All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 11/04/2013
6

All Experimenters Meeting PIP Report

Feb 16, 2016

Download

Documents

junius

All Experimenters Meeting PIP Report. Fernanda G. Garcia on behalf of PIP team 11 /04/2013. PIP Report. Linac 200 MHz RF Power System. Modulator Upgrade 35kV, Marx-topology modulator to drive AD/EE complete testing with 3 cells Full capability (900V - 100 A) - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: All Experimenters Meeting PIP Report

All Experimenters MeetingPIP Report

Fernanda G. Garcia on behalf of PIP team

11/04/2013

Page 2: All Experimenters Meeting PIP Report

PIP Report

F.G. Garcia AEM - PIP Report 11/04/2013

Page 3: All Experimenters Meeting PIP Report

Modulator Upgrade 35kV, Marx-topology modulator to

drive AD/EE complete testing with 3 cells

Full capability (900V - 100 A) AD/EE Working on building 9 cells Marx

Modulator Cells will be mounted on their back with a

stripline making the electrical path between cells

SLAC Design based on ILC Modulator Develop a learning control system

Linac 200 MHz RF Power System

F.G. Garcia AEM - PIP Report 11/04/2013

output current

output voltage(3 cells)

output voltage(1 cell)

triode (or SBK)

Two cells on the finalconfiguration as an example

Page 4: All Experimenters Meeting PIP Report

Linac 200 MHz RF Power System MBK201 FERMI

Complication during contract negotiations Re-evaluation of the technical design

F.G. Garcia AEM - PIP Report 11/04/2013

SBK201FERMI 5MW pulsed klystron to operate at 200 MHz for

use as a power source for the DTL Linac Bid closed 11/1/2013 Single bidder -> CPI

PRELIM

INARY

Activities Initiate gallery floor plan layout in collaboration with AD/MSD

Drafter Dept.

Page 5: All Experimenters Meeting PIP Report

BoosterRF system New cavities

Efforts continue on developing a model of the existing Booster cavity Full 3D model with most of the details

incorporated

F.G. Garcia AEM - PIP Report 11/04/2013

3D EM simulations Identified weak points of max electric field in air and

vacuum A modified/improved design has been under development

PIP plan is to build 3 more cavities New ferrite cores

Procurement of new ferrite cores underway High-mu ferrite proved to be a complicate process

Working with vendor to get the recipe at acceptable performance

Page 6: All Experimenters Meeting PIP Report

BoosterRF system Cavities Refurbishment

9 of 19 cavities have been refurbished

F.G. Garcia AEM - PIP Report 11/04/2013

Booster Cavity WorkRefurbished (15Hz) Cavity Removed

Stats:Last refurbishment : 7. 4* wks<refurb.>last 3 cav. : 9.0 wks* Cones and tuners were available

Cour

tesy

: K. G

ollw

itzer

BRF 1,3,5,6,7,8,11,15,17