PEKERJAAN : NORMALISASI SUNGAILOKASI : DESA LANCANG PASILO JUMERANGKABUPATEN : PIDIEPROPINSI : NANGGROE ACEH DARUSSALAM
KOMPONENPERKIRAAN HARGA JUMLAH
ANALISA SATUAN VOLUME SATUAN HARGA(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)A. TENAGA
1 Pekerja Jam 0.625 6,428.57 4,017.862 Mandor Jam 0.077 6,785.71 522.50
Jumlah Harga Tenaga A 4,540.36
B. PERALATAN
1 Excavator Jam 0.051 247,475.36 12,621.242 Alat Bantu Set 1.000 12,000.00 12,000.00
Jumlah Harga Tenaga B 24,621.24
C. JUMLAH HARGA DAN PERALATAN (A + B) 29,161.60
D OVERHEAD & PROPIT = 10 % x C 2,916.16
E HARGA SATUAN PEKERJAAN ( C + D ) 32,077.76
URAIAN ANALISA HARGA SATUAN
PEKERJAAN : NORMALISASI SUNGAILOKASI : DESA LANCANG PASILO JUMERANGKABUPATEN : PIDIEPROPINSI : NANGGRO ACEH DARUSSALAM
NO. U R A I A N KODE KOEF. SATUAN KETERANGAN
I. ASUMSI1 Menggunakan alat berat ( cara mekanik )2 Lokasi pekerjaan : 3 Kondisi drainase : selesai dibersihkan4 Jam kerja efektif Ttk 7.00 Jam5 Luas penampang saluran L 1.50 M2
II. URUTAN KERJA1 Penggalian sungai dengan menggunakan
Alat Berat Excavator 2 Hasil galian ditimbun disamping sungai dan
membentuk tanggul3 Sekelompok pekerja membersihkan daerah
galian dan merapikan hasil galian, sekaligusmembentuk tanggul saluran
III. PEMAKAIAN ALAT DAN TENAGA
1 ALAT- Excavator C03 Ls
Kapasitas Bucket V 0.65 M3Faktor Bucket Fb 0.90
Faktor Efisiensi Alat Fa 0.83Waktu Siklus : TS1 -
- Menggali dan menimbun T1 0.50 Menit- Lain - lain T2 0.50 Menit
TS1 1.00 M3/JamKap. Produksi/Jam = V x Fb x fa x 60 Q1 29.13
TS1 -Koef. Alat/Km = Galian Saluran -
Q1 = 1 (2 + 1)/2 x 1 C03 0.05 Jam
Q1ALAT BANTU C10
- Cangkul Ls- Sekop
2 TENAGAProduksi Kebutuhan Tenaga Q1 22.41 M3
- Pekerja P 2.00 Jam- Mandor M 0.25 Jam
Koefisien Tenaga :- Pekerja (P x Tk) : Q1 L01 0.625 Jam- Mandor (M x Tk) : Q1 L02 0.077 Jam
URAIAN ANALISA HARGA SATUAN ALAT
JENIS ALAT : BULDOZER 100 -150 HPSATUAN :LOKASI : DESA LANCANG PASILO JUMERANGKABUPATEN : PIDIEPROPINSI : NANGGRO ACEH DARUSSALAM
NO. U R A I A N KODE KOEFISIEN SATUAN KETERANGAN
A. URAIAN PERALATAN1 Jenis Peralatan BULDOZER 100 - 150 HP2 Tenaga Pw 140.00 HP3 Kapasitas Cp4 Alat Baru :
a. Umur Ekonomis A 5.00 Tahunb. Jam Kerja dalam 1 Tahun W 1,600.00 Jamc. Harga Alat B 512,500,000.00 Rupiah
5 Alat yang dipakai :a. Umur Ekonomis A' 5.00 Tahunb. Jam Kerja dalam 1 Tahun W' 1,600.00 Jamc. Harga Alat ( * ) B' 410,000,000.00 Rupiah
B. BIAYA PASTI PER JAM KERJA
1 Nilai sisa alat = 10 % x B C 41,000,000.00 Rupiah
2 Faktor Angsuran Modal = 1 x (1+1) ^ A' D 0.65 M3 (1+1) ^ A' - 1 0.90
3 Biaya pasti per jam : 0.83a. Biaya pengembalian modal ( B' - C ) x D E - Rupiah
W' 0.50b. Asuransi dan lain - lain = 0,002 x B' F 0.50 Rupiah
W' 1.00Biaya pasti per jam = ( E + F ) G 29.13 Rupiah
C. BIAYA PASTI PER JAM KERJA
1 Bahan Bakar = ( 0,175 Ltr/HP/Jam ) x Pw x Ms H 0.05 Rupiah2 Pelumas = ( 0,01 Ltr/HP/Jam ) x Pw x Mp I Rupiah3 Perawatan dan Perbaikan = ( 12,5 % ) x B K Rupiah
