Albany Turnpike over CSXT Railroad Superstructure Replacement Project East Chatham, New York
50

Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Aug 07, 2015

Download

Documents

dgonano
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 2: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Intersection

Adjacent property

Intersection

Alban

y Tu

rnpi

ke

Pohdorf Drive

NY

R295 Utilities

NORTH

Page 3: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Existing Conditions Existing Bridge: Albany Turnpike over CSXT Constructed in 1906 Town of East Chatham, New York Berlin Construction Co., Berlin, CT Double Warren Through Truss Approx. 115’ Span x 18 ‘ Roadway Width x 17’

Deep Single Lane Roadway Vertical Clearance = 21’- 7” Timber Deck / Asphalt Wearing Surface

Page 4: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

ASCE/APWA Summer Meeting 2014

Page 5: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Given Information CSXT Owner (Major Maintenance) Low Volume, Minor Collector (Rural) Original Design Load H10 (10T = 20,000 lbs.

GVW) NYSDOT Inspection (Critical Event) Rated for 20T prior to inspection Load Posted to 4T in 2012 Structurally Deficient, Sufficiency Rating 43.3 Numerous Deterioration “Red Flags” Emergency Contract:

Bergmann Associates, Albany Office

Page 6: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)
Page 7: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

First thoughts on the Project

Repair

Rehabilitate

Replace

• Original 20 Ton rating not possible in only repairing minor item(s).

• Repair current inspection “red flags” and also ones predicted for next inspection cycle (“yellow flags”).

• Restore Previous Load Posting (20 Ton) or Greater

• Most expensive option and one that the Owner had not budgeted.

Page 8: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Rehabilitation Scope Remove Asphalt Overlay, Timber Curb, and

Timber Deck Complete Steel Repairs to Trusses,

Floorbeams, and Bottom Lateral Bracing Remove and Replace Timber Stringers (as

needed) Install New Timber Deck & Curb, Pave Asphalt

Wear Crs. Re-open to Traffic Restrictions: No Construction Loads except Personnel; No

Temporary Reduction in Vertical Clearance; Temporary Shoring of Diagonals and Floorbeams required during Gusset Plate Repair/Replacement ; One Gusset Plate Repair at a Time

Page 9: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

“Sleeved” Bridge Support & Platform

WAY-CR47 (Indian Mill Bridge) Rehabilitationover the Sandusky RiverWyandot County, OhioConstruction: U.S. Bridge/

Page 10: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Moving Toward Bid A couple problems came to light about this

plan …

… IT WASN’T A LONG TERM SOLUTION SO NO ONE WAS REALLY HAPPY WITH

THE SITUATION.

… IT WAS COSTING MORE THAN EXPECTED.

Page 11: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Novel Idea

Repair

Rehabilitate

Replace

SuperstructureReplacement Bid Item

?

Page 12: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Bid Results Bidding (Rehabilitation Plans)

4 Contractors Invited to Submit Bid Mandatory Pre-Bid Site Visit Base Bid: Bridge Rehabilitation Alternate Bid: Superstructure Replacement (late

addition) Bid Results

Two Bids: $300k; $677k Only the Low Bidder Submitted an Alternate Bid:

$550k

Page 13: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

One last ‘i’ and one last ‘t’ What was it going to cost to

recondition the existing abutments? If a ‘GO’, would the Town of East

Chatham be willing to own the bridge?

So Bergmann prepared schematic TS&L type plans (30%).

They were.

Page 14: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Loads Reactions % of CDS

Concrete Deck Slab & SIP = 120 psfConcrete Deck Slab (Strip or Foam) =

106 psfAsphalt Filled Steel Floor = 89 psf

Exodermic Deck = 75 psfTimber Panels = 62 psf

DL= 216 kDL= 191 kDL= 142 kDL= 135 kDL= 112 k

100%93%80%78%72%

Floor Framing Self Wt. = 22 psf Truss Self Wt. = 306 plf

FWS = 25 psf

DL= 40 kDL= 70 kDL= 45 k

Final Total (Exodermic) DL= 72.6k

Loads Reactions % of CDS&SIP

Concrete Deck Slab & SIP = 120 psfConcrete Deck Slab (Strip or Foam) =

106 psfAsphalt Filled Steel Floor = 89 psf

Exodermic Deck = 75 psfTimber Panels = 62 psf

DL= 54.1 kDL= 47.8 kDL= 35.6 kDL= 33.8 kDL= 27.9 k

100%93%80%78%72%

Floor Framing Self Weight = 22 psf Truss Self Weight = 306 plf

FWS = 25 psf

DL= 9.9 kDL= 17.6 kDL= 11.3 k

Final Total (Exodermic) DL= 72.6 k

Dead Load Study

Acceptable - So we have a green light to go forward …

Page 15: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

New Scope of Work HL93 Live Load & NYSDOT Permit Vehicle Railing Service Level TL-2 One Lane, 14’-0” Clear Match or Improve Existing Sight Distance Outboard Sidewalk for Pedestrians Improve Existing Vertical Clearance Design Reconstructed Abutment Caps Concrete Approach Slabs

