Top Banner
AMMSA Visit McCreedy West Mine September 2012
27

AMMSA Visit McCreedy West Mine

Jun 27, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: AMMSA Visit McCreedy West Mine

AMMSA Visit

McCreedy West Mine

September 2012

Page 2: AMMSA Visit McCreedy West Mine

2

McCreedy West Mine Site

Portal Sample tower

Warehouse Main office

Waste sorter

Storm water management pond

Cu

Ni PM

Page 3: AMMSA Visit McCreedy West Mine

MCCREEDY WEST MINE

• 1100 Tons/day from Ni and Cu areas.

• 92% Production from Ni mining areas

• Cut+Fill Mining method -- 78% of ore production

• Longhole Mining method -- 22% of ore production

• Cu areas mined by NV Development, Longhole and Shrinkage methods.

• Stopped Mining PM zone July 2011.

• Production Equipment – 50T+36T Haul Trucks, 7/10 Yd Scooptrams

• Manpower - 82 Hourly

- 24 Staff

3

Page 4: AMMSA Visit McCreedy West Mine

4

46,000

333,000

496,000

565,000

733,000 740,000

290,000 305,000

327,000

252,000

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012YTD

To

ns

MINE ORE-WASTE PRODUCTION

Ore

Waste

Page 5: AMMSA Visit McCreedy West Mine

MINE SECTION

5

3500 feet

2000 ft.

vertical

depth

Page 6: AMMSA Visit McCreedy West Mine

MINE SECTION

6

3500 feet

2000 ft.

vertical

depth

1970 – 1997

15.8 Million Tons

of Ore moved

Ore sent by U/G

Rail to Levack Mine

7,700ft

McCreedy West Mine – 1970 – 1997 ( 27 years)

Page 7: AMMSA Visit McCreedy West Mine

2012 YTD MINING STATS

7

2012 YTD

Production Stats Actual

Tons 252,000

Ni Grade 1.24%

Cu lbs 2,818,000

Ni lbs 6,175,000

Dev - FT 1,931

Page 8: AMMSA Visit McCreedy West Mine

8

MCCREEDY WEST MINE – DEVELOPMENT

Page 9: AMMSA Visit McCreedy West Mine

9

MCCREEDY WEST MINE – Haulage Operation

Page 10: AMMSA Visit McCreedy West Mine

2011-2012 DEVELOPMENT PRODUCTIVITY

10

0.00

1.00

2.00

3.00

4.00

5.00

6.00

Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12

Dev F

t/m

an

-sh

ift

Axis Title

DEVELOPMENT FT/MAN-SHIFT

Dev Ft /MS Dev Ft /MS Plan

Page 11: AMMSA Visit McCreedy West Mine

11

McCreedy West Mine – Ore Sorter Pilot Plant

Page 12: AMMSA Visit McCreedy West Mine

12

McCreedy West Mine – Sorting Operation

Page 13: AMMSA Visit McCreedy West Mine

KGHM-INTERNATIONAL PROPERTIES IN SUDBURY

Page 14: AMMSA Visit McCreedy West Mine

McCreedy West Mine 3-D Model

Page 15: AMMSA Visit McCreedy West Mine

15

GEO-SCIENCE DRILLING 2012 (Nickel-Long Section)

Page 16: AMMSA Visit McCreedy West Mine

McCreedy WEST MINE: 3D-VIEW NICKEL MINING

Portal

600 ft

1770

954

1760

1580

570

780

950

Pod

570

Pod 39 Pod 7

Pod 31

Pod 23

Pod 33

Pod 37

700 Complex 500

1650 HW Exploration Drift

950-level

EM

1490

Current mining areas

Current drilling

Support 2012 Cu-Mining

Page 17: AMMSA Visit McCreedy West Mine

780 Nickel-recent drilling

FNF 31094

Page 18: AMMSA Visit McCreedy West Mine

18

FW

Ore

HW

McCreedy West Mine – 1285 level nickel mining

Mucking Line

Page 19: AMMSA Visit McCreedy West Mine

19

GEO-SCIENCE DRILLING 2012

McCreedy West CU Drilling – 3D-View Looking West

Page 20: AMMSA Visit McCreedy West Mine

McCREEDY WEST MINE: COPPER DRILLING 700 COMPLEX SUPPORT 2012 MINING

Page 21: AMMSA Visit McCreedy West Mine

21

McCreedy West Mine – 600 Level Copper Mining

Page 22: AMMSA Visit McCreedy West Mine

22

McCreedy West Mine – 860 level copper mining

Page 23: AMMSA Visit McCreedy West Mine

23

McCreedy West Mine – Geology

Photos courtesy of Steve Clapp-

Creative Photography

Page 24: AMMSA Visit McCreedy West Mine

24 McCreedy – Production

McCreedy West – Potential Ni Production

Legend

400 ft

Ni-Mining Area 1

Ni-Mining Area 2

Ni-Mining Area 3

Ni-Mining Area 4

Ni-Mining Area 5

Ni-Mining Area 6 Ni-Mining Area 7

Portal

Ni-Contact deposit

PM-FW Deposit

CU-FW Deposit

Ni-mining areas

(Initial proposal)

Ni-Exploration Potential

FW-Exploration

Potential

EM Up dip extension

stope 7 Up dip extension

stope 37

Open

Page 25: AMMSA Visit McCreedy West Mine

25 25 McCreedy – Production - Future

PM

McCreedy West Levack

Morrison

McCreedy – Production - Future

McCreedy West Plan View Showing Exploration Potential

Page 26: AMMSA Visit McCreedy West Mine

26

3D-View Showing– Exploration Potential Between McCreedy West and

Levack Mine

Page 27: AMMSA Visit McCreedy West Mine

27

Portal

570

590

880

950

550

1490

1580 1770

954

1400 E

350 ft

McCreedy – Ni/Cu-Current mining stopes

EM

Stop 1 (570 Level)

Stop 2 (860 Level)

Stop 3 (1770 Level)

820