Ambassador of India to Irelandbcfarchitects.ie/resources/13.54_-_69_Merrion_Road/01._BCF_Architects/201 - Proposed...FLOOR AREAS: BASEMENT FLOOR Existing dwelling B10 - Secure Store
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
FLOOR AREAS: BASEMENT FLOOR
Existing dwelling
B10 -Secure Store
B7 -Plant Room 2
Adjoining boundary wall between 69 Merrion Road and 71
Merrion Road. Care to be taken during basement and
construction works not to damage this wall. Any problems
anticipated to be brought to the attention of the Design Team.
Dumb waiter:
b.k.g 50 46/7
720mm wide by 640mm
as supplied by Ennis Lifts or
equal approved.
Vented rooflight to
patio above (shown dotted)
Gerflor - Tara Safe or equal approved:
Dove Grey finish with cove former to
allow floor covering terminate at wall. All
floor coverings to be laid to the
manufacturers recommendations and
installation requirements.
Gerflor - Decochoc or equal approved:
900mm high decorative and protective
wall finish (Bluebell) installed as per
manufacturers recommendations and
installation guidelines.
All walls above Decochoc wall covering
painted to selected colour.
B8 -Plant Room 3
Gerflor - Tara Safe or equal approved:
Dove Grey finish with cove former to
allow floor covering terminate at wall. All
floor coverings to be laid to the
manufacturers recommendations and
installation requirements.
All walls above Tara Safe floor covering
painted to selected colour.
Gerflor - Tara Safe or equal approved:
Dove Grey finish with cove former to
allow floor covering terminate at wall. All
floor coverings to be laid to the
manufacturers recommendations and
installation requirements.
Gerflor - Decochoc or equal approved:
900mm high decorative and protective
wall finish (Bluebell) installed as per
manufacturers recommendations and
installation guidelines.
All walls above Decochoc wall covering
painted to selected colour.
5955
4475
1192
0
1342
0
3396
2707
17450
20240
1825
7437
8787
17004800
7625
Lift shaft to be min 1700mm * 1930mm as
shown to accommodate a 630kg traction
MRL Passenger Lift to meet the
requirements of Part M, TGD as supplied
by Accel Lifts or equal approved. This lift
shaft to be constructed to ceiling height of
the 2nd floor as shown on cross sections.
Please refer to drawings attached.
To Note:
Water storage tank
(Killarney) or equal
approved to specification
and size as specified by the
M & E Consultant.
To Note:
Rainwater Harvesting
Tank to include for all
filtration systems etc.,
as sepcified by the
M & E Consultant.
Mobile Shelving Rack:
Bruynzeel storage systems - Compacus
Dynamic XTR or equal approved to fit
space measuring:
2.87m * 5m approx and to include for all
electrical wiring for the unit as necessary.
13
12
9
8
6
Landing
1200mm *
1200mm
5 4 3 2 1
1750
1200
225170
250
645
Landing
1200mm *
1200mm
1075
fd60
170
garden wall boundary (ground floor level)
clea
ners
sto
re
at ground level(shown dotted)
1063
0
B1 -Equipment/ FurnitureGeneral Storage
B2 -Kitchen
B4 -Elec 2 B5 -
Lift Shaft
B6 -Lift Lobby
B3 -Elec 1
B9 -Circulation/ Fire Route
CorridorB11 -Document Storage
Service Stair
Gerfloor - Tara Safe Plus
Dove Grey finish with cove former to
allow floor covering terminate at wall. All
floor coverings to be laid to the
manufacturers recommendations and
installation requirements.
Gerflor - Tara Safe or equal approved:
Dove Grey finish with cove former to
allow floor covering terminate at wall. All
floor coverings to be laid to the
manufacturers recommendations and
installation requirements.
All walls above Tara Safe floor covering
painted to selected colour.
Gerflor - Tara Safe or equal approved:
Dove Grey finish with cove former to
allow floor covering terminate at wall. All
floor coverings to be laid to the
manufacturers recommendations and
installation requirements.
All walls above Tara Safe floor covering
painted to selected colour.
Gerflor - Tara Safe or equal approved:
Dove Grey finish with cove former to
allow floor covering terminate at wall. All
floor coverings to be laid to the
manufacturers recommendations and
installation requirements.
All walls above Tara Safe floor covering
painted to selected colour.
6229
9825
12615
4023
5093 1124 4573 3432
2016
1930
7625
1825
7330
Gerflor - Tara Safe or equal approved:
Dove Grey finish with cove former to
allow floor covering terminate at wall. All
floor coverings to be laid to the
manufacturers recommendations and
installation requirements.
Gerflor - Decochoc or equal approved:
900mm high decorative and protective
wall finish (Bluebell) installed as per
manufacturers recommendations and
installation guidelines.
All walls above Decochoc wall covering
painted to selected colour.
2780
Gerflor - Tara Step Stairs
or equal approved:
Dove Grey finish with aluminium stair
nosing T67 Alu, with cove former to allow
floor covering terminate at wall. All floor
coverings, stairs trims to be laid to the
manufacturers recommendations and
installation requirements.
Gerflor - Decochoc or equal approved:
900mm high decorative and protective
wall finish (Bluebell) installed as per
manufacturers recommendations and
installation guidelines.
All walls above Decochoc wall covering
painted to selected colour.
To Note:
Prior to installation of the Gerfloor floor
finish, the appointed contractor is to allow
for a liquid epoxy damp proof membrane
throughout (Permagard or equal
approved) with a floor levelling
compound. This is to ensure a smooth
finish & to avoid any potential damage to
the finish floor wearing course as
specified.
14
15
16
17
11
7
10
Landing
1200mm *
1200mm
Landing
1200mm *
1200mm
Corridor
All basement sub-structure waterproofing
to be in compliance with Standard BS
8102:2009 (Code of practice for
protection of Below Ground Structures
Against Water from the Ground), Grade 3.
D7
FD30
D7
FD30
D7
FD30
D7
FD30
D3
D3
FD30D8
FD60D9
FD60D10
FD60D10
D11
FD60
D11
FD60
fd60
37.3sq.m
17.7sq.m
2.2sq.m 2.0sq.m3.3sq.m
3.4sq.m
3.7sq.m
10.6sq.m
7.8sq.m
24.7sq.m 18.2sq.m
5044
ServiceDuct
ServiceDuct
Compliance with Technical Guidance Documents:All workmanship and materials to conform withthe current Technical Guidance Documents orany amendments made prior to works starting onsite. As part of the Building Control andRegistration process, "the undertaken by Builder"and the "Certificate of Compliance onCompletion" is verification that the maincontractor to the project understands and isaware of their obligation to comply with thecurrent Technical Guidance Documents.
Design Team:The Contractor is to take into account alldrawings, documentation and schedules as issuedby the design team to include Structural Engineer,Mech & Elec Engineer, Fire Safety and DisabilityAccess Consultant. Any discrepencies should bebrough to the attention of the project Architectsassigned to the project prior to commencementof works.
Building Control and Registration:The contractor will need to inform the designteam in advance of any works that will require
inspection and certification prior to covering orclosing. Failure to give adequate notice mayresult in opening up works and unnecessarydelays.
Setting out:The contractor will be responsible for thechecking of all dimensions etc., prior to settingout and commencement of works/ ordering ofmaterials. Any discrepancies to be brought to theattention of the project Architect. Contractor totake care during demolition to adjoiningproperties. A photographic survey to be carriedout prior to any works commencing.
Tidyness:The Contractor is responsible for the cleanlinessof the construction site, access roads and thesurrounding properties including the publicroadways. All areas to be kept in a neat and tidymanner and the Contractor to provide recyclingfacilites for construction and staff waste.
Security:Security of the site is to be maintained at all
times. No unauthorised personnel to be admittedto site. Contractor shall not undertake any workoutside specified scope of work with theArchitects approval. The site is to be securedoutside of normal working hours as per the grantof planning permission.
Materials and Workmanship:All works to be carried out with proper materialsand in a workman like manner and in accordancewith the provisions of Part D of the BuildingRegulations and all other applicable sections ofthe Technical Guidance Documents.
Workmanship to be in accordance with BS8000-0: 2014.
"Proper materials" means materials which are fitfor the use for which they are intended and forthe conditions in which they are to be used, andincludes materials which:(a) bear a CE Marking in accordance with theprovisions of the Construction ProductsRegulations:(b) comply with an appropriate harmonised
standard or European Technical Assessment inaccordance with the provisions of theConstruction Products Regulations; or(c) comply with an appropriate Irish Standard orIrish Agrement Certificate or with an alternativenational technical specification of any state whichis a contracting party to the Agreement on theEuropean Economic Area, which provides in usean equivalent level of safety and suitability.
Materials include products, components, fittings,items of equipment and backfilling forexcavations.
All materials, fittings and finishes as specified orequivalent to be approved by Architect beforework or ordering commences. Samples to beprovided at Architects request. All materials onsite to be suitably and adequately protected fromdamage and weather.
Tolerances:Unless specifically stated otherwise, the accuracyof the Works shall be inaccordance with BS5606:1990
GENERAL NOTES:
Basement Construction:Contractor led design for basement construction andapproval by design team. Basement Contractor will beancillary certifier to the project. The preferred methodof construction will be a combination of water proofconcrete and membrane with drained cavity.
Skirtings & ArchitravesThe skirtings will be forbo/ marmoleum and/or equalapproved with 125mm upstand, welded seam to fairface blockwork. Architraves will be timber, paintedwhite as per details with this tender.
Internal Walls:All walls to the basement will be painted (3 coats) white.There will be no plasterwork except for the kitchen areawhere there will be a combination of plaster and tilefinish.
