Francis Perez 16th ESLS RF Meeting, ALBA , 2012 ALBA, Status and Operation Francis Perez
31

ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Sep 05, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

ALBA, Status and Operation

Francis Perez

Page 2: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Introduction to ALBA

Status

Operation

Page 3: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Introduction to ALBA

Page 4: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

The ALBA TeamWe are today ~150

Page 5: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

and I got new responsibilities!

Responsibilities

associated with

ties!!

Page 6: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

� 3 GeV electron Storage Ring

� 31 beamlines (7 on day one)

� Funding is 50% Spanish – 50% Catalan Governments

� Designed for sub-micron stability and top-up operation

ALBA Synchrotron Light Source

Page 7: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

ALBA founded April 2003

ALBA 1st worker Dec 2003

Design work 2004-2005

Start main building works July 2006

Start Linac installation Feb 2008

Linac commissioning Sept - Oct 2008

Booster and SR installation Feb – Dec 2009

Booster commissioning Jan – Oct 2010

SR Installation Feb – Dec 2010

Storage Ring commissioning March – Nov 2011

Beamlines commissioning Oct 2011 – Dec 2012

Start of Users Operation May 2012

ALBA History

Page 8: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Workshop

Electricity

Cooling - HVAC

Offices

Parking

Warehouse

Main Building

Page 9: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

ALBA Accelerators

LINAC100 Mev

BOOSTER100 MeV – 3 GeV

STORAGE RING3 GeV

Page 10: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

SR and BOOSTER sharing the tunnel

BoosterSR

In vacuum undulatorRF cavitiesBending

Page 11: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Storage Ring: Main Parameters

Electron beam energy 3.0 GeV

Storage Ring Circumference 268.8 m

Number of cells 16

Symmetry 4

Straight section lengths 4 x 8.0 m (3 ID’s+Inj)

12 x 4.4 m (12 ID’s)

8 x 2.6 m (2 ID’s+RF+Diagn)

Beam current 400 mA

Emittance 4 nm.rad

Lifetime > 10 h

Page 12: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Phase 1:

7 Beamlines under commissioning

6 ID’s and 1 bending magnet port

In addition, 2 bending magnet ports for Electron Beam Diagnostic

Phase 2:

8 proposal have been evaluated

2 new beamlines are approved but pending financial budget

In total:

Capability for 17 ID beamlines

And 14 bending magnet beamlines

ALBA BEAMLINES

Page 13: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Bending: e- Diagnostics

SCW30

EXAFS

Bending

Microscopy

IVU21

Macromolecular CristalographyIVU21

Non Cristaline Diffraction

W65

XAS

EU62

Photoemission

spectroscopies

EU71

Polarization dependent

spectroscopiesBending: e- Diagnostics

ALBA BEAMLINES

Page 14: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Status

Page 15: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Multibunch mode

4 nC at linac exit

Main linac parameters:

� All parameters within specs

� Operation modes: single bunch & multibunchFew bunches mode

0.25 nC/bunch at linac exit

εεεεx (norm.) ≈ 9 mm·mrad∆∆∆∆E/E = 0.16% (rms)

Parameters Specifications Working

E MeV 100-130 110

∆E/E rms < 0.50 0.16

Norm. εx,y mm·mrad < 30 < 15

LINAC

Page 16: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Main BO parameters:

� C = 249.6 m, shares tunnel with SR

� E = 110 MeV to 3.0 GeV

� εx ≈ 10 nm·mrad

� Repetition rate: 1 Hz for comm.

3.125 Hz for operation

� Good agreement with the model

0 50 100 150 200 2500

0.05

0.1

0.15

0.2

0.25

0.3

0.35

0.4

0.45

BPM position, s [m]

horiz

onta

l dis

pers

ion

func

tion,

ηx [m

]

modelmeasured

3 GeV200 MeV

BOOSTER

Page 17: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

STORAGE RING

Nominal Achieved

Energy 3 GeV 3 GeV

Max. Current 400 mA 200 mA

Tunes 18.18, 8.37 18.15, 8.37

Emittance 4.3 nm·rad 4.4 ± 0.4 nm·rad

Energy spread 1.05·10-3 1.00·10-3

Coupling < 1 % 0.5 %

Lifetime @ 100 mA >10 h 10 h

Ah accumulated >100

Page 18: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

INSERTION DEVICES

13.07.2012

Phase I beamlines: 6 x IDs All IDs fully operational

1 x Bending

� Spectral range: from UV (80 eV) to hard x-rays (50 keV)

� High brilliance: 1020 at 2 keV

Page 19: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

BBA: Beam based alignment.

