8/13/2019 Analysis of Rate of Building Deportment
1/242
Description1.
i) 16 x 16 mm
Cost of Material 11.00 Per Rft 11.00 Per Rft
Labour Charages for Fixing 2.00 Per Rft 2.00 Per Rft
Total 13.00 Per Rft
Add 10% Contractor Profit 1.30 Per Rft
Total 14.30 Per Rftii) 16 x 25 mm
Cost of Material 14.00 Per Rft 14.00 Per Rft
Labour Charages for Fixing 2.00 Per Rft 2.00 Per Rft
Total 16.00 Per Rft
Add 10% Contractor Profit 1.60 Per Rft
Total 17.60 Per Rft
iii) 40 x 40 mm
Cost of Material 38.0 Per Rft 38.00 Per Rft
Labour Charages for Fixing 2.00 Per Rft 2.00 Per Rft
Total 40.00 Per Rft
Add 10% Contractor Profit 4.00 Per Rft
Total 44.00 Per Rft
Sub Engineer Assistant Engineer Executive Engineer
Project Director
Unit of Rate = Per Rft
RATE ANALYSIS FOR UP-GRADITION OF LABS, ELECTRIC WIRING &
FALSE CIELING FOR VIROUS COMPUTER LABS AT B.J. CAMPUS.
ISLAMIA UNIVERSITY BAHAWALPUR
Supply and Eraction of duct work for wiring (Dura Adamgee) with rawal
plugs,Screws and specials complete in all respects.
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
2/242
8/13/2019 Analysis of Rate of Building Deportment
3/242
Description3
Unit of Rate = Each
Cost of Material 1 No 65 65.00 Each
Labour Charages for Fixing 1 No 5 5.00 Each
Total 70.00 Each
Add 10% Contractor Profit 7.00 Each
Total 77.00 Each
Sub Engineer Assistant Engineer Executive Engineer
Project Director
Supply and Eraction 2 Pins 10/15 AMPS Socket imported (TURKY) complete in all
respects.
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS FOR UP-GRADITION OF LABS, ELECTRIC WIRING &
FALSE CIELING FOR VIROUS COMPUTER LABS AT B.J. CAMPUS.
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
4/242
Description
4 Supply and Eraction Switches 10/15 AMPS Piano type (Best quality)
Unit of Rate = Each
Cost of Material 1 No 20 20.00 Each
Labour Charages for Fixing 1 No 5 5.00 Each
Total 25.00 Each
Add 10% Contractor Profit 2.50 Each
Total 27.50 Each
Sub Engineer Assistant Engineer Executive Engineer
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS FOR UP-GRADITION OF LABS, ELECTRIC WIRING &
FALSE CIELING FOR VIROUS COMPUTER LABS AT B.J. CAMPUS.
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
5/242
Description
5
Unit of Rate = Each
Cost of Material 1 No 220 220.00 Each
Labour Charages for Fixing 1 No 10 10.00 Each
Total 230.00 Each
Add 10% Contractor Profit 23.00 Each
Total 253.00 Each
Sub Engineer Assistant Engineer Executive Engineer
Project Director
Supply and Eraction Switche,plug combined Power plug 30/35 AMPS (Bush Company)
Submitted for Approval
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS FOR UP-GRADITION OF LABS, ELECTRIC WIRING &
FALSE CIELING FOR VIROUS COMPUTER LABS AT B.J. CAMPUS.
8/13/2019 Analysis of Rate of Building Deportment
6/242
Description6 Supply and Eraction distribution board (D.B) 2'x1.50' Size with following detail.
100 AMPS MCCB 3-Phase 240 Volts Circuit breaker
20 AMPS MCB 1-Phase 240 Volts Circuits breaker
10 AMPS MCB 1-Phase 240 Volts Circuits breaker
6 AMPS MCB 1-Phase 240 Volts Circuits breaker
All Circuit breakers Terasaki/Mitsubishi (Black) Japan to be used.
Iron Box 2'x1.50' with Stove enameled paint.
Unit of Rate = Each
Cost of Iron Box 2'x1.50' 1 No 1800 1800.00 Each
Cost of 100 AMPS 3-Phase Circuit breaker 1 No 2850 2850.00 Each
Cost of 20 AMPS 1-Phase Circuit breaker 2 No 225 450.00 EachCost of 10 AMPS 1-Phase Circuit breaker 12 No 225 2700.00 Each
Cost of 6 AMPS 1-Phase Circuit breaker 4 No 225 900.00 Each
Cost of Thimbles 9 No 20 180.00 Each
Labour Charages for Fixing 1 No 400 400.00 Each
Total 9280.00 Each
Add 10% Contractor Profit 928.00 Each
Total 10208.00 Each
Sub Engineer Assistant Engineer Executive Engineer
Project Director
RATE ANALYSIS FOR UP-GRADITION OF LABS, ELECTRIC WIRING &
FALSE CIELING FOR VIROUS COMPUTER LABS AT B.J. CAMPUS.
Submitted for Approval
ISLAMIA UNIVERSITY BAHAWALPUR
8/13/2019 Analysis of Rate of Building Deportment
7/242
Description
7
Unit of Rate = EachCost of Light with Chock, Rod &
Starter complete 1 No 1300 1380.00 Each
Labour Charages for Fixing 1 No 100 100.00 Each
Total 1480.00 Each
Add 10% Contractor Profit 148.00 Each
Total 1628.00 Each
Sub Engineer Assistant Engineer Executive Engineer
Project Director
Supply and Eraction Ceiling lights 2'x2' size with reflective grill phlips rod 2' size 20 Watt,
Philps Chock 40 Watt,Phlips Startar 20 Watt Patty Fitting (Frame of light 2'x2') Pak
light/Equaliant i/c hanging arrangement.
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS FOR UP-GRADITION OF LABS, ELECTRIC WIRING &
FALSE CIELING FOR VIROUS COMPUTER LABS AT B.J. CAMPUS.
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
8/242
Description
Unit of Rate = Each
Cost of Fan 1 No 1500 1500.00 Each
Labour Charages for Fixing 1 No 50 50.00 Each
Total 1550.00 Each
Add 10% Contractor Profit 155.00 Each
Total 1705.00 Each
Sub Engineer Assistant Engineer Executive Engineer
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS FOR UP-GRADITION OF LABS, ELECTRIC WIRING &
FALSE CIELING FOR VIROUS COMPUTER LABS AT B.J. CAMPUS.
Providing & Fixing Wall Bracket Fan with Plastic Body (Pak Fan, G.F.C or Royal Co. of 18"
Sweep. Complete in all respects.
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
9/242
Description
Unit of Rate = Per Sft
Cost of Material 1 Sft 12.00 12.00 Each
Labour Charages for Fixing 1 Sft 4.00 4.00 Each
Total 16.00 Each
Add 10% Contractor Profit 1.60 Each
Total 17.60 Each
Sub Engineer Assistant Engineer Executive Engineer
Project Director
RATE ANALYSIS FOR UP-GRADITION OF LABS, ELECTRIC WIRING &
FALSE CIELING FOR VIROUS COMPUTER LABS AT B.J. CAMPUS.
Submitted for Approval
ISLAMIA UNIVERSITY BAHAWALPUR
Providing & Fixing False ciling of plaster of paris with hanging arrangements and design
and samples as approved by the Engineer Incharge Complete in all respects.
8/13/2019 Analysis of Rate of Building Deportment
10/242
Description
1. Supply and Eraction of duct work for wiring (Dura Adamgee) with rawal
plugs,Screws and specials complete in all respects.
i) 16 x 16 mm
Cost of Material 11.00 Per Rft 11.00 Per Rft
Labour Charages for Fixing 2.00 Per Rft 2.00 Per Rft
Total 13.00 Per Rft
Add 10% Contractor Profit 1.30 Per Rft
Total 14.30 Per Rft
ii) 16 x 25 mm
Cost of Material 14.00 Per Rft 14.00 Per Rft
Labour Charages for Fixing 2.00 Per Rft 2.00 Per Rft
Total 16.00 Per Rft
Add 10% Contractor Profit 1.60 Per Rft
Total 17.60 Per Rft
iii) 40 x 40 mm
Cost of Material 38.0 Per Rft 38.00 Per Rft
Labour Charages for Fixing 2.00 Per Rft 2.00 Per Rft
Total 40.00 Per Rft
Add 10% Contractor Profit 4.00 Per RftTotal 44.00 Per Rft
Sub Engineer Assistant Engineer Executive Engineer
Project Director
Submitted for Approval
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS FOR PROVIDING & FIXING ELECTRIC LINE FOR
CENTRAL LIBRARY AT B.J. CAMPUS.
Unit of Rate = Per Rft
8/13/2019 Analysis of Rate of Building Deportment
11/242
Description
2
Unit of Rate = Each
Cost of Deodar wood Board 9"x4"x3" 1 No 40 40.00 Each
Cost of Bekolite sheet 4mm thick 9"x4" 1 No 30 30.00 Each
Labour Charages for Fixing 1 No 15 15.00 Each
Total 85.00 Each
Add 10% Contractor Profit 8.50 Each
Total 93.50 Each
Sub Engineer Assistant Engineer Executive Engineer
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS FOR PROVIDING & FIXING ELECTRIC LINE FOR
CENTRAL LIBRARY AT B.J. CAMPUS.