Floors:Basement floors will be as per the specification and withu/f heating throughout and as shown. The finish floorwill be a Gerfloor Linoleum or equal approved with aminimum slip resistance of R10.
Staircase:New concrete staircase from basement to ground floorlevel to detail. All risers and goings to be finished in amarmoleum click covering to selected colour with aGradus A Range nosing with selected colour (yellow). Alllinoleum to be installed to manufacturers specificationand detail with the appropriate underlays etc.
Internal Doors:Contractor to supply and fit all internal doors, skirtingsand architraves to include vision panel and achieve minfire rating as per door schedule.
Lift Shaft:Lift shaft to be min 1700mm * 1930mm as shown toaccommodate a 630kg traction MRL Passenger Lift tomeet the requirements of Part M, TGD as supplied byAccel Lifts or equal approved. This lift shaft to beconstructed to ceiling height of the 2nd floor as shownon cross sections.Please refer to drawings attached.
Internal Partitions:No internal partitions to basement level.
Ceilings:
The u/s of the concrete rc slab will form the ceilingalbeit all services to be surface mounted as per theMech and Elec Engineers specification and drawings.U/S of concrete slab will be painted white.
New blockwork as called up. Fair face blockwork tobasement level only. All other blockwork plastered andpainted as per specification.
New stud work as called up to match detail as part oftender document. Plastered and painted as perspecification. 37db level to be achieved by providingacoustic batt
New brickwork as called up and as selected by theArchitect.
Existing structure as retained. Please refer to takedowndrawings No.13.54.08.101 & 102.
To Note:All dimensions to be checked on site. No dimensions to be scaled from drawings. This drawing to be read in conjunction with therelevant specifications, documention and relevant drawings supplied by consultants. All queries should be raised with the Project Supervisor.
BCF ArchitectsCloncannonLower, Mountmellick, County Laois.Tel: 057 8679757 e-mail:[email protected] Herberton, 26 St. James Walk, Rialto, Dublin 8.Tel: 01 - 5352674 e-mail:[email protected]
Ambassador of India to Ireland
13/47/2017 11:47 AM
As Shown
Bcf Architects
Proposed basement, library pavilion and internal refurbishment of existing buildingat 69 Merrion Road, Dublin 4.
201 Basement Layout
C:\Users\Bcf Architects\Dropbox (BCF Architects)\BCF Architects Team Folder\13.54 - 69 Merrion Rd\2017 Design Team Folder\BCF Achitects\A - Tender Set
Complete\201 Proposed Dwg Set.dwg
A1
General Layout
Basement Layout
W
S
E
N
FLOOR AREAS: BASEMENT FLOOR
Total Area 247 sqm
1098
0
3170
1035
0
B
4838 2400
100mm outer brick leaf as selected
150mm x-therm cavity board
225mm concrete block inner leaf.
adjoining boundary wall between 69 Merrion Road and 71
Merrion Road. Care to be taken during basement and
construction works not to damage this wall. All problems
anticipated to be brought to the attention of the Design Team.
Dumb waiter:
b.k.g 50 46/7
720mm wide by 640mm
as supplied by Ennis Lifts or
equal approved.
library shelving (built in) to underside of lower ceiling as shown
dotted. Please refer to drawing showing elevation and section.
Extract ducts to be brought up within the book case unit.
reference tables (loose furniture)
as specified by the client.
modular work stations as selected by client
fully wired for IT requirements as called up on
the M & E Drawings.
modular work stations as selected by client
fully wired for IT requirements as called up on
the M & E Drawings.
2
1
Double doors to reargarden patio area.
G5 -Service Point4.9sq.m
G3 -Toilet4.7sq.m
G4 -Lobby Link14.6sq.m
ceramic floor as selected
by client. Allow €25/sq.m
for supply only.
Contractor responsible
for laying.
Please note some works required here at basement/ floor
zone level for construction of inner leaf. There is a 150mm
step approximately. Stairs will be carried off the basement
wall as shown in the shaded area.
G8 -PA Office15.75sq.m
G7 -Attache23.7sq.m
outline of secant piling shown dashed
G10 -Security Control23.26sq.m
Waiting Area
Interview Area
Passport Assistant
VISA Assistant
Entrance Lobby5.7sq.m Public Entrance
monitor control
glass wall with beam over
monitor shelf
modular work stations as
selected by client
fully wired for IT requirements
as called up on the M & E
Drawings.
modular work stations as
selected by client
fully wired for IT requirements
as called up on the M & E
Drawings.
G13 - Toilet4.1sq.m
ceramic floor as selected
by client. Allow €25/sq.m
for supply only.
Contractor responsible
for laying.
New toilet to underside of existing stairs.
Drained cavity detail. Please refer to drawing No:
ceramic floor as selected
by client. Allow €25/sq.m
for supply only.
Contractor responsible
for laying.
2110
1950
5
6 7
11
12
8
Landing
1200mm *
1200mm
Landing
1200mm *
1200mm
2367
1088
8
adjoining boundary wall between 69 Merrion Road and 71
Merrion Road. Care to be taken during basement and
construction works not to damage this wall. All problems
anticipated to be brought to the attention of the Design Team.
8920 3328
7970
12450 7840
3645
frameless glazing to G8
turning the corner as shown
G11 -Office Area30.9sq.m
Lift Shaftby specialist
D1
FD30
FD60
VP
VP
VP
FD30
D3
FD30
line of new rooflight
1800
Service Point C
5250
13128
A
planted patio
3497
A
outline of secant piling shown dashed
outline of secant piling shown dashed
G1 -Open Plan Library& Resource Centre
reference tables (loose furniture)
as specified by the client.
open book shelves (free standing). Please refer to elevation.
granite window seat.
4
3
Landing
1200mm *
1200mm
G2 -Toilet3.9sq.m
Lift Shaftby specialist
outline of secant piling shown dashed
G12 -Public Office21sq.m
Stores0sq.m
x-ray scanner
D1
9
10
1158
8
7970
1780 2230
2499 1205
5600 2600
3740 1640
1956
1319
3658
G6 -Staff Entrance6.7sq.m
1500mm * 1500mm
turning circle
openable window section here
1500mm * 1500mm
turning circle
2443
fd60
D3
D1
VP
VP
VP
D4
D3
FD30
15051875
All internal layouts/ furniture onseparate drawing number xx
Area to kitchen for
rooflight as per
elevation and
section
1150 15
00
1455
D2
FD30
D1
FD30
D1
FD30
D5
G9 -Chauffeur4.0sq.m
D2
FD30
FD30D6
86.8sq.m
Built in bookcase &
suspended filing system.
Built in bookcase/ suspended
filing system. Services from
basement brought up vertically.
full height frameless glazing
D3
FD30
9
8
7
6
5
4
3
2
1
ServiceDuct
ServiceDuct
floor to ceiling glass screen to
manufacturers details
Interview Station
GENERAL NOTES:
Existing Bay WindowAll existing sliding sash windows, linings and architravesto be replaced using a Carlson Windows, painted whiteand/or equal approved. Contractor to allow for all dampproofing/ air tightness (tape and membrane - Isoverand/or equal approved) when fitting of windows/ linings
Skirtings & ArchitravesContractor to allow for the replacement throughout ofdouble height skirting to match existing. All skirtings tobe painted as per specification to include caulking asnecessary prior to painting.
Coving/ Cornice:Where shown protect ceiling rose,cornice & frieze work,clean down and make good to take new paint work asper specification. All replacement ceiling rose, corniceand frieze work to match existing.
Internal Walls:3 coat paintwork in washable matt emulsion to allplastered finishes in 'Dulux' paint systems orequal/approved.
Picture Rails:Replacement of picture and dado rails in paintedhardwood fixed to match existing heights throughout.
Floors:All timber upper floors to be to Engineers requirementswith full protection to the ceilings under whererequired. All replacement timber floor boards to bestandard T&G to specification. Please note floor boardsto Conference Room F9 to be in selected pre-finishedengineered wood by Tilestyle or other equal andapproved supplier.
Staircase:Existing staircase to be carefully dismantled and existinghandrail, balustrades, strings and linings to be retainedfor use in replacement concrete stairs to detail andspecification. New section of stairs from first to groundfloor level is to be finished as above to match theexisting.
Ground Floor Area:Contractor to note that the existing ground floor area tobe removed and excavated to a depth to allow for theprovision of a new floor build as per section toaccommodate U/F heating. Ground floor throughout tobe finished in selected ceramic floor tile and skirtingwith slip resistant R10 requirement. Contractor to allow€75 per sq.m. from Tilestyle or other equal andapproved.
Internal Doors:Contractor to supply and fit all internal doors, skirtingsand architraves to match existing to include vision paneland achieve 30min fire rating as per door schedule andspecification as supplied by Riverside Furniture or equaland approved.
Lift Shaft:Lift shaft to be min 1700mm * 1930mm as shown toaccommodate a 630kg traction MRL Passenger Lift tomeet the requirements of Part M, TGD as supplied byAccel Lifts or equal approved. This lift shaft to beconstructed to ceiling height of the 2nd floor as shownon cross sections.Please refer to drawings attached.
Internal Partitions:All walls to the Communcations room are 225mm solidblockwork with 18mm plaster both sides painted toselected colour. All other new partitions will be perdetail xx-xx and painted to selected colour. All smartglass walls/doors/ glazing system as per W2W or otherequal and approved. All new partitions will be broughtup to ceiling height unless otherwise shown, as in S6.
Ceilings:RefurbishmentContractor to provide and protection and support toexisting decorative ceilings to be retained. All newceilings in the refurbished main building will be gyprocceiling with replacement ceiling rose and cornice tomatch existing.New Build:Ceiling to the 1st floor office extension to be gyprocplasterboard with isover and/or equal approvedmembrane taped at wall junctions as shown. Paintedwhite.
