ANALISIS DEBIT BANJIR RANCANGAN SUNGAI BABURA DI HILIR KAWASAN KAMPUS USU TUGAS AKHIR Diajukan untuk melengkapi syarat penyelesaian pendidikan Sarjana Teknik Sipil Disusun oleh: 07 0404 041 ANGGI KURNIAWAN \ Pembimbing: 19660417 199303 1 004 Dr. Ir. Ahmad Perwira Mulia, M.Sc BIDANG STUDI TEKNIK SUMBER DAYA AIR DEPARTEMEN TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS SUMATERA UTARA 2012 Universitas Sumatera Utara
15
Embed
analisis debit banjir rancangan sungai babura di hilir kawasan ...
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
ANALISIS DEBIT BANJIR RANCANGAN SUNGAI BABURA DI HILIR KAWASAN KAMPUS USU
TUGAS AKHIR
Diajukan untuk melengkapi syarat penyelesaian
pendidikan Sarjana Teknik Sipil
Disusun oleh:
07 0404 041 ANGGI KURNIAWAN
\
Pembimbing:
19660417 199303 1 004 Dr. Ir. Ahmad Perwira Mulia, M.Sc
BIDANG STUDI TEKNIK SUMBER DAYA AIR DEPARTEMEN TEKNIK SIPIL
FAKULTAS TEKNIK UNIVERSITAS SUMATERA UTARA
2012
Universitas Sumatera Utara
ABSTRAK
Daerah Aliran Sungai (watershed) atau river basin, selanjutnya akan disebut dengan DAS, mengenal pendekatan satu sungai (one river), satu rencana (one plan) dan satu pengelolaan (and one integrated management) yang perlu diwujudkan secara nyata (Sjarief, 2008). Sungai Babura merupakan salah satu dari anak sungai atau Sub DAS dari Sungai Deli (DAS Deli) yang terbentang sepanjang 36,570 km, dari daerah kawasan Sibolangit hingga Kota Medan. Luas catchment area sungai Babura hingga pertemuan Sungai Deli ialah 99 km2.
Metodologi dari Tugas Akhir ini, terdiri dari pengolahan data primer dan sekunder dan menggabungkan keduannya dalam satu softwere presentasi berbentuk video yang menunjukkan keadaan banjir yang terjadi pada Sungai Babura.
Untuk menghitung debit banjir rancangan tersebut perlu adanya data curah hujan, peta tata guna lahan, jumlah penduduk di beberapa Kecamatan di Kota Medan, dan Kabupaten Deli Serdang serta data penggunaan konsumsi air. Dari data data tersebut dapat dihitung banjir kala ulang dengan metode Gumbel dan debit buangan domestik (sanitary) penduduk. Kemudian kedua data diolah menjadi data grand total debit banjir kala ulang 2, 3, 5, 10, 25, 50 dan 100 tahun Sungai Babura dengan metode Hidrograf Satuan Sintetik Nakayasu. Kemudian debit banjir tersebut ditambahkan dengan debit limpasan dari dua Sungai yang berada tidak jauh dari Kampus USU, yaitu Sungai Selayang dan Sungai Putih.
Berdasarkan hasil perhitungan debit banjir rancangan maksimum yang diperoleh sebesar 250,41 m3/detik dengan kecepatan rata rata aliran sebesar 57,7 cm/detik. Data debit banjir kala ulang 25 dan 100 tahun kemudian dimodelkan dan disimulasikan pada Softwere Hydologic Engineering Center River Analysis System (HEC-RAS) Versi 4.0, dan dapat dilihat sejauh mana pengaruh banjir yang terjadi terutama pada daerah kawasan Kampus USU.
Kata kunci: Sungai Babura, Banjir USU, HSS Nakayasu, HEC-RAS
Universitas Sumatera Utara
KATA PENGANTAR
Assalamu’alaikum Wr.Wb.
