ANALISA HARGA SATUAN PEKERJAAN MAKASAR Kot a : Makasar No. URAIAN KOEFISIEN SAT HARGA SATUAN JUMLAH (RP) I PEKERJAAN PERSIAPAN 1 1 M¹ PAGAR SENG GELOMBANG TINGGI : 2 M a Tiang kayu borneo 4/6 0.05 m 3 3,600,000.00 180,000.00 b Semen PC (abu-abu) 0.05 sak 42,000.00 2,100.00 c Seng gelombang 1.20 sak 53,800.00 64,560.00 d Pasir beton 0.01 m 3 72,000.00 360.00 e Split (batu pecah) 0.01 m 3 210,000.00 1,890.00 f Balok kayu borneo 4/6 0.05 m 3 3,600,000.00 180,000.00 g Paku 5 - 10 cm 0.06 kg 14,700.00 882.00 h Meni Besi 0.45 kg 20,000.00 9,000.00 i Tukang kayu 0.20 org 55,000.00 11,000.00 j Pembantu tukang 0.10 org 40,000.00 4,000.00
154

Analisa Harga Satuan Pekerjaan Makasar

Oct 27, 2015

Download

Documents

Muhammad Fahmi

RAB
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Analisa Harga Satuan Pekerjaan Makasar

ANALISA HARGA SATUAN PEKERJAAN MAKASAR

Kota   : Makasar    

No. URAIAN KOEFISIEN SAT HARGA SATUAN JUMLAH (RP)

I PEKERJAAN PERSIAPAN  1 1 M¹ PAGAR SENG GELOMBANG TINGGI : 2 M    a Tiang kayu borneo 4/6 0.05 m3 3,600,000.00 180,000.00     b Semen PC (abu-abu) 0.05 sak 42,000.00 2,100.00     c Seng gelombang 1.20 sak 53,800.00 64,560.00     d Pasir beton 0.01 m3 72,000.00 360.00     e Split (batu pecah) 0.01 m3 210,000.00 1,890.00     f Balok kayu borneo 4/6 0.05 m3 3,600,000.00 180,000.00     g Paku 5 - 10 cm 0.06 kg 14,700.00 882.00     h Meni Besi 0.45 kg 20,000.00 9,000.00     i Tukang kayu 0.20 org 55,000.00 11,000.00     j Pembantu tukang 0.10 org 40,000.00 4,000.00             Jumlah 453,792.00     Dibulatkan 453,790.00   2 1 M¹ PAGAR KAWAT BERDURI TINGGI : 1,8 M    a Tiang kayu borneo 4/6 0.05 m3 3,600,000.00 180,000.00     b Semen PC (abu-abu) 0.04 sak 42,000.00 1,680.00     c Kawat Duri 2.50 kg 166,000.00 415,000.00     d Pasir beton 0.01 m3 72,000.00 360.00     e Split (batu pecah) 0.01 m3 210,000.00 1,890.00     f Paku 5 - 10 cm 0.06 kg 14,700.00 882.00     g Tukang kayu 0.20 org 55,000.00 11,000.00     h Pembantu tukang 0.30 org 40,000.00 12,000.00       Jumlah 622,812.00

Page 2: Analisa Harga Satuan Pekerjaan Makasar

    Dibulatkan 622,810.00   3 1 M1 PENGUKURAN & PEMASANGAN BOWPLANK    a Kayu kaso 5/7 borneo 0.02 m3 3,600,000.00 72,000.00     b Paku 5 - 10 cm 0.02 kg 14,700.00 294.00     c Papan papan kayu terentang 2/20 - m3 1,220,000.00 4,880.00     d Tukang kayu 0.10 org 55,000.00 5,500.00     e Pembantu tukang 0.10 org 40,000.00 4,000.00     Jumlah 86,674.00     Dibulatkan 86,670.00   4 1 M2 PEMBUATAN KANTOR DIREKSI     a Kayu kaso 5/7 borneo 0.02 m3 3,600,000.00 72,000.00     b Papan kayu terentang 0.18 m3 1,220,000.00 219,600.00     c Paku semua ukuran 0.85 kg 14,700.00 12,495.00     d Besi strip 1.10 kg 17,500.00 19,250.00     e Semen PC (abu-abu) 35.00 kg 42,000.00 1,470,000.00     f Pasir pasang 0.15 m3 68,000.00 10,200.00     g Pasir beton 0.10 m3 72,000.00 7,200.00     h Split (batu pecah) 0.15 m3 210,000.00 31,500.00     i Bata merah 30.00 bh 600.00 18,000.00     j Seng gelombang 180 x 90 x 0,05 cm 1.20 lbr 60,600.00 72,720.00     k Seng Plat BJLS 32 1.00 m2 33,000.00 33,000.00     l Kawat harmonika 2.00 m2 22,000.00 44,000.00     m Kaca polos 3 mm 0.08 m2 63,000.00 5,040.00     n Kunci tanam standart 0.15 bh 55,000.00 8,250.00     o Triplek 120 x 240 x 0,4 cm 0.06 lbr 51,000.00 3,060.00     p Tukang kayu 2.00 org 55,000.00 110,000.00     q Tukang batu 1.00 org 55,000.00 55,000.00     r Pembantu tukang 2.00 org 40,000.00 80,000.00     Jumlah 2,271,315.00     Dibulatkan 2,271,310.00

Page 3: Analisa Harga Satuan Pekerjaan Makasar

  5 1 M2 PEMBUATAN GUDANG PROYEK    a Kayu kaso 5/7 borneo 0.02 m3 3,600,000.00 72,000.00     b Papan kayu terentang 0.10 m3 1,220,000.00 122,000.00     c Paku 0.30 kg 14,700.00 4,410.00     d Semen PC (abu-abu) 0.21 sak 42,000.00 8,820.00     e Pasir beton 0.03 m3 72,000.00 2,160.00     f Split (batu pecah) 0.05 m3 210,000.00 10,500.00     g Seng gelombang 180 x 90 x 0,05 cm 1.20 lbr 60,600.00 72,720.00     h Tukang kayu 1.00 org 55,000.00 55,000.00     i Pembantu tukang 1.00 org 40,000.00 40,000.00     Jumlah 387,610.00     Dibulatkan 387,610.00   6 1 M2 MEMBERSIHKAN LOKASI ROYEK    a Pembantu tukang 0.10 org 40,000.00 4,000.00     Jumlah 4,000.00     Dibulatkan 4,000.00   7 1 M2 MEMBERSIHKAN PUING-PUING    a Pembantu tukang 0.20 org 40,000.00 8,000.00     Jumlah 8,000.00     Dibulatkan 8,000.00   8 1 BH MEMBERSIHKAN TUNGGUL TANAMAN    a Pembantu tukang 2.00 org 40,000.00 80,000.00     Jumlah 80,000.00     Dibulatkan 80,000.00   9 1M2 PEMBUATAN JALAN MASUK PROYEK    a Batu belah 15/20 0.10 m3 72,000.00 7,200.00     b Koral 5/7 ( sirtu ) 0.05 m3 122,000.00 6,100.00     c Pasir urug 0.01 m3 66,000.00 660.00     d Pembantu tukang 1.00 org 40,000.00 40,000.00     Jumlah 53,960.00

Page 4: Analisa Harga Satuan Pekerjaan Makasar

    Dibulatkan 53,900.00   10 1 M3 PEMBONGKARAN BETON    a Pembantu tukang 6.20 org 40,000.00 248,000.00     Jumlah 248,000.00     Dibulatkan 248,000.00   11 1 M3 PEMBONGKARAN DINDING BATA    a Pembantu tukang 4.60 org 40,000.00 184,000.00     Jumlah 184,000.00     Dibulatkan 184,000.00   12 1 M2 PEKERJAAN PAGAR PAPAN RANGKA BALOK    a Papan kayu borneo 0.02 m3 4,000,000.00 80,000.00     b Balok kayu borneo 5/7 0.02 m3 3,600,000.00 72,000.00     c Pasir beton 0.08 m3 72,000.00 5,760.00     d Split (batu pecah) 0.15 m3 210,000.00 31,500.00     e Semen abu - abu 0.50 sak 42,000.00 21,000.00     f Tukang kayu 0.13 org 55,000.00 7,150.00     g Pembantu tukang 0.38 org 40,000.00 15,200.00     Jumlah 232,610.00

      Dibulatkan 232,600.00

II PEKERJAAN TANAH  1 1 M3 GALIAN TANAH SEDALAM 1 M    a Pembantu tukang 0.40 org 40,000.00 16,000.00     b Tukang gali 0.02 org 45,000.00 900.00     Jumlah 16,900.00     Dibulatkan 16,900.00   2 1 M3 GALIAN TANAH SEDALAM 2 M    a Pembantu tukang 0.53 org 40,000.00 21,200.00

Page 5: Analisa Harga Satuan Pekerjaan Makasar

    b Tukang gali 0.02 org 45,000.00 900.00     Jumlah 22,100.00     Dibulatkan 22,100.00   3 1 M3 GALIAN TANAH SEDALAM 3 M    a Pembantu tukang 0.74 org 40,000.00 29,600.00     b Tukang gali 0.02 org 45,000.00 900.00     Jumlah 30,500.00     Dibulatkan 30,500.00   4 1 M3 GALIAN TANAH KERAS SEDALAM 1 M    a Pembantu tukang 0.45 org 40,000.00 18,000.00     b Tukang gali 0.02 org 45,000.00 900.00     Jumlah 18,900.00     Dibulatkan 18,900.00   5 1 M2 PEKERJAAN PENGUPASAN TANAH SETEBAL 10 CM    a Pembantu tukang 0.05 org 40,000.00 1,000.00     b Tukang gali 0.02 org 45,000.00 675.00     Jumlah 1,675.00     Dibulatkan 1,670.00   6 1 M3 PEMBUANGAN TANAH SEJAUH 150 M    a Pembantu tukang 0.42 org 40,000.00 16,800.00     b Tukang gali 0.02 org 45,000.00 900.00     Jumlah 17,700.00     Dibulatkan 17,700.00   7 1 M3 URUGAN TANAH KEMBALI     a Pembantu tukang 0.19 org 40,000.00 7,600.00     b Tukang gali 0.02 org 45,000.00 900.00     Jumlah 8,500.00     Dibulatkan 8,500.00   8 1 M3 PEMADATAN TANAH    a Pembantu tukang 0.50 org 40,000.00 20,000.00

Page 6: Analisa Harga Satuan Pekerjaan Makasar

    b Tukang gali 0.02 org 45,000.00 900.00     Jumlah 20,900.00     Dibulatkan 20,900.00   9 1 M3 URUGAN PASIR    a Pasir urug 1.20 m3 66,000.00 79,200.00     b Pembantu tukang 0.30 org 40,000.00 12,000.00     c Tukang gali 0.02 org 45,000.00 900.00     Jumlah 92,100.00     Dibulatkan 92,100.00   10 1 M3 URUGAN TANAH     a Tanah urug 1.20 m3 70,000.00 84,000.00     b Pembantu tukang 0.30 org 40,000.00 12,000.00     c Tukang gali 0.02 org 45,000.00 900.00     Jumlah 96,900.00     Dibulatkan 96,900.00   11 1 M3 URUGAN SIRTU    a Sirtu ( koral ) 1.20 m3 122,000.00 146,400.00     b Pembantu tukang 0.25 org 40,000.00 10,000.00     c Tukang gali 0.02 org 45,000.00 900.00     Jumlah 157,300.00     Dibulatkan 157,300.00

III PEKERJAAN PONDASI  1 1 M3 PASANG PONDASI BT KALI , 1 Pc : 3 Ps    a Batu belah 1.10 m3 72,000.00 79,200.00     b Semen PC (abu-abu) 4.04 sak 42,000.00 169,680.00     c Pasir pasang 0.49 m3 68,000.00 32,980.00     d Pembantu tukang 1.50 org 40,000.00 60,000.00

Page 7: Analisa Harga Satuan Pekerjaan Makasar

    e Tukang batu 0.60 org 55,000.00 33,000.00     Jumlah 374,860.00     Dibulatkan 374,860.00   2 1 M3 PASANG PONDASI BT KALI , 1 Pc : 4 Ps    a Batu belah 1.10 m3 72,000.00 79,200.00     b Semen PC (abu-abu) 3.26 sak 42,000.00 136,920.00     c Pasir pasang 0.52 m3 68,000.00 35,360.00     d Pembantu tukang 1.50 org 40,000.00 60,000.00     e Tukang batu 0.60 org 55,000.00 33,000.00     Jumlah 344,480.00     Dibulatkan 344,480.00   3 1 M3 PASANG PONDASI BT KALI , 1 Pc : 5 Ps    a Batu belah 1.10 m3 72,000.00 79,200.00     b Semen PC (abu-abu) 2.72 sak 42,000.00 114,240.00     c Pasir pasang 0.54 m3 68,000.00 36,992.00     d Pembantu tukang 1.50 org 40,000.00 60,000.00     e Tukang batu 0.60 org 55,000.00 33,000.00     Jumlah 323,432.00     Dibulatkan 323,430.00   4 1 M3 PASANG PONDASI BATU KOSONG ( AANSTAMPING )    a Batu belah 1.20 m3 72,000.00 86,400.00     b Pasir urug 0.30 m3 66,000.00 19,800.00     c Pembantu tukang 0.78 org 40,000.00 31,200.00     d Tukang batu 0.39 org 55,000.00 21,450.00     Jumlah 158,850.00     Dibulatkan 158,800.00   5 1 M3 MEMBUAT BETON BERTULANG UNTUK PONDASI 1 Pc : 2 Ps : 3 Kr    a Semen PC (abu-abu) 6.72 sak 42,000.00 282,240.00     b Pasir beton 0.54 m3 72,000.00 38,880.00     c Split (batu pecah) 0.81 m3 210,000.00 170,100.00

Page 8: Analisa Harga Satuan Pekerjaan Makasar

    d Pembantu tukang 2.00 org 40,000.00 80,000.00     e Tukang batu 0.35 org 55,000.00 19,250.00     Jumlah 590,470.00     Dibulatkan 590,400.00   6 1 Kg PENULANGAN BETON PONDASI    a Besi beton polos 1.05 kg 8,800.00 9,240.00     b Kawat beton 0.02 kg 19,000.00 285.00     c Pembantu tukang 0.01 org 40,000.00 280.00     d Tukang besi 0.01 org 55,000.00 385.00     Jumlah 10,190.00     Dibulatkan 10,100.00   7 1 M2 PEKERJAAN BEKISTING UNTUK PONDASI    a Papan kayu terentang 0.04 m3 1,220,000.00 48,800.00     b Paku 5 - 12 cm 0.30 kg 1,925.00 577.50     c Pelumas begisting (oli/minyak) 0.10 Ltr 10,000.00 1,000.00     d Pembantu tukang 0.30 org 40,000.00 12,000.00     e Tukang kayu 0.26 org 55,000.00 14,300.00     Jumlah 76,677.50     Dibulatkan 76,600.00   8 1 M3 PASANG PONDASI CYCLOOP (60 %BETON : 40% BATU KALI)    a Besi beton polos 50.00 kg 8,800.00 440,000.00     b Semen PC (abu-abu) 4.04 sak 42,000.00 169,680.00     c Pasir beton 0.32 m3 72,000.00 23,040.00     d Split (batu pecah) 0.49 m3 210,000.00 102,900.00     e Kawat beton 0.80 kg 19,000.00 15,200.00     f Batu belah 0.40 m3 72,000.00 28,800.00     g Pembantu tukang 2.00 org 40,000.00 80,000.00     h Tukang batu 0.85 org 55,000.00 46,750.00     Jumlah 906,370.00     Dibulatkan 906,300.00

Page 9: Analisa Harga Satuan Pekerjaan Makasar

  9 1 M3 PASANG PONDASI SUMURAN DIAMETER 100 cm    a Batu belah 0.45 m3 72,000.00 32,400.00     b Semen PC (abu-abu) 5.60 sak 42,000.00 235,200.00     c Pasir beton 0.45 m3 72,000.00 32,400.00     d Split (batu pecah) 0.67 m3 210,000.00 140,700.00     e Pembantu tukang 2.38 org 40,000.00 95,200.00     f Tukang batu 0.30 org 55,000.00 16,500.00     Jumlah 552,400.00     Dibulatkan 552,400.00   10 1 M¹ PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 40 X 40 Cm    a Pasir beton 0.10 m3 72,000.00 7,200.00     b Split (batu pecah) 0.15 m3 210,000.00 31,500.00     c Semen PC (abu-abu) 1.21 sak 42,000.00 50,820.00     d Besi beton polos 45.00 kg 8,800.00 396,000.00     e Kawat beton 0.90 kg 19,000.00 17,100.00     f Balok kayu borneo super 5/7 0.03 m3 3,600,000.00 115,200.00     g Papan kayu terentang 0.01 m3 4,000,000.00 40,000.00     h Paku 5 - 12 cm 0.12 kg 14,700.00 1,764.00     i Pelumas begisting (oli/minyak) 0.09 Ltr 10,000.00 900.00     j Plamir tembok 0.24 kg 27,000.00 6,480.00     k Pembantu tukang 1.00 org 40,000.00 40,000.00     l Tukang batu 0.67 org 55,000.00 36,850.00     Jumlah 743,814.00     Dibulatkan 743,800.00   11 1 M¹ PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 35 X 35 CM    a Pasir beton 0.08 m3 72,000.00 5,760.00     b Split (batu pecah) 0.13 m3 210,000.00 27,300.00     c Semen PC (abu-abu) 0.98 sak 42,000.00 41,160.00     d Besi beton polos 34.50 kg 8,800.00 303,600.00     e Kawat beton 0.70 kg 19,000.00 13,300.00

