MECHANICAL M001 SYMBOLS & SCHEDULES M002 SCHEDULES M003 SCHEDULES M100 FOUNDATION PLAN - DEMOLITION M101 FIRST FLOOR PIPING - DEMOLITION M102 SECOND FLOOR PIPING - DEMOLITION M103 THIRD FLOOR PIPING - DEMOLITION M201 FIRST FLOOR VENTILATION - DEMOLITION M202 SECOND FLOOR VENTILATION - DEMOLITION M203 THIRD FLOOR VENTILATION - DEMOLITION M204 ROOF PLAN - DEMOLITION M205 1ST FLOOR MECHANICAL ROOM - DEMOLITION M206 BOILER ROOM PIPING DIAGRAM - DEMOLITION M207 BOILER ROOM - DEMOLITION M208 2ND FLOOR MECHANICAL ROOM - DEMOLITION M300 FOUNDATION PLAN - NEW CONSTRUCTION M301 FIRST FLOOR PIPING - NEW CONSTRUCTION M302 SECOND FLOOR PIPING - NEW CONSTRUCTION M303 THIRD FLOOR PIPING - NEW CONSTRUCTION M401 FIRST FLOOR VENTILATION - NEW CONSTRUCTION M402 SECOND FLOOR VENTILATION - NEW CONSTRUCTION M403 THIRD FLOOR VENTILATION - NEW CONSTRUCTION M404 ROOF PLAN - NEW CONSTRUCTION M405 1ST FLOOR MECHANICAL ROOMS - NEW CONSTRUCTION M411 AUTOMATIC CONTROLS M412 AUTOMATIC CONTROLS ELECTRICAL E0.00 SITE PLAN E1.01 FIRST FLOOR PLAN - POWER AND LOW VOLTAGE DEMO E1.02 SECOND FLOOR PLAN - POWER AND LOW VOLTAGE DEMO E1.03 THIRD FLOOR PLAN - POWER AND LOW VOLTAGE DEMO E1.04 FIRST FLOOR PLAN - LIGHTING DEMO E1.05 SECOND FLOOR PLAN - LIGHTING DEMO E1.06 THIRD FLOOR PLAN - LIGHTING DEMO E1.07 RISER DIAGRAM - POWER DISTRIBUTION DEMO E2.01 FIRST FLOOR PLAN - POWER SYSTEMS E2.02 SECOND FLOOR PLAN - POWER SYSTEMS E2.03 THIRD FLOOR PLAN - POWER SYSTEMS E2.04 ROOF PLAN - POWER SYSTEMS E2.05 PANEL SCHEDULES E2.06 PANEL SCHEDULES E2.07 PANEL SCHEDULES E2.08 SINGLE LINE DIAGRAM E3.01 FIRST FLOOR PLAN - LIGHTING E3.02 SECOND FLOOR PLAN - LIGHTING E3.03 THIRD FLOOR PLAN - LIGHTING E4.01 FIRST FLOOR PLAN - LOW VOLTAGE SYSTEMS E4.02 SECOND FLOOR PLAN - LOW VOLTAGE SYSTEMS E4.03 THIRD FLOOR PLAN - LOW VOLTAGE SYSTEMS E4.04 RISER DIGRAM - LOW VOLTAGE SYSTEMS GENERAL T0.1 COVER SHEET CIVIL C001 GENERAL NOTES, ABBREVIATIONS, SYMBOLS & VICINITY MAP C100 EXISTING CONDITIONS & SURVEY CONTROL PLAN C101 DEMOLITION PLAN C200 SITE PLAN C300 CONSTRUCTION DETAILS C301 CONSTRUCTION DETAILS C302 CONSTRUCTION DETAILS C303 CONSTRUCTION DETAILS ARCHITECTURAL A0.1 ABBREVIATIONS AND LEGENDS A0.2 CODE PLANS A0.3 CODE PLANS A1.0 SITE PLAN - ARCHITECTURAL A1.1 DEMOLITION FIRST FLOOR PLAN A1.2 DEMOLITION SECOND FLOOR PLAN A1.3 DEMOLITION THIRD FLOOR PLAN A1.4 SLAB PLAN - FIRST FLOOR A2.1 FIRST FLOOR PLAN - NEW CONSTRUCTION A2.2 SECOND FLOOR PLAN - NEW CONSTRUCTION A2.3 THIRD FLOOR PLAN - NEW CONSTRUCTION A3.1 ROOF PLAN - DEMOLITION & NEW CONSTRUCTION A4.1 PARTIAL EXTERIOR ELEVATIONS A5.1 BUILDING SECTIONS A5.2 NEW ELEVATOR SHAFT PLANS & SECTIONS A7.1 ENLARGED PLANS - FIRST FLOOR LABS A7.2 ENLARGED PLANS - RESTROOMS & LABS A8.1 INTERIOR ELEVATIONS A8.2 INTERIOR ELEVATIONS A8.3 INTERIOR ELEVATIONS A8.4 INTERIOR ELEVATIONS A8.5 INTERIOR ELEVATIONS - THIRD FLOOR A8.6 INTERIOR ELEVATIONS SCHEDULE A9.1 REFLECTED CEILING PLAN - FIRST FLOOR A9.2 REFLECTED CEILING PLAN - SECOND FLOOR A9.3 REFLECTED CEILING PLAN - THIRD FLOOR A10.1 EXTERIOR DETAILS A10.2 EXTERIOR DETAILS A10.3 EXTERIOR DETAILS A12.1 SCHEDULES, DOOR TYPES & STOREFRONTS STRUCTURAL S0.01 GENERAL STRUCTURAL NOTES S 1.01 STRUCTURAL DEMO PLAN S2.01 NEW STRUCTURAL FRAMING S2.02 NEW ROOF PENTHOUSE STRUCTURAL FRAMING S2.03 LOADING DOCK FRAMING UNIVERSITY OF ALASKA SOUTHEAST Anderson Building Remodel Juneau, Alaska Design Development Acknowledgements Architecture + Interiors ECI/Hyer, Inc. 101 West Benson Blvd. , suite 306 Anchorage, Alaska 99503 p 907.561.5543 www.ecihyer.com Owner Civil Engineer + Landscape R&M Engineering, Inc. 6205 Glacier Highway Juneau, Alaska 99801 p 907.780.6060 www.rmjuneau.com Structural Engineer Reid Middleton 5300 B Street, Ste. 302 Anchorage, Alaska 99503 p 907.562.3439 www.reidmiddleton.com Mechanical Engineers Murray & Associates 907 Capitol Avenue Juneau, Alaska 99801 p 907.780.6151 www.murraypc.com June 12, 2009 Sheet Index ECI/Hyer project no. 1207 UAS Facilities Services 11120 Glacier Highway Juneau, Alaska 99801 p 907.796.6262 www.uas.alaska.edu Electrical Engineers Haight & Associates 526 Main Street Juneau, Alaska 99801 p 907.586.9788 University of Alaska Southeast Lab Consultant NBBJ 223 Yale Avenue North Seattle, WA 98109 p 206.223.5194 www.haight-assoc.com www.nbbj.com Estimators HMS, Inc. 4103 Minnesota Drive Anchorage, Alaska 99503 p 907.561.1653 www.hmsalaska.com NOT ISSUED FOR CONSTRUCTION
38
Embed
Anderson Building Remodel · a1.4 slab plan - first floor a2.1 first floor plan - new construction a2.2 second floor plan - new construction a2.3 third floor plan - new construction
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
MECHANICALM001 SYMBOLS & SCHEDULESM002 SCHEDULESM003 SCHEDULESM100 FOUNDATION PLAN - DEMOLITIONM101 FIRST FLOOR PIPING - DEMOLITIONM102 SECOND FLOOR PIPING - DEMOLITIONM103 THIRD FLOOR PIPING - DEMOLITIONM201 FIRST FLOOR VENTILATION - DEMOLITIONM202 SECOND FLOOR VENTILATION - DEMOLITIONM203 THIRD FLOOR VENTILATION - DEMOLITIONM204 ROOF PLAN - DEMOLITIONM205 1ST FLOOR MECHANICAL ROOM - DEMOLITIONM206 BOILER ROOM PIPING DIAGRAM - DEMOLITIONM207 BOILER ROOM - DEMOLITIONM208 2ND FLOOR MECHANICAL ROOM - DEMOLITIONM300 FOUNDATION PLAN - NEW CONSTRUCTIONM301 FIRST FLOOR PIPING - NEW CONSTRUCTIONM302 SECOND FLOOR PIPING - NEW CONSTRUCTIONM303 THIRD FLOOR PIPING - NEW CONSTRUCTIONM401 FIRST FLOOR VENTILATION - NEW CONSTRUCTIONM402 SECOND FLOOR VENTILATION - NEW CONSTRUCTIONM403 THIRD FLOOR VENTILATION - NEW CONSTRUCTIONM404 ROOF PLAN - NEW CONSTRUCTIONM405 1ST FLOOR MECHANICAL ROOMS - NEW
ELECTRICALE0.00 SITE PLANE1.01 FIRST FLOOR PLAN - POWER AND LOW VOLTAGE
DEMOE1.02 SECOND FLOOR PLAN - POWER AND LOW VOLTAGE
DEMOE1.03 THIRD FLOOR PLAN - POWER AND LOW VOLTAGE
DEMOE1.04 FIRST FLOOR PLAN - LIGHTING DEMOE1.05 SECOND FLOOR PLAN - LIGHTING DEMOE1.06 THIRD FLOOR PLAN - LIGHTING DEMOE1.07 RISER DIAGRAM - POWER DISTRIBUTION DEMOE2.01 FIRST FLOOR PLAN - POWER SYSTEMSE2.02 SECOND FLOOR PLAN - POWER SYSTEMSE2.03 THIRD FLOOR PLAN - POWER SYSTEMSE2.04 ROOF PLAN - POWER SYSTEMSE2.05 PANEL SCHEDULESE2.06 PANEL SCHEDULESE2.07 PANEL SCHEDULESE2.08 SINGLE LINE DIAGRAME3.01 FIRST FLOOR PLAN - LIGHTINGE3.02 SECOND FLOOR PLAN - LIGHTINGE3.03 THIRD FLOOR PLAN - LIGHTINGE4.01 FIRST FLOOR PLAN - LOW VOLTAGE SYSTEMSE4.02 SECOND FLOOR PLAN - LOW VOLTAGE SYSTEMSE4.03 THIRD FLOOR PLAN - LOW VOLTAGE SYSTEMSE4.04 RISER DIGRAM - LOW VOLTAGE SYSTEMS
GENERALT0.1 COVER SHEET
CIVILC001 GENERAL NOTES, ABBREVIATIONS, SYMBOLS &
VICINITY MAPC100 EXISTING CONDITIONS & SURVEY CONTROL PLANC101 DEMOLITION PLANC200 SITE PLANC300 CONSTRUCTION DETAILSC301 CONSTRUCTION DETAILSC302 CONSTRUCTION DETAILSC303 CONSTRUCTION DETAILS
ARCHITECTURALA0.1 ABBREVIATIONS AND LEGENDSA0.2 CODE PLANSA0.3 CODE PLANSA1.0 SITE PLAN - ARCHITECTURALA1.1 DEMOLITION FIRST FLOOR PLANA1.2 DEMOLITION SECOND FLOOR PLANA1.3 DEMOLITION THIRD FLOOR PLANA1.4 SLAB PLAN - FIRST FLOORA2.1 FIRST FLOOR PLAN - NEW CONSTRUCTIONA2.2 SECOND FLOOR PLAN - NEW CONSTRUCTIONA2.3 THIRD FLOOR PLAN - NEW CONSTRUCTIONA3.1 ROOF PLAN - DEMOLITION & NEW CONSTRUCTIONA4.1 PARTIAL EXTERIOR ELEVATIONSA5.1 BUILDING SECTIONSA5.2 NEW ELEVATOR SHAFT PLANS & SECTIONSA7.1 ENLARGED PLANS - FIRST FLOOR LABSA7.2 ENLARGED PLANS - RESTROOMS & LABSA8.1 INTERIOR ELEVATIONSA8.2 INTERIOR ELEVATIONSA8.3 INTERIOR ELEVATIONSA8.4 INTERIOR ELEVATIONSA8.5 INTERIOR ELEVATIONS - THIRD FLOORA8.6 INTERIOR ELEVATIONS SCHEDULEA9.1 REFLECTED CEILING PLAN - FIRST FLOORA9.2 REFLECTED CEILING PLAN - SECOND FLOORA9.3 REFLECTED CEILING PLAN - THIRD FLOORA10.1 EXTERIOR DETAILSA10.2 EXTERIOR DETAILSA10.3 EXTERIOR DETAILSA12.1 SCHEDULES, DOOR TYPES & STOREFRONTS
STRUCTURALS0.01 GENERAL STRUCTURAL NOTESS1.01 STRUCTURAL DEMO PLANS2.01 NEW STRUCTURAL FRAMINGS2.02 NEW ROOF PENTHOUSE STRUCTURAL FRAMINGS2.03 LOADING DOCK FRAMING
UNIVERSITY OF ALASKASOUTHEAST
Anderson Building RemodelJuneau, AlaskaDesign Development
AcknowledgementsArchitecture + Interiors
ECI/Hyer, Inc.101 West Benson Blvd. , suite 306Anchorage, Alaska 99503p 907.561.5543www.ecihyer.com
Use and Occupancy Classification (IBC Chapter 3):· B (For office, educational opportunities beyound the 12th grade)· S-2 (storage of noncombustible materials).· Mechanical room viewed as incidental use, Section 508.2 and Table 508.2.
