Top Banner

Click here to load reader

Analysis of Rework and Rescheduling in Construction Project using SPSS Software

Sep 11, 2020

Download

Engineering

IJTSRD Journal

Rework is a primary contributor to time wastage and time table overruns which eventually impact on cost, assets and quality. P. Haritha | Dr. K. Vidhya "Analysis of Rework and Rescheduling in Construction Project using SPSS Software" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-4 | Issue-4 , June 2020, URL: https://www.ijtsrd.com/papers/ijtsrd30930.pdf Paper Url :https://www.ijtsrd.com/engineering/civil-engineering/30930/analysis-of-rework-and-rescheduling-in-construction-project-using-spss-software/p-haritha

Welcome message from author
https://www.ijtsrd.com/papers/ijtsrd30930.pdf