Page 16: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Proposed Section Single Lane Outboard Sidewalk Curbed Roadway Vandal Protective

Fencing

Page 17: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Proposed Site Plan Guardrail upgrades or extensions (red) Gabion retaining walls (maroon) Pavement transitions (green)

Page 18: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Proposed Profile Maintain SSD Improve rail

vertical clearance to 21’-9”

Recondition existing abutments

Page 19: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Schedule

PO issued USB

8/6/13Initial

Submittal

9/2513 Release for Fab

10/3/13

Shipped to Site

11/12/13

Begin Shipments to Site

11/18/13

Steel Erected

11/26/13

Concrete Slab Pour

01/14/14

Opened to Traffic

01/31/14

50 days 8 days 46 days

8 days 49 days 17 days

Total = 178 days

Page 20: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Steel Bridge Design Early Coordination of Final Loads & Reactions Different skews caused different truss spans Left =112’-5 ¾”; Right Truss = 114’-11 ¾” AASHTO DL & LL Loads, Wind Loads Strength, Service, Fatigue & Extreme Event Load

Comb. Top Chord/U-Frame Stability Check Gusset Plate Check (per 2009 FHWA Guidance

Report)

Page 21: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Steel Bridge Design Extreme Profile Change/Unusual Framing Exodermic Deck Layout, Slab Reinforcing &

Coordination Bearing Pad Design: Fixed & Sliding CDB

(Cotton Duck) Armored Expansion Joint: Wabo WA300

Compression Seal Vandal Protection Fencing Coordination NYSDOT Level 1 Load Rating (LRFR)

Page 22: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Exodermic® Deck DetailsCourtesy of the Bridge Grid Flooring Manufacturers Association (BGFMA) www.bgfma.org

For this project:

• WT4x5 Bearing Bars at 12” o.c.

• 1 ½” x 1/4” Distribution Bars at 6” o.c.

• 20 Ga. Haunch & Flat Pans

• Longitudinal: #3 bars at 6” o.c.

• Transverse: #5 bars at 8” o.c.

Page 23: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Steel Bridge Design

Looking South at the Forward Abutment

Page 24: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Steel Bridge Design

Looking South at the Forward Abutment

Page 25: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Steel Statistics Truss Girder Weight = 34,810 lbs. Heaviest Segment = 12,070 lbs. Floor Framing Weight = 40,443 lbs. Unique Floor Beams = 7; Unique Stringers =

18 Heaviest Section (Truss): W14x82 Heaviest Section (Framing): W18x50 Total Weight Steel & Hardware = 136,754 lbs. Total Fasteners: 5,462 Bolts Most Common Size: 7/8” dia. x 2 ½” (2,012

Bolts) Shipped in 4 Truck Loads

Page 26: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Superstructure Replacement Cost Mobilization $50.0k WZTC $5.0k Remove Existing Bridge $80.0k Furnish New Truss $450.0k Install New Truss $130.0k Earthwork $100.0k Concrete Work $210.0k Approach Work $175.0k Total $1,200.0k ($1.2M)

Page 27: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Project Participants Owner: CSXT Railroad, Jacksonville, FL

Ross White, Territory Manager Contractor: CP Ward, Inc. of Scottsville, NY

Steve Phillips, Vice President Design Consultant: Bergmann Associates,

Albany, NY Michael Cooper, P.E., Project Manager

Superstructure Design: Contech & U.S. Bridge Dave Morgan, P.E., Project Engineer

Exodermic Deck Design: LB Foster, Pittsburgh, PA Ed Coholich, Project Manager

Town of Chatham Mr. Jesse DeGroodt, Town Supervisor

Page 28: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)
Page 29: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 30: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 31: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 32: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 33: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 34: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 35: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 36: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 37: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 38: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 39: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 40: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Model to Reality

Looking West at the Left Truss Girder

Page 41: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 42: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 43: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 44: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 45: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 46: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 47: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

construction

Page 48: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)
Page 49: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

What made this project work? Collaborative Partnership Innovative Thinking

Non-binding alternate bid proposal Exodermic Deck Steel framing (both at the south abutment and

sidewalk). Deck installation and pour sequence

- Leaving us with a unique project that was successful for the Town and the Owner -

Questions?

Page 50: Albany Turnpike over CSXT Railroad Superstucture Replacement, East Chatham, NY (08-24-14)

Thank you