Top Banner
ignment (results by Jo van den Brand) eparing IP 8 lo arrived at IP 8 eparing UXA C3 stallation transfer lines for the cooling system xt steps Frans Mul 31 May 2006
7

Alignment (results by Jo van den Brand) Preparing IP 8 Velo arrived at IP 8 Preparing UXA C3 Installation transfer lines for the cooling system Next steps.

Dec 29, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Alignment (results by Jo van den Brand) Preparing IP 8 Velo arrived at IP 8 Preparing UXA C3 Installation transfer lines for the cooling system Next steps.

Alignment (results by Jo van den Brand)

Preparing IP 8

Velo arrived at IP 8

Preparing UXA C3

Installation transfer lines for the cooling system

Next steps

Frans Mul 31 May 2006

Page 2: Alignment (results by Jo van den Brand) Preparing IP 8 Velo arrived at IP 8 Preparing UXA C3 Installation transfer lines for the cooling system Next steps.

Drilling holes for th

e LV - boxes

Drilling holes for th

e LV - boxes

Drilling holes for the service platform

Drilling holes for the service platform

Preparing skates Preparing skates

Preparing IP 8

Preparing the false floor

Preparing the false floor

Frans Mul 31 May 2006

Page 3: Alignment (results by Jo van den Brand) Preparing IP 8 Velo arrived at IP 8 Preparing UXA C3 Installation transfer lines for the cooling system Next steps.

Velo arrived at IP 8

In the air

On the road

Frans Mul 31 May 2006

Page 4: Alignment (results by Jo van den Brand) Preparing IP 8 Velo arrived at IP 8 Preparing UXA C3 Installation transfer lines for the cooling system Next steps.

All pictures http://www.nikhef.nl/~fmul/velo/Velo_May 19, 2006, 3:25:56 PM/

Pushing the last meters Velo at IP8

Frans Mul 31 May 2006

Page 5: Alignment (results by Jo van den Brand) Preparing IP 8 Velo arrived at IP 8 Preparing UXA C3 Installation transfer lines for the cooling system Next steps.

Preparing UXA C3Luc, Piet and Jaap started May 29th cabling the racks.

Frans Mul 31 May 2006

Page 6: Alignment (results by Jo van den Brand) Preparing IP 8 Velo arrived at IP 8 Preparing UXA C3 Installation transfer lines for the cooling system Next steps.

On the corner

Installation transfer lines for the cooling system at IP8

Frans Mul 31 May 2006

Page 7: Alignment (results by Jo van den Brand) Preparing IP 8 Velo arrived at IP 8 Preparing UXA C3 Installation transfer lines for the cooling system Next steps.

Next steps:

Velo Alignment at IP8

Installation Velo vacuum system

Cabling at IP 8

Installation service platform

Velo overall test before installation exit window!