Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Dec 26, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Alice Goh,Building & Construction Authority

Page 2: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Objectives1) To demonstrate that an existing building is able to achieve net

zero energy

2) To serve as a test-bed for integration of Green Building technologies (GBTs) in existing buildings

3) To be a hub for practitioners and students in the study of energy efficiency and green buildings

Page 3: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Project TeamOwner - Building &Construction Authority (BCA)Project Manager - Beca Carter Hollings & Ferner (S.E. Asia) Pte LtdArchitects - DP Architects Pte LtdM&E Engineer - Beca Carter Hollings & Ferner (S.E. Asia) Pte LtdC&S Engineer - Beca Carter Hollings & Ferner (S.E. Asia) Pte LtdQuantity Surveyor- Davis Langdon & SeahMain Contractor - ACP Construction Pte LtdPV integrator - Grenzone Pte Ltd

NUS Principal Investigators:Assoc. Prof Lee Siew Eang (Lead) - Total Building PerformanceAssoc. Prof Wong Nyuk Hien - Natural Ventilation & GreeneryAssoc. Prof Stephen Wittkopf - Photovoltaic System & Facade

Page 4: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Guiding PrinciplesStep 2 - Active Systems

Efficient Lighting•T5 Fluorescent lights•LED task lighting•State-of-the art lighting control systems

Efficient ACMV•Personalised Ventilation•Underfloor air distribution system•Single coil twin fans•Solar chimneys

Active Control• State-of-the-art building management system

Step 1 - Passive Systems

Efficient Envelope• Type of window glazing•Type of wall/facade

Minimise Solar Heat Gain• Roof garden & vertical greenery•Sunshades

Capitalize Daylighting•Mirror ducts•Light pipes•Light shelves

Page 5: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Innovative Solutions for FacadeBuilding Envelope

Passive Design - Elements with multiple functions

Page 6: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Photovoltaics on shading devices

Vertical greenery

Light Shelves

Innovative Solutions for FacadeBuilding Envelope

Passive Design – Overcoming the weather

Page 7: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Unusual Aspects and Aesthetic Values

1. Vertical Greenery System

Building Envelope

Page 8: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Unusual Aspects and Aesthetic Values2. PV Story Facade

Building Envelope

Page 9: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Innovative Solutions for RoofBuilding Envelope

Page 10: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Pioneering Use of Materials Solar Assisted Stack Ventilation

Roof Metal ventilation duct

Solar chimney

Metal vertical ventilation duct

Building Envelope

Page 11: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Pioneering Use of MaterialsMirror Duct

Inside Building

Page 12: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Experimental officePersonalised ventilation Light pipes Light shelves

Sensors, T5 lights, task lights

Displacement Ventilation

Inside Building

Page 13: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Innovation in Technology Single Coil Twin Fan

Potential Benefits

• Estimated 7 - 8% capital cost premium• Predicted overall energy savings of about 12%• Improved indoor air quality and comfort• Attractive payback period < 3 years

Inside Building

Page 14: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Well-being of PeopleInside Building

Page 15: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Before

ZEB@BCA Academy

Page 16: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

After

ZEB@BCA Academy

Page 17: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

ResultsZEB@BCA Academy

53% EnergySaving

Surplus Energy

Page 18: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

13,102 Visitors since Oct 200913,102 Visitors since Oct 2009

Page 19: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Accolades

Page 20: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.
Page 21: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Membership Strategic Level Project Level

Involvement in UNEP-SBCI

Board of DirectorsBoard of Directors

UNEPUNEPSecretariatSecretariat

Steering Steering CommitteeCommittee

Advocacy Advocacy CommitteeCommittee

MembersMembers Technical Advisory Technical Advisory CommitteesCommittees

WaterWaterEnergy / GHGEnergy / GHG MaterialsMaterials

BCA’s Executive Director

BCA’sDirector of Research

21

Page 22: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

Involvement in UNEP-SBCI

Regional Status Report Regional Status Report on SB Policies in SEAon SB Policies in SEA

Common Carbon Common Carbon Metric & Protocol Metric & Protocol

Pilot TestPilot Test

22ndnd

Regional Regional

Workshop Workshop

Phase 2 in Phase 2 in

early 2011 early 2011

Membership Strategic Level Project Level 22

Page 23: Alice Goh, Building & Construction Authority. Objectives 1)To demonstrate that an existing building is able to achieve net zero energy 2)To serve as a.

谢谢 谢谢 Thank youThank you

[email protected][email protected]

We shape a safe, high quality, sustainable and friendly built environment.