Supply and Eraction deodar wood box 9"x4"x3" deep I/c bekolite sheet 4mm thick I/c making holes for
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
12/242
Description
5
Unit of Rate = Each
Cost of Material 1 No 270 270.00 Each
Labour Charages for Fixing 1 No 10 10.00 Each
Total 280.00 Each
Add 10% Contractor Profit 28.00 Each
Total 308.00 Each
Sub Engineer Assistant Engineer Executive Engineer
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS FOR PROVIDING & FIXING ELECTRIC LINE FOR
CENTRAL LIBRARY AT B.J. CAMPUS.
Supply and Eraction Power plug, Switche Plug combined 30/35 AMPS (Bush Company)
including shoe 3 pins 20 AMPS
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
13/242
Project Director
Description
6 Supply and Eraction distribution board (D.B) 18"'x15" Size with following detail.
100 AMPS MCCB 3-Phase 240 Volts Circuit breaker
20 AMPS MCB 1-Phase 240 Volts Circuits breaker
All Circuit breakers Terasaki/Mitsubishi (Black) Japan to be used.
Iron Box 18"x15" with Stove enameled paint.
Unit of Rate = Each
Cost of Iron Box 18"x15" 1 No 1350 1350.00 Each
Cost of 100 AMPS 3-Phase Circuit breaker 1 No 2850 2850.00 Each
Cost of 20 AMPS 1-Phase Circuit breaker 8 No 225 1800.00 Each
Labour Charages for Fixing 1 No 400 400.00 Each
Total 6400.00 Each
Add 10% Contractor Profit 640.00 Each
RATE ANALYSIS FOR PROVIDING & FIXING ELECTRIC LINE FOR
CENTRAL LIBRARY AT B.J. CAMPUS.
ISLAMIA UNIVERSITY BAHAWALPUR
8/13/2019 Analysis of Rate of Building Deportment
14/242
Total 7040.00 Each
Sub Engineer Assistant Engineer Executive Engineer
Project Director
DescriptionSupply and Eraction of "U" Clamp for Shackle insulators with Nut bolts and Pins etc complete.
Unit of Rate = Each
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS FOR PROVIDING & FIXING ELECTRIC LINE FOR
CENTRAL LIBRARY AT B.J. CAMPUS.
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
15/242
Cost of "U" Clamp and Nut bolts & Pins 1 No 130 130.00 Each
Cost of Labour for fixing 1 No 10 10.00 Each
Total 140.00 Each
Add 10% Contractor Profit 14.00 Each
Total 154.00 Each
Sub Engineer Assistant Engineer Executive Engineer
Project Director
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
16/242
DescriptionSupply and Eraction of pole stay including enchor rod 3/4" dia with MS Plate
galvanized as per Wapda standard with concrete block (1:2:4) 2' dia 6" thickincluding stay wire complete in all respects.
Unit of Rate = Each
Cost of Stay Rod 3/4" dia with MS Plate 1 No 400 400.00 Each
Cost of Stay Wire 1 No 600 600.00 Each
Cost of Concrete Block 2' dia 6" thick 1 No 300 300.00 Each
Labour charges for fixing 1 No 400 400.00 Each
Total 1700.00 Each
Add 10% Contractor Profit 170.00 Each
Total 1870.00 Each
Sub Engineer Assistant Engineer Executive Engineer
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS FOR PROVIDING & FIXING ELECTRIC LINE FOR
CENTRAL LIBRARY AT B.J. CAMPUS.
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
17/242
Description
Excavation in foundation of building
Unit of Rate = 1000 Cft
Labour Charages:
Excavation 1000.00 @ 148.00 % Cft
TNP Charges 1000.00 @ 45.00 %o Cft
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Rs. 1830/- %o Cft
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Approved for
Project Director
The Islamia University of Bahawalpur
RATE ANALYSIS
RATE ANALYSIS
ISLAMIA UNIVERSITY BAHAWALPUR
Rs.1,830.00
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
18/242
CIVIL WORKS
Description
Cement Concrete Brick or Stone Ballast 1.5" to 2" gauge 1:6:12
Unit of Rate = 100 Cft
Material Cost:
Brick Ballast 97.00 Cft 9.00 Per Cft
Cement 6.50 Bag 333.00 Per Bag
Sand 48.00 Cft 9.00 Per Cft
Total
Labour Charages: 100.00 Cft 700.00 % Cft
TNP Charges 100.00 Cft 81.00 % Cft
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Say Rs.5100/-
ASSISTANT ENGINEER SUB-EN
DEPUTY PROJECT DIRECTOR
Description
Spraying antitermite
Submitted for Approval
The Islamia University of Bahawalpur
RATE ANALYSIS
Project Director
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
19/242
Unit of Rate = 100 Cft Per Sft.
Material Cost: (for 3oo Sft) 1 Ltr 310.00 Per Lit
TNP Charges 100.00 Sft 10.00 100 Sft
Labour Charages: 100.00 Sft 15.00 100 Sft
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft. Rs. 1.2 1.53
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Pacca Brick work in foundation and plinth. 1:6
Unit of Rate = 100 Cft 100 Cft
Material Cost:
Bricks 1350.00
5% Wastage 68.00
1418.00 Nos 2200.00 1000 No
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
CIVIL WORKS
Project Director
A p p r o v e d
8/13/2019 Analysis of Rate of Building Deportment
20/242
Cement 3.50 Bag 333.00 P/Bag
Sand 26.00 Cft 9.00 P/Cft
TNP
I Labour Charages:
TotalAdd 10% Contractor Profit
Add 10% Overhead Charges
Total
Say
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Pacca Brick work in Ground Floor 1:5
Unit of Rate = 100 Cft 100 Cft
Material Cost:
Bricks 1350.00
5% Wastage 68.00
1418.00 Nos 2200.00 1000 No
Cement 4.00 Bag 333.00 P/Bag
Sand 26.00 Cft 9.00 P/Cft
TNP
Labour Charges:
RATE ANALYSIS
CIVIL WORKS
A p p r o v e d
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
8/13/2019 Analysis of Rate of Building Deportment
21/242
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Say
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Damp Proof Course 2" thick I/c bitumen coating and polythene sheet
Unit of Rate = 100 Cft 100 Sft
Material Cost:
Crush 15.00 Cft 28.00 Per Cft
Cement 2.75 Bag 333.00 P/Bag
Sand 28.00 Cft 9.00 P/CftBitumen 10.00 Kg 45.90 Per Kg
Polythene Sheet 500 guage 100.00 Sft 1.00 Per Sft
TNP
Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Say
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
CIVIL WORKS
Project Director
A p p r o v e d
8/13/2019 Analysis of Rate of Building Deportment
22/242
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Reinforced Cement Concrete in foundation 1:2:4
Unit of Rate = 100 Cft Per Cft
Material Cost:
Crush 88.00 Cft
5% Wastage 4.00 Cft
Total 92.00 Cft 30.00 Per Cft
Cement 17.60 Bag 325.00 P/Bag
Sand 44.00 Cft 9.00 P/Cft
TNP
Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Cft 121.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
The Islamia University of BahawalpurRATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
8/13/2019 Analysis of Rate of Building Deportment
23/242
Description
Reinforced Cement Concrete in foundation 1:1.5:3
Unit of Rate = 100 Cft Per Cft
Material Cost:
Crush 84.00 Cft
5% Wastage 4.00 Cft
Total 88.00 Cft 30.00 Per CftCement 22.40 Bag 325.00 P/Bag
Sand 42.00 Cft 9.00 P/Cft
TNP
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Cft 139.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Submitted for Approval
Submitted for Approval
Project Director
The Islamia University of BahawalpurRATE ANALYSIS
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
24/242
Description
Reinforced Cement Concrete in foundation 1:2:4
Unit of Rate = 100 Cft
Material Cost:
Crush 88.00 Cft
5% Wastage 4.00 Cft
Total 92.00 Cft 30.00 Per Cft
Cement 17.60 Bag 325.00 P/Bag
Sand 44.00 Cft 9.00 P/Cft
TNP
Labour Charages:Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Cft 121.00
ASSISTANT ENGINEER SUB-EN
DEPUTY PROJECT DIRECTOR
The Islamia University of Bahawalpur
CIVIL WORKS
Project Director
Project Director
RATE ANALYSIS
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
25/242
Description
Reinforced Cement Concrete in Ground Floor 1:1.5:3
Unit of Rate = 100 Cft Per Cft
Material Cost:
Crush 84.00 Cft
5% Wastage 4.00 Cft
Total 88.00 Cft 30.00 Per Cft
Cement 22.40 Bag 325.00 P/Bag
Sand 42.00 Cft 9.00 P/Cft
TNP
Shuttering Charges
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Cft 175.00
ASSISTANT ENGINEER SUB-EN
DEPUTY PROJECT DIRECTOR
Project Director
The Islamia University of BahawalpurRATE ANALYSIS
CIVIL WORKS
The Islamia University of BahawalpurRATE ANALYSIS
CIVIL WORKS
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
26/242
Description
Reinforced Cement Concrete in Ground Floor 1:2:4
Unit of Rate Per Cft
Material Cost:
Crush 88.00 Cft5% Wastage 4.00 Cft
Total 92.00 Cft 23.00 Per Cft
Cement 17.60 Bag 180.00 P/Bag
Sand 44.00 Cft 9.00 P/Cft
TNP
Shuttering Charges
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Cft 111.36
ASSISTANT ENGINEER SUB-EN
DEPUTY PROJECT DIRECTOR
Description
Fabrication of mild steel (40 grade) Prime Steel, Afco Steel
The Islamia University of BahawalpurRATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
8/13/2019 Analysis of Rate of Building Deportment
