MUD ENGINEER QUALIFICATION General Information Profile Professional mud engineer with excellent technical, analytical and communication skills gained from more than 7 years of experience. Education Institution/UNIVERSITY Degree Earned (attach copy of degree) Major Completion Date Suez Canal University Bachelor degree in science Chemistry 2008 Drilling & Completion fluids related training: Subject Certificate (attach copy of certificates) Training Center Completion Date Safety induction training, including H2S Safety& HSE Course EMEC 2009 SMTC GLOBAL HUET&EBS SMTC GLOBAL 2010 OES Software OES 2011 Mud School Basic Mud School OES 2011 HAZCOM HAZCOM ARAMCO 2015 FALL PROTECTION FALL PROTECTION ARAMCO 2015 Employment History: Company Jop title Date ( from-to) Location EMEC Mud Engineer 2009-2011 EGYPT OES Senior Mud Engineer 2011-2015 KSA PICO Senior Mud Engineer (Consultant) 2015 EGYPT SINOPEC Project Supervisor 2016 KSA Self Dependent Courses : Basic M-I Mud School Hydraulics Current objective Working for SINOPEC company for Building and prepare proposal of a new mud system TEMPDRIL Mud System especially for high temperature and high pressure wells. Determining, recommending and coordinating the material conc. Of the new system for applying it in Aramco. Providing full technical support for Aramco to achieve main objective as success in drilling the trial well. Name: Amr Sherif Sherif Mahmoud Adress: West of Somid-6 October-Giza Egypt phone number: +201151990144 KSA phone number: +966534290988 e-mail: [email protected]Nationality: Egyptian Birth date: 14/02/1986 Language: Arabic-English Status: Married
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
MUD ENGINEER QUALIFICATION
General Information
Profile
Professional mud engineer with excellent technical, analytical and communication skills gained from more
than 7 years of experience.
Education
Institution/UNIVERSITY Degree Earned (attach copy of
degree) Major Completion Date
Suez Canal University Bachelor degree in science Chemistry 2008
Drilling & Completion fluids related training:
Subject Certificate (attach copy
of certificates) Training Center Completion Date
Safety induction training,
including H2S Safety& HSE Course EMEC 2009
SMTC GLOBAL HUET&EBS SMTC GLOBAL 2010
OES Software OES 2011
Mud School Basic Mud School OES 2011
HAZCOM HAZCOM ARAMCO 2015
FALL PROTECTION FALL PROTECTION ARAMCO 2015
Employment History: Company Jop title Date ( from-to) Location
EMEC Mud Engineer 2009-2011 EGYPT
OES Senior Mud Engineer 2011-2015 KSA
PICO Senior Mud Engineer (Consultant) 2015 EGYPT
SINOPEC Project Supervisor 2016 KSA
Self Dependent Courses : Basic M-I Mud School
Hydraulics
Current objective
Working for SINOPEC company for Building and prepare proposal of a new mud system TEMPDRIL Mud System especially for high temperature and high pressure wells.
Determining, recommending and coordinating the material conc. Of the new system for applying it in Aramco.
Providing full technical support for Aramco to achieve main objective as success in drilling the trial well.
Name: Amr Sherif Sherif Mahmoud Adress: West of Somid-6 October-Giza
Performing recaps, inventorying products and costs, re-ordering and re-stocking needed materials and chemicals;
Providing technical support and good level of communication with clients;
Running on daily basis, at well location, with the proper laboratory kits, all the tests for the drilling fluid, according to the A.P.I. standards;
Issuing daily reports for the Client and Drilling Contractor, as required;
Determining, recommending and coordinating the necessary treatments for fluid maintenance within the design parameters;
Acting according with local and internal QHSE rules;
Providing computerized consulting regarding the fluid hydraulics (rheological features, pressure drops etc.), daily variation of fluid parameters, chemical consumption and costs recorded over the entire duration of the operations;
Respond to variation in mud condition in a timely and professional manner in consultation with the company representative;
Monitor mud consumption and respond to down hole mud losses in a timely manner;
Conduct Well Location pilot testing for unusual mud treatments, or as required or directed by Company Well Location supervisory staff, to avoid unsuitable or potentially damaging or incompatible additions to the circulating system;
Proactive engineering of the drilling fluid system;
Be responsible for the safe handling, safe loading and unloading of products and Equipment, safe stacking and handling of chemicals at the Well Location to ensure correct procedures are followed
by rig crew to avoid damage to Products. Challenges
Rig experience :
Formulates and maintains different types of drilling and completion fluids involves: Spud Mud
LSND Polymer Mud
Drill-in fluids Na/K Formate Heavy weighted mud Emulsion Mud Oil base mud (all oil mud and inverted emulsion mud) Completion Fluids (NaCl , CaCl2 and CaBr2 & CaCl2 )
Challenges Well flowing Stuck pipe Partial and total losses of circulation Complete loss circulation with well flowing Contamination treatment (Ca++, Bacterial, Cement, foam …etc)
Worked in offshore and super land rigs with mud pits systems up to 5000 bbl. which used to drill gas, directional and exploration wells (HPHT) up to 18000 ft. vertical depth and 27000 ft. measured depth with inclination between 0 to 90 degree and mud weights between 7.2ppg to 20.3ppg ( 54 pcf to 152 pcf), under balance wells
Oil, gas and exploration fields: Haradh, Hoota, Aljauf, Shudgum, Tinat , Hawiah, Khafji and Hasbah fields in Saudi Arabia and Gulf of Suez in Egypt as the following :
Saudi Arabia Rigs: ADC-28, Dalma-2, ADC-14,PD-157, Pool Arabia-393, Sino-22, Sino-
12, Sino-6, Sino-20, Nabors 54, SP-103,WCL-82, CR-36, SAR-202, All wells and my work experience in Saudi Arabia for Aramco
Egypt Rigs:Centafi-104, EDC-49, Weatherford-104
Contribute to drill more than 25 gas, offshore, oil and exploration wells , the following table contains some of last wells information :
Rig name Well type Oil field Client / Country Date Problems