TCE CONSULTING ENGINEERS LIMITED PROCESS DATA SHEET FOR VESSEL SH 1 OF 1 REV. NO. GENERAL REV. NO. 1 ITEM NUMBER 2 QUANTITY 2 3 CAPACITY (NOMINAL) 4 SERVICE 5 DESIGN CODE 6 LOCATION INDOOR / OUTDOOR 7 FLUID PROPERTIES AT OPERATING TEMP. 8 9 FLUID 10 SPECIFIC GRAVITY 11 VISCOSITY cP 12 VAPOUR PRESSURE kg/cm 2 (a) 13 (AT 30 DEG.C.) 14 15 DESIGN DATA 16 17 OPERATING TEMPERATURE o C 18 DESIGN TEMPERATURE o C 19 OPERATING PRESS.AT 32 DEG.C.kg/c 20 DESIGN PRESS. kg/cm 2 (a) 21 INSIDE DIAMETER mm 22 LENGTH mm 23 HEAD TYPE- TOP 24 - BOTTOM 25 CORROSION ALL mm 26 SUPPORT SADDLE 27 INSULATION - REQUIRED YES / NO 28 - PURPOSE PERS. PROTEC./CONSER. NOTES : 29 AGITATOR YES / NO 3) This vessel shall be designed, fabricated, manufactured, inspected by Third 29 Party & Testing as per the requirement of "The Static & Mobile Pressure 30 Vessels Rules"(SMPV Rules) .This vessel shall be approved by CCoE Nagpur 31 MATERIAL OF CONSTRUCTION and obtaining approval of CCoE Nagpur and inspection by competent third 32 SHELL party shall be in the scope of vessel vendor 5) A Test & Inspection certificate issued by manufacturer of the vessel 33 JACKET shall be furnished to CCoE, Nagpur.This shall be duly countersigned 34 COIL NA by an Inspector, authorised by CCoE, Nagpur that the vessel meets 35 INTERNALS with the requirements of the code approved by CCoE, Nagpur . 36 GASKET PTFE ENVELOPED CAF 37 ACCESSORIES BY TANK VENDOR 38 AGITATOR YES / NO N14 25 1 NITROGEN INLET (DURING COMMISSIONING) 39 BAFFLES YES / NO N13 50 1 SPARE 40 COIL YES / NO N12 50 1 SPARE 41 DIP PIPES YES / NO N11 500 1 MANHOLE 42 N10 25 1 TEMPERATURE INDICATOR 43 SPECIAL REQUIREMENTS N9 25 1 LEVEL GAUGE 44 RADIOGRAPHY 100% N8 25 1 LEVEL INDICATION TRANSMITTER 45 STRESS RELIEF AS PER CODE N7 25 2 LEVEL INDICATION TRANSMITTER 46 BUFFING NA N6 25 1 PRESSURE TRANSMITTER 47 OTHER NA N5 HOLD 1 PRESSURE GAUGE 48 NOTES : N4 HOLD 1 PRESSURE SAFETY VALVE (PSV) 49 1) Sizes and instrument nozzles are under hold pending instrument N3 HOLD 1 PRESSURE SAFETY VALVE (PSV) 51 finalization. N2 50 1 AMMONIA IN 52 2) All liquid level gauging devices shall be as per "SMPV RULES" N1 50 1 AMMONIA OUTLET (TO NH3 COMPRESSOR) 53 NOZZ. NO. SIZE QTY. SERVICE 54 NOZZLE SCHEDULE REV NO. : P0 R0 PPD. BY :Sd/- SPP TCE JOB NO. CLIENT : NUCLEAR FUEL COMPLEX PPD. BY/DATE : Sd/-SPP 31.8.05 Sd/-SPP 11.5.06 CKD. BY:Sd/-MB TCE-4246A PROJECT : NZOSP, PALAYAKAYAL CKD. BY/DATE : Sd/-MB 31.8.05 Sd/-VAK 11.5.06 DATE :31.08.05 PDS NO. : TCE-4246A-CH-T-PDS-322T441 Liquid NH3 23.55 kg/cm2(a) 0.58 - 322-T-441 A/B ASME SEC-VIII DIV. 1 45 KL (Water Capacity) LIQUID NH3 STORAGE LOW TEMPERATURE CARBON STEEL SHELL 3000 AMBIENT 12.7 KG/CM2 (a) 11.89 7250 DISHED END NA DISHED END 3 MM LOW TEMPERATURE CARBON STEEL (-) 33 TO 55 SHELL R1 R0-1997-03-31 TCE.M4-CH-T-PDS- N10 N3 N6 N5 N4 N2 N1 3.0 m 7.25 m N11 N7 N8 N13 N12 N9
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
TCE CONSULTING ENGINEERS LIMITED
PROCESS DATA SHEET FOR VESSEL SH 1 OF 1
REV.
