Top Banner
ANADARKO PETROLEUM CORPORATIOn
11

ANADARKO PETROLEUM CORPORATIOn - Cargos - … de presse/0000_IMAGES-10/169-Lu… · anadarko petroleum corporation ... living quarters strake mooring fairlead mooring ... topside

Jun 11, 2018

Download

Documents

vuonghuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ANADARKO PETROLEUM CORPORATIOn - Cargos - … de presse/0000_IMAGES-10/169-Lu… · anadarko petroleum corporation ... living quarters strake mooring fairlead mooring ... topside

ANADARKO PETROLEUM CORPORATIOn

Page 2: ANADARKO PETROLEUM CORPORATIOn - Cargos - … de presse/0000_IMAGES-10/169-Lu… · anadarko petroleum corporation ... living quarters strake mooring fairlead mooring ... topside

www.anadarko.comanadarko petroleum corporation

– 2 – – 3 –

LUCIUS TRUSS SPAR

LUCIUS PROJECTHIGHLIGHTS

Lucius – Lighting the Way to a bright future• Dec. 10, 2009 Discovery

• Jan. 27, 2010 Successful Appraisal well

• May 28, 2011 Successful Flow Test Confirmed Deliverability

• Dec. 15, 2011 Project Sanction

• July 2, 2012 signed Carried-Interest Agreement

• May 26, 2013 80,000 BOPD Spar Arrives in the gulf of mexico

CAPACITY

80,000 bopd450 mmcf/d

spar diameter

110 feet

spar length

605 feet

hull weight

23,000 tons

water depth

7,100 feet

history of the LUCIUS NAME

Lucius means “Light” in Latin, and the field was named after an Heir to the Roman throne.

LARGEST SPAR BUILT TO DATE BY ANADARKO

TRuss sECTION

KEEL TaNKOIL & Gas EXPORT LINEs

HEavE PLaTE

HaRd TaNK

LIvING QuaRTERs

sTRaKE

MOORING FaIRLEad

MOORING LINE

• 300+ MMBOE resource

• World-class reservoir quality and deliverability

• Anchor project in active area

• On schedule and on budget for first oil in second half 2014

• established $2.8 billion of market value

sPaR CHaIN

CHaIN JaCKs

CELLaR dECK

PROduCTION dECK

MaIN dECK

sub CELLaR dECK

at work or away from the job site, anadarko’s Gulf of Mexico operations team views safety as a top priority. anadarko employees and contractors promote a culture of safety by following the LivesaFE program.

TOPSIDESSPAR HULL

keathley canyon 875

Page 3: ANADARKO PETROLEUM CORPORATIOn - Cargos - … de presse/0000_IMAGES-10/169-Lu… · anadarko petroleum corporation ... living quarters strake mooring fairlead mooring ... topside

www.anadarko.comanadarko petroleum corporation

– 4 – – 5 –

SUBSEA ARCHITECTURE hull construction

LUCIUS PARTNERS• anadarko* 27.800%

• Freeport-McMoRan 23.331%

• apache 11.669%

• ExxonMobil 15.000%

• Petrobras 9.600%

• INPEX 7.200%

• Eni 5.400%

* Operator

KEATHLEY CANYON 875 PORI, FINLAND

UMBILICALS

FLOWLINE

EXPORT

1

5

7

2

3

4

6

6

1 5 6

7

2

3

4

plem pr#2 plem pr#3 kc 919 well #3 kc 919 well #4

plem pr #4

kc 875 well #1

kc 875 west manifold

kc 875 east manifold

Page 4: ANADARKO PETROLEUM CORPORATIOn - Cargos - … de presse/0000_IMAGES-10/169-Lu… · anadarko petroleum corporation ... living quarters strake mooring fairlead mooring ... topside

www.anadarko.comanadarko petroleum corporation

– 6 – – 7 –

Voyage from finland to texasAPRIL 30, 2013 TO MAY 26, 2013

ROUTE FROM PORI, FINLAND TO INGLESIDE, TEXAS

PoriApril 30, 2013

InglesideMay 26, 2013

mighty servant i OFF LOad IN INGLEsIdE, TX

Page 5: ANADARKO PETROLEUM CORPORATIOn - Cargos - … de presse/0000_IMAGES-10/169-Lu… · anadarko petroleum corporation ... living quarters strake mooring fairlead mooring ... topside

