| Clark Construction Group – Chicago, LLC | 216 S Jefferson St., Ste. 502 | Chicago, Illinois 60661 | (312) 474-5500 | 1 Albion at Evanston 1500 Sherman Avenue, Evanston, Illinois, 60201 Construction Management Plan July 23, 2018 General Contractor: Clark Construction Group – Chicago, LLC. Evanston GC License # 09LICC-0053 Owner: Albion Residential Architect: Hartshorne Plunkard Architecture This Construction Management Plan has been prepared by Clark Construction Group - Chicago and outlines the construction procedures that will be used during the Albion Evanston Mix Use Building project located at 1500 Sherman Avenue in Evanston, Illinois.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
| Clark Construction Group – Chicago, LLC | 216 S Jefferson St., Ste. 502 | Chicago, Illinois 60661 | (312) 474-5500 | 1
Albion at Evanston
1500 Sherman Avenue, Evanston, Illinois, 60201
Construction Management Plan
July 23, 2018
General Contractor: Clark Construction Group – Chicago, LLC. Evanston GC License # 09LICC-0053
Owner: Albion Residential
Architect: Hartshorne Plunkard Architecture
This Construction Management Plan has been prepared by Clark Construction Group - Chicago
and outlines the construction procedures that will be used during the Albion Evanston Mix Use
Building project located at 1500 Sherman Avenue in Evanston, Illinois.
| Clark Construction Group – Chicago, LLC | 216 S Jefferson St., Ste. 502 | Chicago, Illinois 60661 | (312) 474-5500 | 2
Construction Management Plan Contents
Staging and Logistics Page 2
Project Schedule Page 3
Construction Work Hours Page 3
Contractor Parking Page 4
Delivery Routes and Staging Page 4
Hazardous Material Abatement Page 5
Vibration Monitoring and Surveys Page 5
Building/Foundation Survey Page 6
Settlement Monitoring Page 6
Work Site Communication with Neighborhood and Residences Page 7
Staging and Logistics
The attached Exhibits are the construction site logistics/staging plan that will be used during the
project. The project will primarily be completed in 3 major phases.
• Phase 1 - Existing Building Demolition, Caisson Installation, and Site Utilities.
TRENCH PATCHED BACKED WITH CONCRETE FLUSH WITH ASPHALT
Scale
Date