Page 10: Analisa Harga Satuan Pekerjaan Makasar

    f Balok kayu borneo super 5/7 0.03 m3 3,600,000.00 108,000.00     g Papan kayu terentang 0.01 m3 4,000,000.00 40,000.00     h Paku 5 - 12 cm 0.12 kg 14,700.00 1,764.00     i Pelumas begisting (oli/minyak) 0.09 Ltr 10,000.00 900.00     j Plamir tembok 0.20 kg 27,000.00 5,400.00     k Pembantu tukang 0.80 org 40,000.00 32,000.00     l Tukang batu 0.50 org 55,000.00 27,500.00     Jumlah 606,684.00     Dibulatkan 606,600.00   12 1 M3 MEMBUAT PONDASI TIANG PANCANG UKURAN 25 X 25  a Pasir beton 0.06 m3 72,000.00 4,320.00   b Split (batu pecah) 0.11 m3 210,000.00 23,100.00   c Semen PC (abu-abu) 0.82 sak 42,000.00 34,440.00   d Besi beton polos 34.50 kg 8,800.00 303,600.00   e Kawat beton 0.60 kg 19,000.00 11,400.00   f Balok kayu borneo super 5/7 0.03 m3 3,600,000.00 108,000.00   g Papan kayu terentang 0.01 m3 4,000,000.00 40,000.00   h Paku 5 - 12 cm 0.11 kg 14,700.00 1,617.00   i Pelumas begisting (oli/minyak) 0.08 Ltr 10,000.00 800.00   j Plamir tembok 0.20 kg 27,000.00 5,400.00   k Pembantu tukang 0.80 org 40,000.00 32,000.00   l Tukang batu 0.50 org 55,000.00 27,500.00     Jumlah 592,177.00     Dibulatkan 592,100.00   13 1 M3 MEMBUAT PONDASI PLAT BETON (PENULANGAN 125 kg + BEKISTING )    a Papan kayu terentang 0.20 m3 1,220,000.00 244,000.00     b Paku 5 - 12 cm 1.50 kg 14,700.00 22,050.00     c Pelumas begisting (oli/minyak) 0.40 Ltr 10,000.00 4,000.00     d Besi beton polos 125.00 kg 8,800.00 1,100,000.00     e Kawat beton 2.25 kg 19,000.00 42,750.00

Page 11: Analisa Harga Satuan Pekerjaan Makasar

    f Semen PC (abu-abu) 6.46 sak 42,000.00 271,320.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00     i Pembantu tukang 3.90 org 40,000.00 156,000.00     j Tukang batu 0.35 org 55,000.00 19,250.00     k Tukang kayu 1.04 org 55,000.00 57,200.00     l Tukang besi 1.05 org 55,000.00 57,750.00     Jumlah 2,175,560.00     Dibulatkan 2,175,500.00   14 1 M3 MEMBUAT PONDASI PLAT BETON (PENULANGAN 150 kg + BEKISTING )    a Papan kayu terentang 0.20 m3 1,220,000.00 244,000.00     b Paku 5 - 12 cm 1.50 kg 14,700.00 22,050.00     c Pelumas begisting (oli/minyak) 0.40 ltr 10,000.00 4,000.00     d Besi beton polos Polos 150.00 kg 8,800.00 1,320,000.00     e Kawat beton 2.25 kg 19,000.00 42,750.00     f Semen PC (abu-abu) 6.46 sak 42,000.00 271,320.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00     i Pembantu tukang 4.00 org 40,000.00 160,000.00     j Tukang batu 0.40 org 55,000.00 22,000.00     k Tukang kayu 1.00 org 55,000.00 55,000.00     l Tukang besi 1.00 org 55,000.00 55,000.00     Jumlah 2,397,360.00     Dibulatkan 2,397,300.00   15 1 M3 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 125 kg + BEKISTING )    a Papan kayu terentang 0.20 m3 1,220,000.00 244,000.00     b Paku 5 - 12 cm 1.50 kg 14,700.00 22,050.00     c Pelumas begisting (oli/minyak) 0.40 ltr 10,000.00 4,000.00     d Besi beton polos Polos 125.00 kg 8,800.00 1,100,000.00     e Kawat beton 2.10 kg 19,000.00 39,900.00

Page 12: Analisa Harga Satuan Pekerjaan Makasar

    f Semen PC (abu-abu) 6.46 sak 42,000.00 271,320.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00     i Pembantu tukang 3.90 org 40,000.00 156,000.00     j Tukang batu 0.40 org 55,000.00 22,000.00     k Tukang kayu 1.00 org 55,000.00 55,000.00     l Tukang besi 1.00 org 55,000.00 55,000.00     Jumlah 2,170,510.00     Dibulatkan 2,170,500.00   16 1 M3 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 150 kg + BEKISTING )    a Papan kayu terentang 0.20 m3 1,220,000.00 244,000.00     b Paku 5 - 12 cm 1.50 kg 14,700.00 22,050.00     c Pelumas begisting (oli/minyak) 0.40 ltr 10,000.00 4,000.00     d Besi beton polos 150.00 kg 8,800.00 1,320,000.00     e Kawat beton 2.25 kg 19,000.00 42,750.00     f Semen PC (abu-abu) 6.46 sak 42,000.00 271,320.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00     i Pembantu tukang 4.00 org 40,000.00 160,000.00     j Tukang batu 0.40 org 55,000.00 22,000.00     k Tukang kayu 1.00 org 55,000.00 55,000.00     l Tukang besi 1.00 org 55,000.00 55,000.00     Jumlah 2,397,360.00     Dibulatkan 2,397,300.00

         

IVPEKERJAAN BETON NON STRUKTUR DAN BETON STRUKTUR

     

  A PEKERJAAN BETON

Page 13: Analisa Harga Satuan Pekerjaan Makasar

  1 1 M3 MEMBUAT BETON NON STRUKTUR, 1 Pc : 3 Ps : 5 Splt    a Semen PC (abu-abu) 4.36 sak 42,000.00 183,120.00     b Pasir beton 0.52 m3 72,000.00 37,440.00     c Split (batu pecah) 0.87 m3 210,000.00 182,700.00     d Pembantu tukang 2.00 org 40,000.00 80,000.00     e Tukang batu 0.35 org 55,000.00 19,250.00     Jumlah 502,510.00     Dibulatkan 502,500.00   2 1 M3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 4 Splt    a Semen PC (abu-abu) 4.64 sak 42,000.00 194,880.00     b Pasir beton 0.52 m3 72,000.00 37,440.00     c Split (batu pecah) 0.78 m3 210,000.00 163,800.00     d Pembantu tukang 2.00 org 40,000.00 80,000.00     e Tukang batu 0.35 org 55,000.00 19,250.00     Jumlah 495,370.00     Dibulatkan 495,300.00   3 1 M3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 3 Splt    a Semen PC (abu-abu) 6.72 sak 42,000.00 282,240.00     b Pasir beton 0.54 m3 72,000.00 38,880.00     c Split (batu pecah) 0.81 m3 210,000.00 170,100.00     d Pembantu tukang 2.00 org 40,000.00 80,000.00     e Tukang batu 0.35 org 55,000.00 19,250.00     Jumlah 590,470.00     Dibulatkan 590,400.00   4 1 M3 MEMBUAT BETON STRUKTUR DENGAN MUTU K 225    a Semen PC (abu-abu) 7.76 sak 42,000.00 325,920.00     b Pasir beton 0.65 m3 72,000.00 46,800.00     c Split (batu pecah) 0.65 m3 210,000.00 136,500.00     d Pembantu tukang 2.00 org 40,000.00 80,000.00     e Tukang batu 0.35 org 55,000.00 19,250.00

Page 14: Analisa Harga Satuan Pekerjaan Makasar

    Jumlah 608,470.00     Dibulatkan 608,400.00   5 1 M3 MEMBUAT BETON STRUKTUR DENGAN MUTU K 275    a Semen PC (abu-abu) 8.00 sak 42,000.00 336,000.00     b Pasir beton 0.55 m3 72,000.00 39,600.00     c Split (batu pecah) 0.70 m3 210,000.00 147,000.00     d Pembantu tukang 2.02 org 40,000.00 80,800.00     e Tukang batu 0.40 org 55,000.00 22,000.00     Jumlah 625,400.00     Dibulatkan 625,400.00   B PEKERJAAN PEMBESIAN  1 1 KG PENULANGAN BETON/BESI BETON POLOS    a Besi beton polos 1.05 kg 8,800.00 9,240.00     b Kawat beton 0.02 kg 19,000.00 380.00     c Pembantu tukang 0.01 org 40,000.00 400.00     d Tukang besi 0.01 org 55,000.00 550.00     Jumlah 10,570.00     Dibulatkan 10,500.00   2 1 KG PENULANGAN BETON/BESI BETON ULIR    a Besi Beton Ulir 1.10 kg 16,300.00 17,930.00     b Kawat beton 0.02 kg 19,000.00 285.00     c Pembantu tukang 0.01 org 40,000.00 400.00     d Tukang besi 0.02 org 55,000.00 1,100.00     Jumlah 19,715.00     Dibulatkan 19,700.00   C PEKERJAAN BEGISTING  1 1 M2 PASANG BEKISTING UNTUK SLOOF    a Papan kayu terentang 0.05 m3 1,220,000.00 54,900.00     b Paku 5 - 12 cm 0.30 kg 14,700.00 4,410.00     c Pelumas begisting (oli/minyak) 0.10 Ltr 10,000.00 1,000.00

Page 15: Analisa Harga Satuan Pekerjaan Makasar

    d Pembantu tukang 0.30 org 40,000.00 12,000.00     e Tukang kayu 0.26 org 55,000.00 14,300.00     Jumlah 86,610.00     Dibulatkan 86,600.00   2 1 M2 PASANG BEKISTING UNTUK KOLOM    a Papan kayu terentang 0.04 m3 1,220,000.00 48,800.00     b Paku 5 - 12 cm 0.40 kg 14,700.00 5,880.00     c Pelumas begisting (oli/minyak) 0.20 Ltr 10,000.00 2,000.00     d Balok Kayu Borneo 0.04 m3 3,600,000.00 144,000.00     e Multiplex 120 x 240 x 9 mm 0.35 lbr 105,000.00 36,750.00     f Pembantu tukang 0.30 org 40,000.00 12,000.00     g Tukang kayu 0.33 org 55,000.00 18,150.00     Jumlah 267,580.00     Dibulatkan 267,500.00   3 1M2 PASANG BEKISTING UNTUK BALOK    a Papan kayu terentang 0.04 m3 1,220,000.00 48,800.00     b Paku 5 - 12 cm 0.40 kg 14,700.00 5,880.00     c Pelumas begisting (oli/minyak) 0.20 Ltr 10,000.00 2,000.00     d Balok Kayu Borneo 0.04 m3 3,600,000.00 144,000.00     e Multiplex 120 x 240 x 9 mm 0.35 lbr 105,000.00 36,750.00     f Pembantu tukang 0.32 org 40,000.00 12,800.00     g Tukang kayu 0.33 org 55,000.00 18,150.00     Jumlah 268,380.00     Dibulatkan 268,300.00   4 1 M2 PASANG BEKISTING UNTUK PLAT LANTAI    a Papan kayu terentang 0.04 m3 1,220,000.00 48,800.00     b Paku 5 - 12 cm 0.40 kg 14,700.00 5,880.00     c Pelumas begisting (oli/minyak) 0.20 Ltr 10,000.00 2,000.00     d Balok Kayu Borneo 0.04 m3 3,600,000.00 144,000.00     e Multiplex 120 x 240 x 9 mm 0.35 lbr 105,000.00 36,750.00

Page 16: Analisa Harga Satuan Pekerjaan Makasar

    f Pembantu tukang 0.32 org 40,000.00 12,800.00     g Tukang kayu 0.33 org 55,000.00 18,150.00     Jumlah 268,380.00     Dibulatkan 268,300.00   5 1 M2 PASANG BEKISTING UNTUK TANGGA    a Papan kayu terentang 0.03 m3 1,220,000.00 36,600.00     b Paku 5 - 12 cm 0.40 kg 14,700.00 5,880.00     c Pelumas begisting (oli/minyak) 0.15 Ltr 10,000.00 1,500.00     d Balok kayu borneo 0.02 m3 3,600,000.00 72,000.00     e Multiplex 120 x 240 x 9 mm 0.35 lbr 105,000.00 36,750.00     f Pembantu tukang 0.32 org 40,000.00 12,800.00     g Tukang kayu 0.33 org 55,000.00 18,150.00     Jumlah 183,680.00     Dibulatkan 183,600.00   D PEKERJAAN BETON BERTULANG  1 1 M3 MEMBUAT SLOOF BETON BERTULANG ( 200 kg BESI + BEKISTING ) K225    a Papan kayu terentang 0.27 m3 1,220,000.00 329,400.00     b Paku 5 - 12 cm 2.00 kg 14,700.00 29,400.00     c Pelumas begisting (oli/minyak) 0.60 Ltr 10,000.00 6,000.00     d Besi beton polos 200.00 kg 8,800.00 1,760,000.00     e Kawat beton 3.00 kg 19,000.00 57,000.00     f Semen PC (abu-abu) 8.00 sak 42,000.00 336,000.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00     i Pembantu tukang 4.50 org 40,000.00 180,000.00     j Tukang batu 0.35 org 55,000.00 19,250.00     k Tukang kayu 1.56 org 55,000.00 85,800.00     l Tukang besi 1.40 org 55,000.00 77,000.00     Jumlah 3,081,090.00     Dibulatkan 3,081,000.00

Page 17: Analisa Harga Satuan Pekerjaan Makasar

  2 1 M3 MEMBUAT KOLOM BETON BERTULANG ( 125 kg BESI + BEKISTING )    a Papan kayu terentang 0.40 m3 1,220,000.00 488,000.00     b Paku 5 - 12 cm 4.00 kg 14,700.00 58,800.00     c Pelumas begisting (oli/minyak) 2.00 Ltr 10,000.00 20,000.00     d Besi beton polos 125.00 kg 8,800.00 1,100,000.00     e Kawat beton 4.50 kg 19,000.00 85,500.00     f Semen PC (abu-abu) 6.45 sak 42,000.00 270,900.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00     i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00     j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 367,500.00     k Pembantu tukang 7.30 org 40,000.00 292,000.00     l Tukang batu 0.35 org 55,000.00 19,250.00     m Tukang kayu 3.30 org 55,000.00 181,500.00     n Tukang besi 2.10 org 55,000.00 115,500.00     Jumlah 4,280,190.00     Dibulatkan 4,280,100.00   3 1 M3 MEMBUAT KOLOM BETON BERTULANG (150 kg BESI + BEKISTING)    a Papan kayu terentang 0.40 m3 1,220,000.00 488,000.00     b Paku 5 - 12 cm 4.00 kg 14,700.00 58,800.00     c Pelumas begisting (oli/minyak) 2.00 Ltr 10,000.00 20,000.00     d Besi beton polos 150.00 kg 8,800.00 1,320,000.00     e Kawat beton 4.50 kg 19,000.00 85,500.00     f Semen PC (abu-abu) 6.45 sak 42,000.00 270,900.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00     i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00     j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 367,500.00     k Pembantu tukang 7.30 org 40,000.00 292,000.00     l Tukang batu 0.35 org 55,000.00 19,250.00

Page 18: Analisa Harga Satuan Pekerjaan Makasar

    m Tukang kayu 3.30 org 55,000.00 181,500.00     n Tukang besi 2.10 org 55,000.00 115,500.00     Jumlah 4,500,190.00     Dibulatkan 4,500,100.00   4 1 M3 MEMBUAT KOLOM BETON BERTULANG ( 160 kg BESI + BEKISTING )    a Papan kayu terentang 0.40 m3 1,220,000.00 488,000.00     b Paku 5 - 12 cm 4.00 kg 14,700.00 58,800.00     c Pelumas begisting (oli/minyak) 2.00 Ltr 10,000.00 20,000.00     d Besi beton polos 160.00 kg 8,800.00 1,408,000.00     e Kawat beton 4.50 kg 19,000.00 85,500.00     f Semen PC (abu-abu) 6.45 sak 42,000.00 270,900.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00     i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00     j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 367,500.00     k Pembantu tukang 7.30 org 40,000.00 292,000.00     l Tukang batu 0.35 org 55,000.00 19,250.00     m Tukang kayu 3.30 org 55,000.00 181,500.00   n Tukang besi 2.10 org 55,000.00 115,500.00   Jumlah 4,588,190.00     Dibulatkan 4,588,100.00   5 1 M3 MEMBUAT KOLOM BETON BERTULANG ( 175 kg BESI + BEKISTING )    a Papan kayu terentang 0.40 m3 1,220,000.00 488,000.00     b Paku 5 - 12 cm 4.00 kg 14,700.00 58,800.00     c Pelumas begisting (oli/minyak) 2.00 Ltr 10,000.00 20,000.00     d Besi beton polos 175.00 kg 8,800.00 1,540,000.00     e Kawat beton 4.50 kg 19,000.00 85,500.00     f Semen PC (abu-abu) 6.45 sak 42,000.00 270,900.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00

Page 19: Analisa Harga Satuan Pekerjaan Makasar

    i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00     j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 367,500.00     k Pembantu tukang 7.30 org 40,000.00 292,000.00     l Tukang batu 0.35 org 55,000.00 19,250.00     m Tukang kayu 3.30 org 55,000.00 181,500.00     n Tukang besi 2.10 org 55,000.00 115,500.00     Jumlah 4,720,190.00     Dibulatkan 4,720,100.00   6 1 M3 MEMBUAT KOLOM BETON BERTULANG ( 200 kg BESI + BEKISTING )    a Papan kayu terentang 0.40 m3 1,220,000.00 488,000.00     b Paku 5 - 12 cm 4.00 kg 14,700.00 58,800.00     c Pelumas begisting (oli/minyak) 2.00 Ltr 10,000.00 20,000.00     d Besi beton polos 200.00 kg 8,800.00 1,760,000.00     e Kawat beton 4.50 kg 19,000.00 85,500.00     f Semen PC (abu-abu) 6.45 sak 42,000.00 270,900.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00     i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00     j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 367,500.00     k Pembantu tukang 7.30 org 40,000.00 292,000.00     l Tukang batu 0.35 org 55,000.00 19,250.00     m Tukang kayu 3.30 org 55,000.00 181,500.00     n Tukang besi 2.10 org 55,000.00 115,500.00     Jumlah 4,940,190.00     Dibulatkan 4,940,100.00   7 1 M3 MEMBUAT KOLOM BETON BERTULANG ( 250 kg BESI + BEKISTING )    a Papan kayu terentang 0.40 m3 1,220,000.00 488,000.00     b Paku 5 - 12 cm 4.00 kg 14,700.00 58,800.00     c Pelumas begisting (oli/minyak) 2.00 Ltr 10,000.00 20,000.00     d Besi beton polos 250.00 kg 8,800.00 2,200,000.00