27/242
Unit of Rate = 100 Cft Per kg
Material Cost:
Steel 100.00 Kg
5% Wastage 5.00 Kg
Total 105.00 Kg 3880.00 100 KgSteel Binding Wire 3.00 Kg 70.00 Per Kg
TNP
I Labour Charges:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Kg 55.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Fabrication of mild steel (40 grade)
Unit of Rate Per kg
Material Cost:
Steel 100.00 Kg
5% Wastage 5.00 Kg
Total 105.00 Kg 3200.00 100 Kg
Steel Binding Wire 3.00 Kg 60.00 Per Kg
TNPI Labour Charges:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Kg 46.08
Submitted for Approval
Project Director
The Islamia University of BahawalpurRATE ANALYSIS
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
28/242
ASSISTANT ENGINEER SUB-EN
DY. PROJECT DIRECTOR
Description
Fabrication of High Tensile steel (60 grade)
Unit of Rate = 100 Cft Per kg
Material Cost:
Steel 100.00 Kg
5% Wastage 5.00 Kg
Total 105.00 Kg 4200.00 100 Kg
Steel Binding Wire 3.00 Kg 70.00 Per Kg
TNP
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Kg 59.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
CIVIL WORKS
Submitted for Approval
The Islamia University of BahawalpurRATE ANALYSIS
Submitted for Approval
Project Director
8/13/2019 Analysis of Rate of Building Deportment
29/242
Description
Cement plaster 1:5 1/2" thick 0' to 20' height
Unit of Rate = 100 Cft Per Sft
Material Cost:
Cement 1.00 Bag 333.00 Per Bag
Sand 3.00 Cft 9.00 Per Cft
TNP
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 12.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
Project Director
The Islamia University of Bahawalpur
8/13/2019 Analysis of Rate of Building Deportment
30/242
Description
Cement plaster 1:3 3/8" thick
Unit of Rate = 100 Cft Per Sft
Material Cost:
Cement 1.00 Bag
Cement for neru 0.25 Bag
1.25 Bag 333.00 Per Bag
Sand 2.50 Cft 9.00 Per Cft
TNP
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead ChargesTotal
Rate Per Sft 12.50
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
8/13/2019 Analysis of Rate of Building Deportment
31/242
Description
Cement plaster 1:5 3/4" thick
Unit of Rate = 100 Cft Per Sft
Material Cost:
Cement 1.50 Bag 310.00 Per Bag
Sand 4.00 Cft 8.00 Per Cft
TNP
I Labour Charages: Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 12.86
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER DEPUTY
The Islamia University of BahawalpurRATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
8/13/2019 Analysis of Rate of Building Deportment
32/242
Description
Dry brick ballast 1.5" to 2" gauge
Unit of Rate = 100 Cft Per Cft
Material Cost: 100.00 Cft 12.00 Per CftTNP
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Cft 16.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
The Islamia University of BahawalpurRATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
8/13/2019 Analysis of Rate of Building Deportment
33/242
Description
Polythene Sheet 500 Gauge
Unit of Rate = 100 Cft Per Sft
Material Cost: 100.00 Sft 1.00 Per Sft
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 1.32
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Project Director
The Islamia University of BahawalpurRATE ANALYSIS
The Islamia University of BahawalpurRATE ANALYSIS
CIVIL WORKS
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
34/242
Description
Vertical DPC 1:3 1/2" thick with 2 coat bitumen
Unit of Rate = 100 Cft Per Sft
Material Cost:
Cement 1.25 Bag 333.00 Per Bag
Sand 3.00 Cft 9.00 Per Cft
Bitumen 16.00 Kg 45.90 Per Kg
TNP
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 22.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Rubber Water Stopper 10" wide 1/4" thick
Submitted for Approval
Project Director
The Islamia University of BahawalpurRATE ANALYSIS
CIVIL WORKS
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
35/242
Unit of Rate = 100 Cft Per Rft
Material Cost: 1.00 Rft 50.00 Per Rft
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Rft 62.40
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Bitumen Coating 20 Lbs per 100 Sft.
Unit of Rate = 100 Cft Per Sft
Material Cost Bitumen: 16.00 Lbs 25.00 Per Lbs
Carocine oil 1.00 ltr 40.00 Per Ltr
TNPI Labour Charages:
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
The Islamia University of Bahawalpur
8/13/2019 Analysis of Rate of Building Deportment
36/242
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per sft 10.50
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
First Class Brick walling 4.5" thick 1:3 hoop iron 12" apart
Unit of Rate = 100 Cft 100 Sft
Material Cost:
Bricks 518.00
5% Wastage 26.00
544.00 Nos 2200.00 1000 No
Cement 2.25 Bag 333.00 P/Bag
Sand 13.00 Cft 9.00 P/Cft
Hoop Iron 100.00 Rft 5.00 Per Rft
CIVIL WORKS
Submitted for Approval
Project Director
The Islamia University of Bahawalpur
RATE ANALYSIS
8/13/2019 Analysis of Rate of Building Deportment
37/242
TNP
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft. 40.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Spray plaster
Unit of Rate = 100 Cft Per Sft
Material Cost:
Cement 1.00 Bag 333.00 Per Bag
Marble Chips 5.00 Bag 25.00 Per BagTNP
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 13.00
ASSISTANT ENGINEER SUB-EN
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
38/242
EXECUTIVE ENGINEER
Description
Mosaic Dado or Skirting 1/2" thick (grey cement) Unit of Rate = 100 Cft Per Sft
1 Material Cost:
Cement 1.25 Bag 333.00 Per Bag
Sand 3.00 Cft 9.00 Per Cft
TNP
I Labour Charages:
Total
2 Material Cost:
Cement 3.00 Bag 333.00 Per Bag
Marble Chips 8.00 Bag 25.00 Per Bag
Marble Powder 2.00 Bag 25.00 Per Bag
TNP
I Labour Charages:
Griding Charges
Polish Charges
Total
Gramd Total A+BAdd 10% Contractor Profit
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
The Islamia University of Bahawalpur
8/13/2019 Analysis of Rate of Building Deportment
39/242
Add 10% Overhead Charges
Total
Rate Per Sft 38.50
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Extra Labour for Arch Work
Unit of Rate = 100 Cft Per Cft
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead ChargesTotal
Rate Per Cft 6.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
Submitted for Approval
Project Director
The Islamia University of Bahawalpur
8/13/2019 Analysis of Rate of Building Deportment
40/242
Description
Pacca Brick work in foundation and plinth. 1:3
Unit of Rate = 100 Cft 100 Cft
Material Cost:
Bricks 1350.00
5% Wastage 68.00
1418.00 Nos 2200.00 1000 No
Cement 6.00 Bag 333.00 P/Bag
Sand 25.00 Cft 9.00 P/Cft
TNP
Labour Charges:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Say
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Project Director
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
41/242
Description
Earth filling under floor
Unit of Rate = 100 Cft 1000 Cft
1 Surplus earth from foundation
TNP 1000.00 Cft
I Labour Charages: 1000.00 Cft
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per 1000 Cft 1400.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Submitted for Approval
Project Director
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
42/242
Description
Sand filling under floor
Unit of Rate = 100 Cft Per Cft
1 sand 100.00 Cft 9.00 Per Cft
TNP 100.00 Cft
I Labour Charages: 100.00 Cft
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Cft. 11.5
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Submitted for Approval
Project Director
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
43/242
Description
Brick on edge floor
Unit of Rate = 100 Cft Per Sft
1 Material
Brick 550.00 No
5% Wastage 28.00
578.00 No 2200.00 Per 1000
Cement 1.25 Bag 333.00 Per Bag
Sand 3.00 Cft 9.00 Per Cft
TNP 100.00 Sft
I Labour Charages: 100.00 Cft 5.00 Per Sft
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 26.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
The Islamia University of Bahawalpur
The Islamia University of Bahawalpur
RATE ANALYSIS
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
8/13/2019 Analysis of Rate of Building Deportment
44/242
Description
Mosaic Floor 1.5" thick, 1" thick 1:2:4 1/2" Mosaic Topping
Unit of Rate = 100 Cft Per Sft
1 Material (100 Sft)
Cement 1:2:4 2.11 Bag 333.00 Per Bag
Sand 5.38 Cft 9.00 Per Cft
Crush 10.56 Cft 28.00 Per Cft
Cement Mosaic toping 2.00 Bag 333.00 Per Bag
Powder 2.00 Bag 25.00 Per Bag
Chips 8.00 Bag 25.00 Per Bag
TNP
I Labour Charages: 100.00 Cft 8.00 Per Sft
Griding
Polish
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 37.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
1/4" thick glazed coloured tile for Dado & Skirting.
