This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
An open auction for the sale of demaged bardana and damaged stock articles on “as is where is basis” will be held on 29.07.2011 at 3.00 pm in theoffice of District Manager, Hafed, Bhodia Road, Fatehabad.
The centre-wise detail of quantity is as under:-
The auction of other items viz.a.viz steel chair, table, locks, calculator, kassi, torch charbeable,bucket etc. will also be conducted on the same day. The exact quantity of above items will beintimated before the start of auction at spot. The detailed terms and conditions can be takenfrom the office of the undersigned on any working day. Hafed reserves the right to accpet any/all auction without assigning any reason thereof.
Terms & Conditions:-1. The parties interesting to participate in auction will have to deposit an earnest money of
Rs.10000/- before the start of the auction either in cash or in the shape of bank draft in favourof The Haryana State Coop. Supply & Mkg. Fed. Ltd. Payable at Fatehabad. The parties caninspect the material at site on any working day.
2. The material auctioned will have to be lifted by the party within 30 days from the date ofauction, failing which the amount of earnest money will be stand forfeited automatically.
3. The successful bidder will required to deposit 25% of the total cost of material in additionto earnest money within 3 days of the auction in confirmation of sale failing which the earnestmoney so deposited is liable to be forfeited.
4. The bidder shall not be allowed to bid without deposit of earnest money as above.5. No interest will be paid on the earnest money/security deposited with this office and earnest
money shall be adjusted to the cost of material in the last consignment.6. Sale tax as applicable will be borne by the party.7. Except weighment charges, all other expenses will be borne by the party.8. The lifting period can be extended if it thinks that the delay in lifting is due to unavoidable
circumstances after imposing the storage and interest charges as per rules.-District Hafed, Fatehabad
S. Name F.bad Bhuna Bhattu Ratia Dharsul Nagpur Jakhal Tohana TotalNo. of Item1. Bardana 11774 8763 0 0 0 0 0 47 20584
TENDER NOTICESealed & separate tenders are invited from the reputed contractors. L/C Societies & supplier for the work
noted below on the prescribed form Mw-4 which can be obtained from the office of the Municipal Council,Fatehabad on each payment of Rs. 500/- on any working day 19.07.2011 upto 05.00 PM during the officehours and should reach to the undersigned on or before 20.07.2011 at 03.00 P.M. the Tender will be openedon the same date and time in the presence of the contractors/L/C Societies or their representatives.
SN. Name of Work E. Amount Earnest Money Time1 Construction of Pavement Gali House of punjab Electric to 500000 5000/10000 2 month
Ramphal Jat, W-12 Const. of Pavement Gali Pakeezah Studio Wali, W-1 300000 3000/6000 2 month3 Construction of Pavement Gali Mandir Wali & Taj Mohammad W-2 500000 5000/10000 2 month4 Drain Closed & Footpath Gurdwara Jawahar Chowk, W-2 & 3 500000 5000/10000 2 month5 Construction of Pavement Gali in shastri Chowk, W-3 500000 5000/10000 2 month6 Construction of Pavement Gali Mukhtiyar Singh 500000 5000/10000 2 month
Wali ,Majra Road, W-47 Const. of Nala From Devi Mandir to Suresh Dhillon, W-4 300000 3000/6000 2 month8 Construction of Pavement in Street Heera Bhat pandu wali, 500000 5000/10000 2 month
EX M.C. Channa Ram Wali, W-59 Construction of Footpath from Arorvansh Dharmshala to 500000 5000/10000 2 month
Bharat Photo state10 Construction of pavement Gali Kundu J.E.to Purushotam House, 500000 5000/10000 2 month
Lajpat Nagar, W-611 Renovation of Park, Lajpat Chowk, W-6 100000 1000/2000 2 month12 Construction of Pavement Gali Raghunath Mandir Harish Asija 300000 3000/6000 2 month
& Others, Remaining Part, W-713 Construction of Pavement Gali Rajiv Gandhi Chowk & Gali 500000 5000/10000 2 month
Sethi/Monga & Nali band, wali, W-814 Construction of Pavement Gali in Street Bhim Anand Wali, W-9 300000 3000/6000 2 month15 Nali Band from Dr. Gilhotra to Jawahar chowk, W- 9+7 500000 5000/10000 2 month16 Construction of Pavement Gali Ajit Battery Wali, W-11+ Main road 500000 5000/10000 2 month17 Construction of pavement in Palika Bazar,W-11 500000 5000/10000 2 month18 Construction of pavement of gali Ashok dhuria & Mahesh wali, W-12 500000 5000/10000 2 month19 Construction of Pavement in street Harizen Colony, W-13 500000 5000/10000 2 month20 Construction of Pavement Chowk Jagjivanpura, W-14 500000 5000/10000 2 month21 Const. of Pavement Gali Mahipal Ranga Back side Hanuman Mandir, W-14 100000 1000/2000 2 month22 Repairing & Pavement of Gali Krishna punia House to Dr.House, W- 14 200000 2000/4000 2 month23 Const. & Development of Park W-15, Gurnam singh Colony 300000 3000/6000 2 month24 Construction of Pavement Gali Billu Havaldar wali, W-15 500000 5000/10000 2 month25 Construction & pavement of Gali No. 5 & 7, Satish Colony, W-16 500000 5000/10000 2 month26 Construction of pavement of Gali Surender godara to Pappu, 500000 5000/10000 2 month
Master Murari & Ravi Wali, W-1727 Construction of Pavement Gali Sharad Batra Wali, W-18 400000 4000/8000 2 month28 Construction of Pavement Gali Bhattu Road se Umed house tak, W-18 700000 7000/15000 2 month29 Construction of pavement of gali Saini to Shyam House tak, W-19 500000 5000/10000 2 month30 Const. of Pavement House of Sethi to Sony, W-19 300000 3000/6000 2 month31 Construction of Footpath from Gopi Chand Dharmshala to 300000 3000/6000 2 month
Aroravansh Dharmshala,W-2 + 2032 Construction of Pavement Gali Shankar Nai & Madan 500000 5000/10000 2 month
Bishnoi wali, W-2033 Construction & Repair of Miscllaneous work, Ward no. 20 200000 2000/4000 2 month34 Construction of pavement near girls school, W-20 200000 2000/4000 2 month35 Construction of Pavement Gurbhaksh Karnail etc. W-21 500000 5000/10000 2 month36 Construction of pavement Gali Ramprakash conductor 300000 3000/6000 2 month
se tailor ke ghar tak,W-2137 Construction of pavement Gali gurbaksh Singh Jaswant singh wali, W-21 300000 3000/6000 2 month38 Construction of Bathroom in AUTO Market 300000 3000/6000 2 month39 Construction of Bathroom on Bhodia khera Road 100000 1000/2000 2 month40 Drain Closed & Footpath Jawahar Chowk to Ice factory, Both side, 500000 5000/10000 2 month41 Nala band Gali Boota Ram depot Wali 100000 1000/2000 2 month42 P/F fixing of Interlocking tiles from Hans Market to Partap Market 500000 5000/10000 2 month43 Construction of pavement Gali Advocate Rana wali, Jagjivanpura, W-14 300000 3000/6000 2 month44 Construction of Footpath from Ahuja Ice Factory to Gopiram Dharmshala, 200000 2000/4000 2 month
Note: -Terms & Conditions can be seen in the office during working hour.
Secretary, President,Municipal Council, Fatehabad Municipal Council, Fatehabad