www.anadarko.comanadarko petroleum corporation

– 8 – – 9 –

suction anchor installationAPRIL 2013

balder

Page 6: ANADARKO PETROLEUM CORPORATIOn - Cargos - … de presse/0000_IMAGES-10/169-Lu… · anadarko petroleum corporation ... living quarters strake mooring fairlead mooring ... topside

www.anadarko.comanadarko petroleum corporation

– 10 – – 11 –

deep water INSTALLATION VESSELS

OriOn

MOORING COMMISSIONING

aegir

RISERS AND FLOWLINES INSTALLATION

deeP energy

UMBILICAL INSTALLATION

balder

HULL AND MOORING INSTALLATION

MOORING CHaIN

BUILT IN SPAINBUILT IN PORTUGAL

POLYEsTER MOORING ROPEs

deeP blue

EXPORT RISER FABRICATION AND REELING

irOn hOrse

JUMPER INSTALLATION

sOlitaire

18" OIL EXPORT PIPELINE INSTALLATION

thialf

TOPSIDE INSTALLATION

CastOrOne

20" GAS EXPORT INSTALLATION

EXPORT PIPELINE

BUILT IN HOUSTON, TX

subsEa TREE

MaNIFOLd

HuLL

TOPsIdE

MOORING LINEs

CHaIN

BUILT IN PORT OF W. ST. MARY, LA

suCTION PILE

suCTION PILEs aT sEa bOTTOM

uMbILICaL LINE

MaNIFOLd

FLOwLINEs

JuMPER

subsEa TREE

Page 7: ANADARKO PETROLEUM CORPORATIOn - Cargos - … de presse/0000_IMAGES-10/169-Lu… · anadarko petroleum corporation ... living quarters strake mooring fairlead mooring ... topside

www.anadarko.comanadarko petroleum corporation

– 12 – – 13 –

MOTOR CONTROL CENTER LIFT ONTO PROduCTION dECK

thialf edda fides~350 PEOPLE REQuIREd FOR HOOK-uP & COMMIssIONING

FLaRE

EasT COMPREssOR MOduLE

wEsT COMPREssOR MOduLE

LIvING QuaRTERs

wEsT CRaNE

NORTH sTaIR TOwER

MaIN MOduLE dECK sTRuCTuRE

TEMPORaRY wORK dECK

sub CELLaR MOduLE

TEMPORaRY wORK dECK

sub CELLaR MOduLE

sTaIR TOwER FabRICaTION

MaIN MOduLE dECK sTRuCTuRE

COMPREssOR MOduLE

BUILT IN HOUMA, LA

ACCOMMODATION VESSELHEAVY LIFT VESSEL

LIvING QuaRTERs

BUILT IN ORANGE, TX

BUILT IN INGLESIDE, TX

topsides

wEsT sTaIR TOwER

}

9 INSTALLATION LIFTS

1

2

3

4

5

6

7

8

9

NOTE: NuMbERs dO NOT REPREsENT THE ORdER OF INsTaLLaTION LIFTs

Page 8: ANADARKO PETROLEUM CORPORATIOn - Cargos - … de presse/0000_IMAGES-10/169-Lu… · anadarko petroleum corporation ... living quarters strake mooring fairlead mooring ... topside

www.anadarko.comanadarko petroleum corporation

– 14 – – 15 –

18" OIL EXPORT PIPELINE

audaCia INsTaLLING OIL EXPORT PLET IN KEaTHLEY CaNYON 831

lucius oil export OIL EXPORT INSTALLATIONS• 100 miles of new pipeline installed

• ~50 miles of existing pipeline reused (Retired Red Hawk Export Line)

