Top Banner
An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS
50

An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Dec 16, 2015

Download

Documents

Kimberly Manger
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

An ARNG ProjectAutodesk Revit Case Study

Mark Da Gama RoseDesign Technology Manager – JACOBS

Page 2: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Class Poll

Audience Composition: Architect/Interior Architect Engineer (Structural/MEP) Principal IT/BIM Manager

Page 3: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Class Intentions

Stress How Early Decisions On A Project Have A Lasting Effect

Talk About What Worked And What Did Not Work

Show Recent Solutions To Issues That Arose On INARNG-AFRC

Stress That It’s All About The Process

Communication And Standards Are Key Especially As A Project Is Hampered By Its Weakest Link

Page 4: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Class Topics

INARNG-AFRC Project Background BIM Mentality And Process Expectations – Both Internally and of Client Hardware File Linking Worksharing And Worksets Model Performance Checks Challenges And Decisions Made Within Each Discipline Coordination Between Disciplines Construction Document Creation Making CAD Files Compatible With AEC 3.0 CAD Standards Revit To 3D Studio Max Rendering Process Summation And Closure

Page 5: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

INARNG-AFRC Project Background

Purpose: Joint Armed Forces Reserve Center to serve the peace-time missions of the assigned unit and space for all personnel to perform the necessary tasks that will improve the unit readiness posture

Project Size: 168,095 SQ. FT.

Design Deliverables:35% Dec 2008

(8 Weeks)PDFs

65% Feb 2009(8 Weeks)

PDFs

95% Apr 2009(8 Weeks)

PDFs

FINAL June 2009 AutoCAD 2007

Page 6: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

INARNG-AFRC Project Background

Primary Spaces Include:

Building’s permanent masonry-type construction consisted of:Slab-On–Grade First Floor And Elevated Steel Structural System For The Second Floor

Brick And Concrete Block Units With Concrete FloorsExterior Masonry Walls Combined With Interior Masonry And Steel Stud/Gyp. Board Partitions

Steel-Framed Roof Structure – Combination Membrane/ Sheet Metal Roof

Locker RoomsMilitary Unit Storage Rooms Including Arms Vaults, Mechanical, Electrical And Equipment Rooms

Office AreasClassroomsAn Assembly HallCommercial Kitchen

Page 7: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

BIM Mentality and Process

THINK BEFORE YOU DO – BIM Process as important as the: Hardware Specs Software Version Limitations Team’s Learning Curve

EARLY REVIT DECISIONS CAN HAVE A LASTING EFFECT ON THE PROJECT

Key Steps in the project: BIM Strategy Call BIM Kickoff Meeting With Team Maintain A Living, Breathing BIM Implementation Plan Throughout The

Project

Page 8: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Expectations – Both Internally and of Client

Per the Client’s Scope of Work the only final documents of record were AutoCAD files

However, Jacobs’ internal mandate is to do projects in BIM…. This project was done using the Autodesk Revit 2009 platform

Page 9: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

How were those Expectations Managed?

Strived To Plot All Construction Documents From Revit Team Member Support Came From BIM Coordinator And Revit

Discipline Leads Tried To Have Weekly Bim “Lunch And Learns” Needed To Have A 5 Minute “Huddle” For Revit Discipline Leads

Just Because We Develop A Model Does Not Mean We Deliver A Model….Client Expectations/Budgets/Staffing/Billable Hours

Page 10: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Hardware

Revit Discipline Leads Had Dell T5400s – 64 Bit (Specs: 8GB RAM, 3.16 GHz, 512 MB Nvidia Video Card)

Most Team Members Had Dell T3400s (Specs: 4GB RAM, 3.16 GHz, 256 MB Nvidia Video Card)

One Rendering Computer: (Specs: Dual Quad core; 8GB RAM; Xeon Processor)

All Users With Dell T3400 Had 3gb Switch Enabled And Paging File Increased To 8GB

