ALLEGANY-LIMESTONE CENTRAL SCHOOL 2020 CAPITAL IMPROVEMENT PROJECT KEY FEATURES ELEMENTARY BUILDING RENOVATIONS - SIDEWALK AND RAMP REPLACEMENT - RADIANT HEAT SIDEWALKS - MULTIPURPOSE ROOM RENOVATIONS - GYMNASIUM RENOVATIONS - LOCKER ROOM RENOVATIONS - CORRIDOR FINISH UPGRADES - CORRIDOR DISPLAY CABINETS - STEAM SPACE UPGRADES - CLASSROOM FINISH AND HVAC UPGRADES - KITCHEN AND CAFE RENOVATIONS - LIBRARY FINISHES - TOILET ROOM UPGRADES - BOILER REPLACEMENT - PLUMBING RENOVATIONS - LED LIGHTING UPGRADES - ROOFING UPGRADES BUS GARAGE RENOVATIONS - BUS LIFT REPLACEMENT - OIL SEPARATOR UPGRADES - TRENCH DRAIN REPLACEMENT - WINDOW REPLACEMENT PROJECT ALTERNATES - PLAYGROUND SURFACE UPGRADES - COURTYARD RENOVATIONS - SOLAR RENOVATIONS The Board of Education and our District Leadership Team have worked hard to ensure the items in this project will support our mission to provide our students with access and opportunities for a well-rounded school experience. We understand that our school facilities serve an important role to our community as a place where families and townspeople come together. Over time, items need to be replaced, repaired, or upgraded to meet the many needs of our students, families, and community members. CLASSROOM 1098 CLASSROOM 1093 CLASSROOM 1099 CLASSROOM 1089 CLASSROOM 1090 CLASSROOM 1102 CLASSROOM 1088 TOILET 1096 SINK 1097 TOILET 1092 SINK 1091 SINK 1101 TOILET 1100 CLASSROOM 1087 CLASSROOM 1086 SPECIAL ED. CLASSROOM 1084 VESTIBULE 1083A CLASSROOM 1095 RESOURCE 1103 STAIR 1104 DATA 1105 STOR. 1107 GIRLS 1108 BOYS 1109 COMPUTER 1110 BOYS 1116 GIRLS 1111 JANITOR 1117 SHOWER 1118 TOILET 1121 SHOWER 1120 OFFICE 1122 DRY 1119 STORAGE 1115 TOILET 1124 STORAGE 1126 LOCKER ROOM 1123 MULTIPURPOSE 1127 VESTIBULE 1128 VESTIBULE 1141 TOILET 1140 STORAGE 1142 OFFICE 1129 TOILET 1130 DRY 1137 SHOWER 1138 BOYS LOCKER ROOM 1139 DATA 1131 OFFICE 1132 SPECIAL ED. ANCILLARY 1135 CLASSROOM 1143 GYMNASIUM 1145 CORRIDOR 1173 ART ROOM 1147 STORAGE 1148 TOILET 1150 VESTIBULE 1149 CONFERENCE TEACHER 1151 TOILET 1153 TOILET 1154 CLASSROOM 1152 CLASSROOM 1155 CLASSROOM 1156 VESTIBULE 1157 TOILET 1158 CLASSROOM 1159 CORRIDOR 1164 CLASSROOM 1160 VESTIBULE 1162 TOILET 1161 DATA 1166 JANITOR 1167 MENS 1165 WOMENS 1168 CLASSROOM 1163 CLASSROOM 1169 CLASSROOM 1172 SPECIAL ED. CLASSROOM 1000 CLASSROOM 1001 CLASSROOM 1002 CLASSROOM 1003 CLASSROOM 1004 CLASSROOM 1005 SERVICE ROOM 1005A CORRIDOR 1006 CLASSROOM 1017 CLASSROOM 1018 ELECTRIC 1020 ANCILLARY 1016 RESOURCE 1015 RESOURCE 1014 COMPUTER ROOM 1021 GIRLS 1022 BOYS 1025 JANITOR 1023 MENS 1024 COPIER 1009 BOYS 1013 WOMENS 1012 JANITOR 1011 GIRLS 1010 SERVER 1008 OFFICE 1007 CLASSROOM 1027 CLASSROOM 1028 CLASSROOM 1029 CLASSROOM 1030 SCIENCE CLASSROOM 1031 RESOURCE 1032 CLASSROOM 179 CLASSROOM 178 PRINCIPALS OFFICE 1006 CORRIDOR 1036 CORRIDOR 1033 CLASSROOM 1037 DATA 1039 WOMENS 1133 MENS 1134 VESTIBULE 1050 NURSE OFFICE 1054 TOILET 1052 ART