Page 20: Analisa Harga Satuan Pekerjaan Makasar

    e Kawat beton 4.50 kg 19,000.00 85,500.00     f Semen PC (abu-abu) 6.45 sak 42,000.00 270,900.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00     i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00     j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 367,500.00     k Pembantu tukang 7.30 org 40,000.00 292,000.00     l Tukang batu 0.35 org 55,000.00 19,250.00     m Tukang kayu 3.30 org 55,000.00 181,500.00     n Tukang besi 2.10 org 55,000.00 115,500.00     Jumlah 5,380,190.00     Dibulatkan 5,380,100.00   8 1 M3 MEMBUAT KOLOM BETON BERTULANG ( 300 kg BESI + BEKISTING )    a Papan kayu terentang 0.40 m3 1,220,000.00 488,000.00     b Paku 5 - 12 cm 4.00 kg 14,700.00 58,800.00     c Pelumas begisting (oli/minyak) 2.00 Ltr 10,000.00 20,000.00     d Besi beton polos 300.00 kg 8,800.00 2,640,000.00     e Kawat beton 4.50 kg 19,000.00 85,500.00     f Semen PC (abu-abu) 6.45 sak 42,000.00 270,900.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00     i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00     j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 367,500.00     k Pembantu tukang 7.30 org 40,000.00 292,000.00     l Tukang batu 0.35 org 55,000.00 19,250.00     m Tukang kayu 3.30 org 55,000.00 181,500.00     n Tukang besi 2.10 org 55,000.00 115,500.00     Jumlah 5,820,190.00     Dibulatkan 5,820,100.00   9 1 M3 MEMBUAT BALOK BETON BERTULANG ( 125 kg BESI + BEKISTING )

Page 21: Analisa Harga Satuan Pekerjaan Makasar

    a Papan kayu terentang 0.32 m3 1,220,000.00 390,400.00     b Paku 5 - 12 cm 3.20 kg 14,700.00 47,040.00     c Pelumas begisting (oli/minyak) 1.60 Ltr 10,000.00 16,000.00     d Besi beton polos 125.00 kg 8,800.00 1,100,000.00     e Kawat beton 2.25 kg 19,000.00 42,750.00     f Semen PC (abu-abu) 6.45 sak 42,000.00 270,900.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00     i Balok kayu Borneo Super 0.12 m3 3,600,000.00 432,000.00     j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 294,000.00     k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 32.00 btg 8,500.00 272,000.00     l Pembantu tukang 5.80 org 40,000.00 232,000.00     m Tukang batu 0.35 org 55,000.00 19,250.00     n Tukang kayu 2.80 org 55,000.00 154,000.00     o Tukang besi 1.05 org 55,000.00 57,750.00     Jumlah 3,529,330.00     Dibulatkan 3,529,300.00   10 1 M3 MEMBUAT BALOK BETON BERTULANG ( 150 kg BESI + BEKISTING )    a Papan kayu terentang 0.32 m3 1,220,000.00 390,400.00     b Paku 5 - 12 cm 3.20 kg 14,700.00 47,040.00     c Pelumas begisting (oli/minyak) 1.60 Ltr 10,000.00 16,000.00     d Besi beton polos 150.00 kg 8,800.00 1,320,000.00     e Kawat beton 2.25 kg 10,000.00 22,500.00     f Semen PC (abu-abu) 6.45 sak 42,000.00 270,900.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 10,000.00 7,800.00     i Balok kayu Borneo Super 0.12 m3 3,600,000.00 432,000.00     j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 294,000.00     k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 32.00 btg 8,500.00 272,000.00     l Pembantu tukang 5.80 org 40,000.00 232,000.00

Page 22: Analisa Harga Satuan Pekerjaan Makasar

    m Tukang batu 0.35 org 55,000.00 19,250.00     n Tukang kayu 2.80 org 55,000.00 154,000.00     o Tukang besi 1.05 org 55,000.00 57,750.00     Jumlah 3,573,080.00     Dibulatkan 3,573,000.00   11 1 M3 MEMBUAT BALOK BETON BERTULANG ( 200 kg BESI + BEKISTING )    a Papan kayu terentang 0.32 m3 1,220,000.00 390,400.00     b Paku 5 - 12 cm 3.20 kg 14,700.00 47,040.00     c Pelumas begisting (oli/minyak) 1.60 Ltr 10,000.00 16,000.00     d Besi beton polos 200.00 kg 8,800.00 1,760,000.00     e Kawat beton 3.00 kg 19,000.00 57,000.00     f Semen PC (abu-abu) 6.45 sak 42,000.00 270,900.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 140,000.00 109200  i Balok kayu Borneo Super 0.14 m3 4,000,000.00 560,000.00   j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 294,000.00   k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 16.00 btg 18,000.00 288,000.00   l Pembantu tukang 5.96 org 27,500.00 163,900.00   m Tukang batu 0.35 org 42,000.00 14,700.00   n Tukang kayu 2.80 org 42,000.00 117,600.00   o Tukang besi 1.40 org 42,000.00 58,800.00   Jumlah 4,184,980.00     Dibulatkan 4,184,900.00   12 1 M3 MEMBUAT BALOK BETON BERTULANG (200 kg BESI + BEKISTING)  a Papan kayu terentang 0.32 m3 1,750,000.00 560,000.00   b Paku 5 - 12 cm 3.20 kg 14,700.00 47,040.00   c Pelumas begisting (oli/minyak) 1.60 Ltr 10,000.00 16,000.00   d Besi beton polos 225.00 kg 8,750.00 1,968,750.00   e Kawat beton 4.00 kg 15,000.00 60,000.00   f Semen PC (abu-abu) 6.45 sak 49,500.00 319,275.00

Page 23: Analisa Harga Satuan Pekerjaan Makasar

  g Pasir beton 0.52 m3 140,000.00 72,800.00   h Split (batu pecah) 0.78 m3 140,000.00 109,200.00   i Balok kayu Borneo Super 0.14 m3 4,000,000.00 560,000.00     j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 294,000.00     k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 16.00 btg 8,500.00 136,000.00     l Pembantu tukang 5.96 org 40,000.00 238,400.00     m Tukang batu 0.35 org 55,000.00 19,250.00     n Tukang kayu 2.80 org 55,000.00 154,000.00     o Tukang besi 1.40 org 55,000.00 77,000.00     Jumlah 4,631,715.00     Dibulatkan 4,631,700.00   13 1 M3 MEMBUAT BALOK BETON BERTULANG ( 250 kg BESI + BEKISTING )    a Papan kayu terentang 0.32 m3 1,220,000.00 390,400.00     b Paku 5 - 12 cm 3.20 kg 14,700.00 47,040.00     c Pelumas begisting (oli/minyak) 1.60 Ltr 10,000.00 16,000.00     d Besi beton polos 250.00 kg 8,800.00 2,200,000.00     e Kawat beton 6.00 kg 19,000.00 114,000.00     f Semen PC (abu-abu) 6.45 sak 42,000.00 270,900.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00     i Balok kayu Borneo Super 0.14 m3 3,600,000.00 504,000.00     j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 294,000.00     k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 16.00 btg 8,500.00 136,000.00     l Pembantu tukang 5.96 org 40,000.00 238,400.00     m Tukang batu 0.35 org 55,000.00 19,250.00     n Tukang kayu 2.80 org 55,000.00 154,000.00     o Tukang besi 1.40 org 55,000.00 77,000.00     Jumlah 4,662,230.00     Dibulatkan 4,662,200.00   14 1 M3 MEMBUAT TANGGA BETON BERTULANG ( 200 kg BESI + BEKISTING )

Page 24: Analisa Harga Satuan Pekerjaan Makasar

    a Papan kayu terentang 0.25 m3 1,220,000.00 305,000.00     b Paku 5 - 12 cm 3.00 kg 14,700.00 44,100.00     c Pelumas begisting (oli/minyak) 1.20 Ltr 10,000.00 12,000.00     d Besi beton polos 200.00 kg 8,800.00 1,760,000.00     e Kawat beton 3.00 kg 19,000.00 57,000.00     f Semen PC (abu-abu) 6.45 sak 42,000.00 270,900.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00     i Balok kayu Borneo Super 0.30 m3 3,600,000.00 1,080,000.00     j Multiplex 120 x 240 x 9 mm 2.50 lbr 105,000.00 262,500.00     k Pembantu tukang 5.60 org 40,000.00 224,000.00     l Tukang batu 0.35 org 55,000.00 19,250.00     m Tukang kayu 2.30 org 55,000.00 126,500.00     n Tukang besi 1.40 org 55,000.00 77,000.00     Jumlah 4,439,490.00     Dibulatkan 4,439,400.00   15 1 M3 MEMBUAT PLAT LANTAI Tb. 10 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING )    a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 590,400.00 590,400.00     b Pasang Bekisting untuk lantai 10.00 m2 268,300.00 2,683,000.00     c Besi Beton rakit 100.00 kg 8,800.00 880,000.00     Jumlah 4,153,400.00     Dibulatkan 4,153,400.00   16 1 M3 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING )    a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 590,400.00 590,400.00     b Pasang Bekisting untuk lantai 8.33 m2 268,300.00 2,234,939.00     c Besi Beton rakit 115.00 kg 10,500.00 1,207,500.00     Jumlah 4,032,839.00     Dibulatkan 4,032,800.00   17 1 M3 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 125 kg BESI + BEKISTING )    a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 590,400.00 590,400.00

Page 25: Analisa Harga Satuan Pekerjaan Makasar

    b Pasang Bekisting untuk lantai 8.33 m2 268,300.00 2,234,939.00     c Besi Beton rakit 125.00 kg 10,500.00 1,312,500.00     Jumlah 4,137,839.00     Dibulatkan 4,137,800.00   18 1 M3 MEMBUAT PLAT LANTAI Tb. 15 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING )    a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 590,400.00 590,400.00     b Pasang Bekisting untuk lantai 6.67 m2 268,300.00 1,789,561.00     c Besi Beton rakit 100.00 kg 10,500.00 1,050,000.00     Jumlah 3,429,961.00     Dibulatkan 3,429,900.00   19 1 M3 MEMBUAT PLAT LANTAI Tb. 20 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING )    a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 590,400.00 590,400.00     b Pasang Bekisting untuk lantai 7.50 m2 268,300.00 2,012,250.00     c Besi Beton rakit 115.00 kg 10,500.00 1,207,500.00     Jumlah 3,810,150.00     Dibulatkan 3,810,100.00   20 1M3 MEMBUAT RING BALK BETON BERTULANG ( 175 kg BESI + BEKISTING ) K225    a Papan kayu terentang 0.27 m3 1,220,000.00 329,400.00     b Paku 5 - 12 cm 2.00 kg 14,700.00 29,400.00     c Pelumas begisting (oli/minyak) 0.60 Ltr 10,000.00 6,000.00     d Besi beton polos 175.00 kg 8,800.00 1,540,000.00     e Kawat beton 3.00 kg 19,000.00 57,000.00     f Semen PC (abu-abu) 8.00 sak 42,000.00 336,000.00     g Pasir beton 0.52 m3 72,000.00 37,440.00     h Split (batu pecah) 0.78 m3 210,000.00 163,800.00     i Pembantu tukang 4.85 org 40,000.00 194,000.00     j Tukang batu 0.40 org 55,000.00 22,000.00     k Tukang kayu 1.75 org 55,000.00 96,250.00     l Tukang besi 1.45 org 55,000.00 79,750.00     Jumlah 2,891,040.00

Page 26: Analisa Harga Satuan Pekerjaan Makasar

    Dibulatkan 2,891,000.00

V PEKERJAAN DINDING  1 1 M2 PASANGAN Bata merah TEBAL 1 BATA, CAMPURAN 1 Pc : 3 Ps    a Bata merah 140.00 bh 600.00 84,000.00     b Semen PC (abu-abu) 0.65 sak 42,000.00 27,300.00     c Pasir pasang 0.09 m3 68,000.00 6,120.00     d Pembantu tukang 0.65 org 40,000.00 26,000.00     e Tukang batu 0.20 org 55,000.00 11,000.00     Jumlah 154,420.00     Dibulatkan 154,400.00   2 1 M2 PASANGAN Bata merah TEBAL 1 BATA, CAMPURAN 1 Pc : 4 Ps    a Bata merah 140.00 bh 600.00 84,000.00     b Semen PC (abu-abu) 0.55 sak 42,000.00 23,100.00     c Pasir pasang 0.09 m3 68,000.00 6,120.00     d Pembantu tukang 0.65 org 40,000.00 26,000.00     e Tukang batu 0.20 org 55,000.00 11,000.00     Jumlah 150,220.00     Dibulatkan 150,200.00   3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 5 Ps    a Bata merah 140.00 bh 600.00 84,000.00     b Semen PC (abu-abu) 0.45 sak 42,000.00 18,900.00     c Pasir pasang 0.10 m3 68,000.00 6,800.00     d Pembantu tukang 0.65 org 40,000.00 26,000.00     e Tukang batu 0.20 org 55,000.00 11,000.00     Jumlah 146,700.00     Dibulatkan 146,700.00   4 1 M2 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 3 Ps    a Bata merah 70.00 bh 600.00 42,000.00

Page 27: Analisa Harga Satuan Pekerjaan Makasar

    b Semen PC (abu-abu) 0.29 sak 42,000.00 12,180.00     c Pasir pasang 0.04 m3 68,000.00 2,720.00     d Pembantu tukang 0.32 org 40,000.00 12,800.00     e Tukang batu 0.10 org 55,000.00 5,500.00     Jumlah 75,200.00     Dibulatkan 75,200.00   5 1 M2 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 4 Ps    a Bata merah 70.00 bh 600.00 42,000.00     b Semen PC (abu-abu) 0.25 sak 42,000.00 10,500.00     c Pasir pasang 0.05 m3 68,000.00 3,400.00     d Pembantu tukang 0.32 org 40,000.00 12,800.00     e Tukang batu 0.10 org 55,000.00 5,500.00     Jumlah 74,200.00     Dibulatkan 74,200.00   6 1 M2 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 5 Ps    a Bata merah 70.00 bh 600.00 42,000.00     b Semen PC (abu-abu) 0.22 sak 42,000.00 9,240.00     c Pasir pasang 0.05 m3 68,000.00 3,400.00     d Pembantu tukang 0.32 org 40,000.00 12,800.00     e Tukang batu 0.10 org 55,000.00 5,500.00     Jumlah 72,940.00     Dibulatkan 72,900.00   7 1 M2 PASANG DINDING BATA ROOSTER / BATA TERAWANG     a Rooster / Terawang ukuran 12 x 11 x 24 37.00 bh 4,100.00 151,700.00     b Semen PC (abu-abu) 0.27 sak 42,000.00 11,340.00     c Pasir pasang 0.04 m3 68,000.00 2,720.00     d Pembantu tukang 0.30 org 40,000.00 12,000.00     e Tukang batu 0.10 org 55,000.00 5,500.00     Jumlah 183,260.00     Dibulatkan 183,200.00

Page 28: Analisa Harga Satuan Pekerjaan Makasar

  8 1 M2 PASANG DINDING GLASSBLOCK    a Glassblock ukuran 18 x 18 cm 30.00 bh 20,000.00 600,000.00     b Semen putih 0.27 sak 12,700.00 3,429.00     c Pembantu tukang 0.30 org 40,000.00 12,000.00     d Tukang batu 0.10 org 55,000.00 5,500.00     Jumlah 620,929.00     Dibulatkan 620,900.00   9 1 M2 PASANGAN BATACO PUTIH, CAMPURAN 1 Pc : 5 Ps    a Bataco putih 15.00 bh 4,200.00 63,000.00     b Semen PC (abu-abu) 0.25 sak 42,000.00 10,500.00     c Pasir pasang 0.03 m3 68,000.00 2,040.00     d Pembantu tukang 0.30 org 40,000.00 12,000.00     e Tukang batu 0.15 org 55,000.00 8,250.00     Jumlah 95,790.00     Dibulatkan 95,700.00   10 1 M2 PASANGAN BATACO PRES SEMEN, CAMPURAN 1 Pc : 5 Ps    a Bataco press semen 15.00 bh 4,300.00 64,500.00     b Semen PC (abu-abu) 0.20 sak 42,000.00 8,400.00     c Pasir pasang 0.02 m3 68,000.00 1,360.00     d Pembantu tukang 0.30 org 40,000.00 12,000.00     e Tukang batu 0.15 org 55,000.00 8,250.00     Jumlah 94,510.00     Dibulatkan 94,500.00   11 1 M2 PASANGAN BATA RINGAN ( HEBEL/CELCON ).    a Bata Ringan ( hebel/celcon ) 8.00 bh 3,800.00 30,400.00     b Semen Instan 11.45 kg 2,450.00 28,052.50     c Pembantu tukang 0.30 org 40,000.00 12,000.00     d Tukang batu 0.20 org 55,000.00 11,000.00     Jumlah 81,452.50     Dibulatkan 81,400.00

Page 29: Analisa Harga Satuan Pekerjaan Makasar

VI PEKERJAAN PLESTERAN/ACCI  1 1 M2 PLESTERAN CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cm    a Semen PC (abu-abu) 0.14 sak 42,000.00 5,880.00     b Pasir pasang 0.02 m3 68,000.00 1,360.00     c Pembantu tukang 0.20 org 40,000.00 8,000.00     d Tukang batu 0.15 org 55,000.00 8,250.00     Jumlah 23,490.00     Dibulatkan 23,400.00   2 1 M2 PLESTERAN CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm    a Semen PC (abu-abu) 0.13 sak 42,000.00 5,460.00     b Pasir pasang 0.02 m3 68,000.00 1,360.00     c Pembantu tukang 0.20 org 40,000.00 8,000.00     d Tukang batu 0.15 org 55,000.00 8,250.00     Jumlah 23,070.00     Dibulatkan 23,000.00   3 1 M2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 1,5 cm    a Semen PC (abu-abu) 0.10 sak 42,000.00 4,200.00     b Pasir pasang 0.02 m3 68,000.00 1,360.00     c Pembantu tukang 0.20 org 40,000.00 8,000.00     d Tukang batu 0.15 org 55,000.00 8,250.00     Jumlah 21,810.00     Dibulatkan 21,800.00   4 1 M2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm    a Semen PC (abu-abu) 0.09 sak 42,000.00 3,780.00     b Pasir pasang 0.02 m3 68,000.00 1,360.00     c Pembantu tukang 0.20 org 40,000.00 8,000.00     d Tukang batu 0.15 org 55,000.00 8,250.00     Jumlah 21,390.00

Page 30: Analisa Harga Satuan Pekerjaan Makasar

    Dibulatkan 21,300.00   5 1 M2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 2,0 cm    a Semen PC (abu-abu) 0.17 sak 42,000.00 7,140.00     b Pasir pasang 0.03 m3 68,000.00 2,040.00     c Pembantu tukang 0.22 org 40,000.00 8,800.00     d Tukang batu 0.16 org 55,000.00 8,800.00     Jumlah 26,780.00     Dibulatkan 26,700.00   6 1 M2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 2,0 cm    a Semen PC (abu-abu) 0.15 sak 42,000.00 6,300.00     b Pasir pasang 0.03 m3 68,000.00 2,040.00     c Pembantu tukang 0.25 org 40,000.00 10,000.00     d Tukang batu 0.20 org 55,000.00 11,000.00     Jumlah 29,340.00     Dibulatkan 29,300.00   7 1 M2 BERAPEN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cm    a Semen PC (abu-abu) 0.11 sak 42,000.00 4,620.00     b Pasir pasang 0.03 m3 68,000.00 1,700.00     c Pembantu tukang 0.15 org 40,000.00 6,000.00     d Tukang batu 0.07 org 55,000.00 3,850.00     Jumlah 16,170.00     Dibulatkan 16,100.00   8 1 M2 PLESTERAN BETON CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cm    a Semen PC (abu-abu) 0.19 sak 42,000.00 7,980.00     b Pasir pasang 0.02 m3 68,000.00 1,360.00     c Pembantu tukang 0.26 org 40,000.00 10,400.00     d Tukang batu 0.20 org 55,000.00 11,000.00     Jumlah 30,740.00     Dibulatkan 30,700.00   9 1 M2 PLESTERAN BETON CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm

Page 31: Analisa Harga Satuan Pekerjaan Makasar

    a Semen PC (abu-abu) 0.15 sak 42,000.00 6,300.00     b Pasir pasang 0.02 m3 68,000.00 1,360.00     c Pembantu tukang 0.26 org 40,000.00 10,400.00     d Tukang batu 0.20 org 55,000.00 11,000.00     Jumlah 29,060.00     Dibulatkan 29,000.00   10 1 M2 PLESTERAN SKONENG CAMPURAN 1 Pc : 2 Ps     a Semen PC (abu-abu) 0.01 sak 42,000.00 420.00     b Pasir pasang 0.01 m3 68,000.00 680.00     c Pembantu tukang 0.06 org 40,000.00 2,400.00     d Tukang batu 0.04 org 55,000.00 2,200.00     Jumlah 5,700.00     Dibulatkan 5,700.00   11 1 M2 ACCIAN PLESTERAN    a Semen PC (abu-abu) 0.08 sak 42,000.00 3,360.00     b Pembantu tukang 0.14 org 40,000.00 5,600.00     c Tukang batu 0.11 org 55,000.00 6,050.00     Jumlah 15,010.00     Dibulatkan 15,000.00   12 1 M2 PLESTERAN SIAR CAMPURAN 1 Pc : 2 Ps     a Semen PC (abu-abu) 0.09 sak 42,000.00 3,780.00     b Pasir pasang 0.02 m3 68,000.00 1,360.00     c Pembantu tukang 0.15 org 40,000.00 6,000.00     d Tukang batu 0.07 org 55,000.00 3,850.00     Jumlah 14,990.00     Dibulatkan 14,900.00

VII PEKERJAAN PELAPIS LANTAI  1 1 M2 PASANG LANTAI KERAMIK UKURAN 40 x 40 cm POLISHED

Page 32: Analisa Harga Satuan Pekerjaan Makasar

    a Keramik ukuran 40 x 40 cm 1.00 m2 246,000.00 246,000.00     b Semen PC (abu-abu) 0.16 sak 42,000.00 6,720.00     c Pasir pasang 0.02 m3 68,000.00 1,462.00     d Semen warna 0.02 kg 12,700.00 254.00     e Pembantu tukang 0.25 org 40,000.00 10,000.00     f Tukang batu 0.12 org 55,000.00 6,600.00     Jumlah 271,036.00     Dibulatkan 271,030.00   2 1 M2 PASANG LANTAI KERAMIK UKURAN 40 x 40 cm UNPOLISH    a Keramik ukuran 40 x 40 cm 1.00 m2 205,000.00 205,000.00     b Semen PC (abu-abu) 0.16 sak 42,000.00 6,720.00     c Pasir pasang 0.02 m3 68,000.00 1,360.00     d Semen warna 0.02 kg 12,700.00 254.00     e Pembantu tukang 0.26 org 40,000.00 10,400.00     f Tukang batu 0.13 org 55,000.00 6,875.00     Jumlah 230,609.00     Dibulatkan 230,600.00   3 1 M2 PASANG LANTAI KERAMIK UKURAN 60 x 60 cm     a Keramik ukuran 60 x 60 cm 1.00 m2 290,000.00 290,000.00     b Semen PC (abu-abu) 0.18 sak 42,000.00 7,560.00     c Pasir pasang 0.02 m3 68,000.00 1,462.00     d Semen warna 0.01 kg 12,700.00 165.10     e Pembantu tukang 0.25 org 40,000.00 10,000.00     f Tukang batu 0.12 org 55,000.00 6,600.00     Jumlah 315,787.10     Dibulatkan 315,780.00   4 1 M2 PASANG LANTAI KERAMIK UKURAN 60 x 90 cm     a Keramik ukuran 60 x 90 cm 1.00 m2 336,000.00 336,000.00     b Semen PC (abu-abu) 0.17 sak 42,000.00 7,140.00     c Pasir pasang 0.02 m3 68,000.00 1,462.00

Page 33: Analisa Harga Satuan Pekerjaan Makasar

    d Semen warna 0.02 kg 12,700.00 254.00     e Pembantu tukang 0.26 org 40,000.00 10,400.00     f Tukang batu 0.14 org 55,000.00 7,700.00     Jumlah 362,956.00     Dibulatkan 362,950.00   5 1 M2 PASANG LANTAI KERAMIK 10 x 20 cm    a Keramik lantai 10 x 20 cm 1.00 m2 32,000.00 32,000.00     b Semen PC ( abu-abu ) 0.18 sak 42,000.00 7,560.00     c Pasir pasang 0.02 m3 68,000.00 1,360.00     d Semen warna 0.02 kg 12,700.00 254.00     e Pembantu tukang 0.22 org 40,000.00 8,800.00     f Tukang batu 0.40 org 55,000.00 22,000.00     Jumlah 71,974.00     Dibulatkan 71,970.00   6 1 M2 PASANG LANTAI KERAMIK POLOS 20 x 20 cm    a Keramik polos 20 x 20 cm 1.00 m2 38,000.00 38,000.00     b Semen PC (abu-abu) 0.17 sak 42,000.00 7,140.00     c Pasir pasang 0.02 m3 68,000.00 1,462.00     d Semen warna 0.02 kg 12,700.00 254.00     e Pembantu tukang 0.30 org 40,000.00 12,000.00     f Tukang batu 0.15 org 55,000.00 8,250.00     Jumlah 67,106.00     Dibulatkan 67,100.00   7 1 M2 PASANG LANTAI KERAMIK MOTIF 20 x 20 cm    a Keramik motif 20 x 20 cm 1.00 m2 38,000.00 38,000.00     b Semen PC (abu-abu) 0.17 sak 42,000.00 7,140.00     c Pasir pasang 0.02 m3 68,000.00 1,462.00     d Semen warna 0.02 kg 12,700.00 254.00     e Pembantu tukang 0.30 org 40,000.00 12,000.00     f Tukang batu 0.15 org 55,000.00 8,250.00

Page 34: Analisa Harga Satuan Pekerjaan Makasar

    Jumlah 67,106.00     Dibulatkan 67,100.00   8 1 M2 PASANG LANTAI KERAMIK POLOS 30 x 30 cm    a Keramik polos 30 x 30 cm 1.00 m2 38,500.00 38,500.00     b Semen PC (abu-abu) 0.16 sak 42,000.00 6,720.00     c Pasir pasang 0.02 m3 68,000.00 1,360.00     d Semen warna 0.02 kg 12,700.00 254.00     e Pembantu tukang 0.25 org 40,000.00 10,000.00     f Tukang batu 0.12 org 55,000.00 6,600.00     Jumlah 63,434.00     Dibulatkan 63,430.00   9 1 M2 PASANG LANTAI KERAMIK MOTIF 30 x 30 cm    a Keramik motif 30 x 30 cm 1.00 m2 41,000.00 41,000.00     b Semen PC (abu-abu) 0.16 sak 42,000.00 6,720.00     c Pasir pasang 0.02 m3 68,000.00 1,360.00     d Semen warna 0.02 kg 12,700.00 254.00     e Pembantu tukang 0.25 org 40,000.00 10,000.00     f Tukang batu 0.12 org 55,000.00 6,600.00     Jumlah 65,934.00     Dibulatkan 65,930.00   10 1 M2 PASANG LANTAI MARMER    a marmer standar 1.00 m2 200,000.00 200,000.00     b Semen PC (abu-abu) 0.48 sak 42,000.00 20,160.00     c Pasir pasang 0.10 m3 68,000.00 6,800.00     d Semen warna 0.20 sak 12,700.00 2,540.00     e Pembantu tukang 0.62 org 40,000.00 24,800.00     f Tukang batu 0.35 org 55,000.00 19,250.00     Jumlah 273,550.00     Dibulatkan 273,550.00   11 1 M2 PASANG LANTAI PARQUET JATI

Page 35: Analisa Harga Satuan Pekerjaan Makasar

    a Parquet jati 1.05 m2 278,000.00 291,900.00     b Lem vinyl 0.60 kg 35,000.00 21,000.00     c Pembantu tukang 0.65 org 40,000.00 26,000.00     d Tukang 0.35 org 55,000.00 19,250.00     Jumlah 358,150.00     Dibulatkan 358,150.00   12 1 M2 PASANG LANTAI GRANIT    a Granit standar 1.00 m2 750,000.00 750,000.00     b Semen PC (abu-abu) 0.48 sak 42,000.00 20,160.00     c Pasir pasang 0.08 m3 68,000.00 5,440.00     d Semen warna 0.10 sak 12,700.00 1,270.00     e Pembantu tukang 0.60 org 40,000.00 24,000.00     f Tukang batu 0.48 org 55,000.00 26,400.00     Jumlah 827,270.00     Dibulatkan 827,270.00

VIII PEKERJAAN PELAPIS DINDING  1 1 M2 PASANG DINDING KERAMIK MOTIF 10 x 20 cm    a Keramik motif 10 x 20 cm 1.00 m2 38,000.00 38,000.00     b Semen PC ( abu-abu ) 0.18 sak 42,000.00 7,560.00     c Pasir pasang 0.02 m3 68,000.00 1,360.00     d Semen warna 0.02 kg 12,700.00 254.00     e Pembantu tukang 0.22 org 40,000.00 8,800.00     f Tukang batu 0.40 org 55,000.00 22,000.00     Jumlah 77,974.00     Dibulatkan 77,970.00   2 1 M2 PASANG DINDING KERAMIK POLOS 10 x 20 cm    a Keramik polos 10 x 20 cm 1.00 m2 34,000.00 34,000.00

Page 36: Analisa Harga Satuan Pekerjaan Makasar

    b Semen PC ( abu-abu ) 0.18 sak 42,000.00 7,560.00     c Pasir pasang 0.02 m3 68,000.00 1,360.00     d Semen warna 0.02 kg 12,700.00 254.00     e Pembantu tukang 0.22 org 40,000.00 8,800.00     f Tukang batu 0.40 org 55,000.00 22,000.00     Jumlah 73,974.00     Dibulatkan 73,970.00   3 1 M2 PASANG DINDING KERAMIK MOTIF 20 x 20 cm    a Keramik motif 20 x 20 cm 1.00 m2 38,000.00 38,000.00     b Semen PC ( abu-abu ) 0.17 sak 42,000.00 7,140.00     c Pasir pasang 0.02 m3 68,000.00 1,360.00     d Semen warna 0.02 kg 12,700.00 254.00     e Pembantu tukang 0.20 org 40,000.00 8,000.00     f Tukang batu 0.39 org 55,000.00 21,450.00     Jumlah 76,204.00     Dibulatkan 76,200.00   4 1 M2 PASANG DINDING KERAMIK POLOS 20 x 20 cm    a Keramik polos 20 x 20 cm 1.00 m2 38,000.00 38,000.00     b Semen PC ( abu-abu ) 0.17 sak 42,000.00 7,140.00     c Pasir pasang 0.02 m3 68,000.00 1,360.00     d Semen warna 0.02 kg 12,700.00 254.00     e Pembantu tukang 0.20 org 40,000.00 8,000.00     f Tukang batu 0.39 org 55,000.00 21,450.00     Jumlah 76,204.00     Dibulatkan 76,200.00   5 1 M2 PASANG DINDING KERAMIK POLOS 20 x 25 cm    a Keramik polos 20 x 25 cm 1.00 m2 38,000.00 38,000.00     b Semen PC ( abu-abu ) 0.16 sak 42,000.00 6,720.00     c Pasir pasang 0.02 m3 68,000.00 1,224.00     d Semen warna 0.01 kg 12,700.00 165.10

Page 37: Analisa Harga Satuan Pekerjaan Makasar

    e Pembantu tukang 0.19 org 40,000.00 7,500.00     f Tukang batu 0.38 org 55,000.00 20,625.00     Jumlah 74,234.10     Dibulatkan 74,230.00   6 1 M2 PASANG DINDING KERAMIK MOTIF 20 x 25 cm    a Keramik motif 20 x 25 cm 1.00 m2 39,000.00 39,000.00     b Semen PC ( abu-abu ) 0.16 sak 42,000.00 6,720.00     c Pasir pasang 0.02 m3 68,000.00 1,224.00     d Semen warna 0.01 kg 12,700.00 165.10     e Pembantu tukang 0.19 org 40,000.00 7,500.00     f Tukang batu 0.38 org 55,000.00 20,625.00     Jumlah 75,234.10     Dibulatkan 75,230.00   7 1 M2 PASANG DINDING MARMER    a Marmer standar 1.00 m2 200,000.00 200,000.00     b Paku sekrup 4.00 bh 750.00 3,000.00     c Semen PC ( abu-abu ) 0.25 sak 42,000.00 10,500.00     d Pasir pasang 0.03 m3 68,000.00 1,700.00     e Semen warna 1.50 kg 12,700.00 19,050.00     f Kawat ikat 0.03 kg 19,000.00 475.00     g Paku 0.03 kg 14,700.00 367.50     h Pembantu tukang 0.72 org 40,000.00 28,800.00     i Tukang batu 0.65 org 55,000.00 35,750.00     Jumlah 299,642.50     Dibulatkan 299,640.00   8 1 M2 PASANG DINDING GRANIT    a Granit standar 1.00 m2 750,000.00 750,000.00     b Paku sekrup 2.00 bh 750.00 1,500.00     c Semen PC ( abu-abu ) 0.25 sak 42,000.00 10,500.00     d Pasir pasang 0.03 m3 68,000.00 1,700.00

Page 38: Analisa Harga Satuan Pekerjaan Makasar

    e Semen warna 1.50 kg 12,700.00 19,050.00     f Kawat ikat 0.03 kg 19,000.00 475.00     g Paku 0.03 kg 14,700.00 367.50     h Pembantu tukang 0.72 org 40,000.00 28,800.00     i Tukang batu 0.65 org 55,000.00 35,750.00     Jumlah 848,142.50     Dibulatkan 848,140.00   9 1 M2 PASANG DINDING BATU TEMPEL HITAM    a Batu tempel hitam 1.00 m2 140,000.00 140,000.00     b Semen PC ( abu-abu ) 0.24 sak 42,000.00 10,080.00     c Pasir pasang 0.04 m3 68,000.00 2,380.00     d Pembantu tukang 0.32 org 40,000.00 12,800.00     e Tukang batu 0.25 org 55,000.00 13,750.00     Jumlah 179,010.00     Dibulatkan 179,010.00   10 1 M2 PASANG DINDING BATU ALAM    a Batu alam 1.00 m2 185,000.00 185,000.00     b Semen PC ( abu-abu ) 0.25 sak 42,000.00 10,500.00     c Pasir pasang 0.04 m3 68,000.00 2,380.00     d Pembantu tukang 0.32 org 40,000.00 12,800.00     e Tukang batu 0.25 org 55,000.00 13,750.00     Jumlah 224,430.00     Dibulatkan 224,430.00   11 1 M¹ PASANG PLINT KERAMIK UKURAN 10 x 40 cm    a Plint Keramik ukuran 10 x 40 cm 2.65 bh 9,000.00 23,850.00     b Semen PC (abu-abu) 0.02 sak 42,000.00 840.00     c Pasir pasang 0.01 m3 68,000.00 680.00     d Semen warna 0.10 kg 12,700.00 1,270.00     e Pembantu tukang 0.06 org 40,000.00 2,400.00     f Tukang batu 0.03 org 55,000.00 1,650.00