New blockwork as called up. Fair face blockwork tobasement level only. All other blockwork plastered andpainted as per specification.
New stud work as called up to match detail as part oftender document. Plastered and painted as perspecification. 37db level to be achieved by providingacoustic batt
New brickwork as called up and as selected by theArchitect.
Existing structure as retained. Please refer to takedowndrawings No.13.54.08.101 & 102.
Compliance with Technical Guidance Documents:All workmanship and materials to conform withthe current Technical Guidance Documents orany amendments made prior to works starting onsite. As part of the Building Control andRegistration process, "the undertaken by Builder"and the "Certificate of Compliance onCompletion" is verification that the maincontractor to the project understands and isaware of their obligation to comply with thecurrent Technical Guidance Documents.
Design Team:The Contractor is to take into account alldrawings, documentation and schedules as issuedby the design team to include Structural Engineer,Mech & Elec Engineer, Fire Safety and DisabilityAccess Consultant. Any discrepencies should bebrough to the attention of the project Architectsassigned to the project prior to commencementof works.
Building Control and Registration:The contractor will need to inform the designteam in advance of any works that will require
inspection and certification prior to covering orclosing. Failure to give adequate notice mayresult in opening up works and unnecessarydelays.
Setting out:The contractor will be responsible for thechecking of all dimensions etc., prior to settingout and commencement of works/ ordering ofmaterials. Any discrepancies to be brought to theattention of the project Architect. Contractor totake care during demolition to adjoiningproperties. A photographic survey to be carriedout prior to any works commencing.
Tidyness:The Contractor is responsible for the cleanlinessof the construction site, access roads and thesurrounding properties including the publicroadways. All areas to be kept in a neat and tidymanner and the Contractor to provide recyclingfacilites for construction and staff waste.
Security:Security of the site is to be maintained at all
times. No unauthorised personnel to be admittedto site. Contractor shall not undertake any workoutside specified scope of work with theArchitects approval. The site is to be securedoutside of normal working hours as per the grantof planning permission.
Materials and Workmanship:All works to be carried out with proper materialsand in a workman like manner and in accordancewith the provisions of Part D of the BuildingRegulations and all other applicable sections ofthe Technical Guidance Documents.
Workmanship to be in accordance with BS8000-0: 2014.
"Proper materials" means materials which are fitfor the use for which they are intended and forthe conditions in which they are to be used, andincludes materials which:(a) bear a CE Marking in accordance with theprovisions of the Construction ProductsRegulations:(b) comply with an appropriate harmonised
standard or European Technical Assessment inaccordance with the provisions of theConstruction Products Regulations; or(c) comply with an appropriate Irish Standard orIrish Agrement Certificate or with an alternativenational technical specification of any state whichis a contracting party to the Agreement on theEuropean Economic Area, which provides in usean equivalent level of safety and suitability.
Materials include products, components, fittings,items of equipment and backfilling forexcavations.
All materials, fittings and finishes as specified orequivalent to be approved by Architect beforework or ordering commences. Samples to beprovided at Architects request. All materials onsite to be suitably and adequately protected fromdamage and weather.
Tolerances:Unless specifically stated otherwise, the accuracyof the Works shall be inaccordance with BS5606:1990
To Note:All dimensions to be checked on site. No dimensions to be scaled from drawings. This drawing to be read in conjunction with therelevant specifications, documention and relevant drawings supplied by consultants. All queries should be raised with the Project Supervisor.
Existing House 138.00 sqmRear Window Bay 1.50 sqmReception Extension 46.20 sqm
window and roof glazing
line of new rooflight
shelving
Lift Shaftby specialist
outline of secant piling shown dashed
outline of secant piling shown dashed
outline of secant piling shown dashed
F1 -Minister/ Counsellor
F2 -Head of Chancery
F10 -Hallway
F6 -Main Lobby &Stairwell
F3 -GA & AA
F8 -Toilet
F7 -Lobby
5146 2440 5061
4192
4937
1592
8
7565
2490
4857
1098
0
3699 2550 3650
12543
1500
1622
3866
all work within zone B - D new build - up works. This will
consist of a timber floor build up to match the finish floor levels
of the existing floor.
ceramic floor as selected
by client. Allow €25/sq.m
for supply only. Contractor
responsible for laying.
A
B
C
Service Point B
AND CONFERENCE ARMCHAIRS
2 NO. 2 SEAT COUCHAND LOW TABLE
FLOOR AREAS: FIRST FLOOR
Total Area 185.70 sqm
Modular Works Station fully ICT wired
shown dotted
planted green canopy/roof
green roof to Pavilion
lower level
outline of secant piling shown dashed
F9 -Conference Room
F11 -Office
F5 -PA Office
F4 -Lift Lobby
Entrance
14194
5628
4507
Tretford carpet
laid on concrete floor build up
New blockwork to form ope similar to
that being retained to the north side of
the existing window. Existing window
lining to be stored safely and re-used in
the Social Secretary's office.
D
existing stairs to be screened
during construction to protect
the integrity of the structure. Access
agreed with project supervisor
VP
D1
fd60
dotted lines indicate external leaf of
communications room on 2nd floor above
ServiceDuct
27421m diam roof light
5000
void area behind
brick panel to detail
1643
2644
D2
FD30
D2
FD30
D2
FD30
ED
FD30
D2
FD30
D3
D5
D5
21.4sq.m
20.7sq.m
18.9sq.m 10.5sq.m
3.2sq.m
2.5sq.m
3.8sq.m
15.5sq.m
8.6sq.m
16.3sq.m
41.1sq.m
3.3sq.m
495
UP
DN
1195
24
23
22
21
20
25
10
11
12
13
14
15
16
17
18
19
30
29
28
27
26
31
32
33
VP
D2
FD30 VP
821
Takedown existing door and make good to brickwork. Infill
with balustrade to match existing.
2230
ServiceDuctservice duct in blockwork with 44mm
batten with american oak or equal
approved cladding. Fire doors lined in
cladding to give 60min fire rating
similar to lift shaft.
GENERAL NOTES:
Existing Bay WindowAll existing sliding sash windows, linings and architravesto be replaced using a Carlson Windows, painted whiteand/or equal approved. Contractor to allow for all dampproofing/ air tightness (tape and membrane - Isoverand/or equal approved) when fitting of windows/ linings
Skirtings & ArchitravesContractor to allow for the replacement throughout ofdouble height skirting to match existing. All skirtings tobe painted as per specification to include caulking asnecessary prior to painting.
Coving/ Cornice:Where shown protect ceiling rose,cornice & frieze work,clean down and make good to take new paint work asper specification. All replacement ceiling rose, corniceand frieze work to match existing.
Internal Walls:3 coat paintwork in washable matt emulsion to allplastered finishes in 'Dulux' paint systems orequal/approved.
Picture Rails:Replacement of picture and dado rails in paintedhardwood fixed to match existing heights throughout.
Floors:All timber upper floors to be to Engineers requirementswith full protection to the ceilings under whererequired. All replacement timber floor boards to bestandard T&G to specification. Please note floor boardsto Conference Room F9 to be in selected pre-finishedengineered wood by Tilestyle or other equal andapproved supplier.
Staircase:Existing staircase to be carefully dismantled and existinghandrail, balustrades, strings and linings to be retainedfor use in replacement concrete stairs to detail andspecification. New section of stairs from first to groundfloor level is to be finished as above to match theexisting.
Ground Floor Area:Contractor to note that the existing ground floor area tobe removed and excavated to a depth to allow for theprovision of a new floor build as per section toaccommodate U/F heating. Ground floor throughout tobe finished in selected ceramic floor tile and skirtingwith slip resistant R10 requirement. Contractor to allow€75 per sq.m. from Tilestyle or other equal andapproved.
Internal Doors:Contractor to supply and fit all internal doors, skirtingsand architraves to match existing to include vision paneland achieve 30min fire rating as per door schedule andspecification as supplied by Riverside Furniture or equaland approved.
Lift Shaft:Lift shaft to be min 1700mm * 1930mm as shown toaccommodate a 630kg traction MRL Passenger Lift tomeet the requirements of Part M, TGD as supplied byAccel Lifts or equal approved. This lift shaft to beconstructed to ceiling height of the 2nd floor as shownon cross sections.Please refer to drawings attached.
Internal Partitions:All walls to the Communcations room are 225mm solidblockwork with 18mm plaster both sides painted toselected colour. All other new partitions will be perdetail xx-xx and painted to selected colour. All smartglass walls/doors/ glazing system as per W2W or otherequal and approved. All new partitions will be broughtup to ceiling height unless otherwise shown, as in S6.
Ceilings:RefurbishmentContractor to provide and protection and support toexisting decorative ceilings to be retained. All newceilings in the refurbished main building will be gyprocceiling with replacement ceiling rose and cornice tomatch existing.New Build:Ceiling to the 1st floor office extension to be gyprocplasterboard with isover and/or equal approvedmembrane taped at wall junctions as shown. Paintedwhite.
New blockwork as called up. Fair face blockwork tobasement level only. All other blockwork plastered andpainted as per specification.
New stud work as called up to match detail as part oftender document. Plastered and painted as perspecification. 37db level to be achieved by providingacoustic batt
New brickwork as called up and as selected by theArchitect.
Existing structure as retained. Please refer to takedowndrawings No.13.54.08.101 & 102.
Compliance with Technical Guidance Documents:All workmanship and materials to conform withthe current Technical Guidance Documents orany amendments made prior to works starting onsite. As part of the Building Control andRegistration process, "the undertaken by Builder"and the "Certificate of Compliance onCompletion" is verification that the maincontractor to the project understands and isaware of their obligation to comply with thecurrent Technical Guidance Documents.
