MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 PZ1 SHEET NO: PUBLISHED: SHEET NAME: DRAWN: CHECKED: SB AG ENLARGED VIEWING & HYPERLINKS: PRINT VERSION OF THIS PLAN PROVIDES MINIMUM INFORMATION NEEDED BY USERS. ELECTRONIC VERSION (EV) PROVIDES MAGNIFIED VIEWING UP TO 6400%. EV ALSO PROVIDES HYPERLINK ACCESS TO OEM MANUALS AND ABUNDANT OTHER SUPPLEMENTARY INFORMATION.EV MAY BE ACCESSED AT: WWW.GEZELMANPE.COM/PV/0129P_Duran_DiscoveryBay_CA.dwg REVISIONS: ALLEN GEZELMAN 16502 HANNA RD. LUTZ, FLORIDA 33549 PH. 813 650 7246 FX. 866 397 9050 Allen@Gezelman PE.COM www.GezelmanPE.com PE. # 34825 I CERTIFY THAT THIS DESIGN & SPECIFICATIONS MEET THE REQUIREMENTS OF THE CURRENT CALIFORNIA BUILDING CODE. 08 SCALE: NTS BILL OF MATERIALS 01 SCALE: N.T.S. BUILDING - ACTUAL ROOF PHOTO 02 SCALE: N.T.S. PARCEL - CONTRA COUNTY ASSESSOR I CERTIFY THAT THE FRAMING OF THIS STRUCTURE WILL SAFELY ACCOMMODATE CALCULATED WIND UPLIFT AND LATERAL FORCES AND EQUIPMENT DEAD LOADS. THIS IS ATTESTED TO BY MY SIGNATURE AND SEAL ON THIS DRAWING AT THE UPPER RIGHT. CERTAIN DETAILS OF THIS PROJECT MAY DIFFER, REFER TO OEM LITERATURE WHICH SHALL PREVAIL. 03 SCALE: 1" = 1'-0" BUILDING AERIAL PHOTO INSTALLATION LOCATION 05 http://www.civicsolar.com/sites/default/files/library/collateral/tilehook-install.pdf MOUNTING SYSTEM - UNIRAC TILE HOOK CONTRACTER RESPONSIBLE TO VERIFY THE FIT OF THIS ARRAY PRIOR TO INSTALLATION: THE SOLAR MODULE ARRAY SHOWN HERE IS BASED ON THE FIELD DATA PROVIDED BY THE CONTRACTOR. CONTRACTOR SHALL CONTACT THE ENGINEER IF THE ARRAY MAY NOT FIT AS PROJECTED AND CHANGES TO LAYOUT OR LOCATION MAY BE REQUIRED. COPY RIGHT & INTELLECTUAL PROPERTY NOTICE • THIS PLAN SET IS COPY RIGHT PROTECTED AND CONTAINS INTELLECTUAL PROPERTY WHICH BELONGS TO ALLEN GEZELMAN PE. • ACCESS IS GIVEN TO THE INFORMATION HEREON SOLELY FOR THE PURPOSE OF COMPLETION OF THE PROJECT FOR WHICH IT IS INTENDED. • NO OTHER USE MAY BE MADE OF THE INFORMATION, DRAWINGS, OR IDEAS HEREON WITHOUT THE EXPRESS , WRITTEN, PERMISSION OF ALLEN GEZELMAN PE ALL AFFIDAVITS, DESIGNS, OPINIONS, CALCULATIONS & OTHER ENGINEERING SERVICES PROVIDED BY ALLEN GEZELMAN PE AND HIS ASSOCIATES ON ANY AND ALL PROJECTS ARE SUBJECT TO THE PROVISIONS OF EJCDC C-700 (ENGINEERS JOINT CONSTRUCTION DOCUMENT COMMITTEE - STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT) CURRENT AT THE TIME. THOSE OBJECTING TO SAID EJCDC C-700 OR PROVISIONS THEREOF ARE DIRECTED NOT TO USE THE AFFIDAVIT, DESIGN, OPINION, CALCULATION OR OTHER ENGINEERING SERVICE OFFERED BY BRUCE TOZIER PE AND HIS ASSOCIATES ON THE PROJECT. EJCDC C-700 MAY BE VIEWED AT: HTTP://GEZELMANPE.COM/REFERENCE/AG/C-700.PDF THIS PLAN