Drawn by
1" = 40'-0"
5/1
1/2
01
8 9
:02
:07
AM
D103
DEMOLITION OF SANITARY AND WATERCUTOFF
ALBION EVANSTON
02/23/2018
Author
CLOSE PARKING LANE AND UTILIZE FOR NORTHBOUND TRAFFICTWO-WAY TRAFFIC MAINTAINED DURING UTILITY WORK
EXHIBIT A1
TYPE 1 BARRICADESUTILITYDISCONNECT PIT TYPE 1 BARRICADES
Public Access toAlley Maintained
Sidewalk on West and East Side ofSherman to be Open ThroughoutThis Construction Phase
HOTEL LOADING ZONE
PAVEMENT IS OVERCUT 1'LARGER THAN HOLE BELOW
- PHASE 12-3 DAY DURATION
7/23/2018JRB
TRENCH PATCHED BACKED WITH CONCRETE FLUSH WITH ASPHALT
Scale
Date
Drawn by
1" = 40'-0"
5/1
1/2
01
8 9
:02
:07
AM
D103
DEMOLITION OF SANITARY AND WATERCUTOFF
ALBION EVANSTON
02/23/2018
Author
CLOSE PARKING LANE AND UTILIZE FOR NORTHBOUND TRAFFICTWO-WAY TRAFFIC MAINTAINED DURING UTILITY WORK
EXHIBIT A2
TYPE 1 BARRICADES UTILITYDISCONNECT PIT
TYPE 1 BARRICADES
Public Access toAlley Maintained
Sidewalk on West and East Side ofSherman to be Open ThroughoutThis Construction Phase
TEMPORARY HOTELLOADING ZONE
PAVEMENT IS OVERCUT 1'LARGER THAN HOLE BELOW
- PHASE 21-2 DAY DURATION
7/23/2018JRB
GATE 1
RE-ROUTE PEDESTRIAN TRAFFIC
ADVANCE WARNING SIGNAGEFOR THE SIDEWALK
ADVANCE WARNING SIGNAGEFOR THE SIDEWALK
ADVANCE WARNING SIGNAGEFOR THE SIDEWALK
SHERMAN AVE
LA
KE
ST
8'- FENCE
8'- FENCE
8'- FENCE
8'- FENCE
8'- FENCE
GR
OV
E S
T
Scale
Date
Drawn by
1" = 40'-0"
6/2
1/2
01
8 1
2:0
6:4
5 P
M
D101A
PHASE 1 FENCING LAYOUTALBION EVANSTON
02/23/2018
Author
7/23/2018JRB
EXHIBIT BPHASE 1 (DEMOLITION AND CAISSONS) 3 MONTHS
FLAGGER AT GATEGATE 1
Parking and Sidewalk AccessMaintained During Demolition& Caisson Phase on BothSides of Sherman
Public Access toAlley Maintained
22'-28' OPENING
STREET SWEEPINGAND DUST CONTROLTO BE PROVIDED ASNEEDED DURING DIRTOPERATIONS
CLARK PROJECT CONTACTINFORMATION SIGN
TO BEDEMOLISHED
TO BEDEMOLISHED
TO BEDEMOLISHED
TO BEDEMOLISHED
SILT FENCE, EROSION CONTROL,AND STORM SYSTEM INLETPROTECTION IS TO BE PROVIDEDPER APPROVED STORM WATERMANAGEMENT PLAN INCLUDED INPERMIT SET OF DRAWINGS.
STABLIZEDCONSTRUCTIONENTRANCE PER CIVILDRAWING DETAILS
PA
RKIN
G"
"NO
GU
Y
WIR
E
"ST
OP"
ME
TE
R
PA
RKIN
G
SP
RIN
KLE
R
AU
TO
FA
UC
ET
RA
CK
BIK
E
ELE
C
BO
X
ME
TE
R
&
ELE
