PARIS15 November 2017 Anacostia River Tunnel Design/Build Project Washington, DC Shane Yanagisawa Project Manager Impregilo Healy Parsons JV Anacostia River Tunnel Shane Yanagisawa
23

Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

Apr 20, 2018

Download

Documents

hathuan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Anacostia River Tunnel

Design/Build Project

Washington, DC

Shane Yanagisawa

Project Manager

Impregilo Healy Parsons JV

Anacostia River Tunnel – Shane Yanagisawa

Page 2: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Stakeholders

Anacostia River Tunnel – Shane Yanagisawa

Page 3: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Main Components:

• 29km of tunnels from 7m to 5,5m diameter

• Drop shafts and adits

• Diversion structures fromexisting sewer to tunnels

• Ventilation Control Facilities

• Green Infrastructure

Anacostia River Tunnel – Shane Yanagisawa

Page 4: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

System

Overview

30m below ground

7m dia.tunnel

*

*When the entire

Anacostia River tunnel system is complete

Anacostia River Tunnel – Shane Yanagisawa

Page 5: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Anacostia River

Tunnel

Anacostia River Tunnel – Shane Yanagisawa

Page 6: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Anacostia River

Tunnel System

Profile

Anacostia River Tunnel – Shane Yanagisawa

Page 7: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Tunnelling

• 7m dia. tunnel x 3,8km excavated with an EPB TBM

• 7m dia. tunnel x 30m excavatedwith Sequential Excavation Method

• 3m dia. tunnel x 100m excavated with pipe jackedslurry MTBM

• 1,4m dia. adits excavated withpipe jacking

Anacostia River Tunnel – Shane Yanagisawa

Page 8: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Sustainability

Initiatives

Design/Build Phase

• 100-year design life

• Careful management of aquifers

• Reduction of carbon footprint

• Preserved integrity of all existing infrastructure

• Implemented storm water pollution preventionmeasures

Anacostia River Tunnel – Shane Yanagisawa

Page 9: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Minimum 100 Year

Design Life

Designed all structures, including precast tunnel liner and cast-in-place structures, for minimum 100 year design life

Anacostia River Tunnel – Shane Yanagisawa

Page 10: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Shaft Construction with

Slurry Walls to Protect Lower Aquifer

Placing Concrete for Guide Walls Hydromill for Slurry Wall Panel Excavation Primary Panel Rebar Cage Fabrication

Preparing Top of Slurry Wall for Capping Beam Installation

Shaft ExcavationPlacing Rebar Cage for

Slurry Wall Panel

Shaft Bottom Concrete

Anacostia River Tunnel – Shane Yanagisawa

Page 11: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Reduced

Carbon Footprint

Use of fly ash in precast concrete segments to provide 100 year durability and reduce carbon footprint by reducing cement consumption

Anacostia River Tunnel – Shane Yanagisawa

Page 12: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Preserved

Integrity of Existing

Infrastructure

Anacostia River Tunnel – Shane Yanagisawa

Page 13: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Including pressurized

sewer and water mains by

compensation grouting as

TBM passed underneath

Protected Fragile

Key Infrastructure

Anacostia River Tunnel – Shane Yanagisawa

Page 14: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Sustainability

Initiatives

Operations Phase• Access to shaft sites via green infrastructure

• Hydraulic design of interceptor drop shafts, designed to operate without active control and absorb the energy of the water dropping 30m

• Ventilation/odor control structures below ground for minimal visual impact

• Reduction of CSO overflows to the Anacostia River for improved water quality

Anacostia River Tunnel – Shane Yanagisawa

Page 15: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Access Shaft Sites

Via Green Infrastructure

Provide turf pavers for access to shaft sites instead of impermeable pavement

Anacostia River Tunnel – Shane Yanagisawa

Page 16: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

In-line Drop Shaft Design

• Constructible solution for soft-ground

• Minimize air entrained in the drop

• Allow air to vent from tunnel system

• Provide space for hydraulic transients to overflow

• Provide a relief for flows that exceed the design diversion rate

• Mitigate potential for geysers

Anacostia River Tunnel – Shane Yanagisawa

Page 17: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

In-line Drop Shaft Design

SURGE RISER (EQUAL

TO DIA. OF TUNNEL)

DEAERATION

CHANNEL

7m DIA.

TUNNEL

PLUNGE

POOL

BAFFLE

WALL

DRAIN

ORIFICE

PARTITION

WALL

DROP

PIPE 15 TO 20m

SHAFT

Anacostia River Tunnel – Shane Yanagisawa

Page 18: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

In-line Drop Shaft Video

Anacostia River Tunnel – Shane Yanagisawa

Page 19: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Venting and Odor Control

Ventilation

• Vents sized for maximum air flow to be exhausted during filling events

• Maximum air velocity at grade limited to prevent nuisance

Odor Control

• Tunnel accepts wet weather flows only

• Tunnel pumped down during and after storm events

• Counterweighted dampers prevent air circulation

• Radial flow activated carbon system at all shafts

COUNTERWEIGHTED

DAMPERS RESIST

NUISANCE DRY

WEATHER AIR

CIRCULATION

LARGE AIRFLOWS DURING

FILLING EXPELLED VIA BAR

GRATING AT GRADE

ODOR CONTROL UNIT

PROVIDES NEGATIVE

PRESSURE IN SHAFT,

TREATMENT FOR MINOR

DRY WEATHER AIR

CIRCULATION

DROP

SHAFT

TUNNEL

`AIR

FLOW

COUNTER

BALANCE

ASSEMBY

LINKAGE

Anacostia River Tunnel – Shane Yanagisawa

Page 20: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Venting and Odor

Control

BACKDRAFT DAMPERS (EXHAUST AND INTAKE)

VENT OPENING

BAR GRATING AT SURFACE

TUNNEL ACCESS POINT: REMOVABLE

CONCRETE SLABS

Anacostia River Tunnel – Shane Yanagisawa

Page 21: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

82% Reduction of CSO to Anacostia River in Spring 2018

after startup of the Anacostia River and Blue Plains

Tunnel Projects

Anacostia River Tunnel – Shane Yanagisawa

Page 22: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

DC Clean Rivers

Project Benefits(DC Water Formed) 96% Reduction

Total System

Anacostia River Tunnel – Shane Yanagisawa

2017

Page 23: Anacostia River Tunnel Design/Build Project … River Tunnel Design/Build Project Washington, DC ... • Careful management of aquifers ... OF TUNNEL) DEAERATION CHANNEL 7m DIA. TUNNEL

PARIS– 15 November 2017

Clean Rivers Project:

Sustainability Initiative of the 21st

Century for Washington, DC

Anacostia River Tunnel – Shane Yanagisawa