AmpaCity Project Update 40 MVA HTS Cable and Fault Current Limiter Installation in City Center Mark Stemmle , Kai Allweins, Frank Merschel, Mathias Noe, Achim Hobl IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
34
Embed
AmpaCity Project Update 40 MVA HTS Cable and Fault Current ...
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
AmpaCity Project Update
40 MVA HTS Cable and Fault Current
Limiter Installation in City Center
Mark Stemmle, Kai Allweins, Frank Merschel, Mathias Noe, Achim Hobl
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
2
AmpaCity Project Objectives
> Installation of 10 kV, 40 MVA HTS system in the German City of Essen
• Project started in September 2011
• Complete system installation in 3rd quarter of 2013
• Commissioning in 4th quarter of 2013
• Project duration of 4.5 years
• Funded by the German Federal Ministry of Economics and Technology
> Investigation of technical feasibility of HTS systems in distribution grids
> Investment comparison of 10 kV HTS systems as alternative to conventional 110 kV systems
> Evaluation of technical operation advantages during demonstration period
> Assessment of further HTS cable and FCL technology applications
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
3
Project start in September 2011
Groundbreaking ceremony on April 9th, 2013
Start of component manufacturing in March 2013
Type test completed in February 2013
Prototype manufactured in October 2012
System installation on site Sept. until Dec. 2013
Pilot operation from 2014 until 2016 in progress
Commissioning test on December 16th, 2013
System commissioning on March 10th, 2014
AmpaCity Milestones
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
4
Prototype Setup for Type Test
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
5
Prototype Joint and Termination
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
6
Type Test Sequence Prototype Setup
> Testing in accordance to DIN VDE 0276-620
> PD test at 20 kV (after 24 kV for 1 min)
> 20 load cycles with 2.3 kA (3 phase)
> PD test at 20 kV (after 24 kV for 1 min)
> Lightning impulse test at ± 75 kV
> AC voltage withstand test at 30 kV (4 h)
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
7
Load Cycle Test Setup
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
8
Lightning Impulse Test Setup
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
9
AmpaCity Installation in Essen
Luftbild: "Darstellung aus HK Luftbilder / Karten Lizenz Nr. 197 / 2012 mit Genehmigung
vom Amt für Geoinformation, Vermessung und Kataster der Stadt Essen vom 13.02.2012"
Substation Dellbrügge
Cable Joint
Substation Herkules
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
10
Loading of Cable Drum in Hannover
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
11
Cable Drum Trailer at Joint Bay
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
12
Preparation of Cable Pulling
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
13
Cable Pulling First Length
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
14
Installation in Substation Dellbrügge
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
15
Termination in Substation Dellbrügge
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
16
Installation of Cable Joint
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
17
Nitrogen Storage Tank at Substation Herkules
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
18
Cooling System Delivery at Substation Herkules
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
19
Fault Current Limiter Delivery at Substation Herkules
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
20
HTS System Installation at Substation Herkules
IEEE/CSC SUPERCONDUCTIVITY NEWS FORUM (global edition) October 2014 Invited Presentation 4LOr3B-01 given at ASC 2014, Charlotte, August 10 – 15, 2014.
21
Cooling Down of Cable System December 2013