C
ME
TE
R
ELE
C
CA
NOP
Y
FE
NC
E
2.5' IR
ON
RA
CK
BIK
E
FE
NC
E
POS
T
PA
RKIN
G
HA
NDIC
AP
RA
CK
BIK
E
PA
RKIN
G
HA
NDIC
AP
RE
GU
LA
TO
R
GAS
GAS
PIP
E
GAS
PIP
E
EN
TE
R"
"DO
NO
T
RA
CK
BIK
E
CO
LU
MN
BRIC
K
(CO
NN
EC
TE
D)
BO
LL
AR
DS
ST
EE
L
GU
TT
ER
S)
CO
NN
EC
TE
D
TO
PIP
E (N
OT
IRO
N
UN
DE
RD
RAIN
4" DRAIN
ST
AIR
S
ME
TA
L
CL
US
TE
R
WIR
E
1-8' M
AS
T
N-S
2-8'M
AS
T
E,W
UP
W/3-T
RA
NS
CL
US
TE
RS
3
WIR
E
1 WIR
E
&
CL
US
TE
R
WIR
E
3 WIRES
CL
US
TE
R
WIR
E CL
US
TE
R
WIR
E
W/TRANS UP
CL
US
TE
RS
& 2
WIR
E
2
WIR
ES
CL
US
TE
R
WIR
E
EN
TR
Y)
GA
TE (N
O
8' M
ET
AL
(LO
CK
ED)
FE
NC
E
8' M
ET
AL
DO
OR
ST
ON
E
BA
R FIR
EP
LA
CE
BRIC
K
RE
GU
LA
TO
R
GAS
BRIC
K
WA
LL N I=14
.86,6"IR
ON
S I=14
.56,6"IR
ON
SW I=19
.31,4
"CP
P
R=2
0.4
1
N I=16
.78,10
"IRO
N
R=19.4
2
LO
CK
ED
MW
RD
R=19.8
1
N,S I=12
.41,12
"CL
AY
R=2
0.15
N,S I=12.66,12"CLAY
W I=13.26,10"CLAY
R=20.16
E I=14
.11,10"IR
ON
R=18.9
6
S I=11.19
,12"C
LA
Y
E I=11.5
9,8"C
LA
Y
R=19.7
9
N I=15
.97,8"P
VC
R=19.0
7
LO
CK
ED
MW
RD
R=19.6
6
N,W I=3.8
8,12
"CL
AY
R=19.7
8
B/
ST
RU
CT
=10.4
2
T/
WA
TE
R=15.12
WA
TE
R
FIL
LE
D
NE I=16
.62,8"+/
-BR
OK
EN
RCP
R=2
0.0
2
SW I=14
.73,8"P
VC
SE I=16
.33,6"P
VC
R=19.9
3
T/
SIL
T=16.18
SIL
T
FIL
LE
D
R=19.3
8
T/
SIL
T=16.4
5
SIL
T
FIL
LE
D
R=19.2
0
E,W I=14
.27,10
"IRO
N
N I=14
.97,10
"IRO
N
SE I=15
.07,10
"CL
AY
R=19.9
7
B/
ST
RU
CT
=13.18
E
T/10
"IRO
N=16.4
8(P
LU
GG
ED)
R=19.2
8
T/
SIL
T=16.2
2
SIL
T
FIL
LE
D
NW
T/6"+/
-IRO
N=16.5
2R
=19.2
2
B/
ST
RU
CT
=10.6
9+/-
T/
SIL
T=15.7
9
SIL
T
FIL
LE
D
R=19.2
9
T/
PIP
E=14.7
0
R=2
0.10
T/
PIP
E=14.5
9
R=2
0.19
R=19.8
4
N,S I=13
.21,12
"IRO
N
E I=14
.21,10
"IRO
N
W I=14
.41,10
"IRO
N
R=2
0.2
1
E I=18
.39,4"IR
ON(2 PIP
ES)
R=2
0.4
9
N,S I=16
.04,10
"RCP
R=2
0.5
4
1' DIA
VE
RT
PIP
E
VISIB
LE
T/
SIL
T=17.9
0
SIL
T
FIL
LE
D
R=2
0.2
0
WA
TE
R
LE
VE
L=16.3
5E
T/10
"CL
AY=17.0
5
S I=16
.65,10
"CL
AY
R=19.8
5
E I=14
.84,10
"CL
AY
NW I=14
.89,10
"CL
AY
SW I=15
.14,10
"CL
AY
R=2
0.4
4
N,S I=15
.46,10
"RCP
R=2
0.8
1
WA
LL
BRIC
K
GA
TE
3' W
OO
D
GA
TE
3' W
OO
D
CL
US
TE
R
1 WIR
E
&
WIR
E
CL
US
TE
R
2
WIR
ES
&
WIR
E
8"P
VC
NW,S I=15
.33,
R=19.11
10"R
CP
N I=16
.38,
R=19.9
2
(TYP)
W/
GR
AT
E
TR
EE
GAS
ME
TE
R
ELE
C
&
WA
LL
BRIC
K
CO
NC
WA
LL
PA