Project Director
CIVIL WORKS
Submitted for Approval
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
45/242
8/13/2019 Analysis of Rate of Building Deportment
46/242
ASSISTANT ENGINEER
EXECUTIVE ENGINEER
Description
Marble Strip 1.5" x 3/8" size
Unit of Rate = 100 Cft Per Rft
1 Material (100 (100 Rft)
Marble strip 100.00 Rft 2.00 Per Rft
Cement (Grey)Sand
TNP
I Labour Charages: 100.00 Rft 1.50 Per Rft
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Rft 5.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
The Islamia University of Bahawalpur
Submitted for Approval
Project Director
8/13/2019 Analysis of Rate of Building Deportment
47/242
Description
Roof Insulation
Unit of Rate = 100 Cft Per Sft
1 Material (100 (100 Sft)
Tile 9"x4.5"x1.5" 350.00
5% Wastage 18.00
368.00 No 2200.00 Per 1000
Bitumen 20.00 Lbs 25.00 Per Lbs
Polythene Sheet 500 Gauge 100.00 Sft 1.00 Per Sft
Earth 16.00 Cft 3.00 Per Cft
jumbo lawn 1" thick 100.00 Sft 30.00 Per Sft
Cement 1.00 Bag 333.00 Per Bag
Sand 3.00 Cft 9.00 Per CftTNP
I Labour Charages: 100.00 Sft 4.15 Per Sft
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per sft 63.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
8/13/2019 Analysis of Rate of Building Deportment
48/242
The Islamia University of Bahawalpur
Description
Khurras on roof 2'x2'x4"
Unit of Rate = 100 Cft Per No
1 Material
Cement 0.30 Bag 333.00 Per Bag
Crush 1.20 Cft 28.00 Per Cft
Sand 0.60 Cft 9.00 Per Cft
TNP
I Labour Charages: 1.00 No 93.00 Per No
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per No 290.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
CIVIL WORKS
Submitted for Approval
Project Director
RATE ANALYSIS
8/13/2019 Analysis of Rate of Building Deportment
49/242
Description
Bottom Khurras
Unit of Rate = 100 CftPer No
1 Material
Cement 0.50 Bag 333.00 Per Bag
Brick 42.00 No 2200.00 Per 1000
Crush 2.00 Cft 28.00 Per Cft
Sand 2.00 Cft 9.00 Per Cft
TNP
Labour Charges: 1.00 No 78.00 Per No
Add 10% Contractor Profit
Add 10% Overhead Charges
TotalRate Per No 505.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
8/13/2019 Analysis of Rate of Building Deportment
50/242
8/13/2019 Analysis of Rate of Building Deportment
51/242
Description
Cost Iron Bend 4" dia
Unit of Rate = 100 Cft Per No
1 Material
CI bend 4" dia (Tipu) 1.00 No 190.00 Per No
Paint 2.00 Sft 7.00 Per Sft
I Labour Charages: 1.00 No 30.00 Per No
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per No 281/-
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Solid Flush Door
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
52/242
Unit of Rate = 100 Cft Per Sft
1 Material (7'x4')
Pertal Wood 2.24
30% Wastage 0.67
2.91 Cft 600.00 Per Cft
Deodar Wood 0.08
30% Wastage 0.02
0.10 Cft 1600.00 Per Cft
Commercial Ply 5 mm thick 56.00 Sft 15.00 Per Sft
Gelu 2.00 Kg 50.00 Per Kg
Kick Plate 8.00 Rft 20.00 Per Rft
Handle 2.00 No 15.00 Per No
Finger Plate 2.00 No 25.00 Per No
Tower Bolt 1.00 No 30.00 Per No
Hinges 3.00 No 25.00 Per No
Screws
Labour Charges: 28.00 Sft 20.00 Per Sft
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 162/-
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Safety Grill
Unit of Rate = 100 Cft Per Sft
1 Material (6'x6')
Angle Iron 1"x1"x1/8" 6.00 Kg 38.00 Per Kg
Square Bar 3/8"x3/8" 30.00 Kg 38.00 Per KgLabour for welding 36.00 Sft 20.00 Per Sft
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
8/13/2019 Analysis of Rate of Building Deportment
53/242
Paint 36.00 Sft 8.00 Per Sft
Cement
Crush
Sand
Labour for fixing at site
Total
Add 10% Contractor Profit
Add 10% Overhead ChargesTotal
Rate Per Sft 86.70
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Sliding Bolt 10"/12"
Unit of Rate = 100 Cft Per No
Sliding Bolt Cromium 1.00 No 92.50 Per No
Labour for fixing at site 1.00 No 20.00 Per No
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per No 135.00
Project Director
Submitted for Approval
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
54/242
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Enamel Paint 3 Coat for doors and windows etc
Unit of Rate = 100 Cft Per Sft
Material (4'X7')
Primer Paint 1.00 Qtr 35.00 Per Qtr
Paint (ICI,Robilac) 1.00 Qtr 130.00 Per Qtr Tarbine Oil 1.00 Qtr 10.00 Per Qtr
TNP
Labour 28.00 Sft 2.00 Per Sft
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 10.00
ASSISTANT ENGINEER SUB-EN
Project Director
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
55/242
EXECUTIVE ENGINEER
Description
Terrace Railing
Unit of Rate = 100 Cft Per Rft
Material (10 Rft)
M.S Condute Pipe 2" dia 16 SWG 10.00 Rft 50.00 Per Rft
M.S Bar 5/8"x5/8" 29.00 Kg 38.00 Per Kg
M.S. Flat 1"x1/8" 2.00 Kg 38.00 Per Kg
Labour for welding 10.00 Rft 30.00 Per Rft
TNP
Labour for fixing at site
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Rft 261.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Submitted for Approval
Project Director
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
56/242
Description
Cement Pointing Deep Struck Joint 1:2
Unit of Rate = 100 Cft Per Sft
Material (100 Sft)
Cement 1.00 Bag 333.00 Per Bag
Sand 3.00 Cft 9.00 Per CftTNP
Labour charges 100.00 Sft 4.00 Per Sft
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 10.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
Project Director
The Islamia University of Bahawalpur
8/13/2019 Analysis of Rate of Building Deportment
57/242
Description
Extra Cost for red oxide
Unit of Rate = 100 Cft Per Sft
Material (100 Sft)
Red Oxide Pigment 4.00 Kg 30.00 Per Kg
TNP
Labour charges 100.00 Sft 1.00 Per Sft
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 2.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Project Director
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
58/242
Description
Distempering of walls 3 Coat including preparation of Surface completein all respect.Colour Scheme as approved by the Engineer Incharge.
Unit of Rate = 100 Cft Per Sft
Material (100 Sft)
Distemper 0.50 G Rs. 155.00 Per G
T&P, Colour ChangeLabour charges 100.00 Sft Rs. 1.00 Per Sft
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft. 225/100 = 2.25
SUB-ENGINEER Deputy P
Project Director
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
8/13/2019 Analysis of Rate of Building Deportment
59/242
Description
White Washing 3 Coat Unit of Rate = 100 Cft Per Sft
Material (100 Sft) 5.00 Kg 2.00 Per Kg
Gelu
Blue Powder
TNP
Labour charges 100.00 Sft 0.50 Per Sft
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 1.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Submitted for Approval
Project Director
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
60/242
Description
P/F aluminium strip 3"x1/8" on Expension Joint
Unit of Rate = 100 Cft Per Rft
Material (10 Rft)
Strip 3"x1/8" 10.00 Rft 20.40 Per Rft
Screw/Rawal plugTNP
Labour charges 10.00 Rft 5.00 Per Rft
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Rft 34.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Submitted for Approval
Project Director
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
61/242
DescriptionThermopore sheet 1-1/2" thick for expension joint
Unit of Rate = 100 Cft Per Sft
Material
Thermopore 1-1/2" 1.00 Sft 8.20 Per Sft
Labour charges 1.00 Sft 1.00 Per Sft
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 11.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
The Islamia University of Bahawalpur
The Islamia University of Bahawalpur
RATE ANALYSIS
RATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
8/13/2019 Analysis of Rate of Building Deportment
62/242
Description
6" Wide Curved Sheet on Expension Joint
Unit of Rate = 100 Cft Per Rft
Material
Sheet 18 Swg 10.00 Rft 25.00 Per Rft
Screw/Rawal Plug
TNP
Labour charges
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Rft 40.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Cement Concrete plain 1:2:4
Project Director
CIVIL WORKS
Submitted for Approval
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
63/242
Unit of Rate = 100 Cft Per Cft
Material (100 Cft)
Cement 17.60 Bag 333.00 Per Bag
Crush 92.00 Cft 28.00 Per Cft
Sand 44.00 Cft 9.00 Per Cft
TNP
Labour charges
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Cft 120.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
P/F Wardrobe.
Unit of Rate = 100 Cft Per Sft
Material 3'x7'
M.S pipe 3"x1.5" 18 SWG 20.00 Rft 32.15 Per Rft
Labour welding
Commercial Win Board 3/4" thick 21.00 Sft
10% Wastage 2.00
23.00 Sft 27.25 Per Sft
CIVIL WORKS
Submitted for Approval
Project Director
The Islamia University of Bahawalpur
RATE ANALYSIS
8/13/2019 Analysis of Rate of Building Deportment
64/242
Deodar Wood 0.04 Cft
30% Wastage 0.01
0.05 Cft 1600.00 Per Cft
Aluminium Rod 3.00 Rft 12.00 Per Rft
Bracket 2.00 No 20.00 Per No
Tower Bolt 2.00 No 20.00 Per No
Lock 808 1.00 No 35.00 Per No
Handle 1.00 No 20.00 Per No
Hardware Charges
Paint 42.00 Sft 10.00 Per Sft
Labour charges 21.00 Sft 15.00 Per Sft
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 146.00
SUB-EN
DEPUTY PROJECT DIRECTOR
Description
P/F STEEL GRATED DOOR.