General Building Heights and Areas (IBC Chapter 5)
Allowable Area Calculations:Allowable Area for B Occupancy: (most restrictive)Aa = {9,000 + [9,000 x 0.36] + [9,000 x 200%]}Aa = 9,000 + 3,240 + 18,000Aa = 30,240 square feet maximum for a single floor
Allowable Area for S-2 OccupancyAa = {13,500 + [13,500 x 0.36] + [13,500 x 200%]}Aa = 13,000 + 4,860 + 27,000Aa = 44,860 square feet maximum for a single floor
Actual Measured Height and Building Area:Floor Area:· Level 1 = 5,910 square feet· Level 2 = 5,100 square feet· Level 3 = 5,100 square feet
Building Height:· 3 stories· 43’-0”
Mixed Use and Occupancy (IBC Section 508)
Nonseparated Occupancies:· B occupancy is the most restrictive, see allowable calculations above.
Types of Construction (IBC Chapter 6)
Type V-B
Fire-Resistance Rating, Building Elements (IBC Table 601)Building Element Type V BStructural Frame 0Bearing Walls (Int & Ext) 0Nonbearing Walls & Partitions (Ext) 0Nonbearing Walls & Partitions (Int) 0Floor Construction 0Roof Construction 0
Fire-Resistance Rating, Exterior Walls (IBC Table 602), Type V BFire SeparationDistance (ft) Group B, & S<5 1>5 to <10 1>10 to <30 0>30 0
FIRE PROTECTION SYSTEMS (Ch. 9)Existing Automatic Sprinkler System
Not Required per 903.2. - Used for height increases.
EXTERIORFREEZER
EXTERIORCOLD LAB
128 SFELECTRICAL
1
102
324 SFMECH.
2
101
909 SF
SEAWATER RESEARCHLAB
23
111
660 SF
BIOLOGYUNDERGRADUATERESEARCH LAB 2
14
109 667 SF
BIOLOGYUNDERGRADUATERESEARCH LAB 3
14
108
374 SFPROCESS ROOM
2
100U2
158 SFMECH.
1
100U3
42 SFELEV. EQUIP
1
107
105 SFSHOWER
1
112A
AUKE BAY
EXIST.HAZMAT
STORAGE
PERMITTED 150-FTFIRE LANE DEAD END
EDGE OFEXISTINGPAVED VEHICLEDRIVE (TYP.)
EXIST. SALTWATER
INTAKE TANK
FIRE APPARATUSACCESS (DEAD-END)
PERMITTED150-FT HOSEACCESSBEYOND FIREAPPARATUS
PERMITTED150-FT HOSEACCESSBEYOND FIREAPPARATUS
FIRE APPARATUSACCESS
ELEVATOR
872 SF
LINEAR EQUIPMENTROOM
0
104
239 SF
DEPARTMENTALSHARED STORAGE
1
115
UNDERGROUNDFUEL OIL TANK
PROPANE FUELEDGENERATOR SET(ALTERNATE NO.1)
TRANSFORMER
PROPANE TANK
307 SF
DIVE LOCKER/ FIELD EQUIPMENTSTORAGE
8
112
200 SF
SEAWEED/ GREENHOUSE/ CULTURELAB
4
110
1 HOUR WALL CONSTRUCTION
CODE EXIT
Room name150 SF
Occupant_Load
101ROOM NUMBER ROOM AREA ROOM TAG (CODE PLAN)
PROPERTY LINE
CODE LEGEND
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
UAS
PR
OJE
CT
NO
: 200
7-01
6/18
/200
9 6:
43:4
2 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A0.2
CO
DE
PLAN
S
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SPJUN
E 12
, 200
9
JS
1/16" = 1'-0"1 CODE PLAN - FIRST FLOOR
1 2 3 4 5
A
B
C
ELEVATOR
847 SF
CHEMISTRYINSTRUCTIONAL LAB
17
309 363 SF
CHEMISTRY STOCKSTORAGE
2
308
335 SFMECHANICAL
2
320
191 SF
CHEMISTRYINSTRUMENT ROOM
4
307
598 SFBIOLOGY LAB 1A
12
316
388 SFBIOLOGY LAB 1B
8
315
878 SF
BIOLOGYINSTRUCTIONAL LAB
18
314
290 SF
SUPPORT LAB BIOLOGYINSTRUCTION
6
310
145 SF
LAB TECH SHAREDOFFICE
2
313
52 SFM
1
319
52 SFW
1
318
138 SF
SPECIMEN COLLECTIONSTORAGE
1
317
OPEN EXITSTAIRWAY
ENCLOSED EXITSTAIRWAY
494 SFCORRIDOR
0
302
1 2 3 4 5
A
B
C
601 SFCLASSROOM 32 SEAT
31
203 460 SF
STUDENT COMMONS -BREAKROOM
33
202
865 SFCLASSROOM 42 SEAT
44
204117 SF
OFFICE
2
205A
117 SFOFFICE
2
205B 117 SFOFFICE
2
205C 117 SFOFFICE
2
205D
158 SFOFFICE
2
205E
679 SF
DEPARTMENTWORKROOM / ADMIN.
OFFICE
7
205
95 SFOFFICE
1
205F
139 SF
ADJUNCT FACULTYOFFICE
2
205G
184 SFWOMEN'S RESTROOM
2
206
162 SFMEN'S RESTROOM
2
207
33 SFJANITOR'S CLOSET
1
208
ELEVATOR
HAZMATSTORAGE
(EXIST)
SALT WATERINTAKE TANK
(EXIST)
CURRENT VEHICLESITE ACCESS
GLACIER HIGHWAY
ADDED EXITPATHWAY TOPUBLIC WAY
SWITCHBOARD
1 HOUR WALL CONSTRUCTION
CODE EXIT
Room name150 SF
Occupant_Load
101ROOM NUMBER ROOM AREA ROOM TAG (CODE PLAN)
PROPERTY LINE
CODE LEGEND
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
UAS
PR
OJE
CT
NO
: 200
7-01
6/18
/200
9 6:
44:0
5 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A0.3
CO
DE
PLAN
S
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SPJUN
E 12
, 200
9
JS
1/16" = 1'-0"2 CODE PLAN - THIRD FLOOR
1/16" = 1'-0"1
ENTRY LEVEL CODE PLAN - SECONDFLOOR
1 2 3 4 5
A
B
C
29' - 10 3/4" 25' - 0" 29' - 10 3/4" 20' - 0"
29' -
10
3/4"
29' -
10
3/4"
INCUB.1
INCUB.2
SALT WATER TANK
AUTOPSY SINK24"X75.5"X5"D
AUTOCLAVEW/ DRAIN
21
2
3
7
31
8
4
31
3
12
12
2
14
14
5
22
5
6 21 1111
10
13
15
30
9
ITEMIZED DEMOLITION NOTES:
1. REMOVE EXISTING CASEWORK; BASE CABINETS, WALL MOUNTED CABINETS,COUNTERTOPS AND ASSOCIATED SINKS, GAS COCKS, AND ELECTRICALPEDESTALS. SEE MECHANICAL AND ELECTRICAL DEMOLITION DRAWINGS.SALVAGE EXISTING WOOD CASEWORK COMPONENTS AS NEEDED TO REPAIREXISTING CASEWORK IN EXISTING THIRD FLOOR LABORATORIES, CHEMISTRYINSTRUCTIONAL LAB 309 AND BIOLOGY INSTRUCTIONAL LAB 314.
2. REMOVE EXISTING FUME HOOD. RE-USE OF EXISTING FUME HOODS IS BEINGEVALUATED. SEE MECHANICAL AND ELECTRICAL DEMOLITION DRAWINGS.
3. REMOVE EXISTING TRENCH DRAIN COMPLETE; GRATING AND ANGLESUPPORTS. PREPARE FOR INFILL OF DEMOLISHED TRENCH WITH NEWCONCRETE FLOOR SLAB. SEE MECHANICAL FOR DEMOLITION OF PIPING ANDDRAINS. SEE “SLAB PLAN - FIRST FLOOR” FOR EXTENT OF TRENCH DRAINS.
4. REMOVE EXISTING TRENCH DRAIN GRATES. EXISTING TRENCH ANDSUPPORT ANGLES TO REMAIN FOR NEW SOLID COVERS.
5. EXISTING MECHANICAL ROOM, SEE MECHANICAL DEMOLITION DRAWINGSFOR EXTENT OF WORK.
6. EXISTING ELECTRICAL ROOM, SEE ELECTRICAL DEMOLITION DRAWINGSFOR EXTENT OF WORK.
7. REMOVE LOWER MODULE OF ALUMINUM STOREFRONT AND PREPAREOPENING FOR INFILL OF NEW EXTERIOR WALL ASSEMBLY.
8. REMOVE EXISTING ALUMINUM ENTRY DOOR, CUT NEW OPENING IN EXISTINGCONCRETE FOUNDATION WALL FOR RELOCATION OF DOOR, PREPARE OLDDOOR OPENING TO RECEIVE NEW INFILL CONSISTING OF CAST-IN-PLACECONCRETE FOUNDATION WALL (MATCH ADJACENT HEIGHT TO REMAIN), ANDNEW EXTERIOR WALL CONSTRUCTION MATCHING ADJOINING.
9. REMOVE EXISTING EXTERIOR WALL PANEL BEHIND EXISTING COLDLABORATORY. REPAIR EXTERIOR WALL ASSEMBLY (PATCH PENETRATIONSAND REPAIR OR REPLACE SHIP LAP SIDING) AS REQUIRED TO MATCHADJOINING WALL CONSTRUCTION.
10. EXISTING CABINET UNIT HEATER TO REMAIN.
11. EXISTING FIRE EXTINGUISHER CABINET TO BE REMOVED. SALVAGE FORPOTENTIAL RE-USE IN NEW WORK.
12. EXISTING EMERGENCY EYE WASH / SHOWER. SALVAGE FOR POTENTIALRE-USE IN NEW WORK.
13. EXISTING ELECTRICAL OR COMMUNICATIONS PANEL. SEE ELECTRICALDEMOLITION DRAWINGS FOR EXTENT OF WORK.
14. ALTERNATE NO. 1: REMOVE EXISTING GENERATOR COMPLETE INCLUDINGEXTERIOR RADIATOR AND EXHAUST. SEE ELECTRICAL DEMOLITIONDRAWINGS.
15. AREA OF EXISTING EXTERIOR LOADING DOCK CONCRETE SLAB ONGRADE, RETAINING WALLS, STAIRS AND RAILINGS. DEMOLISH AS REQUIREDFOR NEW WORK. SEE SHEET A1.0 SITE PLAN - ARCHITECTURAL AND CIVIL FORREVISED LAYOUT. EXISTING WALK-IN FREEZER (9’-8” SQUARE), COLD-LABREFRIGERATOR AND ENCLOSURE (9’-10” X 15’-10”), WOODEN CRIBBING, ANDROOF MOUNTED CONDENSERS TO BE REMOVED. SEE MECHANICAL ANDELECTRICAL DEMOLITION DRAWINGS.
16. EXISTING TACKBOARD TO BE REMOVED.
17. EXISTING WALL MOUNTED PHONE. SEE ELECTRICAL DEMOLITIONDRAWINGS.
18. EXISTING PROJECTION SCREEN TO BE REMOVED.
19.REMOVE AND SALVAGE EXISTING FLOOR MOP SINK AND MOP HOLDERRACK FOR REINSTALLATION.
20. REMOVE AND SALVAGE EXISTING WALL MOUNTED SLIDING MARKERBOARDUNIT AND CASEWORK FOR REINSTALLATION FOLLOWING DEMOLITION ANDCONSTRUCTION OF NEW WALLS. COORDINATE PROVISIONS FOR BACKINGWITH REINSTALLATION.
21. EXISTING TOILET ROOM. DEMOLISH ALL FIXTURES, TOILET PARTITIONS,AND TOILET ACCESSORIES COMPLETE. SEE MECHANICAL DEMOLITIONDRAWINGS FOR ASSOCIATED PLUMBING WORK.
22. DEMOLISH EXISTING HYDRAULIC ELEVATOR, OPENINGS, SIGNAL AND CALLSTATIONS, AND EQUIPMENT COMPLETE. ENLARGE FLOOR OPENINGS FORNEW ELEVATOR AS DESCRIBED. ENLARGE ELEVATOR PIT FOUNDATION ANDWALLS AS REQUIRED FOR NEW ELEVATOR.
23. EXISTING INSTRUCTIONAL ISLAND TO REMAIN. SEE MECHANICAL ANDELECTRICAL DRAWINGS FOR DEMOLITION AND NEW WORK.
24. LOCATION FOR NEW SWITCHBOARD (SEE ELECTRICAL). DEMOLISHEXISTING ROOF/PAVER ASSEMBLY AS REQUIRED FOR INSTALLATION OF NEWCAST-IN-PLACE PEDESTAL BASE AND ROOF FLASHING TERMINATIONS.