W'4 Operator = ( 1 orang/Jam ) x U1 L Rupiah5 Pembantu Operator = ( 1 orang/Jam ) x U2 M Rupiah
Biaya Operasi per Jam = ( H + 1 + K + L + M ) P 22.41 Rupiah2.00
D. TOTAL SEWA ALAT PER JAM = ( G + P ) S 0.25 Rupiah
E. LAIN - LAIN
1 Tingkat suku bunga i %/Tahun2 Upah operator/sopir U1 9,500.00 Rp./Jam3 Upah pembantu operator/pembantu sopir U2 6,000.00 Rp./Jam4 Bahan Bakar bensin Mb 4,500.00 Liter5 Bahan bakar solar Ms 4,300.00 Liter6 Minyak Pelumas Mp 12,500.00 Liter
URAIAN ANALISA HARGA SATUAN ALAT
LIST OF WAGES, BUILDING MATERIAL AND EQUIPM
PROJECT : REHABILITATION OF FISHPOND KEMBANG TANJUNG SUB DISTRIC PIDIE DISTRIC NANGGROE ACEH DARRUSALAM
WORK ITEM : REPLACEMENT OF SEMI PERMANENT BRIDGE WITH 6 METER SPANCODE :NAME OF OWNER :LOCATION : JEUMANANG, PASI LHOK, LANCANG VILLAGES
1 Common Timber M3 750,000.00 -2 1st Class Timber M3 3,000,000.00 -3 2nd Class Timber M3 2,500,000.00 -4 Log Timber dia. 15 Cm Bh 5,200.00 -5 Nail Kg 9,250.00 -6 Plywood Nail Kg 9,250.00 -7 Zincplate Nail Kg 19,000.00 -8 Porland Cement @ 50 Kg Zak 41,000.00 -9 Soil for Filler M3 30,000.00 -
10 Sand for Filler M3 55,000.00 -11 Sand for Mortar M3 79,500.00 -12 Sand for Concrete M3 79,500.00 -
WAGE/HOURS
TRANSPORTATION
13 Gravel M3 70,750.00 -14 River Stone M3 65,000.00 -15 Crushed Stone 2/3 M3 65,000.00 -16 Crushed Stone 5/7 M3 65,000.00 -17 Reinforced Concrete Steel Kg 8,000.00 -18 Reinforced Concrete Wire Kg 10,000.00 -19 IWF 300.150.6,5.9 Steel M' 480,000.00 -20 IWF 150.75.5.7 Steel M' 188,000.00 -21 IWF 250.125.6.9 Steel M' 340,000.00 -22 IWF 125.60.6.8 Steel M' 130,000.00 -23 L 75.75.7 Steel Profile M' 88,000.00 -24 L 60.60.6 Steel Profile M' 64,000.00 -25 Steel Aungkur Unit 7,200.00 -26 Bolt Unit 3,500.00 -27 Corrugated Zinc BJLS 20 K Unit 45,000.00 -28 Zinc Rige BJLS 35 K Unit 30,000.00 -29 Rubber Block Unit 23,000.00 -30 Cast Iron dia. 1,5" M1 15,000.00 -31 PVC Pipe dia. 3/4" M1 12,000.00 -32 PVC Pipe dia. 4" M1 30,000.00 -33 Acrylic Painting Kg 7,500.00 -34 Oil Painting Kg 23,000.00 -35 Tinner for Painting Kg 5,200.00 -36 Filler for Painting Kg 4,500.00 -37 Base Painting Kg 18,000.00 -38 Sand Paper Piece 2,750.00 -39 Wood Painting Kg 15,000.00 -40 Teer Kg 6,500.00 -41 Zinc Plate M2 32,500.00 -42 Gasoline Litre 4,500.0043 Solar Litre 4,300.0044 Grase Litre 12,500.00
NO. E X P L A N A T I O N UNITPRICE
(Rp.) (Rp.)(1) (2) (3) (4) (5)
C. EQUIPMENT RENTAL UNIT PRICE 1 Chain Saw Unit 4,510,000.00 25,995.802 Concrete Mixer Unit 9,840,000.00 23,424.113 Excavator 80 - 140 HP Unit 410,000,000.00 247,475.364 Buldozer 100 - 150 HP Unit 512,500,000.00 354,640.565 Dump Truck 3 - 4 M3 Unit 110,700,000.00 109,978.546 Dump Truck Unit 123,000,000.00 131,678.96
RENTAL COST/HOURS
7 Stamper Unit 6,150,000.00 11,008.298 Jack Hammer Unit 5,330,000.00 16,306.189 Generator Set Unit 41,000,000.00 151,168.79
10 Supporting Equipment Unit 12,000.00 12,000.00
KEMBANG TANJUNG SUB DISTRIC PIDIE DISTRIC NANGGROE ACEH DARRUSALAMREPLACEMENT OF SEMI PERMANENT BRIDGE WITH 6 METER SPAN