Design Team:The Contractor is to take into account alldrawings, documentation and schedules as issuedby the design team to include Structural Engineer,Mech & Elec Engineer, Fire Safety and DisabilityAccess Consultant. Any discrepencies should bebrough to the attention of the project Architectsassigned to the project prior to commencementof works.
Building Control and Registration:The contractor will need to inform the designteam in advance of any works that will require
inspection and certification prior to covering orclosing. Failure to give adequate notice mayresult in opening up works and unnecessarydelays.
Setting out:The contractor will be responsible for thechecking of all dimensions etc., prior to settingout and commencement of works/ ordering ofmaterials. Any discrepancies to be brought to theattention of the project Architect. Contractor totake care during demolition to adjoiningproperties. A photographic survey to be carriedout prior to any works commencing.
Tidyness:The Contractor is responsible for the cleanlinessof the construction site, access roads and thesurrounding properties including the publicroadways. All areas to be kept in a neat and tidymanner and the Contractor to provide recyclingfacilites for construction and staff waste.
Security:Security of the site is to be maintained at all
times. No unauthorised personnel to be admittedto site. Contractor shall not undertake any workoutside specified scope of work with theArchitects approval. The site is to be securedoutside of normal working hours as per the grantof planning permission.
Materials and Workmanship:All works to be carried out with proper materialsand in a workman like manner and in accordancewith the provisions of Part D of the BuildingRegulations and all other applicable sections ofthe Technical Guidance Documents.
Workmanship to be in accordance with BS8000-0: 2014.
"Proper materials" means materials which are fitfor the use for which they are intended and forthe conditions in which they are to be used, andincludes materials which:(a) bear a CE Marking in accordance with theprovisions of the Construction ProductsRegulations:(b) comply with an appropriate harmonised
standard or European Technical Assessment inaccordance with the provisions of theConstruction Products Regulations; or(c) comply with an appropriate Irish Standard orIrish Agrement Certificate or with an alternativenational technical specification of any state whichis a contracting party to the Agreement on theEuropean Economic Area, which provides in usean equivalent level of safety and suitability.
Materials include products, components, fittings,items of equipment and backfilling forexcavations.
All materials, fittings and finishes as specified orequivalent to be approved by Architect beforework or ordering commences. Samples to beprovided at Architects request. All materials onsite to be suitably and adequately protected fromdamage and weather.
Tolerances:Unless specifically stated otherwise, the accuracyof the Works shall be inaccordance with BS5606:1990
To Note:All dimensions to be checked on site. No dimensions to be scaled from drawings. This drawing to be read in conjunction with therelevant specifications, documention and relevant drawings supplied by consultants. All queries should be raised with the Project Supervisor.
BCF ArchitectsCloncannonLower, Mountmellick, County Laois.Tel: 057 8679757 e-mail:[email protected] Herberton, 26 St. James Walk, Rialto, Dublin 8.Tel: 01 - 5352674 e-mail:[email protected]
Ambassador of India to Ireland
13/47/2017 11:47 AM
As Shown
Bcf Architects
Proposed basement, library pavilion and internal refurbishment of existing buildingat 69 Merrion Road, Dublin 4.
203 First Flr Plan
C:\Users\Bcf Architects\Dropbox (BCF Architects)\BCF Architects Team Folder\13.54 - 69 Merrion Rd\2017 Design Team Folder\BCF Achitects\A - Tender Set
Complete\201 Proposed Dwg Set.dwg
A1
General Layout
First Floor Layout
W
S
E
N
Rear Window Bay 1.50 sqm
FLOOR AREAS: FIRST FLOOR
Existing House 138.00 sqm
Total Area 255.55 sqm
Reception Extension 116.05 sqm
AutoCAD SHX Text
250
AutoCAD SHX Text
D
AutoCAD SHX Text
250
AutoCAD SHX Text
D
AutoCAD SHX Text
200
AutoCAD SHX Text
B
AutoCAD SHX Text
200
AutoCAD SHX Text
B
AutoCAD SHX Text
250
AutoCAD SHX Text
B
AutoCAD SHX Text
250
AutoCAD SHX Text
B
AutoCAD SHX Text
250
AutoCAD SHX Text
C
AutoCAD SHX Text
250
AutoCAD SHX Text
C
S4 -Lift Lobby
S12 -Toilet
no takedown works here.
existing timber floor to be maintained.
all work within zone A - B new build - up
works. This will consist of a new concrete
floor and screed as called up on cross
section. All finish floor levels to match
that of the existing floor.
A C
D
Tretford carpet (
Tretford carpet
B
all work within zone B - D new build - up works. This will
consist of a timber floor build up to match the finish floor levels
of the existing floor.
New set of double (pocket)
sliding doors opened between
the Ambassadors Suite and the
Waiting Room by W2W or
equal and approved.
Replace all existing doors to match existing
with 1/2 hr fire rated doors with vision panel to
meet DAC & FSC requirements.
existing wall demolished to be replaced with a
timber stud partition. please refer to sectiion.
ceramic floor as selected
by client. Allow €25/sq.m
for supply only. Contractor
responsible for laying.
150mm insulated cavity
100mm blockwork inner leaf
150mm insulated cavity
100mm blockwork inner leaf
5061
14192
4910
4910
1109
6
5325
3607
outline of secant piling shown dashed
outline of secant piling shown dashed
fd60
Service Duct 2186
1800
Service Point A
VIEW 2
2114
S6 -PA to Ambassador
S7 -Social Secretary
S8 -Communications Room
S1 -Ambassador's Office
S2 -Waiting Room
S3 -Upper Landing
S5 -Lift Shaft
S10 -Service Point
S11 -Toilet
Tretford carpet
Tretford carpet
Laid on existing timber floor build-up
Tretford carpet
laid on concrete beam
and block floor build up
wheelchair reserve
New blockwork to form ope similar to
that being retained to the north side of
the existing window. Existing window
lining to be stored safely and re-used in
the Social Secretary's office.
Large mirror to be stored off-site/ on site protection during the
works.
100mm outer leaf plastered
to match existing.
Brick outer leaf
5146 2400
80196171
14190
3942
3234
1202
1 1500mm * 1500mm
turning circle
outline of secant piling shown dashed
existing stairs to be screened
during construction to protect
the integrity of the structure. Access
agreed with project supervisor
Tretford carpet
line of rooflight/smokevent over
to Fire Officiers requirement
2440
1825
Take down beam over
to form toilet area
1825
2543
VIEW 1
VIEW 3
VIEW 4
void area behind
brick panel to detail
D2
FD30
D2
FD30
D2
FD30 Display
D3
D3
D1
FD30
ED
FD30
ED
FD30
D4
17.9sq.m
27.3sq.m
16.0sq.m
24.0sq.m
3.8sq.m5.2sq.m
4.7sq.m11.7sq.m
3.3sq.m
10.0sq.m
Sedum roof to 1st flooroffice block over driveway43.0sq.m
Door type D1 is steel security door with
vision panel opening into
communications room and secondary
lockable D2 mirrored door, outward
opening and to specification.
ED
FD30
glazed screen system by W2W
or equal and approved.
GENERAL NOTES:
Existing Bay WindowAll existing sliding sash windows, linings and architravesto be replaced using a Carlson Windows, painted whiteand/or equal approved. Contractor to allow for all dampproofing/ air tightness (tape and membrane - Isoverand/or equal approved) when fitting of windows/ linings
Skirtings & ArchitravesContractor to allow for the replacement throughout ofdouble height skirting to match existing. All skirtings tobe painted as per specification to include caulking asnecessary prior to painting.
Coving/ Cornice:Where shown protect ceiling rose,cornice & frieze work,clean down and make good to take new paint work asper specification. All replacement ceiling rose, corniceand frieze work to match existing.
Internal Walls:3 coat paintwork in washable matt emulsion to allplastered finishes in 'Dulux' paint systems orequal/approved.
Picture Rails:Replacement of picture and dado rails in paintedhardwood fixed to match existing heights throughout.
Floors:All timber upper floors to be to Engineers requirementswith full protection to the ceilings under whererequired. All replacement timber floor boards to bestandard T&G to specification. Please note floor boardsto Conference Room F9 to be in selected pre-finishedengineered wood by Tilestyle or other equal andapproved supplier.
Staircase:Existing staircase to be carefully dismantled and existinghandrail, balustrades, strings and linings to be retainedfor use in replacement concrete stairs to detail andspecification. New section of stairs from first to groundfloor level is to be finished as above to match theexisting.
Ground Floor Area:Contractor to note that the existing ground floor area tobe removed and excavated to a depth to allow for theprovision of a new floor build as per section toaccommodate U/F heating. Ground floor throughout tobe finished in selected ceramic floor tile and skirtingwith slip resistant R10 requirement. Contractor to allow€75 per sq.m. from Tilestyle or other equal andapproved.
Internal Doors:Contractor to supply and fit all internal doors, skirtingsand architraves to match existing to include vision paneland achieve 30min fire rating as per door schedule andspecification as supplied by Riverside Furniture or equaland approved.
Lift Shaft:Lift shaft to be min 1700mm * 1930mm as shown toaccommodate a 630kg traction MRL Passenger Lift tomeet the requirements of Part M, TGD as supplied byAccel Lifts or equal approved. This lift shaft to beconstructed to ceiling height of the 2nd floor as shownon cross sections.Please refer to drawings attached.
Internal Partitions:All walls to the Communcations room are 225mm solidblockwork with 18mm plaster both sides painted toselected colour. All other new partitions will be perdetail xx-xx and painted to selected colour. All smartglass walls/doors/ glazing system as per W2W or otherequal and approved. All new partitions will be broughtup to ceiling height unless otherwise shown, as in S6.
