Almaty, 2009. Ecological design Ecological design and and standardization standardization standardization standardization S E D ustaina b le co lo g y evelopm ent
Dec 18, 2015
Almaty, 2009.
Ecological design and Ecological design and standardizationstandardization
standardizationstandardization
SED
us tainablec o logyevelopment
Expertise
I. Ecological design and standartization
II. Applied ecology
III. Costomer ecology turnkey support
Services
I. I. ECOLOGICAL DESIGN AND STANDARTISATION
Projects on maximum permissible emissions standards (MPE) of contaminants discharged into atmosphere..
Projects on maximum permissible discharge standards (MPD) of contamination substances into water sources..
Projects on industrial and consumption wastes formation standards
Ecological passports for enterprises..
Development of “Environmental Protection (EP)” and “Environmental Impact Assessment (EIA)” to the projects of construction, reconstruction and enlargement of enterprises..
II. APPLIED ECOLOGY
Complex ecological programs.
Environment protection and response plans.
Analysis of environment protection activities compliance with legislation.
Reports according to 2TP-air, 2TP-water management, 3TP- wastes forms.
Calculation of payments for pollution\contamination.
Development of documents to obtain permits for special nature use.
Water supply and sewerage systems design.
Water supply and sewage treatment facilities design.
Heat supply, ventilation and air conditioning systems design.
Water consumption and water discharge balances.
Constant ecological support of the activity is carried out by industrial companies, consultations are rendered throughout the entire validity of the developed MPE, MPD and Production Wastes Projects.
Our constant clients are:
OJSC “Tolkynneftegas”
LLP “TengizChevroil”
CJSC JV “Kazpolmunay”
OJSC “Karachaganak Petroleum Operating B.V”
CJSC “Intergas Central Asia”
III. III. COSTOMER ECOLOGY TURNKEY SUPPORT
Experience in ecological design and standartisation
To develop chapters “Environmental protection”, “Environmental Impact Assessment” our specialists perform standardization of contaminant emissions into atmosphere (MPE), contaminant discharges into water (MPD) and production & consumption wastes.
Projects are performed in workmanlike manner by highly
qualified professionals, who have extensive experience in the field of ecological design and norms.
For the last 3 years our company executed approximately
100 projects in the field of ecological design and standardization.
Experience in ecological design and standartisation
CJSC “Intergas Central Asia”- MPE Projects are developed practically for entire Kazakhstan territory –Mangistau, Atyrau, West Kazakhstan, Aktobe, South Kazakhstan, Zhambyl, Almaty regions.
CJSC “KazTransOil”. West branch.
OJSC “Mangistaumunaygas, Production Department “Kalamkasmunaygas” – oil deposit.
OJSC “Tolkynneftegas” – gas condensate deposits- Tolkyn, Tabyl.
CJSC “JV Kazpolmunay” – oil, gas condensate deposit Borankol.
OJSC “Mangistaumunayzholdary” – deposits of non-metallic mineral resources.
State Utilities Enterprise “Vodokanal”, Atyrau
For MPE regulation our specialists employ mathematical modeling of contaminants dispersion processes in ground layer. For the mentioned purposes company uses “Software system “Era”, version 1.7. Map documents are performed using GIS-technology ArcInfo, ArcGIS, MapInfo 9.0.
MPE PROJECTSMPE PROJECTS
MPD PROJECTSMPD PROJECTS
Experience in ecological design and standartisation
LLP “TengizChevroil” OJSC “Karachaganak Petroleum Operating Company B.V.” CJSC «Intergas Central Asia” – for Mangistau and Atyrau oblasts CJSC “KazTran sOil”. West branch OJSC “Donskoy Mining & Processing Integrated Works”, branch of JSC Transnational Company “Kazkhrom” OJSC “UzenMunayGas” State Utilities Enterprise “Vodokanal”, Atyrau
PROJECTS ON WASTES STANDARDIZATIONPROJECTS ON WASTES STANDARDIZATION
Experience in ecological design and standartisation
CJSC “KazTransOil”.West branch.
Chapters “Production & Consumption Wastes” in all developed projects
CHAPTERS “ENVIRONMENT PROTECTION (EP)” CHAPTERS “ENVIRONMENT PROTECTION (EP)” FOR PROJECTS:FOR PROJECTS:
Experience in ecological design and standartisation
LLP “TengizChevroil” –Industrial waste water injection into subsurface
OJSC “Mangistaumunayzholdary” – Bitumen storage for highways (with 500 tons capacity) construction
LLP “TengizChevroil” – Upgrade of Nitrogen&Oxygen Unit
LLP “TengizChevroil” – Calculation of oil reserves
LLP “Union Espanola de Explosives Kazakhstan” – Plant producing the matrix of water gel explosive agent RIOFLEX at “Nurkazgan” deposit in Karaganda oblast
OJSC “Mangistaumunaygas” –Sea Water Desalination Plant in Aktau
LLP “TengizChevroil” – “Medical and ecological investigations within the settlements – Kulsary city, Sarykamys village and Akkistogay village” – sections “Analysis of potential impact of production emissions on air basin quality in Zhylyoi district” and “Assessment of water management activity of Zhylyoi district”.
Experience in applied ecology
OJSC “Karachaganak Petroleum Company B.V.” – Water consumption and water discharge balance schemes for all facilities/sites.
LLP “TengizChevroil” – standardization of the pollutants in wastewaters for the project “Injection of the wastewaters into subsoil for TCO ” which eliminated penalty and extra payments for limit excess.
OJSC “Tolkynneftegas”, CJSC JV “Kazpolmunay” – Development of the documentation for obtaining natural resources use permit for 2004.
CJSC “Intergas Central Asia” – rendering support in development of documents for application to obtain natural resources use permit for 2005.
PartnersThe following laboratories are
subcontracted for analysis :
LLP “Kazecoanalysis”, Almaty
PC “Ecoproject”, Almaty
KGKP “Analytical laboratory of environmental protection”, Atyrau
Laboratory of Korneev (private entrepreneur), Almaty.
IPC “Hydromet”, Aksai West Kazakhstan oblast
Sanitary Epidemiological Surveillance Laboratory, Aktau
Analytical laboratory of Kazakh Oil & Gas Institute, Almaty
Project execution
Projects are executed in compliance with the procedures set forth in our Corporate Standard CS-11
Project management is performed using the programs Microsoft Project and Prima Vera
Projects are developed by applying regulatory documents of the Republic of Kazakhstan and International standards
Customer’s special requirements are taken into account in the course of projects development.
Applied project management system and highly qualified professionals employed by our company enable successful and
timely completion of project works.
Thank you for your
attention!SED LLP
3 Askarov, Almaty, 050043Republic of Kazakhstan
Tel.: (+7 727) 255-05-07, 295-48-19, 226-66-88Fax: (+7 727) 295-48-20
Е-mail: [email protected]; Web: www.sed.kz