Alhamdulillah, segala puji syukur bagi Allah SWT yang telah memberi
karunia kesehatan dan kekuatan kepada penulis untuk menyelesaikan Tugas Akhir
ini. Shalawat beriring salam, selalu tercurahkan kepada Baginda Rasullah
Muhammad SAW yang telah memberi keteladanan tauhid, ikhtiar dan kerja keras
sehinggga menjadi panutan dalam menjalankan setiap aktifitas penulis sehari-hari,
terkhusus dalam menyelesaikan penulisan Laporan Tugas Akhir ini.
Penulisan skripsi ini merupakan salah satu syarat untuk menyelesaikan studi
sekaligus persyaratan untuk mendapatkan gelar Sarjana pada Program Studi Stara
Satu (S1) Departemen Teknik Sipil, Fakultas Teknik, Universitas Sumatera Utara.
Adapun judul skripsi yang diambil oleh penulis adalah:
“Analisis Debit Banjir Rancangan Sungai Babura Di Hilir Kawasan
Kampus USU”
Penulis menyadari bahwa dalam menyelesaikan Tugas Akhir ini tidak
terlepas dari dukungan, bantuan serta bimbingan dari berbagai pihak. Oleh karena
itu, penulis ingin menyampaikan ucapan terima kasih yang sebesar-besarnya kepada
beberapa pihak yang berperan penting yaitu :
1. Bapak Dr. Ir. Ahmad Perwira Mulia M.Sc selaku Dosen Pembimbing, yang
telah banyak memberikan bimbingan, masukan, dukungan serta meluangkan
waktu, tenaga dan pikiran membantu penulis dalam menyelesaikan Tugas Akhir
ini.
2. Bapak Muhammad Faisal ST, MT, selaku Asisten Dosen Pembimbing, tempat
bergantung penulis pada saat pengerjaan Laporan yang telah banyak
memberikan dukungan, masukan, bimbingan baik tenaga dan pikiran dalam
menyelesaikan Laporan Tugas Akhir ini.
3. Bapak Prof. Dr. Ir. Bustami Syam, MSME selaku Dekan Fakultas Teknik
Universitas Sumatera Utara.
Universitas Sumatera Utara
4. Bapak Prof. Dr. Ing. Johannes Tarigan selaku Ketua Departemen Teknik Sipil
Fakultas Teknik Universitas Sumatera Utara.
5. Bapak Ir. Syahrizal, MT selaku Sekretaris Departemen Teknik Sipil Fakultas
Teknik Universitas Sumatera Utara.
6. Bapak Ir. Teruna Jaya, MSc, Bapak Ivan Indrawan ST, MT, dan Bapak Ir. Boas
Hutagalung, MSc selaku Dosen Pembanding, atas saran dan masukan yang
diberikan kepada penulis terhadap Tugas Akhir ini.
7. Ibunda Purnawati dan Ayahanda Hanafi, Amd tercinta yang telah banyak
berkorban, memberikan motivasi hidup, semangat dan nasehat yang tidak akan
pernah terbalaskan, serta kakak-kakakku tersayang, Novika Afriyeni, Amd dan
Lily Adri Fani, ST, yang selalu mendo’akan dan mendukung penulis setiap saat.
8. Bapak Nadirin, Bang Ucok, Bang Rawi, Bang Roy, Bang Tikno, Bang Joko dan
kawan kawan Gang Dipanegara yang telah membantu menyelesaikan survey di
lokasi study.
9. Bapak Kepala Dinas Badan Meteorologi Klimatologi dan Geofisika (BMKG)
Sampali, yang telah membantu penulis dalam menyediakan data curah hujan.
10. Bapak Kepala Dinas Pengembangan Sumber Daya Air Sumatera Utara, yang
telah membantu penulis dalam mengajarkan Softwere Google Earth
11. Bapak Kepala Dinas Kehutanan Kota Medan, Kepala Dinas Balai Wilayah
Sungai I Sumatera Utara yang telah membantu penulis dalam menyediakan data
tata guna lahan dan menyediakan data data sungai Babura.