A. HARGA SATUAN UPAH1 Buruh Tak Terlatih OH 35,000.00 5,000.002 Pekerja OH 45,000.00 6,428.573 Mandor OH 47,500.00 6,785.714 Tukang kayu OH 52,500.00 7,500.005 Kepala Tukang OH 55,000.00 7,857.146 Operator Alat Berat OH 66,500.00 9,500.007 Operator Chain Saw OH 55,500.00 7,928.578 Pembantu Operator OH 42,000.00 6,000.009 Juru Ukur OH 65,000.00 9,285.71
10 Pembantu Juru Ukur OH 45,000.00 6,428.57
NO. URAIAN SATUAN(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
B. HARGA SATUAN BAHAN1 Kayu /Papan Sembarang M3 1,300,000.00 - 1,300,000.002 Kayu / Papan kelas II M3 2,000,000.00 - 2,000,000.003 Kayu / Papan kelas III M3 1,700,000.00 - 1,700,000.004 Kayu Bulat dia. 15 Cm Bh 1,200.00 - 1,200.005 Paku Biasa Kg 10,000.00 - 10,000.006 Paku Triplek Kg 9,250.00 - 9,250.007 Paku Seng / Atap Kg 19,000.00 - 19,000.00
8 Semen PC (40 Kg) Zak 30,000.00 - 30,000.009 Tanah Timbun M3 30,000.00 - 30,000.00
10 Pasir Urug M3 55,000.00 - 55,000.0011 Pasir Pasang M3 65,000.00 - 65,000.0012 Pasir Beton M3 79,500.00 - 79,500.0013 Kerikil M3 70,750.00 - 70,750.0014 Batu Kali M3 65,000.00 - 65,000.0015 Batu Belah 2/3 M3 85,000.00 - 85,000.0016 Batu Belah 5/7 M3 65,000.00 - 65,000.0017 Besi beton Kg 6,500.00 - 6,500.0018 Kawat beton Kg 5,000.00 - 5,000.0019 Besi IWF 300.150.6,5.9 M' 480,000.00 - 480,000.0020 Besi IWF 150.75.5.7 M' 188,000.00 - 188,000.0021 Besi IWF 250.125.6.9 M' 340,000.00 - 340,000.0022 Besi IWF 125.60.6.8 M' 130,000.00 - 130,000.0023 Besi L 75.75.7 M' 88,000.00 - 88,000.0024 Besi L 60.60.6 M' 64,000.00 - 64,000.0025 Angker/Sengkang Bh 7,200.00 - 7,200.0026 Angkur/Baut Bh 3,500.00 - 3,500.0027 Seng Gelombang BJLS 20 K Bh 45,000.00 - 45,000.0028 Rabung Seng BJLS 35 K Bh 30,000.00 - 30,000.0029 Karet Mati Bh 23,000.00 - 23,000.0030 Saluran Air Bersih Pipa dia. 1,5" M1 15,000.00 - 15,000.0031 Saluran Air Kotor Pipa dia. 3/4" M1 12,000.00 - 12,000.0032 Saluran Air Kotor Pipa dia. 4" M1 30,000.00 - 30,000.0033 Cat tembok Kg 7,500.00 - 7,500.0034 Cat Minyak Kg 23,000.00 - 23,000.0035 Minyak Cat Kg 5,200.00 - 5,200.0036 Dempul Kg 4,500.00 - 4,500.0037 Cat Menie Kg 18,000.00 - 18,000.0038 Amplas Lbr 2,750.00 - 2,750.0039 Cat Kayu Kg 15,000.00 - 15,000.0040 Teer Kg 6,500.00 - 6,500.0041 Seng Plat M2 32,500.00 - 32,500.0042 Minyak Bensin Ltr 4,500.00 4,500.0043 Minyak Solar Ltr 4,300.00 4,300.0044 Minyak Pelumas Ltr 12,500.00 12,500.00
HARGA SATUAN (Rp.)
ONGKOS ANGKUT
JLH HARGA DILOKASI
NO. URAIAN SATUAN(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
C. HARGA SATUAN ALAT1 Chain Saw OH 4,510,000.00 25,995.802 Concrete Mixer OH 9,840,000.00 23,424.113 Excavator 80 - 140 HP OH 495,000,000.00 247,475.364 Buldozer 100 - 150 HP OH 512,500,000.00 354,640.565 Dump Truck 3 - 4 M3 OH 110,700,000.00 109,978.546 Dump Truck OH 123,000,000.00 131,678.967 Stamper OH 6,150,000.00 11,008.298 Jack Hammer OH 5,330,000.00 16,306.189 Generator Set OH 41,000,000.00 151,168.79 10,077.92
10 Alat Bantu OH 12,000.00 12,000.00
HARGA SATUAN (Rp.)
