GSPublisherVersion 204.54.71.26 Drawing No. DA13 Amend't No. of sheets Job No. 18036 Drawn: CC Scale: As shown @ A1 Project: Dwg Name: Address: Nominated Architects CAD File: U:\2018\18036.St Agnes.Admin Refurb\3.Design\3.2 DA\18036.DA_Issue_St Agnes.New Admin & Carpark.pln Project North: CEO Parramatta NSW Architects Registration Board No. Daniel Donai 9068 13 of 20 ALTERATIONS & ADDITIONS TO ST AGNES COLLEGE Lot 2, D.P.579138 24 Evans Rd Rooty Hill NSW 2766 BLOCK A - FIRST FLOOR PLAN MAY 19 Date: Client: Issue Amendment P1 Drwn Date Chk'd 11.12.18 CC BA Issue for client review A C 1. DO NOT SCALE FROM DRAWINGS. USE WRITTEN DIMENSIONS ONLY. 2. BUILDER TO CHECK & VERIFY ALL DIMENSIONS & LEVELS PRIOR TO COMMENCEMENT OF WORK. 3. IT IS THE OWNERS RESPONSIBILITY TO ENSURE THAT THE ENGINEER HAS INVESTIGATED SUBSOIL CONDITIONS & DESIGNED ALL STRUCTURAL ELEMENTS TO SUIT. 4. THE DESIGN & DETAILS CONTAINED ON THIS DRAWING IS SUPPLIED IN CONFIDENCE & IS NOT TO BE USED FOR ANY OTHER PURPOSE, EXCEPT THAT AUTHORISED BY DTA ARCHITECTS COPYRIGHT - DTA ARCHITECTS 88 bathurst street liverpool nsw 2170 | po box 68 liverpool bc nsw 1871 ARCHITECTS THINK ARCHITECTURE THINK COLLABORATION THINK DTA ARCHITECTS w: www.dta.net.au | e: [email protected] | t: +612 9601 1011 A 27.05.18 CC BA Issue for DA 247° 52' 20 " 5.485 157° 52' 20" 9.755 5.485 67° 52' 20" 34 .855 68 ° 42 ' 00 " 157° 52' 20" 32.095 110.0 m² TEACHERS 041 8.6 m² STAIR 040 5.9 m² STAIR 042 103.8 m² 107 33.7 m² staff study 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 UP Custom Text 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 UP Custom Text 106.15 m 2 109.31 m 2 #DrgID #LayID 2 DA19 1 DA19 14,472 4,910 400 150 13,940 150 5,385 20,215 10,000 Existing roof structure to remain. Patch and repair existing roof finishes as required, make good to all surfaces, junctions, flashings as required. EXISTING ROOF EXISTING ROOF All existing painted surfaces both internally and externally to be repainted and repaired as required. Confirm ceiling heights , ridge heights, existing column locations and existing wall lengths on site prior to works. TV HDB 06 HDB 05 HDB 06 HDB 05 HDB 06 HDB 05 HDB 06 BLOCK A EXISTING 21,300 950 8,500 1,590 293.40 m 2 New gutters,downpipes, fascias, to match existing, gutters & downpipes to be colorbond finish, facsia to be timber with paint finish. Provide flashing & seal junction as required to ensure water tightness, make good to surrounds where disturbed by new works. New Klip lok roof sheeting to suite new roof, finish to match existing roof, flash & seal junction as required to ensure water tightness, make good to surrounds where disturbed by new works. Existing gutters,downpipes, fascias, make good to existing as required.. Existing roof sheeting, make good to existing as required, including repairs to all junctions and flashing as required. Existing gutters,downpipes, fascias, make good to existing as required.. Existing gutters,downpipes, fascias, make good to existing as required.. Existing roof sheeting, make good to existing as required, including repairs to all junctions and flashing as required. Existing gutters,downpipes, fascias, make good to existing as required.. Existing chimney, restore and resurface as required, make good to existing as required. Existing chimney, restore and resurface as required, make good to existing as required. Existing chimney, restore and resurface as required, make good to existing as required. New Cola, with solid and translucent roof sheeting, profile to match existing building, flash & seal junction as required to ensure water tightness, make good to surrounds where disturbed by new works. Paint finish fascias,barge boards and capping. To match existing. Colorbond finish gutters and downpipes to match existing. New