12. Bapak/Ibu seluruh staff pengajar dan administrasi Departemen Teknik Sipil
Fakultas Teknik Universitas Sumatera Utara.
13. Kawan-kawan seperjuangan angkatan 2007: Maulana, Ijal, Kandar, Yudi, Delfi,
(Si om), Arvina (Ivi), dan Rio serta orang-orang yang penulis sayangi, terima
kasih atas penghilang stress selama ini. 16. Rekan rekan Ikatan Mahasiswa Jambi – Medan, KAMMI Koms.Teknik USU,
Bulletin of Civil Engineering (BUILDING), PEMA FT USU, KOMPOSITS,
dan SIMETRIKA yang tidak dapat disebutkan satu per satu, terima kasih atas
dukungan dan do’anya. 17. Dan segenap pihak yang belum tersebut di sini terima kasih atas jasa-jasanya
dalam mendukung dan membantu penulis dari segi apapun, sehingga Tugas
Akhir ini dapat diselesaikan dengan baik, semoga Allah membalasnya dengan
kebaikan pula.
Mengingat adanya keterbatasan yang penulis miliki, maka penulis menyadari
bahwa laporan Tugas Akhir ini masih jauh dari kesempurnaan. Oleh karena itu,
segala saran dan kritik yang bersifat membangun dari pembaca diharapkan untuk
penyempurnaan laporan Tugas Akhir ini.
Akhir kata penulis mengucapkan terima kasih dan semoga laporan Tugas
Akhir ini bermanfaat bagi para pembaca.
Wassalamu’alaikum Wr.Wb.
Medan, Juli 2012
Penulis
Anggi Kurniawan
07 0404 041
Universitas Sumatera Utara
DAFTAR ISI
ABSTRAK ................................................................................................................... i KATA PENGANTAR ..................................................................................................... ii DAFTAR ISI ................................................................................................................... v DAFTAR GAMBAR ....................................................................................................... viii DAFTAR TABEL ........................................................................................................... x DAFTAR NOTASI .......................................................................................................... xii DAFTAR LAMPIRAN ................................................................................................... xiv BAB I PENDAHULUAN 1.1 Umum ....................................................................................................... 1 1.2 Latar Belakang........................................................................................... 2 1.3 Tujuan Penelitian ....................................................................................... 3 1.4 Pembatasan Masalah ................................................................................. 3 1.5 Metodologi Penelitian ............................................................................... 4 1.5.1 Aspek Pengumpulan Data ................................................................ 4 1.5.2 Aspek Analisis dan Pengolahan Data .............................................. 5 1.6 Sistematika Penulisan ................................................................................ 7 1.7 Lokasi Penelitian ....................................................................................... 8 BAB II TINJAUAN PUSTAKA 2.1 Siklus Hidrologi......................................................................................... 9 2.2 Daerah Aliran Sungai (DAS) ..................................................................... 10 2.2.1 Pengertian Sungai ............................................................................. 10 2.2.2 Fungsi Sungai ................................................................................... 10 2.2.3 Bentuk Bentuk Daerah Aliran Sungai .............................................. 10 2.2.4 Keadaan Daerah Aliran Sungai ........................................................ 12 2.3 Analisis Curah Hujan Kawasan ................................................................. 14 2.3.1 Metode Aritmatik (Aljabar) ............................................................. 14 2.3.2 Metode Thiessen ............................................................................... 14 2.3.3 Metode Isohyet ................................................................................. 15 2.4 Analisis Frekuensi ..................................................................................... 16 2.4.1 Metode Distribusi Gumbel ............................................................... 17 2.4.2 Metode Distribusi Log Pearson Tipe III .......................................... 17 2.4.3 Metode Distribusi Normal ................................................................ 18
Universitas Sumatera Utara