Unit of Rate = 100 Cft Per Sft
Material 4'x7'
M.S angle iron 1.5"x1.5"x3/16" 25.00 Kg
M.S Sheet 1/16" 30.00 Kg
55.00 Kg 40.00 Per Kg
Welding Labour Charges 55.00 Kg 9.00 Per Kg
Red Oxide Paint
Sliding Bolt. 2.00 No 138.00 Each
TNP
Labour for fixing at site
Total
Add 10% Contractor Profit
CIVIL WORKS
Submitted for Approval
PROEJCT DIRECTOR
The Islamia University of Bahawalpur
RATE ANALYSIS
8/13/2019 Analysis of Rate of Building Deportment
65/242
Add 10% Overhead Charges
Total
Rate Per Sft 150.89
SUB-EN
DEPUTY PROJECT DIRECTOR
Description
Steel Windwos Openable
Unit of Rate = 100 Cft Per Sft
Material (6'x6')
M.S Box pipe 2"x1.5" (16 SWG) 48.00 Rft 25.00 Per Rft
M.S Box Pipe 1.5"x1" (16 SWG) 72.00 Rft 20.00 Per Rft
M.S Box Ppipe 1/2"x1/2" (18 SWG) 72.00 Rft 10.00 Per Rft
M.S Box Ppipe 3/8"x3/8" (18 SWG) 72.00 Rft 8.00 Per Rft
M.S Flat 1"x1/8" 72.00 Rft 5.00 Per Rft
M.S Flat 3/4"x1/8" 48.00 Rft 4.00 Per Rft
5 mm thick glass 36.00 Sft 30.00 Per Sft
Hinges 16.00 No 20.00 Per NoHandle 4.00 No 20.00 Per No
Stay Rod 8.00 No 25.00 Per No
Wire Gauze 24 SWG 36.00 Sft 15.00 Per Sft
Painting 108.00 Sft 10.00 Per Sft
Labour for welding 36.00 Sft 29.00 Per Sft
Labour for fixing at site
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 300.00
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
A p p r o v e d
Project Director
8/13/2019 Analysis of Rate of Building Deportment
66/242
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Providing & Fixing Kitchen Cabinet
Unit of Rate = 100 Cft Size 3' x 7'
Material
M.S pipe 3"x1.25" 18 SWG 20.00 Rft 35.00 Per Rft
Labour welding
Lamination Board 3/4" thick 21.00 Sft
10% Wastage 2.00
23.00 Sft 32.00 Per Sft
Deodar Wood 0.04 Cft
30% Wastage 0.01
0.05 Cft 1600.00 Per Cft
Tower Bolt 2.00 No 18.00 Per No
Lock 808 1.00 No 32.00 Per No
Handle 1.00 No 15.00 Per No
Hardware ChargesPaint 42.00 Sft 10.00 Per Sft
Labour charges 21.00 Sft 15.00 Per Sft
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Cft 148.00
ASSISTANT ENGINEER SUB-EN
SNACK BARE OF ENGINEERING COLLEGE
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
Project Director
A p p r o v e d
8/13/2019 Analysis of Rate of Building Deportment
67/242
8/13/2019 Analysis of Rate of Building Deportment
68/242
Description
Providing & Fixing open able Wardrobe Commercial Vin Board 3/4" thick for A/
Unit of Rate = P sft
Materials 2.25x2.75'MS pipe 1.5''x1.5'' 18 SWG 12.38 Rft 47.5 P.Rft
Labour rate welding LS
Commercial Vin Board 3/4" thick 5.00 Sft 50.00 Per Sft
Wooden Beading LS 50.00
Tower Bolts 4.00 Nos 35.00 each
Handle 2.00 Nos 20.00 each
Labour charges
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
RATE PSFT RATE P.SFT RS=
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER Project D
Name of Work:Construction Faculty Hostel for Women at B.
Director Engineering
The Islamia University of Bahawalpur
RATE ANALYSIS
NON SCHEDULE CIVIL WORKS
Approved
8/13/2019 Analysis of Rate of Building Deportment
69/242
Description
Cement plaster 1:5 1/2" thick
Unit of Rate = 100 Cft Per Sft
Material Cost:
Cement 1.00 Bag 333.00 Per Bag
Sand 3.00 Cft 9.00 Per Cft
TNP
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 13.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
The Islamia University of BahawalpurRATE ANALYSIS
CIVIL WORKS
Submitted for Approval
Project Director
8/13/2019 Analysis of Rate of Building Deportment
70/242
Description
Cement plaster 1:3 3/8" thick
Unit of Rate = 100 Cft Per Sft
Material Cost:
Cement 1.00 Bag
Cement for neru 0.25 Bag
1.25 Bag 333.00 Per Bag
Sand 2.50 Cft 9.00 Per Cft
TNP
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead ChargesTotal
Rate Per Sft 13.50
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Submitted for Approval
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
71/242
Description
1/4" thick mat coloured tile for floor.
Unit of Rate = 100 Cft Per Sft
1 Material (100 Sft)
Tile 100.00 Sft
5% Wastage 5.00
105.00 Sft 40.70 Per Sft
Cement (Grey) 1.50 Bag 333.00 Per Bag
Sand 3.00 Cft 9.00 Per Cft
Cement WhiteTNP
I Labour Charages: 100.00 Sft 9.00 Per Sft
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 72.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Submitted for Approval
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
72/242
Description
Cement plaster 1:3 3/4" thick
Unit of Rate = 100 Cft Per Sft
Material Cost:
Cement 1.25 Bag 333.00 Per Bag
Sand 3.00 Cft 9.00 Per Cft
TNP
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 14.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
CIVIL WORKS
CIVIL WORKS
Submitted for Approval
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
8/13/2019 Analysis of Rate of Building Deportment
73/242
Earth filling under floor lead 3 mile.
Unit of Rate = 1000 Cft
Earth 1000.00 Cft 2.65 Cft
Labour Charges:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft ######
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER
Description
Pacca Brick work in foundation and plinth. 1:5
Unit of Rate = 100 Cft 100 Cft
Material Cost:
Submitted for Approval
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
CIVIL WORKS
Project Director
8/13/2019 Analysis of Rate of Building Deportment
74/242
Bricks 1350.00
5% Wastage 68.00
1418.00 Nos 2200.00 1000 No
Cement 4.00 Bag 333.00 P/Bag
Sand 26.00 Cft 9.00 P/Cft
TNP
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Say
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER DEPUTY
Description
Cement pointing struck joint on walls up to 20' height ratio 1:2
Unit of Rate = 100 Cft Per Sft
Material Cost:
Cement 1.50 Bag 333.00 Per Bag
Sand 4.00 Cft 9.00 Per Cft
TNP
Project Director
A p p r o v e d
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
CIVIL WORKS
8/13/2019 Analysis of Rate of Building Deportment
75/242
I Labour Charages:
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Sft 14.00
ASSISTANT ENGINEER SUB-EN
EXECUTIVE ENGINEER DEPUTY
Submitted for Approval
Project Director
8/13/2019 Analysis of Rate of Building Deportment
76/242
8/13/2019 Analysis of Rate of Building Deportment
77/242
Description
Unit of Rate = 100 Cft Per Rft
1 Cost of Morble 3"x12"x3/4" 1.00 No. 62.50
2 Wastage 3%3 Carriage 1.00 No. 0.66
4 Material Cost of Floating Coat (MRS July 2005) 0.25 Sft 336.10
5 Cost of Martor under marble 3/4" thick (MRS Jul 05)
6 Ratio 1:2 0.25 Sft 7.88
7 Cost of floating coat (MRS July 2005). 0.25 Sft 336.10
8 Cost of PCC 1:2:4 1" thick (MRS July 2005) 0.25 Sft 1103.90
9 Cost of Pigment 0.25 Sft 4.50
10 Cost of Labour for fixing & chemical polishing (10+14) 0.25 Sft 24.00
Total
Add 10% Contractor Profit on Items No. 1-3, 9 & 10
Add 10% over head charges on Items No. 1-3, 9 & 10G. Total
ASSISTANT ENGINEER SUB-EN
DEPUTY PROJECT DIRECTOR
Approved
Cons truc ti on of Admin is t ra ti on Block for Un ivers it y Co l lege of Eng ineer ing a
Baghd ad-ul-Jadeed Campu s
Providing and fixing marble 3/4" thick 12" long 3" wide with pure chocklate colour with floating coat of ceme
of 3/4" thick cement sand mortar 1:2 over 1" thick PCC 1:2:4 Gray cement, including colour pigment to mat
colour of marble tiles, laid with cement sand mortor 1:2 rubbing and chemical polishing complete in all resp
directed and approved by the Engineer incharge.
SAY
The Islamia University of Bahawalpur
RATE ANALYSIS
CIVIL WORKS
Project Director
8/13/2019 Analysis of Rate of Building Deportment
78/242
Description
Unit of Rate = 100 Cft Per Sft
1 Cost of Marble 3/4" thick 36"-60"/13.5" i/c chemical polishing 1.00 Sft 135.002 Carriage 1.00 Sft 3.00
3 Loading, unloading and stacking 1.00 Sft 5.004 Material Cost of Floating Coat (MRS July 2005) 1.00 Sft 336.10
5 Cost of Martor under marble 3/4" thick (MRS Jul 05)
Ratio 1:2 1.00 Sft 7.88
6 Cost of floating coat (MRS July 2005). 1.00 Sft 336.10
7 Cost of Pigment 1.00 Sft 4.50
8 Cost of Labour for fixing & chemical polishing (10+14) 1.00 Sft 10.00
Total
Add 10% Contractor Profit on Items No. 1-3, 7 & 8
Add 10% over head charges on Items No. 1-4, 7 & 8
G. Total
ASSISTANT ENGINEER SUB-EN
Approved
Project Director
The Islamia University of Bahawalpur
Construct ion of Adm inistrat ive Block for Universi ty Col lege of Engineer ing
RATE ANALYSIS
CIVIL WORKS
Providing and fixing botiseana/fency marble for stair steps 3/4" thick 36"-60"/13.5" with floating co
of 3/4" thick cement sand mortar 1:2 including colour pigment to match with the colour of marble t
sand mortor 1:2 rubbing and chemical polishing complete in all respects as directed and approve
incharge.