Page 39: Analisa Harga Satuan Pekerjaan Makasar

    Jumlah 30,690.00     Dibulatkan 30,690.00   12 1 m¹ PASANG PLINT KERAMIK UKURAN 10 x 30 cm    a Plint Keramik ukuran 10 x 30 cm 3.30 bh 7,500.00 24,750.00     b Semen PC (abu-abu) 0.02 sak 42,000.00 840.00     c Pasir pasang 0.01 m3 68,000.00 680.00     d Semen warna 0.12 kg 12,700.00 1,524.00     e Pembantu tukang 0.06 org 40,000.00 2,400.00     f Tukang batu 0.03 org 55,000.00 1,650.00     Jumlah 31,844.00     Dibulatkan 31,840.00

IX PEKERJAAN KUSEN, PINTU, JENDELA, PARTISI  1 1 M3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER SAMARINDA    a Balok kayu kamper samarinda 1.20 m3 5,766,800.00 6,920,160.00     b Pembantu tukang 6.00 org 40,000.00 240,000.00     c Tukang kayu 15.00 org 55,000.00 825,000.00     Jumlah 7,985,160.00     Dibulatkan 7,985,160.00   2 1 M3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER MEDAN / KRUING    a Balok kayu kamper medan 1.20 m3 3,950,000.00 4,740,000.00     b Pembantu tukang 6.00 org 40,000.00 240,000.00     c Tukang kayu 15.00 org 55,000.00 825,000.00     Jumlah 5,805,000.00     Dibulatkan 5,805,000.00   3 1 M3 PASANG KUSEN PINTU & JENDELA KAYU BORNEO SUPER    a Kayu balok borneo super 1.20 m3 3,600,000.00 4,320,000.00     b Pembantu tukang 6.00 org 40,000.00 240,000.00

Page 40: Analisa Harga Satuan Pekerjaan Makasar

    c Tukang kayu 15.00 org 55,000.00 825,000.00     Jumlah 5,385,000.00     Dibulatkan 5,385,000.00   4 1 M2 PASANG PINTU PANEL KAYU KAMPER SAMARINDA    a Papan kayu kamper samarinda 0.04 m3 5,000,000.00 200,000.00     b Pembantu tukang 1.00 org 40,000.00 40,000.00     c Tukang kayu 2.50 org 55,000.00 137,500.00     Jumlah 377,500.00     Dibulatkan 377,500.00   5 1 M2 PASANG PINTU PANEL KAYU KAMPER MEDAN / KRUING    a Papan kayu kamper medan 0.04 m3 3,800,000.00 152,000.00     b Pembantu tukang 1.00 org 40,000.00 40,000.00     c Tukang kayu 2.50 org 55,000.00 137,500.00     Jumlah 329,500.00     Dibulatkan 329,500.00   6 1 M2 PASANG PINTU DAN JENDELA KACA KAYU KAMPER MEDAN    a Papan kayu kamper medan 0.04 m3 3,800,000.00 154,000.00     b Pembantu tukang 0.80 org 40,000.00 57,750.00     c Tukang kayu 2.00 org 55,000.00 154,000.00     Jumlah 365,750.00     Dibulatkan 365,700.00   7 1 M2 PASANG PINTU DAN JENDELA KACA KAYU BORNEO    a Papan kayu borneo super 0.04 m3 4,000,000.00 47,040.00     b Pembantu tukang 0.80 org 40,000.00 16,000.00     c Tukang kayu 2.00 org 55,000.00 110,000.00     Jumlah 173,040.00     Dibulatkan 173,000.00   8 1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU KAMPER MEDAN    a Papan kayu Kamper Medan 0.06 m3 3,800,000.00 243,200.00     b Pembantu tukang 1.00 org 40,000.00 40,000.00

Page 41: Analisa Harga Satuan Pekerjaan Makasar

    c Tukang kayu 3.00 org 55,000.00 165,000.00     Jumlah 448,200.00     Dibulatkan 448,200.00   9 1 M2 PASANG PINTU TRIPLEK RANGKAP , RANGKA KAYU KAMPER MEDAN    a Papan kayu kamper medan 0.02 m3 3,800,000.00 74,480.00     b Paku 1 s/d 5 cm 0.03 kg 14,700.00 441.00     c Lem Kayu 0.30 Ltr 28,000.00 8,400.00     d Triplek 0,4 cm ukuran pintu 1.00 lbr 47,500.00 47,500.00     e Pembantu tukang 0.60 org 40,000.00 24,000.00     f Tukang kayu 2.00 org 55,000.00 110,000.00     Jumlah 264,821.00     Dibulatkan 264,800.00   10 1 M2 PASANG JALUSI MATI KUSEN KAYU KAMPER MEDAN    a Papan kayu kamper medan 0.06 m3 3,800,000.00 228,000.00     b Paku 1 s/d 5 cm 0.15 kg 14,700.00 2,205.00     c Pembantu tukang 0.50 org 40,000.00 20,000.00     d Tukang kayu 2.00 org 55,000.00 110,000.00     Jumlah 360,205.00     Dibulatkan 360,200.00   11 1 M2 PASANG PINTU TRIPLEK RANGKAP , RANGKA KAYU BORNEO SUPER    a Papan kayu borneo super 0.02 m3 4,000,000.00 78,400.00     b Paku 1 s/d 5 cm 0.03 kg 14,700.00 441.00     c Lem kayu 0.30 Ltr 28,000.00 8,400.00     d Triplek 0,4 cm ukuran pintu 1.00 lbr 47,500.00 47,500.00     e Pembantu tukang 0.60 org 40,000.00 24,000.00     f Tukang kayu 2.00 org 55,000.00 110,000.00     Jumlah 268,741.00     Dibulatkan 268,700.00   12 1 M2 PASANG PINTU TEAKWOOD RANGKAP , RANGKA KAYU KAMPER MEDAN    a Papan kayu Kamper Medan 0.02 m3 3,800,000.00 74,480.00

Page 42: Analisa Harga Satuan Pekerjaan Makasar

    b Paku 1 s/d 5 cm 0.30 kg 14,700.00 4,410.00     c Lem Kayu 0.30 Ltr 28,000.00 8,400.00     d Teakwood 120 x 240 x 0,4 cm 1.00 lbr 80,000.00 80,000.00     e Pembantu tukang 0.60 org 40,000.00 24,000.00     f Tukang kayu 2.00 org 55,000.00 110,000.00     Jumlah 301,290.00     Dibulatkan 301,200.00   13 1 M2 PASANG PINTU TRIPLEK & FORMIKA RANGKA KAYU KAMPER MEDAN    a Papan kayu kamper medan 0.02 m3 3,800,000.00 74,480.00     b Paku 1 s/d 5 cm 0.30 kg 14,700.00 4,410.00     c Lem kayu 0.80 Ltr 28,000.00 22,400.00     d Triplek 0,4 cm ukuran pintu 1.00 lbr 47,500.00 47,500.00     e Formica 3" x 6" 0.50 lbr 150,000.00 75,000.00     f Pembantu tukang 0.80 org 40,000.00 32,000.00     g Tukang kayu 2.50 org 55,000.00 137,500.00     Jumlah 393,290.00     Dibulatkan 393,200.00   14 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU KAMPER MEDAN     a Papan kayu kamper medan 0.02 m3 3,800,000.00 74,480.00     b Paku 1 s/d 5 cm 0.30 kg 14,700.00 4,410.00     c Lem Kayu 0.80 Ltr 28,000.00 22,400.00     d Teakwood 120 x 240 x 0,4 cm 0.50 lbr 80,000.00 40,000.00     e Vernis 0.50 Ltr 40,000.00 20,000.00     a Formica 4" x 8" 0.50 lbr 150,000.00 75,000.00     b Pembantu tukang 0.80 org 40,000.00 32,000.00     c Tukang kayu 2.50 org 55,000.00 137,500.00     Jumlah 405,790.00     Dibulatkan 405,700.00   15 1 M2 PASANG DINDING PEMISAH DOUBLE TEAKWOOD, RANGKA KAYU KAMPER MEDAN    a Balok kayu Kamper Medan 0.02 m3 3,950,000.00 77,025.00

Page 43: Analisa Harga Satuan Pekerjaan Makasar

    b Papan kayu Kamper Medan 0.01 m3 3,800,000.00 26,600.00     c Paku 5 - 12 cm 0.10 kg 14,700.00 1,470.00     d Lem Kayu 0.56 Ltr 28,000.00 15,680.00     e Teakwood 120 x 240 x 0,4 cm 1.00 lbr 80,000.00 80,000.00     f Pembantu tukang 0.15 org 40,000.00 6,000.00     g Tukang kayu 0.45 org 55,000.00 24,750.00     Jumlah 231,525.00     Dibulatkan 231,500.00   16 1 M2 PASANG DINDING PEMISAH DOUBLE GRC, RANGKA KAYU KAMPER MEDAN    a Balok kayu Kamper Medan 0.02 m3 3,950,000.00 77,025.00     b Papan kayu Kamper Medan 0.01 m3 3,800,000.00 26,600.00     c Paku 5 - 12 cm 0.10 kg 14,700.00 1,470.00     d Lem Kayu 0.56 Ltr 28,000.00 15,680.00     e Triplek 0,4 cm ukuran pintu 1.00 lbr 47,500.00 47,500.00     f Pembantu tukang 0.20 org 40,000.00 8,000.00     g Tukang kayu 0.60 org 55,000.00 33,000.00     Jumlah 209,275.00     Dibulatkan 209,200.00   17 1 BH PASANG PINTU ALUMINIUM / PINTU PVC    a Pintu Aluminium / Pintu PVC 1.00 bh 400,000.00 400,000.00     b Alat bantu 10 % harga material 1.00 ls 40,000.00 40,000.00     c Tukang kayu 0.02 org 55,000.00 1,155.00     Jumlah 441,155.00     Dibulatkan 441,100.00   18 1 M2 PASANG KUSEN PARTISI DOUBLE TRIPLEK     a Balok kayu borneo super 0.11 m3 3,600,000.00 378,000.00     b Triplek 0,4 cm ukuran pintu 5.00 lbr 47,500.00 237,500.00     c Paku 1 s/d 3 cm 2.00 kg 14,700.00 29,400.00     d Ampelas 2.00 lbr 2,500.00 5,000.00     e Engsel 4.00 bh 25,000.00 100,000.00

Page 44: Analisa Harga Satuan Pekerjaan Makasar

    f Grendel / slot 4.00 bh 32,500.00 130,000.00     g Pembantu tukang 0.30 org 40,000.00 12,000.00     h Tukang kayu terampil 1.30 org 55,000.00 71,500.00     Jumlah 963,400.00     Dibulatkan 129,530.00   19 1 M2 PASANG KUSEN PARTISI DOUBLE GYPSUM + RANGKA KAYU    a Balok kayu borneo super 0.11 m3 3,600,000.00 378,000.00     b Gypsum board ( 120 x 240 x 9 ) mm 0.72 lbr 78,000.00 56,160.00     c Paku 1 s/d 3 cm 2.00 kg 14,700.00 29,400.00     d Ampelas 2.00 lbr 2,500.00 5,000.00     e Engsel 4.00 bh 25,000.00 100,000.00     f Grendel / Slot 4.00 bh 32,500.00 130,000.00     g Pembantu tukang 0.30 org 40,000.00 12,000.00     h Tukang kayu 1.30 org 55,000.00 71,500.00     Jumlah 782,060.00     Dibulatkan 129,530.00   20 1 M2 PASANG DINDING PARTISI GYPSUM BOARD + RANGKA BESI HOLLOW    a Hollow 4/4 Zincromate 0.42 btg 48,000.00 20,160.00     b Hollow 2/4 Zincromate 0.15 btg 35,000.00 5,250.00     c Gypsum board ( 120 x 240 x 9 ) mm 0.72 lbr 78,000.00 56,160.00     d Paku sekrup 25.00 bh 750.00 18,750.00     e Ramset / dina bolt 4.00 bh 2,200.00 8,800.00     f Cotton plaster 0.10 bh 58,000.00 5,800.00     g Compoun 0.13 kg 32,000.00 4,160.00     h Pembantu tukang 0.10 org 40,000.00 4,000.00     i Tukang kayu 0.05 org 55,000.00 2,750.00     Jumlah 125,830.00     Dibulatkan 125,830.00

Page 45: Analisa Harga Satuan Pekerjaan Makasar

X PEKERJAAN RANGKA ATAP DAN PENUTUP ATAPA PEKERJAAN RANGKA ATAP  1 1 M3 PEKERJAAN KONSTRUKSI KUDA - KUDA KAYU KAMPER MEDAN    a Balok kayu kamper medan 1.10 m3 3,950,000.00 4,345,000.00     b Besi strip 15.00 kg 17,500.00 262,500.00     c Paku ukuran besar 0.80 kg 14,700.00 11,760.00     d Meni kayu 0.40 kg 16,000.00 6,400.00     e Pembantu tukang 4.00 org 40,000.00 160,000.00     f Tukang kayu 12.00 org 55,000.00 660,000.00     Jumlah 5,445,660.00     Dibulatkan 5,445,600.00   2 1 M3 PEKERJAAN KONSTRUKSI KUDA - KUDA KAYU BORNEO SUPER    a Balok kayu borneo super 1.10 m3 3,600,000.00 3,960,000.00     b Besi strip 15.00 kg 17,500.00 262,500.00     c Paku ukuran besar 0.80 kg 14,700.00 11,760.00     d Meni kayu 0.40 kg 16,000.00 6,400.00     e Pembantu tukang 4.00 org 40,000.00 160,000.00     f Tukang kayu 12.00 org 55,000.00 660,000.00     Jumlah 5,060,660.00     Dibulatkan 5,060,600.00   3 1 M2 PASANG KASO + RENG GENTENG PLENTONG KAYU BORNEO SUPER    a Balok kayu borneo super 0.01 m3 3,600,000.00 43,200.00     b Paku 7 - 10 cm 0.15 kg 14,700.00 2,205.00     c Pembantu tukang 0.10 org 40,000.00 4,000.00     d Tukang kayu 0.10 org 55,000.00 5,500.00     Jumlah 54,905.00     Dibulatkan 54,900.00   4 1 M2 PASANG KASO + RENG GENTENG BETON KAYU BORNEO SUPER

Page 46: Analisa Harga Satuan Pekerjaan Makasar

    a Balok kayu borneo super 0.01 m3 3,600,000.00 50,400.00     b Paku 7 - 10 cm 0.15 kg 14,700.00 2,205.00     c Pembantu tukang 0.10 org 40,000.00 4,000.00     d Tukang kayu 0.10 org 55,000.00 5,500.00     Jumlah 62,105.00     Dibulatkan 62,100.00   5 1 M1 PASANG LISPLANG KAYU KAMPER MEDAN UKURAN 3 X 20 cm     a Papan kayu kamper medan 0.01 m3 3,800,000.00 27,360.00     b Paku 7 - 10 cm 0.05 kg 14,700.00 735.00     c Pembantu tukang 0.10 org 40,000.00 4,000.00     d Tukang kayu 0.20 org 55,000.00 11,000.00     Jumlah 43,095.00     Dibulatkan 43,000.00   6 1 M2 PASANG LISPLANG KAYU KAMPER MEDAN UKURAN 3 X 30 cm     a Papan kayu kamper medan 0.01 m3 3,800,000.00 41,800.00     b Paku 7 - 10 cm 0.05 kg 14,700.00 735.00     c Pembantu tukang 0.11 org 40,000.00 4,400.00     d Tukang kayu 0.22 org 55,000.00 12,100.00     Jumlah 59,035.00     Dibulatkan 59,000.00   7 1 M3 PEKERJAAN NOK/GORDING/JURAY KAYU BORNEO SUPER     a Balok kayu borneo super 1.05 m3 3,600,000.00 3,780,000.00     b Paku 10 - 15 cm 0.20 kg 14,700.00 2,940.00     c Pembantu tukang 2.00 org 40,000.00 80,000.00     d Tukang kayu 2.00 org 55,000.00 110,000.00     Jumlah 3,972,940.00     Dibulatkan 3,972,900.00 B PEKERJAAN PENUTUP ATAP  1 1 M2 PASANG ATAP GENTENG PLENTONG    a Genteng palentong 25.00 bh 800.00 20,000.00

Page 47: Analisa Harga Satuan Pekerjaan Makasar

    b Pembantu tukang 0.15 org 40,000.00 6,000.00     c Tukang kayu 0.08 org 55,000.00 4,125.00     Jumlah 30,125.00      Dibulatkan 30,120.00    2 1 M2 PASANG NOK/BUBUNGAN GENTENG KERAMIK GLAZUR    a Genteng nok/bubungan plentong 5.00 bh 26,500.00 132,500.00     b Semen PC (abu-abu) 0.16 sak 42,000.00 6,720.00     c Pasir pasang 0.03 m3 68,000.00 2,176.00     d Pembantu tukang 0.30 org 40,000.00 12,000.00     e Tukang kayu 0.20 org 55,000.00 11,000.00     Jumlah 164,396.00      Dibulatkan 164,390.00    3 1 M2 PASANG ATAP FIBREGLASS UKURAN 180 X 90 cm    a Atap fibreglass 0.60 lbr 68,000.00 40,800.00     b Paku 2 - 5 cm 0.05 kg 14,700.00 735.00     c Pembantu tukang 0.14 org 40,000.00 5,600.00     d Tukang kayu 0.07 org 55,000.00 3,685.00     Jumlah 50,820.00      Dibulatkan 50,820.00    4 1 M2 PASANG ATAP ASBES GELOMBANG UKURAN 2,70 x 1,05 m TEBAL 4 mm    a Asbes gelombang 0.35 lbr 72,000.00 25,200.00     b Paku payung 0.12 kg 14,700.00 1,764.00     c Pembantu tukang 0.14 org 40,000.00 5,600.00     d Tukang kayu 0.07 org 55,000.00 3,850.00     Jumlah 36,414.00      Dibulatkan 36,410.00    5 1 M2 PASANG ATAP ASBES GELOMBANG UKURAN 2,40 x 1,05 m TEBAL 4 mm    a Asbes gelombang 0.42 lbr 65,000.00 27,300.00     b Paku payung 0.12 kg 14,700.00 1,764.00     c Pembantu tukang 0.14 org 40,000.00 5,600.00