IS VOID WITHOUT MY SIGNATURE & RAISED SEAL. THIS PLAN MAY NOT BE PLACED ON FILE FOR PULLING MULTIPLE PERMITS.EACH PERMIT PULLED REQUIRES ITS OWN RAISED SEAL COPY OF THIS PLAN. DESIGNED PER: ASCE 7-05, APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE OWNER: 2254 WINCHESTER LOOP, DISCOVERY BAY, CA 94505 DIANE DURAN INSTALLATION OF A SOLAR ELECTRIC SYSTEM 2254 WINCHESTER LOOP, DISCOVERY BAY, CA 94505 ROOF MOUNT EXPOSURE: DESIGN WIND SPEED: BLDG. IP. CATEGORY: 85MPH B II CONTRACTOR: KERRY DURANT, DURANT CONSTRUCTION & SOLAR ADD. 902 MOUNT CASEY CT, EL DORADO HILLS CA 95762 LICENSE #653460 THIS PLAN IS ONLINE FOR REVIEW @ WWW.GEZELMANPE.COM/PV/0129P_DURAN_DISCOVERYBAY_CA.PDF 06 SCALE: 1" = 1'-0" SCHEMATIC ROOF ATTACHMENT DETAIL 07 SCALE: N.T.S. PV MODULE - MPE 225 PS09 MAX. UPLIFT: PZ1_9.8 PSF; PZ2_17.0 PSF; PZ3_25.1 PSF . ASCE 7 PRESSURE ZONE DIAGRAM MAY BE VIEWED AT: http://www.unirac.com/pdf/ii227.pdf CALIFORNIA PHOTO-VOLTAIC (PV) SYSTEM INSTALLATION NOTES: THE DETAILS SPECIFIED ON THIS “PAPER” PLAN ARE CONSIDERED TO BE THE MINIMUM NEEDED BY USERS (AHJ -AUTHORITY HAVING JURISDICTION AND INSTALLERS). USERS ARE ENCOURAGED TO ACCESS EV (ELECTRONIC VERSION) OF THIS PLAN: WWW.GEZELMANPE.COM/PV/0129P_DURAN_DISCOVERYBAY_CA.PDF. ACTIVE HYPERLINKS EMBEDDED IN EV PROVIDE SEAMLESS ACCESS TO VALUABLE SUPPLEMENTARY INFORMATION - SUCH AS OEM (ORIGINAL EQUIPMENT MANUFACTURER/DISTRIBUTOR) DOCUMENTS. EV ALSO ALLOWS VIEWER TO STUDY THE PLAN AND OEM DETAILS AT A MAGNIFICATION OF HIS CHOICE UP TO 6400%. IF A CONFLICT SHOULD OCCUR BETWEEN A DRAWING AND/OR SPECIFICATION HEREON AND AN OEM DETAIL, OEM SHALL PREVAIL. WIND IS THE ONLY LOAD OF SIGNIFICANCE FOR A ROOF-MOUNTED PV SYSTEM. PV MODULES (INCLUDING MOUNTING HARDWARE & RACKING) IMPOSE A LOAD OF LESS THAN 4-PSF. SNOW LOADS ARE UNAFFECTED BY AND DO NOT ADVERSELY AFFECT THE SOLAR EQUIPMENT. PV MOUNTING SYSTEM ALLOWS THE SOLAR EQUIPMENT TO ADJUST TO MOVEMENT IMPARTED BY SEISMIC EVENTS. THESE DRAWINGS AND ENGINEERING ESTABLISH THE INSTALLATION REQUIREMENTS FOR SPECIFIED PV EQUIPMENT ON BUILDINGS IN CALIFORNIA 60 FEET OR LESS IN HEIGHT AND AT ROOF ANGLES FROM FLAT UP TO 45 DEGREES. ENGINEER HAS EVALUATED THE INSTALLATION COMPONENTS AND HARDWARE CURRENTLY PROVIDED BY OEM AS ITS' OEM INSTALLATION KITS AND FOUND THEM TO MEET THE REQUIREMENTS OF THE CURRENT CBC (CALIFORNIA BUILDING CODE). THERE SHALL BE NO SUBSTITUTION OF OTHER VENDOR MATERIALS WITHOUT PRIOR APPROVAL OF ENGINEER. MATERIALS MANUFACTURED BY PROFESSIONAL SOLAR PRODUCTS INC. 1. ENGINEER OF RECORD (EOR) HAS DETERMINED THAT THE HOLD-DOWN HARDWARE AND FASTENERS SUPPLIED BY SOLAR ELECTRIC SUPPLY ARE ADEQUATE FOR DESIGN WIND SPEEDS