NO.GENERAL
REV.
NO.
1 ITEM NUMBER
2 QUANTITY 2
3 CAPACITY (NOMINAL)
4 SERVICE
5 DESIGN CODE
6 LOCATION INDOOR / OUTDOOR
7 FLUID PROPERTIES AT OPERATING TEMP.
8
9 FLUID
10 SPECIFIC GRAVITY
11 VISCOSITY cP
12 VAPOUR PRESSURE kg/cm2(a)
13 (AT 30 DEG.C.)
14
15 DESIGN DATA
16
17 OPERATING TEMPERATURE o C
18 DESIGN TEMPERATURE o
C
19 OPERATING PRESS.AT 32 DEG.C.kg/cm2(g)
20 DESIGN PRESS. kg/cm2(a)
21 INSIDE DIAMETER mm
22 LENGTH mm
23 HEAD TYPE- TOP
24 - BOTTOM
25 CORROSION ALLOWANCE mm
26 SUPPORT SADDLE
27 INSULATION - REQUIRED YES / NO
28 - PURPOSE PERS. PROTEC./CONSER. NOTES :
29 AGITATOR YES / NO 3) This vessel shall be designed, fabricated, manufactured, inspected by Third
29 Party & Testing as per the requirement of "The Static & Mobile Pressure
30 Vessels Rules"(SMPV Rules) .This vessel shall be approved by CCoE Nagpur
31 MATERIAL OF CONSTRUCTION and obtaining approval of CCoE Nagpur and inspection by competent third
32 SHELL party shall be in the scope of vessel vendor
5) A Test & Inspection certificate issued by manufacturer of the vessel
33 JACKET shall be furnished to CCoE, Nagpur.This shall be duly countersigned
34 COIL NA by an Inspector, authorised by CCoE, Nagpur that the vessel meets
35 INTERNALS with the requirements of the code approved by CCoE, Nagpur .
R1 CRITERIA FOR ELIGIBILITY FOR EVALUATION OF TENDER DOCUMENT
1
C2 TEC-4246A-950 R1 PROJECT INFORMATION – GENERAL 3
C3 TCE-4246A-951 R0 PROJECT INFORMATION – ELECTRICAL 2
C4 TCE.4246A – 952
RO DOCUMENT & DRAWING SUBMISSION & DISTRIBUTION SCHEDULE
2
C5 TCE-4246A-C-300-005
R1
SCOPE AND GENERAL SPECIFIC TECHNICAL REQUIREMENTS FOR LIQUID AMMONIA AND 35% AMMONIUM HYDROXIDE STORAGE AND TRANSFER SYSTEM
11
C6 TCE-4246A-C-300-05
R1
EQUIPMENT, SYSTEM AND SERVICE TO BE PROVIDED BY CONTRACTOR. SYSTEM DESCRIPTION AND VARIOUS DETAILS FOR LIQUID AMMONIA AND 35% AMMONIUM HYDROXIDE STORAGE AND TRANSFER SYSTEM
12
C6 TCE-4246A-CH-T-PDS-322T441
R1 DATASHEET FOR LIQUID AMMONIA STORAGE VESSEL / BULLET
1
C6 TCE-4246A-CH-T-PDS-322T442
R1 DATASHEET FOR AMMONIUM HYDROXIDE SOLUTION STORAGE VESSEL / BULLET
1. CRITERIA OF ELIGIBILITY FOR TECHNICAL EVALUATION OF THE BIDS
1.1 Experience of Contractor in similar works / Past Performance
For the purpose of this clause „similar work‟ means the works of “work of one or more types of the system / subsystems alongwith its components, accessories & equipment required as per this tender and including all allied works such as instrumentation, electrical and piping to make the system complete and including erection & commissioning at site”.
