Analisa Harga Satuan Pekerjaan Persiapan No. URAIAN SATUAN A-01 1 M' Pagar Sementara Dari Kayu Tinggi 2 m - Dolken Kayu Ø 8-10 / 400 cm Btg - Semen Portland Kg - Pasir beton M3 - Koral Beton 2/3 M3 - Kayu balok terentang M3 - Paku Biasa 2" - 5" Kg - Residu Kg - Pekerja Oh - Tukang Kayu Oh - Kepala Tukang Oh - Mandor Oh Jumlah Dibulatkan A-02 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m - Dolken Kayu Ø 8-10 / 400 cm Btg - Semen Portland Kg - Seng Gelombang BJLS-30 Lbr - Pasir beton M3 - Koral Beton 2/3 M3 - Kayu balok terentang M3 - Paku Biasa 2" - 5" Kg - Meni Besi Kg - Pekerja Oh - Tukang Kayu Oh - Kepala Tukang Oh - Mandor Oh Jumlah Dibulatkan A-03 - Dolken Kayu Ø 8-10 / 400 cm Btg - Semen Portland Kg - Kawat Duri Kg - Pasir beton M3 - Koral Beton 2/3 M3 - Paku Biasa 2" - 5" Kg 1 M' Pagar SementaraKawat Duri Tinggi 1,80 m
35

Analisis Harga Satuan SNI 2011

Nov 19, 2015

Download

Documents

Analisis Harga Satuan SNI 2011
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript

Analisa Harga Satuan Pekerjaan Analisa Harga Satuan Pekerjaan PersiapanNo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)A-011 M' Pagar Sementara Dari Kayu Tinggi 2 m-Dolken Kayu 8-10 / 400 cmBtg1.2528,000.0035,000.00-Semen PortlandKg2.51,406.003,515.00-Pasir betonM30.005255,400.001,277.00-Koral Beton 2/3M30.009211,100.001,899.90-Kayu balok terentangM30.0722,640,000.00190,080.00-Paku Biasa 2" - 5"Kg0.0623,400.001,404.00-ResiduKg0.48,100.003,240.00-PekerjaOh0.442,000.0016,800.00-Tukang KayuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.0280,000.001,600.00Jumlah269,315.90Dibulatkan269,316.00A-021 M' Pagar Sementara Seng Gelombang Tinggi 2 m-Dolken Kayu 8-10 / 400 cmBtg1.2528,000.0035,000.00-Semen PortlandKg2.51,406.003,515.00-Seng Gelombang BJLS-30Lbr1.262,900.0075,480.00-Pasir betonM30.005255,400.001,277.00-Koral Beton 2/3M30.009211,100.001,899.90-Kayu balok terentangM30.0722,640,000.00190,080.00-Paku Biasa 2" - 5"Kg0.0623,400.001,404.00-Meni BesiKg0.4530,400.0013,680.00-PekerjaOh0.442,000.0016,800.00-Tukang KayuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.0280,000.001,600.00Jumlah355,235.90Dibulatkan355,236.00A-031 M' Pagar SementaraKawat Duri Tinggi 1,80 m-Dolken Kayu 8-10 / 400 cmBtg128,000.0028,000.00-Semen PortlandKg21,406.002,812.00-Kawat DuriKg2.563,500.00158,750.00-Pasir betonM30.005255,400.001,277.00-Koral Beton 2/3M30.009211,100.001,899.90-Paku Biasa 2" - 5"Kg0.0623,400.001,404.00-PekerjaOh0.342,000.0012,600.00-Tukang KayuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.0280,000.001,600.00Jumlah222,842.90Dibulatkan222,843.00A-041 M2 Pengukuran Dan Pasang Bouwplank-Kayu kaso 5/7M30.0121,870,500.0022,446.00-Paku Biasa 2" - 5"Kg0.0223,400.00468-Kayu papan albasiaM30.0072,071,700.0014,501.90-PekerjaOh0.142,000.004,200.00-Tukang KayuOh0.165,000.006,500.00-Kepala TukangOh0.0175,000.00750-MandorOh0.00580,000.00400Jumlah49,265.90Dibulatkan49,266.00A-051 M2 Pembuatan Kantor Sementara dgn Lantai Diplester-Dolken Kayu 8-10 / 400 cmBtg1.2528,000.0035,000.00-Kayu Balok terentangM30.182,640,000.00475,200.00-Paku BiasaKg0.8523,400.0019,890.00-Besi StripKg1.126,800.0029,480.00-Semen PortlandKg351,406.0049,210.00-Pasir PasangM30.15233,400.0035,010.00-Pasir betonM30.1255,400.0025,540.00-Koral Beton2/3M30.15211,100.0031,665.00-Bata MerahBh3077523,250.00-Seng Platm'0.2515,815.003,953.75-Kawat harmonikaM2235,900.0071,800.00-Kaca Polos 3mmM20.0887,400.006,992.00-Kunci TanamBh0.1594,500.0014,175.00-Plywood 120 x 240 x 0,4 cmLbr0.06140,000.008,400.00-PekerjaOh242,000.0084,000.00-Tukang KayuOh265,000.00130,000.00-Tukang BatuOh165,000.0065,000.00-Kepala TukangOh0.375,000.0022,500.00-MandorOh0.0580,000.004,000.00Jumlah1,135,065.75Dibulatkan1,135,066.00A-061 M2 Pembuatan Gudang Semen dan Alat-alat-Dolken Kayu 8-10 / 400 cmBtg1.728,000.0047,600.00-Kayu balok terentangM30.212,640,000.00554,400.00-Paku BiasaKg0.323,400.007,020.00-Semen PortlandKg10.51,406.0014,763.00-Pasir BetonM30.03255,400.007,662.00-Koral Beton 2/3M30.05211,100.0010,555.00-Seng Gelombang BJLS 30Lbr1.562,900.0094,350.00-PekerjaOh142,000.0042,000.00-Tukang