ONGKOS ANGKUT
JLH HARGA DILOKASI
Hal. 1
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
DEEP SOIL EXCAVATION GALIAN TANAH DALAM K.224 A
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION ASUMTION1 Soil excavation doing by man 1 Using man power
power 2 Capacity of working group 100/ day2 Result of soil excavation 3 Average of excavation up to 3 m
be moved from digging 4 For the stony the work with code K.224 3 Depth excavation be containing be multiplicated by 1,5 factor
water and having balance factor 5 For drying be suporting by pump
URAIAN : 1 Penggalian tanah dengan tenaga ANGGAPAN : 1 Penggunaan tenaga manusiamanusia 2 Kapasitas kerja kelompok 100/ hari
2 3 Kedalaman rata - rata s/d 3 mgalian 4 Untuk jenis berbatu harga satuan pekerjaan K.224
3 Galian dalam terdapat air dan dikalikan dengan faktor 1,5adanya faktor kesesuaian 5 Untuk proses pengeringan perlu dibantu pompa
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)(Rp.)
- - - - - - -
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
0.00
JUMLAH (Rp.) 327,500.00VOLUME E 2.000 SATUAN M3
D/E HARGA SATUAN (Rp.) 40,937.50 Per M3
Tanah galian disingkirkan dari lobang tenaga
FRENCH RED CROSSPALANG MERAH PERANCIS
Hal. 2
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
SOIL FILLER FOR OPRIT TIMBUNAN TANAH/OPRIT K.225
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 For the pilling of building ASUMTION 1 Material cost be calculated on the job sitematerial must be clean 2 Compaction coefisien 1,30from the organic matter
2 Construction of filling doing layer by layer
ANGGAPAN : 1 Harga bahan sampai di lokasi pekerjaan2 Koefisien pemadatan 1,30
URAIAN : 1 Tempat penimbunan bahan untuk konstruksi bersih daribahan organik
2 Pekerjaan ditempatkan untuktimbunan pada konstruksi lapisdemi lapis.
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
SOIL RE-FILL URUGAN TANAH KEMBALI 1/2 A.1
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Soil from excavation be filled ASUMTION 1 Tanah urugan diratakan dan dipadatkan dengan to the digging location cara menumbuk.
2 The organic disposal fromdigging be throwing ANGGAPAN : 1 Soil filler be flated and be compacted by
hand compactionURAIAN : 1
ke bekas galian2 Membuang sampah - sampah dari
bekas galian
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)(Rp.)
- - - - - - -
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
Water Pump - 0.00 -
0.00
JUMLAH (Rp.) 13,695.00VOLUME E 1.000 SATUAN M3
D/E HARGA SATUAN (Rp.) 1,711.88 Per M3
Tanah bekas galian diurug kembali
FRENCH RED CROSSPALANG MERAH PERANCIS
Hal. 4
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
K.900
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Material on out of job site ASUMTION 1 Cost of material franco on pick up location2 2 Length of timber 7 M be lifted by 4 man
power to the job site33 ANGGAPAN : 1 Harga bahan sesuai dengan tempat pengambilan
5 km 2 Panjang kayu kurang lebih 7 M diangkut oleh 4 orang
URAIAN : 1 Bahan/material berada diluarlokasi pekerjaan
2 Bahan diangkut oleh tenagamanusia ketempat pekerjaan
3
4
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)(Rp.)
Timber 0.220 M3 - 1,300,000.000 286,000.00 -
286,000.00
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
- - - - -
0.00
JUMLAH (Rp.) 304,750.00VOLUME E 7.000 SATUAN M'
LOG TIMBER Ø 15 s/d 20 Cm FOR PILLINGPENGADAAN TIANG PANCANG Ø 15 s/d 20 Cm
Transportation the material by man
Material be pilled on the pic up locationThe distance of pick up location max
Bahan ditumpuk ditempat pengambilanJarak pengambilan maksimum 5 Km
FRENCH RED CROSSPALANG MERAH PERANCIS
D/E HARGA SATUAN (Rp.) 43,535.71 Per M'
Hal. 5
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PEMANCANGAN TIANG PANCANG KAYU K.901CEROCOK dia. 15 S/D 20 CM
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Material and equipment stand ASUMTION 1 Weight of hammer minimum 0.75 - 1 Tonby on job site by supplyer 2 Pilling be stoped after 10 kali ditumbuk
2 Material be located near job masuk = 1 cmsite 3 Foundation using the timber piling and pillar
4 Pile set up be diging before URAIAN : 1 Bahan/Alat siap dilapangan oleh
supplier2 Bahan diletakkan kedudukannya ANGGAPAN : 1 Berat penumbuk minimal 0.75 - 1 Ton
dekat dengan lokasi pekerja 2 Penghentian pemancangan setelah 10 kali ditumbuk masuk = 1 cm
3 Pondasi digunakan pemancang kayu dan pilar4 Letak pancang dilubangi lebih dahulu.
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)(Rp.)
- - - - - - -
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
Hammer 1.000 - 0.140 11,415.00 1,598.10
1,598.10
LOG TIMBER Ø 15 s/d 20 Cm PILLINGFRENCH RED CROSSPALANG MERAH PERANCIS
JUMLAH (Rp.) 112,373.10VOLUME E 1.000 SATUAN M'
D/E HARGA SATUAN (Rp.) 112,373.10 Per M'
Hal. 6
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
SAND FILLER UNDER THE FOUNDATIONURUGAN PASIR PADA BAWAH PONDASI A. 18
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Filling be compacted ASUMTION 1 Material cost be calculated on the job siteeach 20 cm per layer 2 Capacity of working group 100/ day
URAIAN : 1 Timbunan harus dipadatkan ANGGAPAN : 1 Harga bahan sampai dilokasi pekerjaansetiap lapisan setebal 20 cm 2
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)(Rp.)
Sand Filler 1.200 M3 55,000.00 66,000.00
66,000.00
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
-
Kapasitas kerja kelompok 100/ hariKoefisien pemadatan 1 : 2
FRENCH RED CROSSPALANG MERAH PERANCIS
0.00
JUMLAH (Rp.) 86,257.50VOLUME E 1.000 SATUAN M3
D/E HARGA SATUAN (Rp.) 10,782.19 Per M3
Hal. 7
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
RIVER STONE PAIRING CONTRUCTIONKONSTRUKSI PASANGAN BATU K.810
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Material and equipment stand ASUMTION 1 Using culvert, bridge and shear wall andby on job site by supplyer ather structure with stone pairing
2 Stone crushed be install with wit water proofing mortarPC and Sand mortar 2 Material be delivered on job site
3 Not included the excavation and filling URAIAN : 1 Material disiapkan di lokasi oleh 4 Mortar 1 : 3
supplier2 ANGGAPAN : 1 Digunakan pada gorong - gorong, jembatan, tembok
spesi semen PC + Pasir penahan dan struktur-struktur yang lain yang menggunakan pasangan batu kedap air
2 Material dikirim sampai lokasi3 tidak termasuk pekerjaan galian/timbunan4 Adukan spesi 1 : 3
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)(Rp.)
Batu belah 10-15 cm 5.000 M3 - 65,000.000 325,000.00 -Pasir 1.250 M3 - 65,000.000 81,250.00 -Semen (40 Kg) 15.000 zak - 30,000.000 450,000.00 -
856,250.00
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
Batu belah dipasang dengan ikatan
FRENCH RED CROSSPALANG MERAH PERANCIS
- - - - -
0.00
JUMLAH (Rp.) 1,486,725.00VOLUME E 5.000 SATUAN M3
D/E HARGA SATUAN (Rp.) 297,345.00 Per M3
Hal. 8
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
PLESTERINGPLESTERAN K.811
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Material and equipment stand ASUMTION 1 Weight of hammer minimum 0.75 - 1 Tonby on job site by supplyer 2 Pilling be stoped after 10 kali ditumbuk
2 Material be located near job masuk = 1 cmsite 3 Foundation using the timber piling and pillar
4 Pile set up be diging before URAIAN : 1 Bahan/Alat siap dilapangan oleh
supplier ANGGAPAN : 1 Berat penumbuk minimal 0.75 - 1 Ton2 Bahan diletakkan kedudukannya 2 Penghentian pemancangan setelah 10 kali ditumbuk
dengan pekerja masuk = 1 cm3 Pondasi digunakan pemancang kayu dan pilar4 Letak pancang dilubangi lebih dahulu.
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTAL
FRENCH RED CROSSPALANG MERAH PERANCIS
PERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)(Rp.)
0.00
JUMLAH (Rp.) 837,500.00VOLUME E 50.000 SATUAN M2
D/E HARGA SATUAN (Rp.) 16,750.00 Per M2
Hal. 9
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
CONCRETE FORM WORK PEKERJAAN CETAKAN UNTUK BETON K. 890
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 The equipment be installed on ASUMTION 1 Material cost be calculated on the job siteconcrete or stone pairing 2 Cutting of PVC pipe dia. 2 " depend on wall thickess with the slope to below or wall thickess.ather 3 Palm fibre be install on the end of PVC
2 4 PVC be calculated @ 40 m'dalam peralon.
ANGGAPAN : 1 Harga bahan dihitung ditempat pekerjaanURAIAN : 1 Memasang peralatan pada 2 Setiap potongan peralon 2 " panjang tergantung lebar/
pasangan batu/beton pada talud tebal dinding.dengan miring ke bawah bagian 3 Ijuk dipasang diujung sekeliling peralon bagian dalam.lainnya 4 Hitungan peralon per 40 m'
2 Memasang ijuk disekeliling bagiandalam peralon.
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
-
0.00
JUMLAH (Rp.) 867,500.00VOLUME E 40.000 SATUAN M'
D/E HARGA SATUAN (Rp.) 21,687.50 Per M3
Hal. 9a
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
CANAL REPLECEMENT BY HEAVY DUTY EQ.MEMBUAT SALURAN K. 110 A
(MENGGUNAKAN ALAT BERAT)
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Canal excavation doing by ASUMTION 1 Using the excavator (140 M3/hari)Excavation 2 Tree and any planting be clean up
2 Soil from canal excavation be following the dykes be construction.throwing on side of canal
3 Man power be throwing the ANGGAPAN : 1 Menggunakan alat berat exavator (140 M3/hari)roots and ather disposal 2 Pohon-pohon dan semak belukar sudah dibersihkan
pada waktu pembentukan tanggul samping.URAIAN : 1
excavator2 Tanah galian diangkat ke
samping saluran yang digali.3 Tenaga manusia membuang akar-
akar kayu dan sampah-sampahlainnya.
