Page 1: Alireza Mohammadi-G-Visual CV

Engineering Executive

Vehicle Integration

Electric Vehicle Integration & Architecture

Vehicle Development

Program Management

Page 2: Alireza Mohammadi-G-Visual CV

2013-Present:

Senior Project Manager

Page 3: Alireza Mohammadi-G-Visual CV

2010-2013:

Senior Director, Vehicle Integration

Vehicle Quality/ Validation Manager

Page 4: Alireza Mohammadi-G-Visual CV

2003-2010:

Product Development Director/ Program Director

- Development Budget of €37M

- Sold in 37 countries

- Exterior & Interior Face lift of 206

- Complete new upper body

on existing platform with a

budget of €105M

Page 5: Alireza Mohammadi-G-Visual CV

2003-2010:

Product Development Director/ Program Director Vehicle

Page 6: Alireza Mohammadi-G-Visual CV

1999-2003:

Vehicle Engineering and Test Manager

Page 7: Alireza Mohammadi-G-Visual CV

1996-1999:

Vehicle Body (BIW) Design Engineer

Page 8: Alireza Mohammadi-G-Visual CV

Vehicle Target Setting, Validation and Sign off

Performance

& Driveability

P/T Performance Feel

0-60 Times

0-100 Times

¼ Mile times

Top Speed

Braking Distance

Driving Range

9.2

8.9

9.6

6.7

10

8.1

10.4

0 2 4 6 8 10 12

Chevrolet Volt

Honda Fit

Mini Cooper

Audi A3 (TFSI - AWD)

Nissan Leaf

Fod Focus (5-Door)

Toyota Prius

Acceleration (0-60 mph) [s]

100

113

122

130

90

121

97

0 20 40 60 80 100 120 140

Chevrolet Volt

Honda Fit

Mini Cooper

Audi A3

Nissan Leaf

Ford Focus

Toyota Prius

Top Speed [mph]

TARGET

TARGET

Product Positioning

Benchmarking

PALS (Product Attribute Leadership Strategy)

Accessibility /

Affordability

Aerodynamics /

Thermal

Design /

Styling

Driving Dynamics

Package / Ergonomics

Environment

Safety / Security

Durability / Reliability

Performance / Drivability /

Range / Charging

LeadershipAmong the

LeadersCompetitiveUncompetitive

NVH

(Noise, Vibration & Harshness)

Innovation / Ingenuity

Page 9: Alireza Mohammadi-G-Visual CV

Affordability & Serviceability

Aerodynamics / Thermal

Design / Styling

Driving Dynamics

Package / Ergonomics

Environment/ Range / Charging

Safety / Security

Durability / Reliability

Performance / Drivability

NVH (Noise, Vibration & Harshness)

Innovation / Ingenuity

Page 10: Alireza Mohammadi-G-Visual CV

Whole Vehicle Test and Prototype Plan (Hands On)

Page 11: Alireza Mohammadi-G-Visual CV
Page 13: Alireza Mohammadi-G-Visual CV
Page 14: Alireza Mohammadi-G-Visual CV
Page 15: Alireza Mohammadi-G-Visual CV
Page 16: Alireza Mohammadi-G-Visual CV

(UDDS)

(HWFET)

Page 17: Alireza Mohammadi-G-Visual CV

Key member of Product Planning Committee

Styling review

Led design reviews to ensure the design robustness and followed critical issues

Conducted DFMEA Process

Managed Product Validation

Product/ project signoff report and smooth transfer to life cycle production

Cooperation with suppliers for simultaneous engineering (DFM/ DFA)

Providing quality loops plan (pre- production stages)

Page 18: Alireza Mohammadi-G-Visual CV

Engineering contractors selection and contract agreement

RFQ preparation, review quotations, selection process, etc.

Monitoring progress, technical and commercial reviews, deliverables approval

Page 19: Alireza Mohammadi-G-Visual CV
Page 20: Alireza Mohammadi-G-Visual CV

Hands on supervision on:

Project scope definition & control

Projects timing plan establishment & Control

Project budget establishment & control

Project resource planning

Page 21: Alireza Mohammadi-G-Visual CV

Hands on supervision on:

WBS (Work Breakdown Structure) & Deliverables Management

Definition of Project Metrics

Risk Management

Open Issue Management

Page 22: Alireza Mohammadi-G-Visual CV

1

Implementation of Tests (CAE)

& Report Preparation

Start Phase Sign off Method

2

Target Achieved? Yes No

5

Root Cause Analysis

Yes No

12

Test Indicator Result is Amber

Risk will be defined

A

6

Design impacts?

7

Raising DMR

Followed in Change Control Process

•Establish, technical solution

•implementation plan

•identify required retest or CAE

8

Raising open issue (PIR)

Followed in JIRA

•Establish, technical solution

•implementation plan

•identify required retest

3

Test Indicator Result is Red Risk will be defined

9

Solution is feasible to be

implemented

(Time? Cost?)

4

Risk

High Low

10

Implement and validate the

solution

11

Target Relaxing

(Management approval)

Yes No

Approved

A

13

Find a more feasible solution or implement the existing

solution by management approval on time and cost

Not Approved

B

C

Page 23: Alireza Mohammadi-G-Visual CV