EXCEEDING 120-MPH. ATTACHMENT MAY BE MADE BY LAGGING TO THE ROOF SHEETING IN ASCE ROOF PRESSURE ZONE 1 (PZ1) USING (MINIMUM) #14, CORROSION RESISTANT STEEL(CRS), LAGS. SELECT LENGTH ADQUATE TO FULLY PENETRATE ROOF SHEETING. IN PZ2 AND PZ3, LAGS SHALL PENETRATE A MINIMUM OF TWO INCHES INTO TRUSSES, BLOCKING, OR OTHER STRONG POINT. CONTRACTOR IS ENCOURAGED TO INSTALL IN PRESSURE ZONE 1 (PZ1) ONLY. THERE SHALL BE TWO RAILS UNDER EVERY PV MODULE. 4-HOLD-D0WNS SHALL ATTACH THE MODULES TO THE RAILS. RAILS SHALL ATTACH TO ROOF AT NOT GREATER THAN* 6-FT CENTER-TO-CENTER IN PZ1, NOT GREATER THAN* 4-FT CENTER TO CENTER IN PZ2, NOT GREATER THAN* 2-FT IN PZ3 (*NOTE THAT THESE DISTANCES CAN BE EXCEEDED BY UP TO 6-INCHES TO ACCOMMODATE IN-SITU RAFTER/TRUSS SPACING). 3. CONTRACTOR SHALL ADHERE TO REQUIREMENTS OF 2010 CBC (CALIFORNIA BUILDING CODE) CHAPTER 15 (ROOFING HTTP://PUBLICECODES.CITATION.COM/ST/CA/ST/B200V10/ST_CA_ST_B200V10_15_SECTION.HTM)AND BEST PRACTICES OF THE NRCA (NATIONAL ROOFING CONTRACTORS ASSOCIATION) ROOFING & WATERPROOFING MANUAL TO ENSURE THAT THE SOLAR INSTALLATION DOES NOT CAUSE ROOF LEAKS AT INITIAL INSTALLATION OR AS THE SYSTEM “AGES”. 4. ELECTRICAL GENERAL: • PV-MODULES PRODUCE ELECTRICITY WHEN EXPOSED TO SUNLIGHT. USE COMMON-SENSE & CAUTION. • TWISTED (WIRE NUT) CONNECTIONS ARE NOT PERMITTED FOR DC WIRING. USE OEM PLUG CONNECTOR HARNESS BETWEEN PV MODULES. • MAKE SOLID MECHANICAL CONNECTIONS TO ENSURE ELECTRICAL CONDUCTIVITY BETWEEN ALL PV MODULE ENCLOSURES AND FRAMING MEMBERS WITH NO ELECTRICALLY ISOLATED COMPONENTS, USE #10 AWG BARE COPPER WITH SCREWED CONNECTIONS FOR BONDING JUMPERS AS NEEDED. OEM BONDING PLATES/LUGS/SPECIAL APARATUS ARE AN ACCEPTABLE SUBSTITUTE. • DO NOT LEAVE LOOSE, UNSECURED WIRES/HARNESS BETWEEN PV-MODULES, TIE TO THE MOUNTING RAILS WITH UV RESISTANT ZIP TIES OR APPROVED WIRE CLIPS IN NEAT, PROFESSIONAL MANNER. • USE APPROVED MEANS AND METHODS PER CURRENT NATIONAL ELECTRIC CODE (NEC). 5. CONTRACTORS, INSPECTORS, & PLAN REVIEWERS HAVING QUESTIONS, CONTACT EOR DIRECTLY - OFFICE: 813 909 1956, CELL: 813 650 7246, FAX: 866 397 9050, E-MAIL: [email protected] CONTRA COSTA COUNTY PROPERTY INFO: APN # 011410054 SITE DESCRIPTION: T8429 L54 04 http://prosolar.com/prosolar-new/pages/rooftrac-main2.htm PRO SOLAR - SUPPORT RAIL 07 SCALE: 3/16" = 1'-0" ROOF PLAN W/ 24 FLUSH MOUNT PV MODULES STRUCTURAL PERMIT ONLY: ELECTRICAL DRAWINGS BY OTHERS. REVIEWED BY E.O.R. CONSIDERED TO BE CODE COMPLIENT. PRO SOLAR SUPPORT RAIL - 2.5" UNIRAC UNIVERSIAL MOUNT HOLD DOWN HARDWARE UNIRAC UNIVERSIAL MOUNT INSTALLATION UNIRAC UNIVERSIAL MOUNT HOLD - SAMPLE PHOTO PZ1 UTILITY (VIF.) GARAGE DISCONNECT INVERTER