Top Banner
3

An insulated concrete formwork (ICF) building system was selected for the ... element of the ICF acts as a buffer to the thermal mass, ... installed to a lift height to suit requirements:

Mar 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: An insulated concrete formwork (ICF) building system was selected for the ... element of the ICF acts as a buffer to the thermal mass, ... installed to a lift height to suit requirements:
Page 2: An insulated concrete formwork (ICF) building system was selected for the ... element of the ICF acts as a buffer to the thermal mass, ... installed to a lift height to suit requirements:
Page 3: An insulated concrete formwork (ICF) building system was selected for the ... element of the ICF acts as a buffer to the thermal mass, ... installed to a lift height to suit requirements: