AMSZ AGM 2014 NYANGA 29 AUGUST 2014 WAYNE D. SILUNDE MINE SURVEYOR ( UNKI MINES) 1 IMPORTANT! THE ROLE OF THE MINE SURVEYOR IN PLATINUM ORE RESERVE DETERMINATION
1
AMSZ AGM 2014
NYANGA 29 AUGUST 2014
WAYNE D. SILUNDEMINE SURVEYOR ( UNKI MINES)
IMPORTANT!
THE ROLE OF THE MINE SURVEYOR IN PLATINUM ORE RESERVE DETERMINATION
2
SURVEY RESPONSIBILITIES TODAY
amsz2014agm
• Generic
•Surface Operations
•Underground Operations
•Reporting
•Technology
3
SURVEY RESPONSIBILITIES TODAY
– Technology
The speed of technology…..
4
LEGACY OBJECTIVES
amsz2014agm
PURPOSE
– Re-establish Survey as the Knowledge Base through Mine Analysis
• Implementation of system tools to facilitate business appreciation and understanding
• (Basic Mining Equation , Basic Waste Equation, Basic Tonnage Equation, BRE, Inventory
Management & Benchmarking)
– Become a versatile source of information
• Re-establish the Mine Surveyor as a critical component of the Mine Management Team
– Raise the STATUS of Survey on the Mines and as a profession.
– Reclaim the AUTHORITY of the Surveyor on the Operations
5
AREAS OF CONCERN
amsz2014agm
– Raise the STATUS of Mine Surveyor on the Mine Value Chain !!
– Poor adherence to Standards and Safety
• Inventory Management
• Standard Layouts and Sections,
• Legal Notifications,
• Working areas (Raises, General Offices)
– Poor adoption of Technology
• long periods of conversion
– Poor Quality of Plans
• CGMS Plans, Production Plans, Surface plans
Respect!!!
WHY???
6
THE FUNDAMENTAL PRINCIPLES
amsz2014agm
ETHICS
Mine Surveyors have an obligation to themselves, their survey colleagues and to
their employer, to uphold and advance the integrity, honour, and dignity of the
mine Surveyors' profession by:
• Using their knowledge and skill for the benefit of their employer;
• Being honest and impartial, and serving with fidelity their employers, the
government and their clients;
• Striving to increase the competence and prestige of the mine Surveyors'
profession; and
• Supporting the professional and technical societies of their disciplines.
( AMSZ , PLATO, IMSSA, SAIMM)
7
THE ROLE OF THE MINE SURVEYOR IN PLATINUM ORE RESERVE DERTEMINATION
amsz2014agm
Figure 2—The interrelationship of increasing certainty and project valuewith advancing development stages and the level of technical study(after Lilford, 2011)
8
•
- Overbreak on Hangwall and footwall (cm)- Sliping on Hangwall or Footwall (Tips, Underpass) %- Reef in Hangwall or footwall ( % of content)- Scaling- Fall Of ground ( % of resource volume)- Redevelopment Factors (M)- Off Reef mining loss (% of Resource area)- Reef Tonnes extracted / Waste Tonnes extracted (% of reef horizon that’s removed from UG)- Extracted reef/waste tonnes to concentrator ( % volume trammed remainder goes to waste dump)- Temporarily not Available-TNA (% of TNA vs IMS)- In Stope Pillars (m )- Discrepancy affect content and grade and not tonmes -Mine Call Factor (%, only affects tonnes not content)
amsz2014agm
B
Modifying Factors
9
MINERAL RESOURCE CONVERTION TO RESERVE PROCESS
amsz2014agmFigure 1—General relationship between Exploration Results, MineralResources, and Mineral Reserves (SAMREC, 2009)
10
Compliance and reporting rules in Mineral Resource Evaluation :
amsz2014agm
PURPOSE
A-Reporting codes
B-Competency requirements
C-Resources and Reserves
11
Reporting CodesJoint Ore Reserves Committee Code (JORC Code) - Australia
National Instrument 43-101 (NI 43-101) - Canada
South African Code for the Reporting of Mineral Resources and Mineral Reserves (SAMREC) – South Africa
These codes are broadly related
Committee Code (JORC Code), and the South African Code for the Reporting of Mineral Resources and Mineral Reserves (SAMREC are
the general standards. .
we will focus on the SAMREC code
amsz2014agm
A
12
- Qualification ( Survey C. Competence, ND in Mine Survey, HND in Mine Survey, B.Tech Mine Survey)
- Experience ( > 5 years in the deposit under consideration)
- Professional registration ( Plato, Saimm)
- Adherence to national and international standards ( The Codes)
amsz2014agm
B
COMPETENT PERSONS
13
How To Improve and stay relevant
amsz2014agm
PURPOSE
Embracing technological advancement
· Laser Scanners, total stations, gyroscopes. · Profiling instruments
Geospatial Platform
· Build technical decisional views · Maintaining strategic and technical reporting requirements · Image processing · Contouring · Batch processing and modelling
GIS Suite
· Presentation · Visualisation · Spatial analysis · Data capturing and cleansing · Topology and data structure management
Adopting Capable software packages
· Cads mine, Stopecad, Valcan, Surpac ,Microstation , Histogrames · Depletion
Chief Surveyor/Survey Manager
Shaft Surveyor/ Snr Surveyor
Section Surveyor
Mine Surveyor
No. of Professionals
Hig
h
Low
Low
Hig
h
Competence & Reward
10
Solutions stack & performance
15
Questions & Comments ???
amsz2014agm