RKIN
G"
"PE
RMIT
(TYP
OF 4)
"RE
SE
RV
ED
PA
RKIN
G"
(TYP
OF 5)
"PE
RMIT
PA
RKIN
G"
RE
GU
LA
TO
R
GAS
&
BO
X
ELE
C
ME
TE
R
METAL FREEZER
ME
TA
L F
RE
EZ
ER
WIR
E
CL
US
TE
R
3
WIR
ES
&
FR
AM
E
ON
E
ST
OR
Y
(WO
OD
FA
CE)
BUIL
DIN
G
BRIC
K
TW
O S
TO
RY
GA
RA
GE
PA
RKIN
G
TW
O S
TO
RY
BUIL
DIN
G
CO
NC
RE
TE
ST
OR
Y
TW
EL
VE
BUIL
DIN
G
CO
NC
RE
TE
ON
E
ST
OR
Y
ME
TE
R
PA
RKIN
G
ME
TE
R
PA
RKIN
G
ME
TE
R
PA
RKIN
G
ME
TE
R
PA
RKIN
G
ME
TE
R
PA
RKIN
G
ME
TE
R
PA
RKIN
G
ME
TE
R
PA
RKIN
G
GR
OU
ND
LE
VE
L)
AR
EA = 7,7
60 S
F (A
T
BUIL
DIN
G
CO
NC
RE
TE
BL
OC
K
ON
E
ST
OR
Y B
RIC
K
&
GR
OU
ND
LE
VE
L)
AR
EA = 9,7
30 S
F (A
T
ST
UC
CO
BUIL
DIN
GO
NE
ST
OR
Y B
RIC
K
&
GR
OU
ND
LE
VE
L)
AR
EA = 5,4
75 S
F (A
T
BUIL
DIN
G
ON
E
ST
OR
Y B
RIC
K
CO
NC
RE
TE
BL
OC
K
TW
O S
TO
RY
TW
O S
TO
RY B
RIC
K
(NO
LID)
8" V
AL
VE
CL
US
TE
R
WIR
E
2
WIR
ES
&
WA
LL
CO
NC
#1
BE
NC
HM
AR
K
SIT
E
WA
LL
CO
NC
W
W
APPROXIMATE LOCATION PER ATLAS12"WM
W
W
APPROXIMATE LOCATION PER ATLAS12"WM
W
W
APPROXIMATE LOCATION PER ATLAS12"WM
2
WIR
ES
2" P
E
PE
R
NIC
OR
AT
LAS
2" PE PER NICOR ATLAS 2" PE PER NICOR ATLAS
WW
U U
E
W
G
W
C
G
W
W
W
W
CC
B B
C
B
ILLINOIS
RE
ENI
GNE
LANOISSEFORP D
ES
NE
CI
L
BATOR
PIOTR
NO. 062-056183
ISSUED FORDATE
Project
North
CK. BY:
SCALE:
AREA FOR CITY APPROVAL STAMP
DN. BY:
PROJ. # 9536
EVANSTON, IL
1500 SHERMAN AVE.
AVENUE
1500 SHERMAN
1 05/01/2018 ISSUED FOR PERMIT
05/18/20182 FOUNDATION PERMIT
06/01/20183 ISSUED FOR DD
06/06/20184 MWRD PERMIT
06/11/20185 FOUNDATION PERMIT CORRECTIONS
07/06/20186 FOUNDATION/MWRD PERMIT CORRECTIONS
SHERMAN AVENUE
LA
KE S
TR
EE
T
N
0 10
SCALE 1" = 10'
20
TO REMAIN
METER
EXISTING
METER
EXISTING
RELOCATE
METER
EXISTING
RELOCATE
METER
EXISTING
RELOCATE
METER
EXISTING
RELOCATEMETER
EXISTING
RELOCATE
METER
EXISTING
RELOCATE
METER
EXISTING
RELOCATE
LEGEND
SEE NOTE 1 ON THIS SHEET.
SEWER SERVICE PER CITY (TYP).
APPROXIMATE LOCATION OF EXISTING
SEE NOTE 2 ON THIS SHEET.
EXISTING WATER SERVICE (TYP).
APPROXIMATE LOCATION OF
x
x
x x x x x
REMOVED AND REPLACED
STOP SIGN TO BE THE INSIDE EDGE OF THE GUTTER (TYP)
FULL DEPTH, A MINIMUM OF 2 FT FROM
SAWCUT AND REMOVE & REPLACE PAVEMENT
x
STAIRS
REMOVE
CAUTION
x
x
(TYP)
AND GATE
REMOVE FENCE
AND NOTIFY ENGINEER.