The contractor should have the proven technical, commercial and financial capability in terms of having executed turnkey jobs of this nature as required in the tender document.
Bidder shall have satisfactory performance of the works carried out. Bidder shall provide a reference list of previous clients for whom similar work has been carried out and the value of the jobs. Bidder shall to provide letters from them for satisfactory performance, workmanship and delivery of items / system & completion schedules.
1.2 Design, Manufacturing & Quality Control Facilities
Bidder to furnish the details of existing manufacturing (plant and machinery), infrastructural & quality control facilities available with the bidder.
Bidder shall submit the organisation chart and his technical, supervisory & managerial establishment and the technical & managerial staff, CAD / CAM facilities that will be deployed for this project.
1.3 Financial Stability
1.3.1 Turnover :
Average annual financial turnover during last 3 years ending 31st March of the previous financial year. The contractor shall submit TDS certificates or audited balance sheets showing receipts from contracts, profit and loss etc in support of his claim.
SPEC. NO. TCE CONSULTING ENGINEERS LIMITED SECTION D
DATA SHEET
TCE.4356A-C-300-005 DIGITAL PANEL METERS SHEET 1 OF 1
DOCUMENT & DRAWING SUBMISSION & DISTRIBUTION SCHEDULE
SHEET OF 2 OF 4
1
ISSUE R0
TITLE
TCE FORM 329 R3
The Vendor / Contractor shall submit and distribute to the PURCHASER / OWNER and CONSULTANT / ENGINEER the following number of copies of the required documents and drawings mentioned in the tender.
Sl. No.
Description Vendor / Contractor
Owner Engineer
1. General Correspondence from Vendor / Contractor
a) Commercial S Ori.+ 1 3 (*)
b) Technical S Ori. + 1 3 (*)
2. General Correspondence from :
a) TCE Ori. 2 S
b) NFC Ori. S 3 (*)
3. Vendor / Contractor Manufacturing, fabrication, delivery and erection schedule
S 3 3 (*)
4. Manufacturing Test Reports S Ori. + 3 3
5. Operating, Maintenance and Erection Manuals
a) Preliminary S 4 3 (*)
b) Final S 6 3 (*)
6. Vendor / Contractor Drawings / Documents
a) First submission and subsequent revisions
S 6 6
b) As-Built S R + 6 3 (*)
c) As-Built (on CD) (Soft Copy) S 3 3
7. Draft & Final Reports S 5 4 (*)
(*) : One copy to TCE Site Office. n -- Number of Copies required. Legend : S -- Source, Ori. -- Original, R -- Reproducible
4.0 Each of the above supplies will be made available at one Terminal Point. Vendor shall provide for further distribution of supply. If any other supply is desired by the Vendor, he shall provide for all the necessary hardware to derive this supply from the Control Supply provided by the Purchaser.
1.1 The scope includes the design, preparation of detailed drawings, fabrication, testing, inspection, supply, transportation to site, unloading, safe storage and handling at site, erection, testing & commissioning of the Liquid Ammonia & 35% Ammonium Hydroxide solution Storage & Transfer System and Accessories as given below:
1.1.1 LIQUID AMMONIA & 35% AMMONIUM HYDROXIDE SOLUTION STORAGE & TRANSFER SYSTEM AND ACCESSORIES
SR. No.
