Modulator Upgrade 35kV, Marx-topology modulator to
drive AD/EE complete testing with 3 cells
Full capability (900V - 100 A) AD/EE Working on building 9 cells Marx
Modulator Cells will be mounted on their back with a
stripline making the electrical path between cells
SLAC Design based on ILC Modulator Develop a learning control system
Linac 200 MHz RF Power System
F.G. Garcia AEM - PIP Report 11/04/2013
output current
output voltage(3 cells)
output voltage(1 cell)
triode (or SBK)
Two cells on the finalconfiguration as an example
Linac 200 MHz RF Power System MBK201 FERMI
Complication during contract negotiations Re-evaluation of the technical design
F.G. Garcia AEM - PIP Report 11/04/2013
SBK201FERMI 5MW pulsed klystron to operate at 200 MHz for
use as a power source for the DTL Linac Bid closed 11/1/2013 Single bidder -> CPI
PRELIM
INARY
Activities Initiate gallery floor plan layout in collaboration with AD/MSD
Drafter Dept.
BoosterRF system New cavities
Efforts continue on developing a model of the existing Booster cavity Full 3D model with most of the details
incorporated
F.G. Garcia AEM - PIP Report 11/04/2013
3D EM simulations Identified weak points of max electric field in air and
vacuum A modified/improved design has been under development
PIP plan is to build 3 more cavities New ferrite cores
Procurement of new ferrite cores underway High-mu ferrite proved to be a complicate process
Working with vendor to get the recipe at acceptable performance
BoosterRF system Cavities Refurbishment
9 of 19 cavities have been refurbished
F.G. Garcia AEM - PIP Report 11/04/2013
Booster Cavity WorkRefurbished (15Hz) Cavity Removed
Stats:Last refurbishment : 7. 4* wks<refurb.>last 3 cav. : 9.0 wks* Cones and tuners were available
Cour