KayuOh265,000.00130,000.00-Kepala TukangOh0.275,000.0015,000.00-MandorOh0.0580,000.004,000.00Jumlah927,350.00Dibulatkan927,350.00A-071 M2 Pembuatan Bedeng Buruh-Dolken Kayu 8-10 / 400 cmBtg1.2528,000.0035,000.00-Kayu balok terentangM30.1862,640,000.00491,040.00-Paku BiasaKg0.323,400.007,020.00-Semen PortlandKg181,406.0025,308.00-Pasir BetonM30.03255,400.007,662.00-Koral Beton 2/3M30.05211,100.0010,555.00-Seng Gelombang BJLS 30Lbr1.562,900.0094,350.00-PekerjaOh142,000.0042,000.00-Tukang KayuOh265,000.00130,000.00-Kepala TukangOh0.275,000.0015,000.00-MandorOh0.0580,000.004,000.00Jumlah861,935.00Dibulatkan861,935.00A-081 M2 Membersihkan Lapangan dan Perataan-PekerjaOh0.142,000.004,200.00-MandorOh0.0580,000.004,000.00Jumlah8,200.00Dibulatkan8,200.00A-091M2 Pembuatan Jalan Sementara-Batu Belah 15/20M30.15205,500.0030,825.00-Batu Pecah 5/7M30.09196,000.0017,640.00-Pasir PasangM30.01233,400.002,334.00-PekerjaOh142,000.0042,000.00-MandorOh0.0580,000.004,000.00Jumlah96,799.00Dibulatkan96,799.00A-101 M3 Bongkaran Beton Bertulang-PekerjaOh6.66742,000.00280,014.00-MandorOh0.33380,000.0026,640.00Jumlah306,654.00Dibulatkan306,654.00A-111 M3 Bongkaran Dinding Tembok Bata Merah-PekerjaOh6.66742,000.00280,014.00-MandorOh0.03380,000.002,640.00Jumlah282,654.00Dibulatkan282,654.00A-121 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm-Panel Beton PracetakLbr0.986199,200.00196,411.20-Kolom Beton PracetakBtg0.525264,000.00138,600.00-Pasir BetonM30.074255,400.0018,899.60-Koral 2/3M30.146211,100.0030,820.60-Semen abu - abuKg451,406.0063,270.00-PekerjaOh0.37542,000.0015,750.00-Tukang BatuOh0.12565,000.008,125.00-Kepala TukangOh0.01275,000.00900-MandorOh0.01980,000.001,520.00Jumlah474,296.40Dibulatkan474,296.00A-131 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'-Kawat ram ayamLbr0.43414,900.006,466.60-Besi siku L 50.50.5Kg6.78618,300.00124,183.80-Besi pelat (1,2 x 3) mmKg0.042418,300.00775.92-Bautbh46002,400.00-Semen PortlandKg2.51,406.003,515.00-Pasir betonM30.005255,400.001,277.00-Koral Beton 2/3M30.009211,100.001,899.90-PekerjaOh0.37542,000.0015,750.00-Tukang BatuOh0.12565,000.008,125.00-Kepala TukangOh0.01275,000.00900-MandorOh0.01980,000.001,520.00Jumlah166,813.22Dibulatkan166,813.00A-141 M2 Pagar BRC lengkap dengan tiang-BRC lengkap dengan tiangLbr0.434171,300.0074,344.20-Semen PortlandKg21,406.002,812.00-Kawat DuriKg2.563,500.00158,750.00-Pasir betonM30.005255,400.001,277.00-Koral Beton 2/3M30.009211,100.001,899.90-PekerjaOh0.37542,000.0015,750.00-Tukang BatuOh0.12565,000.008,125.00-Kepala TukangOh0.01275,000.00900-MandorOh0.01980,000.001,520.00Jumlah265,378.10Dibulatkan265,378.00A-151 M2 Steiger Werk / perancah dari Bambu-Bambu 6 - 10 (600) cmbtng125,000.0025,000.00-Tali ijukkg0.2523,400.005,850.00-Pekerjaorg0.2542,000.0010,500.00-Tukang kayuorg0.01765,000.001,105.00-Kepala tukangorg0.00275,000.00150-Mandororg0.01380,000.001,040.00Jumlah43,645.00Dibulatkan43,645.00A-161 M' Cerucuk Bambu-Bambu 7 -10 (400) cmbtng1.2525,000.0031,250.00-Pekerjaorg0.542,000.0021,000.00-Mandororg0.02580,000.002,000.00Jumlah54,250.00Dibulatkan54,250.00

