ANALISIS DESAIN SAMBUNGAN BALOK-KOLOM SISTEM PRACETAK
UNTUK RUKO TIGA LANTAIADIMAS BAGUS INDRAYANA3108100090DOSEN PEMBIMBINGMudji Irmawan, Ir., MS.Faimun, Ir., MSc., PhD.
JURUSAN TEKNIK SIPILFAKULTAS TEKNIK SIPIL DAN PERENCANAANINSTITUT TEKNOLOGI SEPULUH NOPEMBER
SURABAYA 2013
LATAR BELAKANG
• KEBUTUHAN AKAN PEMBANGUNAN• PEMBANGUNAN YANG CEPAT DAN EKONOMIS• PEMBANGUNAN BANGUNAN TAHAN GEMPA• MINIMNYA PENGGUNAAN METODE PRACETAK
DIAGRAM ALIR
Ya Ya
Tidak Tidak
C
START
Preliminary design : BALOK KOLOM
INPUT : Menetapkan desain bangunan 3 lantai
PERANCANGAN PADA KOLOM
PERANCANGAN PADA BALOK
Analisis Struktur
Pembebanan
A B
CEK KOLOM
CEK BALOK
DIAGRAM ALIR
Tidak
Ya
HASIL:KONFIGURASI PENULANGAN BALOK,KOLOM,HBK
LAPORAN
HITUNG :
A B
FINISH
C
Cek Strong Column
Weak Beam dan HBK
LANGKAH-LANGKAH STUDI• PRELIMINARY DESIGN
• DIMENSI PELAT 12 CM• DIMENSI BALOK 30 X 35• DIMENSI KOLOM 45 X 45
DATA BANGUNAN• PERUNTUKAN : RUMAH TOKO• ZONA GEMPA : 5(GEMPA TINGGI)• LEBAR BANGUNAN : 8 M• PANJANG BANGUNAN : 12 M• TINGGI ANTAR LANTAI : 4 M• JUMLAH LANTAI : 3• MUTU BETON : 2500 kg/cm2
• MUTU BAJA : 3900 kg/cm2
DENAH LANTAI 1
DENAH LANTAI 2
DENAH LANTAI 3
POTONGAN MEMANJANG
POTONGAN MELINTANG
DETAIL SAMBUNGAN BALOK-KOLOM
SISTEM SAMBUNGAN
HBK TAMPAK ATAS
PROSES EREKSI ELEMEN STRUKTUR PRACETAK
PRELIMINARY DESIGN PELAT• L = 4 X 4 M DIBAGI DUA SEGMEN L = 2 X 4 M• DIMENSI = 2 X 4 M H 7 CM
PRELIMINARY DESIGN BALOK• L = 4 M ; DIMENSI = 30 X 35
PRELIMINARY DESIGN KOLOM• L = 4 M ; DIMENSI = 45 X 45
PEMBEBANAN
qD= 892 kg/m’ qD= 892 kg/m’
qD= 1957,5kg/m’ qD= 1957,5kg/m’ qD= 1957,5kg/m’
qD= 892 kg/m’
qD= 1957,5kg/m’ qD= 1957,5kg/m’ qD= 1957,5kg/m’
qL=267 kg/m’ qL=267 kg/m’ qL=267 kg/m’
qL=667 kg/m’ qL=667 kg/m’ qL=667 kg/m’
qL=667 kg/m’ qL=667 kg/m’ qL=667 kg/m’
BEBAN HIDUP BEBAN MATI
PEMBEBANAN
LVL Hi (m) Wi(kg) Wi x Hi V (kg) Fi (kg) Fi (30%)(kg)
3 12 77616 931392 54283 142754283
2 8 217530 1740237 54283 266728002
1 4 217530 870118 54283 133364001
512675 3541747
ANALISA BEBAN GEMPABangunan terletak pada zona gempa 5, C = 0,9Faktor keutamaan gedung, I = 1, SNI 03-1726-2002 ps 4.1.2Faktor reduksi gedung, R = 8,5 , SNI 03-1726-2002,tabel 3Gaya geser gempa (v) = V =
V = = 54283 kg
ANALISA STRUKTUR
MOMEN SEBELUM KOMPOSIT
Moment 3-3 Diagram Kombinasi 1,2 D+1,6 L Portal Memanjang
MOMEN SEBELUM KOMPOSIT
Moment 3-3 Diagram Kombinasi ENVELOPE Portal Memanjang
SHEAR SEBELUM KOMPOSIT
Shear Diagram Kombinasi 1,2 D + 1,6 L Portal Melintang
SHEAR SEBELUM KOMPOSIT
Shear Diagram Kombinasi ENVELOPE Portal Melintang
MOMEN SETELAH KOMPOSIT
Moment 3-3 Diagram Kombinasi ENVELOPE Portal Memanjang
SHEAR SETELAH KOMPOSIT
Shear Diagram Kombinasi ENVELOPE Portal Melintang
PENULANGAN PELAT
SEBELUM KOMPOSIT
SETELAH KOMPOSIT
PENULANGAN BALOK SEBELUM KOMPOSIT• L = 4 M ; DIMENSI = 30 X 35AKIBAT PERLETAKAN AKIBAT PENGANGKATAN
LAPANGAN TUMPUAN LAPANGAN TUMPUAN
PENULANGAN BALOK SETELAH KOMPOSIT• L = 4 M ; DIMENSI = 30 X 47