Equipment Quantity Details
Liquid Ammonia & 35% Ammonium Hydroxide solution Storage & Transfer System and Accessories
1 Liquid Ammonia Storage vessels / Bullets
02 Nos.
Detailed scope & specifications are given in section C6 – “Technical Specifications of Liquid Ammonia & 35% Ammonium Hydroxide solution Storage & Transfer System”
1.2 This specification covers the requirements of design, preparation of detailed drawings, supply of materials & accessories, fabrication, manufacture, testing, inspection at Vendor‟s / Sub-Vendor‟s works, packing, forwarding, transportation and delivery at site, safe storage at site, transport to the site of installation, Installation / erection, mechanical completion, testing at site, pre-commissioning, commissioning of the Liquid Ammonia & 35% Ammonium Hydroxide solution Storage & Transfer System and Accessories alongwith its associated sub-systems and accessories complete in all respects, performance testing at site, supply of necessary documentation / calculations / drawings, manuals etc. for comments / approval by purchaser / consultant, supply of as-built documents / drawings described in various sections of this specification.
1.3 It is not the intent to specify completely herein all details of design and construction of equipment or materials to be supplied or of services to be rendered. However, the equipment, materials and services shall conform in all respects to high standards of engineering design, workmanship and be capable of performing in continuous commercial operation in a manner acceptable to PURCHASER who will interpret the meaning of drawings and specifications and shall have the power to reject any work or materials which in his judgement are not in full accordance therewith.
1.4 The scope of work under this contract shall also cover following :
a) Supply of equipment and accessories as specified.
b) Unloading, Safe storage of equipment supplied by CONTRACTOR & Unloading & Safe Storage of equipment and free-issue items wherever required, supplied by PURCHASER.
c) Taking over the equipment from PURCHASER'S storage / unloading area for equipment and free-issue items supplied by PURCHASER.
d) Transfer of material / equipment to CONTRACTOR'S storage area.
e) Maintaining equipment during storage and installation in safe custody.
f) Installation of equipment and carrying out wiring, cabling and earthing to complete the liquid ammonia & 35% ammonium hydroxide solution storage & transfer system as detailed under the technical requirements of the enclosed sections.
g) Installation of equipment at site requiring material handling including hoisting facilities.
h) Testing and commissioning of the equipment within CONTRACTOR'S scope for PURCHASER'S satisfaction.
i) Providing 'As-Built Drawings' and draft and final „Operation & Maintenance‟ manuals.
j) Obtaining all the clearances/ approvals from external agencies such as CCOE etc.
k) Providing with foundation drawings so as to enable the purchaser to take up with civil contractor. However minor civil works shall be in the scope of the vendor.
l) Supply of essential spares.
2. INSTRUCTION TO BIDDERS
2.1 Bidders shall completely familiarise themselves with the scope of work involved & the job completion schedule. Any clarification required shall be sought from PURCHASER / CONSULTANT, prior to quoting for the Bid.
2.2 Bidder shall ensure that the bids are complete & are prepared in the specified form. Incomplete bids are liable for rejection. Deviation, if any, shall be listed in Section-D; Schedule of Deviations (from Technical Specifications & General conditions). Except for these deviations, it is assumed that BIDDER shall comply with all requirements of the specifications. Any deviation sought at later date will not be entertained.
2.3 While quoting the prices, BIDDER shall quote separately for „supply‟ including all taxes, duties & levies considered and separately for “erection, testing & commissioning” including all taxes, duties & levies considered.