S
8/13/2019 Analysis of Rate of Building Deportment
79/242
8/13/2019 Analysis of Rate of Building Deportment
80/242
1480.00
45.00
1525.00
152.50
152.50
1830.00
INEER
1000 Cft
8/13/2019 Analysis of Rate of Building Deportment
81/242
8/13/2019 Analysis of Rate of Building Deportment
82/242
103.00
10.00
15.00
128.00
12.80
12.80
153.60
INEER
3119.60
8/13/2019 Analysis of Rate of Building Deportment
83/242
1165.50
234.00
148.00
1000.00
5667.10566.71
566.71
6800.52
6800.00
INEER
3119.60
1332.00
234.00
200.00
948.00
8/13/2019 Analysis of Rate of Building Deportment
84/242
8/13/2019 Analysis of Rate of Building Deportment
85/242
8/13/2019 Analysis of Rate of Building Deportment
86/242
8/13/2019 Analysis of Rate of Building Deportment
87/242
2760.00
5720.00
396.00
200.00
1000.0010076.00
1007.60
1007.60
12091.20
120.912
INEER
8/13/2019 Analysis of Rate of Building Deportment
88/242
2640.00
7280.00
378.00
200.00
3000.00
1100.00
14598.00
1459.80
1459.80
17517.60
INEER
8/13/2019 Analysis of Rate of Building Deportment
89/242
2116.00
3168.00
396.00
100.00
3000.00
500.00
9280.00
928.00
928.00
11136.00
INEER
8/13/2019 Analysis of Rate of Building Deportment
90/242
8/13/2019 Analysis of Rate of Building Deportment
91/242
INEER
4410.00
210.00
100.00
200.00
4920.00
492.00
492.00
5904.00
INEER
8/13/2019 Analysis of Rate of Building Deportment
92/242
8/13/2019 Analysis of Rate of Building Deportment
93/242
8/13/2019 Analysis of Rate of Building Deportment
94/242
465.00
32.00
75.00
500.00
1072.00
107.20
107.20
1286.40
INEER
PROJECT DIRECTOR
8/13/2019 Analysis of Rate of Building Deportment
95/242
1200.00
34.00
100.00
1334.00
133.40
133.40
1600.80
INEER
8/13/2019 Analysis of Rate of Building Deportment
96/242
100.00
10.00
110.00
11.00
11.00
132.00
INEER
8/13/2019 Analysis of Rate of Building Deportment
97/242
416.25
27.00
734.40
156.00
500.00
1833.65
183.37
183.37
2200.38
INEER
8/13/2019 Analysis of Rate of Building Deportment
98/242
50.00
2.00
52.00
5.20
5.20
62.40
INEER
400.00
40.00
150.00285.00
8/13/2019 Analysis of Rate of Building Deportment
99/242
875.00
87.50
87.50
1050.00
INEER
1196.80
749.25
117.00
500.00
8/13/2019 Analysis of Rate of Building Deportment
100/242
8/13/2019 Analysis of Rate of Building Deportment
101/242
416.25
27.00
50.00
400.00
893.25
999.00
200.00
50.00
200.00
566.00
200.00
100.00
2315.00
3208.25320.83
8/13/2019 Analysis of Rate of Building Deportment
102/242
8/13/2019 Analysis of Rate of Building Deportment
103/242
2836.00
1998.00
225.00
100.00
675.00
5834.00
583.40
583.40
7000.80
7000.00
INEER
8/13/2019 Analysis of Rate of Building Deportment
104/242
45.00
1122.00
1167.00
116.70
116.70
1400.40
INEER
8/13/2019 Analysis of Rate of Building Deportment
105/242
900.00
20.00
38.50
958.50
95.85
95.85
1150.20
INEER
8/13/2019 Analysis of Rate of Building Deportment
106/242
1271.60
416.25
27.00
52.00
400.00
2166.85
216.69
216.69
2600.22
INEER
8/13/2019 Analysis of Rate of Building Deportment
107/242
702.63
48.42
295.68
666.00
50.00
200.00
100.00
720.00
200.00
100.00
3082.73
308.27
308.27
3699.28
INEER
8/13/2019 Analysis of Rate of Building Deportment
108/242
4357.50
499.50
27.00
150.00
150.00
900.00
6084.00
608.40
608.40
7300.80
INEER
with the structure
400.00
200.00
100.00
300.00
150.001150.00
115.00
1265.00
126.50
126.50
1518.00
151.80
8/13/2019 Analysis of Rate of Building Deportment
109/242
8/13/2019 Analysis of Rate of Building Deportment
110/242
809.60
500.00
100.00
48.00
3000.00
333.00
27.0050.00
415.00
5282.60
528.26
528.26
6339.12
INEER
8/13/2019 Analysis of Rate of Building Deportment
111/242
99.90
33.60
5.40
10.00
93.00
241.90
24.14
24.14
290.18
INEER
8/13/2019 Analysis of Rate of Building Deportment
112/242
166.50
92.40
56.00
18.00
10.00
78.00
420.90
42.09
42.09
505.08
INEER
8/13/2019 Analysis of Rate of Building Deportment
113/242
800.00
60.00
63.00
31.0010.00
75.00
1039.00
103.90
103.90
1246.80
INEER
8/13/2019 Analysis of Rate of Building Deportment
114/242
8/13/2019 Analysis of Rate of Building Deportment
115/242
8/13/2019 Analysis of Rate of Building Deportment
116/242
288.00
50.00
20.00
5.00
150.00
2601.00
260.10
260.103121.20
INEER
92.50
20.00
112.50
11.25
11.25
135.00
8/13/2019 Analysis of Rate of Building Deportment
117/242
INEER
35.00
130.0010.00
10.00
56.00
241.00
24.10
24.10
289.20
INEER
8/13/2019 Analysis of Rate of Building Deportment
118/242
500.00
1102.00
76.00
300.00
50.00
150.00
2178.00
217.80
217.80
2613.60
INEER
8/13/2019 Analysis of Rate of Building Deportment
119/242
333.00
27.0074.00
400.00
834.00
83.40
83.40
1000.80
INEER
8/13/2019 Analysis of Rate of Building Deportment
120/242
8/13/2019 Analysis of Rate of Building Deportment
121/242
77.50
10.00100.00
187.50
18.75
18.75
225.00
roject Director
8/13/2019 Analysis of Rate of Building Deportment
122/242
8/13/2019 Analysis of Rate of Building Deportment
123/242
204.00
20.0010.00
50.00
284.00
28.40
28.40
340.80
INEER
8/13/2019 Analysis of Rate of Building Deportment
124/242
8/13/2019 Analysis of Rate of Building Deportment
125/242
250.00
20.00
10.00
53.00
333.00
33.30
33.30
399.60
INEER
8/13/2019 Analysis of Rate of Building Deportment
126/242
5860.80
2576.00
396.00
175.00
1000.00
10007.80
1000.78
1000.78
12009.36
INEER
643.00
100.00
626.75
8/13/2019 Analysis of Rate of Building Deportment
127/242
8/13/2019 Analysis of Rate of Building Deportment
128/242
8/13/2019 Analysis of Rate of Building Deportment
129/242
INEER
700.00
100.00
736.00
80.00
36.00
32.00
15.00
150.00420.00
315.00
2584.00
258.40
258.40
3100.80
INEER
8/13/2019 Analysis of Rate of Building Deportment
130/242
200.00
10.00
100.00
310.00
31.0031.00
372.00
INEER
8/13/2019 Analysis of Rate of Building Deportment
131/242
8/13/2019 Analysis of Rate of Building Deportment
132/242
333.00
27.00
50.00
674.00
1084.00
108.40
108.40
1300.80
INEER
8/13/2019 Analysis of Rate of Building Deportment
133/242
416.25
22.50
75.00
612.00
1125.75
112.58
112.581350.90
INEER
8/13/2019 Analysis of Rate of Building Deportment
134/242
8/13/2019 Analysis of Rate of Building Deportment
135/242
8/13/2019 Analysis of Rate of Building Deportment
136/242
8/13/2019 Analysis of Rate of Building Deportment
137/242
3119.60
1332.00
234.00
150.00
1000.00
5835.60
583.56
564.11
6983.27
7000.00
INEER
PROJECT DIRECTOR
499.50
36.00
50.00
8/13/2019 Analysis of Rate of Building Deportment
138/242
590.00
1175.50
117.55
117.55
1410.60
INEER
PROJECT DIRECTOR
8/13/2019 Analysis of Rate of Building Deportment
139/242
Per Sft 125.00Per Sft 3.00
Per Sft 5.00
% Sft 3.36
Per Sft 7.88
% Sft 3.36
Per Sft 4.50
Per Sft 24.00
176.10
16.15
16.15
208.40
208
INEER
ver a bed of 3/4" thick
cement sand mortor
ineer incharge.
Y Rs.
& Technology at
8/13/2019 Analysis of Rate of Building Deportment
140/242
Each 62.50
1.88Each 0.66
% Sft 0.84
Per Sft 1.97
% Sft 0.84
% Sft 2.76
Per Sft 1.13
Per Sft 6.00
78.570
7.22
7.2293.002
INEER
nd Techn ology at
nt over a bed
h with the
ects as
Rs. 93.00 Per Rft
8/13/2019 Analysis of Rate of Building Deportment
141/242
8/13/2019 Analysis of Rate of Building Deportment
142/242
5
ed in
92.50
20.00
112.50
11.25
11.25
135.00
NT ENGINEER
8/13/2019 Analysis of Rate of Building Deportment
143/242
Description
G.I Pipe (Medium Quality).