Ceilings:RefurbishmentContractor to provide and protection and support toexisting decorative ceilings to be retained. All newceilings in the refurbished main building will be gyprocceiling with replacement ceiling rose and cornice tomatch existing.New Build:Ceiling to the 1st floor office extension to be gyprocplasterboard with isover and/or equal approvedmembrane taped at wall junctions as shown. Paintedwhite.
New blockwork as called up. Fair face blockwork tobasement level only. All other blockwork plastered andpainted as per specification.
New stud work as called up to match detail as part oftender document. Plastered and painted as perspecification. 37db level to be achieved by providingacoustic batt
New brickwork as called up and as selected by theArchitect.
Existing structure as retained. Please refer to takedowndrawings No.13.54.08.101 & 102.
Compliance with Technical Guidance Documents:All workmanship and materials to conform withthe current Technical Guidance Documents orany amendments made prior to works starting onsite. As part of the Building Control andRegistration process, "the undertaken by Builder"and the "Certificate of Compliance onCompletion" is verification that the maincontractor to the project understands and isaware of their obligation to comply with thecurrent Technical Guidance Documents.
Design Team:The Contractor is to take into account alldrawings, documentation and schedules as issuedby the design team to include Structural Engineer,Mech & Elec Engineer, Fire Safety and DisabilityAccess Consultant. Any discrepencies should bebrough to the attention of the project Architectsassigned to the project prior to commencementof works.
Building Control and Registration:The contractor will need to inform the designteam in advance of any works that will require
inspection and certification prior to covering orclosing. Failure to give adequate notice mayresult in opening up works and unnecessarydelays.
Setting out:The contractor will be responsible for thechecking of all dimensions etc., prior to settingout and commencement of works/ ordering ofmaterials. Any discrepancies to be brought to theattention of the project Architect. Contractor totake care during demolition to adjoiningproperties. A photographic survey to be carriedout prior to any works commencing.
Tidyness:The Contractor is responsible for the cleanlinessof the construction site, access roads and thesurrounding properties including the publicroadways. All areas to be kept in a neat and tidymanner and the Contractor to provide recyclingfacilites for construction and staff waste.
Security:Security of the site is to be maintained at all
times. No unauthorised personnel to be admittedto site. Contractor shall not undertake any workoutside specified scope of work with theArchitects approval. The site is to be securedoutside of normal working hours as per the grantof planning permission.
Materials and Workmanship:All works to be carried out with proper materialsand in a workman like manner and in accordancewith the provisions of Part D of the BuildingRegulations and all other applicable sections ofthe Technical Guidance Documents.
Workmanship to be in accordance with BS8000-0: 2014.
"Proper materials" means materials which are fitfor the use for which they are intended and forthe conditions in which they are to be used, andincludes materials which:(a) bear a CE Marking in accordance with theprovisions of the Construction ProductsRegulations:(b) comply with an appropriate harmonised
standard or European Technical Assessment inaccordance with the provisions of theConstruction Products Regulations; or(c) comply with an appropriate Irish Standard orIrish Agrement Certificate or with an alternativenational technical specification of any state whichis a contracting party to the Agreement on theEuropean Economic Area, which provides in usean equivalent level of safety and suitability.
Materials include products, components, fittings,items of equipment and backfilling forexcavations.
All materials, fittings and finishes as specified orequivalent to be approved by Architect beforework or ordering commences. Samples to beprovided at Architects request. All materials onsite to be suitably and adequately protected fromdamage and weather.
Tolerances:Unless specifically stated otherwise, the accuracyof the Works shall be inaccordance with BS5606:1990
To Note:All dimensions to be checked on site. No dimensions to be scaled from drawings. This drawing to be read in conjunction with therelevant specifications, documention and relevant drawings supplied by consultants. All queries should be raised with the Project Supervisor.
gated entrance to reargarden. existingextension to bedemolished.
Existing staffaccommodation to bedemolished.
CL
CL
NORTH EAST ELEVATION
EXISTING
12860
12860
71 Merrion Road
71 Merrion Road
All existing sliding sash windows to beremoved and disposed off site.
Returnstonework pier tonew gate
69 Merrion Road
Re-instate window ope tomatch existing & fit newtriple glazed window
Make good and repair existingbrickwork throughout
400
2650
NORTH EAST ELEVATION
PROPOSED
CL
2640
3538
6178
Brick to match existingbrick of existing building
new reception wing toreplace existing firstfloor extension.
twin granite columns tomatch those at existingentrance arch
CL
CL
CL
CL
3190
4187
7377
existing extension to theside of the dwelling to bedemolished. (outlined red)
existing commercial unit to be demolishedto allow for entrance to rear gardenand existing stonework to be kept safefor re-use. All stone and lintols will becleaned down.
67 Merrion Road
67 Merrion Road
Remove existingdoor and frame
69 Merrion Road
All existing slate to be removed carefully,timbers/ wallplates to be replaced asnecessary. New felt and existing salvagedslate to be used.
clean down and makegood stone steps andflanks with new steps tomatch existing.
All windows to the existingbuilding will be replaced usingCarlson and or equal approvedtriple glazed in white.
All existing slate to be removedcarefully, timbers/ wallplates to bereplaced as necessary. New felt andexisting salvaged slate to be used.
10273222
remove existing chimney and makegood as part of the roof repair works.
remove existing chimney and makegood as part of the roof repair works.
Internal finish floor Level
1495 4650
2438
To Note:All dimensions to be checked on site. No dimensions to be scaled from drawings. This drawing to be read in conjunction with therelevant specifications, documention and relevant drawings supplied by consultants. All queries should be raised with the Project Supervisor.
BCF ArchitectsCloncannonLower, Mountmellick, County Laois.Tel: 057 8679757 e-mail:[email protected] Herberton, 26 St. James Walk, Rialto, Dublin 8.Tel: 01 - 5352674 e-mail:[email protected]
Ambassador of India to Ireland
13/47/2017 11:47 AM
As Shown
Bcf Architects
Proposed basement, library pavilion and internal refurbishment of existing buildingat 69 Merrion Road, Dublin 4.
207 Side Elevation and Long Section
C:\Users\Bcf Architects\Dropbox (BCF Architects)\BCF Architects Team Folder\13.54 - 69 Merrion Rd\2017 Design Team Folder\BCF Achitects\A - Tender Set
Complete\201 Proposed Dwg Set.dwg
A1
North East Elevation - Proposed
North East Elevation - Existing
Front Elevations
AutoCAD SHX Text
17.77
AutoCAD SHX Text
18.35
AutoCAD SHX Text
6.31
AutoCAD SHX Text
16.32
AutoCAD SHX Text
6.31
AutoCAD SHX Text
13.64
AutoCAD SHX Text
6.31
AutoCAD SHX Text
17.77
AutoCAD SHX Text
6.65
AutoCAD SHX Text
13.64
AutoCAD SHX Text
0.0m OD
AutoCAD SHX Text
17.77
AutoCAD SHX Text
14.58
AutoCAD SHX Text
6.31
AutoCAD SHX Text
7.32
AutoCAD SHX Text
16.32
AutoCAD SHX Text
9.44
AutoCAD SHX Text
6.31
AutoCAD SHX Text
6.65
AutoCAD SHX Text
17.77
AutoCAD SHX Text
13.64
AutoCAD SHX Text
0.0m OD
AutoCAD SHX Text
6.65
AutoCAD SHX Text
16.32
AutoCAD SHX Text
17.77
AutoCAD SHX Text
14.58
AutoCAD SHX Text
9.44
AutoCAD SHX Text
7.32
AutoCAD SHX Text
6.65
AutoCAD SHX Text
16.32
AutoCAD SHX Text
14.58
AutoCAD SHX Text
3.53
AutoCAD SHX Text
16.32
AutoCAD SHX Text
6.31
AutoCAD SHX Text
3.53
AutoCAD SHX Text
17.77
AutoCAD SHX Text
18.35
AutoCAD SHX Text
13.64
AutoCAD SHX Text
16.32
AutoCAD SHX Text
14.58
GF level 100.00
3.78
2250
3521
SF level 107.20
FF level 102.98
10400
16375
6225
All single glazed sliding sash windows to bereplaced with a new double glazed similar unitmatching the existing.
CL
SF level 107.20
2980
FF level 102.98
new reception wing toreplace existing first floorextension.
2.85m high trellis & evergreenclimber to boundary wall
garden level at67 Merrion Road
EXISTING BAY WINDOW
b6. securestorageBasement Level
SF level 107.20
2980
Door
2250
SF level 107.20
FF level 102.98
9700
5210
LIBRARY/RESOURCE AREA
1506
existing garden level
3259
CL
GF level 100.00
new stone capping to existingboundary wall
2.85m high "green" wall trellis
existing garden levelgated archway to rear garden
3134
6100
FF level 102.98
planted borderat boundary wall
Main Extension to rear shown outlined red with basement.
SOUTH WEST ELEVATION
REAR
PROPOSED LIBRARY EXTENSION
SOUTH WEST ELEVATION
REAR
CROSS SECTION OF
PROPOSED LIBRARY EXTENSION
AND BASEMENT LEVEL
3225
3225
b8. general storage
b1. circulatio/fire route
Strip back plaster work torear elevation and plasterthroughout
Internal finish floor Level
3012
3965 1245
2400
2100
3332
2700
please refer to Engineers details forthe secant piling details
please refer to Engineers details forthe basement slab.
3060
2707
2100
top of garden wall
new bay window to replacekitchen door and balcony
75mm services void below rc slab.
Internal finish floor Level
Internal finish Floor Level
sedum roof build as permanufacturers specifications andinstallation details.
planted greenroof
new reception wing toreplace existing first floorextension.