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)(Rp.)
Menggali saluran dengan Exavator.
FRENCH RED CROSSPALANG MERAH PERANCIS
0.00
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
Exavator 140 HP 1.000 1.000 5.000 247,475.36 1,237,376.80
1,237,376.80
JUMLAH (Rp.) 1,568,376.80VOLUME E 140.000 SATUAN M3
D/E HARGA SATUAN (Rp.) 11,202.69 Per M3
Hal. 10
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
CONCRETE FORM WORKPEKERJAAN CETAKAN UNTUK BETON K. 710
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION ASUMTIONURAIAN : ANGGAPAN : 1 1/3 dari bahan masih dapat digunakan lagi untuk
1 Menyiapkan bahan memotong, pada cetakan lain.
mengergaji, memaku dan 2 Kapasitas produksi = 2 M3 / hari.
memasang
2 Membongkar cetakan setelah
beton mengeras.
10 Formwork
10 Cetakan dibongkar oleh pekerja
atau ijin Direksi.
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)(Rp.)
Kayu Begisting 0.800 M3 1,300,000.00 1,040,000.00 Paku 8.000 Kg 10,000.00 80,000.00
1,120,000.00
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
0.00
JUMLAH (Rp.) 1,677,500.00VOLUME E 2.000 SATUAN M3
D/E HARGA SATUAN (Rp.) 671,000.00 Per M3
FRENCH RED CROSSPALANG MERAH PERANCIS
Hal. 11
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
CLEANING AND COATING PEMBERSIHAN DAN CAT TEMBOK K.813
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION ASUMTIONURAIAN : ANGGAPAN : Bahan dihitung ditempat pekerjaan.
1 Membersihkan tempat yang akan 2 1 kg can be covered on 6 m2dicat. 1 kg dapat menghasilkan 6 m2
3 Calculated per 1 m2 2 Cat dituang kedalam baskom Hitungan per 1 m2
dan dicatkan dengan roll kuas.
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)(Rp.)
Cat Tembok 0.300 Kg - 7,500.000 2,250.00
2,250.00
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
0.00
JUMLAH (Rp.) 13,225.00VOLUME E 1.000 SATUAN M2
D/E HARGA SATUAN (Rp.) 13,225.00 Per M2
FRENCH RED CROSSPALANG MERAH PERANCIS
Hal. 12
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
CONCRETE REINFORCEMENT PENULANGAN BETON K. 715
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Bahan disediakan oleh Supplier2 Besi dipotong dibentuk dan diikat. ASUMTION 1 200 Kg besi dapat disiapkan dalam 1 hari
2 Cost of material besed on job siteURAIAN : 1 Bahan disediakan oleh Supplier 2 Harga material berdasarkan ditempat pekerjaan.
2 Besi dipotong dibentuk dan diikat. Pemakaian bahan tulangan dilebihkan 10 % untuk3 membengkok dan penyambungan.
ANGGAPAN : 1 200 Kg besi dapat disiapkan dalam 1 hari2 Cost of material besed on job site2 Harga material berdasarkan ditempat pekerjaan.
Pemakaian bahan tulangan dilebihkan 10 % untuk3 membengkok dan penyambungan.
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)(Rp.)
Besi Beton 220.000 Kg 6,500.00 1,430,000.00 Kawat Ikat 2.000 Kg 5,000.00 10,000.00
1,440,000.00
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
0.00
JUMLAH (Rp.) 1,700,000.00VOLUME E 2.000 SATUAN M3
D/E HARGA SATUAN (Rp.) 850,000.00 Per M3
FRENCH RED CROSSPALANG MERAH PERANCIS
Hal. 13
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
CONCRETE K. 175B E T O N K. 175 K.725
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Material and equipment stand ASUMTION 1 Material cost be calculated on the job siteby on job site by supplyer 2 Productivity of concrete mixer is 10 M3/hari.
2 Before using the agregat must be 3 Mix design 1 : 2 : 3.cleaning 4 Length of mixing is 9 minute
3 Concrete be mixed by mechanical 5 The weight of 1 M3 concrete 2.400 Kg and mixer and near the job site. 1 Pocket PC 40 Kg.
ANGGAPAN : 1 Harga/material dihitung dilokasi pekerjaan.URAIAN : 1 Bahan/material disediakan oleh 2 Kapasitas produksi adukan beton 10 M3/hari.