stud walls with CFC external cladding, paint finished. Lined with plasterboard to inside face, paint finish, provide insulation as per section J requirements, flash & seal junctions as required to ensure water tightness, make good to surrounds where disturbed by new works. New windows, to match existing, make good to surrounds where disturbed by new works. Line of roof over shown dotted. Line of building under shown dotted. bench team table TV TV TV TV WB team table team table team table team table team table team table team table team table team table STAFF STUDY ROOM STAFF STUDY ROOM HDB 06 HDB 05 55" TV MH5 55" TV MH5 HDB 06 HDB 05 55" TV MH5 55" TV MH5 HDB 06 HDB 05 55" TV MH5 55" TV MH5 HDB 06 55" TV MH5 DPS DPS DPS DP DP DP DP DP ext-DPS ext-DPS SHEET METAL ROOFING SMR 6.5 degree fall 25 degree fall WB 6.5 degree fall 6.5 degree fall 25 degree fall 25 degree fall 25 degree fall 3.0 degree fall 30 degree fall 30 degree fall 30 degree fall 30 degree fall 30 degree fall 30 degree fall 30 degree fall DP WB 60 lockers 30 lockers WB C 6610mm x 18850mm C 21085mm x 13910mm EXISTING ROOF FALL EXISTING ROOF FALL EXISTING ROOF FALL EXISTING ROOF FALL EXISTING ROOF FALL EXISTING ROOF FALL EXISTING ROOF FALL EXISTING ROOF FALL EXISTING ROOF FALL 25 deg fall 25 deg fall EXISTING ROOF FALL EXISTING ROOF FALL TN MN WT01 LEGEND - PLAN Existing walls to remain. repair & reinstate to damage caused during new works. Existing walls to be removed, repair & reinstate to all surfaces damaged during new works. Nom. New brick wall, face brick finish to both internal & external faces. Coloured Concrete finish. Refer to finishes schedule B Bollards, located as shown, to eng's details. Refer to finishes schedule Proposed levels. Refer also to drainage drawing. RL 9.100+ Carpet / vinyl floor finish. Refer to finishes schedule Stud framed wall, c/w 13mm plasterboard / FC lining both sides of framing, set ready for selected paint finish. Wall type. Refer to wall type schedule Carpet / vinyl floor finish. Refer to finishes schedule Extent of proposed new building work shown in colour. Non-slip ceramic floor tiles. Refer to finishes schedule Ceramic floor tiles. Refer to finishes schedule Stud framed wall, c/w 13mm plasterboard / FC lining on furring channells to FC lining to external face, set ready for selected paint finish. Nom. New brick wall, rendered finish to both internal & external faces, pain finish. Extent of existing building shown in colour. Extent of proposed new building shown in colour. SWP Stormwater pit. Refer also to drainage drawing. General notes: Verify on site all survey information including all existing services & levels prior to construction. Demolish existing structures & clear all vegetation as required and/or as shown on drawings, ready for new works. Dispose of demolished building materials and asbestos material encountered during demolition, except those items specifically identified for reuse. Terminate, cap off or divert of all existing services where so require and/or as necessary to carry out new works. Perform all works in best tradesman-like manner and to the satisfaction of relevant authorities. Refer to structural eng's documents for details of conc. Slabs, steps, footings including sizes of structural members. All timber framing sizes shall comply with the timber framing code. Comply with landscaping requirements as required by the council conditions and/or as detailed by landscape architect . Refer to hydraulic eng's details for location and levels of all storm water pits. Uno. Connect all downpipes into nearest existing storm water system as required and/or to hyd. Eng's details. Uno. Provide fall in ground finishes ensuring all storm water falls away from building. Lay paving with sufficient fall to pit to