Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II PVSS II Detector Ethernet Database(s) OPC client DIM client 16 72 Detector ? High Voltage Low Voltage Environment monitor User interface PVSS II HV LV Muon-Trg Control room (ACR) [FSM?] ELMB (I/O device) Crate Control Efficiency system VME (wiener) Details? CR4- Z06 SY1527 E CR3 CAEN OPCserver PVSS II OPC client 2 UX-D Wiener 4 E CR3 Wiener OPCserver PVSS II OPC client ACC C 4 CR3 PCI-CAN Wiener OPCserver PVSS II OPC client 17 ACC CR3 PCI-CAN ELMB OPCserver PVSS II OPC client C ? ? CR3 SG2 CR5 SG2 Gas system PLC Gas E Detector PVSS II DIP [GWG] Gas Gas PVS S INFN TURIN LPC CLERMONT
5
Embed
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Alice
MTR DCS
F.Jouve 15 th DCS workshop CERN 13/03/2006
UX-A,B,D
Detector
PVSS II PVSS II
Detector
Ethernet
Database(s)
OPCclient
DIMclient
1672
Detector
?
High Voltage
Low Voltage
Environment monitor
User interface
PVSS II
HV LV
Muon-Trg
Co
ntr
ol
roo
m
(AC
R)
[FSM?]
ELMB(I/O device)
Crate Control
Efficiencysystem
VME(wiener)
Details?
CR4-Z06
SY1527
E
CR3
CAEN OPCserver
PVSS IIOPC client
2
UX-D
Wiener4
E
CR3
Wiener OPCserver
PVSS IIOPC client
ACC
C
4
CR3
PCI-CANWiener OPCserver
PVSS IIOPC client
17
ACC
CR3
PCI-CANELMB OPCserver
PVSS IIOPC client
C
?
?
CR3
SG2
CR5
SG2
Gas system
PLC
Gas
E
Detector
PVSS IIDIP
[GWG]
Gas
GasPVS
S
INFN TURIN
LPC CLERMONT
LV /VME crates DCS. (LPC CLERMONT)
F.Jouve 15 th DCS workshop CERN 13/03/2006
Status
Databases In progress…..The parameter table is defined(we are expecting the PS delivery asap to check specificationsFixed values are being tuned.
Hardware:LV proto Ok with canbus opc server.1 crate tested:( 1 x 3.5 V & 1x -2 V channels)VME proto crates ok (2 crates daisy chain tested)
We are impatiently waiting for our power supplies.
We intend to test them in our lab.
Obviously, we won’t have the detector there but we plan to simulatedifferent configurations in order to have a realistic working(consumption/load..and so on..)