All Users Had Gigabit Switch To The Desktop Connections

Page 11: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

File Linking

INARNG-AFRC Project File Structure

INARNG-AFRC

INARNG-AFRC-A-CENTRAL.RVT

INARNG-AFRC-A-DETAILS.RVT

INARNG-AFRC-E-CENTRAL.RVT

INARNG-AFRC-E-DETAILS.RVTINARNG-AFRC-P-DETAILS.RVT

INARNG-AFRC-A-DRAWINGINDEX.RVT

INARNG-AFRC-I-CENTRAL.RVT

INARNG-AFRC-S-CENTRAL.RVT

INARNG-AFRC-M-CENTRAL.RVT

INARNG-AFRC-M-DETAILS.RVT

INARNG-AFRC-F-CENTRAL.RVT

INARNG-AFRC-F-DETAILS.RVT

INARNG-AFRC-P-CENTRAL.RVT

Page 12: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

File Linking

3 Main Reasons Why Discipline Models Were Separated Out:

1. Each Discipline Controlled Their Own Drawing Sheet Set

2. Prevented Disciplines “Stepping On Each Other’s Toes” Concerning Element Borrowing And Relinquishing

3. Model Performance Was Controlled Through The Opening And Closing Of Linked File Worksets

Page 13: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

File Linking

Negatives To Linking By Discipline

Systems Connections

Limitations on Tagging through the Link

Split Architecture from Interiors?

File Management Issues Magnified

Communication Needs To Be Especially High

Page 14: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

File Linking

A “Model” And Typical Detail File Was Created For Almost Every Discipline

Pros: Model Performance Streamlined Discipline Workflow

Cons: View And Sheet Referencing 2 Files To Manage Settings And Coordinate Drawings for Submittals Need To Be Very Clear Whether Drawing Sheets Are Located In

“Model” File Or Typical Detail File

Page 15: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

File Linking

Important Considerations:

Renaming The Linked Instance

Pin Linked Instance

“Make Editable” Linked Project Files

Keep Same Name Of Linked Central Files (Project Prefix-Discipline Initial-CENTRAL.RVT) INARNG-AFRC-A-CENTRAL.RVT INARNG-AFRC-M-CENTRAL.RVT

Page 16: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

File Linking

INARNG-AFRC-DRAWINGINDEX.RVT

Separated Out For Two Reasons:1. Model Performance

2. Architectural Workflow – Allows Specialization Of Task

Page 17: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

File Linking

Downfalls Time to Open Project File

Discipline Management Process

Sorting/Grouping of Discipline Sheets

INARNG-AFRC-DRAWINGINDEX.RVT

Page 18: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Worksharing and Worksets

“LARGE CHUNKS OF THE MODEL”

Need Mentality “Why Do I Need To Create A New Workset?”

Uses: Workflow Model Performance View Visibility Control – Inside Of Project File View Visibility Control – Between Project Files

Page 19: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Worksharing and Worksets

Key Project Aspects: Workset For Each Linked File Minimal Amount Of User Created Worksets Element Workset Classification Identified And Updated In BIM

Implementation Plan Naming Convention

*LINKED MECH *LINKED STRUCT Shell Core

Page 20: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Worksharing and Worksets

Key Project Aspects:

Only Discipline Leads Were Allowed To Create New Worksets

Checking Active Workset

Workset Classification Correction

Best Approach To Relinquishing?

Workset View Visibility (View Specific) VERSUS Closing Worksets (Global)

Page 21: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Worksharing and Worksets

Key Project Aspects: Taking Advantage of Closing Worksets

Element Borrowing Was Heavily Used

Making Worksets “Editable” Allows 2 Main Benefits:1. Prevents Anyone Else From Manipulating Elements Tied To That

Workset

2. Revit Does Not Constantly “Ping” The Central File About Who Is Borrowing Elements Of That Workset

Page 22: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Model Performance Checks

**Open/Close** Drafting View

64 Bit Machines To Plot Out Submittals

Benefited From Using The 3GB Switch

Close Worksets When Possible

Work In Wireframe/Plot In Hidden Line

Review And Fix Warnings

Family Detail Level & Visibility In Plan/Elevation

Page 23: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Challenges and Decisions Made Within Each Discipline

Common Challenges Amongst The Disciplines

Proximity of Team

Worksharing Monitor Usage

Saving & Relinquishing

Specialization of Task

AutoCAD Versus Revit Newbie Mentality

Ghost of Revit

Page 24: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Challenges and Decisions Made Within Each Discipline

Architectural Challenges

“Elements Have Duplicate Mark Values”

Team Members Rotated In And Out

Wall Join Conditions

Page 25: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Challenges and Decisions Made Within Each Discipline

Interiors Challenges

Adding Room Tags

Interior Elevations

Maintaining View & Sheet Consistency

Tile Patterns

Material Legend

Page 26: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Challenges and Decisions Made Within Each Discipline

Structural Challenges

Coordinating Design And Revit Production Workflow

Custom Truss Creation

Page 27: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Challenges and Decisions Made Within Each Discipline