25. EXISTING FIRE ALARM ANNUNCIATOR PANEL TO BE REMOVED. SEEELECTRICAL DEMOLITION DRAWINGS.
26. EXISTING FUME HOODS, SOFFIT, AND FIRE SUPPRESSION SYSTEM TO BEREMOVED. SEE MECHANICAL AND ELECTRICAL DEMOLITION DRAWINGS.
27. EXISTING EMERGENCY EYE WASH / SHOWER TO REMAIN.
28. EXISTING DISPLAY CASE TO BE REMOVED.
29. EXISTING DRINKING FOUNTAIN TO BE REMOVED. SEE MECHANICALDEMOLITION DRAWINGS.
30. REMOVE EXTERIOR SOFFIT COMPLETE.
31. REMOVE WALL COMPLETE (FORMER EXTERIOR WALL AND EXISTINGEXTERIOR WALL). REUSE OF ALUMINUM WINDOWS BEING EVALUATED FOR RE-USE IN NEW SOUTH EXTERIOR WALL BETWEEN GRIDS 1 AND 2.
32. REMOVE PORTION OF EXTERIOR WALL FOR NEW MECHANICAL LOUVER.SEE MECHANICAL DEMOLITION DRAWINGS.
33. EXISTING CHASE. REMOVE AND REPAIR PORTIONS AS NEEDED TOUPGRADE EXISTING SEAWATER PIPING. SEE MECHANICAL DEMOLITIONDRAWINGS.
34. REMOVE EXISTING CASEWORK; BASE CABINETS, WALL MOUNTEDCABINETS, COUNTERTOPS AND ASSOCIATED SINKS. SEE MECHANICALDEMOLITION DRAWINGS. SALVAGE FOR REINSTALLATION FOLLOWING NEWWALL CONSTRUCTION. (2) EXISTING MICROSCOPE CABINETS TO BEREINSTALLED IN ADJOINING ROOM, SUPPORT LAB BIOLOGY INSTRUCTION 310.
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
GENERAL DEMOLITION NOTES:
DEMOLITION WORK IS BASED ON RECORD DOCUMENTS PROVIDED BY THE UNIVERSITY OF ALASKA SOUTHEAST AND LIMITED FIELD VERIFICATION.DISCOVERED DISCREPANCIES ARE TO BE NOTED AND SUBMITTED TO THE OWNER FOR CLARIFICATION AND DIRECTION OF WORK.
ALL CEILINGS AND SUPPORT STRUCTURE ARE TO BE DEMOLISHED UNLESS OTHERWISE NOTED. SEE ELECTRICAL DEMOLITION DRAWINGS FORLIGHTING.
ALL FLOOR FINISHES TO BE REMOVED UNLESS NOTED OTHERWISE, SEE SHEET A12.1, ROOM FINISH SCHEDULE
EXISTING FREESTANDING POWER/DATA POLES TO BE REMOVED SEE ELECTRICAL DEMOLITION DRAWINGS.
THE FACILITY IS CURRENTLY PROTECTED WITH AN AUTOMATIC SPRINKLER SYSTEM. REQUIRED MODIFICATIONS ARE COVERED IN PERFORMANCESPECIFICATIONS, SEE MECHANICAL DOCUMENTS.
A SIGNIFICANT AMOUNT OF DEMOUNTABLE PARTITIONS EXIST WITHIN THE FACILITY. DEMOLITION OF DEMOUNTABLE PARTITIONS TO CONSIST OF ALLACCESSORIES; NOT LIMITED TO CHALKBOARD SURFACES AND SURFACE RACEWAYS AND OUTLETS (SEE ELECTRICAL DEMOLITION DRAWINGS).
AN EXISTING ENVIRONMENTAL REPORT WAS PREPARED BY CARSON DORN, INC. FOR THE UNIVERSITY OF ALASKA SOUTHEAST TITLED “ASBESTOSSURVEY FOR ANDERSON BUILDING, JUNEAU, ALASKA,” DATED DECEMBER 2008. THE REPORT IDENTIFIED ASBESTOS CONTAINING BUILDING MATERIALFOUND IS IN THE LAB BENCHES ON THE FIRST/GROUND FLOOR, WHICH CONTAINS 15% CHRYSOTILE.
AN ENVIRONMENTAL INVESTIGATION IS BEING UNDERTAKEN FOR THE EXISTING ROOF. A FINAL REPORT WILL BE PREPARED FOR USE BY THE DESIGNTEAM AND THE CONTRACTOR.
ALL ITEMS NOT REMOVED BY OWNER FROM WORK AREAS OR INDICATED FOR SALVAGE TO BE DEMOLISHED.
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
UAS
PR
OJE
CT
NO
: 200
7-01
6/18
/200
9 4:
53:0
0 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A1.1
DEM
OLI
T IO
N F
IRS T
FLO
OR
PLA
N
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SPJUN
E 12
, 200
9
JS
1/8" = 1'-0"1 DEMOLITION - FIRST FLOOR
1 2 3 4 5
A
B
C
23
18
18
16
16
25
16
11
11
1617
24
29' -
10
3/4"
29' -
10
3/4"
29' - 10 3/4" 25' - 0" 29' - 10 3/4" 20' - 0"
33
ITEMIZED DEMOLITION NOTES:
1. REMOVE EXISTING CASEWORK; BASE CABINETS, WALL MOUNTED CABINETS,COUNTERTOPS AND ASSOCIATED SINKS, GAS COCKS, AND ELECTRICALPEDESTALS. SEE MECHANICAL AND ELECTRICAL DEMOLITION DRAWINGS.SALVAGE EXISTING WOOD CASEWORK COMPONENTS AS NEEDED TO REPAIREXISTING CASEWORK IN EXISTING THIRD FLOOR LABORATORIES, CHEMISTRYINSTRUCTIONAL LAB 309 AND BIOLOGY INSTRUCTIONAL LAB 314.
2. REMOVE EXISTING FUME HOOD. RE-USE OF EXISTING FUME HOODS IS BEINGEVALUATED. SEE MECHANICAL AND ELECTRICAL DEMOLITION DRAWINGS.
3. REMOVE EXISTING TRENCH DRAIN COMPLETE; GRATING AND ANGLESUPPORTS. PREPARE FOR INFILL OF DEMOLISHED TRENCH WITH NEWCONCRETE FLOOR SLAB. SEE MECHANICAL FOR DEMOLITION OF PIPING ANDDRAINS. SEE “SLAB PLAN - FIRST FLOOR” FOR EXTENT OF TRENCH DRAINS.
4. REMOVE EXISTING TRENCH DRAIN GRATES. EXISTING TRENCH ANDSUPPORT ANGLES TO REMAIN FOR NEW SOLID COVERS.
5. EXISTING MECHANICAL ROOM, SEE MECHANICAL DEMOLITION DRAWINGSFOR EXTENT OF WORK.
6. EXISTING ELECTRICAL ROOM, SEE ELECTRICAL DEMOLITION DRAWINGSFOR EXTENT OF WORK.
7. REMOVE LOWER MODULE OF ALUMINUM STOREFRONT AND PREPAREOPENING FOR INFILL OF NEW EXTERIOR WALL ASSEMBLY.
8. REMOVE EXISTING ALUMINUM ENTRY DOOR, CUT NEW OPENING IN EXISTINGCONCRETE FOUNDATION WALL FOR RELOCATION OF DOOR, PREPARE OLDDOOR OPENING TO RECEIVE NEW INFILL CONSISTING OF CAST-IN-PLACECONCRETE FOUNDATION WALL (MATCH ADJACENT HEIGHT TO REMAIN), ANDNEW EXTERIOR WALL CONSTRUCTION MATCHING ADJOINING.
9. REMOVE EXISTING EXTERIOR WALL PANEL BEHIND EXISTING COLDLABORATORY. REPAIR EXTERIOR WALL ASSEMBLY (PATCH PENETRATIONSAND REPAIR OR REPLACE SHIP LAP SIDING) AS REQUIRED TO MATCHADJOINING WALL CONSTRUCTION.
10. EXISTING CABINET UNIT HEATER TO REMAIN.
11. EXISTING FIRE EXTINGUISHER CABINET TO BE REMOVED. SALVAGE FORPOTENTIAL RE-USE IN NEW WORK.
12. EXISTING EMERGENCY EYE WASH / SHOWER. SALVAGE FOR POTENTIALRE-USE IN NEW WORK.
13. EXISTING ELECTRICAL OR COMMUNICATIONS PANEL. SEE ELECTRICALDEMOLITION DRAWINGS FOR EXTENT OF WORK.
14. ALTERNATE NO. 1: REMOVE EXISTING GENERATOR COMPLETE INCLUDINGEXTERIOR RADIATOR AND EXHAUST. SEE ELECTRICAL DEMOLITIONDRAWINGS.
15. AREA OF EXISTING EXTERIOR LOADING DOCK CONCRETE SLAB ONGRADE, RETAINING WALLS, STAIRS AND RAILINGS. DEMOLISH AS REQUIREDFOR NEW WORK. SEE SHEET A1.0 SITE PLAN - ARCHITECTURAL AND CIVIL FORREVISED LAYOUT. EXISTING WALK-IN FREEZER (9’-8” SQUARE), COLD-LABREFRIGERATOR AND ENCLOSURE (9’-10” X 15’-10”), WOODEN CRIBBING, ANDROOF MOUNTED CONDENSERS TO BE REMOVED. SEE MECHANICAL ANDELECTRICAL DEMOLITION DRAWINGS.
16. EXISTING TACKBOARD TO BE REMOVED.
17. EXISTING WALL MOUNTED PHONE. SEE ELECTRICAL DEMOLITIONDRAWINGS.
18. EXISTING PROJECTION SCREEN TO BE REMOVED.
19.REMOVE AND SALVAGE EXISTING FLOOR MOP SINK AND MOP HOLDERRACK FOR REINSTALLATION.
20. REMOVE AND SALVAGE EXISTING WALL MOUNTED SLIDING MARKERBOARDUNIT AND CASEWORK FOR REINSTALLATION FOLLOWING DEMOLITION ANDCONSTRUCTION OF NEW WALLS. COORDINATE PROVISIONS FOR BACKINGWITH REINSTALLATION.
21. EXISTING TOILET ROOM. DEMOLISH ALL FIXTURES, TOILET PARTITIONS,AND TOILET ACCESSORIES COMPLETE. SEE MECHANICAL DEMOLITIONDRAWINGS FOR ASSOCIATED PLUMBING WORK.
22. DEMOLISH EXISTING HYDRAULIC ELEVATOR, OPENINGS, SIGNAL AND CALLSTATIONS, AND EQUIPMENT COMPLETE. ENLARGE FLOOR OPENINGS FORNEW ELEVATOR AS DESCRIBED. ENLARGE ELEVATOR PIT FOUNDATION ANDWALLS AS REQUIRED FOR NEW ELEVATOR.
23. EXISTING INSTRUCTIONAL ISLAND TO REMAIN. SEE MECHANICAL ANDELECTRICAL DRAWINGS FOR DEMOLITION AND NEW WORK.
24. LOCATION FOR NEW SWITCHBOARD (SEE ELECTRICAL). DEMOLISHEXISTING ROOF/PAVER ASSEMBLY AS REQUIRED FOR INSTALLATION OF NEWCAST-IN-PLACE PEDESTAL BASE AND ROOF FLASHING TERMINATIONS.
25. EXISTING FIRE ALARM ANNUNCIATOR PANEL TO BE REMOVED. SEEELECTRICAL DEMOLITION DRAWINGS.
26. EXISTING FUME HOODS, SOFFIT, AND FIRE SUPPRESSION SYSTEM TO BEREMOVED. SEE MECHANICAL AND ELECTRICAL DEMOLITION DRAWINGS.
27. EXISTING EMERGENCY EYE WASH / SHOWER TO REMAIN.
28. EXISTING DISPLAY CASE TO BE REMOVED.
29. EXISTING DRINKING FOUNTAIN TO BE REMOVED. SEE MECHANICALDEMOLITION DRAWINGS.
30. REMOVE EXTERIOR SOFFIT COMPLETE.
31. REMOVE WALL COMPLETE (FORMER EXTERIOR WALL AND EXISTINGEXTERIOR WALL). REUSE OF ALUMINUM WINDOWS BEING EVALUATED FOR RE-USE IN NEW SOUTH EXTERIOR WALL BETWEEN GRIDS 1 AND 2.
32. REMOVE PORTION OF EXTERIOR WALL FOR NEW MECHANICAL LOUVER.SEE MECHANICAL DEMOLITION DRAWINGS.
33. EXISTING CHASE. REMOVE AND REPAIR PORTIONS AS NEEDED TOUPGRADE EXISTING SEAWATER PIPING. SEE MECHANICAL DEMOLITIONDRAWINGS.
34. REMOVE EXISTING CASEWORK; BASE CABINETS, WALL MOUNTEDCABINETS, COUNTERTOPS AND ASSOCIATED SINKS. SEE MECHANICALDEMOLITION DRAWINGS. SALVAGE FOR REINSTALLATION FOLLOWING NEWWALL CONSTRUCTION. (2) EXISTING MICROSCOPE CABINETS TO BEREINSTALLED IN ADJOINING ROOM, SUPPORT LAB BIOLOGY INSTRUCTION 310.
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
GENERAL DEMOLITION NOTES:
DEMOLITION WORK IS BASED ON RECORD DOCUMENTS PROVIDED BY THE UNIVERSITY OF ALASKA SOUTHEAST AND LIMITED FIELD VERIFICATION.DISCOVERED DISCREPANCIES ARE TO BE NOTED AND SUBMITTED TO THE OWNER FOR CLARIFICATION AND DIRECTION OF WORK.
ALL CEILINGS AND SUPPORT STRUCTURE ARE TO BE DEMOLISHED UNLESS OTHERWISE NOTED. SEE ELECTRICAL DEMOLITION DRAWINGS FORLIGHTING.
ALL FLOOR FINISHES TO BE REMOVED UNLESS NOTED OTHERWISE, SEE SHEET A12.1, ROOM FINISH SCHEDULE
EXISTING FREESTANDING POWER/DATA POLES TO BE REMOVED SEE ELECTRICAL DEMOLITION DRAWINGS.
THE FACILITY IS CURRENTLY PROTECTED WITH AN AUTOMATIC SPRINKLER SYSTEM. REQUIRED MODIFICATIONS ARE COVERED IN PERFORMANCESPECIFICATIONS, SEE MECHANICAL DOCUMENTS.
A SIGNIFICANT AMOUNT OF DEMOUNTABLE PARTITIONS EXIST WITHIN THE FACILITY. DEMOLITION OF DEMOUNTABLE PARTITIONS TO CONSIST OF ALLACCESSORIES; NOT LIMITED TO CHALKBOARD SURFACES AND SURFACE RACEWAYS AND OUTLETS (SEE ELECTRICAL DEMOLITION DRAWINGS).
AN EXISTING ENVIRONMENTAL REPORT WAS PREPARED BY CARSON DORN, INC. FOR THE UNIVERSITY OF ALASKA SOUTHEAST TITLED “ASBESTOSSURVEY FOR ANDERSON BUILDING, JUNEAU, ALASKA,” DATED DECEMBER 2008. THE REPORT IDENTIFIED ASBESTOS CONTAINING BUILDING MATERIALFOUND IS IN THE LAB BENCHES ON THE FIRST/GROUND FLOOR, WHICH CONTAINS 15% CHRYSOTILE.
AN ENVIRONMENTAL INVESTIGATION IS BEING UNDERTAKEN FOR THE EXISTING ROOF. A FINAL REPORT WILL BE PREPARED FOR USE BY THE DESIGNTEAM AND THE CONTRACTOR.
ALL ITEMS NOT REMOVED BY OWNER FROM WORK AREAS OR INDICATED FOR SALVAGE TO BE DEMOLISHED.
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
UAS
PR
OJE
CT
NO
: 200
7-01
6/18
/200
9 4:
53:1
3 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A1.2
DEM
OLI
TIO
N S
E CO
ND
FLO
OR
PLA
N
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SPJUN
E 12
, 200
9
JS
1/8" = 1'-0"1 DEMOLITION - SECOND FLOOR
1 2 3 4 5
A
B
C
27 26
13 282911
19
32
22
29' -
10
3/4"
29' -
10
3/4"
29' - 10 3/4" 25' - 0" 29' - 10 3/4" 20' - 0"
27 27 2020
17
27
34
33
ITEMIZED DEMOLITION NOTES:
1. REMOVE EXISTING CASEWORK; BASE CABINETS, WALL MOUNTED CABINETS,COUNTERTOPS AND ASSOCIATED SINKS, GAS COCKS, AND ELECTRICALPEDESTALS. SEE MECHANICAL AND ELECTRICAL DEMOLITION DRAWINGS.SALVAGE EXISTING WOOD CASEWORK COMPONENTS AS NEEDED TO REPAIREXISTING CASEWORK IN EXISTING THIRD FLOOR LABORATORIES, CHEMISTRYINSTRUCTIONAL LAB 309 AND BIOLOGY INSTRUCTIONAL LAB 314.
2. REMOVE EXISTING FUME HOOD. RE-USE OF EXISTING FUME HOODS IS BEINGEVALUATED. SEE MECHANICAL AND ELECTRICAL DEMOLITION DRAWINGS.
3. REMOVE EXISTING TRENCH DRAIN COMPLETE; GRATING AND ANGLESUPPORTS. PREPARE FOR INFILL OF DEMOLISHED TRENCH WITH NEWCONCRETE FLOOR SLAB. SEE MECHANICAL FOR DEMOLITION OF PIPING ANDDRAINS. SEE “SLAB PLAN - FIRST FLOOR” FOR EXTENT OF TRENCH DRAINS.
4. REMOVE EXISTING TRENCH DRAIN GRATES. EXISTING TRENCH ANDSUPPORT ANGLES TO REMAIN FOR NEW SOLID COVERS.
5. EXISTING MECHANICAL ROOM, SEE MECHANICAL DEMOLITION DRAWINGSFOR EXTENT OF WORK.
6. EXISTING ELECTRICAL ROOM, SEE ELECTRICAL DEMOLITION DRAWINGSFOR EXTENT OF WORK.
7. REMOVE LOWER MODULE OF ALUMINUM STOREFRONT AND PREPAREOPENING FOR INFILL OF NEW EXTERIOR WALL ASSEMBLY.
8. REMOVE EXISTING ALUMINUM ENTRY DOOR, CUT NEW OPENING IN EXISTINGCONCRETE FOUNDATION WALL FOR RELOCATION OF DOOR, PREPARE OLDDOOR OPENING TO RECEIVE NEW INFILL CONSISTING OF CAST-IN-PLACECONCRETE FOUNDATION WALL (MATCH ADJACENT HEIGHT TO REMAIN), ANDNEW EXTERIOR WALL CONSTRUCTION MATCHING ADJOINING.
9. REMOVE EXISTING EXTERIOR WALL PANEL BEHIND EXISTING COLDLABORATORY. REPAIR EXTERIOR WALL ASSEMBLY (PATCH PENETRATIONSAND REPAIR OR REPLACE SHIP LAP SIDING) AS REQUIRED TO MATCHADJOINING WALL CONSTRUCTION.
10. EXISTING CABINET UNIT HEATER TO REMAIN.
11. EXISTING FIRE EXTINGUISHER CABINET TO BE REMOVED. SALVAGE FORPOTENTIAL RE-USE IN NEW WORK.
12. EXISTING EMERGENCY EYE WASH / SHOWER. SALVAGE FOR POTENTIALRE-USE IN NEW WORK.
13. EXISTING ELECTRICAL OR COMMUNICATIONS PANEL. SEE ELECTRICALDEMOLITION DRAWINGS FOR EXTENT OF WORK.
14. ALTERNATE NO. 1: REMOVE EXISTING GENERATOR COMPLETE INCLUDINGEXTERIOR RADIATOR AND EXHAUST. SEE ELECTRICAL DEMOLITIONDRAWINGS.
15. AREA OF EXISTING EXTERIOR LOADING DOCK CONCRETE SLAB ONGRADE, RETAINING WALLS, STAIRS AND RAILINGS. DEMOLISH AS REQUIREDFOR NEW WORK. SEE SHEET A1.0 SITE PLAN - ARCHITECTURAL AND CIVIL FORREVISED LAYOUT. EXISTING WALK-IN FREEZER (9’-8” SQUARE), COLD-LABREFRIGERATOR AND ENCLOSURE (9’-10” X 15’-10”), WOODEN CRIBBING, ANDROOF MOUNTED CONDENSERS TO BE REMOVED. SEE MECHANICAL ANDELECTRICAL DEMOLITION DRAWINGS.
16. EXISTING TACKBOARD TO BE REMOVED.
17. EXISTING WALL MOUNTED PHONE. SEE ELECTRICAL DEMOLITIONDRAWINGS.
18. EXISTING PROJECTION SCREEN TO BE REMOVED.
19.REMOVE AND SALVAGE EXISTING FLOOR MOP SINK AND MOP HOLDERRACK FOR REINSTALLATION.
20. REMOVE AND SALVAGE EXISTING WALL MOUNTED SLIDING MARKERBOARDUNIT AND CASEWORK FOR REINSTALLATION FOLLOWING DEMOLITION ANDCONSTRUCTION OF NEW WALLS. COORDINATE PROVISIONS FOR BACKINGWITH REINSTALLATION.
21. EXISTING TOILET ROOM. DEMOLISH ALL FIXTURES, TOILET PARTITIONS,AND TOILET ACCESSORIES COMPLETE. SEE MECHANICAL DEMOLITIONDRAWINGS FOR ASSOCIATED PLUMBING WORK.
22. DEMOLISH EXISTING HYDRAULIC ELEVATOR, OPENINGS, SIGNAL AND CALLSTATIONS, AND EQUIPMENT COMPLETE. ENLARGE FLOOR OPENINGS FORNEW ELEVATOR AS DESCRIBED. ENLARGE ELEVATOR PIT FOUNDATION ANDWALLS AS REQUIRED FOR NEW ELEVATOR.
23. EXISTING INSTRUCTIONAL ISLAND TO REMAIN. SEE MECHANICAL ANDELECTRICAL DRAWINGS FOR DEMOLITION AND NEW WORK.
24. LOCATION FOR NEW SWITCHBOARD (SEE ELECTRICAL). DEMOLISHEXISTING ROOF/PAVER ASSEMBLY AS REQUIRED FOR INSTALLATION OF NEWCAST-IN-PLACE PEDESTAL BASE AND ROOF FLASHING TERMINATIONS.
25. EXISTING FIRE ALARM ANNUNCIATOR PANEL TO BE REMOVED. SEEELECTRICAL DEMOLITION DRAWINGS.
26. EXISTING FUME HOODS, SOFFIT, AND FIRE SUPPRESSION SYSTEM TO BEREMOVED. SEE MECHANICAL AND ELECTRICAL DEMOLITION DRAWINGS.
27. EXISTING EMERGENCY EYE WASH / SHOWER TO REMAIN.
28. EXISTING DISPLAY CASE TO BE REMOVED.
29. EXISTING DRINKING FOUNTAIN TO BE REMOVED. SEE MECHANICALDEMOLITION DRAWINGS.
30. REMOVE EXTERIOR SOFFIT COMPLETE.
31. REMOVE WALL COMPLETE (FORMER EXTERIOR WALL AND EXISTINGEXTERIOR WALL). REUSE OF ALUMINUM WINDOWS BEING EVALUATED FOR RE-USE IN NEW SOUTH EXTERIOR WALL BETWEEN GRIDS 1 AND 2.
32. REMOVE PORTION OF EXTERIOR WALL FOR NEW MECHANICAL LOUVER.SEE MECHANICAL DEMOLITION DRAWINGS.
33. EXISTING CHASE. REMOVE AND REPAIR PORTIONS AS NEEDED TOUPGRADE EXISTING SEAWATER PIPING. SEE MECHANICAL DEMOLITIONDRAWINGS.
34. REMOVE EXISTING CASEWORK; BASE CABINETS, WALL MOUNTEDCABINETS, COUNTERTOPS AND ASSOCIATED SINKS. SEE MECHANICALDEMOLITION DRAWINGS. SALVAGE FOR REINSTALLATION FOLLOWING NEWWALL CONSTRUCTION. (2) EXISTING MICROSCOPE CABINETS TO BEREINSTALLED IN ADJOINING ROOM, SUPPORT LAB BIOLOGY INSTRUCTION 310.
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
GENERAL DEMOLITION NOTES:
DEMOLITION WORK IS BASED ON RECORD DOCUMENTS PROVIDED BY THE UNIVERSITY OF ALASKA SOUTHEAST AND LIMITED FIELD VERIFICATION.DISCOVERED DISCREPANCIES ARE TO BE NOTED AND SUBMITTED TO THE OWNER FOR CLARIFICATION AND DIRECTION OF WORK.
ALL CEILINGS AND SUPPORT STRUCTURE ARE TO BE DEMOLISHED UNLESS OTHERWISE NOTED. SEE ELECTRICAL DEMOLITION DRAWINGS FORLIGHTING.
ALL FLOOR FINISHES TO BE REMOVED UNLESS NOTED OTHERWISE, SEE SHEET A12.1, ROOM FINISH SCHEDULE
EXISTING FREESTANDING POWER/DATA POLES TO BE REMOVED SEE ELECTRICAL DEMOLITION DRAWINGS.
THE FACILITY IS CURRENTLY PROTECTED WITH AN AUTOMATIC SPRINKLER SYSTEM. REQUIRED MODIFICATIONS ARE COVERED IN PERFORMANCESPECIFICATIONS, SEE MECHANICAL DOCUMENTS.
A SIGNIFICANT AMOUNT OF DEMOUNTABLE PARTITIONS EXIST WITHIN THE FACILITY. DEMOLITION OF DEMOUNTABLE PARTITIONS TO CONSIST OF ALLACCESSORIES; NOT LIMITED TO CHALKBOARD SURFACES AND SURFACE RACEWAYS AND OUTLETS (SEE ELECTRICAL DEMOLITION DRAWINGS).