2.85m high trellis & evergreenclimber to boundary wall
garden level at67 Merrion Road
new stone capping to existingboundary wall
2.85m high "green" wall trellis
gated archway to rear gardenplanted borderat boundary wall
top of garden wall
new bay window to replacekitchen door and balcony
stone cappingto parapet
2732
2100
sunken garden to rear ofpavilion - see site plan
remove existing chimney and makegood as part of the roof repair works.
brick to match existing
Rationel powder coated'aluclad' windows tripleglazed, white to matchexisting colour
brick to match existing
1544
10630
3332
2390
10492195104519781045
To Note:All dimensions to be checked on site. No dimensions to be scaled from drawings. This drawing to be read in conjunction with therelevant specifications, documention and relevant drawings supplied by consultants. All queries should be raised with the Project Supervisor.
BCF ArchitectsCloncannonLower, Mountmellick, County Laois.Tel: 057 8679757 e-mail:[email protected] Herberton, 26 St. James Walk, Rialto, Dublin 8.Tel: 01 - 5352674 e-mail:[email protected]
Ambassador of India to Ireland
13/47/2017 11:47 AM
As Shown
Bcf Architects
Proposed basement, library pavilion and internal refurbishment of existing buildingat 69 Merrion Road, Dublin 4.
208 Elevation Section A - A
C:\Users\Bcf Architects\Dropbox (BCF Architects)\BCF Architects Team Folder\13.54 - 69 Merrion Rd\2017 Design Team Folder\BCF Achitects\A - Tender Set
Complete\201 Proposed Dwg Set.dwg
A1
Rear Elevation
Typical Cross Section
AutoCAD SHX Text
9.44
AutoCAD SHX Text
18.35
AutoCAD SHX Text
9.68
AutoCAD SHX Text
6.26
AutoCAD SHX Text
6.65
AutoCAD SHX Text
6.04
AutoCAD SHX Text
Door
AutoCAD SHX Text
17.77
AutoCAD SHX Text
17.77
AutoCAD SHX Text
14.58
AutoCAD SHX Text
17.77
AutoCAD SHX Text
13.64
AutoCAD SHX Text
6.26
AutoCAD SHX Text
6.65
AutoCAD SHX Text
Glasshouse
AutoCAD SHX Text
9.44
AutoCAD SHX Text
18.35
AutoCAD SHX Text
6.65
AutoCAD SHX Text
8.76
AutoCAD SHX Text
17.77
AutoCAD SHX Text
5.70
AutoCAD SHX Text
Door
AutoCAD SHX Text
13.64
AutoCAD SHX Text
9.68
AutoCAD SHX Text
6.26
AutoCAD SHX Text
8.80
AutoCAD SHX Text
9.68
AutoCAD SHX Text
GL
AutoCAD SHX Text
6.65
AutoCAD SHX Text
11.17
AutoCAD SHX Text
13.64
AutoCAD SHX Text
13.64
AutoCAD SHX Text
16.32
AutoCAD SHX Text
9.68
AutoCAD SHX Text
8.76
AutoCAD SHX Text
Glasshouse
AutoCAD SHX Text
Door
AutoCAD SHX Text
5.76
AutoCAD SHX Text
11.17
AutoCAD SHX Text
0.0m OD
AutoCAD SHX Text
17.77
AutoCAD SHX Text
17.77
AutoCAD SHX Text
8.80
AutoCAD SHX Text
14.58
AutoCAD SHX Text
13.64
AutoCAD SHX Text
0.0m OD
AutoCAD SHX Text
16.32
AutoCAD SHX Text
6.04
AutoCAD SHX Text
6.26
AutoCAD SHX Text
11.17
AutoCAD SHX Text
5.70
AutoCAD SHX Text
5.76
AutoCAD SHX Text
11.17
AutoCAD SHX Text
13.64
2935
remove existing hip roofand make good with newdetail to valley D02
car parking to front of building
2650
3032
NEW RECEPTION WING TO REPLACEEXISTING FIRST FLOOR EXTENSION.
2463
LANDSCAPED GARDEN
Illustrationcaretakers unit
existing granite wall to 71Merrion road.
All single glazed sliding sashwindows to be replaced with a newdouble glazed similar unit matchingthe existing.
solar array on southerly slopesof refurbished existing roofs
LOBBY LINK
LIBRARY/ RESOURCE CENTRE
brick to match existing
6135
1425
2450
2325
Sectioncaretakers unit
kitchen
2750
1517
3870
2595
3292
700
4000
G11 -Office23.7sq.mG5 -
PA Office23.7sq.m
new steps to match existing
replace existingbrickwork in salvagedand/or matching brick
Soffit Build up - Refer to Sheet 306- screed to achieve ffl to match existing dwelling- 25mm insulation- 150mm rc slab to engineers details- 100mm PIR Soffit Plus (X0/STP) and/ or equal approved- T&G iroco sheeting fixed as per manufacturers recommendations
sedum roof build up to roofat replacement first floorwing
Dashed line indicates ffl of theproposed caretakers unit.
TO NOTE:Cross section is for illustration purposes only - nodimensions or setting out to be taken from this section.Please refer to the caretakers unit sheets.
just to note that all existing building elements withinthe dotted line shown will be taken down to facilitatethe secant piling? basement works
remove existing chimney and makegood as part of the roof repair works.
The existing roof to be removedthroughout, slate carefully removedfor re-use. Wallplate to be removed.New truss roof to be installed toreplicate and replace existing roofform.
Wall Type A -350mm cavity wall constructionwith brick facade
75mm services void belowrc slab.
Internal finish floor Level
Internal finish Floor Level
A B E G
sedum roof build up to roofat replacement first floor wing
Dashed line indicates ffl of the proposedpavillion building and ground floorthroughout
aluminium cap to brick toselected colour and profile.
Dashed line indicates fflof the proposed pavillionbuilding and groundfloor throughout
remove existing hip roofand make good with newdetail to valley D02
car parking to front of building
brick to match existing
new steps to match existing
replace existingbrickwork in salvagedand/or matching brick
Internal finishFloor Level
Upper Roof 1
Intermediate
Roof 2
Internal finishFloor Level
C D F
All windows/ doors identified A - G aboveare new. Takedown works required here.Careful consideration to be given to theexisting stone blocks when forming allopes. All windows doors are rational orequal approved aluclad, white in colour,triple glazed.
New entrance lobby to publicoffice area finished in athermally broken aluminiumframe, triple glazed, whitecolour. please refer to detail.
Rationel powder coated'aluclad' windows tripleglazed, white to matchexisting colour
remove existing chimney and makegood as part of the roof repair works.
The existing roof to be removedthroughout, slate carefully removedfor re-use. Wallplate to be removed.New truss roof to be installed toreplicate and replace existing roofform.
Internal finish Floor Level
existing stone to be strippedback and re-stored to matchexisting at ground floorlevel and in keeping with theadjoining dwelling on MerrionRoad.
A B E G
New granite window cill from A- C & E - G to match cills tofront elevation in size anddepth.
Dashed line indicates ffl of the proposedpavillion building and ground floorthroughout
aluminium cap to brick toselected colour and profile.
Dashed line indicates fflof the proposed pavillionbuilding and groundfloor throughout
brick to match existing brick panel to selected design
3015
2100
550
2450
To Note:All dimensions to be checked on site. No dimensions to be scaled from drawings. This drawing to be read in conjunction with therelevant specifications, documention and relevant drawings supplied by consultants. All queries should be raised with the Project Supervisor.
BCF ArchitectsCloncannonLower, Mountmellick, County Laois.Tel: 057 8679757 e-mail:[email protected] Herberton, 26 St. James Walk, Rialto, Dublin 8.Tel: 01 - 5352674 e-mail:[email protected]
Ambassador of India to Ireland
13/47/2017 11:47 AM
As Shown
Bcf Architects
Proposed basement, library pavilion and internal refurbishment of existing buildingat 69 Merrion Road, Dublin 4.
209 Section B - B
C:\Users\Bcf Architects\Dropbox (BCF Architects)\BCF Architects Team Folder\13.54 - 69 Merrion Rd\2017 Design Team Folder\BCF Achitects\A - Tender Set
Complete\201 Proposed Dwg Set.dwg
A1
Side Elevation - North West - General Details
Side Elevation - North West - Cross Section
AutoCAD SHX Text
0.0m OD
AutoCAD SHX Text
0.0m OD
2980
S1 -Ambassadors Office
F1 -Minister/ Counsellor
G11 -Office Area
landing
solar array on southerly slopes of refurbished existingroofs
existing building
car parking to frontof building
3580
3970
G7 -Attache
bay window
S6 -PA to Ambassador
LIBRARY/
RESOURCE
CENTRE
6066
3141
4220
3700
F9 -conference room
landing
central stairwell
12820
2768
LOBBY LINK
3400 8850
12250
brick to match existing
Internal finishFloor Level
Upper Roof 1
Intermediate
Roof 2
Rationel powder coated'aluclad' windows tripleglazed, white to matchexisting colour
planted canopy at lowerroof at boundary wall
Lower Roof 3
2732
3332
Blockwork upstand withroof light to kitchen
please refer to site plan/ boundarytreatment details for sunken terracedetails
stone cappingto all parapets
Sedum green roof with rooflight tomain pavilion as per roof plan
Basement Level - 0.70
Ground Floor Level - 0.70
First Floor Level - 0.70
Second Floor Level - 0.70
From points A - B
Existing ground floor slab to be removed.
New 68mm underfloor heating slab on
125mm xtratherm rigid insulation board
on 100mm concrete sub floor on
radon membrane on 50mm sand blinding
on 150mm min hardcore compacted.
Underfloor heating slab throughout
ground floor plan
A B
Underfloor heating slab throughout
ground floor plan
Under StairsStores Area
Ceilings to all rooms at first and second floor
level outside of secant piling zone to be
protected during the construction period.