SIZES, TYPES, DISCHARGE LOCATIONS,
INCOMING AND OUTGOING PIPE
CONTRACTOR TO FIELD VERIFY ALL
ASSOCIATED WIRING TO REMAIN
EXISTING POWER POLE AND
(TYP)
FREEZER BUILDING TO REMAIN
EXISTING CURB ADJACENT TO
REMOVAL PLAN
C6
SP
RIN
KLE
R
AU
TO
FA
UC
ET
RA
CK
BIK
E
ELE
C
BO
X
ME
TE
R
&
ELE
C
ME
TE
R
ELE
C
CA
NOP
Y
FE
NC
E
2.5' IR
ON
RA
CK
BIK
E
FE
NC
E
POS
T
PA
RKIN
G
HA
NDIC
AP
RA
CK
BIK
E
RE
GU
LA
TO
R
GAS
GAS
PIP
E
CO
LU
MN
BRIC
K
(CO
NN
EC
TE
D)
BO
LL
AR
DS
ST
EE
L
GU
TT
ER
S)
CO
NN
EC
TE
D
TO
PIP
E (N
OT
IRO
N
UN
DE
RD
RAIN
4" DRAIN
ST
AIR
S
ME
TA
L
EN
TR
Y)
GA
TE (N
O
8' M
ET
AL
(LO
CK
ED)
FE
NC
E
8' M
ET
AL
DO
OR
ST
ON
E
BA
R FIR
EP
LA
CE
BRIC
K
RE
GU
LA
TO
R
GAS
BRIC
K
WA
LL
E I=18
.39,4"IR
ON(2 PIP
ES)
R=2
0.4
9
1' DIA
VE
RT
PIP
E
VISIB
LE
T/
SIL
T=17.9
0
SIL
T
FIL
LE
D
R=2
0.2
0
WA
TE
R
LE
VE
L=16.3
5E
T/10
"CL
AY=17.0
5
S I=16
.65,10
"CL
AY
R=19.8
5
E I=14
.84,10
"CL
AY
NW I=14
.89,10
"CL
AY
SW I=15
.14,10
"CL
AY
R=2
0.4
4
WA
LL
BRIC
K
GA
TE
3' W
OO
D
GA
TE
3' W
OO
D
(TYP)
W/
GR
AT
E
TR
EE
GAS
ME
TE
R
ELE
C
&
WA
LL
BRIC
K
CO
NC
WA
LL
PA
RKIN
G"
"PE
RMIT
(TYP
OF 4)
"RE
SE
RV
ED
PA
RKIN
G"
(TYP
OF 5)
"PE
RMIT
PA
RKIN
G"
RE
GU
LA
TO
R
GAS
FR
AM
E
ON
E
ST
OR
Y
(WO
OD
FA
CE)
GR
OU
ND
LE
VE
L)
AR
EA = 7,7
60 S
F (A
T
BUIL
DIN
G
CO
NC
RE
TE
BL
OC
K
ON
E
ST
OR
Y B
RIC
K
&
GR
OU
ND
LE
VE
L)
AR
EA = 9,7
30 S
F (A
T
ST
UC
CO
BUIL
DIN
GO
NE
ST
OR
Y B
RIC
K
&
GR
OU
ND
LE
VE
L)
AR
EA = 5,4
75 S
F (A
T
BUIL
DIN
G
ON
E
ST
OR
Y B
RIC
K
CO
NC
RE
TE
BL
OC
K
TW
O S
TO
RY
TW
O S
TO
RY B
RIC
K
(NO
LID)
8" V
AL
VE
WW B B
W
SIGN
EXISTING
RELOCATE
SIGN
EXISTING
RELOCATE
ME
TE
R
PA
RKIN
G
PA
RKIN
G"
"NO
"ST
OP"
ME
TE
R
PA
RKIN
G
ME
TE
R
PA
RKIN
G
ME
TE
R
PA
RKIN
G
ME
TE
R
PA
RKIN
G
TO REMAIN
LIGHT POLE
EXISTING
ME
TE
R
PA
RKIN
G
ITEM REMOVAL
ASPHALT SURFACE REMOVAL AND REPLACEMENT
BUILDING/SIDEWALK/PAVEMENT REMOVAL
UNDERGROUND UTILITY REMOVAL
CURB AND GUTTER TO BE REMOVED
PAVEMENT SAWCUT (FULL DEPTH)
GAS SERVICE PRIOR TO REMOVAL
CONTRACTOR TO VERIFY
G G
GAS SERVICE PRIOR TO REMOVAL
CONTRACTOR TO VERIFY
1
AND RELOCATED BY OTHERS
POWER POLE TO BE REMOVED
AND RELOCATED BY OTHERS
POWER POLE TO BE REMOVED
AND RELOCATED BY OTHERS
POWER POLE TO BE REMOVED
2
2
2
2
AND RELOCATED BY OTHERS
POWER POLE TO BE REMOVED
2
2
NOTES:
(SHEET E2000) BY BONUS ELECTRIC FOR LIGHT POLE LOCATIONS AND DETAILS. 4. LIGHT POLE LOCATIONS SHOWN FOR REFERENCE ONLY. SEE SITE LIGHTING PLAN
3. ITEMS SHOWN IN FULL-TONE TO BE REMOVED.
TO BE SCHEDULED WITH TIM BARTUS (847-448-8220). CONTRACTOR TO VERIFY LIVE CONNECTIONS WITH CITY. ALL DISCONNECTS2. EXISTING WATER SERVICES TO BE DISCONNECTED BY CONTRACTOR.
A MINIMUM OF 2 FEET OF NON-SHRINK GROUT PLUGS (PER MWRD).1B. EXISTING SEWER SERVICES TO BE DISCONNECTED ARE TO BE PLUGGED WITH
AND INSPECTED BY CITY PLUMBING INSPECTOR.1A. EXISTING SEWER SERVICES TO BE DISCONNECTED BY CONTRACTOR
POWER POLES TO BE REMOVED BY COMEDTREES TO BE REMOVEDEXISTING LIGHT POLES, SOME TO BE RELOCATED, OTHERS TO REMAIN IN PLACESTOP SIGN TO BE REMOVED AND REPLACED THROUGHOUT CONSTRUCTION
EXISTING PARKING METERS, SOME TO BE RELOCATED, OTHERS TO REMAIN IN PLACE
BIKE RACKS TO BE REMOVED
7/23/2018JRB
EXHIBIT C
GATE #3
GATE #2GATE #1
HEIGHT = 213'-0"RADIUS = 196'-0"
TOWER
TOWER
HOIST AND LOADING DOCK
CONCRETE TRUCK AND PUMP
FENCING AND BARRIERS
FENCING AND BARRIERS
FENCING
GATE
FENCING
FENCING
TRAILERS
TR
AIL
ER
S
ADVANCE WARNING SIGNAGEFOR THE SIDEWALK
ADVANCE WARNING SIGNAGEFOR THE SIDEWALK
Mason Laydown Area
PROTECT FIRE HYDRANT BY BARRIERS AND FENCING
GATE #4
TEMP POWER
RE-ROUTE PEDESTRIAN TRAFFIC
METRA LINES
LA
KE
ST
TW
O -
WA
Y T
RA
FF
IC
SHERMAN AVENUETWO-WAY TRAFFIC
PEDESTRIAN WALKWAY
Scale
Date
Drawn by
1" = 40'-0"
7/2
3/2
01
8 2
:37
:51
PM
101
PHASE 2 STRUCTURE AND ENCLOSURE(12 MONTHS)
ALBION EVANSTON
02/23/2018
JF
UTILIZE EXISTINGCROSSWALKS ANDCURB CUTS
PROVIDE SIGNAGE SOVISIBLE FROM STREET
CLARK PROJECT CONTACTINFORMATION SIGN
CLARK FIELD OFFICE
Public Access toAlley Maintained
20' From WhiteDrive-Line to Curb-Line.
10' Clear Drive AisleBetween Jersey Barrierand Lane
ConcreteJersey Barriers
8' Chain Link Fencewith Tennis Fabric OnTop of Jersey Barrier
ConstructionDrive Lane
New BuildingUnder Construction
PHASE 2 JERSEY BARRIER/SITEFENCE SECTION CUTRELATIONSHIP BETWEE EXISTINGCURBLINE/DRIVE-LANES AND NEWPROPERTY LINE.