AN EXISTING ENVIRONMENTAL REPORT WAS PREPARED BY CARSON DORN, INC. FOR THE UNIVERSITY OF ALASKA SOUTHEAST TITLED “ASBESTOSSURVEY FOR ANDERSON BUILDING, JUNEAU, ALASKA,” DATED DECEMBER 2008. THE REPORT IDENTIFIED ASBESTOS CONTAINING BUILDING MATERIALFOUND IS IN THE LAB BENCHES ON THE FIRST/GROUND FLOOR, WHICH CONTAINS 15% CHRYSOTILE.
AN ENVIRONMENTAL INVESTIGATION IS BEING UNDERTAKEN FOR THE EXISTING ROOF. A FINAL REPORT WILL BE PREPARED FOR USE BY THE DESIGNTEAM AND THE CONTRACTOR.
ALL ITEMS NOT REMOVED BY OWNER FROM WORK AREAS OR INDICATED FOR SALVAGE TO BE DEMOLISHED.
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
UAS
PR
OJE
CT
NO
: 200
7-01
6/18
/200
9 4:
53:2
6 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A1.3
DEM
OLI
T IO
N T
HIR
DFL
OO
R P
LAN
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SPJUN
E 12
, 200
9
JS
1/8" = 1'-0"1 DEMOLITION - THIRD FLOOR
1 2 3 4 5
A
B
C
22
6
69
9
9
9
6
10
11 1112
21 3
4
5 5
6
13
8
7
29' -
10
3/4"
29' -
10
3/4"
29' - 10 3/4" 25' - 0" 29' - 10 3/4" 20' - 0"
ITEMIZED DEMOLITION NOTES:
1. EXISTING TRENCH DRAIN TO REMAIN.
2. REMOVE EXISTING TRENCH DRAIN COMPLETE; GRATING ANDANGLE SUPPORTS. PREPARE FOR INFILL OF DEMOLISHEDTRENCH WITH NEW CONCRETE FLOOR SLAB. SEE MECHANICALFOR DEMOLITION OF PIPING AND DRAINS.
3. REMOVE EXISTING TRENCH DRAIN GRATES. EXISTING TRENCHAND SUPPORT ANGLES TO REMAIN FOR NEW SOLID COVERS.
4. NEW TRENCH DRAIN. MATCH EXISTING DIMENSIONS OFADJOINING EXISTING TRENCH TO REMAIN. AT CONTINUATION OFTRENCHES BELOW INTERIOR WALLS PROVIDE SOLID COVER FORWALL THICKNESS PLUS 8-INNCHES EITHER SIDE.
5. EXISTING CONCRETE CURB AT BOTTOM OF WALL. DEMOLISHCURB AS REQUIRED TO PATCH FLOOR AND APPLY NEW FLOORFINISHES. REMOVE VERTICAL RE-BAR PENETRATING REMAININGFLOOR SLABS TO A POINT 2-INCHES BELOW SLAB ELEVATIONAND PREPARE FOR CONCRETE PATCH.
6. NEW 6-INCH HIGH CAST CONCRETE CURB.
7. ENLARGE ELEVATOR PIT TO ACCOMMODATE NEW ELEVATOR.SEE STRUCTURAL AND ARCHITECTURAL DRAWINGS FORDIMENSIONS AND NEW FOUNDATION WORK. PROVIDE NEW PITSUMP, COORDINATE DIMENSIONS WITH ELEVATORMANUFACTURER. SEE STRUCTURAL AND MECHANICALDRAWINGS.
8. FOR DETAILED LAYOUT OF EXISTING EXTERIOR LOADINGDOCK MODIFICATIONS AND DRAINS SEE SHEET A1.0 SITE PLAN -ARCHITECTURAL, CIVIL, AND MECHANICAL DRAWINGS. FOREXTENT OF HEAT TRACED DRAIN LINES SEE ELECTRICAL.
9. GENERAL FLOOR DRAIN.
10. SHOWER DRAIN.
11. EMERGENCY EYE WASH / SHOWER DRAIN.
12. FLOOR SINK FOR ICE MAKER INDIRECT DRAIN.
13. EXISTING CONCRETE STEM WALL. CUT NEW OPENING FORRELOCATED EXIT DOOR AND REPLACE WALL AT OLD OPENING.SEE STRUCTURAL.
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
NEW WORK
GENERAL DEMOLITION NOTES:
DEMOLITION WORK IS BASED ON RECORD DOCUMENTS PROVIDED BY THE UNIVERSITY OF ALASKASOUTHEAST AND LIMITED FIELD VERIFICATION. DISCOVERED DISCREPANCIES ARE TO BE NOTED ANDSUBMITTED TO THE OWNER FOR CLARIFICATION AND DIRECTION OF WORK.
FOR UNDERSLAB PLUMBING MODIFICATIONS AND NEW WORK SEE MECHANICAL DRAWINGS FORDEMOLITION AND NEW WORK. NEW FLOOR DRAINS ASSOCIATED WITH ROOM DATA SHEET LISTINGS AREINDICATED ONLY ON PLAN.
FOR BURIED ELECTRICAL CONDUITS AND TERMINATIONS SEE ELECTRICAL DRAWINGS FOR DEMOLITIONAND NEW WORK.
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
6/18
/200
9 4:
53:4
0 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A1.4
SLAB
PL A
N -
F IR
S TFL
OO
R
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SPJUN
E 12
, 200
9
JS
1/8" = 1'-0"1 SLAB PLAN - FIRST FLOOR
1 2 3 4 5
A
B
C
29' - 10 3/4" 25' - 0" 29' - 10 3/4" 20' - 0"
29' -
10
3/4"
29' -
10
3/4"
ELEV. EQUIP107
EXTERIOR FREEZER103B
101
100U3B
100U3A
100U2
108C
A4.1
1
A4.1 2
128 SF
ELECTRICAL102
324 SF
MECH.101
909 SF
SEAWATERRESEARCH LAB
111
660 SF
BIOLOGYUNDERGRADUATERESEARCH LAB 2
109
667 SF
BIOLOGYUNDERGRADUATERESEARCH LAB 3
108
LINEAREQUIPMENT
ROOM104
374 SF
PROCESS ROOM100U2
158 SF
MECH.100U3
234 SF
STAIR103
A8.1
1
2
3
4
A8.27
108
239 SF
DEPARTMENTALSHARED
STORAGE115
232 SF
SUPPORT LAB:SEAWATER LAB
114307 SF
DIVE LOCKER/FIELD EQUIPMENT
STORAGE112
SHOWER112A
M106
W105
1A5.1
2A5.1
111A
111B 109103C
104
107106
105
114 115112
NN01
A5.22
112A
NN01
102
NN01
110
200 SF
SEAWEED/GREENHOUSE/CULTURE LAB
110
1N02
1AN02
1N71
NN01
1N71
1N02
NAN23A7.1
1
A7.12
8
8
3
18
3
FS
PARTIAL
PARTIAL
7
EXTERIOR COLDLAB & FREEZER
7
15
16
5 6
EDGE OFCANOPYABOVE
6
FEC, (E)
CUH, (E)
FECFEC
FEC
2
1N71
MBD MBD
MBD
19191919 19
19
19
19
NEW FUMEHOOD
NEW FUMEHOOD
ITEMIZED PLAN NOTES:
1. ALIGN FACE OF FINISH WITH FACE OF EXISTING.
2. REPLACE EXISITING WINDOW WITH NEW MULLION AND GLASS ATCENTERLINE OF NEW WALL.
3. CENTER WALL ON COLUMN.
4. CHEMISTRY INSTRUCTIONAL LAB 309 AND BIOLOGY INSTRUCTIONAL LAB314. EXISTING CASEWORK; BASE CABINETS, AND WALL MOUNTED CABINETSTO RECEIVE REMEDIAL REPAIRS TO DOOR AND DRAWER FRONTS.SALVAGED EXISTING WOOD CASEWORK COMPONENTS FROM THE FIRSTFLOOR DEMOLITION TO BE USED AS NEEDED.
5. NEW ALUMINUM ENTRY DOOR, MATCH EXISTING CONSTRUCTION, PROFILEAND FINISH OF EXISTING EXTERIOR ALUMINUM DOORS TO REMAIN.
6. NEW INFILL CONSISTING OF CAST-IN-PLACE CONCRETE FOUNDATIONWALL (MATCH ADJACENT HEIGHT TO REMAIN), AND NEW EXTERIOR WALLABOVE TO MATCH ADJOINING EXTERIOR CONSTRUCTION AND FINISHES.
7. NEW PRE-MANUFACTURED WALK-IN FREEZER AND COLD-LABREFRIGERATOR. REFERENCE MECHANICAL AND ELECTRICAL DOCUMENTSFOR UTILITY HOOK-UPS AND PROVISIONS.
8. NEW EMERGENCY EYE WASH / SHOWER. SEE MECHANICAL DRAWINGSFOR UTILITY PROVISIONS.
9. REINSTALLED FLOOR MOP SINK AND MOP HOLDER RACK.
10. RE-INSTALLED SLIDING MARKERBOARD UNIT AND CASEWORK.COORDINATE PROVISIONS FOR BACKING WITH REINSTALLATION.
11. EXISTING INSTRUCTIONAL ISLAND TO REMAIN. SEE MECHANICAL ANDELECTRICAL DRAWINGS FOR NEW WORK.
12. LOCATION FOR NEW SWITCHBOARD (SEE ELECTRICAL). PROVIDE NEWCAST-IN-PLACE PEDESTAL BASE AND ROOF FLASHING TERMINATIONS.
13. NEW FIRE ALARM REMOTE ANNUNCIATOR PANEL. SEE ELECTRICALDRAWINGS.
14. EXISTING EMERGENCY EYE WAS / SHOWER TO REMAIN. SEE MECHANICALDRAWINGS FOR UTILITY PROVISIONS.
15. NEW EXTERIOR WALL ASSEMBLY. EVALUATION OF RE-USE OF EXISTINGALUMINUM WINDOWS ONGOING.
16. NEW EXTERIOR WALL ASSEMBLY (OPAQUE). MATCH EXISTING WALLASSEMBLY CONSTRUCTION.
17. NEW MECHANICAL LOUVER. SEE MECHANICAL DEMOLITION DRAWINGS.
18. NEW FLOOR SINK FOR INDIRECT DRAIN PROVISIONS (ICE MAKER). SEEMECHANICAL DRAWINGS.
19. FUTURE EQUIPMENT, OFOI.
20. CENTERLINE OF WALL ASSEMBLY TO ALIGN WITH CENTERLINE OFEXISTING WINDOW MULLION.
21. RE-INSTALL EXISTING MICROSCOPE CABINETS.
22. SPECIMEN STORAGE CABINETS, METAL SHELVING, PROCESSING TABLEAND STOOL, OFOI.
23. NEW WALL FURRING TO SURROUND EXISTING VENT PIPE. ALIGN FACEWITH EXISTING FACE OF COLUMN ENCLOSURE.
24. RE-INSTALLED CASEWORK; BASE CABINETS, WALL MOUNTED CABINETS,COUNTERTOPS AND ASSOCIATED SINKS. PROVIDE NEW END PANEL ATEXPOSED ENDS OF CASEWORK AT THE NORTH END. SEE MECHNICALDRAWINGS FOR PLUMBING CONNECTIONS.
GENERAL NOTES:
NEW WORK IS BASED ON RECORD DOCUMENTS PROVIDED BY THE UNIVERSITY OF ALASKA SOUTHEAST AND LIMITED FIELD VERIFICATION. DISCOVEREDDISCREPANCIES ARE TO BE NOTED AND SUBMITTED TO THE OWNER FOR CLARIFICATION AND DIRECTION OF WORK.
THE FACILITY IS CURRENTLY PROTECTED WITH AN AUTOMATIC SPRINKLER SYSTEM. REQUIRED MODIFICATIONS ARE COVERED IN PERFORMANCESPECIFICATIONS, SEE MECHANICAL DOCUMENTS.
AN EXISTING ENVIRONMENTAL REPORT WAS PREPARED BY CARSON DORN, INC. FOR THE UNIVERSITY OF ALASKA SOUTHEAST TITLED “ASBESTOSSURVEY FOR ANDERSON BUILDING, JUNEAU, ALASKA,” DATED DECEMBER 2008. THE REPORT IDENTIFIED ASBESTOS CONTAINING BUILDING MATERIALFOUND IS IN THE LAB BENCHES ON THE FIRST/GROUND FLOOR, WHICH CONTAINS 15% CHRYSOTILE.
AN ENVIRONMENTAL INVESTIGATION IS BEING UNDERTAKEN FOR THE EXISTING ROOF. A FINAL REPORT WILL BE PREPARED FOR USE BY THE DESIGNTEAM AND THE CONTRACTOR.
DIMENSIONS TO EXISTING WALLS ARE TO FACE OF FINISH UNLESS OTHERWISE NOTED.
DIMENSIONS FOR NEW CONSTRUCTION ARE TO CENTERLINE OF WALL ASSEMBLY UNLESS OTHERWISE NOTED.
REFERENCE SHEET A0.1 FOR INTERIOR WALL ASSEMBLIES.