Unit of Rate Per Foot. 1/2" I/d 3/4" I/d 1" I/d 1.25" I/d 1.50" I/d 2" I/d
G.I Pipe 25.00 32.00 45.00 60.00 75.00 95.00
Accessores/Fittings. 5.00 7.00 10.00 20.00 30.00 35.00
Labour charges 5.00 5.00 8.00 8.00 10.00 10.00
35.00 44.00 63.00 88.00 115.00 140.00
Add 10% Contractor Profit 3.50 4.40 6.30 8.80 11.50 14.00
Add 10% Overhead Charges 3.50 4.40 6.30 8.80 11.50 14.00
Total 42.00 52.80 75.60 105.60 138.00 168.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
Plumbing Work
A p p r o v e d
8/13/2019 Analysis of Rate of Building Deportment
144/242
Description
Water Closet European type
Unit of Rate Per No
W.C (3 star-Master) Coloured 1.00 No 1600.00 Per No 1600.00
Bend 1.00 No 150.00 Per No 150.00
Labour charges 1.00 No 100.00 Per No 100.00
1850.00
Add 10% Contractor Profit 185.00
Add 10% Overhead Charges 185.00
Total 2220.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Rate approved for per No.
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
Plumbing Work
Rs.2,220.00
8/13/2019 Analysis of Rate of Building Deportment
145/242
Description
Water Closet Orisa Pattern type
Unit of Rate Per No
W.C (3 star-Master) Coloured 1 No 650.00 Per No 650.00
Cement 1 No 100.00 Each 100.00
Sand 10.00
PVC Bend 1 No 40.00 Each 40.00Labour charges 1 No 150.00 Per No 150.00
Total 950.00
Add 10% Contractor Profit 95.00
Add 10% Overhead Charges 95.00
Total 1140.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
A p p r o v e d
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
Plumbing Work
8/13/2019 Analysis of Rate of Building Deportment
146/242
Description
Seat & Cover for European.
Unit of Rate Per No
Seat & Cover coloured 1 No 250.00 Per No 250.00
Labour charges 1 No 25.00 Per No 25.00
275.00
Add 10% Contractor Profit 27.50
Add 10% Overhead Charges 27.50
Total 330.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
Plumbing Work
A p p r o v e d
Project Director
8/13/2019 Analysis of Rate of Building Deportment
147/242
Description
Wash hand Basin 24" x 20"
Unit of Rate Per No
Wash hand Basin Coloured (Master-3 Star) 1 No 850.00 Per No 850.00
Bracket Set 1 Set 75.00 Each 75.00
Waste Pipe 1 No 40.00 Each 40.00
Waste Coupline 1 No 125.00 Each 125.00
Padestel 1 No 350.00 Each 350.00
TNP 50.00
Labour charges 1 No 150.00 Per No 150.00
1640.00
Add 10% Contractor Profit 164.00
Add 10% Overhead Charges 164.00
Total 1968.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
A p p r o v e d
Project Director
Plumbing Work
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
8/13/2019 Analysis of Rate of Building Deportment
148/242
Description
P Trap Glazed
Unit of Rate Per No
P Trap (Full size) 1 No 60.00 Each 60.00
Cement 20.00
Labour charges 1 No 20.00 Per No 20.00
100.00
Add 10% Contractor Profit 10.00
Add 10% Overhead Charges 10.00
Total 120.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
Plumbing Work
A p p r o v e d
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
8/13/2019 Analysis of Rate of Building Deportment
149/242
Description
Plastic made Flushing cistern (3 gallons) Master.
Unit of Rate Per No
Flushing Cistern (Coloured) 1 No 825.00 Each 825.00Brecket 1 Set 75.00 Each 75.00
PVC Pipe 1 No 50.00 Each 50.00
Rubber Connection 1 No 50.00 Each 50.00
Labour charges 1 No 75.00 Each 75.00
Total 1075.00
Add 10% Contractor Profit 107.50
Add 10% Overhead Charges 107.50
Total 1290.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
RATE ANALYSIS
Plumbing Work
A p p r o v e d
8/13/2019 Analysis of Rate of Building Deportment
150/242
Description
Toilet Paper holder (Fasil/Alyas)
Unit of Rate Per No
Toilet Paper Holder 1 No 200.00 Each 200.00
Labour charges 1 No 50.00 Each 50.00
Total 250.00
Add 10% Contractor Profit 25.00
Add 10% Overhead Charges 25.00
Total 300.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Plumbing Work
A p p r o v e d
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
Plumbing Work
8/13/2019 Analysis of Rate of Building Deportment
151/242
Description
Chromium Plated Towel Rail 24" x 3/4".
Unit of Rate Per No
Rod 1.00 No 200.00 Each 200.00
Brecket 2.00 No 40.00 Each 80.00
Labour charges 1.00 No 30.00 Each 30.00
Total 310.00
Add 10% Contractor Profit 31.00
Add 10% Overhead Charges 31.00Total 372.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Description
Looking Glass Plastic Body (Master).
RATE ANALYSIS
Plumbing Work
A p p r o v e d
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
8/13/2019 Analysis of Rate of Building Deportment
152/242
8/13/2019 Analysis of Rate of Building Deportment
153/242
8/13/2019 Analysis of Rate of Building Deportment
154/242
Total 204.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Description
Stop Cock Plastic Head 1/2" size (Fasil/Alyas).
Unit of Rate Per No
Stop Cock 1.00 No 250.00 Each 250.00
Labour charges 1.00 No 20.00 Each 20.00
Total 270.00
Add 10% Contractor Profit 27.00
Add 10% Overhead Charges 27.00
Total 324.00
A p p r o v e d
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
Plumbing Work
8/13/2019 Analysis of Rate of Building Deportment
155/242
8/13/2019 Analysis of Rate of Building Deportment
156/242
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Description
Bib Cock Plastic Head 1/2" size (Fasil/Alyas).
Unit of Rate Per No
Bib Cock 1.00 No 220.00 Each 220.00
Labour charges 1.00 No 20.00 Each 20.00
Total 240.00Add 10% Contractor Profit 24.00
Add 10% Overhead Charges 24.00
Total 288.00
ASSISTANT ENGINEER SUB-ENGINEER
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
Plumbing Work
A p p r o v e d
Project Director
8/13/2019 Analysis of Rate of Building Deportment
157/242
8/13/2019 Analysis of Rate of Building Deportment
158/242
Description
Shower Roase 4" x 1/2" size adjustable (Fasil/Alyas).
Unit of Rate Per No
Shower Roase 1.00 No 180.00 Each 180.00
Labour charges 1.00 No 20.00 Each 20.00
Total 200.00
Add 10% Contractor Profit 20.00
Add 10% Overhead Charges 20.00
Total 240.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Plumbing Work
A p p r o v e d
A p p r o v e d
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
8/13/2019 Analysis of Rate of Building Deportment
159/242
Description
Mixing Valve Plastic Head (Fasil/Alyas).
Unit of Rate Per No
Mixing Valve 1.00 No 650.00 Each 650.00
Labour charges 1.00 No 50.00 Each 50.00
Total 700.00
Add 10% Contractor Profit 70.00
Add 10% Overhead Charges 70.00
Total 840.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
Plumbing Work
A p p r o v e d
8/13/2019 Analysis of Rate of Building Deportment
160/242
Description
Gun metal Peat/Gate Valve 1.5" to 2" (Anwar).Unit of Rate Per No
Gun metal Peat/Gate 1.00 No 375.00 Each 375.00
Labour charges 1.00 No 100.00 Each 100.00
Total 475.00
Add 10% Contractor Profit 47.50
Add 10% Overhead Charges 47.50
Total 570.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
Plumbing Work
A p p r o v e d
8/13/2019 Analysis of Rate of Building Deportment
161/242
Description
4" size glazed gully trap with chamber 12" x 12" I/c 9" dia C.I Cover & Frame.
Unit of Rate Per No
Gully trap 1.00 No 75.00 Each 75.00
Bricks 20.00 No 2.00 Each 40.00
Cement 0.25 Bag 310.00 Each 77.50
Sand 10.00
C.I Frame with Cover 1.00 No 250.00 Each 250.00
Labour charges 1.00 No 100.00 Each 100.00
Total 552.50
Add 10% Contractor Profit 55.25
Add 10% Overhead Charges 55.25
Total 663.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Plumbing Work
A p p r o v e d
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
8/13/2019 Analysis of Rate of Building Deportment
162/242
8/13/2019 Analysis of Rate of Building Deportment
163/242
Description
P/L 3'' I/d Upvc Pressure Pipe class B (Dadex) in trenchi/c jointing pipe with collers.clamps i/c testing.
and entire satisfaction of Engineer Incharg.
Unit of Rate =20 Rft
3'' i/d uPVC pressur Pipe class B(Dadex).@1182/-per len
3''i/d ,ELBOW etc 275.00
3''i/d ,TEE etc
Solution dadex
Labour lowering pipe and jointing
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Rft =
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER Project Director
193.70
2324.40
116
1182.00
10.00
20.00
1937.00
193.70
A p p r o v e d
450.00
RATE ANALYSIS
Plumbing Work
8/13/2019 Analysis of Rate of Building Deportment
164/242
Description
P/L 3'' I/d Upvc double union valvei/c jointing pipe with flange i/c testing.
and entire satisfaction of Engineer Incharg.