1A
SECTION CUTDETAIL 1/A
UNION PACIFIC
CTA PURPLE
Sidewalk Closed- Use Crosswalk
CLARK PROJECT CONTACTINFORMATION SIGN
UTILIZE EXISTINGCROSSWALKS ANDCURB CUTS
Parking and Sidewalk ClosedWest Side of Sherman
Sidewalk on East Side of Sherman tobe Open Throughout Construction
CRANE LOADS ARE NOT TO BESWUNG OVER PRIVATE PROPERTY
ROLLING GATE22'-28' OPENING
SWING
10'-16'OPENING
Temp Site Lighting as Necessary
CANTILEVERED SWING& ROLLING GATE28'-36' OPENING
SidewalkClosed - UseCrosswalk
JRB7/23/18
ROLLING GATE20'-26' OPENING
ROLLING GATE20'-26' OPENING
1B
JERSEY BARRIERWALL TO PROTECTPEDESTRIANS
TEMPORARYPEDESTRIANPATHWAY
PROJECTSITE FENCE
SECTION CUTDETAIL 1/B
EXHIBIT D
jboisver
Callout
Ten (10') Foot Drivel-lane Maintained
jboisver
Snapshot
jboisver
Text Box
SECTION CUT DETAIL 1/A
jboisver
Callout
SIX (6') WIDE PATHWAY
jboisver
Checkmark
jboisver
Rectangle
jboisver
Checkmark
jboisver
Polygon
jboisver
Callout
Truck Delivery Buffer Zone
jboisver
Text Box
With Reflectors and Flashing Lights
jboisver
Checkmark
jboisver
Text Box
With Reflectors and Flashing Lights
jboisver
Snapshot
jboisver
Snapshot
jboisver
Snapshot
jboisver
Snapshot
jboisver
Length Measurement
11'-6"
jboisver
Length Measurement
64'-0"
grkaszni
Dimension
340'
grkaszni
Dimension
371'
grkaszni
Image
grkaszni
Rectangle
grkaszni
Callout
STOP SIGN TO BE MOUNTED AT END OF JERSEY INLINE WITH STOP BAR
grkaszni
Arrow
grkaszni
Rectangle
grkaszni
Text Box
10-5-18
TWELVE STORY CONCRETE BUILDINGN.I.C.
TWO STORY PARKING GARAGE
N.I.C.
TWO STORY BRICK BUILDING
N.I.C.
CTA PURPLE LINE
N.I.C.
SHERMAN AVENUE
TWO-WAY TRAFFIC
LA
KE
ST
RE
ET
TW
O-W
AY
TR
AF
FIC
GARAGE
ENTRY
RESIDENTIAL
ENTRY
RETAIL
ENTRY
RETAIL
ENTRY
LOADING
DOCK
MAIN ELECTRICAL ROOM
113
BIKE ROOM
115
WATER BOOSTER ROOM
122
FIRE PUMP ROOM
123
PARKING - 33 SPACES
A112
RETAIL A
120
TRASH ROOM
116
LOBBY
100
CLOSING ROOM
105
FIRE COMMAND
118
MAIL
102
COMED ROOM
A120
TELCO
112
RETAIL TRASH
119
RETAIL B
121
BIKE BATHROOM
109
PARK MAINTENANCE
125
PACKAGE
103
JANITOR
108
BATHROOM
107
EM. DIST.
110
MAINTENANCE OFFICE
117
WATER SERVICE ROOM
124
MANAGEMENT OFFICE
104
FILE/COPY ROOM
106
PODCAST ROOM
101
ELEV. VESTIBULE
100
STAIR 1
ST-1
STAIR 2
ST-2
ELEVATOR 2
EL-2
ELEVATOR 1
EL-1
ELEVATOR 3
EL-3
TOWER
PARKING AND SIDEWALK RE-OPENPARKING AND SIDEWALK RE-OPEN PARKING AND SIDEWALK RE-OPEN