Mechanical Challenges

Systems Creation

Family Creation

Page 28: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Challenges and Decisions Made Within Each Discipline

Electrical Challenges

Circuit Creation Content Creation

Page 29: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Challenges and Decisions Made Within Each Discipline

Plumbing Challenges

Filters Distinguished Pipe System Types By: Color (Graphically) Linetype (for construction

documents) Export Mapping To Systems

Layers In AutoCAD

WAN workflow

Page 30: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Challenges and Decisions Made Within Each Discipline

Fire Protection Challenges

Sprinkler Pipe Creation

Page 31: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Coordination Between Disciplines

Setting Structural Usage of Walls

Assigning Family Category & Sub-Category

Room Volume Coordination & Workflow

Room Tag Coordination & Workflow

Page 32: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Coordination Between Disciplines

To Host Or Not To Host?

Structural Column Grid Updates

Owning Linked Worksets

Concrete Plan to Prepare for Submittals

Page 33: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Construction Document Creation

Browser Organization – Crucial For Views And Sheets Need To Sort By Working And Sheet Views And Then By Sub

Discipline If Needed Did not implement effectively on INARNG-AFRC

Page 34: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Construction Document Creation

Did Not Really Use Dependant Views

Had To Use Masking Regions As A Polygonal Viewport Clip

Page 35: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Construction Document Creation

View Templates Not Enforced From The Start & Maintained Thereafter On INARNG-

AFRC Very Important To Set Up In The Beginning Need To Have One For Each Type Of View – Should Be Part Of

Template Helps Alleviate “Ghost of Revit”

Page 36: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Construction Document Creation

Only Copy/Monitored Structural Column Grids And Levels

Section Cuts Apparent In Multiple Plans

MEP Disciplines Could Not Show Arrowhead On Space Tags

Page 37: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Construction Document Creation

Instead Of Keynotes (Could Not Number By Keynote Or Sheet) We Used Note Blocks

All Keyed Notes Per Type Of View Listed Regardless Of Shown Or Not

Strike Through Keyed Notes Not Applicable To View

Needed To Have Note Block And Corresponding Tag For Each Type Of View That Has Keyed Notes

Page 38: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Construction Document Creation

Details

Imported And Exploded In Revit

Replaced With Detail Components

Incurred Numerous “Line Slightly Off Axis Sketch” After Importing

Text Style Converted To Revit

Page 39: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Navigating through the Export Process to Match AEC CAD Standards

Checklist In Revit Before Exporting

Mapping Of Layers/Colors (Export Layers Txt File)

File > Export…Export Options

Miscellaneous Text On Titleblock Should Be Set To Transparent Had Issue With Section Headers Hatching – Needed To Edit Block Symbol

Page 40: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Navigating through the Export Process to Match AEC CAD Standards 3.0

Checklist In AutoCAD 2007 After Exporting

Linetype Scale – Scale Up X92 For 1/8”=1’-0”

Fill Patterns And Masking Regions Were Solid Hatch In AutoCAD Files

DWG File Naming Convention To Match AEC CAD Standards

Page 41: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Revit To 3DS Max Rendering Process

1. Exported Revit Discipline Models Detach From Central Remove All Links Export 3d View To AutoCAD

2. In 3DS Max: Linked In The Architectural .DWG Linked In Each Other Discipline .DWG

3. The Model Only Edited If Needed For A Rendered View Materials & Lights Added VRAY – Rendering Engine

Page 42: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Rendering Images

Page 43: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Rendering Images

Page 44: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Rendering Images

Page 45: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Rendering Images

Page 46: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Rendering Images

Page 47: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Rendering Images

Page 48: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Summation and Closure

Survey User Level Experience Per Discipline (1-5)

Establish Expected/Specific/Realistic Tasks By Team Members In Each Discipline Model (Roles And Responsibilities – Put In BIM Implementation Plan)

Standards Are Key – Templates, Bim Implementation Plan, Organized Details And Content

Acceptance Of Working In Revit And How It Will Be Done On A Project Is Crucial….Everyone Must Be On The Same Page

1 Brand New User

2 Worked On 1-2 Revit Projects

3 Can Resolve Coordination Review Issues

4 Can Fix Warnings; Cleans Up Workset Classification

5 Advanced Parametric Family Creation; Revit Discipline Lead

Page 49: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.

Questions/Comments

Page 50: An ARNG Project Autodesk Revit Case Study Mark Da Gama Rose Design Technology Manager – JACOBS.