ROOM 1056 STORAGE 1059 STORAGE 1058 KILN 1057 MUSIC 1060 STORAGE 1061 MUSIC PRACTICE 1062 CORRIDOR 1055 CAFETERIA 1083 SERVING 1082 JANITOR 1081 JANITOR 1080 OFFICE 1079 LKRS 1070 VESTIBULE 1114A ELECTRIC 1114 RESOURCE 1112 RESOURCE 1113 CORRIDOR 1146 CORRIDOR 1094 VESTIBULE 1106 CORRIDOR 1144 CORRIDOR 1085 RECEIVING 1077 TOILET 1076 KITCHEN STORAGE 1073 GENERAL STORAGE 1072 VESTIBULE 1067 MUSIC 1065 ELECTRIC ROOM 1069 BOILER ROOM 1068 CORRIDOR 1071 KITCHEN 1078 PT/OT 1038 STORAGE 1053 MAIL ROOM 1002 VAULT 1004 OPEN OFFICE 1001 EXISTING VESTIBULE 1008 LIBRARY 1026 CORRIDOR 1164 TOILET ROOM 1003 CORRIDOR 1055 TOTAL CAPITAL IMPROVEMENTS REFERENDUM: $ 10M PUBLIC VOTE DATE - FEB 11, 2020 12PM-9PM IN THE MS/HS BUILDING DISTRICT OFFICE PUBLIC INFORMATIONAL MEETING - JAN 14, 2020 6PM IN THE ELEMENTARY MULTI-PURPOSE ROOM • UPGRADE EXISTING SPACE TO BE A NEW MAKER STEAM SPACE. • SPACE WILL RECEIVE A FULL WALL OF CABINETRY WITH A SINK. • NEW PAINT, NEW FLOORING & ELECTRICAL UPGRADES TO CREATE A SPACE WHERE STUDENTS CAN LEARN, CREATE AND COLLABORATE. • REPLACE WALK OFF MAT WITH NEW WALK OFF MAT. • REPAIR ANY DAMAGED TERRAZZO. • PROVIDE FLEXIBLE FURNITURE FOR PRE-K GATHERINGS IN SENSORY CORRIDOR. • REMOVE ALL BUILT-IN DISPLAY CASES AND PROVIDE NEW WAYS TO DISPLAY IN CORRIDORS. • PAINT EXISTING LOCKERS SCHOOL COLORS. • REMOVE ALL SHEET VINYL FLOORING, PREPARE SUBSTRATE WITH LEVELING AND FEATHERING TO RECEIVE NEW FLOORING. PROVIDE NO WAX FLOORS. • REMOVE BLEACHERS AND REPAIR RUBBER SHEET FLOORING. • INSTALL NEW ROCK WALL WITH TALLER AREA. • INSTALL NEW DROP-DOWN CENTER CURTAIN. • UPDATE SOUND SYSTEM. • PROVIDE PROJECTION SCREEN. • PA SYSTEM UPGRADES. • REPLACEMENT OF TOILET PARTITIONS AND FIXTURES. • NEW FINISHES. • CONFIRM SPACES MEET ADA REQUIREMENTS. STEAM - SCIENCE, TECHNOLOGY, ENGINEERING, THE ARTS, AND MATHEMATICS EXISTING CORRIDOR CORRIDOR EXISTING TOILET ROOM BOILER ROOM SIDEWALK MULTIPURPOSE ROOM EXISTING EXISTING • REMOVE ALL DAMAGED TRANSITIONS AND PROVIDE FEATHERED ARDEX IN LOCATIONS THAT RECEIVE A CHANGE IN FLOOR MATERIAL. • PROVIDE WALL TILE WAINSCOT OVER EXISTING STRUCTURAL GLAZED TILE WITH PAINT ABOVE. • PROVIDE WAYFINDING THROUGH WALL TILE DESIGN, SIGNAGE, ARTWORK, SMALL SOFFITS, ETC. • AT EACH INTERSECTION, PROVIDE CEILING NODE THROUGH COLORED, PATTERNED AND/OR WOOD LOOK CEILING AS WAYFINDING AND INTEREST POINT. REVENUE SOURCES CAPITAL RESERVE & FUND BALANCE 25% NYS BUILDING AID 75% LOCAL SHARE/TAXES 0% NO ANTICIPATED TAX IMPACT! PUBLIC VOTE FEB 11, 2020 12PM-9PM PROJECT DESIGN FEB 2020 – JULY 2020 SED SUBMISSION/REVIEW AUG 2020 – JAN 2021 BIDDING SPRING 2021 CONSTRUCTION SUMMER 2021 – SUMMER 2022 ELEMENTARY SCHOOL • REPLACEMENT OF 4 EXISTING BOILERS WITH NEW HIGH EFFICIENCY BOILERS • PLUMBING UPGRADES INCLUDED ADDED ISOLATION VALVES AND NEW GAS PIPING • ELECTRICAL PANEL REPLACEMENT • CRACKED SIDEWALK REPLACEMENT • RADIANT HEATED SIDEWALKS AT FRONT AND PLAYGROUND ENTRANCE