Page 48: Analisa Harga Satuan Pekerjaan Makasar

    d Tukang kayu 0.07 org 55,000.00 3,850.00     Jumlah 38,514.00      Dibulatkan 38,510.00    6 1 M2 PASANG ATAP ASBES GELOMBANG UKURAN 2,70 x 1,02 m TEBAL 5 mm    a Asbes gelombang 0.44 lbr 90,000.00 39,600.00     b Paku payung 0.12 kg 14,700.00 1,764.00     c Pembantu tukang 0.14 org 40,000.00 5,600.00     d Tukang kayu 0.07 org 55,000.00 3,685.00     Jumlah 50,649.00      Dibulatkan 50,640.00    7 1 M2 PASANG ATAP ASBES GELOMBANG UKURAN 2,40 x 1,02 m TEBAL 5 mm    a Asbes gelombang 0.51 lbr 81,000.00 41,310.00     b Paku payung 0.12 kg 14,700.00 1,764.00     c Pembantu tukang 0.14 org 40,000.00 5,600.00     d Tukang kayu 0.07 org 55,000.00 3,685.00     Jumlah 52,359.00      Dibulatkan 52,350.00    8 1 M2 PASANG ATAP ASBES GELOMBANG ( 1,50 x 1,02 m ) x 5 mm    a Asbes gelombang 0.80 lbr 48,000.00 38,400.00     b Paku payung 0.12 kg 14,700.00 1,764.00     c Pembantu tukang 0.14 org 40,000.00 5,600.00     d Tukang kayu 0.07 org 55,000.00 3,850.00     Jumlah 49,614.00      Dibulatkan 49,610.00    9 1 M¹ PASANG ATAP SIRAP    a Genteng sirap 80.00 bh 600.00 48,000.00     b Paku 0.20 kg 14,700.00 2,940.00     c Pembantu tukang 0.10 org 40,000.00 4,000.00     d Tukang kayu 0.20 org 55,000.00 11,000.00     Jumlah 65,940.00  

Page 49: Analisa Harga Satuan Pekerjaan Makasar

    Dibulatkan 65,940.00    10 1 M2 PASANG ATAP GENTENG BETON    a Genteng beton 1.10 bh 65,000.00 71,500.00     b Paku 5 - 12 cm 0.03 kg 14,700.00 441.00     c Pembantu tukang 0.20 org 40,000.00 8,000.00     d Tukang kayu 0.10 org 55,000.00 5,500.00     Jumlah 85,441.00      Dibulatkan 85,440.00    11 1 M2 PASANG ATAP GENTENG METAL + C301    a Genteng metal 1.02 lbr 129,800.00 132,396.00     b Paku 5 - 12 cm 0.20 kg 14,700.00 2,940.00     c Pembantu tukang 0.20 org 40,000.00 8,000.00     d Tukang kayu 0.10 org 55,000.00 5,500.00     Jumlah 148,836.00      Dibulatkan 148,830.00    12 1 M¹ PASANG NOK GENTENG BETON    a Nok genteng beton 3.50 bh 16,000.00 56,000.00     b Paku 5 - 12 cm 0.05 kg 14,700.00 735.00     c Semen PC (abu-abu) 0.22 sak 42,000.00 9,072.00     d Pasir pasang 0.03 m3 68,000.00 2,176.00     e Semen warna 1.00 kg 12,700.00 12,700.00     f Pembantu tukang 0.40 org 40,000.00 16,000.00     g Tukang kayu 0.20 org 55,000.00 11,000.00     Jumlah 107,683.00      Dibulatkan 107,680.00    13 1 M¹ PASANG NOK GENTENG METAL    a Nok genteng metal 1.10 bh 58,000.00 63,800.00     b Paku payung 0.05 kg 14,700.00 735.00     c Pembantu tukang 0.25 org 40,000.00 10,000.00     d Tukang kayu 0.15 org 55,000.00 8,250.00

Page 50: Analisa Harga Satuan Pekerjaan Makasar

    Jumlah 82,785.00      Dibulatkan 82,780.00    14 1 M2 PASANG ATAP SENG GELOMBANG    a Seng gelombang 0.70 lbr 53,800.00 37,660.00     b Paku payung 0.02 kg 14,700.00 294.00     c Pembantu tukang 0.12 org 40,000.00 4,800.00     d Tukang kayu 0.06 org 55,000.00 3,300.00     Jumlah 46,054.00     Dibulatkan 46,050.00   15 1 M2 PASANG NOK SENG UNTUK ATAP SENG GELOMBANG    a Seng plat BJLS 1.05 M1 33,000.00 34,650.00     b Paku payung 0.04 kg 14,700.00 588.00     c Pembantu tukang 0.15 org 40,000.00 6,000.00     d Tukang kayu 0.07 org 55,000.00 3,850.00     Jumlah 45,088.00     Dibulatkan 45,080.00   16 1 M2 PASANG ATAP POLYCARBONATE    a Polycarbonate 1.05 m2 222,000.00 233,100.00     b Besi Hollow 1.50 btg 48,000.00 72,000.00     c Alat bantu 20 % harga material 1.00 ls 46,620.00 46,620.00     d Pembantu tukang 0.15 org 40,000.00 6,000.00     e Tukang kayu 0.05 org 55,000.00 2,750.00     Jumlah 360,470.00     Dibulatkan 360,470.00   17 1 M2 PASANG ALUMINIUM FOIL     a Aluminium foil 1.05 m2 5,600.00 5,880.00     b Alat bantu 20 % harga material 1.00 ls 1,176.00 1,176.00     c Pembantu tukang 0.15 org 40,000.00 6,000.00     d Tukang kayu 0.05 org 55,000.00 2,750.00     Jumlah 15,806.00

Page 51: Analisa Harga Satuan Pekerjaan Makasar

    Dibulatkan 15,800.00

XI PEKERJAAN PENUTUP PLAFON  1 1 M2 PASANG RANGKA PLAFON ( UKRN 0,50 X 1,00 ) M, KAYU BORNEO SUPER    a Balok kayu borneo super 4 x 6 cm 0.01 m3 3,600,000.00 43,200.00     b Paku 5 - 12 cm 0.10 kg 14,700.00 1,470.00     c Pembantu tukang 0.15 org 40,000.00 6,000.00     d Tukang kayu 0.25 org 55,000.00 13,750.00     Jumlah 64,420.00     Dibulatkan 64,400.00   2 1 M2 PLAFON GRC ( 60 X 1,20 ) M, TEBAL 4 MM    a Pelat GRC tebal 4 mm 1.10 lbr 47,500.00 52,250.00     b Paku 1 cm 0.01 kg 14,700.00 147.00     c Pembantu tukang 0.03 org 40,000.00 1,200.00     d Tukang kayu 0.07 org 55,000.00 3,850.00     Jumlah 57,447.00     Dibulatkan 57,440.00   3 1 M2 PLAFON Asbes ( 1,00 x 1,00 ) m, tebal 5 mm    a Pelat asbes tebal 5 mm 1.10 lbr 13,500.00 14,850.00     b Paku 1 cm 0.01 kg 14,700.00 147.00     c Pembantu tukang 0.03 org 40,000.00 1,200.00     d Tukang kayu 0.07 org 55,000.00 3,850.00     Jumlah 20,047.00     Dibulatkan 20,040.00   4 1 M2 PLAFON Akustik ( 60 x 120 ) cm    a Akustik 600 x 1200 x 15 mm 1.50 lbr 78,000.00 117,000.00     b Paku 2 - 5 cm 0.05 kg 14,700.00 735.00     c Pembantu tukang 0.06 org 40,000.00 2,400.00

Page 52: Analisa Harga Satuan Pekerjaan Makasar

    d Tukang kayu 0.10 org 55,000.00 5,500.00     Jumlah 125,635.00     Dibulatkan 125,630.00   5 1 M2 PLAFON AKUSTIK ( 60 X 120 ) CM + RANGKA ALLUMINIUM    a Profil Alluminium "T" 3.60 M¹ 33,000.00 118,800.00     b Kawat seng polos 0.15 kg 19,000.00 2,850.00     c Ramset / dina bolt 1.00 bh 2,200.00 2,200.00     d Akustik 600 x 1200 x 15 mm 1.50 lbr 78,000.00 117,000.00     e Pembantu tukang 0.15 org 40,000.00 6,000.00     f Tukang kayu 0.20 org 55,000.00 11,000.00     Jumlah 257,850.00     Dibulatkan 257,850.00   6 1 M¹ LIST PLAFON PROFIL KAYU    a Listp profil kayu 1.10 M¹ 7,700.00 8,470.00     b Paku 2 cm 0.01 kg 14,700.00 147.00     c Pembantu tukang 0.05 org 40,000.00 2,000.00     d Tukang kayu 0.05 org 55,000.00 2,750.00     Jumlah 13,367.00     Dibulatkan 13,360.00   7 1 M¹ LIST PLAFON KAYU 1/4    a List kayu 1/4 1.10 M¹ 1,925.00 2,117.50     b Paku 2 cm 0.01 kg 14,700.00 147.00     c Pembantu tukang 0.05 org 40,000.00 2,000.00     d Tukang kayu 0.05 org 55,000.00 2,750.00     Jumlah 7,014.50     Dibulatkan 7,010.00   8 1 M2 PLAFON TRIPLEK 4 MM + RANGKA KAYU BORNEO SUPER    a Balok kayu borneo super 0.02 m3 3,600,000.00 82,800.00     b Paku 1- 12 cm 0.06 kg 14,700.00 882.00     c Triplek 120 cm x 240 cm x 0,4 cm 0.39 lbr 47,500.00 18,525.00

Page 53: Analisa Harga Satuan Pekerjaan Makasar

    d Pembantu tukang 0.27 org 40,000.00 10,800.00     e Tukang kayu 0.40 org 55,000.00 22,000.00     Jumlah 135,007.00     Dibulatkan 135,000.00   9 1 M2 PLAFON TEAKWOOD 4 MM + RANGKA KAYU BORNEO SUPER    a Balok kayu borneo super 0.02 m3 3,600,000.00 82,800.00     b Paku 1 - 12 cm 0.06 kg 14,700.00 882.00     c Teakwood 120 cm x 240 cm x 0,4 cm 0.39 lbr 80,000.00 31,200.00     d Pembantu tukang 0.27 org 40,000.00 10,800.00     e Tukang kayu 0.40 org 55,000.00 22,000.00     Jumlah 147,682.00

Dibulatkan 147,680.00   10 1 M2 Plafon PAPAN 10 CM, TEBAL 1 CM + RANGKA KAYU BORNEO SUPER    a Balok kayu borneo super 0.02 m3 3,600,000.00 82,800.00     b Paku 2 - 12 cm 0.20 kg 14,700.00 2,940.00     c Papan kayu kamper 0.02 m3 5,000,000.00 100,000.00     d Pembantu tukang 0.35 org 40,000.00 14,000.00     e Tukang kayu 0.50 org 55,000.00 27,500.00     Jumlah 227,240.00

Dibulatkan 227,240.00   11 1 M2 Plafon GYPSUM BOARD, TEBAL 9 MM + RANGKA BESI HOLLOW    a Hollow 4/4 Zincromate 0.42 btg 48,000.00 19,920.00     b Hollow 2/4 Zincromate 0.15 btg 35,000.00 5,250.00     c Gypsum board ( 120 x 240 x 9 ) mm 0.36 lbr 78,000.00 28,392.00     d Paku sekrup 25.00 bh 750.00 18,750.00     e Ramset / dina bolt 4.00 bh 2,200.00 8,800.00     f Cotton plaster 0.07 bh 58,000.00 4,176.00     g Compoun 0.13 kg 32,000.00 4,000.00     h Pembantu tukang 0.10 org 40,000.00 4,000.00     i Tukang kayu 0.05 org 55,000.00 2,750.00

Page 54: Analisa Harga Satuan Pekerjaan Makasar

    Jumlah 96,038.00     Dibulatkan 96,030.00

           XII PEKERJAAN SANITAIR   1 MEMASANG 1 BUAH KLOSET DUDUK / MONOBLOK    a Kloset duduk / monoblok 1.00 bh 2,350,000.00 2,350,000.00     b Perlengkapan ( 10% hrg kloset )     235,000.00 235,000.00     c Pembantu tukang 3.30 org 40,000.00 132,000.00     d Tukang batu 1.10 org 55,000.00 60,500.00     Jumlah 2,777,500.00     Dibulatkan 2,777,500.00   2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN    a Kloset jongkok porselen 1.00 bh 173,000.00 173,000.00     b Semen PC (abu-abu) 0.12 sak 42,000.00 5,040.00     c Pasir pasang 0.01 m3 68,000.00 680.00     d Pembantu tukang 1.00 org 40,000.00 40,000.00     e Tukang batu 1.50 org 55,000.00 82,500.00     Jumlah 301,220.00     Dibulatkan 301,220.00   3 MEMASANG 1 BUAH URINOIR    a Urinoir 1.00 bh 400,000.00 400,000.00     b Perlengkapan ( 30% hrg urinoir )     120,000.00 120,000.00     c Semen PC (abu-abu) 0.12 sak 42,000.00 5,040.00     d Pasir pasang 0.01 m3 68,000.00 680.00     e Pembantu tukang 1.00 org 40,000.00 40,000.00     f Tukang batu 1.00 org 55,000.00 55,000.00     Jumlah 620,720.00     Dibulatkan 620,720.00   4 MEMASANG 1 BUAH WASTAFEL DINDING    a Wastafel 1.00 bh 215,000.00 215,000.00

Page 55: Analisa Harga Satuan Pekerjaan Makasar

    b Perlengkapan ( 12% hrg kloset )     25,800.00 25,800.00     c Semen PC ( abu-abu ) 0.12 sak 42,000.00 5,040.00     d Pasir pasang 0.01 m3 68,000.00 680.00     e Pembantu tukang 1.20 org 40,000.00 48,000.00     f Tukang batu 1.45 org 55,000.00 79,750.00     Jumlah 374,270.00     Dibulatkan 374,270.00   5 MEMASANG 1 BUAH WASTAFEL KAKI    a Wastafel 1.00 bh 260,000.00 260,000.00     b Perlengkapan ( 12% hrg kloset )     31,200.00 31,200.00     c Semen PC ( abu-abu ) 0.12 sak 42,000.00 5,040.00     d Pasir pasang 0.01 m3 68,000.00 680.00     e Pembantu tukang 1.20 org 40,000.00 48,000.00     f Tukang batu 1.45 org 55,000.00 79,750.00     Jumlah 424,670.00     Dibulatkan 424,670.00   6 MEMASANG 1 BH SHOWER DINDING    a Shower dinding 1.00 bh 145,000.00 145,000.00     b Pembantu tukang 0.01 org 40,000.00 400.00     c Tukang batu 0.10 org 55,000.00 5,500.00     Jumlah 150,900.00     Dibulatkan 150,900.00   7 MEMASANG BAK MANDI FIBERGLASS UKURAN SEDANG    a Bak fibreglass 1.00 bh 182,000.00 182,000.00     b Perlengkapan ( 20% hrg bak )     32,760.00 32,760.00     c Pembantu tukang 1.80 org 40,000.00 72,000.00     d Tukang batu 2.70 org 55,000.00 148,500.00     Jumlah 435,260.00     Dibulatkan 435,260.00   8 MEMASANG BAK KONTROL PASANGAN BATU BATA UKURAN 30 X 30 CM, TINGGI 35 CM

Page 56: Analisa Harga Satuan Pekerjaan Makasar

    a Batu bata 0.15 m3 600.00 90.00     b Semen PC (abu-abu) 0.88 sak 42,000.00 36,960.00     c Pasir pasang 0.07 m3 68,000.00 4,760.00     d Batu kerikil 0.07 m3 185,000.00 12,950.00     e Besi beton 1.60 kg 16,300.00 26,080.00     f Pasir beton 0.06 m3 72,000.00 4,320.00     g Pembantu tukang 3.20 org 40,000.00 128,000.00     h Tukang batu 1.02 org 55,000.00 56,100.00     Jumlah 269,260.00     Dibulatkan 269,260.00   9 MEMASANG KICHEN ZINK/BAK CUCI PIRING STAINLESS STEEL    a Bak cuci stainless steel 1.00 bh 192,000.00 192,000.00     b Water Drain + Asesories 1.00 Set 85,000.00 85,000.00     c Pembantu tukang 0.03 org 40,000.00 1,200.00     d Tukang batu 0.30 org 55,000.00 16,500.00     Jumlah 294,700.00     Dibulatkan 294,700.00   10 MEMASANG 1 BH KRAN DIAMETER 3/4 " ATAU 1/2 "    a Kran air 1.00 bh 56,000.00 56,000.00     b Perlengkapan ( 2% hrg kran ) 1.00 ls 1,120.00 1,120.00     c Pembantu tukang 0.01 org 40,000.00 400.00     d Tukang batu 0.10 org 55,000.00 5,500.00     Jumlah 63,020.00     Dibulatkan 63,020.00   11 MEMASANG 1 BH KRAN AIR ANGSA    a Kran air angsa 1.00 bh 155,500.00 155,500.00     b Perlengkapan ( 2% hrg kran ) 1.00 ls 3,110.00 3,110.00     c Pembantu tukang 0.01 org 40,000.00 400.00     d Tukang batu 0.10 org 55,000.00 5,500.00     Jumlah 164,510.00