REFERENCE SHEET A12.1 FOR OPENING TYPES (DOORS AND FRAMES, STOREFRONTS AND WINDOWS).
REFERENCE SHEET A12.1 FOR DOOR SCHEDULE.
REFERENCE SHEET A12.1 FOR ROOM FINISH SCHEDULE.
PLAN LEGEND
EXISTING ITEM
NEW ITEM
CORNER GUARD
FIRE EXTINGUISHER CABINET (FEC)
MARKERBOARD (MBD)
TACKBOARD (TKBD)
FD FLOOR DRAIN
FS FLOOR SINK
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
UAS
PR
OJE
CT
NO
: 200
7-01
6/18
/200
9 4:
53:5
9 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A2.1
FIR
ST F
L OO
R P
LAN
-N
EW C
ON
STR
UC
T IO
N
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SPJUN
E 12
, 200
9
JS
1/8" = 1'-0"1 FIRST FLOOR PLAN
1 2 3 4 5
A
B
C
29' -
10
3/4"
29' -
10
3/4"
29' - 10 3/4" 25' - 0" 29' - 10 3/4" 20' - 0"
200S1
301A
200C2B
201
206
208
207
A8.3
4
1
36
865 SF
CLASSROOM 42SEAT204
117 SF
OFFICE205A
117 SF
OFFICE205B
117 SF
OFFICE205C
117 SF
OFFICE205D
158 SF
OFFICE205E
95 SF
OFFICE205F
139 SF
ADJUNCTFACULTY OFFICE
205G
679 SF
DEPARTMENTWORKROOM /
ADMIN. OFFICE205
184 SF
WOMEN'SRESTROOM
206
162 SF
MEN'SRESTROOM
207
33 SF
JANITOR'SCLOSET
208
856 SF
CORRIDOR201
VEND, OFCI
232 SF
STAIR200
WS-1(TYP)
DISTANCEEDUCATIONDELIVERYEQUIPMENT,OFOI COPIER
(NIC)PRINTER(NIC)
FAXMACHINE
(NIC)
STOR. CAB.(TYP), OFOI
MBD,(TYP)
FILECAB.
PRINTER(NIC)
COLLATINGTABLE (NIC)MAILBOXES
A8.3
28
29
A8.325
22
23
24
26
27
-
2
30
31
-
15
1621
20
A8.47
4
5
6
A8.4
8
9
10
11
A7.21
RECYCLING
PERIODICALSHELVING
460 SF
STUDENTCOMMONS -
BREAKROOM202
A8.3
5
2
601 SF
CLASSROOM 32SEAT203
1A5.1
2A5.1
203
204
205D205A 205B 205C 205E
205G
205F
2
3
4
5
6
8
7
A5.23
NAN81
NAN22
NAN81
NAN22
NAN22
NAN81
NAN22
NAN22
NAN22
NAN81
NAN81
NAN82
NAN81
NAN81NA
N81
NAN81
STUDENT TABLES AND CHAIRS (TYP), OFOITABLES: 60"x18" (20), 30"x18" (5)
CB (TYP)
MULTIPANELCHALKBOARD
INSTRUCTIONTABLE, OFOI
MULTIPANELCHALKBOARD
NAN81
TKBD
TKBD
STUDENT TABLES AND CHAIRS (TYP), OFOITABLES: 60"x18" (16)
MICROWAVE
NN01
205
EXISITING COVEREDEXTERIOR RAMP
11
PROJECTIONSCREEN
PROJECTIONSCREEN
FECFEC, (E)
13
DF
12
NEW EXTERIORRAMP, SEE CIVILAND SHEET A1.0
PROJECTIONSCREEN
NN81
20TYP.
202A
202B
PLAN LEGEND
EXISTING ITEM
NEW ITEM
CORNER GUARD
FIRE EXTINGUISHER CABINET (FEC)
MARKERBOARD (MBD)
TACKBOARD (TKBD)
FD FLOOR DRAIN
FS FLOOR SINK
ITEMIZED PLAN NOTES:
1. ALIGN FACE OF FINISH WITH FACE OF EXISTING.
2. REPLACE EXISITING WINDOW WITH NEW MULLION AND GLASS ATCENTERLINE OF NEW WALL.
3. CENTER WALL ON COLUMN.
4. CHEMISTRY INSTRUCTIONAL LAB 309 AND BIOLOGY INSTRUCTIONAL LAB314. EXISTING CASEWORK; BASE CABINETS, AND WALL MOUNTED CABINETSTO RECEIVE REMEDIAL REPAIRS TO DOOR AND DRAWER FRONTS.SALVAGED EXISTING WOOD CASEWORK COMPONENTS FROM THE FIRSTFLOOR DEMOLITION TO BE USED AS NEEDED.
5. NEW ALUMINUM ENTRY DOOR, MATCH EXISTING CONSTRUCTION, PROFILEAND FINISH OF EXISTING EXTERIOR ALUMINUM DOORS TO REMAIN.
6. NEW INFILL CONSISTING OF CAST-IN-PLACE CONCRETE FOUNDATIONWALL (MATCH ADJACENT HEIGHT TO REMAIN), AND NEW EXTERIOR WALLABOVE TO MATCH ADJOINING EXTERIOR CONSTRUCTION AND FINISHES.
7. NEW PRE-MANUFACTURED WALK-IN FREEZER AND COLD-LABREFRIGERATOR. REFERENCE MECHANICAL AND ELECTRICAL DOCUMENTSFOR UTILITY HOOK-UPS AND PROVISIONS.
8. NEW EMERGENCY EYE WASH / SHOWER. SEE MECHANICAL DRAWINGSFOR UTILITY PROVISIONS.
9. REINSTALLED FLOOR MOP SINK AND MOP HOLDER RACK.
10. RE-INSTALLED SLIDING MARKERBOARD UNIT AND CASEWORK.COORDINATE PROVISIONS FOR BACKING WITH REINSTALLATION.
11. EXISTING INSTRUCTIONAL ISLAND TO REMAIN. SEE MECHANICAL ANDELECTRICAL DRAWINGS FOR NEW WORK.
12. LOCATION FOR NEW SWITCHBOARD (SEE ELECTRICAL). PROVIDE NEWCAST-IN-PLACE PEDESTAL BASE AND ROOF FLASHING TERMINATIONS.
13. NEW FIRE ALARM REMOTE ANNUNCIATOR PANEL. SEE ELECTRICALDRAWINGS.
14. EXISTING EMERGENCY EYE WAS / SHOWER TO REMAIN. SEE MECHANICALDRAWINGS FOR UTILITY PROVISIONS.
15. NEW EXTERIOR WALL ASSEMBLY. EVALUATION OF RE-USE OF EXISTINGALUMINUM WINDOWS ONGOING.
16. NEW EXTERIOR WALL ASSEMBLY (OPAQUE). MATCH EXISTING WALLASSEMBLY CONSTRUCTION.
17. NEW MECHANICAL LOUVER. SEE MECHANICAL DEMOLITION DRAWINGS.
18. NEW FLOOR SINK FOR INDIRECT DRAIN PROVISIONS (ICE MAKER). SEEMECHANICAL DRAWINGS.
19. FUTURE EQUIPMENT, OFOI.
20. CENTERLINE OF WALL ASSEMBLY TO ALIGN WITH CENTERLINE OFEXISTING WINDOW MULLION.
21. RE-INSTALL EXISTING MICROSCOPE CABINETS.
22. SPECIMEN STORAGE CABINETS, METAL SHELVING, PROCESSING TABLEAND STOOL, OFOI.
23. NEW WALL FURRING TO SURROUND EXISTING VENT PIPE. ALIGN FACEWITH EXISTING FACE OF COLUMN ENCLOSURE.
24. RE-INSTALLED CASEWORK; BASE CABINETS, WALL MOUNTED CABINETS,COUNTERTOPS AND ASSOCIATED SINKS. PROVIDE NEW END PANEL ATEXPOSED ENDS OF CASEWORK AT THE NORTH END. SEE MECHNICALDRAWINGS FOR PLUMBING CONNECTIONS.
GENERAL NOTES:
NEW WORK IS BASED ON RECORD DOCUMENTS PROVIDED BY THE UNIVERSITY OF ALASKA SOUTHEAST AND LIMITED FIELD VERIFICATION. DISCOVEREDDISCREPANCIES ARE TO BE NOTED AND SUBMITTED TO THE OWNER FOR CLARIFICATION AND DIRECTION OF WORK.
THE FACILITY IS CURRENTLY PROTECTED WITH AN AUTOMATIC SPRINKLER SYSTEM. REQUIRED MODIFICATIONS ARE COVERED IN PERFORMANCESPECIFICATIONS, SEE MECHANICAL DOCUMENTS.
AN EXISTING ENVIRONMENTAL REPORT WAS PREPARED BY CARSON DORN, INC. FOR THE UNIVERSITY OF ALASKA SOUTHEAST TITLED “ASBESTOSSURVEY FOR ANDERSON BUILDING, JUNEAU, ALASKA,” DATED DECEMBER 2008. THE REPORT IDENTIFIED ASBESTOS CONTAINING BUILDING MATERIALFOUND IS IN THE LAB BENCHES ON THE FIRST/GROUND FLOOR, WHICH CONTAINS 15% CHRYSOTILE.
AN ENVIRONMENTAL INVESTIGATION IS BEING UNDERTAKEN FOR THE EXISTING ROOF. A FINAL REPORT WILL BE PREPARED FOR USE BY THE DESIGNTEAM AND THE CONTRACTOR.
DIMENSIONS TO EXISTING WALLS ARE TO FACE OF FINISH UNLESS OTHERWISE NOTED.
DIMENSIONS FOR NEW CONSTRUCTION ARE TO CENTERLINE OF WALL ASSEMBLY UNLESS OTHERWISE NOTED.
REFERENCE SHEET A0.1 FOR INTERIOR WALL ASSEMBLIES.
REFERENCE SHEET A12.1 FOR OPENING TYPES (DOORS AND FRAMES, STOREFRONTS AND WINDOWS).
REFERENCE SHEET A12.1 FOR DOOR SCHEDULE.
REFERENCE SHEET A12.1 FOR ROOM FINISH SCHEDULE.
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
UAS
PR
OJE
CT
NO
: 200
7-01
6/18
/200
9 4:
54:1
2 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A2.2
SEC
ON
D F
LOO
R P
LAN
- NEW
CO
NST
RU
CT I
ON
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SPJUN
E 12
, 200
9
JS
1/8" = 1'-0"1 SECOND FLOOR PLAN
1 2 3 4 5
A
B
C
29' - 10 3/4" 25' - 0" 29' - 10 3/4" 20' - 0"
29' -
10
3/4"
29' -
10
3/4"
301B
308
307
314
302
309319
320
M319
W318
CORRIDOR302
847 SF
CHEMISTRYINSTRUCTIONAL
LAB309
363 SF
CHEMISTRYSTOCK STORAGE
308
335 SF
MECHANICAL320
598 SF
BIOLOGY LAB 1A316
138 SF
SPECIMENCOLLECTION
STORAGE317
388 SF
BIOLOGY LAB 1B315
878 SF
BIOLOGYINSTRUCTIONAL
LAB314
290 SF
SUPPORT LABBIOLOGY
INSTRUCTION310
145 SF
LAB TECHSHARED OFFICE
313
191 SF
CHEMISTRYINSTRUMENT
ROOM307
256 SF
STAIR301
NEW FUME HOOD
A8.4
20
21
22
23
310
315
317
316
313
1A5.1
2A5.1
318
A5.24
NAN81
NN01
NN01
NN61
A7.23
NN81
A7.22
NN01
1N71
NN31
1N71
1N71
2
MBD
21
NEW SNORKLE HOOD
4
14
14 10
14
141011
4
FEC
9
17
22
23
24
20
314B
SNORKELHOOD
SNORKELHOOD
PLAN LEGEND
EXISTING ITEM
NEW ITEM
CORNER GUARD
FIRE EXTINGUISHER CABINET (FEC)
MARKERBOARD (MBD)
TACKBOARD (TKBD)
FD FLOOR DRAIN
FS FLOOR SINK
ITEMIZED PLAN NOTES:
1. ALIGN FACE OF FINISH WITH FACE OF EXISTING.
2. REPLACE EXISITING WINDOW WITH NEW MULLION AND GLASS ATCENTERLINE OF NEW WALL.
3. CENTER WALL ON COLUMN.
4. CHEMISTRY INSTRUCTIONAL LAB 309 AND BIOLOGY INSTRUCTIONAL LAB314. EXISTING CASEWORK; BASE CABINETS, AND WALL MOUNTED CABINETSTO RECEIVE REMEDIAL REPAIRS TO DOOR AND DRAWER FRONTS.SALVAGED EXISTING WOOD CASEWORK COMPONENTS FROM THE FIRSTFLOOR DEMOLITION TO BE USED AS NEEDED.
5. NEW ALUMINUM ENTRY DOOR, MATCH EXISTING CONSTRUCTION, PROFILEAND FINISH OF EXISTING EXTERIOR ALUMINUM DOORS TO REMAIN.