Harga Satuan Pekerjaan tanah Analisa Harga Satuan Pekerjaan TanahB. ANALISA HARGA SATUAN PEKERJAAN TANAHNo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)B-011 M3 Galian Tanah Biasa sedalam 1 m-PekerjaOh0.442,000.0016,800.00-MandorOh0.0480,000.003,200.00Jumlah20,000.00Dibulatkan20,000.00B-021 M3 Galian Tanah Biasa Sedalam 2 m-PekerjaOh0.52642,000.0022,092.00-MandorOh0.05280,000.004,160.00Jumlah26,252.00Dibulatkan26,252.00B-031 M3 Galian Tanah Biasa Sedalam 3 m-PekerjaOh0.73542,000.0030,870.00-MandorOh0.07380,000.005,840.00Jumlah36,710.00Dibulatkan36,710.00B-041 M3 Galian Tanah Keras Sedalam 1 m-PekerjaOh0.62542,000.0026,250.00-MandorOh0.06280,000.004,960.00Jumlah31,210.00Dibulatkan31,210.00B-051 M3 Galian Tanah Lumpur Sedalam 1 m-PekerjaOh0.82342,000.0034,566.00-MandorOh0.08380,000.006,640.00Jumlah41,206.00Dibulatkan41,206.00

Harga Satuan Pekerjaan PondasiAnalisa Harga Satuan Pekerjaan PondasiC. ANALISA HARGA SATUAN PEKERJAAN PONDASINo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)C-011 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps-Batu BelahM31.1205,500.00226,050.00-Semen PortlandKg2021,406.00284,012.00-Pasir PasangM30.485233,400.00113,199.00-PekerjaOh1.542,000.0063,000.00-Tukang BatuOh0.665,000.0039,000.00-Kepala TukangOh0.0675,000.004,500.00-MandorOh0.07580,000.006,000.00Jumlah735,761.00Dibulatkan735,761.00C-021 M3 Pasang Pondasi Batu kali adk 1pc : 4ps-Batu BelahM31.1205,500.00226,050.00-Semen PortlandKg1631,406.00229,178.00-Pasir PasangM30.52233,400.00121,368.00-PekerjaOh1.542,000.0063,000.00-Tukang BatuOh0.665,000.0039,000.00-Kepala TukangOh0.0675,000.004,500.00-MandorOh0.07580,000.006,000.00Jumlah689,096.00Dibulatkan689,096.00C-031 M3 Pasang Pondasi Batu kali adk 1pc : 5ps-Batu BelahM31.1205,500.00226,050.00-Semen PortlandKg1361,406.00191,216.00-Pasir PasangM30.544233,400.00126,969.60-PekerjaOh1.542,000.0063,000.00-Tukang BatuOh0.665,000.0039,000.00-Kepala TukangOh0.0675,000.004,500.00-MandorOh0.07580,000.006,000.00Jumlah656,735.60Dibulatkan656,736.00C-041 M3 Pasang Pondasi Batu Kosong (aanstamping)-Batu BelahM31.2205,500.00246,600.00-Pasir UrugM30.3175,300.0052,590.00-PekerjaOh0.7842,000.0032,760.00-Tukang BatuOh0.3965,000.0025,350.00-Kepala TukangOh0.03975,000.002,925.00-MandorOh0.03980,000.003,120.00Jumlah363,345.00Dibulatkan363,345.00