Page 57: Analisa Harga Satuan Pekerjaan Makasar

    Dibulatkan 164,510.00   12 MEMASANG 1 BH FLOOR DRAIN    a Floor drain 1.00 bh 63,000.00 63,000.00     b Pembantu tukang 0.01 org 40,000.00 400.00     c Tukang batu 0.10 org 55,000.00 5,500.00     Jumlah 68,900.00     Dibulatkan 68,900.00   13 MEMASANG 1 BH TEMPAT SABUN    a Tempat Sabun 1.00 bh 33,000.00 33,000.00     b Pembantu tukang 0.01 org 40,000.00 400.00     c Tukang batu 0.10 org 55,000.00 5,500.00     Jumlah 38,900.00     Dibulatkan 38,900.00

               XIII PEKERJAAN PERPIPAAN DAN POMPA  1 MEMASANG 1 M¹ PIPA GALVANIS DIAMETER ½"    a Pipa galvanis dia 1/2" 1.10 M¹ 11,000.00 12,100.00     b Perlengkapan ( 30% harga pipa )     3,300.00 3,300.00     c Pembantu tukang 0.05 org 40,000.00 2,160.00     d Tukang pipa 0.09 org 55,000.00 4,950.00     Jumlah 22,510.00     Dibulatkan 22,510.00   2 MEMASANG 1 M¹ PIPA GALVANIS DIAMETER ¾"    a Pipa galvanis 1.10 M¹ 18,500.00 20,350.00     b Perlengkapan ( 30% harga pipa )     5,550.00 5,550.00     c Pembantu tukang 0.05 org 40,000.00 2,160.00     d Tukang pipa 0.09 org 55,000.00 4,950.00     Jumlah 33,010.00     Dibulatkan 33,010.00

Page 58: Analisa Harga Satuan Pekerjaan Makasar

  3 MEMASANG 1 M¹ PIPA GALVANIS DIAMETER 1"    a Pipa galvanis 1.10 M¹ 30,250.00 33,275.00     b Perlengkapan ( 30% harga pipa )     9,075.00 9,075.00     c Pembantu tukang 0.05 org 40,000.00 2,160.00     d Tukang pipa 0.09 org 55,000.00 4,950.00     Jumlah 49,460.00     Dibulatkan 49,460.00   4 MEMASANG 1 M¹ PIPA GALVANIS DIAMETER 1½"    a Pipa galvanis 1.10 M¹ 33,000.00 36,300.00     b Perlengkapan ( 30% harga pipa )     9,900.00 9,900.00     c Pembantu tukang 0.11 org 40,000.00 4,320.00     d Tukang pipa 0.18 org 55,000.00 9,900.00     Jumlah 60,420.00     Dibulatkan 60,420.00   5 MEMASANG 1 M¹ PIPA PVC TYPE D DIAMETER 3"    a Pipa PVC type D 1.10 M¹ 6,700.00 7,370.00     b Perlengkapan ( 30% harga pipa )     2,010.00 2,010.00     c Pembantu tukang 0.10 org 40,000.00 4,000.00     d Tukang pipa 0.18 org 55,000.00 9,900.00     Jumlah 23,280.00     Dibulatkan 23,280.00   6 MEMASANG 1 M¹ PIPA PVC TYPE D DIAMETER 4"    a Pipa PVC type D 1.10 M¹ 9,000.00 9,900.00     b Perlengkapan ( 30% harga pipa )     2,700.00 2,700.00     c Pembantu tukang 0.13 org 40,000.00 5,200.00     d Tukang pipa 0.22 org 55,000.00 12,100.00     Jumlah 29,900.00     Dibulatkan 29,900.00   7 MEMASANG 1 M¹ PVC TIPE AW DIAMETER ½"    a Pipa PVC 1.10 M¹ 3,400.00 3,740.00

Page 59: Analisa Harga Satuan Pekerjaan Makasar

    b Perlengkapan ( 30% harga pipa )     1,020.00 1,020.00     c Pembantu tukang 0.04 org 40,000.00 1,440.00     d Tukang pipa 0.06 org 55,000.00 3,300.00     Jumlah 9,500.00     Dibulatkan 9,500.00   8 MEMASANG 1 M¹ PVC TIPE AW DIAMETER ¾"    a Pipa PVC 1.10 M¹ 6,675.00 7,342.50     b Perlengkapan ( 30% harga pipa )     2,002.50 2,002.50     c Pembantu tukang 0.03 org 40,000.00 1,200.00     d Tukang pipa 0.06 org 55,000.00 3,300.00     Jumlah 13,845.00

Dibulatkan 13,840.00   9 MEMASANG 1 M¹ PVC TIPE AW DIAMETER 1"    a Pipa PVC 1.10 M¹ 13,400.00 14,740.00     b Perlengkapan ( 30% harga pipa )     4,020.00 4,020.00     c Pembantu tukang 0.04 org 40,000.00 1,440.00     d Tukang pipa 0.06 org 55,000.00 3,300.00     Jumlah 23,500.00     Dibulatkan 23,500.00   10 MEMASANG 1 M¹ PVC TIPE AW DIAMETER 2"    a Pipa PVC 1.10 M¹ 18,000.00 19,800.00     b Perlengkapan ( 30% harga pipa )     5,400.00 5,400.00     c Pembantu tukang 0.05 org 40,000.00 2,160.00     d Tukang pipa 0.09 org 55,000.00 4,950.00     Jumlah 32,310.00     Dibulatkan 32,310.00   11 MEMASANG 1 M¹ PVC TIPE AW DIAMETER 4"    a Pipa PVC 1.10 M¹ 39,000.00 42,900.00     b Perlengkapan ( 30% harga pipa )     11,700.00 11,700.00     c Pembantu tukang 0.08 org 40,000.00 3,240.00

Page 60: Analisa Harga Satuan Pekerjaan Makasar

    d Tukang pipa 0.14 org 55,000.00 7,425.00     Jumlah 65,265.00     Dibulatkan 65,260.00   12 MEMBUAT 1 BH SEPTICTANK PASANGAN BATU BATA DAN REMBESAN  a Galian tanah Septictank & rembesan 7.5 m3 30,500.00 228,750.00   b Pasir urug 0.21 m3 66,000.00 13,860.00   c Lantai kerja 2.25 m3 502,500.00 1,130,625.00   d Pasang bata 1 Pc : 2 Psr 15.00 m2 75,200.00 1,128,000.00   e Pelat beton penutup dan balok 0.30 m3 4,032,800.00 1,209,840.00   f Pipa PVC 4 inci AW & perlengkapannya 5.40 M1 39,000.00 210,600.00   g Plesteran 1 Pc : 3 Psr 30.00 m2 23,000.00 690,000.00   h Pasangan ijuk 5.00 IKAT 6,000.00 30,000.00   i Urugan kerikil 3,5 cm 1.05 m3 157,300.00 165,165.00   j Pipa PVC 4 inci AW dilobang 9.00 M1 39,000.00 351,000.00   k Urugan kembali 1.13 m3 8,500.00 9,605.00   l Pembantu tukang 4.00 org 40,000.00 160,000.00   m Tukang batu 3.00 org 55,000.00 165,000.00   Jumlah 5,492,445.00     Dibulatkan 5,492,440.00   13 MEMASANG 1 BH POMPA AIR    a Pompa Air 100 Watt 1.00 bh 925,000.00 925,000.00     b Perlengkapan ( 25% harga pompa )     231,250.00 231,250.00     c Pembantu tukang 0.08 org 40,000.00 3,240.00     d Tukang Pipa 0.14 org 55,000.00 7,425.00     Jumlah 1,166,915.00     Dibulatkan 1,166,910.00

XIV PEKERJAAN PENUTUP BESI DAN BAJA

Page 61: Analisa Harga Satuan Pekerjaan Makasar

  1 1 KG PASANG RANGKA ATAP BAJA    a Besi profil WF 1.10 kg 12,000.00 13,200.00     b Meni besi 0.08 kg 19,000.00 1,520.00     c Peralatan las ( 5 % material ) 1.00 ls 660.00 660.00     d Elektroda 0.20 ls 18,000.00 3,600.00     e Tukang besi 0.04 org 55,000.00 2,200.00     f Pembantu tukang 0.06 org 40,000.00 2,400.00     Jumlah 23,580.00     Dibulatkan 23,580.00   2 1 KG PASANG RANGKA ATAP BESI SIKU    a Besi Siku 1.10 kg 12,000.00 13,200.00     b Meni besi 0.10 kg 19,000.00 1,900.00     c Peralatan las ( 5 % material ) 1.00 ls 660.00 660.00     d Elektroda 0.15 ls 18,000.00 2,700.00     e Baud 0.20 kg 16,300.00 3,260.00     f Tukang besi 0.04 org 55,000.00 2,200.00     g Pembantu tukang 0.06 org 40,000.00 2,400.00     Jumlah 26,320.00     Dibulatkan 26,320.00   3 1 KG PASANG GORDING BESI C    a Besi C 1.10 kg 17,500.00 19,250.00     b Meni besi 0.10 kg 19,000.00 1,900.00     c Peralatan las ( 5 % material ) 1.00 ls 962.50 962.50     d Elektroda 0.15 ls 18,000.00 2,700.00     e Baud 0.20 kg 16,300.00 3,260.00     f Tukang besi 0.04 org 55,000.00 2,200.00     g Pembantu tukang 0.06 org 40,000.00 2,400.00     Jumlah 32,672.50     Dibulatkan 32,670.00   4 1 M2 PASANG PINTU ROLLING DOOR BESI

Page 62: Analisa Harga Satuan Pekerjaan Makasar

    a Rolling door besi 1.00 m2 680,000.00 680,000.00     b Tukang besi 1.50 org 55,000.00 82,500.00     c Pembantu tukang 1.05 org 40,000.00 42,000.00     Jumlah 804,500.00     Dibulatkan 804,500.00   5 1 BH PASANG PINTU BESI UKURAN 0,8 X 2 M    a Pintu besi jadi 1.00 bh 400,000.00 400,000.00     b Tukang besi 1.05 org 55,000.00 57,750.00     c Pembantu tukang 1.05 org 40,000.00 42,000.00     Jumlah 499,750.00     Dibulatkan 499,750.00   6 1 M2 PASANG TERALIS BESI    a Besi strip 2 mm x 3 cm 11.50 M¹ 17,500.00 201,250.00     b Tukang las 1.20 org 55,000.00 66,000.00     c Pembantu tukang 1.20 org 40,000.00 48,000.00     Jumlah 315,250.00     Dibulatkan 315,250.00   7 1 M2 PASANG KAWAT HARMONIKA    a Kawat harmonika 1.10 m2 18,000.00 19,800.00     b Paku 2 - 5 cm 0.02 kg 14,700.00 294.00     c Papan kayu kamper medan - m3 3,800,000.00 6,840.00     d Pembantu tukang 0.10 org 40,000.00 4,000.00     e Tukang kayu 0.10 org 55,000.00 5,500.00     Jumlah 36,434.00     Dibulatkan 36,430.00   8 1 M1 PASANG TALANG DATAR, SENG PLAT BJLS    a Seng plat BJLS 1.00 M1 33,000.00 33,000.00     b Paku 2 - 5 cm 0.02 kg 14,700.00 220.50     c Papan kayu borneo super 0.01 m3 4,000,000.00 38,400.00     d Flincote / meni besi 0.25 kg 20,000.00 5,000.00

Page 63: Analisa Harga Satuan Pekerjaan Makasar

    e Pembantu tukang 0.15 org 40,000.00 6,000.00     f Tukang kayu 0.40 org 55,000.00 22,000.00     Jumlah 104,620.50     Dibulatkan 104,620.00   9 1 M1 PASANG TALANG MIRING, SENG PLAT BJLS    a Seng plat BJLS 0.50 M1 33,000.00 16,500.00     b Paku 2 - 5 cm 0.02 kg 14,700.00 220.50     c Papan kayu borneo super 0.02 m3 4,000,000.00 76,000.00     d Flincote / meni besi 0.30 kg 20,000.00 6,000.00     e Pembantu tukang 0.04 org 40,000.00 1,600.00     f Tukang kayu 0.40 org 55,000.00 22,000.00     Jumlah 122,320.50     Dibulatkan 122,320.00

XV PEKERJAAN ALUMINIUM  1 1 M2 PASANG PINTU ROLLING DOOR ALUMINIUM    a Rolling door aluminium 1.00 m2 680,000.00 680,000.00     b Tukang besi konstruksi 1.50 org 55,000.00 82,500.00     c Pembantu tukang 1.05 org 40,000.00 42,000.00     Jumlah 804,500.00     Dibulatkan 804,500.00   2 1 M2 PASANG PINTU ALUMINIUM PABRIKAN    a Pintu alluminium 1.00 bh 400,000.00 400,000.00     b Tukang batu 1.05 org 75,671.00 79,454.55     c Pembantu tukang 1.05 org 40,000.00 42,000.00     Jumlah 521,454.55     Dibulatkan 521,450.00   3 1 UNIT KUSEN JENDELA ALUMINIUM 2 LUBANG DGN 2 DAUN JENDELA (UKURAN 1,6 X 1,5 M)

Page 64: Analisa Harga Satuan Pekerjaan Makasar

    a Profil aluminium 4" natural (+ spare 20 %) 9.24 M1 86,000.00 794,640.00     b Profil daun jendela alm.( + spare 20%) 11.04 M1 80,000.00 883,200.00     c Kaca polos 3 mm 2.40 m2 63,000.00 151,200.00     d Engsel jendela 4.00 ps 22,000.00 88,000.00     e Grendel jendela 2.00 bh 19,500.00 39,000.00     f Kait angin 2.00 bh 14,000.00 28,000.00     g Acesories ( 6 % harga bahan) 1.00 ls 109,742.40 109,742.40     h Upah pembuatan profil ( 20 % bahan ) 1.00 ls 158,928.00 158,928.00     i Upah pembuatan daun jendela (20 % bahan) 1.00 ls 176,640.00 176,640.00     Jumlah 2,429,350.40      Dibulatkan 2,429,350.00

  41 UNIT KUSEN JENDELA ALUMINIUM 3 LUBANG DGN 2 DAUN JENDELA DAN 1 KACA MATI (UKURAN 2 X 1,5 M)

    a Profil aluminium 4" natural (+ spare 20 %) 12.00 M1 86,000.00 1,032,000.00     b Profil daun jendela alm.( + spare 20%) 11.04 M1 80,000.00 883,200.00     c Kaca polos 3 mm 3.00 m2 63,000.00 189,000.00     d Engsel jendela 4.00 ps 22,000.00 88,000.00     e Grendel jendela 2.00 bh 19,500.00 39,000.00     f Kait angin 2.00 bh 14,000.00 28,000.00     g Acesories ( 6 % harga bahan ) 1.00 ls 126,252.00 126,252.00     h Upah pembuatan profil ( 20 % bahan ) 1.00 ls 206,400.00 206,400.00     i Upah pembuatan daun jendela (20 % bahan) 1.00 ls 176,640.00 176,640.00     Jumlah 2,385,452.00     Dibulatkan 2,385,450.00

  51 UNIT KUSEN PINTU JENDELA GENDONG ALUMINIUM DGN 2 JNDL DAN 1 PNT TEAKWOOD (UKR 2,2 X 2,7 M)

    a Profil aluminium 4" natural (+ spare 20 %) 17.04 M1 86,000.00 1,465,440.00     b Profil daun jendela alm.( + spare 20%) 14.88 M1 80,000.00 1,190,400.00     c Kaca polos 3 mm 3.96 m2 63,000.00 249,480.00     d Daun pintu teakwood 1.80 m2 301,200.00 542,160.00

Page 65: Analisa Harga Satuan Pekerjaan Makasar

    e Engsel jendela 4.00 ps 22,000.00 88,000.00     f Grendel jendela 2.00 bh 19,500.00 39,000.00     g Kait angin 4.00 bh 14,000.00 56,000.00     h Engsel pintu 3.00 ps 25,000.00 75,000.00     i Grendel pintu 1.00 bh 32,500.00 32,500.00     j Kunci tanam 1.00 bh 20,000.00 20,000.00     k Acesories ( 6 % harga bahan ) 1.00 ls 145,266.00 145,266.00     l Upah pembuatan profil ( 20 % bahan ) 1.00 ls 17,600.00 17,600.00     m Upah pembuatan daun jendela (20 % bahan) 1.00 ls 7,800.00 7,800.00     Jumlah 3,928,646.00     Dibulatkan 3,928,640.00   6 1 UNIT KUSEN PINTU ALUMINIUM UKR 0.9 X 2,7 M    a Profil aluminium 4" natural (+ spare 20 %) 7.56 M1 86,000.00 650,160.00     b Kaca polos 3 mm untuk bovenlight 0.45 m2 63,000.00 28,350.00     c Daun pintu tekwood 1.68 m2 301,200.00 506,016.00     d Engsel pintu 3.00 ps 25,000.00 75,000.00     e Grendel pintu 1.00 bh 32,500.00 32,500.00     f Kunci tanam 1.00 bh 20,000.00 20,000.00     g Acesories ( 6 % ) 1.00 ls 40,710.60 40,710.60     h Upah pembuatan profil ( 20 % bahan ) 1.00 ls 130,032.00 130,032.00     Jumlah 1,482,768.60     Dibulatkan 1,482,760.00   7 1 BH BOVENLIGHT ALMUNIUM DENGAN KISI-KISI ALMUNIUM PLAT (UKURAN 0,5 X 1 M)    a Profil Aluminium 4" natural + upah 20% 3.60 M1 63,000.00 226,800.00     b Plat Aluminium untuk Jalusi 5.00 M1 18,000.00 90,000.00     c Acesories ( 6 % ) 1.00 ls 13,608.00 13,608.00     d Upah pembuatan profil ( 20 % bahan ) 1.00 ls 26,006.40 26,006.40     Jumlah 356,414.40     Dibulatkan 356,410.00   8 1 BH BOVENLIGHT ALMUNIUM UKURAN 0,5 X 1 M DENGAN BAGIAN DALAM KACA