avoid ponding. Refer to hydraulic eng's details for details of sewer connection . Comply with relevant authorities requirements. Supply & install all electrical services including but not limited to, power, exit signs, emergency lifting & telephone supply to relevant aust standards & authorities requirements. Supply & install all mechanical ventilation including but not limited to, mechanical exhaust fans & ducts, air conditioning units & ducts to relevant aust standards & authorities requirements. Remove all redundant vehicle crossings & replaced with kerb & gutter to council's requirements. repair & reinstate to surrounds where disturbed by new works to council engineer's specification. Provide physical termite treatment in accordance with as 3660.1 WC with inward swinging doors closer than 1200mm to the pan shall be fitted with lift off hinges as required by BCA. Uno. Provide 50mm set down in floor slab to all wet areas. Lay paving with sufficient fall to floor waste to avoid ponding. repair & reinstate to all surfaces, damaged / effected during new works At completion clean up the site prior to hand over. repair & reinstate to surrounds where disturbed during new works. LEGEND B BOLLARD B-1 VANITY BASIN - SEMI RECESSED B-2 WALL HUNG BASIN - DISABLE COMPLIANT BFC BROOM FINISHED CONCRETE C CARPET AS SPECIFIED CC COVE FINISHED CONCRETE CAP CEILING ACCESS PANEL CH CLOTHES HOOK CLR CLEANERS SINK CONC CONCRETE CR CEMENT RENDERED FINISH CP1 CONCRETE PAINT 1 CT CERAMIC TILES C/W COMPLETE WITH DP DOWNPIPE DPS DOWNPIPE & SPREADER DW DISHWASHER AS SPEC. EDB ELECT. DISTRIBUTION BOARD, REFER TO ELECT. DOCUMENTS EW EYE WASH EX EXISTING EXC EXISTING CONCRETE COLUMN ex-CR EXISTING CEMENT RENDERED FINISH ex-DP EXISTING DOWNPIPE ex-SMR EXISTING SHEET METAL ROOF ex-COL EXISTING COLUMN F FRIDGE AS SPEC. FB FACE BRICK FINISH FCPF1 CFC PAINT FINISH 1 FG FIXED GLASS FHR FIRE HOSE REEL FW FLOOR WASTE GD GRATED DRAIN GPO-S SINGLE GENERAL PURPOSE OUTLET GPO-D DOUBLE GENERAL PURPOSE OUTLET GR GRAB RAIL GMWB GLASS MAGNETIC WHITE BOARD HWU HOT WATER UNIT HD HAND DRYER LM LAMINATED BENCH TOP & CUPBOARDS M1 MIRROR M2 MIRROR - DISABLE COMPLIANT MF1 METAL FENCE 1 MF2 METAL FENCE 2 MH1 MOUNTING HEIGHT 1 - AS PER STAGE MIN. MW MICROWAVE OVEN AS SPEC. NS-CT NON-SLIP CERAMIC TILE PB PLASTERBOARD LINING PTD PAPER TOWEL DISPENSER RCC REINFORCED CONCRETE COLUMN RH RANGE HOOD RM RECESSED ENTRY MAT RW1 RETAINING WALL 1 SCR SHOWER CURTAIN RAIL SMR SHEET METAL ROOF SC STEEL COLUMN SD SOAP DISPENSER SH WALL SHELF SK-1 STAINLESS STEEL SINK SK-2 CLEANER SINK SS STAINLESS STEEL FINISH ST STOVE STF STEEL TROWEL FINISHED CONCRETE TGSI TACTILE INDICATOR TIM TIMBER FLOORING TP TOILET PARTITIONS TPH TOILET PAPER HOLDER TS TRANSLUCENT ROOF SHEETING US MOP & BROOM SHELF V VINYL VP VENT PIPE REFER TO HYDRAULIC DOCUMENTS VTY VANITY UNIT WB1 GLASS MAGNETIC WHITE BOARD 1 WB2 GLASS MAGNETIC WHITE BOARD 2 WB3 GLASS MAGNETIC WHITE BOARD 3 WB4 GLASS MAGNETIC WHITE BOARD 4 WC-1 TOILET PAN / SUITE WC-2 TOILET PAN / SUIT DISABLE COMPLIANT Building Element Proposed Building Roof and Ceiling Total R3.5 – New Metal Roof Roof Colour (Solar Absorptance) Any colour Total R2.8 – New Brick Cavity Wall Total R2.8 – New FC Clad Wall External Walls (Solar Absorptance) Any colour Internal Walls No insulation required No insulation required – Concrete Slab on Ground No insulation required – Suspended Concrete Slab U-Value 4.5, SHGC 0.47 (Timber Framed Single Glazed Low E Clear) U-Value 5.0, SHGC 0.55 (Aluminium Framed Single Glazed Low E Clear) U-Value 3.4 , SHGC 0.34 (Double Glazed Fixed Skylights) Note: U-Value must be less than or equal to the above and SHGC must be within ±10% Services DTS compliant systems External Walls Floor Glazing SECTION J / JV3 REQUIREMENTS 1 - FIRST FLOOR PLAN - NEW 1:100