2.4.4 Metode Distribusi Log Normal ........................................................ 18 2.5 Uji Kecocokan (Goodnes of fittest test) ..................................................... 18 2.6 Intensitas Curah Hujan .............................................................................. 19 2.7 Waktu Konsentrasi .................................................................................... 20 2.8 Metode Perhitungan Debit Banjir .............................................................. 21 2.8.1 Debit Rancangan Dengan Metode Rasional ..................................... 21 2.8.2 Metode Hidrograf Banjir .................................................................. 21 2.9 Tata Guna Lahan ...................................................................................... 26 2.10 Kependudukan ......................................................................................... 27 2.11 Hydologic Engineering Center River Analysis System (HEC-
RAS) .......................................................................................................... 28 2.11.1 Graphical User Interface ............................................................... 29 2.11.2 Analisis Hidraulika ......................................................................... 29 2.11.3 Penyimpanan Data dan Manajemen Data....................................... 30 2.11.4 Grafik dan Pelaporan ...................................................................... 31 BAB III METODOLOGI PENELITIAN 3.1 Lokasi Studi dan Lingkup Kegiatan Penelitian ....................................... 32 3.2 Metodologi Pengolahan Data Primer ...................................................... 34
3.2.1 Pengukuran Penampang Sungai ..................................................... 34 3.2.2 Pengukuran Kecepatan Aliran........................................................ 36 3.2.3 Pengukuran Elevasi ........................................................................ 38 3.3 Metodologi Pengolahan Data Sekunder .................................................. 41 3.3.1 Observasi Data Curah Hujan .......................................................... 41 3.3.2 Uji kecocokaan ............................................................................... 42 3.3.3 Menganalisa Debit Banjir Rancangan dengan Metode Hidrograf Satuan Sintetik Nakayasu .............................................. 42 3.3.4 Menganalisa Debit Banjir Sanitary ................................................ 43 3.3.5 Menganalisa Debit Banjir Total ..................................................... 43 3.4 Pemodelan dan Simulasi Keadaan Banjir Rancangan ............................ 43 BAB IV ANALISA DAN PEMBAHASAN 4.1 Perhitungan Data Curah Hujan Kawasan ................................................ 44 4.2 Perhitungan Koefisen Pengaliran ............................................................ 48 4.3 Saluran Drainase Primer ......................................................................... 55 4.4 Perhitungan Frekuensi Curah Hujan Kala Ulang .................................... 58 4.4.1 Metode Distribusi Gumbel ............................................................. 59 4.4.2 Metode Distribusi Log Pearson Tipe III ....................................... 60
Universitas Sumatera Utara
4.4.3 Metode Distribusi Normal.............................................................. 61 4.4.4 Metode Distribusi Log Normal ...................................................... 62 4.5 Uji Kecocokan (Goodnes of fittest test) .................................................. 63 4.6 Debit Buangan Domestik Penduduk (Sanitary) ...................................... 65 4.7 Debit Banjir Rancangan Metode Hidrograf Satuan Sintetik
Nakayasu ................................................................................................. 69 4.8 Pemodelan Keadaan Banjir Sungai Babura Setelah Penambahan
Debit Sungai Putih dan Selayang ............................................................ 85 BAB V KESIMPULAN DAN SARAN 5.1 Kesimpulan ................................................................................................ 97 5.2 Saran .......................................................................................................... 97 DAFTAR PUSTAKA ...................................................................................................... 98 LAMPIRAN .......................................................................................................... 100
Universitas Sumatera Utara
DAFTAR GAMBAR
Gambar 1.1: Bagan alir penelitian ……………… ...................................................... 6
Gambar 1.2: (a) Peta Kota Medan, (b) Outlet USU bagian depan, (c) Outlet
USU bagian belakang .............................................................................. 8
Gambar 2.1: Daur siklus hidrologi ............................................................................... 9
Gambar 2.2: DAS bentuk memanjang ......................................................................... 11