• South Marsh Island (SMI) - 205 Platform Additions to Increase Capacity

galveston

port fourchon

garden banks green canyon

keathley canyon walker ridge

KC 875

TEXASLOUISIANA

SOUTH MARSH ISLAND 205 PLATFORM

to clovelly

to st. james

Page 9: ANADARKO PETROLEUM CORPORATIOn - Cargos - … de presse/0000_IMAGES-10/169-Lu… · anadarko petroleum corporation ... living quarters strake mooring fairlead mooring ... topside

www.anadarko.comanadarko petroleum corporation

– 16 – – 17 –

CastOrOne bERTHEd aT GaLvEsTON

20" GAS EXPORT PIPELINElucius gas export GAS EXPORT INSTALLATIONS

• 230 miles of pipeline to be installed

galveston

port fourchon

garden banks green canyon

keathley canyon walker ridge

SOUTH TIMBALIER 283 JUNCTION PLATFORM

LAROSE GAS PROCESSING PLANT

KC 875

TEXASLOUISIANA

Page 10: ANADARKO PETROLEUM CORPORATIOn - Cargos - … de presse/0000_IMAGES-10/169-Lu… · anadarko petroleum corporation ... living quarters strake mooring fairlead mooring ... topside

www.anadarko.comanadarko petroleum corporation

– 18 – – 19 –

design one, build two.

LUCIUS: 80,000 BOPD

HEIDELBERG: 80,000 BOPD

FIRST OIL 2014 FIRST OIL 2016

LUCIUS: PATH TO FIRST OIL

2012 - 2014

• 18" OIL EXPORT LINE INSTALLATION

• HULL SAIL-AWAY TO GULF OF MEXICO

• INSTALL HULL, FLOW LINES, RISERS, UMBILICALS

• LOAD-OUT AND INSTALL TOPSIDES

• HOOK-UP AND COMMISSIONING

• CONCLUDE INITIAL DRILLING AND COMPLETIONS

SECOND HALF OF 2014

• EXPECTED FIRST OIL

DEVE

LOPM

ENT D

RILL

ING

AND

WEL

L COM

PLET

IONS

Page 11: ANADARKO PETROLEUM CORPORATIOn - Cargos - … de presse/0000_IMAGES-10/169-Lu… · anadarko petroleum corporation ... living quarters strake mooring fairlead mooring ... topside

REGaRdING FORwaRd-LOOKING sTaTEMENTs aNd OTHER MaTTERs

This presentation contains forward-looking statements within the meaning of section 27a of the securities act of 1933 and section 21E of the securities Exchange act of 1934. anadarko believes that its expectations are based on reasonable assumptions. No assurance, however, can be given that such expectations will prove to have been correct. a number of factors could cause actual results to differ materially from the projections, anticipated results or other expectations expressed in this presentation, including anadarko’s ability to meet financial and operating guidance; to achieve its production targets, successfully manage its capital expenditures and complete, test and commercially operate the wells and prospects identified in this presentation; and to achieve its production and budget expectations on its mega projects. see “Risk Factors” in the company’s 2012 annual Report on Form 10-K, Quarterly Reports on Form 10-Q and other public filings and press releases. anadarko undertakes no obligation to publicly update or revise any forward-looking statements.

Cautionary Note to u.s. Investors: The united states securities and Exchange Commission (“sEC”) permits oil and gas companies, in their filings with the sEC, to disclose only proved, probable and possible reserves that meet the sEC’s definitions for such terms. anadarko uses certain terms in this news release, such as “resources,” and similar terms that the sEC’s guidelines strictly prohibit anadarko from including in filings with the sEC. u.s. investors are urged to consider closely the disclosure in anadarko’s Form 10-K for the year ended dec. 31, 2012, File No. 001-08968, available from anadarko at www.anadarko.com or by writing anadarko at: anadarko Petroleum Corporation, 1201 Lake Robbins drive, The woodlands, Texas 77380, attn: Investor Relations. This form may also be obtained by contacting the sEC at 1-800-sEC-0330.

1201 lake robbins drive | the woodlands, teXas 77380

1.832.636.1000 | www.anadarko.com | nyse: apc

follow us on www.youtube.com/anadarkotv

like us on www.facebook/anadarkopetroleumcorporation