Harga Satuan Pekerjaan BetonAnalisa Harga Satuan Pekerjaan BetonNOURAIANSATVOLUMEHRG.SATJUMLAHD-17r21 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15Kayu papan terentangM30.272,850,000769,500Paku Biasa 2" - 5"Kg223,40046,800Besi BetonKg18016,5002,970,000Kawat BetonKg327,70083,100Semen PortlandKg3231,200387,600Pasir BetonM30.52225,000117,000Koral Beton 2/3M30.78200,000156,000PekerjaOh4.8555,000266,750Tukang BatuOh0.3570,00024,500Tukang KayuOh1.5670,000109,200Tukang BesiOh1.470,00098,000Kepala TukangOh0.33180,00026,480MandorOh0.1785,00014,450Jumlah5,069,380Dibulatkan5,069,3801 M3 Kolom Beton Tulang 15/20 (180 kg besi + bekisting) 4dia.12 8-15Kayu papan terentangM30.42,850,0001,140,000Paku Biasa 2" - 5"Kg423,40093,600Minyak BekistingLtr40,500-Besi BetonKg18016,5002,970,000Kawat BetonKg1.827,70049,860Semen PortlandKg3231,200387,600Pasir BetonM30.52225,000117,000Koral Beton 2/3M30.78200,000156,000Kayu Balok TerentangM30.152,640,000396,000Dolken -8-10/4mBtg2015,000300,000PekerjaOh7.355,000401,500Tukang BatuOh0.3570,00024,500Tukang KayuOh3.370,000231,000Tukang BesiOh2.170,000147,000Kepala TukangOh0.5780,00045,600MandorOh0.2585,00021,250Jumlah6.480.910Dibulatkan6.481.0001 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk + balok poratl (180 kg besi + bekisting) 4dia. 12, 8-15Kayu papan terentangM30.322,850,000912,000Paku Biasa 2" - 5"Kg3.223,40074,880Besi BetonKg18016,5002,970,000Kawat BetonKg2.2527,70062,325Semen PortlandKg3231,200387,600Pasir BetonM30.52225,000117,000Koral Beton 2/3M30.78200,000156,000Kayu Balok TerentangM30.142,640,000369,600Dolken -8-10/4mBtg1615,000240,000PekerjaOh5.9655,000327,800Tukang BatuOh0.3570,00024,500Tukang KayuOh2.870,000196,000Tukang BesiOh1.470,00098,000Kepala TukangOh0.45580,00036,400MandorOh0.20885,00017,680Jumlah6.412.865Dibulatkan6,413,000D-291 M3 Tangga Beton Tulang (90 kg besi + bekisting)Kayu papan terentangM30.252,850,000712,500Paku Biasa 2" - 5"Kg323,40070,200Minyak BekistingLtr1.240,50048,600Besi BetonKg9016,5001,485,000Kawat BetonKg327,70083,100Semen PortlandKg3231,200387,600Pasir BetonM30.52225,000117,000Koral Beton 2/3M30.78200,000156,000Kayu Balok TerentangM30.1052,640,000277,200Dolken -8-10/4mBtg1415,000210,000PekerjaOh5.655,000308,000Tukang BatuOh0.3570,00024,500Tukang KayuOh2.370,000161,000Tukang BesiOh1.470,00098,000Kepala TukangOh0.40580,00032,400MandorOh0.20285,00017,170Jumlah4,188,720Dibulatkan4,189,00031 M3 Membuat Plat Lantai Tb. 10 Cm Beton Bertulang ( 90 Kg Besi + Bekisting )Kayu TerentangM30.42,850,0001,140,000Paku Biasa 2" - 5"Kg423,40093,600Minyak BekistingLtr240,50081,000Besi Beton PolosKg9016,5001,485,000Kawat BetonKg327,70083,100Kayu Balok TerentangM30.105151,10015,866Plywood Tebal 9 mmLbr3.5151,100528,850Dolken kayu Galam o - 8-10/4 mBtg6015,000900,000Semen PortlandKg3231,200387,600Pasir BetonM30.52225,000117,000Koral Beton 2/3M30.78200,000156,000PekerjaOh5.255,000286,000Tukang BatuOh0.3570,00024,500Tukang KayuOh3.370,000231,000Kepala TukangOh0.36580,00029,200MandorOh1.0685,00090,100Jumlah5,648,816Dibulatkan5,649,000

Harga Satuan Pekerjaan DindingAnalisa Harga Satuan Pekerjaan DindingE. ANALISA HARGA SATUAN PEKERJAAN DINDINGNo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)E-011M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 3ps-Bata MerahBh140775108,500.00-Semen PortlandKg32.951,406.0046,327.70-Pasir PasangM30.091233,400.0021,239.40-PekerjaOh0.6542,000.0027,300.00-Tukang BatuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.0380,000.002,400.00Jumlah220,267.10Dibulatkan220,267.00E-021M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 4ps-Bata MerahBh140775108,500.00-Semen PortlandKg26.551,406.0037,329.30-Pasir PasangM30.093233,400.0021,706.20-PekerjaOh0.6542,000.0027,300.00-Tukang BatuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.0380,000.002,400.00Jumlah211,735.50Dibulatkan211,736.00E-031M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 5ps-Bata MerahBh140775108,500.00-Semen PortlandKg22.21,406.0031,213.20-Pasir PasangM30.102233,400.0023,806.80-PekerjaOh0.6542,000.0027,300.00-Tukang BatuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.0380,000.002,400.00Jumlah207,720.00Dibulatkan207,720.00E-041M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 3ps-Bata MerahBh7077554,250.00-Semen PortlandKg14.371,406.0020,204.22-Pasir PasangM30.04233,400.009,336.00-PekerjaOh0.3242,000.0013,440.00-Tukang BatuOh0.165,000.006,500.00-Kepala TukangOh0.0175,000.00750-MandorOh0.01580,000.001,200.00Jumlah105,680.22Dibulatkan105,680.00E-051M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps-Bata MerahBh7077554,250.00-Semen PortlandKg11.51,406.0016,169.00-Pasir PasangM30.043233,400.0010,036.20-PekerjaOh0.3242,000.0013,440.00-Tukang BatuOh0.165,000.006,500.00-Kepala TukangOh0.0175,000.00750-MandorOh0.01580,000.001,200.00Jumlah102,345.20Dibulatkan102,345.00E-061M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps-Bata MerahBh7077554,250.00-Semen PortlandKg9.681,406.0013,610.08-Pasir PasangM30.045233,400.0010,503.00-PekerjaOh0.3242,000.0013,440.00-Tukang BatuOh0.165,000.006,500.00-Kepala TukangOh0.0175,000.00750-MandorOh0.01580,000.001,200.00Jumlah100,253.08Dibulatkan100,253.00