Gambar 2.3: DAS bentuk radial ................................................................................... 11
Gambar 2.4: DAS bentuk paralel ................................................................................. 12
Gambar 2.5: DAS bentuk komplek .............................................................................. 12
Gambar 2.6: Bagan ilustrasi respon das akibat masukan berupa hujan ....................... 13
Gambar 2.7: Aljabar ..................................................................................................... 14
Gambar 2.8: Polygon thiessen..................................................................... ................. 15
Gambar 2.9: Metode isohyet ........................................................................................ 16
Gambar 2.10: Hidrograf Satuan Sintetik Nakayasu ..................................................... 25
Gambar 2.11: Tampilan HEC-RAS 4.0 ......................................................................... 31
Gambar 3.1: Peta lokasi studi (google earth)............................................................... 33
Gambar 3.2: Pembagian lebar sungai........................................................................... 34
Gambar 3.3: Contoh hasil pengukuran profil sungai ................................................... 35
Gambar 3.4: Pengukuran profil sungai (cross section) ................................................ 36
Gambar 3.5: Contoh pembagian lebar sungai .............................................................. 36
Gambar 3.6: Alat pengukur kecepatan arus sungai (current meter) ............................ 37
Gambar 3.7: Contoh format hitungan debit ................................................................. 37
Gambar 3.8: Pengukuran kecepatan arus sungai dengan current meter ...................... 38
Gambar 3.9: (a) Receiver GPS dan (b) Controller GPS .............................................. 41
Gambar 4.1: Polygon thiessen Sungai Babura ............................................................. 44
Gambar 4.2: Sebaran kelerengan lahan ........................................................................ 48
Universitas Sumatera Utara
Gambar 4.3: Subsistem Drainase Kota Medan ........................................................... 49
Gambar 4.4: Skema Jaringan Sungai dan Saluran Drainase ........................................ 50
Gambar 4.5: Daerah tangkapan sungai sungai di Kota Medan dan sekitarnya ............ 51
Gambar 4.6: Peta Rencana Tata Ruang Kota Medan ................................................... 52
Gambar 4.7: Kondisi eksisting Sungai Putih di Pembangunan ................................... 55
Gambar 4.8: Kondisi eksisting Sungai Selayang di Jalan Abdul Hakim ..................... 55
Gambar 4.9: Proyek Peningkatan Jaringan Drainase Proyek MUDP I dan II ............. 56
Gambar 4.10: Skema debit banjir kala ulang 20 tahun pada Sungai Selayang
dan Sungai Putih ..................................................................................... 57
Gambar 4.11: Grafik metode gumbel............................................................................. 59
Gambar 4.12: Grafik metode log pearson tipe III ......................................................... 60
Gambar 4.13: Grafik metode distribusi normal ............................................................. 61
Gambar 4.14: Grafik metode distribusi log normal ....................................................... 62
Gambar 4.15: Grafik resume frekuensi curah hujan harian ........................................... 63
Gambar 4.16: Batas-batas daerah sempadan sungai ...................................................... 69
Gambar 4.17: Grafik hidrograf satuan sintetik Nakayasu .............................................. 75
Gambar 4.18: Grafik hidrograf satuan sintetik Nakayasu Sungai Babura ..................... 87
Gambar 4.19: Profil muka air di hilir kawasan Kampus USU ....................................... 90
Gambar 4.20: Profil muka air di sepanjang Sungai Babura saat banjir ......................... 90
Gambar 4.21: Profil kecepatan aliran di sepanjang Sungai Babura ............................... 91
Gambar 4.22: Kurva ukur debit di hilir kawasan Kampus USU ................................... 92
Gambar 4.23: Gambar perspektif terjadinya banjir di Sungai Babura kawasan
Kampus USU .......................................................................................... 93
Gambar 4.24: Hidrograf satuan sintetik Nakayasu periode 100 tahun .......................... 94
Gambar 4.25: Sifat-sifat hidraulik di hilir kawasan Kampus USU ................................ 95
Gambar 4.26: Output hasil hitungan rinci di hilir kawasan Kampus USU .................... 96