Air tightness membrane to new
ceiling area only
remove existing slates, ridge caps and store on site for
use on external roof profile replacing damaged or
broken slate/ ridge caps. remove existing timber
battens and existing felt, off site and provide new a1
protect felt (felt to be laid with min 150mm horizontal
lap, and 100mm vertical lap), with new treated timber
50mm x 35mm battens. fit new firbe cement 600mm x
300mm slates to internal roof profile.(slates to be laid
with min 110mm laps). Stripping of Roof to determine
full extent of works
All salvaged slates and ridge caps to be re-laid on the public roof profile
being the front and rear and all hipped sections visible from the public
road.
Existing stairs to be carefully dismantled and removed
of site. New concrete stairs lined as per the orignal
stairs with matching balustrades and handrails.
D01
304
To Note:All dimensions to be checked on site. No dimensions to be scaled from drawings. This drawing to be read in conjunction with therelevant specifications, documention and relevant drawings supplied by consultants. All queries should be raised with the Project Supervisor.
To Note:All dimensions to be checked on site. No dimensions to be scaled from drawings. This drawing to be read in conjunction with therelevant specifications, documention and relevant drawings supplied by consultants. All queries should be raised with the Project Supervisor.
Sedum Roof Build up by Bauder or equal approved contrctor.
- Bauder F30 Sedum Blanket 35mm
- Bauder SDF Drainage Mat 20mm
- Bauder Roof Resistant Capping Sheet 5mm
- Bauder Underlayer (self adhesive) 4mm
- Bauder PIR Insulation 100mm
- Bauder Vapour Barrier (Alu self lined) 4mm
- Sand/ Cement Screed Fall 1:60 0 - 80mm max
- Structural Deck 150mm RC Slab
Maximun roof build up of 398mm as shown on all sections. Do we need to include
a structural screed of 50mm prior to laying Sand/ Cement Screed Fall layer.
underside
of stairs
stores to u/s of stairs
2935
remove existing hip roofand make good with newdetail to valley D02
car parking to front of building
NEW RECEPTION WING TO REPLACEEXISTING FIRST FLOOR EXTENSION.
2463
700
4000
G11 -Office23.7sq.m
G5 -PA Office23.7sq.m
new steps to match existing
replace existingbrickwork in salvagedand/or matching brick
Soffit Build up- screed to achieve ffl to match existing dwelling- 25mm insulation- 150mm rc slab to engineers details- 100mm PIR Soffit Plus (X0/STP) and/ or equal approved- Shera Cement Fibre board (mid grey) fixed as per manufacturersrecommendations
2463
Internal finishFloor Level
C D F
sedum roof build up to roofat replacement first floorwing
remove existing chimney and makegood as part of the roof repair works.
The existing roof to be removedthroughout, slate carefully removedfor re-use. Wallplate to be removed.New truss roof to be installed toreplicate and replace existing roofform.
2700
Wall Type A -350mm cavity wall constructionwith brick facade
75mm servicesvoid below rc slab.
Internal finish floor Level
Internal finish Floor Level
A B E G
sedum roof build up to roofat replacement first floor wing
Dashed line indicates ffl of the proposedpavillion building and ground floorthroughout
D02
306
3000
2973
550
Timber/ iroco cladding zone Timber/ iroco cladding zone
3060
Stair well
G1 -Open Plan Library& Resource Centre
B12 -Document Storage
B11 -Secure Store
B8 -Plant Room 3
B7 -Plant Room 2
2775
D01
306
D02
306
2475
Gyproc MF suspended ceiling system to
B7 & B8 only. All other services to be
surface mounted.
D04
304
D05
304
To Note:All dimensions to be checked on site. No dimensions to be scaled from drawings. This drawing to be read in conjunction with therelevant specifications, documention and relevant drawings supplied by consultants. All queries should be raised with the Project Supervisor.
Floors to be retained to the front section of the existingbuilding where no takedown works for secant piling will takeplace. Local intevention only to accommodate services etc.
Ceilings to all rooms at first and second floor level outside ofsecant piling zone to be protected during the constructionperiod.
Ceilings to all rooms at first and second floor level outside ofsecant piling zone to be protected during the constructionperiod.
vertical services duct
starting at basement
level and teminating
at second floor level
as shown.
D03
306
Existing Walls to the front section to remain with littleintervention except for internal finishes/ windowreplacement/ lining works
2040
D07
306
27°
Sedum Roof Build up by Bauder or equal approved contrctor.
- Bauder F30 Sedum Blanket 35mm
- Bauder SDF Drainage Mat 20mm
- Bauder Roof Resistant Capping Sheet 5mm
- Bauder Underlayer (self adhesive) 4mm
- Bauder PIR Insulation 100mm
- Bauder Vapour Barrier (Alu self lined) 4mm
- Sand/ Cement Screed Fall 1:60 0 - 80mm max
- Structural Deck 150mm RC Slab
Maximun roof build up of 398mm as shown on all sections. Do we need to include
a structural screed of 50mm prior to laying Sand/ Cement Screed Fall layer.
200mm ceiling zone - services area
63mm screed for u/f heating with 32mm hd insulation beneath.
200mm rc slab as per engineers details
63mm screed for u/f heating with 32mm hd insulation beneath.
2760
all mech/ elec services surface mounted to u/s of rc slab
stores to u/s of stairs
27
00
21
00
50mm RIGID THERMOSET PHENOLIC INSULATION
ffl - ground level
ffl - basement
3060
lift sump detailsrequired
ground level
50mm metal batten system to allow for installation of services.
37mm gyproc thermal board, skimmed as per manufacturers recommendations.
Stepped dpc
150mm * 100mm build up here
63mm screed to facilitate ffl of existing
dwelling
and to carry RC slab within blockwork
course
50mm screed to facilitate ffl of existingdwelling and to carry RC slab within blockworkcourse
1122
2760
3580
3580
outline of secant piling shown dashed
Floors to be retained to the front section of the existingbuilding where no takedown works for secant piling will takeplace. Local intevention only to accommodate services etc.
Air tightness membrane to newceiling area only
vertical lift shaft
through existing
building poured
in-situ concrete to
Engineers spec
vertical lift shaft
through existing
building poured
in-situ concrete to
Engineers spec
vertical lift shaft
through existing
building poured
in-situ concrete to
Engineers spec
vertical services duct
starting at basement
level and teminating
at second floor level
as shown.
30
0
remove existing floor finishes throughout, fit125mm highdensity insulation on radon barrier, fit underfloor heatingsystem and cover with 55mm screed. Fit 25mm high denistyinsulation to external edge of floor.
remove existing slates, ridge caps and store on site foruse on external roof profile replacing damaged or brokenslate/ ridge caps. remove existing timber battens andexisting felt, off site and provide new a1 protect felt (feltto be laid with min 150mm horizontal lap, and 100mmvertical lap), with new treated timber 50mm x 35mmbattens. fit new firbe cement 600mm x 300mm slates tointernal roof profile.(slates to be laid with min 110mmlaps).
All salvaged slates and ridge caps to be re-laidon the public roof profile being the front andrear and all hipped sections visible from thepublic road.
All salvaged slates and ridge caps to be re-laidon the public roof profile being the front andrear and all hipped sections visible from thepublic road.
D01
306
D02
306
D04
306
D06
306
dotted line indicates outline of
existing dwelling above
all mech/ elec services surface mounted to u/s of rc slab
D05
306
D08
306
65
5
Please refer to Engineers drawings for the details of thesecant piling, basement floor, sump locations/ details andwater proofing system to be used.
247527
00
B12 -Document Storage24.5sq.m
B11 -Secure Store7.5sq.m
D09
306
Upper Roof 1
Intermediate Roof 2
3477
200mm rc slab as per engineers details
3300
Section A-A (1:20)
254x146x37 UB
254x254x89 UC
FFL
Section H-H (1:20)
50x225 C24 joists
@ 300 crs.
254x146x37 UB
Beyond
203x203x46 UC
Beyond
10mm thk plate &
gussets @ 600mm
crs.
2392
To Note:All dimensions to be checked on site. No dimensions to be scaled from drawings. This drawing to be read in conjunction with therelevant specifications, documention and relevant drawings supplied by consultants. All queries should be raised with the Project Supervisor.
Main Extension to rear shownoutlined red with basement.
Brick outer leaf in course
150mm insulated cavity
100mm blockwork in course
Granite stone cap to parapet
Stepped dpc
Sedum Roof Build up by Bauder or equal approved contrctor.
- Bauder F30 Sedum Blanket 35mm
- Bauder SDF Drainage Mat 20mm
- Bauder Roof Resistant Capping Sheet 5mm
- Bauder Underlayer (self adhesive) 4mm
- Bauder PIR Insulation 100mm
- Bauder Vapour Barrier (Alu self lined) 4mm
- Sand/ Cement Screed Fall 1:60 0 - 80mm max
- Structural Deck 150mm RC Slab
Maximun roof build up of 398mm as shown on all sections. Do we need to include
a structural screed of 50mm prior to laying Sand/ Cement Screed Fall layer.
3060
2475
Upper Roof 1
SECTION E - E
B1 -Equipment/ FurnitureGeneral Storage37.1sq.m
B11 -Document Storage24.5sq.m
G1 -Open Plan Library& Resource Centre86.8sq.m
Lower Roof 3
Main Extension to rear shownoutlined red with basement.
HW Doors and Glazed Screenbetween Library and entrance link
Brick outer leaf in course
150mm insulated cavity
100mm blockwork in course
Granite stone cap to parapet
Stepped dpc
Sedum Roof Build up by Bauder or equal approved contrctor.