→ align BPM to center of quad

Raw orbit without correctors after BBA

Horizontal orbit < 3mm

Vertical orbit < 2 mm

Good alignment

CLOSED ORBIT

Page 20: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

SOFB (Slow Orbit FeedBack)

� Running every 3 s

� With RF frequency included on SOFB

RMS-Values:

σx = 0.5 µm

σy = 0.2 μm

Beam Stability over 24 h

-0.005

-0.004

-0.003

-0.002

-0.001

0.000

0.001

0.002

0.003

0.004

0.005

0 4 8 12 16 20 24

Time [h]

BP

M [

mm

]

0

25

50

75

100

125

Cu

rrent [m

A]

BPMx [8,2] BPMy [8,2] Current

ORBIT STABILITY

Page 21: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Long term drift @ MSPD

Vertical plane

Projection

eBPMs

Front End

E XBPM 90 umChange of RF freq since Feb 2012

PHOTON BEAM STABILITY

Page 22: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

“BUILDING” STABILITY

Change in RF frequency

~ 3 kHz

Change in Circumference

~ 2 mm

Page 23: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Operation

Page 24: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

TRANSITION

End 2011: Transition to Operation

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

oc

tob

er

no

ve

mb

er

de

ce

mb

er

Month 2011

ho

urs

of

op

era

tia

on

BLs

injections

down time

SR comm.

Page 25: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

4300 h of operation

3200 h for Beamlines

1100 h for accelerators

development

OPERATION 2012

� Running 3 shifts/day

� Runs of 24 days on average

� Monday: Accelerators start-up

� Tuesday 07h00 – Monday 07h00 Beam for users

� 2 long shut downs, 5 short (1 w) shut downs

Page 26: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

7th May 2012: First users

Page 27: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Statistics Jan-Sept 2012

� Beamline operation:

� 2073 planned

� 1950 delivered

� 94 % beam availability:

OPERATION 2012

Hours for BLs: Planed vs. Delivered

0

100

200

300

400

500

RU

N_

01

RU

N_

02

RU

N_

03

RU

N_

04

RU

N_

05

RU

N_

06

RU

N_

07

RU

N_

08

RU

N_

09

Run #

Ho

urs

[h

]

Planned

Delivered

Hours for BLs: % Delivered vs Planned

75%

80%

85%

90%

95%

100%

RU

N_

01

RU

N_

02

RU

N_

03

RU

N_

04

RU

N_

05

RU

N_

06

RU

N_

07

RU

N_

08

RU

N_

09

Run #

Ho

urs

[h

]

Page 28: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

OPERATION 2012

BEAM FOR BEAMLINES:

By Number of Failures

BL

3%CT

5%

DI

1%

EPS

2%

ID

3%

INF

2%

LI

1%

MML

1%

OE

3%

OI

2%OT

7%

PM

2%

PS

10%

PSS

3%

RF

53%

VC

1,0%

WI

1,0%

BL

CT

DI

EPS

ID

INF

LI

MML

OE

OI

OT

PM

PS

PSS

RF

VC

WI

Page 29: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

OPERATION 2012

BEAM FOR BEAMLINES:

By Downtime

BL

4%CT

3%

DI

1%

EPS

2%

ID

1%

INF

4%

LI

2%

MML

1%

OE

1%

OI

1%

OT

12%

PM

11%

PS

27%

PSS

3%

RF

27%

VC

0,4%

WI

0,4% BL

CT

DI

EPS

ID

INF

LI

MML

OE

OI

OT

PM

PS

PSS

RF

VC

WI

Page 30: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

SUMMARY

� Main specifications for ALBA have been reached

� ALBA is already open to users

� 2013 will have:

� 3600 hours for BLs (2800 for users)

� 1400 hours for Accelerators

� Future work:

� FOFB

� Top-up

� Fast Feedback system

� Increase operation current

Page 31: ALBA, Status and Operation · 2012. 10. 15. · Linaccommissioning Sept -Oct 2008 Booster and SR installation Feb –Dec 2009 Booster commissioning Jan –Oct 2010 SR Installation

Francis Perez16th ESLS RF Meeting, ALBA , 2012

Thank you