Page 66: Analisa Harga Satuan Pekerjaan Makasar

    a Profil Aluminium 4" natural + upah 20% 3.60 M1 86,000.00 309,600.00     b Kaca Polos 3 mm 0.50 m2 63,000.00 31,500.00     c Acesories ( 6 % ) 1.00 ls 18,576.00 18,576.00     d Upah pembuatan profil ( 20 % bahan ) 1.00 ls 5,201.28 5,201.28     Jumlah 364,877.28     Dibulatkan 364,870.00

  XVI PEKERJAAN KACA & PENGGANTUNG  1 1 BUAH PASANG KUNCI TANAM BESAR    a Kunci tanam besar 1.00 bh 175,000.00 175,000.00     b Pembantu tukang 0.06 org 40,000.00 2,400.00     c Tukang kayu 0.60 org 55,000.00 33,000.00     Jumlah 210,400.00     Dibulatkan 210,400.00   2 1 BUAH PASANG KUNCI TANAM SEDANG    a Kunci tanam sedang 1.00 bh 55,000.00 55,000.00     b Pembantu tukang 0.01 org 40,000.00 400.00     c Tukang kayu 0.50 org 55,000.00 27,500.00     Jumlah 82,900.00     Dibulatkan 82,900.00   3 1 BUAH PASANG KUNCI BULAT PUTAR KAMAR MANDI    a Kunci bulat putar kamar mandi 1.00 bh 55,000.00 55,000.00     b Pembantu tukang 0.01 org 40,000.00 200.00     c Tukang kayu 0.50 org 55,000.00 27,500.00     Jumlah 82,700.00     Dibulatkan 82,700.00

Page 67: Analisa Harga Satuan Pekerjaan Makasar

  4 1 BUAH PASANG ENGSEL PINTU    a Engsel pintu 1.00 bh 25,000.00 25,000.00     b Pembantu tukang 0.02 org 40,000.00 600.00     c Tukang kayu 0.15 org 55,000.00 8,250.00     Jumlah 33,850.00     Dibulatkan 33,850.00   5 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU    a Engsel jendela 1.00 bh 22,000.00 22,000.00     b Pembantu tukang 0.01 org 40,000.00 400.00     c Tukang kayu 0.10 org 55,000.00 5,500.00     Jumlah 27,900.00     Dibulatkan 27,900.00   6 1 BUAH PASANG KAIT ANGIN    a Kait angin 1.00 bh 14,000.00 14,000.00     b Pembantu tukang 0.02 org 40,000.00 600.00     c Tukang kayu 0.15 org 55,000.00 8,250.00     Jumlah 22,850.00     Dibulatkan 22,850.00   7 1 BUAH PASANG DOOR CLOSER    a Door closer 1.00 bh 412,000.00 412,000.00     b Pembantu tukang 0.05 org 40,000.00 2,000.00     c Tukang kayu 0.50 org 55,000.00 27,500.00     Jumlah 441,500.00     Dibulatkan 441,500.00   8 1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER    a Door holder 1.00 bh 50,000.00 50,000.00     b Pembantu tukang 0.05 org 40,000.00 2,000.00     c Tukang kayu 0.50 org 55,000.00 27,500.00     Jumlah 79,500.00     Dibulatkan 79,500.00

Page 68: Analisa Harga Satuan Pekerjaan Makasar

  9 1 BUAH PASANG PENAHAN PINTU / DOOR STOPER    a Door stoper 1.00 bh 65,000.00 65,000.00     b Pembantu tukang 0.05 org 40,000.00 2,000.00     c Tukang kayu 0.50 org 55,000.00 27,500.00     Jumlah 94,500.00     Dibulatkan 94,500.00   10 1 BUAH PASANG GRENDEL / SLOOT PINTU    a Grendel / sloot pintu 1.00 bh 32,500.00 32,500.00     b Pembantu tukang 0.05 org 40,000.00 2,000.00     c Tukang kayu 0.50 org 55,000.00 27,500.00     Jumlah 62,000.00     Dibulatkan 62,000.00   11 1 BUAH PASANG GRENDEL / SLOOT JENDELA    a Grendel / sloot jendela 1.00 bh 19,500.00 19,500.00     b Pembantu tukang 0.05 org 40,000.00 2,000.00     c Tukang kayu 0.50 org 55,000.00 27,500.00     Jumlah 49,000.00     Dibulatkan 49,000.00   12 1 BUAH PASANG TARIKAN JENDELA    a Tarikan jendela 1.00 bh 17,600.00 17,600.00     b Pembantu tukang 0.05 org 40,000.00 2,000.00     c Tukang kayu 0.50 org 55,000.00 27,500.00     Jumlah 47,100.00     Dibulatkan 47,100.00   13 1 M2 PASANG KACA POLOS, TEBAL 3 MM    a Kaca polos 1.10 m2 63,000.00 69,300.00     b Pembantu tukang 0.02 org 40,000.00 600.00     c Tukang kayu 0.15 org 55,000.00 8,250.00     Jumlah 78,150.00     Dibulatkan 78,150.00

Page 69: Analisa Harga Satuan Pekerjaan Makasar

  14 1 M2 PASANG KACA POLOS, TEBAL 5 MM    a Kaca polos 1.10 m2 85,000.00 93,500.00     b Pembantu tukang 0.02 org 40,000.00 600.00     c Tukang kayu 0.15 org 55,000.00 8,250.00     Jumlah 102,350.00     Dibulatkan 102,350.00   15 1 M2 PASANG KACA RAY BAND, TEBAL 5 MM    a Kaca 1.10 m2 155,000.00 170,500.00     b Pembantu tukang 0.02 org 40,000.00 600.00     c Tukang kayu 0.15 org 55,000.00 8,250.00     Jumlah 179,350.00     Dibulatkan 179,350.00

                 XVIIPEKERJAAN PENGECATAN  1 1 M2 MENGIKIS / MENGEROK / MENGELUPAS PERMUKAAN CAT TEMBOK LAMA    a Soda api 0.05 kg 45,000.00 2,250.00     b Pembantu tukang 0.05 org 40,000.00 2,000.00     c Tukang cat 0.02 org 55,000.00 1,100.00     Jumlah 5,350.00     Dibulatkan 5,350.00   2 1 M2 MENDEMPUL DAN MENGGOSOK KAYU    a Dempul jadi 0.10 kg 24,500.00 2,450.00     b Minyak cat 0.03 kg 20,000.00 600.00     c Ampelas kasar 0.30 lbr 2,500.00 750.00     d Pembantu tukang 0.04 org 40,000.00 1,600.00   e Tukang cat 0.05 org 55,000.00 2,750.00   Jumlah 8,150.00     Dibulatkan 8,150.00

Page 70: Analisa Harga Satuan Pekerjaan Makasar

  3 1 M2 PENGECATAN KAYU LAMA    a Cat meni 0.25 kg 19,000.00 4,750.00     b Plamir 0.15 kg 22,500.00 3,375.00     c Ampelas 1.00 lbr 2,500.00 2,500.00     d Cat dasar 0.15 kg 40,000.00 6,000.00     e Cat penutup kwalitas baik 0.60 kg 40,000.00 24,000.00     f Pembantu tukang 0.05 org 40,000.00 2,000.00     g Tukang cat 0.15 org 55,000.00 8,250.00     Jumlah 50,875.00     Dibulatkan 50,870.00   4 1 M2 PENGECATAN KAYU BARU    a Cat meni 0.50 kg 19,000.00 9,500.00     b Plamir 0.15 kg 22,500.00 3,375.00     c Ampelas 1.00 lbr 2,500.00 2,500.00     d Cat dasar 0.15 kg 40,000.00 6,000.00     e Cat penutup kwalitas baik 0.35 kg 40,000.00 14,000.00     f Pembantu tukang 0.05 org 40,000.00 2,000.00     g Tukang cat 0.15 org 55,000.00 8,250.00     Jumlah 45,625.00     Dibulatkan 45,620.00   5 1 M2 PENGECATAN KAYU DENGAN POLITUR    a Politur 0.15 Ltr 35,000.00 5,250.00     b Dempul jadi 0.25 kg 24,500.00 6,125.00     c Ampelas 2.00 lbr 2,500.00 5,000.00     d Pembantu tukang 0.05 org 40,000.00 2,000.00     e Tukang cat 0.15 org 55,000.00 8,250.00     Jumlah 26,625.00     Dibulatkan 26,620.00   6 1 M2 PENGECATAN KAYU DENGAN MELAMIK  a Melamik 0.15 Ltr 32,200.00 4,830.00

Page 71: Analisa Harga Satuan Pekerjaan Makasar

    b Dempul jadi 0.25 kg 24,500.00 6,125.00     c Ampelas 2.00 lbr 2,500.00 5,000.00     d Pembantu tukang 0.05 org 40,000.00 2,000.00     e Tukang cat 0.15 org 55,000.00 8,250.00     Jumlah 26,205.00     Dibulatkan 26,200.00   7 1 M2 PENGECATAN KAYU DENGAN CAT RESIDU/TER  a Residu atau ter 0.35 Ltr 4,300.00 1,505.00     b Pembantu tukang 0.15 org 40,000.00 6,000.00     c Tukang cat 0.02 org 55,000.00 1,100.00     Jumlah 8,605.00     Dibulatkan 8,600.00   8 1 M2 PENGECATAN TEMBOK/Plafon BARU KWALITAS SEDANG  a Plamir 0.10 kg 27,000.00 2,700.00     b Rol cat 0.01 bh 27,400.00 274.00     c Cat penutup kwalitas sedang 0.45 kg 15,000.00 6,750.00     d Steger ( perancah kerja ) 0.01 Ls 70,000.00 700.00     e Ampelas 0.50 lbr 2,500.00 1,250.00     f Pembantu tukang 0.06 org 40,000.00 2,400.00     g Tukang cat 0.20 org 55,000.00 11,000.00     Jumlah 25,074.00     Dibulatkan 25,070.00   9 1 M2 PENGECATAN TEMBOK/Plafon BARU KWALITAS BAIK  a Plamir 0.10 kg 27,000.00 2,700.00     b Rol cat 0.01 bh 27,400.00 274.00     c Cat penutup kwalitas baik 0.50 kg 44,000.00 22,000.00     d Steger ( perancah kerja ) 0.01 Ls 70,000.00 700.00     e Ampelas 0.50 lbr 2,500.00 1,250.00     f Pembantu tukang 0.06 org 40,000.00 2,400.00     g Tukang cat 0.20 org 55,000.00 11,000.00

Page 72: Analisa Harga Satuan Pekerjaan Makasar

    Jumlah 40,324.00     Dibulatkan 40,320.00   10 1 M2 PENGECATAN TEMBOK LAMA    a Cat penutup kwalitas baik 0.40 kg 28,250.00 11,300.00     b Rol cat 0.01 bh 27,400.00 274.00     c Steger ( perancah kerja ) 0.01 Ls 70,000.00 700.00     d Ampelas 0.50 lbr 2,500.00 1,250.00     e Pembantu tukang 0.06 org 40,000.00 2,400.00     f Tukang cat 0.20 org 55,000.00 11,000.00     Jumlah 26,924.00     Dibulatkan 26,920.00   11 1 M2 PENGECATAN EXTERIOR  a Cat tembok 0.36 kg 78,000.00 28,080.00     b Plamir tembok 0.16 kg 27,000.00 4,320.00     c Rol cat 0.01 bh 27,400.00 274.00     d Steger ( perancah kerja ) 0.01 Ls 70,000.00 700.00     e Ampelas 0.50 lbr 2,500.00 1,250.00     f Pembantu tukang 0.20 org 40,000.00 8,000.00     g Tukang cat 0.30 org 55,000.00 16,500.00     Jumlah 59,124.00     Dibulatkan 59,120.00   12 1 M2 MEMASANG WALLPAPER    a Wallpaper 1.20 m2 17,600.00 21,120.00     b Lem Perekat 0.20 kg 35,000.00 7,000.00     c Pembantu tukang 0.02 org 40,000.00 800.00     d Tukang cat 0.15 org 55,000.00 8,250.00     Jumlah 37,170.00     Dibulatkan 37,170.00   13 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI    a Meni besi 0.10 kg 19,000.00 1,900.00

Page 73: Analisa Harga Satuan Pekerjaan Makasar

    b Kuas 0.01 bh 14,000.00 140.00     c Pembantu tukang 0.02 org 40,000.00 800.00     d Tukang cat 0.20 org 55,000.00 11,000.00     Jumlah 13,840.00     Dibulatkan 13,840.00   14 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN CAT    a Meni besi 0.10 kg 19,000.00 1,900.00     b Cat besi 0.13 kg 38,500.00 5,005.00     c Kuas 0.01 bh 14,000.00 140.00     d Ampelas 0.50 lbr 2,500.00 1,250.00     e Perancah kayu 0.01 m3 70,000.00 700.00     f Pembantu tukang 0.20 org 40,000.00 8,000.00     g Tukang cat 0.20 org 55,000.00 11,000.00     Jumlah 27,995.00     Dibulatkan 27,990.00

 

XVIII PEKERJAAN LISTRIK  1 PASANG 1 TITIK STOP KONTAK    a Stop kontak 1.00 bh 21,200.00 21,200.00     b Kabel listrik NYM 3 x 2,5 mm 0.25 rol 445,000.00 111,250.00     c Aksesoris ( 20 % material ) 1.00 ls 22,250.00 22,250.00     d Pembantu tukang 0.20 org 40,000.00 8,000.00     e Tukang listrik 0.60 org 55,000.00 33,000.00     Jumlah 195,700.00     Dibulatkan 195,700.00   2 PASANG 1 TITIK LAMPU    a Saklar 1.00 bh 21,200.00 21,200.00     b Kabel Listrik NYM 2 x 2,5 mm 0.25 rol 425,000.00 106,250.00     c Aksesoris ( 20 % material ) 1.00 ls 21,250.00 21,250.00

Page 74: Analisa Harga Satuan Pekerjaan Makasar

    d Pembantu tukang 0.20 org 40,000.00 8,000.00     e Tukang listrik 0.60 org 55,000.00 33,000.00     Jumlah 189,700.00     Dibulatkan 189,700.00   3 PASANG 1 BUAH LAMPU SL     a Lampu SL 1.00 bh 58,000.00 58,000.00     b Aksesoris ( 1 % alat ) 1.00 ls 580.00 580.00     c Tukang listrik 0.10 org 55,000.00 5,500.00     Jumlah 64,080.00     Dibulatkan 64,080.00   4 PASANG 1 BUAH LAMPU TL    a Lampu TL 1.00 bh 58,000.00 58,000.00     b Aksesoris ( 1 % alat ) 1.00 ls 580.00 580.00     c Tukang listrik 0.12 org 55,000.00 6,600.00     Jumlah 65,180.00     Dibulatkan 65,180.00   5 PASANG 1 BUAH LAMPU BARET    a Lampu Baret 1.00 bh 90,000.00 90,000.00     b Aksesoris ( 1 % alat ) 1.00 ls 900.00 900.00     c Tukang listrik 0.15 org 55,000.00 8,250.00     Jumlah 99,150.00     Dibulatkan 99,150.00   6 PASANG 1 BUAH LAMPU PIJAR    a Lampu Pijar 1.00 bh 6,000.00 6,000.00     b Aksesoris ( 1 % alat ) 1.00 ls 60.00 60.00     c Tukang listrik 0.10 org 55,000.00 5,500.00     Jumlah 11,560.00     Dibulatkan 11,560.00   7 PASANG 1 BUAH LAMPU TAMAN    a Lampu Taman 1.00 bh 186,000.00 186,000.00

Page 75: Analisa Harga Satuan Pekerjaan Makasar

    b Aksesoris ( 1 % alat ) 1.00 ls 1,860.00 1,860.00     c Tukang listrik 0.35 org 55,000.00 19,250.00     Jumlah 207,110.00     Dibulatkan 207,110.00   8 PASANG 1 BUAH PANEL    a Panel Listrik standart untuk Rumah 1.00 bh 300,000.00 300,000.00     b Aksesoris ( 10 % alat ) 1.00 ls 30,000.00 30,000.00     c Tukang listrik 1.00 org 55,000.00 55,000.00   Jumlah 385,000.00     Dibulatkan 385,000.00    XIX PEKERJAAN WATERPROOFING  1 PASANG 1 M2 WATERPROOFING MEMBRAN    a Material Primer 2.50 kg 2,450.00 6,125.00     b Waterproofing Membrane 1.10 m2 70,000.00 77,000.00     c Pengetesan ( 10 % material ) 1.00 ls 7,700.00 7,700.00     d Pembantu tukang 0.20 org 40,000.00 8,000.00     e Tukang batu 0.60 org 55,000.00 33,000.00     Jumlah 131,825.00     Dibulatkan 131,820.00   2 PASANG 1 M2 WATERPROOFING COATING    a Pre treatment / Cleaning ( 10 % material ) 1.00 m2 4,500.00 4,500.00     b Bahan Waterproofing Coating 1.00 kg 45,000.00 45,000.00     c Kuas 3 " 0.25 bh 14,000.00 3,500.00     d Pembantu tukang 0.20 org 40,000.00 8,000.00     e Tukang batu 0.60 org 55,000.00 33,000.00     Jumlah 94,000.00     Dibulatkan 94,000.00   3 PASANG 1 M2 FLOOR HARDERNER    a Material Natural non Metalic 1.10 kg 45,000.00 49,500.00

Page 76: Analisa Harga Satuan Pekerjaan Makasar

    b Aksesoris ( 10 % alat ) 1.00 ls 495.00 495.00     c Pembantu tukang 0.20 org 40,000.00 8,000.00     d Tukang batu 0.60 org 55,000.00 33,000.00     Jumlah 90,995.00     Dibulatkan 90,990.00