Harga Satuan Pekerjaan PlesteraAnalisa Harga Satuan Pekerjaan PlesteranF. ANALISA HARGA SATUAN PEKERJAAN PLESTERANNo.URAIANSATUANVOLUMEHARGA SATUANHARGA(Rp)(Rp)F-011 M2 Plesteran adk. 1pc : 2ps Tebal 15 mm-Semen PortlandKg8.521,406.0011,979.12-Pasir PasangM30.017233,400.003,967.80-PekerjaOh0.242,000.008,400.00-Tukang BatuOh0.1565,000.009,750.00-Kepala TukangOh0.01575,000.001,125.00-MandorOh0.0180,000.00800Jumlah36,021.92Dibulatkan36,022.00F-021 M2 Plesteran adk. 1pc : 3ps Tebal 15 mm-Semen PortlandKg6.481,406.009,110.88-Pasir PasangM30.019233,400.004,434.60-PekerjaOh0.242,000.008,400.00-Tukang BatuOh0.1565,000.009,750.00-Kepala TukangOh0.01575,000.001,125.00-MandorOh0.0180,000.00800Jumlah33,620.48Dibulatkan33,620.00F-031 M2 Plesteran adk. 1pc : 4ps Tebal 15 mm-Semen PortlandKg5.21,406.007,311.20-Pasir PasangM30.02233,400.004,668.00-PekerjaOh0.242,000.008,400.00-Tukang BatuOh0.1565,000.009,750.00-Kepala TukangOh0.01575,000.001,125.00-MandorOh0.0180,000.00800Jumlah32,054.20Dibulatkan32,054.00F-041 M2 Plesteran adk. 1pc : 3ps Tebal 20 mm-Semen PortlandKg10.81,406.0015,184.80-Pasir PasangM30.026233,400.006,068.40-PekerjaOh0.2542,000.0010,500.00-Tukang BatuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.012580,000.001,000.00Jumlah47,253.20Dibulatkan47,253.00F-051 M2 Plesteran adk. 1pc : 4ps Tebal 20 mm-Semen PortlandKg8.681,406.0012,204.08-Pasir PasangM30.028233,400.006,535.20-PekerjaOh0.2542,000.0010,500.00-Tukang BatuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.012580,000.001,000.00Jumlah44,739.28Dibulatkan44,739.00F-061 M2 Plesteran adk. 1pc:5ps tebal 20 mm-Semen PortlandKg7.291,406.0010,249.74-Pasir PasangM30.026233,400.006,068.40-PekerjaOh0.2542,000.0010,500.00-Tukang BatuOh0.265,000.0013,000.00-Kepala TukangOh0.0275,000.001,500.00-MandorOh0.012580,000.001,000.00Jumlah42,318.14Dibulatkan42,318.00F-111 M2 Acian Plesteran-Semen PortlandKg41,406.005,624.00-PekerjaOh0.14342,000.006,006.00-Tukang batuOh0.10765,000.006,955.00-Kepala TukangOh0.010575,000.00787.5-MandorOh0.010580,000.00840Jumlah20,212.50Dibulatkan20,213.00

Analisa Harga Satuan Penutup AtPenggalan Analisa Harga Satuan Penutup Atap