6. NEW INFILL CONSISTING OF CAST-IN-PLACE CONCRETE FOUNDATIONWALL (MATCH ADJACENT HEIGHT TO REMAIN), AND NEW EXTERIOR WALLABOVE TO MATCH ADJOINING EXTERIOR CONSTRUCTION AND FINISHES.
7. NEW PRE-MANUFACTURED WALK-IN FREEZER AND COLD-LABREFRIGERATOR. REFERENCE MECHANICAL AND ELECTRICAL DOCUMENTSFOR UTILITY HOOK-UPS AND PROVISIONS.
8. NEW EMERGENCY EYE WASH / SHOWER. SEE MECHANICAL DRAWINGSFOR UTILITY PROVISIONS.
9. REINSTALLED FLOOR MOP SINK AND MOP HOLDER RACK.
10. RE-INSTALLED SLIDING MARKERBOARD UNIT AND CASEWORK.COORDINATE PROVISIONS FOR BACKING WITH REINSTALLATION.
11. EXISTING INSTRUCTIONAL ISLAND TO REMAIN. SEE MECHANICAL ANDELECTRICAL DRAWINGS FOR NEW WORK.
12. LOCATION FOR NEW SWITCHBOARD (SEE ELECTRICAL). PROVIDE NEWCAST-IN-PLACE PEDESTAL BASE AND ROOF FLASHING TERMINATIONS.
13. NEW FIRE ALARM REMOTE ANNUNCIATOR PANEL. SEE ELECTRICALDRAWINGS.
14. EXISTING EMERGENCY EYE WAS / SHOWER TO REMAIN. SEE MECHANICALDRAWINGS FOR UTILITY PROVISIONS.
15. NEW EXTERIOR WALL ASSEMBLY. EVALUATION OF RE-USE OF EXISTINGALUMINUM WINDOWS ONGOING.
16. NEW EXTERIOR WALL ASSEMBLY (OPAQUE). MATCH EXISTING WALLASSEMBLY CONSTRUCTION.
17. NEW MECHANICAL LOUVER. SEE MECHANICAL DEMOLITION DRAWINGS.
18. NEW FLOOR SINK FOR INDIRECT DRAIN PROVISIONS (ICE MAKER). SEEMECHANICAL DRAWINGS.
19. FUTURE EQUIPMENT, OFOI.
20. CENTERLINE OF WALL ASSEMBLY TO ALIGN WITH CENTERLINE OFEXISTING WINDOW MULLION.
21. RE-INSTALL EXISTING MICROSCOPE CABINETS.
22. SPECIMEN STORAGE CABINETS, METAL SHELVING, PROCESSING TABLEAND STOOL, OFOI.
23. NEW WALL FURRING TO SURROUND EXISTING VENT PIPE. ALIGN FACEWITH EXISTING FACE OF COLUMN ENCLOSURE.
24. RE-INSTALLED CASEWORK; BASE CABINETS, WALL MOUNTED CABINETS,COUNTERTOPS AND ASSOCIATED SINKS. PROVIDE NEW END PANEL ATEXPOSED ENDS OF CASEWORK AT THE NORTH END. SEE MECHNICALDRAWINGS FOR PLUMBING CONNECTIONS.
GENERAL NOTES:
NEW WORK IS BASED ON RECORD DOCUMENTS PROVIDED BY THE UNIVERSITY OF ALASKA SOUTHEAST AND LIMITED FIELD VERIFICATION. DISCOVEREDDISCREPANCIES ARE TO BE NOTED AND SUBMITTED TO THE OWNER FOR CLARIFICATION AND DIRECTION OF WORK.
THE FACILITY IS CURRENTLY PROTECTED WITH AN AUTOMATIC SPRINKLER SYSTEM. REQUIRED MODIFICATIONS ARE COVERED IN PERFORMANCESPECIFICATIONS, SEE MECHANICAL DOCUMENTS.
AN EXISTING ENVIRONMENTAL REPORT WAS PREPARED BY CARSON DORN, INC. FOR THE UNIVERSITY OF ALASKA SOUTHEAST TITLED “ASBESTOSSURVEY FOR ANDERSON BUILDING, JUNEAU, ALASKA,” DATED DECEMBER 2008. THE REPORT IDENTIFIED ASBESTOS CONTAINING BUILDING MATERIALFOUND IS IN THE LAB BENCHES ON THE FIRST/GROUND FLOOR, WHICH CONTAINS 15% CHRYSOTILE.
AN ENVIRONMENTAL INVESTIGATION IS BEING UNDERTAKEN FOR THE EXISTING ROOF. A FINAL REPORT WILL BE PREPARED FOR USE BY THE DESIGNTEAM AND THE CONTRACTOR.
DIMENSIONS TO EXISTING WALLS ARE TO FACE OF FINISH UNLESS OTHERWISE NOTED.
DIMENSIONS FOR NEW CONSTRUCTION ARE TO CENTERLINE OF WALL ASSEMBLY UNLESS OTHERWISE NOTED.
REFERENCE SHEET A0.1 FOR INTERIOR WALL ASSEMBLIES.
REFERENCE SHEET A12.1 FOR OPENING TYPES (DOORS AND FRAMES, STOREFRONTS AND WINDOWS).
REFERENCE SHEET A12.1 FOR DOOR SCHEDULE.
REFERENCE SHEET A12.1 FOR ROOM FINISH SCHEDULE.
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
UAS
PR
OJE
CT
NO
: 200
7-01
6/18
/200
9 4:
54:3
5 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A2.3
THIR
D F
L OO
R P
LAN
-N
EW C
ON
STR
UC
T IO
N
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SPJUN
E 12
, 200
9
JS
1/8" = 1'-0"1 THIRD FLOOR PLAN
1 2 3 4 5
A
B
C
275 GAL.STORAGE
TANK
A5.27
LOW
ROOF DRAIN &EMERGENCYOVERFLOW(SEE 1/A10.3)
3
A10.2
LOADINGDOCK CANOPY
ROOF BELOW
1/4":1'-0"
1/4":
1'-0"
3
3
3
SLOP
E
SLOPE SLOPE
SLOP
E
SLOPE
34
2
3
1 2 3 4 5
A
B
C
EXISTING STAIR ANDPENTHOUSE - ROOF
ACCESS
2
2
4
4
4
3
14
SLOP
E
SLOPE SLOPE
SLOP
E
DEMOLITION NOTES:
1. REMOVE PORTIONS OF EXISTING ROOF AS REQUIRED TO INSTALLENLARGED ELEVATOR SHAFT AND ACCOMMODATE INCREASED INTERIORCLEARANCES. SEE STRUCTURAL FOR ROOF FRAMING MODIFICATIONS.
2. EXISTING EXHAUST CAP TO REMAIN.
3. EXHAUST FAN AND CURB TO BE REMOVED.
4. EXISTING EXHAUST FAN BEING REMOVED, EXISTING CURB TO BEREFURBISHED FOR INSTALLATION OF NEW MECHANICAL EXHAUST. SEEMECHANICAL DRAWINGS.
ROOF PLAN NOTES:
1. REMOVE PORTIONS OF EXISTING ROOF AS REQUIRED TO INSTALLENLARGED ELEVATOR SHAFT AND ACCOMMODATE INCREASED INTERIORCLEARANCES. SEE STRUCTURAL FOR ROOF FRAMING MODIFICATIONS.
2. NEW ROOFING TO BE A SINGLE-PLY MEMBRANE. SEE SHEET A5.2 FORELEVATOR ENLARGEMENT PLANS, SECTION AND DETAILING.
3. REFURBISH ROOF CURBS TO SUPPORT MECHANICAL FAN EQUIPMENT. SEEMECHANICAL DRAWINGS.
4. NEW ROOF CURB AND EXHAUST FAN. SEE MECHANICAL DRAWINGS.
5. PATCH ROOFING FOLLOWING DEMOLITION OF EXHAUST CAP.
GENERAL NOTES:
EXISTING ROOFING TO REMAIN UNLESS NOTED OTHERWISE. ROOFING IS AN INVERTEDROOF MEMBRANE ASSEMBLY (IRMA) CONSISTING OF; CONCRETE PAVER BALLASTOVERLAYING RIGID INSULATION, ROOF MEMBRANE AND PERLITE DECK OVER METALROOF DECK.
NEW ROOFING; SINGLE-PLY MEMBRANE SLOPED AT A MINIMUM ¼” PER FOOT. SLOPEPROVIDED IN STRUCTURAL FRAMING.
SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ROOF PENETRATIONS. USE ROOFMANUFACTURER’S STANDARD PREFORMED FLASHING DETAILS.
REFERENCE STRUCTURAL DRAWINGS FOR DESIGN WIND LOADS USED TO CALCULATEROOF UPLIFT FORCES AND EDGE SECUREMENT REQUIREMENTS.
LEGEND
EXHAUST FAN
CHIMNEY (GUY WIRE SUPPORTED)
EXHAUST CAP
ROOF DRAIN AND OVERFLOW
VENT THROUGH ROOF
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
6/18
/200
9 4:
55:1
2 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A3.1
RO
OF
PLAN
-D
E MO
LIT I
ON
& N
E WC
ON
STR
UC
T IO
N
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SP, S
MC
JUN
E 12
, 200
9
JS
1/16" = 1'-0"2 ROOF PLAN 1/16" = 1'-0"1 ROOF DEMOLITION PLAN
FIRST FLOOR0' - 0"
SECOND FLOOR14' - 0"
1
LOADING DOCKCANOPY BEYOND
PRE-MANUFACTUREDCOLD LABORATORY
0 0.5 0.9
3' -
6"
STL. COL. @ CANOPYBEYOND (SEE STRUCT.)
NEW ALUMINUMFRAME WINDOWS
NEW EXTERIOR WALL- 4" CMU VENEER WAINSCOT- 5/8" M.R. GYPSUM BOARD- VAPOR RETARDER- METAL STUDS W/ FULL BATT INSULATION- 5/8" EXT. M.R. SHEATHING- AIR BARRIER- PAINTED SHIP LAP SIDING TO MATCH EXISTING
FIN. GRADE (SEE CIVIL)
36" HIGH HANDRAIL &GUARDRAIL ASSEMBLY@ RAMP EDGE
3' -
0 1/
2"
LANDINGRAMP
42" HIGH GUARDRAILASSEMBLY @ COLD LAB
FND. WALL BEYOND
7A10.1
GUARDRAIL BEYOND
C.I.P. CONC. RETAININGWALL BEYOND (SEE CIVIL)
STEP BEYOND
FIRST FLOOR0' - 0"
SECOND FLOOR14' - 0"
B C
LOADINGDOCKCANOPY
NEW SERVICE ENTRY ANDEGRESS DOORS BEYOND
EXTERIOR FREEZER
PRE-MANUFACTUREDCOLD LABORATORY
2A5.1
B.1 B.4
3' -
0 1/
2"
42" HIGH 4-RAIL GUARDRAILASSEMBLY @ COLD LAB
FND. WALL BEYOND36" HIGH 3-RAIL
GUARDRAIL & HANDRAILASSEMBLY @ RAMP EDGE
FIN. GRADE(SEE CIVIL)
RAMP
LANDING
CONNECT ROOF DRAIN RISERTO STORM DRAIN (SEE MECH.)
C.I.P. CONC. RETAININGWALL (SEE CIVIL)
C.I.P. CONC. RETAININGWALL (SEE CIVIL)
42" HIGH 6-RAILGUARDRAIL ASSEMBLY
FIN. GRADE (SEE CIVIL)
FIRST FLOOR0' - 0"
SECOND FLOOR14' - 0"
AB
THIRD FLOOR27' - 0"
ROOF39' - 8"
Level 10' - 0"
Level 210' - 0"
NEW 80" WIDE X 60" HIGHLOUVER (SEE MECH.)
