
CONSTRUCTION D'UNE MAISON D'HABITATION
PLAN NIVEAU -1
N +000 = niveau + 000 metreshsp = hauteur sous plafond
LEYSEN
RUE GELEYTSBEEK 751180 UCCLEREGION DE BRUXELLES-CAPITALE
AVANT-PROJETN17.10.2014
ECHELLE: 2 CM / M0 21
-1st floor
2,5
N +3.03
N +0.30
N -2,15
N +8,63
N +2.83
2,2
2,5
2,5
N -2,37
N +0,33
N +5.63
1,48
2,53 2
,2
1,45
N +0,00N +0,20
2,2
2,17
2,53
MAITRE DE L'OUVRAGE
ARCHITECTE
BCARCHITECTS SPRLREPRESENTEE PAR BENOIT CRUYSMANS
AVENUE PAUL DESCHANEL 19/10B- 1030 BRUXELLES
T + 32 474 84 68 80E [email protected]
AP 15
CONSTRUCTION D'UNE MAISON D'HABITATION
COUPE AA
N +000 = niveau + 000 metreshsp = hauteur sous plafond
LEYSEN
RUE GELEYTSBEEK 751180 UCCLEREGION DE BRUXELLES-CAPITALE
AVANT-PROJET
17.10.2014
ECHELLE: 2 CM / M0 21
Section
Land Art. ETSAV
Thank you.