2.4 Bidder shall quote firm price which will be kept firm throughout the duration of the contract.
2.5 The price schedule shall be strictly as per Section E of this specification.
2.6 The make of components shall be as per the “List of approved sub-vendors” of Section – C and / or subject to PURCHASER / CONSULTANT approval. In case, sub-vendors are not mentioned for some items, bidders shall identify the sub-vendor considered for these items and mention in the technical bid documents. In all cases, after placement of the order, the main contractor / main vendor shall submit the list of sub-vendors to Purchaser / Consultant for comments / approval and the order shall be placed onto sub-vendors only approved by Purchaser / Consultant.
2.7 PURCHASER can add / delete items included in scope of work. Unit rates for different items shall prevail under such eventuality.
2.8 Bidder may provide a separate addendum to our price schedule format and submit the unpriced format of the addendum with the technical bid (Section-D) and priced portion of the addendum with the priced bid (Section-E). Description of items offered against such additional unit rates considered by
the bidder shall be mentioned in Section D of the bid (unpriced portion) and the rates / prices quoted shall be included in Section E (priced portion of the bid). Purchaser / Consultant shall review these points from technical and commercial considerations and discuss, if required with the bidders at the time of technical bid evaluation. The bid shall be evaluated on lump sum basis including the spares.
2.9 PURCHASER‟S RIGHT:
The PURCHASER does not bind himself to accept the lowest or any Bid and reserves the right to accept or reject any Bid or a portion thereof without assigning any reason thereof.
2.10 ACKNOWLEDGEMENT OF ENQUIRY:
BIDDER shall acknowledge the receipt of enquiry and within two (2) days advise whether he will be quoting or not. If the BIDDER is not quoting, all enclosures to this enquiry must be returned promptly to the issuing authority with „REGRET‟ letter. All specifications and documents enclosed are PURCHASER‟s property and are to be used only for the purpose of this enquiry and any order which may result from it.
2.11 DELIVERY:
Tenderers should note that no tender will be considered by Purchaser unless the Tenderer can meet the delivery schedule specified by the Purchaser. All equipments / machinery / plant / components covered by this tender document should be supplied on or before 24 Weeks or as specified in the tender document from the date of receipt of LOI. The prices quoted by the tenderer should include all charges involved for direct and safe delivery of the items by Road to the Project site of the Purchaser. If a tenderer so desires, separate lumpsum charges for transportation and safe delivery to the Purchaser‟s site at Palayakayal could be furnished. Purchaser will neither undertake responsibility for transit insurance nor pay for it separately. No other, delivery term will be accepted by the Purchaser. The installation and commissioning of the Liquid Ammonia & 35% Ammonium Hydroxide solution Storage & Transfer System shall be carried out within 8 weeks from the date of intimation of site readiness. The vendor will depute personnel to site and carry out joint inspection of site to confirm site readiness.
2.12.1 Increase / decrease the quantities of equipment involved in scope of supply of CONTRACTOR.
2.12.2 The item rates for supply & installation in Section-E shall be applicable for: any increase / decrease in quantities without any ceiling on variation.
2.12.3 Splitting of the order for individual sub-systems / package systems mentioned in the tender.
2.12.4 Calculating the extra price / price reduction on account of any variation.
2.12.5 The prices for new items shall be negotiable.
2.12.6 All site test reports in a specified format maintained by the CONTRACTOR, duly approved by the CONSULTANT / PURCHASER shall be handed over to the PURCHASER/CONSULTANT after completion of job, as per Vendor Distribution Schedule enclosed.
2.12.7 In overall planning of installation work, it shall be the responsibility of CONTRACTOR to minimise wastage of materials and consumables.
2.12.8 The Contractor shall supply all the required documentation / drawings as mentioned in document no. TCE.4246A-952 / R0 enclosed as a part of this tender.
3. GENERAL REQUIREMENTS
3.1 The following definitions shall cover the scope of work and as such the quoted prices shall be based on the same considerations. Payment claims arising out of wrong understanding shall not be entertained or paid for.
The items are enlisted below in and Section E 'Schedule of Prices' enclosed in this specification. Following works are envisaged for these items under the head of “Supply” and “Installation, Testing and commissioning”.