Supplier. 3 Campuran 1 : 2 : 3.2 Sebelum digunakan agregat harus 4 Lamanya setiap kali pengadukan 9 menit
dibersihkan dahulu 53 Beton diaduk dengan pengaduk
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
Concrete Mixer 1.000 - 8.000 23,424.11 187,392.88
187,392.88
JUMLAH (Rp.) 1,354,390.38
1 M3 beton beratnya 2.400 Kg dan 1 Zak PC beratnya 40 Kg
mekanis didekat lokasi pengecoran.
FRENCH RED CROSSPALANG MERAH PERANCIS
VOLUME E 2.000 SATUAN M3
D/E HARGA SATUAN (Rp.) 677,195.19 Per M3
Hal. 14
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
REINFORCEMENT CONCRETE BETON BERTULANG LANDASAN PLAT INJAK K.725 A
DAN GLAGAR
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Reinforcement steel and concrete ASUMTION 1 Concrete mixing 1 : 2 : 3workform be ready in jab site 2 Capacity are 2 M3/days
2 Concrete be mixing by mechanic 3 Material cost be calculated on the job sitemixer and near the concrete location ANGGAPAN : 1 Campuran beton 1 : 2 : 3
2 Kapasitas 2 M3/hariURAIAN : 1 Bahan besi dan cetakan telah siap 3 Haraga bahan dilokasi pekerjaan.
ditempat.2 Beton diaduk dengan mesin
pengaduk mekanis didekat lokasipengecoran.
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
Concrete Mixer 1.000 - 8.000 23,424.11 187,392.88
187,392.88
FRENCH RED CROSSPALANG MERAH PERANCIS
JUMLAH (Rp.) 4,447,390.38VOLUME E 2.000 SATUAN M3
D/E HARGA SATUAN (Rp.) 2,223,695.19 Per M3
Hal. 15
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
INSTALL THE TIMBER BEAM AND BRANCHING MEMASANG GELAGAR/SEKUR K.900E
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Balok pemikul dipasang diatas ASUMTION 1 With man pawer tiang pancang. 2 Main Beam 25/30
2 Gelagar dipasang diatas balok 3 Timber 5/30 pemikul. 4 Be calculated per 1 M3
3 Untuk perkuatan masing-masing sambungan memakai baut/paku ANGGAPAN : 1 Dengan tenaga manusiadan begel. 2 Balok utama ukuran 25/30
3 Balok melintang ukuran 25/30URAIAN : 1 Balok pemikul dipasang diatas 4 Dihitung per 1 M3
tiang pancang.2 Gelagar dipasang diatas balok
pemikul.3 Untuk perkuatan masing-masing
sambungan memakai baut/paku dan begel.
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
FRENCH RED CROSSPALANG MERAH PERANCIS
Alat bantu 1.000 Set - 12,000.000 12,000.00 -
12,000.00
JUMLAH (Rp.) 2,576,208.00VOLUME E 1.000 SATUAN M3
D/E HARGA SATUAN (Rp.) 2,576,208.00 M3
Hal. 16
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
INSTALL THE TIMBER RUNNING FLOORPEKERJAAN KAYU BANTALAN LANTAI K. 903
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Kayu diketam terlebih dahulu. ASUMTION 1 Material cost be calculated on the job site2 2 Be calculate per 1 M3
dalam desain.ANGGAPAN : 1 Hitungan bahan ditempat pekerjaan.
URAIAN : 1 Kayu diketam terlebih dahulu. 2 Dihitung per 1 M32
dalam desain.
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAH
Kayu dipotong sesuai dengan ukuran
Kayu dipotong sesuai dengan ukuran
FRENCH RED CROSSPALANG MERAH PERANCIS
ALAT KERJA KERJA SATUAN (Rp.) C (Rp.)(Rp.)
- - - - -
0.00
JUMLAH (Rp.) 2,193,000.00VOLUME E 1.000 SATUAN M3
D/E HARGA SATUAN (Rp.) 2,193,000.00 Per M3
Hal. 17
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
COATING FOR RAILING PENGECATAN SANDARAN K.813 A
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Membersihkan tempat yang akan ASUMTION 1 Material cost be calculated on the job sitedicat. 2 1 Kg anty terminete can be covered 3 m2 area
2 Cat dikerjakan dengan kuas. 3 Calculated per 1 m2
URAIAN : 1 Membersihkan tempat yang akan ANGGAPAN : 1 Bahan dihitung ditempat pekerjaandicat. 2 1 Kg dapat menghasilkan 3 M2
2 Cat dikerjakan dengan kuas. 3 Hitungan per 1 M2
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)(Rp.)