- Bauder F30 Sedum Blanket 35mm
- Bauder SDF Drainage Mat 20mm
- Bauder Roof Resistant Capping Sheet 5mm
- Bauder Underlayer (self adhesive) 4mm
- Bauder PIR Insulation 100mm
- Bauder Vapour Barrier (Alu self lined) 4mm
- Sand/ Cement Screed Fall 1:60 0 - 80mm max
- Structural Deck 150mm RC Slab
Maximun roof build up of 398mm as shown on all sections. Do we need to include
a structural screed of 50mm prior to laying Sand/ Cement Screed Fall layer.
3060
2688
D2
fd30
Upper Roof 1
2137
SECTION D - D
10
9
11
8
5
G5 -Service Point4.9sq.m
G4 -Lobby Link14.6sq.m
G2 -Toilet3.9sq.m
G6 -Staff Entrance6.7sq.m
B2 -Kitchen Corridor Service Stair
6
7
painted area
(curved wall)
2757
303
200
3060
3060
ECO-A23 "walk on" Ecogard rooflight
by Lonsdale or equal and approved.
Double glazed aluclad windows to selected colour to
all external facades by Carlson or equal and approved.
2.475m high glazing wall
system by W2W or equal and
approved.
3060
2544
B8 -Plant Room 3
B4 -Elec 2
B9 -Circulation/ Fire Route
Vehicular Entrance
G1 -Minister/ Counsellor
G2 -Head of Chancery G3 -
GA & AA
G4 -Lobby Link14.6sq.m
G8 -PA Office15.75sq.m
G7 -Attache23.7sq.m
S6 -PA to Ambassador18.0sq.m
S7 -Social Secretary10.45 sq.m
S8 -Communications Room12.0sq.m
3013
4225
TIMBER FLOOR ZONE
TIMBER FLOOR ZONE
CONC FLOOR ZONE:
63mm screed
150 t-beam and block
75mm services zone
18 plasterboard
CONC FLOOR ZONE:
63mm screed
150 rc slab
75mm services zone
18 plasterboard
SOFFIT ZONE:
125mm HD Insulation
Iroco timber cladding to u/s
469
2.544mm subject to ground level
3580
course 2
course 3
course 7
course 8
course 9
course 10
course 11
course 12
course 19
course 21
course 23
course 25
course 26
course 30
course 1
course 4
course 5
course 6
course 13
course 14
course 15
course 16
course 17
course 18
course 20
course 22
course 24
course 27
course 28
course 29
course 31
course 32
course 33
course 34
steel
zone
2475
2707
300
Section B-B (1:20)
3060
200
External
internal
Please refer to sheet 306 for full
details of the suspended first floor
office.
2768
A
D03
306
D05
306
Sika watertight concrete constructiondesign - specification by usageGrade 4 minimum (BS 8102) with Sikamembrane
Sika lastic 1K semi-tecious membrane laidtotop of rc slab and lapped over sikamembrancefrom rising wall basement construction asshowm.
Tobermore block paving as selected laidas per laying guidelines v.1.0 on a bed of30mm sharp sand as shown. All efforts areto be made to avoid damage to the Sikalastic 1K membranne.
225mm internal concrete block basementwall150mm HD Xtra-therm rigid insulationxtra-therm Xtro-liner
XO/ST 100mm(R-value 4.76) fittedusing xtrathermapproved fixings. Allgaps to be filled asnecessary.
Scale: 1:10
Section F - F
6
D06
304
To Note:All dimensions to be checked on site. No dimensions to be scaled from drawings. This drawing to be read in conjunction with therelevant specifications, documention and relevant drawings supplied by consultants. All queries should be raised with the Project Supervisor.
To Note:All dimensions to be checked on site. No dimensions to be scaled from drawings. This drawing to be read in conjunction with therelevant specifications, documention and relevant drawings supplied by consultants. All queries should be raised with the Project Supervisor.
BCF ArchitectsCloncannonLower, Mountmellick, County Laois.Tel: 057 8679757 e-mail:[email protected] Herberton, 26 St. James Walk, Rialto, Dublin 8.Tel: 01 - 5352674 e-mail:[email protected]
Ambassador of India to Ireland
13/47/2017 11:47 AM
As Shown
Bcf Architects
Proposed basement, library pavilion and internal refurbishment of existing buildingat 69 Merrion Road, Dublin 4.
212 Window Details Elevations
C:\Users\Bcf Architects\Dropbox (BCF Architects)\BCF Architects Team Folder\13.54 - 69 Merrion Rd\2017 Design Team Folder\BCF Achitects\A - Tender Set
Complete\201 Proposed Dwg Set.dwg
A1
Elevations
Window Schedule
AutoCAD SHX Text
0.0m OD
VEHICULAR ACCESSVIA ARCHWAY UNDER
Existing House 138.00 sqmRear Window Bay 1.50 sqmReception Extension 46.20 sqm
Lift Shaftby specialist
F1 -Minister/Counsellor
F2 -Head ofChancery
F10 -Hallway
F6 -Main Lobby&Stairwell
F3 -GA & AA
F8 -Toilet
F7 -Lobby
Service Point B
FLOOR AREAS: FIRST FLOOR
Total Area 185.70 sqm
F9 -ConferenceRoom
F11 -Office
F5 -PA Office
F4 -Lift Lobby
Entrance
VP
D1
fd60
Service Duct
W(ff)-23
W(ff)-24
W(ff)-25
W(ff)-26
W(ff)-28
W(ff)-29
W(ff)-30W(ff)-31
W(ff)-32
W(ff)-33
W(ff)-35
W(ff)-34
d(ff)-27
700
1433
700
1460
1414
1013
1012
1011
1350
900
1045
1045
765
1900
1045
1045
2000
D2
FD30
D2
FD30
D2
FD30
ED
FD30
D2
FD30
D3
D5
D5
21.4sq.m
20.7sq.m
18.9sq.m 10.5sq.m
3.2sq.m
2.5sq.m
3.8sq.m
15.5sq.m
8.6sq.m
16.3sq.m
41.1sq.m
3.3sq.m
495
UP
DN
1195
VP
D2
FD30 VP
Service Duct
B
2
1
G5 -ServicePoint4.9sq.m
G3 -Toilet4.7sq.m
G4 -Lobby Link14.6sq.m
G8 -PA Office15.75sq.m
G7 -Attache23.7sq.m
G10 -SecurityControl23.26sq.m Waiting
Area
PassportAssistant
VISAAssistant
EntranceLobby5.7sq.m
PublicEntrance
G13 - Toilet4.1sq.m
5
6 7
11
12
8
Landing
1200mm *
1200mm
Landing
1200mm *
1200mm
G11 -Office Area30.9sq.m
Lift Shaftby specialist
D1
FD30
FD60
VP
VP
VP
FD30
D3
FD30
Service Point C
G1 -Open PlanLibrary& ResourceCentre
4
3
Landing
1200mm *
1200mm
G2 -Toilet3.9sq.m
Lift Shaftby specialist
G12 -Public Office21sq.m
Stores0sq.m
D1
9
10
G6 -StaffEntrance6.7sq.m
fd60
D3
D1
VP
VP
VP
D4
D3
FD30
W(gf)-01
W(gf)-02
W(gf)-03
W(gf)-04
W(gf)-05
d(gf)-01W(gf)-06W(gf)-07
W(gf)-08
W(gf)-09W(gf)-10W(gf)-11
W(gf)-12W(gf)-13
W(gf)-14W(gf)-15W(gf)-16
W(gf)-17
W(gf)-18
d(gf)-03
W(gf)-19
W(gf)-21
W(gf)-22
d(gf)-02
W(gf)-20
700
1550
2600
2460
700
1433
700
1460
677
1233870870
870 871 871
1290
13202070112511251700
1925
1125
1125
1800
1140
1700
1350 1355 1150
D2
FD30
D1
FD30
D1
FD30
D5
G9 -Chauffeur4.0sq.m
D2
FD30
FD30D6
86.8sq.m
D3
FD30
Service DuctService Duct
Interview Station
S4 -Lift Lobby
S12 -Toilet
fd60
Service Duct
Service Point A
VIEW 2
S6 -PA toAmbassador
S7 -SocialSecretary
S8 -CommunicationsRoom
S1 -Ambassador'sOffice
S2 -WaitingRoom
S3 -UpperLanding
S5 -Lift Shaft
S10 -ServicePointS11 -
ToiletVIEW 1
VIEW 3
VIEW 4
W(sf)-36
W(sf)-37
W(sf)-38
W(sf)-39
W(sf)-42
W(sf)-43
W(sf)-45
W(sf)-44
W(sf)-41
W(sf)-40
700
1433
700
1147
1147
1182
735
1045
1045
1045
D2
FD30
D2
FD30
D2
FD30Display
D3
D3
D1
FD30
ED
FD30
ED
FD30
D4
17.9sq.m
27.3sq.m
16.0sq.m
24.0sq.m
3.8sq.m5.2sq.m4.7sq.m11.7sq.m
3.3sq.m
10.0sq.m
Sedum roofto 1st flooroffice blockoverdriveway
43.0sq.m
ED
FD30
Example of
w(ff)-30
Please note that there are a number of windows/ doors called up as specials that will require the supplier to
issue a design for approval with the design team.All information as supplied in for the purpose of tender and
the window supplier should be aware that the final design of the windows will need to be agreed. Details to
include door handles, opening sections etc.
Second Floor Plan
1 - 100
First Floor Plan
1 - 100
Ground Floor Plan
1 - 100
To Note:All dimensions to be checked on site. No dimensions to be scaled from drawings. This drawing to be read in conjunction with therelevant specifications, documention and relevant drawings supplied by consultants. All queries should be raised with the Project Supervisor.