3.1.1.1 SUPPLY:
This shall include supply of equipment including packing / forwarding, transport and insurance charges complete with all fittings and accessories which form integral part of the equipment for installation purpose to ensure satisfactory commercial operation and timely delivery of the equipment to site. The place of supply shall be “Zirconium Complex” at Palayakayal near Tuticorin, Tamilnadu. Manufacturing, inspection & Testing at vendor's / sub-vendor‟s works of equipment, accessories and items, shall conform to relevant standards and meet statutory approvals.
a) Unloading, handling, storage of equipment, transportation of equipment from CONTRACTOR'S and from PURCHASER'S stores to their proposed locations.
b) Installation of equipment as per Manufacturer's guidelines or specification drawings and / or relevant Indian Standards, Codes of Practice, including supply of materials / fittings / accessories as are necessary for the completion of the installation in all respects, and
c) Testing and commissioning of the equipment as per manufacturer's guidelines, Indian Standards, Codes of practices etc.
The PURCHASER / CONSULTANT may ask for such additional tests at site as in his opinion are necessary for determining that the works comply with the specification. The CONTRACTOR shall be responsible for carrying out the same at no extra cost to the PURCHASER.
d) Preparation of 'AS BUILT' Drawings
e) The VENDOR shall arrange following at his own cost.
i. Adequate quantum of welding electrodes including special
electrodes and welding units required for erection. ii. All consumable items viz. kerosene oil, cotton wool, emery
paper etc. iii. All erection tools and tackles, cranes, hoisting equipment, etc
as required. iv. All skilled, semi-skilled and unskilled labour required for
erection. Any facility, as required, for the labour force such as accommodation, transport, medical facility, insurance etc.
v. First fill of lubricants and grease etc. vi. Chemical cleaning operation for Liquid Ammonia & 35%
Ammonium Hydroxide solution Storage & Transfer System and piping.
vii. Commissioning the Liquid Ammonia & 35% Ammonium Hydroxide solution Storage & Transfer System and accessories and handing over to PURCHASER.
3.2 CODES AND STANDARDS:
All equipment, supply, installation, testing and commissioning shall comply with the requirements of SMPV Rule, latest editions of Indian Standards and Codes of Practices. Where these standards are in conflict with the stipulations of this specification, this specification shall govern.
3.3.1 All engineering documents & drawings, construction purpose drawings, cable schedules for execution of contract works, Operation & Maintenance manuals etc. will be prepared & furnished by the Contractor for review, comments, approval by PURCHASER / CONSULTANT.
3.3.2 The drawings attached with this specification, are for the general guidance of the BIDDER. The CONSULTANT / PURCHASER may also issue further drawings and sketches if considered necessary during execution of the work.
3.4 TESTING AND COMMISSIONING:
3.4.1 The performance and commissioning tests shall be carried out as per Section-C of this specification. It is the responsibility of the Contractor to arrange for required test equipment and instruments for such purpose.
3.4.2 The PURCHASER may ask for such additional tests on site, as in his opinion are necessary to determine that the work comply with the specifications, of manufacturer's instruction or IS code of Installation. The CONTRACTOR shall be responsible and bear the cost of such additional tests.
3.4.3 All routine tests shall be conducted in the presence of PURCHASER / ENGINEER on all equipment as per relevant IS standards.
3.4.4 Typical type tests certificate for all equipment of equivalent ratings shall be submitted for scrutiny / approval by PURCHASER / CONSULTANT.
3.4.5 All commissioning tests shall be carried out in the presence of PURCHASER'S representative and approval for the same shall be obtained before commissioning the installations.
3.4.6 All instruments and accessories required for testing and commissioning of the items specified shall be provided by the CONTRACTOR at no extra cost for the duration of Performance Test.
3.4.7 All instruments used for Testing and Commissioning shall have valid calibration certificates, traceable to National / International Standards of repute.