Unit of Rate =I job
P/L 3'' I/d Upvc double union valve
3''Upvc Flange 972.00
Solution dadex
Labour jointing
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per job =
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER Project Director
7560.00
ISLAMIA UNIVERSITY BAHAWALPUR
Director Engineeing
10310
A p p r o v e d
8592.00
859.20
859.20
10310.40
10.00
50.00
RATE ANALYSIS
Plumbing Work
8/13/2019 Analysis of Rate of Building Deportment
165/242
Description
Brass Gas Cock
Unit of Rate Per Foot. 1/2" I/d 3/4" I/d
Gas Cock 65.00 80.00Labour charges 20.00 28.50
85.00 108.50
Add 10% Contractor Profit 8.50 10.85
Add 10% Overhead Charges 8.50 10.85
Total 130.20
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
102.00
Plumbing Work
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
A p p r o v e d
Director Engineeing
8/13/2019 Analysis of Rate of Building Deportment
166/242
Description
RCC Pipe 1:1.5:3 as per specification BS 5911 class L.
Unit of Rate Per Foot. 6" I/d 9" I/d
Market Rate 50.00 56.70
Cement 15.00 15.00Labour charges 20.00 20.00
85.00 91.70
Add 10% Contractor Profit 8.50 9.17
Add 10% Overhead Charges 8.50 9.17
Total 110.04
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Plumbing Work
A p p r o v e d
Project Director
102.00
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
8/13/2019 Analysis of Rate of Building Deportment
167/242
8/13/2019 Analysis of Rate of Building Deportment
168/242
Description
P/F 3" thick RCC main hole cover with tee shaped C.I Frame of 20" Clear (37.32 Kg)
Unit of Rate = Per No.
Material
C.I Frame 1.00 No 400.00 Each 400.00
MS Angle Iron & Steel Bar 1.00 No 450.00 Each 450.00
Cement 0.25 Bag 310.00 Per Bag 77.50
Crush 1.00 Cft 28.00 Per Cft 28.00
Sand 1.00 Cft 50.00 Per Cft 50.00
TNP 50.00
Labour Charages: 150.00
Total 1205.50
Add 10% Contractor Profit 120.55
Add 10% Overhead Charges 120.55
Total 1446.60
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
A p p r o v e d
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
PLUMBING WORKS
8/13/2019 Analysis of Rate of Building Deportment
169/242
8/13/2019 Analysis of Rate of Building Deportment
170/242
8/13/2019 Analysis of Rate of Building Deportment
171/242
Description:
PVC Pipe 25 mm dia including all specials (Beta/Galco/shaval
Unit of Rate = Per Foot.
PVC Pipe 10 Rft 70.00
Accessores/Fittings. 10.00
Labour charges 5.00
TOTAL 85.00
Add 10% Contractor Profit 8.50
Add 10% Overhead Charges 8.50
TOTAL 102.00
Rate Per Rft 10.20
ASSISTANT ENGINEER SUB-ENGINEER
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
Project Director
Electrical WORKS
8/13/2019 Analysis of Rate of Building Deportment
172/242
8/13/2019 Analysis of Rate of Building Deportment
173/242
8/13/2019 Analysis of Rate of Building Deportment
174/242
Description:
PVC Pipe 40 mm dia including all specials (Beta/Galco/shaval
Unit of Rate = Per Foot.
PVC Pipe 10 Rft 95.00
Accessores/Fittings. 12.00
Labour charges 8.00
TOTAL 115.00
Add 10% Contractor Profit 11.50
Add 10% Overhead Charges 11.50
TOTAL 138.00
Rate Per Rft 13.80
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Approved Rate of Rs.13.80 per Rft
Project Director
Electrical WORKS
8/13/2019 Analysis of Rate of Building Deportment
175/242
8/13/2019 Analysis of Rate of Building Deportment
176/242
Approved Rate of Rs.21.00 per Rft
Description:
PVC Pipe 3" dia including all specials (Beta/Galco/shaval
Unit of Rate = Per Foot.
PVC Pipe 10 Rft 250.00
Accessores/Fittings. 15.00
Labour charges 10.00
Total 275.00
Add 10% Contractor Profit 27.50
Add 10% Overhead Charges 27.50
Total 330.00
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
Electrical WORKS
8/13/2019 Analysis of Rate of Building Deportment
177/242
Rate Per Rft 33.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Approved Rate of Rs.33.00 per Rft
Description:
Single Core PVC insulatted Copper conductor 3/0.029" Cable (Pakistan,New age)
ISLAMIA UNIVERSITY BAHAWALPUR
Project Director
RATE ANALYSIS
Electrical WORKS
8/13/2019 Analysis of Rate of Building Deportment
178/242
Unit of Rate = Per Metre
Cable (one coil 90 meter) 710.00
Wastage 5% 35.50
Accessores/Fittings. 20.00
TNP 30.00
Labour charges 100.00
TOTAL 895.50
Add 10% Contractor Profit 89.55
Add 10% Overhead Charges 89.55
TOTAL 1074.60
Rate Per Mater 11.94
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Approved Rate of Rs.11.94 per Rft
Project Director
8/13/2019 Analysis of Rate of Building Deportment
179/242
Description:
Single Core PVC insulatted Copper conductor 3/0.029" Cable (Pakistan,New age)
Unit of Rate = Per Metre
Cable (one coil 90 meter) 710.00
Wastage 5% 35.50
Accessores/Fittings. 20.00
TNP 30.00
Labour charges 100.00
TOTAL 895.50
Add 10% Contractor Profit 89.55
Add 10% Overhead Charges 89.55
TOTAL 1074.60
Rate Per Mater 11.94
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Approved Rate of Rs.11.94 per Rft
Electrical WORKS
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
8/13/2019 Analysis of Rate of Building Deportment
180/242
Description:Single Core PVC insulatted Copper conductor 7/0.029" Cable (Pakistan,New age)
Unit of Rate = Per Metre
Cable (one coil 90 meter) 1250.00
Wastage 5% 62.50
Accessores/Fittings. 20.00
TNP 25.00
Labour charges 125.00
TOTAL 1482.50
Add 10% Contractor Profit 148.25Add 10% Overhead Charges 148.25
TOTAL 1779.00
Rate Per Mater 19.77
Electrical WORKS
RATE ANALYSIS
ISLAMIA UNIVERSITY BAHAWALPUR
Project Director
8/13/2019 Analysis of Rate of Building Deportment
181/242
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Approved Rate of Rs.19.77 per Rft
Description:
Single Core PVC insulatted Copper conductor 7/0.044" Cable (Pakistan,New age)
Unit of Rate = Per Metre
Cable (one coil 90 meter) 2175.00
Wastage 5% 108.75
Accessores/Fittings. 40.00
TNP 50.00
Labour charges 150.00
RATE ANALYSIS
Electrical WORKS
ISLAMIA UNIVERSITY BAHAWALPUR
Project Director
8/13/2019 Analysis of Rate of Building Deportment
182/242
TOTAL 2523.75
Add 10% Contractor Profit 252.38
Add 10% Overhead Charges 252.38
TOTAL 3028.50
Rate Per Mater 33.65
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Approved Rate of Rs.33.65 per Rft
Project Director
RATE ANALYSIS
Electrical WORKS
ISLAMIA UNIVERSITY BAHAWALPUR
8/13/2019 Analysis of Rate of Building Deportment
183/242
8/13/2019 Analysis of Rate of Building Deportment
184/242
8/13/2019 Analysis of Rate of Building Deportment
185/242
Description:
3 Pin switch socket & Plug combined (PPI/BBI)
Unit of Rate Per No 5 Amp 10/15 Amp
Plug combined switch 55.00 125.00
Labour charges 10.00 20.00
65.00 145.00
Add 10% Contractor Profit 6.50 14.50
Add 10% Overhead Charges 6.50 14.50
Total 78.00 174.00
ASSISTANT ENGINEER SUB-ENGINEER
EXECUTIVE ENGINEER
Electrical WORKS
A p p r o v e d
Project Director
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
8/13/2019 Analysis of Rate of Building Deportment
186/242
8/13/2019 Analysis of Rate of Building Deportment
187/242
8/13/2019 Analysis of Rate of Building Deportment
188/242
8/13/2019 Analysis of Rate of Building Deportment
189/242
8/13/2019 Analysis of Rate of Building Deportment
190/242
8/13/2019 Analysis of Rate of Building Deportment
191/242
8/13/2019 Analysis of Rate of Building Deportment
192/242
Description
Coper Conducter Cables for service connection PVC Sheeted armoured 4 core70mm
Unit of Rate Per Rft.
1.00 Ft. 270.00 Per Rft.
Labour charges 1.00 Ft. 25.00 Per Rft.
Total
Add 10% Contractor Profit
Add 10% Overhead Charges
Total
Rate Per Rft. 350/-
ASSISTANT ENGINEER SUB-ENGIN
EXECUTIVE ENGINEER
ISLAMIA UNIVERSITY BAHAWALPUR
RATE ANALYSIS
ISLAMIA UNIVERSITY BAHAWALPUR
Electric Work
A p p r o v e d
Project Director
Cable (Pakistan-New age) 70mm
RATE ANALYSIS
8/13/2019 Analysis of Rate of Building Deportment
193/242
Description Shifting of Transformer of education faculty with in distance of 300' i/c disconecting,demolishing
H.T steel wire and other electrical asessories like jumpers fuses insulators ic lowering of transformer
with chain cupy in the supervision of experts and skilled labour i/c errection
and placing transformer at new site with providing same actvity as mension above
i/c errection of new steel cables jumpers fuses stays etc complete in all respect.i/c
Providing & Fixing H.T Galvanized Steel structure single pole as per WAPDA specifications. a) H.T.Pole 35' Height with Concrete Foundation (1:2:4), 2' x 2' x 6' size using Angle Iron 2" x 2" x 5/32" siz
for Legs and Angle Iron 1.375" x 1.375" x 1/8" size for Bracing