Nail/Bolt 6.500 Kg 10,000.00 65,000.00 Timber 1.000 M3 1,700,000.00 1,700,000.00
1,765,000.00
FRENCH RED CROSSPALANG MERAH PERANCIS
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
Suporting Eq. 1.000 Set - 12,000.000 12,000.00 -
12,000.00
JUMLAH (Rp.) 2,158,500.00VOLUME E 1.000 SATUAN M3
D/E HARGA SATUAN (Rp.) 2,158,500.00 Per M3
Hal. 18
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
INSTALL THE TMBER FOR BRIDGE FLOORING MEMASANG LANTAI JEMBATAN K.902
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Papan diketam terlebih dahulu. ASUMTION 1 Material cost be calculated on the job site2 Papan dipotong sesuai lebar 2 Papan lantai tebal 8 Cm dan lebar 20 - 25 Cm
jembatan. 3 Hitungan per 1 M23 Papan dibaut pada kayu bantalan
lantai ANGGAPAN : 1 Hitungan bahan ditempat pekerjaan2 Papan lantai tebal 8 Cm dan lebar 20 - 25 Cm
URAIAN : 1 Papan diketam terlebih dahulu. 3 Hitungan per 1 M22 Papan dipotong sesuai lebar
jembatan.3 Papan dibaut pada kayu bantalan
lantai
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)(Rp.)
Nail/Bolt 6.500 Kg 10,000.00 65,000.00 Timber 1.000 M3 1,300,000.00 1,300,000.00
FRENCH RED CROSSPALANG MERAH PERANCIS
1,365,000.00
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
-
0.00
JUMLAH (Rp.) 1,782,500.00VOLUME E 1.000 SATUAN M2
D/E HARGA SATUAN (Rp.) 1,782,500.00 Per M2
Hal. 19
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
INSTALL THE TIMBER FOR FLOORING COVER LAPIS PENUTUP LANTAI K. 813 B
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Membersihkan kayu yang akan ASUMTION 1 Material cost be calculated on the job sitediteer. 2 1 Kg anty terminete can be covered 3 m2 area
2 Teer dioleskan dengan kuas. 3 Calculated per 1 m2
URAIAN : 1 Membersihkan kayu yang akan ANGGAPAN : 1 Bahan dihitung ditempat pekerjaan.diteer. 2 1 Kg teer mengerjakan 3 m2 luasan
2 Teer dioleskan dengan kuas. 3 Hitungan per 1 m2
TOTAL TOTAL BILLING COST SUB TOTALLABOUR PERSONEL DAYS MAN/DAYS RATE (Rp.) A (Rp.)PEKERJA JUMLAH HARI JUMLAH (Rp./Days/Man) BIAYA SUB JUMLAH
MATERIAL SUM UNIT (Rp.) (Rp.) B (Rp.)BAHAN JUMLAH SATUAN HARGA BIAYA SUB JUMLAH
SATUAN (Rp.) B (Rp.)(Rp.)
FRENCH RED CROSSPALANG MERAH PERANCIS
Stone Crush 5/7 cm 0.070 M3 65,000.00 4,550.00 Stone Crush 2/3 cm 0.030 M3 85,000.00 2,550.00 Terminite (Teer) 4.000 Kg 6,500.00 26,000.00 Sand 0.020 M3 65,000.00 1,300.00 Seng Plat BJLS 20 0.500 Lbr 45,000.00 22,500.00
56,900.00
EQUIPMENT TOTAL WORK WORK UNIT PRICE COST SUB TOTALPERALATAN EQUIPMENT DAYS HOURS (Rp.) (Rp.) C (Rp.)
JUMLAH HARI JAM HARGA BIAYA SUB JUMLAHALAT KERJA KERJA SATUAN (Rp.) C (Rp.)
(Rp.)
Supporting Eq. 2.000 Set - 12,000.000 24,000.00 -
24,000.00
JUMLAH (Rp.) 419,400.00VOLUME E 1.000 SATUAN M2
D/E HARGA SATUAN (Rp.) 419,400.00 Per M2
Hal. 20
WORK COST ESTIMATE ANALIZE CODEANALISA PERKIRAAN BIAYA PEKERJAAN KODE
CLEAN OUT AND TERMINITE COATING PEMBERSIHAN DAN PENGETERAN K. 813 B
REHABILITATION AND RECONSTRUCTION OF THE FISHPONDS IN JEUMERANG, PASI LHOK, LANCANG,KEMBANG TANJUNG SUB DISTRICT PIDIE DISTRICT NANGGROE ACEH DARUSSALAM PROVINCE
REHABILITASI TAMBAK UDANG DI DESA JEUMERANG, PASI LHOK, LANCANG KECAMATAN KEMBANG TANJUNG KABUPATEN PIDIE PROPINSI NANGGROE ACEH DARUSSALAM
EXPLANATION 1 Membersihkan kayu yang akan ASUMTION 1 Material cost be calculated on the job sitediteer. 2 1 Kg anty terminete can be covered 3 m2 area
2 Anty termite painting be 3 Calculated per 1 m2coating by shaving brush
URAIAN : 1 Membersihkan kayu yang akan ANGGAPAN : 1 Bahan dihitung ditempat pekerjaan.diteer. 2 1 Kg teer mengerjakan 3 m2 luasan