3.4.8 All instruments used for testing at vendor‟s / sub-vendor‟s works or at site shall have valid calibration certificates, traceable to national / international standards of repute. The calibration certificates shall be presented to PURCHASER‟S / CONSULTANT‟S representative.
3.5 MAINTENANCE REQUIREMENTS:
3.5.1 In order to carry out preventive maintenance, it should be possible to readily
disassemble, repair, re-assemble the equipment in the shortest period and to attend to any defect by a minimum disassembly.
3.5.2 The BIDDER shall furnish one complete set of any special maintenance tools required for normal maintenance of equipment. The prices for the same shall be indicated in Section-E – Format for Submissions of Part-II.
3.5.3 The BIDDER shall confirm that space shown for the equipment is adequate from point of view of access, easy maintenance and for day to day operation.
3.5.4 All system must have convenient maintenance characteristics including :
Minimum disturbance to production during preventive maintenance. Easy access to replacement part which can be installed by personnel with
minimum skill
3.6 INSTALLATION SCHEDULE:
3.6.1 The PURCHASER requires that the CONTRACTOR shall follow schedule for installation, testing and commissioning of the equipment under the scope of this specification which will enable the PURCHASER to commission the project in time.
3.6.2 However, the final installation schedule shall be decided by the CONTRACTOR in consultation with PURCHASER / CONSULTANT.
3.6.3 CONTRACTOR shall submit a 'Bar Chart' indicating the installation schedule and get it approved from the PURCHASER / CONSULTANT. This approved installation schedule shall form the basis of all installation work to be performed by the CONTRACTOR.
3.6.4 For the purpose of overall coordination, CONTRACTOR shall submit the PURCHASER / CONSULTANT, every fortnight, a detailed installation schedule indicating actual progress against planned progress of installation work of individual equipment.
3.6.5 In case of shortfall in actual progress, which shall be clearly brought out by CONTRACTOR, CONTRACTOR shall indicate reasons attributable to it and certify that the equipment installation is being accelerated in order to meet with the 'completion dates'.
3.7 SITE FACILITIES:
3.7.1 This section details various „Site‟ facilities as may be required for execution of „Work‟ under this Contract, their availability and relevant terms and conditions where applicable.
3.7.2 The following facilities will be provided by the OWNER in good faith at terms indicated hereunder. No claims, whatsoever, arising out of use, misuse or
Open space, free of charge, for the CONTRACTOR‟s site office and storage space for keeping the CONTRACTOR‟s own tools / tackles and other materials for performance of work under this contract. Whereas space will be provided by the OWNER free of cost, the construction of office, their safety and security including safety of materials supplied by the OWNER for erection purpose as well as subsequent removal of the same on completion of „Work‟ under this contract are the responsibility of the CONTRACTOR.
3.7.2.2 Electric Power supply at site and general safety procedure:
a) Electric power supply at medium voltage (415 V, 3 phase, 4 wire) for
construction site lighting, office and stores enclosure lighting and construction machinery will be made available at site or near site of work at the discretion of Purchaser / Engineer-in-charge at one point. The distance will be within a reasonable distance from the building site.
b) Vendor / Contractor shall make his own arrangements for further
distribution of power supply, to lay and maintain further distribution lines and wiring necessary for the work at his own cost. Suitably rated kWh meter will be supplied and installed by the contractor and test certificates as per IS from authorised test lab or manufacturer shall be submitted. Contractor shall ensure at his cost that all electric lines and equipment conform to the Indian Electricity Rules, 1966 and Indian Electricity Act, 1910, with latest amendments. All extensions & distribution by the Contractor shall be executed in an approved manner with prior permission of Purchaser / Engineer-in-charge.
c) Contractor shall submit a list of equipment he proposes to connect for
constructional and general lighting purpose indicating power requirements for approval of Purchaser / Engineer-in-charge. The contractor shall post licensed Electrical staff at site. Double grounding will be provided for all equipment. Power supply will be effected after completion of the above.
d) The contractor shall pay the charges based on his power consumption at the rate of Rs. 7.00 per unit (kWh).