APPROX . LINE OFOVERHEAD PEDESTRIAN
CROSSING BRIDGE
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
UAS
PR
OJE
CT
NO
: 200
7-01
6/18
/200
9 4:
55:3
5 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A4.1
PAR
TIAL
EX T
E RIO
REL
EVAT
ION
S
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SP, S
MC
JUN
E 12
, 200
9
JS
3/16" = 1'-0"1 PARTIAL SOUTH ELEVATION
3/16" = 1'-0"2 PARTIAL WEST ELEVATION
3/16" = 1'-0"3 PARTIAL NC - EAST
FIRST FLOOR0' - 0"
SECOND FLOOR14' - 0"
1234
EXISTING -FOUNDATION
-2' - 4"
THIRD FLOOR27' - 0"
ROOF39' - 8"
1A5.1
14' -
0"
13' -
0"
12' -
8"
BIOLOGY LAB 1A316
SPECIMENCOLLECTION
STORAGE317
BIOLOGYINSTRUCTIONAL
LAB314
SUPPORT LABBIOLOGY
INSTRUCTION310
ADJUNCTFACULTY OFFICE
205G
DEPARTMENTWORKROOM /
ADMIN. OFFICE205
CLASSROOM 42SEAT204
BIOLOGYUNDERGRADUATERESEARCH LAB 3
108
BIOLOGYUNDERGRADUATERESEARCH LAB 2
109
SEAWATERRESEARCH LAB
111MECH.100U3
FIRST FLOOR0' - 0"
SECOND FLOOR14' - 0"
A B C
THIRD FLOOR27' - 0"
ROOF39' - 8"
2A5.1
12' -
8"
13' -
0"
14' -
0"
NEW ELEVATOR SHAFTENCLOSURE
BIOLOGYUNDERGRADUATERESEARCH LAB 2
109
DEPARTMENTALSHARED
STORAGE115
OFFICE205B
DEPARTMENTWORKROOM /
ADMIN. OFFICE205
CORRIDOR201
BIOLOGY LAB 1B315
CORRIDOR302
CHEMISTRYINSTRUMENT
ROOM307
CHEMISTRYSTOCK STORAGE
308
LINEAREQUIPMENT
ROOM104
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
6/18
/200
9 4:
55:5
7 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A5.1
BUIL
DIN
G S
ECT I
ON
S
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SPJUN
E 12
, 200
9
JS
1/8" = 1'-0"2 EAST-WEST SECTION
1/8" = 1'-0"1 NORTH-SOUTH SECTION
4
CLR. SHAFT
8' - 10"
ELEV. EQUIP1075'
- 9"
7' - 4"
5A5.2
6A5.2
1' - 1"
3' - 0" 4' - 9"
7"
FIRST FLOOR0' - 0"
SECOND FLOOR14' - 0"
THIRD FLOOR27' - 0"
ROOF39' - 8"
6A5.2
BOT. ELEV. PIT-4' - 0"
CLR
. OVE
RH
EAD
TO
HO
IST
BEAM
13' -
4"
5' - 9"
FIRST FLOOR0' - 0"
SECOND FLOOR14' - 0"
4
THIRD FLOOR27' - 0"
ROOF39' - 8"
5A5.2
BOT. ELEV. PIT-4' - 0"
CLR
. OVE
RH
EAD
13' -
4"
CLR. SHAFT
8' - 10"7"
45A5.2
6A5.2
CLR. SHAFT
8' - 10"
3' MIN
3' - 9"
1' - 1" 3' - 0" 4' - 9" 7"
CLR
. SH
AFT
5' -
9"
45A5.2
6A5.2
1' - 1"
3' - 0" 4' - 9"
7"
CLR
. SH
AFT
5' -
9"
CLR. SHAFT
8' - 10"
4
PIT LADDER
45
A5.2
6A5.2
12' - 2 3/4"
7' -
7"
8
A5.2
9
A5.2
1/4":1'-0" MIN. SLOPE
SINGLE-PLY MEMBRANE ROOFING
SINGLE-PLY MEMBRANEROOFING
FULL DEPTH BATT INSULATION
COLD FORMED STLSTUDS
PLYWOOD ROOF SHEATHING
PLYWOOD WALLSHEATHING
VAPOR RETARDER
GWB
1' -
0"
COLD FORMED STL JOISTSFULL DEPTH BATT
INSULATION
ROOFING MFR'S ROOFEDGE
SINGLE-PLY MEMBRANE ROOFING
FULL DEPTH BATT INSULATION
PLYWOOD ROOF SHEATHING
1' -
0"
COLD FORMED STL JOISTS
MIN
.
1' -
0"
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
6/18
/200
9 4:
56:1
9 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A5.2
NEW
ELE
V AT O
RS H
A FT
PLAN
S &
S EC
TIO
NS
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SPJUN
E 12
, 200
9
JS
1/4" = 1'-0"2 FIRST FLOOR PLAN
1/4" = 1'-0"5 NC - ELEVATOR SECTION N-S 1/4" = 1'-0"6 NC - ELEVATOR SECTION E-W
1/4" = 1'-0"4 THIRD FLOOR PLAN 1/4" = 1'-0"3 SECOND FLOOR PLAN
F13 ADA RETROFIT OR REPLACE ADA RETROFIT OR REPLACE W10UPGRADE HANDLES OR REPLACE FIXTURESTO MEET ADA ACCESSIBILITY
F14 W6 W6 1 OUTLET FILTERED, 1 OUTLET UNFILTERED
F15 W13 2-W12
WALL MOUNTED SEAWATER WITH 2 STAGESEAWATER FILTRATION WITH TAP FOR EACH"COARSE" FILTRATION & "FINE" FILTRATIONINTO SINK. EACH TAP TO ALLOWATTACHMENT OF STANDARD GARDEN HOSE.FILTER CARTRIDGES ARE TO BE LOCATEDON WALL AT END OF SINK FOR EASE OFSERVICE. WALL MOUNTED H/C.
GAS FITTING SCHEDULETAG TYPE GAS AIR MOUNT NOTES/REMARKSF21 AIR YES WALLF22 GAS YES WALLF23 AIR YES DECKF24 GAS YES DECKF25 AIR YES HOODF26 GAS YES HOOD
FUME HOOD SCHEDULETAG TYPE SIZE UTILITIES TOP SINK ROOM MOUNT ADA NOTES/REMARKS
H-1GENERAL PURPOSE CHEMICALFUME HOOD: SAFEAIRE II 72" x 31.25" CW, GAS, AIR,DUPLEX OUTLETS EPOXY CUP
H-2
GENERAL PURPOSE ADAACCESSIBLE CHEMICAL FUMEHOODHOPEC IV 72" x 31.25" CW, GAS, AIR,DUPLEX OUTLETS EPOXY CUP YES
H-3 CANOPY HOOD 72"H-4 SNORKEL HOOD
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
6/18
/200
9 4:
59:4
2 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A8.6
INTE
RI O
REL
EVAT
ION
SS C
HED
UL E
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SPJUN
E 12
, 200
9
JS
1 2 3 4 5
A
B
C
A.F.F.2' x 4' ACT System
9' - 0"
A.F.F.SUSP. GWB9' - 0"
OPEN TOSTRUCTURE ABOVE
1A5.1
2A5.1
A.F.F.2' x 4' ACT System
9' - 0"
101
109 108
111
110
104
106 105 114
112A
112 115 107
A.F.F.GWB on Mtl. Stud
9' - 0"
A.F.F.GWB on Mtl. Stud
8' - 0"
A.F.F.2' x 4' ACT System
9' - 0"
A.F.F.2' x 4' ACT System
9' - 0"
102
A.F.F.1-HR CLG.9' - 0"
OPEN TOSTRUCTURE ABOVE
A.F.F.Accoustic Panel
13' - 5 1/2"
WT-3, TYP.WT-3, TYP.WT-3, TYP.WT-3, TYP.
WT-3, TYP.
A9.12
HORIZONTAL SHAFT WALLASSEMBLY CONSTRUCTION
FUME HOOD(TYP)
OPEN TOSTRUCTURE ABOVE
REFLECTED CEILING PLAN LEGEND:
DIRECT/INDIRECT RECESSED MOUNTED LIGHT FIXTURE
RECESSED CAN LIGHT FIXTURE
CEILING MOUNTED PROJECTOR
PERIMETER RECESSED LIGHT FIXTURE
DROP DOWN PROJECTION SCREEN
BLACKOUT SHADE (WT-1)
HORIZONTAL BLINDS (WT-3)
LED SURFACE MOUNTED STRIP LIGHT FIXTURE
WALL TO ROOF STRUCTURE(UNDERSIDE OF DECK OR STRUCTURE)
WALL TO 6" ABOVE CEILING , GWB OR ACT
ACOUSTICAL CEILING TILE
FLUORESCENT SURFACE MOUNTED LIGHT FIXTURE
ACOUSTICAL CEILING PANEL
SEAWATER DISTRIBUTION GRID
DIRECT/INDIRECT SUSPENDED LIGHT FIXTURE
1 2
B
CUNISTRUT FRP SEAWATER DISTRIBUTION GRID
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
6/18
/200
9 4:
59:5
7 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A9.1
REF
LEC
T ED
CE I
LIN
GP L
A N -
FIR
S T F
LOO
R
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SPJUN
E 12
, 200
9
JS
1/8" = 1'-0"1 FIRST FLOOR REFLECTED CEILING PLAN
1/4" = 1'-0"2 ENLARGED SEAWATER LAB
1 2 3 4 5
A
B
C
A.F.F.2' x 4' ACT System
9' - 0"
A.F.F.2' x 4' ACT System
9' - 0"
A.F.F.GWB on Mtl. Stud
8' - 0"
A.F.F.GWB on Mtl. Stud
8' - 0"
A.F.F.2' x 4' ACT System
9' - 0"
A.F.F.2' x 4' ACT System
9' - 0"
A.F.F.2' x 4' ACT System
9' - 0"
A.F.F.2' x 4' ACT System
9' - 0"
WT-1, TYP. WT-1, TYP.
WT-1, TYP. WT-3, TYP.
WT-3, TYP.
REFLECTED CEILING PLAN LEGEND:
DIRECT/INDIRECT RECESSED MOUNTED LIGHT FIXTURE
RECESSED CAN LIGHT FIXTURE
CEILING MOUNTED PROJECTOR
PERIMETER RECESSED LIGHT FIXTURE
DROP DOWN PROJECTION SCREEN
BLACKOUT SHADE (WT-1)
HORIZONTAL BLINDS (WT-3)
LED SURFACE MOUNTED STRIP LIGHT FIXTURE
WALL TO ROOF STRUCTURE(UNDERSIDE OF DECK OR STRUCTURE)
WALL TO 6" ABOVE CEILING , GWB OR ACT
ACOUSTICAL CEILING TILE
FLUORESCENT SURFACE MOUNTED LIGHT FIXTURE
ACOUSTICAL CEILING PANEL
SEAWATER DISTRIBUTION GRID
DIRECT/INDIRECT SUSPENDED LIGHT FIXTURE
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
6/18
/200
9 5:
00:1
7 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A9.2
REF
LEC
T ED
CE I
LIN
GP L
A N -
SEC
ON
DFL
OO
R
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SPJUN
E 12
, 200
9
JS
1/8" = 1'-0"1
SECOND FLOOR REFLECTED CEILINGPLAN
1 2 3 4 5
A
B
C
A.F.F.2' x 4' ACT System
9' - 0"
A.F.F.2' x 4' ACT System
9' - 0"
A.F.F.2' x 4' ACT System
9' - 0"
A.F.F.GWB on Mtl. Stud
8' - 0"
A.F.F.2' x 4' ACT System
9' - 0"
A.F.F.2' x 4' ACT System
9' - 0"
A.F.F.2' x 4' ACT System
9' - 0"
A.F.F.2' x 4' ACT System
9' - 0"
A.F.F.2' x 4' ACT System
9' - 0"
A.F.F.GWB on Mtl. Stud
9' - 0"
WT-3, TYP.
WT-3, TYP.
WT-3, TYP.
WT-3, TYP.
REFLECTED CEILING PLAN LEGEND:
DIRECT/INDIRECT RECESSED MOUNTED LIGHT FIXTURE
RECESSED CAN LIGHT FIXTURE
CEILING MOUNTED PROJECTOR
PERIMETER RECESSED LIGHT FIXTURE
DROP DOWN PROJECTION SCREEN
BLACKOUT SHADE (WT-1)
HORIZONTAL BLINDS (WT-3)
LED SURFACE MOUNTED STRIP LIGHT FIXTURE
WALL TO ROOF STRUCTURE(UNDERSIDE OF DECK OR STRUCTURE)
WALL TO 6" ABOVE CEILING , GWB OR ACT
ACOUSTICAL CEILING TILE
FLUORESCENT SURFACE MOUNTED LIGHT FIXTURE
ACOUSTICAL CEILING PANEL
SEAWATER DISTRIBUTION GRID
DIRECT/INDIRECT SUSPENDED LIGHT FIXTURE
HYE
RA
R CHI
T EC
TURE
P L
AN
NIN
G
INT E
RIO
RS1 0
1 W
EST
B EN
SON
S U
ITE 3
06
AN
CH O
RAG
E A
LASK
A
9950
3 9
0 7 5
6 1 5
543
200 7
EC
I/HYE
R, IN
C.
c
SUBM
IT D
ATE
DR
AWN
CH
ECKE
D
REV
ISIO
NS
PLO
T D
ATE
PRO
JEC
T N
O.
FILE
NAM
E
PRELIMINARY NOT FOR CONSTRUCTION
6/18
/200
9 5:
00:3
4 PM
C:\R
evit\
UAS
And
erso
n\D
D_U
AS A
ND
ERSO
NBL
G.R
EMO
DEL
-loca
l.rvt
A9.3
REF
LEC
T ED
CE I
LIN
GP L
A N -
THIR
D F
LOO
R
1207
UN
IVER
SITY
OF
ALAS
K A S
OU
T HEA
ST
A ND
ERSO
N B
UI L
DIN
GR
EMO
DEL
S CH
EMA T
IC D
ESIG
N
SPJUN
E 12
, 200
9
JS
1/8" = 1'-0"1 THIRD FLOOR REFLECTED CEILING PLAN
Level 10' - 0"
4"
COLD LAB AND/ORFREEZER UNIT DOOR
COLD LAB AND/ORFREEZER UNIT FLOOR
CONT PT SLEEPERSRIPPED TO ACCOMMODATESLAB SLOPE
CONT. 4 X 6 X 3/4 HOTDIPPED GALV. STL.ANGLE WELDED TOSLAB EDGE ANGLE