3.7.2.3 Water Supply during erection / installation at site:
a) Water required for construction purposes for the work covered under the
scope of the Contract as well as for drinking purposes and for Contractor's temporary establishment at site shall be arranged by the Purchaser to the
contractor at one place to be determined by the Engineer-in-charge at available pressure. The distance will be within a reasonable distance from the building site.
b) Contractor shall, at his own expense, make connections and lay and
maintain the pipelines upto the points of consumption, install water meters, provide storage facility etc. as may be necessary. Contractor shall supply & install a tested meter of approved make for metering the water supplied to the contractor. The meter shall be provided with a masonry chamber with a cover and locking arrangement. All installations shall be
subject to approval of Engineer-in-charge. In case, it is observed that the
water meter is out of order, the consumption of water for the period during which the meter was out of order shall be worked out by the Purchaser in consultation with Engineer-in-charge and the amount shall be payable by the contractor.
c) The contractor shall pay the charges based on his water consumption at
the rate of Rs.35.00 per kilolitre. d) In case, Purchaser cannot supply power and water for construction
purpose for any reason, contractors shall make his own arrangement for getting the power & water for using in his work. No extra payment will be
made to the contractor in this regard by the Purchaser. However, no
recovery will be affected in the bill for this quantum of power and water for which contractor/s has/have made his / their own arrangement. Non-availability of construction power and water by the Purchaser will not make the contractors to delay the completion of work or withdraw from the responsibility of carrying out the work. No claim for compensation or extension of time shall be entertained by the Purchaser for any failure or short supply.
3.7.3 Site shall be handed over to the OWNER in a clean and tidy conditions on completion of „Work‟ or as instructed by the OWNER /ENGINEER.
3.7.4 The OWNER will not provide the following facilities and it is the responsibility of the CONTRACTOR to make suitable arrangements for the same.
(a) The CONTRACTOR shall use his own portable compressors, pumps,
temporary piping and accessories as required for cleaning, testing, flushing etc.
(b) No space will be available from the OWNER to accommodate the
CONTRACTOR‟s workmen and supervisory personnel. Necessary residential accommodation, for the same shall have to be arranged by the CONTRACTOR at his own cost.
(c) Workshop Facilities The CONTRACTOR shall arrange to set up his own workshop to carry out site fabrication as may be required.
(d) Canteen Facilities
The CONTRACTOR shall arrange his own canteen facilities to cater to the requirements of his personnel.
(e) Consumables
The CONTRACTOR shall arrange all consumables and expendables required for work under this contract including necessary welding electrodes.
(f) Lighting
The CONTRACTOR will make his own arrangement for lighting for carrying out work at night as required. Only general lighting of the area as already available shall be maintained by the OWNER.
TCE CONSULTING ENGINEERS LIMITED SECTION: C6
TCE.4246A-C-300-005
LIQUID AMMONIA AND AMMONIUM HYDROXIDE SOLUTION STORAGE AND TRANSFER SYSTEM
SHEET 1 OF 12
FILE NAME: F120R1
ISSUE
R1
FORM NO. 120 R1
1.1. EQUIPMENT, SYSTEM AND SERVICES TO BE PROVIDED BY
CONTRACTOR
1.2. The equipment / system to be supplied and erected under this specification
are shown in the P & I Diagram enclosed with this specification ‘TCE.4246A-
322-PI-8725 ‘R0’’ as detailed in Section C. Any item which may not have
been specifically mentioned herein but are needed to complete the
equipment / system and the process performance equipment / system to
achieve, shall also be treated as included and the same shall also be
furnished and erected, unless otherwise specifically excluded as indicated in
the bid document.
1.3. The Bidder scope also includes the following for Liquid Ammonia and